Owner’s Manual
Installation and Operation
Models:
Pier-HV-IPI
ST-HV-IPI
LCOR-HV-IPI
RCOR-HV-IPI
READ THIS MANUAL BEFORE INSTALLING OR
OPERATING THIS APPLIANCE. THIS INSTALLERS
GUIDE MUST BE LEFT WITH APPLIANCE FOR
FUTURE REFERENCE.
WARNING: IMPROPER INSTALLA-
TION, ADJUSTMENT, ALTERATION,
SERVICE OR MAINTENANCE CAN
CAUSE INJURY OR PROPERTY DAM-
AGE. REFER TO THIS MANUAL. FOR
ASSISTANCE ORADDITIONAL INFOR-
MATION CONSULT A QUALIFIED IN-
STALLER, SERVICE AGENCY, OR THE
GAS SUPPLIER.
WARNING: IF THE INFORMATION
IN THESE INSTRUCTIONS IS NOT
FOLLOWED EXACTLY, A FIRE OR
EXPLOSION MAY RESULT CAUS-
ING PROPERTY DAMAGE, PER-
SONAL INJURY, OR DEATH.
1. This appliance may be installed in an af-
termarket, permanently located, manufac-
tured (mobile) home, where not prohibited
by local codes.
- Do not store or use gasoline or other flam-
mable vapors and liquids in the vicinity of this
or any other appliance.
-
What to do if you smell gas
• Do not try to light any appliance.
• Do not touch any electrical switch.
• Do not use any phone in your building.
2. This appliance is only for use with the type
of gas indicated on the rating plate. This
appliance is not convertible for use with
other gases, unless a certified kit is used.
• Immediately call your gas supplier from a
neighbor's phone. Follow the gas supplier's
instructions.
• If you cannot reach your gas supplier, call
the fire department.
In the Commonwealth of Massachusetts:
• installation must be performed by a licensed
plumber or gas fitter;
- Installation and service must be performed by a
qualified installer, service agency, or the gas
supplier.
See Table of Contents for location of additional
Commonwealth of Massachusetts requirements.
Printed in U.S.A. Copyright 2006
Please contact your Heat & Glo dealer with any
questions or concerns. For the location of your nearest
Heat & Glo, a brand of Hearth & Home Technologies Inc.
20802 Kensington Boulevard, Lakeville, MN 55044
This product may be covered by one or more of the following patents: (United States) 4593510, 4686807, 4766876, 4793322, 4811534, 5000162, 5016609, 5076254, 5113843, 5191877, 5218953, 5263471,
5328356, 5341794, 5347983, 5429495, 5452708, 5542407, 5601073, 5613487, 5647340, 5688568, 5762062, 5775408, 5890485, 5931661, 5941237, 5947112, 5996575, 6006743, 6019099, 6048195, 6053165,
6145502, 6170481, 6237588, 6296474, 6374822, 6413079, 6439226, 6484712, 6543698, 6550687, 6601579, 6672860, 6688302B2, 6715724B2, 6729551, 6736133, 6748940, 6748942, 6769426, 6774802,
6796302, 6840261, 6848441, 6863064, 6866205, 6869278, 6875012, 6880275, 6908039, 6919884, D320652, D445174, D462436; (Canada) 1297749, 2195264, 2225408, 2313972; (Australia) 780250,
780403, 1418504 or other U.S. and foreign patents pending.
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
1
Download from Www.Somanuals.com. All Manuals Search And Download.
