Honeywell Marine Lighting SG 60 User Manual

Airport Systems  
Installation and Operation Guide  
for  
High Intensity Obstruction  
Lighting System  
Model SG-60  
Manual Number EPM-00000019-001  
Honeywell Airport Systems  
2162 Union Place  
Simi Valley, CA 93065  
Phone (805) 581-5591  
Fax (805) 581-5032  
Copyright 2002 Honeywell Inc.  
All Rights Reserved  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
DISCLAIMERS  
This manual could contain technical inaccuracies or typographical errors. Honeywell  
reserves the right to revise this manual from time to time of the contents thereof without  
obligation of Honeywell to notify any person of such revision or change. Details and  
values given in this manual are average values and have been compiled with care.  
They are not binding, however, and Honeywell disclaims any liability for damages or  
detriments suffered as a result of reliance on the information given herein or the use of  
product, processes or equipment to which this manual refers. No warranty is made that  
the use of the information or of the products processes or equipment to which this  
manual refers will not infringe any third party’s patents or rights. The information given  
does not release the buyers from making their own experiments and tests.  
EPM-00000019-001  
ii  
Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
TABLE OF CONTENTS  
SAFETY INFORMATION ............................................................................................... V  
SECTION 1. GENERAL INFORMATION .....................................................................1-1  
1.1 SCOPE ......................................................................................................................................1-1  
1.2 GENERAL DESCRIPTION ..............................................................................................................1-1  
1.2.1 Model SGC-60 Master Controller.....................................................................................1-1  
1.2.2 Model SGF-60 Flashhead................................................................................................1-1  
1.2.3 Ambient Light Sensor (P/N 12H00107-001).......................................................................1-1  
1.3 SAFETY PRECAUTIONS................................................................................................................1-4  
1.4 SPECIFICATIONS.........................................................................................................................1-6  
SECTION 2. INSTALLATION & POWER UP...............................................................2-1  
2.1 UNPACKING ...............................................................................................................................2-1  
2.2 SYSTEM CONFIGURATION..............................................................................................................2-1  
2.2.1 Master Controller Configuration .......................................................................................2-1  
2.2.2 Flashhead Configuration..................................................................................................2-3  
2.3 INSTALLATION ............................................................................................................................2-6  
2.3.1 SGC-60 Master Controller...............................................................................................2-6  
2.3.2 SGF-60 Flashhead...........................................................................................................2-6  
2.3.3 Ambient Light Sensor (Photocell).....................................................................................2-7  
2.3.4 Cables and Junction Boxes..............................................................................................2-8  
2.4 INSTALLATION WIRING ..............................................................................................................2-11  
2.4.1 Master Controller to Photocell Wiring.............................................................................2-12  
2.4.2 Master Controller Data/Communications Wiring.............................................................2-12  
2.4.3 Master Controller Power Wiring .....................................................................................2-12  
2.4.4 Master Controller Wiring For Dual Systems ...................................................................2-13  
2.4.5 Flashhead Wiring...........................................................................................................2-14  
2.4.6 Conduit and Tower Wiring Detail ...................................................................................2-14  
2.4.7 Junction Box Details ......................................................................................................2-18  
2.5 FINAL INSTALLATION CHECK ......................................................................................................2-27  
2.5.1 Preliminary ....................................................................................................................2-27  
2.5.2 Verify Correct Wiring in Master Controller......................................................................2-27  
2.5.3 Verifying Photocell Wiring..............................................................................................2-27  
2.5.4 Verify Proper Tower Wiring for Data/Control Cable........................................................2-27  
2.6 POWER UP AND SYSTEM TESTS.................................................................................................2-28  
2.6.1 Master Controller Status Indicators ................................................................................2-28  
2.6.2 Flashhead Status Indicators...........................................................................................2-29  
2.6.3 System Power Up..........................................................................................................2-29  
2.6.4 Verify Local Mode Operation..........................................................................................2-30  
2.6.5 Verify Photocell Operation Connected to Controller .......................................................2-33  
2.6.6 Verify Photocell Operation Not Connected to Controller.................................................2-33  
SECTION 3. PRINCIPLES OF OPERATION ...............................................................3-1  
3.1 OVERALL DESCRIPTION...............................................................................................................3-1  
3.2 SGF-60 FLASHHEAD ..................................................................................................................3-1  
3.2.1 SGF-60 Motherboard.......................................................................................................3-3  
3.2.2 SGF-60 Digital Board.......................................................................................................3-3  
3.2.3 SGF-60 Trigger/High-Voltage Board ................................................................................3-6  
3.3 SGC-60 MASTER CONTROLLER ..................................................................................................3-8  
3.3.1 Power Supply...................................................................................................................3-8  
3.3.2 Flash Requests and Flashhead Status .............................................................................3-8  
3.3.3 System Mode Selection ...................................................................................................3-9  
EPM-00000019-001  
iii  
Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
3.3.4 Communications Circuitry..............................................................................................3-10  
SECTION 4. TROUBLESHOOTING ............................................................................4-1  
SECTION 5. MAINTENANCE ......................................................................................5-1  
5.1 SGC-60 MASTER CONTROLLER ..................................................................................................5-1  
Transformer Replacement............................................................................................................5-1  
5.2 SGF-60 FLASHHEAD ..................................................................................................................5-2  
5.2.1 Flashtube Replacement...................................................................................................5-2  
5.3 AMBIENT LIGHT SENSOR (PHOTOCELL).........................................................................................5-3  
SECTION 6. REPLACEMENT PARTS ........................................................................6-1  
SECTION 7. ANTENNA OBSTRUCTION LIGHT (AOL) .............................................7-1  
TABLE OF FIGURES  
Figure 1-1: Model SGC-60 Master Controller...............................................................1-2  
Figure 1-2: Model SGF-60 Flashhead..........................................................................1-3  
Figure 2-1: Flashtube Installation.................................................................................2-6  
Figure 2-2: Master Controller Mounting Dimensions....................................................2-9  
Figure 2-3: Flashhead Outline and Mounting Dimensions............................................2-10  
Figure 2-4: Typical Wiring Installation..........................................................................2-11  
Figure 2-5: Flex Conduit Typical Installation Layout..................................................2-15  
Figure 2-6: Junction Box Wiring Details.....................................................................2-19  
Figure 2-7: Flex Conduit Installation Detail................................................................2-20  
Figure 2-8: WC000001 Cable Overview ....................................................................2-21  
Figure 2-9: Flashhead Cable.......................................................................................2-24  
Figure 2-10: Master Controller Circuit Board .............................................................2-25  
Figure 2-11: Flashhead Digital Control Board............................................................2-26  
Figure 3-1: Master Controller Board Schematic.........................................................3-11  
Figure 3-2: SGF-60 Flashhead System Schematic....................................................3-12  
Figure 3-3: SGF-60 Digital Board Schematic.............................................................3-13  
Figure 3-4: SGF-60 Trigger/High-Voltage Board Schematic......................................3-14  
Figure 4-1: General Troubleshooting – All Flashheads Stuck in Day Mode ................4-3  
Figure 4-2: General Troubleshooting – Flashhead Does Not Flash.............................4-4  
Figure 4-3: General Troubleshooting – Flashhead Stuck in Day Mode .......................4-5  
Figure 4-4: Dual System-Specific Troubleshooting......................................................4-6  
Figure 4-5: Catenary System-Specific Troubleshooting Chart.....................................4-7  
Figure 5-1: SGC-60 Replacement Transformer ...........................................................5-1  
Figure 5-2: Flashtube Installation.................................................................................5-3  
Figure 7-1: SG-60 AOL Flashhead Mounting Dimensions...........................................7-2  
Figure 7-2: SG-60 AOL Power Supply Mounting Dimensions......................................7-3  
Figure 7-3: SG-60 AOL Wiring Installation...................................................................7-4  
Figure 7-4: SG-60 AOL Flashhead Component Locations...........................................7-5  
Figure 7-5: SG-60 AOL Power Supply Component Locations......................................7-6  
Figure 7-6: SG-60 AOL Schematic...............................................................................7-7  
EPM-00000019-001  
iv  
Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
SAFETY INFORMATION  
This section contains general safety instructions for using your Honeywell equipment. Task  
and equipment-specific Warnings are included in other sections of this manual where  
appropriate. Read all Warnings and follow all instructions carefully. Failure to do so may  
result in personal injury, death, or property damage. To use this equipment safely, refer to  
the following:  
1. Refer to the FAA Advisory Circular AC 150/5340-26, Maintenance of Airport Visual  
Aids Facilities, for instructions on safety precautions.  
2. Observe all safety regulations. To avoid injuries, always remove power prior to making  
any wire connections and/or touching any parts. Refer to FAA Advisory Circular AC  
150/5340-26.  
3. Read and become familiar with the general safety instructions provided in this section  
of the manual before installing, operating, maintaining, or repairing this equipment.  
4. Read and carefully follow the instructions given throughout this manual before  
performing specific tasks and working with specific equipment.  
5. Store this manual within easy reach of personnel installing, operating, maintaining, or  
repairing this equipment.  
6. Follow all applicable safety procedures required by your company, industry standards,  
and government or other regulatory agencies.  
7. Obtain and read Material Safety Data Sheets (MSDS) for all materials used.  
SAFETY AND WORKMANSHIP ALERTS  
This manual uses two types of markings when giving instructions requiring special  
attention. The markings will be followed by indented text:  
WARNING!  
The WARNING sign in this manual denotes a hazard. The WARNING  
calls attention to a procedure or practice which, if not correctly  
performed or adhered to, could result in property damage, injury or  
death. Do not proceed beyond a WARNING sign until the indicated  
conditions are fully understood and met.  
.
CAUTION  
Failure to obey the instructions following a CAUTION marking may  
result in equipment damage.  
EPM-00000019-001  
v
Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
QUALIFIED PERSONNEL  
The term “qualified personnelis defined here as individuals who thoroughly  
understand the equipment and its safe operation, maintenance, and repair. Qualified  
personnel are physically capable of performing the required tasks, familiar with all  
relevant safety rules and regulations and have been trained to safely install, operate,  
maintain, and repair the equipment. It is the responsibility of the company operating  
this equipment to see that its personnel meet these requirements.  
INTERLOCKS  
This equipment contains interlocks for your protection. To ensure safety, always  
remove power from the equipment prior to opening access panels or doors if possible.  
Do not depend on the interlocks or door switches when working with the equipment.  
Do not short-circuit or tamper with any access gate, door or other safety interlock  
switch. Discharge capacitors with an approved insulated grounding rod prior to  
touching any part. When it is absolutely mandatory that an interlock be bypassed for  
the purpose of tracing or correcting a malfunction, authorized maintenance personnel  
may perform the bypass for the specific test to be made. Immediately after completing  
the test, restore the interlock to working condition.  
WARNING!  
INTENDED USE  
HONEYWELL IS NOT RESPONSIBLE FOR INJURIES OR DAMAGES  
RESULTING FROM NONSTANDARD, UNINTENDED APPLICATIONS OF  
ITS EQUIPMENT. THIS EQUIPMENT IS DESIGNED AND INTENDED  
ONLY FOR THE PURPOSE DESCRIBED IN THIS MANUAL. USES NOT  
DESCRIBED IN THIS MANUAL ARE CONSIDERED UNINTENDED USES  
AND MAY RESULT IN SERIOUS PERSONAL INJURY, DEATH OR  
PROPERTY DAMAGE. UNINTENDED USES MAY RESULT FROM  
TAKING ANY OF THE ACTIONS LISTED BELOW.  
1. Making changes to the equipment that have not been recommended  
or described in this manual, or using parts that are not genuine  
Honeywell replacement parts.  
2. Failing to make sure that auxiliary equipment complies with approval  
agency requirements, local codes, and all applicable safety  
standards.  
3. Using materials or auxiliary equipment that are inappropriate or  
incompatible with your Honeywell equipment.  
4. Allowing unqualified personnel to perform any task.  
EPM-00000019-001  
vi  
Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
WARNING!  
KEEP AWAY FROM LIVE CIRCUITS. OPERATION AND MAINTENANCE  
PERSONNEL MUST OBSERVE ALL SAFETY REGULATIONS AT ALL  
TIMES.  
DO NOT CHANGE PLUG-IN COMPONENTS OR MAKE  
ADJUSTMENTS INSIDE EQUIPMENT WITH THE HIGH VOLTAGE  
SUPPLY ON. UNDER CERTAIN CONDITIONS, THERE IS A POTENTIAL  
FOR SERIOUS INJURY FROM CIRCUITS WITH POWER CONTROLS IN  
THE OFF POSITION. THIS IS DUE TO CHARGES RETAINED BY THE  
CAPACITORS. TO AVOID SERIOUS INJURY, ALWAYS DISCONNECT  
POWER, THEN DISCHARGE CAPACITORS BY USING AN APPROVED  
GROUNDING ROD PRIOR TO TOUCHING ANY PART.  
RESUSCITATION. MAINTENANCE PERSONNEL SHOULD BE TRAINED  
IN CARDIOPULMONARY RESUSCITATION (CPR).  
CAUTION  
This equipment contains static sensitive semiconductor devices and  
integrated circuits that may be damaged by Electro-Static Discharge  
(ESD). Take the necessary precautions before attempting service.  
Any replacement circuit boards should be kept in metallized anti-static  
bags until immediately before installation. Ground yourself (touch the  
outside of a grounded metal enclosure) before removing circuit boards  
from their protective bags. Avoid touching components when handling  
the boards.  
EPM-00000019-001  
vii  
Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
SECTION 1. GENERAL INFORMATION  
1.1  
Scope  
This manual provides information about the installation, operation, and maintenance of  
the StrobeGuardâ , Model SG-60, High Intensity Obstruction Lighting System  
manufactured by Honeywell.  
1.2  
General Description  
The StrobeGuardâ system is a high intensity flashing white obstruction lighting system  
with a xenon flashtube as the light source. It designed for use as a high intensity  
aviation obstruction warning system. The system is designed and manufactured to  
comply with Federal Aviation Administration Advisory Circular 150/5345-43E. The  
StrobeGuardâ system can support up to 24 Flashheads controlled by a single  
controller at distances up to 2500 feet. The Flashheads are FAA light type L-856 or  
L-857.  
System components are shown in Figure 1-1 on Page 1-2, and Figure 1-2 on Page 1-3.  
The system consists of the following units:  
·
·
·
Model SGC-60 Master Controller  
Model SGF-60 Flashhead  
Ambient Light Sensor  
1.2.1 Model SGC-60 Master Controller  
The Master Controller is a microprocessor-based system that controls the flash interval  
and timing, flash intensity, and monitors the complete StrobeGuardâ system. The  
controller is designed with LED status indicators and relays for remote alarming.  