Table of Contents
Safety and Warning Information.................................................. 2
Í
Service Parts List ......................................................................... 4
Approvals and Codes ................................................................ 13
Appliance Certification ................................................................................. 13
Installation Codes ........................................................................................ 13
HighAltitude Installations............................................................................. 13
Í
Requirements for the Commonwealth of Massachusetts .............................. 14
Getting Started............................................................................ 15
Introducing the Heat & Glo Gas Fireplaces .................................................. 15
Pre-install Preparation ................................................................................. 15
Installing the Fireplace ............................................................... 19
Step 1. Locating the Fireplace .................................................................... 19
Step 2. Framing the Fireplace ..................................................................... 20
Step 3. Installing the Vent System .............................................................. 23
A. Vent System Approvals ......................................................... 23
B. Installing Vent Components ................................................... 30
Î
C. Vent Termination.................................................................... 32
Step 4. Positioning, Leveling, and Securing the Fireplace ........................... 35
Step 5. The Gas Control System ................................................................ 35
Step 6. The Gas Supply Line ...................................................................... 36
Step 7. Gas Pressure Requirements........................................................... 36
ÎStep 8. Wiring the Fireplace........................................................................ 37
Step 9. Finishing......................................................................................... 40
Step 10. Installing Trim, Logs & Ember Material .......................................... 41
Installing the Trim .......................................................................... 41
Positioning the Logs...................................................................... 41
Shutter Settings ............................................................................ 41
Glass Specifications...................................................................... 41
Preparing Electric Ember Bed and Lava Rock ............................... 41
Placing the Ember Material ........................................................... 43
Ember Light Bulb Replacement ..................................................... 43
Step 11. Before Lighting the Fireplace........................................................ 44
Step 12. Lighting the Fireplace ................................................................... 44
After the Installation ..................................................................................... 44
Maintaining and Servicing Your Fireplace ................................ 45
Î = Contains updated information.
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
3
Download from Www.Somanuals.com. All Manuals Search And Download.
Service Parts
Pier-HV-IPI
Beginning Manufacturing Date: 6-03
Ending Manufacturing Date: ______
(NG, LP) Exploded Parts Diagram
3
1
5
4
2
6 Log Assembly
Grate
Bar
4
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
Service Parts List (NG, LP)
PIER-HV-IPI
IMPORTANT: THIS IS DATED INFORMATION. The most current information is located on your dealers VIP site. When ordering,
supply serial and model numbers to ensure correct service parts.
AVAILABLE
TO SHIP IN 24
HOURS
ITEM
DESCRIPTION
SERIAL #
PART NUMBER
582-833
Burner Orifice NG (#33DMS)
Burner Orifice LP (#50DMS)
End Glass Assembly
Y
Y
Y
Y
Y
582-850
1
2
3
GLA-MS
Glass Door Assembly
Burner Assembly
GLA-6TROC
2005-006
4
5
6
7
Log Grate
2005-012
Side Refractory
Log Set Assembly
Log 1
SRV2005-730
LOGS-MSR
SRV2005-701
Y
8
9
Log 2
Log 3
Log 4
SRV2005-700
SRV2005-702
SRV2005-703
10
11 Log 5
SRV2005-704
SRV2005-705
SRV703-703
2005-790
12
13
Log 6
Log 7
Lava Rock Bag
Flue Restrictor
385-128
Teco-Sil, 5 lb. bag
Ember Mesh Assembly
Junction Box
700-790
2006-008
4021-013
2006-136
2006-137
593-593A
593-594A
060-455
Y
Y
Non-Combustible Board (side)
Non-Combustible Board (end)
3V Adaptor Plug
Y
Y
Battery Pack
Fiberglass Rope
Glass Latch Support Assembly
Mineral Wool
386-122A
050-721
Y
Conversion Kit NG
Conversion Kit LP
NGK-MS
LPK-MS
Y
Y
ACCESSORIES
Fan Kit
GFK-160A
Remote Control Kit
Remote Control Kit
Remote Control - Multi-functional
Wall Switch, Multi-functional
RC-SMART-HNG
SMART-STAT-HNG
RCT-MLT-HNG
WSK-MLT
Plug Adapator Kit (for WSK-MLT)
Louvers with Mesh
PLUG-ADP
MS-LOUVERS
MS-LOUVERS-EP
Louvers with Mesh - End Panel
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
5
ST-HV-IPI
Beginning Manufacturing Date: 6-03
Ending Manufacturing Date: ______
Service Parts
(NG, LP) Exploded Parts Diagram
4
2
3
1
5 Log Assembly
Grate
Bar
6
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
Service Parts List (NG, LP)
ST-HV-IPI
IMPORTANT: THIS IS DATED INFORMATION. The most current information is located on your dealers VIP site. When ordering,
supply serial and model numbers to ensure correct service parts.