1.2.2 Model SGF-60 Flashhead  
The Flashhead is designed as a capacitor discharge xenon flashtube unit. The  
Flashhead consists of the following major components:  
·
·
·
·
·
Xenon flashtube  
Reflector  
High voltage trigger transformer  
Power supply (including high voltage)  
Control circuits  
1.2.3 Ambient Light Sensor (P/N 12H00107-001)  
The Ambient Light Sensor (photocell) is used to provide input to the controller. With  
this input, the controller adjusts the operation of the system between day, twilight, and  
night.  
SG-60 High Intensity Strobe System  
1-1  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
Figure 1-1: Model SGC-60 Master Controller  
SG-60 High Intensity Strobe System  
1-2  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
Figure 1-2: Model SGF-60 Flashhead  
SG-60 High Intensity Strobe System  
1-3  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
1.3  
Safety Precautions  
The following general safety precautions must be observed during all phases of operation,  
service, and repair of this equipment. Failure to comply with these precautions or with  
specific warnings elsewhere in this manual violates safety standards of design,  
manufacture, and intended use of this equipment. Honeywell assumes no liability for the  
customer’s failure to comply with these requirements, as listed below.  
1. Any interruption of the protective grounding conductor (inside or  
outside the instrument) or disconnecting the protective earth ground  
terminal is likely to make this equipment dangerous. Intentional  
interruption is prohibited.  
2. Whenever it is likely that the ground protection has been impaired, the  
equipment must be made inoperative by removing AC line power, and  
then shall be secured against any unintended operation.  
3. Ensure that only fuses with the required rated current and of the  
specified type (normal blow, time delay, etc.) are used for replacement.  
The use of repaired fuses and the short-circuiting of fuseholders must  
be avoided.  
4. Electrical energy available at many points may result in personal injury  
or death if touched. Any adjustment, maintenance, and repair of the  
opened equipment while power is applied shall be avoided as much as  
possible, however some maintenance described in this manual is  
performed with power supplied to the equipment while protective  
covers are removed. When repair with power applied is unavoidable,  
maintenance shall be carried out only by a skilled person who is aware  
of the hazard involved. Do not attempt internal service or adjustment  
unless another person, capable of rendering first aid and resuscitation,  
is present.  
5. Do not install substitute parts or perform any unauthorized modification  
to the equipment.  
6. Capacitors inside the equipment may still be charged after the  
equipment has been disconnected from its power source, even though  
the equipment was designed to drain charge from the capacitors when  
power is removed. Do not put hands or tools in the Flashhead until  
the High Voltage Indicator neon lamp DS1 on the High Voltage &  
Trigger board is extinguished. (Refer to Figure 1-2, Page 1-3, for  
the location of High Voltage Indicator DS1 - do not confuse the High  
Voltage Indicator DS1, with the PWR ON lamp DS1.) Note that it is  
possible for the High Voltage Indicator DS1 to be lit even when the  
PWR ON lamp DS1 is off. If this happens, the energy storage  
capacitors C1 - C3 must be discharged before performing  
maintenance.  
SG-60 High Intensity Strobe System  
1-4  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
WARNING!  
This system uses lethal voltages in the Flashhead. Unless absolutely  
necessary, do not attempt to service or adjust the equipment with AC  
line power applied.  
Safety interlock switches are provided in the Flashhead enclosure to  
interrupt main AC power to the power supply. These interlock switches  
are activated when the Flashhead door is opened in a conventional  
manner. No interlock is provided when other means of access are used.  
Never tamper with (remove, short circuit) the interlocks in any way.  
AC LINE VOLTAGE IS STILL PRESENT WHEN INTERLOCKS ARE  
ACTIVATED. DISCONNECT POWER AT THE MAIN AC CIRCUIT  
BREAKERS BEFORE INSPECTING OR SERVICING, UNLESS  
ABSOLUTELY NECESSARY TO PERFORM MAINTENANCE WITH  
POWER ON.  
WARNING!  
Flashtubes in this lighting system produce brilliant flashes of light  
containing some ultraviolet radiation that can cause temporary or  
permanent eye damage.  
DO NOT LOOK DIRECTLY AT THE FLASHHEAD WHILE IT IS IN  
OPERATION.  
SG-60 High Intensity Strobe System  
1-5  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
1.4  
Specifications  
Light Output:  
Day Intensity..............................................270,000 ±25% effective candelas, single flash  
Twilight Intensity..........................................20,000 ±25% effective candelas, single flash  
Night Intensity......................................... 2,000 ±25% effective candelas, burst of flashes  
Beam Pattern...............................................................120º horizontally, 3º min. vertically  
max. intensity of 3% of peak at -10º  
Flash Rate: Day......................................................................... 40 fpm - single white flash  
Twilight.................................................................. 40 fpm - single white flash  
Night................................................................40 fpm - white burst of flashes  
Master/Slave Operation ........ Up to 24 slave SGF-60 Flashheads may share a common  
sync and photocell circuit from one SGC-60 Master Controller.  
Electrical Input:  
Master Controller...................... 50 Watts. 120, 208, 240, 277, 380, 480 VAC. 50, 60Hz  
Flashhead...............................500 Watts. 120, 208, 240, 277, 380, 480 VAC. 50, 60Hz  
Requires specific voltage selector block and manual  
change to transformer wiring for different AC voltages.  
Mechanical Properties:  
Flashhead  
Weight...........................................................................................82 pounds (37.2 kg)  
Dimensions............. 18.88"w (479.4mm) x 15.25"h (387.4mm) x 10.75"d (273.1mm)  
Surface Area.......................................................................................1.89 square feet  
Wind Load .............................................................. 100 pounds at 150 mph (240kph)  
Master Controller  
Weight ……………………………………………………… ........24 pounds (10.89 kg)  
Dimensions ....................................... 14"w (356mm) x 12"h (305mm) x 6"d (152mm)  
Operating Environment:  
Operating Temperature..............................................................................-55ºC to +55ºC  
Humidity.............................................................................................95% relative humidity  
System Operating Status Indicators:  
Flashhead, AC line power present ...............................................PWR ON Indicator DS1  
Flashhead, high voltage present on capacitors ....................High Voltage Indicator DS1  
(located on Trigger / High Voltage board)  
Master Controller Indicators  
Flashhead Status ..........................................................LEDs DS1 - DS24, red/green  
Day Mode ..............................................................................................LED DS25 red  
Twilight Mode ........................................................................................LED DS26 red  
Night Mode ............................................................................................LED DS27 red  
SG-60 High Intensity Strobe System  
1-6  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
Flashhead Fail......................................... Relay K1 de-energized and LED DS29 Off  
Photocell Fail.......................................... Relay K2 de-energized and LED DS30 Off  
Power Fail................................................ Relay K3 de-energized and LED DS31 Off  
Night Mode Operation............................. Relay K4 de-energized and LED DS32 Off  
White Night Backup (Dual Systems) ........... Relay K5 energized and LED DS33 On  
SG-60 High Intensity Strobe System  
1-7  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
SECTION 2. INSTALLATION & POWER UP  
WARNING!  
Modifications to the Power Supply are required for certain applications.  
Remove input power at circuit breakers and discharge capacitors with  
an approved grounding rod before attempting any necessary  
modifications.  
2.1  
Unpacking  
Carefully unpack each item and remove any internal packing material from the master  
controller, and the flashhead/power supply. Carefully check the supplied materials with  
the High Intensity Lighting System bill of materials. There are many small items that  
should be supplied inside clear plastic bags, verify each of these bags contain the  
proper amount of parts per the bill of materials. Report any shortages of materials  
immediately to the Honeywell Technical Support.  
Examine each item for obvious physical damage. Report any claims to the carrier  
immediately. Pertinent data such as installation drawings, schematics, interconnection  
drawings, and operation manuals are included in the Master Controller carton. The  
flashtubes are packaged separately inside each Flashhead carton. Do not remove  
flashtubes from their boxes until you are ready to install them.  
2.2  
System Configuration  
Honeywell pre-configures the system to match the installation. However, there are  
cases where complete installation information is not available prior to the system  
leaving the factory or the installation has changed. Setting the configuration may also  
be necessary when replacing individual units in the system. The following is a guide  
for configuring the Master Controller and the Flashheads.  
2.2.1  
Master Controller Configuration  
There are a number of system control switches and configuration switch blocks (DIP  
switches) on the Master Controller. The configuration switch blocks may have multiple  
switches. Reference to the individual switches will be made by referring to the switch  
block number followed by the number of the individual switch as labeled on the switch  
block. For example, SW1 (Figure 2-10, Item 1, Page 2-25) has 5 individual switches.  
The third switch from the left is labeled as #3 on the switch block and will be referred to  
as SW1-3.  
SG-60 High Intensity Strobe System  
2-1  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
2.2.1.1  
System Controls  
Set Master Controller switches (Figure 1-1, Page 1-2) as follows:  
POWER SWITCH -------------------------------------------------------------------------- OFF  
LOCAL / REMOTE Switch ------------------------------------------------------------ LOCAL  
MODE Switch ------------------------------------------------------------------------------- DAY  
The Master Controller has the following control switches (Figure 1-1, Page 1-2):  
·
POWER SWITCH: Toggle switch that turns input AC line power on/off in the Master  
Controller. Does not affect AC power to the Flashheads. Input voltage is present at  
terminal block PB1, even with the power switch turned off.  
·
·
RESET Switch: Momentary pushbutton that resets the Master Controller. Switch  
must be held for about one second to activate.  
REMOTE / LOCAL Mode Switch: Two-position toggle switch that permits manual  
(local) selection of the flash intensity level using the DAY / TWILIGHT / NIGHT  
rotary switch. In normal (remote) operation, permits automatic operation controlled  
by the Ambient Light Sensor photocell.  
·
DAY / TWILIGHT / NIGHT Switch: Three-position rotary switch that allows manual  
selection of three light intensities of the system (DAY = high, TWILIGHT =  
intermediate, and NIGHT = low). The REMOTE / LOCAL Mode Switch must be in  
the LOCAL position to use this switch.  
2.2.1.2  
Power Configuration  
The input voltage selection is set at the factory prior to shipping. The user shall verify  
the correct voltage as indicated by the label by Power In terminal block PB1 (Figure  
1-1, Page1-2). If the voltage listed on the label does not match the voltage at the site,  
contact Tech Support at (805) 581-5591.  
2.2.1.3  
Configuration Switches  
·
SW1 – (Figure 2-10, Item 1, Page 2-25). This switch is used to set the  
number of Flashheads (including antenna obstruction light (AOL)) in the  
system up to 24. If the switches are set for more than 24 the system will still  
monitor only 24 Flashheads. The number of lights configured equals the sum  
of all the switches set to ON (positive binary). For example, to configure for  
10 Flashheads, set SW1-4 (8 lights) to ON and SW1-2 (2 lights) to ON for a  
total of 10 (8+2) lights.  
§ SW1-1 – Set to ON (up) for 1 light  
§ SW1-2 – Set to ON (up) for 2 lights  
§ SW1-3 – Set to ON (up) for 4 lights  
§ SW1-4 – Set to ON (up) for 8 lights  
§ SW1-5 – Set to ON (up) for 16 lights  
SG-60 High Intensity Strobe System  
2-2  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
·
SW2 – (Figure 2-10, Item 2, Page 2-25) This switch is used to set for  
Catenary operation (suspended cable warning lights) and for Dual systems  
(Red lights at night, and white strobes during the day).  
§ SW2-1 – Set to ON (up) for Catenary system.  
§ SW2-2 – Set to ON (up) for Dual system.  
§ SW2-3 – Set to OFF (down). Reserved for future use.  
·
SW3 – (Figure 2-10, Item 8, Page 2-25) This switch is used to set the  
termination resistor for the communications line.  
§ SW3-1 – Set to ON if the Master Controller is at the end of the  
communications line. In a typical installation, the communications lines  
are terminated at the Master Controller and at the top level of  
Flashheads. In this case, this switch should be set ON.  
2.2.2  
Flashhead Configuration  
All of the configuration for the Flashhead in done on the digital controller board.  
Because of the high voltage present in the Flashhead, there are interlock switches and  
fuses as follows (Figure 1-2, Page 1-3):  
·
S1 POWER Interlock Switch: Three-position push/pull switch. When the  
Flashhead door is opened, S1 interrupts AC line power to transformers T1 and  
T2 when using 120VAC single-phase power. (When using 2-phase AC power,  
S1 does not interrupt AC power to transformers T1 and T2.) When the  
Flashhead door is opened, the PWR ON lamp DS1 to turn off. Also interrupts  
power to relay K1, causing the high voltage to be shut off and the energy storage  
capacitors to discharge. When door is open and S1 is pulled out manually, the  
interlock is defeated, which allows the Flashhead to operate under power.  
·
S2 MODE Interlock Switch: Three-position push/pull switch. When the  
Flashhead door is opened, transfers flash intensity mode select from remote  
control (by SGC-60 Master Controller) to local control using switch S3. When  
door is open and S2 is pulled out manually, the interlock is defeated, which  
allows the Flashhead to operate under remote mode control.  
·
·
·
S3 MODE TEST Switch: Three-position rotary switch allows local flash intensity  
mode selection (Day, Twilight or Night) for the individual Flashhead, while not  
affecting the operation of any other Flashhead in the system.  
F1 Main Power Line Fuse: Provides protection for AC power to transformer T1.  
Value varies with input AC line voltage. Refer to Section 7.0 for the correct fuse  
values. Honeywell provides the correct fuse for the supplied power configuration.  
F2 Logic Power Line Fuse: Provides protection for the AC power to the logic  
transformer T2. Value varies with input line voltage. Refer to Section 7.0 for the  
correct fuse values. Honeywell provides the correct fuse for the supplied power  
configuration.  
SG-60 High Intensity Strobe System  
2-3  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
2.2.2.1  
Power Configuration  
The Flashhead(s) are factory set for the correct AC input line voltage. However, the  
user shall verify that the AC line voltage selector block (located on the transformer  
board on top of transformer T1, Figure 1-2, Page 1-3) is labeled with the correct AC  
line voltage used at the site. For example, voltage selector block part number 77-3319  
is labeled for 120VAC. If the voltage selector block is not labeled for the correct AC  
line voltage used at the site, the correct voltage selector block must be obtained from  
Honeywell, and the AC input wiring to transformer T2 must also be verified and  
corrected if necessary according to Figure 3-2, Page 3-12.  
2.2.2.2  
Configuration Switches  
·
SW1 – (Figure 2-11, Item 2, Page 2-26) This switch is used to reset the  
processor  
§ Press and hold – resets the processor and tests the automatic power  
reset circuit. Press and hold SW1 until the 5v power indicator (DS1,  
Figure 2-11, Item 1, Page 2-26) turns OFF momentarily then release.  
·
SW2 – (Figure 2-11, Item 4, Page 2-26) This switch is used to set special  
operation options. Set all four switches to OFF unless your system meets  
one of the two conditions below:  
CONDITION 1: You have a Catenary System  
§ SW2-1 – Set ON for all Flashheads on top level of a Catenary installation.  
§ SW2-2 – Set ON for all Flashheads on bottom level of Catenary  
installation.  
§ SW2 -1 & -2 – Set both to ON for all Flashheads on middle level of a  
Catenary installation.  
CONDITION 2: You have Dual (Red/White) system with an older-model  
Master Controller.  
§ SW2-3 – Set to ON. This is provided for backward compatibility with  
older installations only. For new installations this switch is always  
OFF. For older white-only installations this switch is also OFF.  
To determine if an existing installation has an older Master Controller,  
refer to the new Master Controller in Figure 2-10, Page 2-25. Older  
Master Controllers do not have terminals TB5-TB9, or an EXT RED switch  
SW2-2 (Item 2 in the figure).  
Note: Switch SW2-4 is a spare reserved for future use.  
SG-60 High Intensity Strobe System  
2-4  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
·
SW3 – (Figure 2-11, Item 3, Page 2-26) Used to specify the ID number for  
the Flashhead. Each Flashhead must be set with a unique ID number as  
indicated on the installation drawings. There is a diagram next to the switch  
showing the values for the switch. The ID number is the total of the values of  
the switches set to OFF (negative binary). For example, to set ID #10, set  
SW3-2 (value 2) OFF (down) and SW3-4 (value 8) OFF (down) for a total of  
10 (2+8).  
§ SW3-1 – Set to OFF (down) for value 1  
§ SW3-2 – Set to OFF (down) for value 2  
§ SW3-3 – Set to OFF (down) for value 4  
§ SW3-4 – Set to OFF (down) for value 8  
§ SW3-5 – Set to OFF (down) for value 16  
·
SW4 – (Figure 2-11, Item 5, Page 2-26) This is used for the terminating  
resistor on the communications line.  
§ SW4-1 – Set to ON (up) for terminating resistor. This should be set ON  
only for the Flashhead where the communication lines are terminated. In  
a typical installation, the communications lines are terminated at the  
Master Controller and the upper most Flashhead. In systems with an  
AOL, the AOL is typically the upper most Flashhead. In systems without  
an AOL, any one but only one of the Flashheads at the top level can be  
set to ON. For all others, set to OFF. If the system is being installed in  
stages as the tower is erected, SW4-1 should be set ON for one of the  
flashheads at the highest installed level. As additional flashheads are  
added at higher levels, adjust the configuration by setting SW4-1 to OFF  
in the previous flashhead and set SW4-1 to ON for one of the flashheads  
at the highest installed level.  
2.2.2.3  
Flashtube Installation  
The Flashheads are shipped from the factory without the flashtubes installed to prevent  
damage during shipping. Install the flashtubes per the following procedure:  
1.  
If Flashhead is already wired to AC power: Shut off the power to the system  
by opening the main AC power circuit breakers.  
2.  
3.  
Release the Flashhead cover latches.  
Swing the cover open, exercising caution not to damage the glass face or the  
gasket.  
4.  
5.  
Unpack the flashtube. Do not touch the glass envelope - contamination from  
a fingerprint will degrade the reliability of the flashtube.  
Holding the flashtube by its metal ends, center it in the reflector assembly  
and snap it into place. Make sure the red mark on the flashtube matches the  
red mark on the socket assembly.  
6.  
Attach the fast-on connector at each end of the flashtube to each socket  
assembly. Make sure wires are not twisted - the metal to glass bond is fragile.  
SG-60 High Intensity Strobe System  
2-5  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
7.  
8.  
Refer to Figure 2-1 below. Dress the electrode wires away from the sides of  
the reflector.  
Close and fasten the Flashhead cover.  
Figure 2-1: Flashtube Installation  
2.3  
Installation  
SGC-60 Master Controller  
2.3.1  
The Master Controller is connected to Flashheads via the data communications cable  
provided by Honeywell. The length of this cable (up to 2500 feet) determines how far  
the Master Controller can be mounted from the Flashheads.  
A detailed drawing for mounting the Master Controller is shown in Figure 2-2, Page 2-9  
2.3.2  
SGF-60 Flashhead  
Normally the Flashheads are mounted at the uppermost point and additional  
referenced elevations on the structure. The Flashhead is connected to its Master  
Controller via the data communications cable provided by Honeywell. The length of  
this cable (up to 2500 feet) determines how far any Flashhead can be mounted from  
the Master Controller.  
Honeywell labels all the Flashheads with numbers ranging from 1 to 24 depending on  
the number of required lights for the structure. Typically, the upper most level of lights  
will contain the lights with numbers 1 through 3 or 4. If the structure has an  
appurtenance of greater that 40 feet, an AOL (Antenna Obstruction Light) is required  
and it will have a Flashhead Number of 1. The High Intensity Flashheads will start with  
Flashhead Number 2. The flashheads should continue down the tower from the top  
sequentially ending with the highest number at the bottom level.  
The vent hole on the bottom surface of the power supply is covered with a solid plug  
prior to shipping. Optional screened plugs are furnished separately.  
SG-60 High Intensity Strobe System  
2-6  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
Typically, the Flashhead is mounted to a bracket, which is then attached to the  
structure. Honeywell can supply brackets for most types of installations.  
A detailed drawing for mounting the Flashhead is shown in Figure 2-3, Page 2-10.  
2.3.2.1  
Setting the Flashhead Elevation  
Flashheads must be mounted at the proper vertical angle to assure proper light output.  
Depending on the elevation of the light level, the Flashhead may need to be adjusted to  
reduce the amount of ground scatter. Please refer to the table below for proper  
elevation for the lights.  
1. Slightly loosen the angle lock bolts, which are at the bottom of the mounting  
arms (see Figure 2-3, Page 2-10). The bolt heads and nuts fit 7/16" wrenches or  
nut drivers (tightening will require a pair of tools).  
2. Adjust the Flashhead enclosure until the bubble indicator on top of the enclosure  
reads level.  
3. Take note of the position of the bolt with respect to the silk-screened markings  
on the angle indicator. This position is the zero degree position. The markings  
are screened at intervals of one degree.  
4. Adjust the Flashhead enclosure to aim the beam upward until the bolt head has  
shifted by the number of degrees indicated in the table below.  
5. Securely tighten both angle lock bolts.  
Light Unit Elevation Above the Horizontal  
Height of Light Unit Above  
Ground Level  
Degrees of Elevation above  
Horizontal  
More than 500 feet  
401 feet to 500 feet  
301 feet to 400 feet  
Less than 300 feet  
0°  
1°  
2°  
3°  
2.3.3  
Ambient Light Sensor (Photocell)  
The Ambient Light Sensor, when supplied with the system, shall be mounted upright,  
away from artificial light (e.g. floodlights), and in a location that will enable the sensor  
window to have an unobstructed view of the polar sky (pointed north in the northern  
hemisphere, not pointed toward the sun). The photocell housing wire entry is tapped to  
allow mounting to 1/2" threaded pipe. Conduit and related hardware will be  
supplied by the customer. A 21-foot 3-conductor cable is attached to the photocell  
for remote installation.  
SG-60 High Intensity Strobe System  
2-7  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
2.3.4  
Cables and Junction Boxes  
The cables shall be properly supported and terminated in the junction boxes per the  
detailed description provided in section 2.4, page 2-11 of this document. Additional  
information regarding cables and junction box installation can be found on the drawing set  
for the lighting system. Particular attention should be paid to assure that the data cable  
shields are isolated from the junction box housings.  
SG-60 High Intensity Strobe System  
2-8  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
Figure 2-2: Master Controller Mounting Dimensions  
SG-60 High Intensity Strobe System  
2-9  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
Figure 2-3: Flashhead Outline and Mounting Dimensions  
SG-60 High Intensity Strobe System  
2-10  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
2.4  
Installation Wiring  
Follow the procedure below to perform the installation wiring. Note that the wiring of the  
Alarm Relay outputs is customer and site specific and is therefore not specified in this  
manual.  
Figure 2-5: Typical Wiring Installation  
SG-60 High Intensity Strobe System  
2-11  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
2.4.1  
Master Controller to Photocell Wiring  
The photocell is supplied with a length of wire attached. If a longer wire is needed, this  
should be accomplished using a junction box. Make the interconnect between the  
external Photocell and the Master Controller TB2 per Figure 2-5, Page 2-11, as  
follows.  
Black wire  
White wire  
Red wire  
Photocell ------------------------ to -----------Master Controller TB2-B  
Photocell ------------------------ to ---------- Master Controller TB2-W  
Photocell ------------------------ to -----------Master Controller TB2-R  
2.4.2  
Master Controller Data/Communications Wiring  
Typically, the data/communications wiring is done with Honeywell P/N WC000002, a  
shielded, twisted-pair cable. It has one pair of conductors, and a drain wire for making  
shield connections. This cable is routed up the structure in the same conduit as the  
Flashhead power wiring. Connect the data cable wires to Master Controller TB5  
according to Figure 2-5, Page 2-11, and as follows:  
White or Clear wire (Data signal "A") ------- to ----------------Master Controller TB5-A  
Blue wire (Data signal "B")--------------------- to ----------------Master Controller TB5-B  
Shield drain wire (Data shield) ----------- to --------------Master Controller TB5-S  
(TB5-S is position 4)  
The Data Shield (TB5-S) is grounded by the factory-installed wire that connects  
the E1 ground lug on the Master Controller circuit board to PB1-G.  
If you need to connect a Flashhead directly to the Master Controller using the data  
cable integrated into Flashhead Cable WC000002, use the following connections.  
White or Clear wire-----Master Controller TB5-A -----------to---- Flashhead TB1-4  
Blue wire-------------------Master Controller TB5-B -----------to---- Flashhead TB1-5  
Inner Shield ---------------Master Controller TB5-S (4) -------to---- Flashhead TB1-6  
Outer Shield ---------------------------------------------------------not connected at either end  
2.4.3  
Master Controller Power Wiring  
Make the connections for incoming AC line power to Master Controller PB1 per Figure  
2-5, Page 2-11 as follows. These wires (or cable) are not supplied by Honeywell. A  
separate circuit breaker is recommended for the Master Controller. The Master  
Controller may, if desired, use a different AC line voltage than the Flashheads.  
The wire colors below are typical for single-phase power. Be sure to check your own  
installation colors.  
Black wire (Phase or hi) ----------------------------- to ----------- Master Controller PB1-L  
White wire (Phase or neutral) ---------------------- to -------- Master Controller PB1-L/N  
Green wire (Equipment ground) ----------------to--------- Master Controller PB1-G  
SG-60 High Intensity Strobe System  
2-12  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
2.4.4  
Master Controller Wiring For Dual Systems  
If your installation is a Dual (Red/White) system, you must make additional connections  
to coordinate between the High Intensity Strobe System and the Red Light System.  
See the sections below for wiring details. For configuration switch settings for a Dual  
system, see 2.2.1.3 on Page 2-2.  
2.4.4.1  
Controlling the Red Light System  
The Master Controller uses Relay K4 to control the Red Light System. The Relay K4  
contacts should be wired to the Red Light System in such a way that when K4 is  
energized, the Red Lights turn off, and when K4 is de-energized, the Red Lights turn  
on.  
Typically this is done by disconnecting the Red Light System photocell, and wiring  
those photocell inputs to the Relay K4 contact. The contacts are rated for up to 5A,  
and up to either 30VDC or 250VAC.  
If your red light system has a Honeywell 9LCA-Series Red Light Controller, the 9LCA  
photocell is not used. Instead of connecting the 9LCA photocell to 9LCA terminal TB3,  
make the following connections:  
Master Controller TB3-C4--------------- to -------- 9LCA Red Light Controller TB3-B  
Master Controller TB5-NO4 ------------ to ----------9LCA Red Light ControllerTB3-R  
Configure the 9LCA Red Light Controller to use Automatic mode control. Other Red  
Light Systems may require different connections. Refer to the Tower Kit drawing (if  
Honeywell provided both systems as a kit), refer to the Red Light System's manual, or  
contact Honeywell for assistance.  
2.4.4.2  
Responding to Top Red Beacon Failures  
When a top-level red beacon fails at night, a Dual system must switch from red to white  
lights. The Master Controller will switch to the white strobes at night if it detects an  
open circuit between TB6-1 and TB6-2 ("EXT RED").  
Install external wiring must in a single electrical loop from TB6-1 to TB6-2 in such a way  
that the loop is closed when all the top-level red beacons are operating correctly, and  
the loop is opened (broken) when any top-level red beacon fails.  
The External Red Ready indicator (LED DS36 -- Item 10 in Figure 2-10, Page 1-2)  
turns on to indicate a closed loop (Red Lights OK), and turn off to indicate an open loop  
(Red Light Failure).  
SG-60 High Intensity Strobe System  
2-13  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
If your red light system has a Honeywell 9LCA Series Red Light Controller, locate the  
Alarm terminals and Flasher Bypass terminals corresponding to the top beacon, and  
make the following connections:  
Master Controller TB6-1-----------------to----------------------9LCA Flasher Bypass C1  
9LCA Flasher Bypass NC1 -------------to----------------------------9LCA Alarm Card C1  
Master Controller TB6-2-----------------to--------------------------9LCA Alarm Card NC1  
Note: Usually the top beacon terminals are found on the top/left Flasher Bypass Card  
(TB4), and the left channel of the top Alarm Card (TB3).  
Other Red Light Systems may require different connections. Refer the to Tower Kit  
drawing (if both systems were provided as a kit by Honeywell), the Red Light System's  
manual, or contact Honeywell for assistance.  
2.4.5  
Flashhead Wiring  
Incoming AC power and data communications enter the Flashhead in a single cable,  
Honeywell P/N WC000001, that combines three wires for AC power with a  
twisted-pair/double-shielded data cable (See Figure 2-9, Page 2-21).  
Flashheads are supplied with a 10-20 foot length of this cable already installed.  
Typically,  
Should you need to install or replace this cable, make the connections for incoming AC  
power and data to Flashhead TB1 per Figure 2-5, Page 2-11, and Figure 2-10, Page 2-  
24, as follows.  
Green wire (Equipment ground) ------------------------to----------------- Flashhead TB1-1  
White wire (Phase or neutral) ---------------------------to----------------- Flashhead TB1-2  
Black wire (Phase or hi) ----------------------------------to----------------- Flashhead TB1-3  
Data Cable  
White or Clear wire (Data signal "A") ------------to----------------- Flashhead TB1-4  
Blue wire (Data signal "B") --------------------------to----------------- Flashhead TB1-5  
Inner shield (Data shield)----------------------------to----------------- Flashhead TB1-6  
Outer shield-------------------------------------------------------- trim short; not connected  
2.4.6  
Conduit and Tower Wiring Detail  
This section details a standard practice of installing conduit and the related tower  
lighting wires for the system. Please use this guide to help install the wires into the  
conduit system. The wires and cables for the SG-60 High Intensity system need to be  
run properly to insure that the system will work properly. Wire insulation that is  
damaged will lead to a system that will not function properly and may void the warranty.  
Insure that the following procedure is followed. Pay close attention to all bold text.  
SG-60 High Intensity Strobe System  
2-14  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
Figure 2-5: Flex Conduit Typical Installation Layout  
Procedures for installation of conduit and tower wiring  
2.4.6.1  
1. All conduit, junction boxes, mounting hardware, fixtures, etc. provided for  
installation of the electrical system (i.e. lighting or equipment power distribution)  
should be inventoried and checked against the appropriate bills of materials.  
(a)  
Conduit and junction box components provided for electrical  
systems should be checked against appropriate bills of materials to  
ensure all are present and of proper size.  
(b)  
Numbers of wires to be carried by each conduit run should be  
checked against National Electrical Code. Honeywell sizes the  
conduit run for a 40% fill of the conduit by the NEC.  
2. Use pipe compound or equivalent for all threaded connections in the conduit  
run. This will prevent water from entering the conduit system and make an  
electrical connection between the conduit and ground.  
3. All custom cut pieces of conduit must be de-burred after they are threaded to  
remove sharp edges that may cut wiring insulation. Honeywell supplies conduit  
in 10-foot lengths, therefore cutting and threading of the conduit may be  
necessary.  
4. Insure that “chase nipples” or bushings are properly installed in all junction box  
ports to protect the wiring insulation from pipe threads and other sharp edges in  
SG-60 High Intensity Strobe System  
2-15  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
the junction box ports. Do not begin to run wire through a junction box port  
before a chase nipple or grommet is in place.  
5. Before running the wire into a box insure the wire insulation will be  
protected from any sharp edges on the junction boxes. Pieces of carpet,  
wide copper braid, etc. can be fastened in place over sharp edges to protect  
wire insulation.  
6. Precut and bundle method of wire installation:  
(a)  
(b)  
(c)  
Cut all conductors to length for their respective run with adequate  
excess to allow for strain relief and additional slack for  
connections.  
Ensure that there is plenty of wire pulling lubricant on site before  
beginning to pull wiring. Use plenty of lubricant as the wire is  
being run through the conduit.  
The wiring bundle should be hoisted above the junction box at the  
top of the run into which it is to be inserted then lowered down into  
the conduit. There should be someone at the top junction box  
of the run to insure the wiring does not get scuffed or cut on  
junction box edges and to apply lubricant to the wiring as it  
enters the conduit.  
(d)  
(e)  
If the conduit and wire will be installed on the ground, use the  
same methods described here.  
Insure proper amount of  
lubricant is available and that the wire is shielded from any rough  
edges on the conduit or ground that might damage the wire/cable  
insulation.  
Adequate slack should be pulled back up into the uppermost  
junction box to effect strain relief and to make proper wiring  
connections. Once wiring bundle is supported by the strain relief  
mechanism, make all wiring connections in the junction box.  
i. To make proper connections the wiring entering the box from  
above and the wiring above, the strain relief mechanism at the  
bottom of the box must be long enough. The wires at the top of  
the box should be formed into a “J” shape and the last 1/2-inch  
of insulation should be stripped off the conductor. The wires  
from the bottom of the box supported by the strain relief  
mechanism should be run up to a point just short of the top of  
the junction box and cut off. The last 1/2-inch of insulation  
should then be stripped from those. Wire connections should  
be made with proper sized Scotch® Twist wire nuts or split bolt  
connectors.  
ii. Once a wire nut is installed, hold the wire nut and tug on all  
wires firmly to ensure the connection of all conductors is tight.  
iii. Finish each connection with at least 6 wraps of Scotch 33+ tape  
or equivalent for proper moisture protection.  
iv. When a proper connection is complete, the wire nut should be  
positioned upside-down (wire nut opening pointing downward)  
SG-60 High Intensity Strobe System  
2-16  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
and the connection should be at the top end of the junction box.  
Wiring from ports in the sides of junction boxes should also be  
made such that the wire nuts are at the top of the junction box  
with the wire nut openings pointing downward, (see Figure 2-6,  
Page 2-19) for proper moisture protection.  
(f)  
Move down to the next intermediate (strain relief) junction box and  
pull enough of the wiring into the box to provide for the proper  
installation of the strain relief mechanism.  
(g)  
Move down to the next intermediate junction box and repeat the  
above procedure until the entire tower is wired.  
SG-60 High Intensity Strobe System  
2-17  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
2.4.7  
Junction Box Details  
This section will detail the proper wire interconnection details for the input voltage and  
data cable to the flashhead pigtail cable. These connections are very important to the  
proper operation of the lighting system. The flashhead pigtail contains all the wires  
required for proper interconnection between the conduit wiring and flashhead.  
Additional reference materials can be found on the High Intensity Lighting system  
drawing set. Please reference the below information and drawings for a proper  
installation. Mis-wiring of these wires will not allow the flashheads to operate properly.  
Please call the Honeywell Technical Support if you have any questions regarding the  
installation of these connections. Systems that are improperly wired may void the  
warranty.  
2.4.7.1  
Flex Conduit Installation  
On each of the high intensity flashheads, a pigtail is attached at the factory for  
installation to the junction box. This pigtail may not be long enough for proper routing  
along the horizontal and vertical struts on the tower. The high intensity lighting system  
will have a 100-foot spool of pigtail cable, Honeywell P/N WC000001, for installer to  
use for those flashheads that do not have a long enough pigtail. If this spool of cable  
will not accommodate all the flashheads, extra cable can be ordered from Honeywell.  
The ¾” flex conduit will be used for shielding of possible RF Interference generated by  
some broadcast and radio towers. The conduit will be positioned over the flashhead  
pigtail and connected at the junction box and flashhead enclosure by watertight  
connector designed for the ¾” flex conduit. The installation will consist of the following  
materials:  
¾” Flex Conduit – Honeywell part number CL000002  
¾” Sealing Ring – P/N *77-1085  
¾” Bushing Insulator – P/N *77-1087  
¾” Flex Conduit Fitting – P/N CD000003  
Consists of: Gland nut, body, edge cone, nylon seal ring, and ¾” locknut  
Please reference Figure 2-7, Page 2-20 for proper installation of this conduit.  
SG-60 High Intensity Strobe System  
2-18  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
Figure 2-6: Junction Box Wiring Details  
SG-60 High Intensity Strobe System  
2-19  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
Figure 2-7: Flex Conduit Installation Detail  
SG-60 High Intensity Strobe System  
2-20  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
The flex conduit will need to be properly mounted to the horizontal and vertical struts by  
way of the supplied 20-inch cable ties. These cable ties should be placed at a  
minimum of 3 feet apart for proper bonding to the tower structure. The distance  
between the cable ties may need to be reduced if the installer sees that the 3-foot  
distance will not allow for proper bonding and securing to the tower.  
Figure 2-5, Page 2-15 depicts a standard installation layout for the Flashhead pigtails  
and flex conduit.  
2.4.7.2  
Splicing Details for WC000001 Cable  
The installation of the data/communication cable is the most important part of the High  
Intensity Lighting system installation. Without a sound connection for the data cable,  
the entire system will not work properly. Insure that the following steps are followed to  
insure a proper installation and connection.  
NOTE: Splicing of the cables at any other location besides the light level is not  
recommended. The intermediate junction boxes between the light levels should be  
used as pull boxes and for strain relief only, with no splices.  
The WC000001 cable is a multi-conductor cable that is used for the interconnection of  
the flashhead to the junction box. The WC000001 cable consists of the following  
wires/cable:  
Figure 2-9: WC000001 Cable Overview  
Item 1 (A, B, S) is the data/communication cable that is used to transmit all the data  
from the master controller, SGC-60, to the flashhead, SGF-60. Without a proper  
connection, the lighting system will flash erratically, or default to Day mode.  
Items 2, 3, and 4 are used for the power input from the junction box to the flashhead.  
Item 5 is the Drain Wire for the outer cable shield.  
SG-60 High Intensity Strobe System  
2-21  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
Item 6 is a shield drain wire that will not be used for interconnection. This wire should  
be cut off flush from the cable when the outer jacket is stripped back for interconnection  
of the system.  
The following section is a guideline to a proper installation of the WC000001 cable.  
Please follow this guideline to ensure a proper installation and interconnection in the  
junction box.  
1.  
Strip back at least 16” of the outer jacket of the WC000001 cable. Make  
sure that during this removal, the other wires are not damaged. If the  
insulation is damaged on one of the other wires, a potential of lighting  
problems can occur shortly after the system is connected.  
2.  
3.  
4.  
Remove all the aluminum foils and braids from the exposed conductors.  
These will not be used for interconnection.  
Cut off Item #6, bare shield wire, that protrudes from the cable. This wire  
will not be used for interconnection.  
Connect Item #5, bare shield wire, and Item #4, #12-AWG Green wire,  
from all the cables to the ground lug inside the junction box. This ground  
lug can be found on the back plane of the junction box or at an internal  
locknut that has a ground screw attached. No other wires will be  
connected to ground.  
5.  
Connect Item #1S, data/communication inner shield drain wire, to the  
other data shield drain wires from the additional data cables. Trim back  
the associated shield neatly. Make sure that this drain wire and the shield  
cannot contact the walls of the junction box or other wires. Do not  
connect inner shield to outer shield. Extra taping may be required for  
proper isolation. The inner shield should only have a connection to  
ground inside the SGC-60 controller.  
On a typical installation, there will be a total of 5 wires that will be  
connected together. One from the lower junction box level, three from the  
flashhead cables on that level, and one for the cable going to the next  
level.  
6.  
7.  
8.  
Connect Item #1A to corresponding wires in other four cables as stated  
above in step 5.  
Connect Item #1B to corresponding wires in other four cables as stated  
above in step 5.  
Connect the #12-AWG Black and #12-AWG White wires as required by  
the installation drawing set supplied with the lighting system. If the  
system has a 3-phase input, ensure proper connection between the  
3-phase wires (typically brown, orange, and yellow) and the black and  
white wires from the flashhead. Proper load balancing is required on the  
three-phase input to operate efficiently (distribute the flashheads as  
evenly as possible across the phases).  
SG-60 High Intensity Strobe System  
2-22  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
9.  
The power wires should be spliced together using split bolt connectors.  
The data wires should be spliced together using Scotch® Twist Lock  
connectors. After splicing, ensure all wires are secure by pulling on each  
wire. Wrap each connection with at least 6 wraps of Scotch 33+ tape or  
equivalent for moisture protection. All connection ends should be located  
in the upper corners of the junction box with all closed end of the  
connector pointing up. See Figure 2-6, Page 2-19 for reference.  
Note: The Master Controller can operate from a different AC voltage than the  
Flashheads if desired.  
SG-60 High Intensity Strobe System  
2-23  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
** It is extremely important to connect all  
Data cable inner shields together, but isolate  
them from all other shields and grounds **  
Figure 2-10: Flashhead Cable  
SG-60 High Intensity Strobe System  
2-24  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
Figure 2-10: Master Controller Circuit Board  
SG-60 High Intensity Strobe System  
2-25  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
Figure 2-11: Flashhead Digital Control Board  
SG-60 High Intensity Strobe System  
2-26  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
2.5  
Final Installation Check  
Before applying power to the equipment, perform the procedures in Sections 2.5.1 -  
2.5.4. If any test does not pass, please consult SECTION 4. TROUBLESHOOTING in  
this manual or call Honeywell Technical Support at (805) 581-5591.  
2.5.1  
Preliminary  
1.  
2.  
Verify that all AC input power circuit breakers are turned off.  
Check that all printed circuit boards are properly seated in their sockets, and  
retaining brackets are securely fastened..  
3.  
4.  
Check that any user-installed wiring does not interfere with relay operation  
when covers are closed.  
Check that all Flashheads are mounted are mounted at the correct  
elevation per Section 2.3.2.1, Page 2-7. Check that all Flashhead covers  
are shut properly for a weather-tight seal with all latches closed.  
5.  
Set Master Controller switches as follows:  
POWER SWITCH ----------------------------------------------------------------- OFF  
LOCAL / REMOTE Switch --------------------------------------------------- LOCAL  
MODE Switch ----------------------------------------------------------------------- DAY  
2.5.2  
Verify Correct Wiring in Master Controller  
Verify correct wiring of the Master Controller as specified in section 2.4 page 2-11.  
2.5.3  
Verifying Photocell Wiring  
Verify correct wiring of the photocell as specified in section 2.4.3 page 2-12.  
2.5.4  
Verify Proper Tower Wiring for Data/Control Cable  
This test assumes a typical tower configuration with the data cable terminating at the  
Master Controller.  
1.  
2.  
Unplug Data Cable connector TB5 from PCB1 in Master Controller.  
Verify 120-140 ohms resistance between TB5-A and TB5-B on the Data  
Cable. (This checks that a single 100-ohm data line termination resistor is  
in the circuit. Resistance of 70 ohms or less indicates that more than one  
Flashhead has the terminating resistor switch set to on. See SW4 page  
2-5.  
3.  
Verify open circuit by measuring resistance between TB5-S on the Data  
Cable and panel ground.  
4.  
5.  
Verify open circuit between TB5-A on the Data Cable and panel ground.  
Verify open circuit between TB5-B on the Data Cable and panel ground.  
SG-60 High Intensity Strobe System  
2-27  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
6.  
7.  
8.  
Verify open circuit between TB5-S and TB5-A (both on Data Cable)  
Verify open circuit between TB5-S and TB5-B (both on Data Cable).  
In one of the top-most Flashheads, install a jumper (or alligator clip)  
between TB1-5 and TB1-6.  
9.  
Verify short circuit between (<20 ohms) TB5-S and TB5-B (both on Data  
Cable).  
10.  
11.  
12.  
Remove the jumper between TB1-5 and TB1-6.  
Verify open circuit between TB5-S and TB5-B (both on Data Cable)  
On the Master Controller card, measure between TB5-A and TB5-B and  
verify 120 ohms +/- 10% resistance. If not, check for proper configuration.  
See SW4 on page 2-5.  
13.  
14.  
Plug Data Cable Connector TB5 back into PCB1.  
Verify short circuit between TB5-S screw terminal and panel ground.  
2.6  
During the power up of the system, there are indicator lights which will be checked to  
verify correct operation and installation. The following is a description of all the  
Power Up and System Tests  
indicators in the Master Controller and the Flashheads. The indicators in the  
Flashhead need not be checked unless problems are encountered during the normal  
power up tests.  
2.6.1  
Master Controller Status Indicators  
·
Photo Mode Indicators (Figure 2-10, Item 3, Page 2-25)  
§ DS25 – Red indicates active mode is Day  
§ DS26 – Red indicates active mode is Twilight  
§ DS27 – Red indicates active mode is Night  
§ DS28 – Green indicates photocell is OK, Red indicates photocell is bad  
·
·
Individual Flashhead Status (Figure 2-10, Item 4, Page 2-25)  
§ DS1-24 – Green indicates Flashhead is good, OFF indicates Flashhead  
has not been selected for monitoring, Red indicates Flashhead is bad.  
Miscellaneous Indicators  
§ DS34 – (Figure 2-10, Item 7, Page 2-25) ON indicates transmit OK  
§ DS35 – (Figure 2-10, Item 9, Page 2-25) Flashing indicates sync input  
read OK.  
§ DS36 – (Figure 2-10, Item 10, Page 2-25) ON indicates red lights are  
available, OFF indicates red lights are reporting alarm or not installed  
SG-60 High Intensity Strobe System  
2-28  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
§ DS32 - 33 – (Figure 2-10, Item 5, Page 2-25) The indications on these  
lights are dependent on the setting for external red light system on SW2.  
If SW2-2 is set for an EXTERNAL RED system (ON), then  
·
DS32 – ON indicates there has been a red light system alarm  
sometime during the night and the red light system is off, but will reset  
the next day. OFF when in night mode and the red light system is not  
in alarm  
·
DS33 – ON indicates in night mode, red lights are turned off and white  
strobes are operating, OFF indicates NORMAL operation.  
If SW2-2 is set for no EXTERNAL RED system (OFF) then  
·
·
DS32 – ON during DAY and TWILIGHT, OFF during NIGHT mode  
DS33 - Not used (lower right of board)  
§ DS31 – (Figure 2-10, Item 5, Page 2-25) ON indicates power OK, OFF  
indicates power failure  
§ DS30 – (Figure 2-10, Item 5, Page 2-25) ON indicates photocell is  
GOOD, OFF indicates photocell is BAD or not connected  
§ DS29 – (Figure 2-10, Item 5, Page 2-25) ON indicates all Flashheads are  
good, OFF indicates one or more Flashheads are bad  
2.6.2  
Flashhead Status Indicators  
·
Miscellaneous Indicators (Figure 2-11, Item 1, Page 2-26)  
§ DS1 Red  
ON for 5-Volt logic power OK  
§ DS2 Yellow ON for Flash Current Feedback OK  
§ DS3 Green ON Steady for communications OK (receive & transmit)  
OFF for no communications reception  
Slow Blink (1/sec) for receiving but not being addressed to  
transmit  
Fast Blink (4/sec) for receiving, being addressed to transmit  
but failing to transmit  
2.6.3  
System Power Up  
All switches and indicators listed in this section are in the Master Controller, except for  
the external system circuit breakers.  
1.  
2.  
3.  
4.  
5.  
6.  
Verify POWER SWITCH is turned OFF.  
Verify LOCAL / REMOTE switch is set to LOCAL.  
Verify MODE switch is set to DAY.  
Turn on circuit breaker to apply power to Master Controller.  
Turn on circuit breaker to apply power to Flashheads.  
Turn POWER SWITCH to ON.  
SG-60 High Intensity Strobe System  
2-29  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
7.  
Verify that the LED test sequence has started. The test sequence will  
exercise every LED and relay (e.g. it will quickly sweep through the  
Flashhead Status LEDs in red and green mode).  
After the test sequence completes, the Flashhead status LEDs for the  
selected number of Flashheads shall be lit red then change to green as  
the Flashheads report (DS1 - DS24, Figure 2-10 Item 4, Page 2-25).  
8.  
After 1 minute, verify the number of Flashhead status LEDs (DS1 - DS24,  
Figure 2-10 Item 4, Page 2-25) that are lit green matches the total number  
of white Flashhead lights (including AOL) on the tower (if there are n  
Flashheads on the tower, Flashhead status LEDs DS1 - DSn shall be lit  
green). Verify that the remaining unused Flashhead status LEDs (DSn+1  
- DS24) are turned off.  
Once all the flashheads report good (green), the relay monitor LEDs  
should display as follows: DS29-DS32 GREEN, DS33 OFF (DS29 -  
DS33, Figure 2-10 Item 5, Page 2-25).  
9.  
Verify Photocell status LED DS28 (Figure 2-10, Item 3, Page 2-25) is lit  
green.  
10.  
Verify Day Mode LED DS25 (Figure 2-10, Item 3, Page 2-25) is lit red,  
and the Twilight and Night LEDs (DS26 and DS27 respectively (Figure  
2-10, Item 3, Page 2-25)) are not lit.  
11.  
12.  
Hold down the RESET switch for approximately 1 second and verify the  
LED test sequence has restarted.  
Wait 1 minute and measure the voltage between TB1-1 and TB1-2 to  
verify the voltage is 12-18 VAC. Repeat steps 7 - 10 to assure proper  
recovery after reset.  
2.6.4  
Verify Local Mode Operation  
All switches and indicators listed in this section are in the Master Controller.  
2.6.4.1  
1.  
Day Mode:  
Verify MODE Switch is set to DAY.  
2.  
3.  
Verify Day mode LED DS25 (Figure 2-10 Item 3, Page 2-25) is lit red.  
After about 6 seconds, verify all Flashheads are flashing in sync and in  
Day mode (maximum brightness).  
4.  
5.  
Verify that the Flashhead Status LED for each Flashhead on the tower is  
lit green (including any AOL). Unused Flashhead status LEDs shall be  
off. (DS1 - DS24: Figure 2-10, Item 4, Page 2-25)  
Verify relay status LEDs DS29-DS32 are lit green, ans DS33 is OFF.  
(Figure 2-10, Item 5, Page 2-25)  
SG-60 High Intensity Strobe System  
2-30  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
6.  
7.  
If you have a Dual (Red/White) System, the Red Lights should be OFF.  
If you have a Catenary System, Verify Catenary flash timing.  
(a)  
(b)  
(c)  
(d)  
(e)  
(f)  
All Flashhead on Middle Level should flash together.  
All Flashheads on Top Level should flash together  
All Flashheads on Bottom Level should flash together.  
Middle Level Flashheads should flash first.  
Top Level Flashheads should flash second (1/13 second later)  
Bottom Level Flashheads should flash third (2/13 second after  
Top)  
(g)  
Sequence should repeat every 1 second. (Time between Bottom  
and Middle flash is 10/13 seconds).  
2.6.4.2  
Twilight Mode:  
1.  
2.  
Set MODE Switch to TWILIGHT.  
Verify Day and Night mode LEDs (DS25 and DS27 respectively Figure  
2-10, Item 3, Page 2-25) are unlit and the Twilight mode LED DS26 is lit  
red.  
3.  
4.  
After 6 seconds, Verify all Flashheads are flashing in sync and in Twilight  
mode (medium brightness).  
Verify that the Flashhead Status LED for each Flashhead on the tower is  
lit green (including any AOL). Unused Flashhead status LEDs shall be  
off. (DS1 - DS24: Figure 2-10, Item 4, Page 2-25)  
5.  
6.  
Verify relay status LEDs DS29 - DS32 are lit green, and DS33 is off.  
(Figure 2-10, Item 5, Page 2-25)  
If you have a Dual (Red/White) System, the Red Lights should be OFF.  
2.6.4.3  
Night Mode  
1.  
2.  
Set MODE Switch to NIGHT.  
Verify Day and Twilight mode LEDs (DS25 and DS26 respectively (Figure  
2-10, Item 3, Page 2-25) are unlit and Night mode LED DS27 is lit red.  
3.  
Verify that the Flashhead Status LED for each Flashhead on the tower is  
lit green (including any AOL). Unused Flashhead status LEDs shall be  
off. (DS1 - DS24: Figure 2-10, Item 4, Page 2-25)  
4.  
5.  
Verify relay status LEDs DS29-DS31 are lit green, and DS32 and DS33  
are off. (DS29 - DS33: Figure 2-10, Item, 5, Page 2-25)  
If you have a White-Only System: After 6 seconds, Verify all Flashheads  
are flashing in sync and in Night mode (lowest brightness, ~1/8 second  
duration bursts at 40 bursts per minute).  
SG-60 High Intensity Strobe System  
2-31  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
6.  
If you have a Dual (Red/White) System: Verify normal red night mode  
operation.  
(a)  
(b)  
Verify that all Flashheads are OFF  
Verify that all Red Lights are ON and flashing properly, and the  
Red Light Controller does not indicate any alarms in the top-most  
Red Beacons.  
(c)  
Verify that LED DS36 (EXT RED READY) is lit green (See Item 10,  
Figure 2-10, Page 2-25).  
7.  
If you have a Dual (Red/White) System: Perform the following steps to  
check white night backup operation.  
(a)  
Simulate a Top Red Beacon failure.  
On a Honeywell 9LCA Series Control, this may be done with the B1  
circuit breaker in the Control. Turn the B1 breaker off to activate  
the 9LCA Beacon Failure Alarm, or toggle the breaker momentarily  
to activate the 9LCA Flasher Bypass Alarm.  
Other Redlight systems have different controls, and may require  
removing Red Beacon power at the input power circuit breakers.  
(b)  
(c)  
(d)  
(e)  
(f)  
Verify that the DS36 (External Red Ready) LED is OFF.  
Verify that the DS32 (Night/Red) LED is ON  
Verify that the DS33 (Backup) LED is ON  
Verify that all the Red Lights are OFF  
Verify that all Flashheads are flashing in sync and in Night mode  
(lowest brightness, ~1/8 second duration bursts at 40 bursts per  
minute).  
(g)  
(h)  
(i)  
Repair the simulated Red Beacon failure.  
Verify that DS36 (External Red Ready) LED is ON.  
Verify that the lighting system is still operating white strobes, and  
not red-lights.  
(j)  
Set the MODE switch to DAY. Wait for the Flashheads to switch to  
DAY mode (about 6 seconds). Set the MODE switch back to  
NIGHT. Wait for the Flashheads to switch to OFF mode (about 6  
seconds).  
(k)  
(l)  
Verify normal red night mode operation per Step 6 above.  
If you have more than one Red Beacon at the top level, repeat the  
simulated failure test for each Red Beacon.  
SG-60 High Intensity Strobe System  
2-32  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
2.6.5  
Verify Photocell Operation Connected to Controller  
1.  
Verify proper mounting and orientation of photocell. Photocell shall face  
toward the polar sky (e.g., North in the northern hemisphere), not toward  
the sun.  
2.  
3.  
Set LOCAL / REMOTE switch to REMOTE.  
Verify that the correct Mode status LED (DS25 - DS27 Figure 2-10, Item  
3, Page 2-25) is lit red according to the ambient light conditions (during  
normal daylight, DS25 shall be lit red).  
4.  
5.  
6.  
7.  
Completely cover photocell (use a glove or hat, for example).  
Verify Night Mode status LED DS27 is lit red.  
Verify all other LEDs are in normal operating condition.  
Verify that the Tower Lighting System is operating in normal night mode  
per 2.6.4.3. (Steps 2 through 6 only)  
8.  
9.  
Uncover the photocell to expose it to ambient light.  
Verify Mode status LEDs are in normal status for current ambient light  
conditions (during normal daylight, DS25 shall be lit red and DS26 and  
DS27 shall be unlit).  
2.6.6  
Verify Photocell Operation Not Connected to Controller  
Disconnect connector TB2 from PCB1 in the Master Controller.  
Verify all Flashhead LEDs (DS1 - DS24) are lit red.  
15.  
16.  
17.  
Verify Photocell status LED DS28 (Figure 2-10, Item 3, Page 2-25) is lit  
red.  
18.  
19.  
Verify Photocell alarm LED DS30 (Figure 2-10, Item 5, Page 2-25) is un-  
lit.  
Verify all Flashheads are operating in Day mode (maximum brightness).  
The Flashheads will very slowly drift out of sync.  
20.  
21.  
Reconnect connector TB2 to PCB1 in the Master Controller.  
Verify that the Flashhead Status LED for each Flashhead on the tower is  
lit green (including any AOL). Unused Flashhead status LEDs shall be  
off. (DS1 - DS24: Figure 2-10, Item 4, Page 2-25)  
22.  
23.  
Verify Photocell status LED DS28 (Figure 2-10, Item 3, Page 2-25) is lit  
green.  
Verify Photocell alarm LED DS30 (Figure 2-10, Item 5, Page 2-25) is lit  
green.  
If the system passed all of the tests in Sections 2.6.3 - 2.6.6 above, the Master  
Controller, photocell and tower wiring were installed properly and the system is ready  
SG-60 High Intensity Strobe System  
2-33  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
for normal operation.  
If any test did not pass, please consult SECTION 4.  
TROUBLESHOOTING in this manual or call Honeywell Technical Support at (805) 581-  
5591.  
SG-60 High Intensity Strobe System  
2-34  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
SECTION 3. PRINCIPLES OF OPERATION  
3.1  
Overall Description  
The SG-60 High Intensity Obstruction Lighting System meets the requirements of the  
FAA Advisory Circular 150/5345-43E. Depending on system configuration, the  
Flashheads are either type L-856 (simultaneous flashing, 40 flashes per minute (FPM))  
or type L-857 (catenary flash pattern 60 FPM). The main components of the system  
are the Model SGC-60 Master Controller and the Model SGF-60 High Intensity  
Flashhead (with integrated power supply). Depending on tower configuration, a  
Medium Intensity Antenna Obstruction Light (AOL) may also be part of the system.  
The Master Controller detects the ambient light conditions, controls the timing and  
intensity of the Flashhead flashes, monitors the Flashheads' operating status, and  
provides alarm and status information to the tower operator. See Figure 2-10, Page 2-  
25.  
The Flashhead produces a flash of white light from a xenon flashtube. The Flashhead  
Power Supply generates the high voltages and currents needed to trigger the flashtube  
and create the flash itself. The Flashhead Control Logic receives communications from  
the Master Controller, and sets the flash brightness and timing accordingly. The  
Flashhead Control Logic also provide a status reply when queried by the Master  
Controller.  
The Master Controller and Flashheads communicate with electrical signals carried on a  
single twisted-pair cable (two signal conductors). Any transmission from either the  
Master Controller or a Flashhead uses both signal conductors together (only one  
device can be transmitting at any given time).  
Both the Master Controller and Flashhead have override switches allowing the operator  
to select Day, Twilight, or Night Modes manually for test or troubleshooting purposes.  
3.2  
SGF-60 Flashhead  
The main AC power input to the Flashhead is fed into the T1 ferro-resonant  
transformer. It can accept a variety of input voltages depending on how the primaries  
are tapped (using a special voltage selector block). The transformer secondaries  
provide a regulated outputs of 2000 volts peak-to-peak, and 450 volts peak-to-peak.  
The inputs of the T1 transformer are protected by fuse F1.  
The Trigger/High-Voltage card rectifies the 2000Vp-p to a pulsating 2000VDC. This  
voltage is then used to charge the energy storage capacitors. The flashtube V1, is  
always connected in parallel with the capacitors, but it is non-conductive until triggered,  
thus allowing the capacitors to charge to their peak voltage.  
When the flashtube is triggered by a very short, high-voltage pulse (about 15KV), the  
xenon gas in the flashtube ionizes, and the flashtube can conduct electricity. The  
SG-60 High Intensity Strobe System  
3-1  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
energy storage capacitors discharge rapidly through the flashtube. The high discharge  
current briefly heats the xenon gas to great temperatures, producing a bright flash. The  
short-circuit output current of the T1 transformer is limited to less than the flashtube's  
shut-off current. Once the capacitors discharge below a certain level, the current  
flowing through the tube cannot keep the xenon gas ionized, and the flashtube  
becomes a non-conductor and shuts off (self-extinguishes). Once the flashtube shuts  
off, the selected energy storage capacitors immediately begin charging the next flash.  
Relays K1 and K2 control which energy storage capacitors are charged, and thus  
determine how bright the next flash will be.  
When K1 and K2 are de-energized (as shown in Figure 3-2, Page 3-12), C1, C2, and  
C3 are charged (C3 includes C3A and C3B). This is provides the energy required for  
the Day Mode flash (approximately 270,000 candela (cd) effective intensity).  
If K2 is energized, C3 is removed from the charging circuit, and the reduced energy  
produces a Twilight Mode flash (approximately 20,000 cd effective intensity).  
If K1 and K2 are energized, C2 and C3 are removed from the charging circuit. The  
remaining C1 provides the energy for the pulsed Night Mode flash (approximately  
2,000 cd effective intensity).  
The DB1 diode block isolates the capacitors from each other during charging, so that  
they can be charged independently, but allows them to all discharge through the  
flashtube simultaneously.  
As an automatic safety feature, the K3 relay will discharge the energy stored in C1, C2  
and C3 when the case is opened (opening the S1 interlock). Never rely solely on the  
K3 discharge relay, because if the safety discharge wiring became loose or damaged,  
the capacitors could still be charged to 2000VDC. Although the High Voltage indicator  
on the Trigger/High-Voltage is designed to indicate any high voltage still stored in the  
capacitors, you should always discharge the capacitors with an approved grounding  
rod before working with the system.  
The 450Vp-p from T1 is used to charge a trigger capacitor on the Trigger/High-Voltage  
Board. When the flashtube should be fired, this trigger capacitor is discharged through  
the primary of trigger transformer T4. T4 steps up the trigger pulse to the 15KV  
Transformer T2 provides power for the digital circuitry, and the K1-K3 relays. It can  
accept a variety of input voltages depending on the primary tap connections, and it  
provides outputs of 12VAC and 24VAC. The T2 inputs are protected by fuse F2.  
Logic circuits in the Flashhead receive command signals from the SGC-60 Master  
Controller. However, in the absence of command signals, the Flashhead generates its  
own timing signal, which controls the rate of flash.  
Test switches located on the Flashhead switch assembly allow the system to operate in  
either Day, Twilight or Night mode. When the Flashhead door is closed, the system  
operates in Remote mode regardless of the switch positions. See Figure 1-2, Page 1-3.  
SG-60 High Intensity Strobe System  
3-2  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
WARNING!  
HIGH VOLTAGE is on the energy storage capacitors C1, C2, C3A and  
C3B when the High Voltage Indicator DS1 indicator is lit! (DS1 is the  
neon lamp located on the High Voltage & Trigger board - do not  
confuse the High Voltage Indicator DS1, with the PWR ON lamp DS1.)  
It is possible to have high voltage on the energy storage capacitors  
even if all AC power has been removed from the system, even though  
the system is designed to drain the energy storage capacitors when  
power is removed.  
3.2.1  
SGF-60 Motherboard  
The Motherboard has no active components. It provides the necessary connections  
between the external power and control wires and the Digital and Trigger/High Voltage  
Cards.  
It provides card edge sockets for the Trigger/High-Voltage Board (J1) and the Digital  
Board (J2). Logic signals enter the motherboard through the J3 cable connector. Most  
of the fast-on terminals (E1-E10) are used for high voltage and/or high-current  
connections.  
3.2.2  
SGF-60 Digital Board  
The digital board is responsible for coordinating all the activity within the Flashhead.  
The microcontroller U6 is the main processing units of the Flashhead. It receives,  
interprets, acts on, and replies to commands from the Master Controller. It also  
controls the energy selection relays, reads the manual mode select switches, controls  
the flashtube triggering, monitors the flash current. In the absence of any signals from  
the Master Controller, it will autonomously operate the strobe in Day Mode.  
The following is a simplified sequence of events from the perspective of the Digital  
Board:  
1. Wait to receive a flash request from Master Controller  
2. Wait for next AC zero-crossing  
3. Send trigger request signal to Trigger/High-Voltage Board  
4. Check flash feedback current  
5. Transmit a reply to Master Controller if the flash request was addressed to this  
Flashhead number and flash status is good.  
6. Set K1, K2 Relays for next flash mode (Day, Twilight, Night)  
7. Update Indicators DS2, DS3  
SG-60 High Intensity Strobe System  
3-3  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
The Digital Board functions are discussed in more detail below.  
3.2.2.1  
Power Supplies  
The Digital board rectifies (DB1) and filters (C4) the 24VAC output of the Flashhead T2  
transformer, and uses the resulting unregulated voltage to power the K1, K2, and K3  
relays. The K3 relay coil is wired directly to this supply. K3 will be energized whenever  
power is supplied to the digital board. Power to the K1 and K2 relay coils is controlled  
by the micro-controller.  
The unregulated power that feeds the relays is regulated by VR1 to +15VDC. This is  
used to power the logic and control circuitry on the Trigger/High-Voltage Board.  
(Connection between the boards is made by traces on the Motherboard.)  
The Digital board also rectifies (DB2) and filters (C5) one of the 12VAC outputs of the  
Flashhead T2 transformer. This unregulated voltage is supplied to the power down  
circuit (described below), and VR2. VR2 provides regulated 5V power to the  
microcontroller and other logic chips. When 5V logic power is present, DS1 turns on  
(red).  
The power-down circuit can briefly shut down the input to VR2, effectively removing all  
logic power from the board. The power-down logic has its own independent 5V power  
(using simple zener diode regulation of the DB2/C5 output). The shutdown circuit does  
not affect the relay or +15V supplies (although the K1 and K2 relays cannot be  
energized as long as the micro-controller is unpowered). You can test the function of  
the power-down circuit by pressing the S1 pushbutton for about 1 second. You should  
see DS1 turn off momentarily, and then as DS1 turns back on, you should see the LED  
check as the microcontroller software initializes (DS2 and DS3 should quickly blink  
together twice).  
3.2.2.2  
Communications  
The Digital Board receives commands from the Master Controller via an RS485 serial  
link. The RS485 transceiver chip U11 is protected from voltage transients by surge  
suppression devices and by transformer/optical isolation from chassis ground and the  
rest of the digital board.  
If a voltage transient destabilizes the communications hardware or the main processor,  
the Digital Board will remove and restore its own logic power, thus clearing any  
momentary hardware (or software) faults. See 3.2.2.1 above for more information on  
the power down circuit.  
SW4-1 (TERM) provides the necessary termination resistance for the RS485 serial  
network. Each end of the cable should be terminated with a resistor. Typically, only  
one flashhead (one of the ones farthest from the Master Controller) will have SW4-1  
set to ON. All other flashheads will have SW4-1 set to OFF.  
Every Flashhead must be assigned a unique address or ID (flashhead number) from 1  
through 24 inclusive, so the Master Controller can monitor the status of each individual  
Flashhead. The Flashhead number is set using SW3. Set the SW3 switches so that  
their total value equals the desired flashhead number. The value for each switch  
SG-60 High Intensity Strobe System  
3-4  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
position is shown on the board silkscreen. Note that ON means zero, and that OFF  
means the indicated value (negative binary).  
The Digital Board will only transmit a reply when its number is specified by the Master  
Controller.  
The Digital Board monitors its transmission quality by reading the transmission as it  
sends it. The green LED DS3 indicates the current communications status. It is  
updated after every flash. If no valid requests are being received from the Master  
Controller, the LED will stay off. If DS3 comes on, this indicates a valid data reception  
from the Master Controller. The DS3 flash pattern indicates the status of the most  
recent transmission from this Flashhead to the Master Controller. A "slow blink"  
indicates that no transmission has been attempted yet (status unknown). A "steady on"  
state indicates that the most recent transmission read back correctly. A "fast blink"  
indicates that most recent transmission failed to read back correctly.  
The normal cycle on power up is: DS3 Off, then slow blink, then steady on. The  
duration of the "slow blink" period depends on the number of Flashheads in the system,  
as the Master Controller queries them in numeric order.  
The Digital Board expects the Master Controller to request every flash. If the request  
does not arrive when expected, the DS3 will go out, and the DS3 status cycle will start  
over (transmission status will start as unknown).  
If no flash requests are received from the Master Controller for 4 consecutive flash  
periods, the Digital Board considers that there has been a communications failure. If it  
has been at least 12 hours since power-on, it will use the power down circuit to reset  
itself. Otherwise it will switch the strobe to Day Mode.  
For a Dual System, when the white lights are not flashing (at night), the Master  
Controller is still broadcasting regular flash requests -- but is requesting that the strobe  
flash in the "Off Mode."  
3.2.2.3  
Mode Selection  
If the Local/Remote switch is open (the spring-back position after being pushed in), the  
Digital Board will operate the strobe according to the position it reads in the Mode  
Select Switch. If the Local/Remote switch is closed (pushed in or pulled all the way  
out), the Digital Board operates the Flashhead in the mode requested by the Master  
Controller.  
When the Master Controller requests a change in mode, there will be a 4-flash delay  
before the Flashheads update own remote mode selection to match the requested  
mode.  
If the SW2-3 (NO NITE) is set ON, the Digital Board will not flash at all in night mode.  
This option is provided for backward compatibility with Dual Systems with older Master  
Controllers installed that can not broadcast an "Off" mode. In these older systems the  
flashheads were configure the flashheads to not flash at night, when the Red Lights  
were switched on. This option should not be used with the Master Controller described  
in this manual. Instead, configure the Master Controller to work with a Dual System.  
SG-60 High Intensity Strobe System  
3-5  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
3.2.2.4  
Flash Control  
To fire the flashtube, the Digital Board pulls down the trigger request line (P2-17) for  
about 500uS. This signals the Trigger/High-Voltage Card to trigger the flashtube.  
The Digital Board will issue its trigger request on a T2 zero-crossing. (Normally, the  
first zero-crossing it detects after receiving a flash request from the Master Controller.)  
In Day and Twilight modes, the Digital Board will issue a single trigger request. In  
Night mode, the Digital Board will issue a series of 15 pulses at consecutive zero  
crossings.  
The zero crossing is determined from a 12VAC output from Flashhead transformer T2.  
(T2-15 and T2-16, entering the Digital Board at P2-21 and P2-23 respectively). As a  
failsafe measure, the Digital Board will issue a trigger request after a timeout period  
even if no zero crossing is detected.  
When acting as a Top or Bottom Catenary Flashhead, the Digital Board will delay by  
1/13 and 3/13 seconds respectively before looking for the first T2 zero-crossing, to  
achieve the required Catenary flash sequence:  
(Middle -- 1/13 s, Top -- 2/13 s, Bottom -- 10/13 s, Middle -- etc.)  
The SW2-1 and SW2-2 switches instruct the Digital Board to apply the correct timing  
delays for Catenary Systems. The faster flash rate (60 flashes per minute) is set by an  
option on the Master Controller (SW2-1).  
3.2.2.5  
Flash Feedback  
The Digital Board monitors the current discharged through the flashtube with the  
Flashhead current sense transformer T3. The T3 output is used to peak-charge a  
capacitor C17. The microcontroller reads the captured voltage level at the capacitor  
with A/D converter (U5) before and after the flash to determine if the flash occurred  
successfully. C17 will fully discharge before the next flash.  
The yellow LED DS2 indicates the results of the most recent flash. If the Digital Board  
considered the flash successful the DS2 will be on. If the Digital Board considers the  
flash to have failed, DS2 will be off.  
If four consecutive flashes fail, the Digital Board reports a Flash/Fail alarm to the  
Master Controller (per FAA specifications).  
The T3 transformer connections are polarity sensitive. If the wires are reversed, the  
Digital Board will not be able to detect good flashes, especially in Day and Twilight  
modes.  
3.2.3  
SGF-60 Trigger/High-Voltage Board  
The Trigger/High-Voltage combines two completely independent functions: high  
voltage rectification and flashtube triggering.  
SG-60 High Intensity Strobe System  
3-6  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
3.2.3.1  
High Voltage Rectification  
This section of the Trigger/High-Voltage Board provides the DC to charge the energy  
storage capacitors that power the flashtube.  
The high voltage AC from the ferro-resonant power transformer T1 pins T1-7 and T1-8  
is output to the Trigger/High-Voltage board through the Flashhead motherboard pins  
E5 and E6, respectively. The high-power diode bridge DB1 rectifies the incoming  
2000Vp-p voltage to pulsed 2000VDC. This DC voltage is sent to charge the energy  
storage capacitors through Flashhead motherboard pins E7 (+) and E4 (-). Voltage  
divider circuit R6 - R10 with a series neon lamp, High Voltage Indicator DS1, is  
connected to the bridge output. High Voltage Indicator DS1 lights whenever high  
voltage is present.  
3.2.3.2  
Flashtube Triggering  
The trigger control section receives +15V power from the Digital Board. The Digital  
Board also provides the trigger request signal telling the Trigger/High-Voltage Board to  
fire the flashtube.  
The heart of the Trigger circuit consists of a trigger capacitor C4, SCR Q4, and  
unijunction transistor Q3. The trigger circuit energy is derived from terminals T1-6 and  
T1-2 of transformer T1 through a rectifier circuit in the trigger control section. This  
trigger energy is stored in a 0.5mF capacitor C4, whose charge path is through the  
primary coil of the high voltage trigger transformer T2 to ground.  
Microcontroller U1 synchronizes the actual flashtube firing more precisely with the high  
voltage zero crossing. It buffers incoming trigger requests from the Digital Board, and  
U1 pin 9 receives the trigger request signal from Digital Board U3 (about a 500msec  
low). U1 waits for a high-voltage zero crossing to pass, and then drives pin 10 is high  
to charge C3. As soon as U1 detects the next high voltage zero crossing on pin 6, it  
drives pin 10 low for 500msec. This momentarily forces the gate of Q3 below the anode  
of Q3, triggering Q3, a snap-action unijunction switch. C3 discharges through Q3 with a  
fast rising current, driving the gate of SCR Q4. SCR Q4 then turns on, switching 0.5mF  
capacitor C4, charged to 450 volts, into the primary coil of the series trigger transformer  
T3, located on the flashtube assembly. The series trigger transformer T3 steps the  
pulse to approximately 15KV, flashing the flashtube V1. The recharge current for the  
capacitor C4 is limited by a series resistor to a value below the hold-in current of the  
SCR Q4 so that it turns off, allowing capacitor C4 to charge again in time for the next  
flash.  
If another trigger request signal has arrived from the Digital Board, C3 is immediately  
charged and the process is repeated until all trigger requests are processed.  
The Trigger/High-Voltage Board will only fire the flashtube in response to a trigger  
request from the Digital Board. For night flashes composed of multiple pulses, the  
Trigger/High-Voltage Board requires a series of requests from the Digital Board.  
If the U1 microcontroller cannot detect the high-voltage zero crossing, it will fire the  
flashtube immediately after receiving the trigger request from the Digital Card.  
SG-60 High Intensity Strobe System  
3-7  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
3.3  
SGC-60 Master Controller  
3.3.1  
Power Supply  
The Master Controller input power is connected to PB1, which then feeds transformer  
T1 (under the switch panel). The Master Controller can accept a number of input  
voltages, depending on the primary tap connections to T1, and will operate at 50 or 60  
Hz. The T1 transformer output provides 12VAC to the Master Controller circuit board  
PCB1 (T1-17 and T1-18 connecting to PCB1 TB1-1 and TB1-2). The input voltage  
passes through fuse F1, is rectified by DB1, and filtered by C16.  
This unregulated voltage (about 16VDC) is available for external use TB8. The 16VDC  
is also fed into the switch mode power supply (including voltage regulator VR1), which  
provides regulated +5VDC to the rest of the board.  
The 16VDC is also used to provide power for the power-down circuit. The power-down  
circuit can briefly shut down the regulated +5VDC supply powering the rest of the board  
logic, providing a power-on reset for the rest of the board logic.  
The power-down circuit will be activated automatically if (1) the microcontroller stops  
functioning normally, or (2) the microcontroller detects a severe communications  
failure. To prevent nuisance alarm chatter, the microcontroller will only deliberately  
activate the power-down circuit if at least 24 hours have elapsed since the last power  
on.  
The power-down circuit is intended to allow automatic recovery from rare cases when  
transients lock up the communications transceiver, but it can also be used as a manual  
board reset. . You may test this function by holding down the RESET toggle switch on  
the switch panel for about 1 second.  
If input power is lost, or fuse F1 is blown the Power Fail Relay (K4, terminals TB3-C3,  
-NO3, -NC3) will de-energize.  
3.3.2  
Flash Requests and Flashhead Status  
The Master Controller transmits a flash request command to the Flashheads every 1.5  
seconds (or every 1.0 seconds in Catenary mode, selected with SW2-1). The flash  
request also contains the requested operating mode. The flash request applies to all  
Flashheads, but is addressed to a specific Flashhead.  
All Flashheads receive the flash request. All Flashheads flash in response to the  
request, and update their operating mode, but only the addressed Flashhead may reply  
to the Master Controller.  
Whenever a the Flashhead replies OK, the Master Controller marks it as good, and  
sets the corresponding Flashhead Status LED to green.  
If the Flashhead does not reply OK, the Master Controller marks it as bad, and sets the  
corresponding Flashhead Status LED to red.  
SG-60 High Intensity Strobe System  
3-8  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
The Master Controller gives previously good Flashheads four chances to reply  
(addressing that Flashhead repeatedly), before marking them bad. Previously bad  
Flashheads are given one chance to reply OK before moving on to the next Flashhead.  
The Master Controller checks the status of each Flashhead in order of increasing  
flashhead number, cycling repeatedly through the total number of selected Flashheads.  
You can set the number of Flashheads monitored using DIP Switch SW1. If the Master  
Controller is not monitoring a flashhead, the corresponding Flashhead Status LED is  
turned off.  
If any Flashhead is marked bad (Red LED), the Master Controller will de-energize the  
Flashheads Alarm Relay K1 (TB3-C1, -NO1, -NC1), and turn off the corresponding LED  
(DS29).  
3.3.3  
System Mode Selection  
The master controller determines what mode to transmit with the Flash Request by  
reading the Photocell input and the Front Panel Switches.  
If the Remote/Local Switch on the front panel switch is set to Local, the Master  
Controller will take its operating mode from the position of the Local Mode Select  
Switch (Day, Twilight, or Night).  
If the Remote/Local Switch is set to Remote (Photocell), the Master Controller will take  
its operating mode from the analog reading of the photocell input to TB2 of the Master  
Controller Board. If the photocell fails, the Master Controller will automatically select  
Day Mode.  
The Master Controller indicate its current Photo Mode by illuminating the Day, Twi, or  
Nite LEDs (DS25-DS27). If the Photocell fails (including open or short circuit), the PC  
OK LED (DS28) will turn red, and the Photocell Fail Relay (K2) will de-energize. If the  
photocell status is good, DS28 will be green and K2 will be energized.  
If the Master Controller is configured for a Dual System (SW2-2 is On), uses the K4  
relay to control the Red Light Controller. The Master Controller energizes K4 to turn  
the Red Lights off, and de-energizes K4 to turn the Red Lights on. As long as the Red  
Lights are operating normally, the Master Controller will request Off Mode from the  
Flashheads instead of Night Mode.  
If the Red Light Controller signals a top beacon failure (by creating an open between  
TB6-1 and TB6-2), the Master Controller will request Night Mode from the Flashheads,  
and energize K4 to turn off down the remaining Red Lights. The Master Controller also  
energizes K5, the Backup Relay, to provide an indication that the Dual system has  
switched to White Night Backup.  
Once the Master Controller has switched into White Night Backup, it will remains  
latched in that mode until switched into Twilight or Day Mode (either automatically or  
manually). If the Red Light Controller indicates is ready (DS36 is lit) at the next  
transition to into Night Mode, the Red Lights will be tried again. Typically, Red Light  
Systems (such as the Honeywell 9LCA series) do not report any Beacon Failures  
SG-60 High Intensity Strobe System  
3-9  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
during the daytime. In this case, the Master Controller will briefly try the Red Lights  
each night until the top beacon is repaired.  
Troubleshooting Tip: To check system communications independent of most Flashhead  
failures, place a jumper across TB6-1 and TB6-2, set SW2-2 On, and select Local  
Night Mode from the switch panel. Because an Off Mode "flash" cannot fail, all the  
Flashheads will reply OK if they can. Be sure to restore your Master Controller to its  
proper configuration after testing.  
3.3.4  
Communications Circuitry  
The Master Controller transmits it flash requests, and receives replies via an RS485  
serial link. The RS485 transceiver chip U2 is protected from voltage transients by  
surge suppression devices and by transformer/optical isolation from chassis ground  
and the rest of the digital board.  
The microcontroller (U1) monitors its own transmissions. After each transmission, the  
COM OK LED will be lit green if the transmission read back properly, or turned off it  
there was a read-back failure. This only indicates that the transceiver chip on the  
Master Controller is functioning properly -- it does not indicate that the Flashheads are  
communicating properly.  
SW3-1 (TERM) provides the necessary termination resistance for the RS485 serial  
network. Each end of the cable should be terminated with a resistor. Typically the  
Master Controller is installed at one end of the communications cable, in which case  
SW3-1 should be ON.  
The Master Controller board also provides the ground connection for the  
communication cable shielding. The shield drain wire terminates at TB5-S (position 4),  
and a heavy trace on the circuit board connects the shield to the lower right mounting  
screw, and fast-on connector, both marked E1. The factory installs a grounding wire  
from E1 to PB1-G. This should be the only place the communications shield is  
grounded. You can check this by unplugging TB5, and measuring for an open circuit  
between the (unplugged) TB5-S screw terminal and earth ground.  
SG-60 High Intensity Strobe System  
3-10  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
Figure 3-1: Master Controller Board Schematic  
SG-60 High Intensity Strobe System  
3-11  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
Figure 3-2: SGF-60 Flashhead System Schematic  
SG-60 High Intensity Strobe System  
3-12  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
Figure 3-3: SGF-60 Digital Board Schematic  
SG-60 High Intensity Strobe System  
3-13  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
Figure 3-4: SGF-60 Trigger/High-Voltage Board Schematic  
SG-60 High Intensity Strobe System  
3-14  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
SECTION 4. TROUBLESHOOTING  
Refer to the troubleshooting flowcharts. Replace components in the order stated, and  
keep track of those replaced. The following troubleshooting procedures presume that  
all fuses, interlocks, and controls are functioning properly. Note that the troubleshooting  
flowcharts are intended to be used as a general guide, and do not cover every possible  
mode of failure.  
WARNING!  
1.  
Always turn off power when changing any component or printed  
circuit board.  
2.  
High voltage is present in the Flashhead. Do not cheat the  
interlocks.  
3.  
Do not put hands or tools in the Flashhead until the High Voltage  
Indicator neon lamp DS1 on the High Voltage & Trigger board is  
extinguished. Refer to Figure 1-2, Page 1-3, for the location of High  
Voltage Indicator DS1 - do not confuse the High Voltage Indicator DS1,  
with the PWR ON lamp DS1. Note that it is possible for the High Voltage  
Indicator DS1 to be lit even when the PWR ON lamp DS1 if off. If this  
happens, the energy storage capacitors C1 - C3 must be discharged  
before performing maintenance.  
4.  
Do not look directly into the Flashhead at close range when it is  
flashing. Flashtubes in this lighting system produce brilliant flashes of  
light containing some ultraviolet radiation, which can cause temporary  
or permanent eye damage.  
5. The components and assemblies in this system were designed by  
Honeywell to handle the high voltages that are present. Honeywell  
strongly recommends against substituting components or assemblies  
that might be available through other vendors.  
Before consulting the troubleshooting charts, check the following.  
·
·
The Master Controller Local/Remote Switch is in Remote (Photocell)  
If you have a Dual System, check that the Red Light Controller is also set for  
Automatic Mode Control.  
·
·
·
Master Controller is turned on.  
Main Circuit Breakers are not tripped.  
Flashhead Fuses F1 and F2 are intact. (Remove power at breakers!)  
SG-60 High Intensity Strobe System  
4-1  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
The charts assume that that you have already eliminated these as possible causes for  
the observed problem.  
The charts may instruct you to make temporary changes for testing (such as select  
operating modes manually, or installing a jumper). These temporary measures are  
marked with rectangles with rounded corners. Always return the systems to their  
normal state after completing your troubleshooting. To reduce chart complexity,  
the charts not specify the individual actions necessary.  
Multiple strobe problems are most commonly cause by faults in the communications  
cabling. If you have determined that there is a short or break, we recommend  
disconnecting communication wiring leading to the upper sections of the tower while  
checking and/or repairing the lower sections. Individual flashheads may be isolated in  
the same way. Using this technique, work upward from one flashhead level to the next,  
to create known good wiring (per Section 2.5.4).  
If the cable test shows an open between TB5-A and TB5-B even though a terminator is  
set in a top-most strobe, then there is a break in either the A or B line. Use the  
following test to determine if the break is above or below a Flashhead level.  
1. Remove all power from Flashheads and Master Controller at the main circuit  
breakers.  
2. Unplug Data Cable connector TB5 from PCB1 in Master Controller.  
3. In one of the Flashheads on a given level, install a jumper (or alligator clip)  
between TB1-4 and TB1-5.  
4. Verify short circuit between (<20 ohms) TB5-A and TB5-B (both on Data Cable).  
If the measurement is open instead, the break is below that Flashhead level.  
5. Remove the jumper between TB1-4 and TB1-5.  
6. Plug Data Cable Connector TB5 back into PCB1.  
The Troubleshooting charts use the following abbreviations:  
FH  
Flashhead  
MC Master Controller  
DB  
Digital Board (inside the SGF-60 Flashhead)  
THVB Trigger/High-Voltage Board (inside the SGF-60 Flashhead)  
RLC Red-Light Controller (such as Honeywell’s 9LCA series).  
SG-60 High Intensity Strobe System  
4-2  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
All Flashheads stuck  
in Day Mode  
No  
Are any LEDs  
on Master  
Replace MC Fuse F1.  
Controller lit?  
Yes  
Does MC  
show Green  
PC OK LED  
(DS28?)  
Yes  
Troubleshoot Flashheads  
Individually.  
Does MC  
show Green  
FH Status  
LEDs?  
Yes  
No  
Check Photocell Wiring.  
If wiring OK, replace Photocell.  
No  
No  
Is Master  
Controller  
COM OK LED  
lit? (DS34)  
Is Master  
No  
Yes  
Check for shorts  
between  
communication  
cable and power  
wiring.  
Controller  
COM OK LED  
lit? (DS34)  
Unplug MC TB5  
No  
Yes  
Visually examine MC for damage near TB5.  
If damaged, replace Master Controller PC Board.  
Otherwise, replace Master Controller chip U2.  
Is Comm  
Cable wired to  
MC TB5  
Correct wiring.  
1
correctly ?  
Yes  
Make sure only a single (a  
top-level) Flashhead has  
SW4-1 (TERM) set to on.  
Check for shorts or breaks in  
the communication cable.  
Perform  
No  
Comm Wiring  
2
Tests . Is  
wiring OK?  
Yes  
1Per Section 2.4.2  
Troubleshoot each Flashhead  
individually.  
2Per Section 2.5.4 and page 4-2  
Figure 4-1: General Troubleshooting – All Flashheads Stuck in Day Mode  
SG-60 High Intensity Strobe System  
4-3  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
This test assumes that F1  
and F2 have tested OK.  
Flashhead does not  
flash  
Yes  
Is FH Flashtube  
broken?  
Replace Flashtube.  
Microcontroller Failure.  
Replace Digital Board.  
No  
Press DB SW1  
pushbutton 1 sec  
Yes  
Yes  
Is THVB DS1  
High Voltage  
Indicator Lit?  
Is DB DS1 red  
LED (+5V  
Indicator) lit?  
and release.  
No  
No  
Remove Power at  
Breakers. Discharge  
Capacitors.  
Power Supply Failure:  
Replace Digital Board.  
Do DB DS2  
(yellow) and DS3  
(green) blink twice  
together?  
No  
Yes  
Replace capacitor. If THVB  
DS1 High Voltage Indicator  
still does not light, or system  
flashes erratically, replace FH  
T1 Transformer.  
Yes  
Is FH capacitor  
C1A, C1B, C2,  
C3, or C4 shorted  
out?  
Check to see if problem is resolved  
after each step.  
1. Replace Trigger/HV Card  
2. Replace Digital Card  
3. Replace Flashtube.  
4. Replace Trigger Transformer  
Once problem is resolved, try  
restoring (one at a time),  
components replaced in previous  
steps.  
No  
Select Manual Day  
Mode from FH Switch  
panel. Apply power to  
Flashhead.  
Check to see if problem is resolved  
after each step:  
1. Check K3 fast-on connectors.  
2. Replace Digital Board.  
3. Replace K3 Relay.  
Check FH resistor pack R2-R4 (stack  
closest to door). Replace if visually  
damaged.  
Does K3 Relay  
pull in at power  
on?  
No  
Rectification Failure:  
Replace Trigger/High-  
Voltage Board  
Yes  
Figure 4-2: General Troubleshooting – Flashhead Does Not Flash  
SG-60 High Intensity Strobe System  
4-4  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
Flashhead stuck in  
Day Mode  
Check if problem is resolved  
after each step taken.  
1. Replace Digital Board.  
2. Check for loose connections  
to coil of FH K2 Relay  
Will FH  
operate in  
other modes  
with manual  
selection?  
Is DB DS3  
green LED  
steady off?  
No  
No  
No  
No  
3. Replace FH K2 relay.  
Yes  
Check for loose mounting nuts  
on FH switch assembly. Make  
sure FH Remote/Local  
interlock is pressed when door  
latched.  
Yes  
Are Comm  
wires correctly  
wired in FH  
Correct wiring.  
TB1? 1  
Yes  
Are Comm  
wires correctly  
wired in MC  
Correct wiring.  
TB5? 2  
Yes  
Remove all power  
from FH and MC.  
No  
Locate and repair  
break.  
Did wires pass  
isolation and  
continuity  
Perform Comm Wiring  
tests (Installation  
Check3, and A-B  
Continuity Check. 4)  
checks?  
Yes  
1Per Section 2.4.2  
2Per Section 2.4.5  
3Per Section 2.5.4  
4Per page 4-2  
Replace Digital  
Board.  
Figure 4-3: General Troubleshooting – Flashhead Stuck in Day Mode  
SG-60 High Intensity Strobe System  
4-5  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
Red Lights don’t turn  
on at night.  
1. Disconnect RLC Photocell.  
2. Connect wiring from MC  
Red/Night relay K4 to RLC  
Is MC K4  
wired to RLC  
Photo Input?  
No  
Photocell Input.1  
Yes  
Connect wiring from MC TB-6 to  
Top Red Beacon alarms.2  
Is MC TB6  
wired to RLC  
Top Beacon  
Alarms?  
No  
Manually turn on  
Red Lights at RLC.  
Yes  
Does MC Red  
Ready LED light  
up (DS36)?  
Check wiring from MC Red/Night  
relay K4 to RLC Photocell Input.1  
No  
Check wiring from MC TB-6 to  
Top Red Beacon alarms.2  
No  
Is RLC reporting  
a Top Beacon  
Alarm?  
Yes  
1Per Section 2.4.4.1  
2Per Section 2.4.4.2  
Repair Failed Top Beacon.  
Figure 4-4: Dual System-Specific Troubleshooting  
SG-60 High Intensity Strobe System  
4-6  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
All Flashheads are  
flashing together, but  
not in catenary pattern.  
All Flashheads flash too  
slow (40 flashes per  
minute).  
A Flashhead is out of  
sync with its catenary  
level.  
Does MC show  
Does MC show  
Green FH Status  
LED for each  
Does MC show  
Green FH Status  
LED for that FH?  
No  
No  
No  
Green FH Status  
LED for each  
working FH?  
working FH?  
Yes  
Yes  
Yes  
Set MC switch SW-2 to  
on.  
For each top-level FH:  
Set DB switch SW2-1 to on  
Set DB switch W2-2 to off  
If FH is on top level:  
Set DB SW2-1 to on  
Set DB SW2-2 to off  
·
·
·
·
·
·
For each bottom-level FH:  
Set DB switch SW2-1 to off  
Set DB switch SW2-1 to off  
If FH is on bottom level:  
Set DB SW2-1 to off  
Set DB SW2-2 to on  
For each mid-level FH:  
Set DB switch SW2-1 to on  
Set DB switch SW2-2 to on  
If FH is on middle level:  
Set DB SW2-2 to on  
Set BD SW2-2 to on  
See General System  
Troubleshooting  
Figure 4-5: Catenary System-Specific Troubleshooting Chart  
SG-60 High Intensity Strobe System  
4-7  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
SECTION 5. MAINTENANCE  
5.1  
SGC-60 Master Controller  
The Master Controller required no periodic maintenance. However, below are the  
instructions for installing a new transformer  
5.1.1  
Transformer Replacement  
see step 10  
Figure 5-1: SGC-60 Replacement Transformer  
Transformer replacement instructions.  
1.  
2.  
3.  
4.  
5.  
6.  
Open Controller unit and set power switch to off.  
Secure Controller input power at the circuit breaker.  
Verify power to the controller is off.  
Remove 4 screws attaching Switch panel to standoffs.  
Swing panel up and out of the way.  
Remove 2 screws attaching the white wire pair to the transformer outer  
terminals.  
7.  
8.  
9.  
Disconnect the black and white wire connectors from transformer inner  
terminals.  
Remove 2 screws securing transformer to back panel and remove  
transformer.  
Place new transformer in controller with terminals facing right and secure  
with upper screw only. Bottom screw not matched to back panel but  
should not affect operation.  
SG-60 High Intensity Strobe System  
5-1  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
10.  
11.  
12.  
Attach wires with the push on connectors to the following terminals.  
(a)  
(b)  
White wire to the outer bottom right terminal  
Black wire to the terminal that matches the Controller input  
voltage. (240v shown in Figure 5-1.)  
You will need to replace the terminal lugs on the other 2 white wires  
before attaching to the transformer.  
(a)  
(b)  
Cut off wire terminal lugs as close to lug as possible  
Strip insulation back and crimp on new push on connectors.  
Attach White wires with new connectors to the upper back terminals  
shown in diagram.  
13.  
14.  
15.  
16.  
Re-install switch panel assembly to standoffs.  
Visually inspect for loose connectors or any short-circuited lines.  
Apply power to the Controller from the Circuit breaker.  
Set Controller power switch to on and verify normal operation.  
5.2  
SGF-60 Flashhead  
Normal maintenance of the Flashhead requires periodic cleaning of the window with a  
non-abrasive soap.  
WARNING!  
Ensure that the power is off and the energy storage capacitors have  
been discharged before opening the Flashhead. Do not put hands or  
tools in the Flashhead until the High Voltage Indicator neon lamp DS1  
on the High Voltage & Trigger board is extinguished. Refer to Figure  
1-2, Page 1-3, for the location of High Voltage Indicator DS1 - do not  
confuse the High Voltage Indicator DS1, with the PWR ON lamp DS1.  
Note that it is possible for the High Voltage Indicator DS1 to be lit even  
when the PWR ON lamp DS1 if off. If this happens, the energy storage  
capacitors C1 - C3 must be discharged before performing maintenance.  
5.2.1  
Flashtube Replacement  
Flashtubes that are faulty or degraded in performance by aging shall be replaced per  
the following procedure:  
1.  
Shut off the power to the system by opening the main AC power circuit  
breakers.  
2.  
3.  
Release the Flashhead cover latches.  
Swing the cover open, exercising caution not to damage the glass face or the  
gasket.  
4.  
Release the old flashtube by disconnecting the electrode wire fastons at each  
end and carefully snapping the flashtube from its holders.  
SG-60 High Intensity Strobe System  
5-2  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
5.  
6.  
Unpack the new flashtube. Do not touch the glass envelope - contamination  
from a fingerprint will degrade the reliability of the flashtube.  
Holding the flashtube by its metal ends, center it in the reflector assembly  
and snap it into place. Make sure the red mark on the flashtube matches the  
red mark on the socket assembly.  
7.  
8.  
Attach the faston connector at each end of the flashtube to each socket  
assembly. Make sure wires are not twisted - the metal to glass bond is fragile.  
Refer to Figure 5-2 below. Dress the electrode wires away from the sides of  
the reflector.  
9. Close and fasten the Flashhead cover.  
Figure 5-2: Flashtube Installation  
5.3  
Ambient Light Sensor (Photocell)  
The only maintenance required for the photocell is periodic cleaning. The frequency of  
cleaning depends on the environment to which the photocell is exposed.  
SG-60 High Intensity Strobe System  
5-3  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
SECTION 6. REPLACEMENT PARTS  
Description  
Part Number  
SGF-60 Flashhead  
Capacitor, 1mF, C1-----------------------------------------------------77-4220  
Capacitor, 3mF, C4-----------------------------------------------------77-3311  
Capacitor, 12.5mF, C2 ---------------------------------------------AC000003  
Capacitor, 110mF, C3A -----------------------------------------77-4133-001  
Capacitor, 50mF, C3B----------------------------------------------AC000002  
Diode Block Assembly, DB1-------------------------------------277-3342-6  
Flashtube Assembly, V1----------------------------------------------77-3295  
Fuse, FNQ, 3.2A, F1 (for 480VAC) -----------------------------77-2041  
Fuse, FNQ, 6A, F1  
(for 208/240VAC)------------------------77-1167  
Fuse, FNQ, 10A, F1 (for 120VAC) -----------------------------77-2040  
Fuse, FLA, 1/4A, F2 (for 120/208VAC)---------------------FU000003  
Fuse, FLA, 1/4A, F2 (for 240VAC) --------------------------FU000003  
Fuse, FLQ, 1/10A, F2 (for 480VAC)--------------------------FU000004  
PC Board, Motherboard -------------------------------------- 277-5053-001  
PC Board, Digital Controller, Programmed------------- 34E00031-001  
PC Board, Trigger & High Voltage------------------------ 34E00010-001  
Relays K1, K2, K3------------------------------------------------------77-3870  
Transformer, T1 (60Hz)-----------------------------------------------77-3890  
Transformer, T1 (50Hz)--------------------------------------------- 277-4244  
Transformer, T2 (50Hz / 60Hz)---------------------------------- TP000005  
Trigger transformer -------------------------------------------------- 277-3324  
Power resistor--------------------------------------------------------- 277-5101  
Surge Arrestor ----------------------------------------------------------77-4139  
SGC-60 Master Controller  
PC Board, Master Controller ------------------------------- 34E00240-001  
Transformer, T1 (50Hz / 60Hz)---------------------------------- TP000005  
Photocell---------------------------------------------------------12H00107-001  
SG-60 High Intensity Strobe System  
6-1  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
SECTION 7. ANTENNA OBSTRUCTION LIGHT (AOL)  
This addendum includes the following Figures:  
Figure 7-1: SG-60 AOL Flashhead Mounting Dimensions  
Figure 7-2: SG-60 AOL Power Supply Mounting Dimensions  
Figure 7-3: SG-60 AOL Wiring Installation  
Figure 7-4: SG-60 AOL Flashhead Component Locations  
Figure 7-5: SG-60 AOL Power Supply Component Location  
Figure 7-6: SG-60 AOL Schematic  
SG-60 High Intensity Strobe System  
7-1  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
Figure 7-1: SG-60 AOL Flashhead Mounting Dimensions  
SG-60 High Intensity Strobe System  
7-2  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
Figure 7-2: SG-60 AOL Power Supply Mounting Dimensions  
SG-60 High Intensity Strobe System  
7-3  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
Figure 7-3: SG-60 AOL Wiring Installation  
SG-60 High Intensity Strobe System  
7-4  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
Figure 7-4: SG-60 AOL Flashhead Component Locations  
SG-60 High Intensity Strobe System  
7-5  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
Figure 7-5: SG-60 AOL Power Supply Component Locations  
SG-60 High Intensity Strobe System  
7-6  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Airport Systems  
Figure 7-6: SG-60 AOL Schematic  
SG-60 High Intensity Strobe System  
7-7  
Manual EPM-00000019 Rev A  
Download from Www.Somanuals.com. All Manuals Search And Download.  

Grundig Vacuum Cleaner VCC9850 User Manual
Hafler Stereo Amplifier 1600 User Manual
Haier Refrigerator HFD647AS User Manual
Hasbro Motorized Toy Car 82435 User Manual
Honeywell Security Camera HD40 User Manual
Hoshizaki Ice Maker KM 630MAH User Manual
HP Hewlett Packard Computer Drive C5445 90906 User Manual
Hunter Fan Fan 23970 User Manual
Icom Marine Radio IM422 User Manual
ICP DAS USA Computer Hardware 3 axis encoder card 2 axis stepping servo User Manual