AVAILABLE TO
SHIP IN 24
HOURS
ITEM
DESCRIPTION
SERIAL #
PART NUMBER
582-832
Burner Orifice NG (#32DMS)
Burner Orifice LP (#50DMS)
Glass Door Assembly
Burner Assembly
Y
Y
Y
Y
582-850
1
2
GLA-6TROC
2005-006
3
4
5
6
Log Grate
2005-012
Side Refractory
Log Set Assembly
Log 1
SRV2005-730
LOGS-MSR
SRV2005-701
Y
7
8
9
Log 2
Log 3
Log 4
SRV2005-700
SRV2005-702
SRV2005-703
10
11
12
Log 5
Log 6
Log 7
SRV2005-704
SRV2005-705
SRV703-703
Lava Rock Bag
Flue Restrictor
Teco-Sil, 5 lb. bag
2005-790
385-128
700-790
Hood, black
SRV60-143-BK
2005-008
2005-172
4021-013
060-455
Ember Mesh Assembly
Non-Combustible Board
Junction Box
Y
Y
Fiberglass Rope
Glass Latch Support Assembly
Mineral Wool
386-122A
050-721
Y
3V Adaptor Plug
593-593A
593-594A
Y
Y
Battery Pack
Conversion Kit NG
Conversion Kit LP
NGK-MS
LPK-MS
Y
Y
ACCESSORIES
Fan Kit
GFK-160A
Remote Control Kit
RC-SMART-HNG
SMART-STAT-HNG
RCT-MLT-HNG
WSK-MLT
Remote Control Kit
Remote Control - Multi-functional
Wall Switch, Multi-functional
Plug Adapator Kit (for WSK-MLT)
Louvers with Mesh
PLUG-ADP
MS-LOUVERS
MS-LOUVERS-EP
Louvers with Mesh - End Panel
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
7
LCOR-HV-IPI
Beginning Manufacturing Date: 6-03
Ending Manufacturing Date: ______
Service Parts
(NG, LP) Exploded Parts Diagram
1
6
2
3
15
5
4
7 Log Assembly
15
Part number list on following page.
8
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
Service Parts List (NG, LP)
LCOR-HV-IPI
IMPORTANT: THIS IS DATED INFORMATION. The most current information is located on your dealers VIP site. When ordering,
supply serial and model numbers to ensure correct service parts.
AVAILABLE TO
SHIP IN 24
HOURS
ITEM
COMMON PARTS
SERIAL #
PART NUMBER
582-832
Burner Orifice NG (#32DMS)
Burner Orifice LP (#50DMS)
End Glass Assembly
Y
Y
Y
Y
Y
582-850
1
2
3
GLA-MS
Glass Door Assembly
Burner Assembly
GLA-6TROC
2005-006
4
5
6
7
8
Log Grate
2005-012
Side Refractory
Refractory, Back
Log Set Assembly
Log 1
SRV2005-730
SRV2005-731
LOGS-MSR
SRV2005-701
Y
9
Log 2
Log 3
Log 4
SRV2005-700
SRV2005-702
SRV2005-703
10
11
12
13
14
Log 5
Log 6
Log 7
SRV2005-704
SRV2005-705
SRV703-703
Lava Rock Bag
Flue Restrictor
Teco-Sil, 5 lb. bag
2005-790
385-128
700-790
Ember Mesh Assembly
Non-Combustible Board (side)
Non-Combustible Board (end)
Junction Box
2006-008
2006-136
2008-114
4021-013
060-455
Fiberglass Rope
Glass Latch Support Assembly
Mineral Wool
386-122A
050-721
Y
3V Adaptor Plug
593-593A
593-594A
Y
Y
Battery Pack
Conversion Kit NG
Conversion Kit LP
NGK-MS
LPK-MS
Y
Y
ACCESSORIES
Fan Kit
GFK-160A
Remote Control Kit
RC-SMART-HNG
SMART-STAT-HNG
RCT-MLT-HNG
WSK-MLT
Remote Control Kit
Remote Control - Multi-functional
Wall Switch, Multi-functional
Plug Adapator Kit (for WSK-MLT)
Louvers with Mesh
PLUG-ADP
MS-LOUVERS
MS-LOUVERS-EP
Louvers with Mesh - End Panel
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
9
RCOR-HV-IPI
Beginning Manufacturing Date: 6-03
Ending Manufacturing Date: ______
Service Parts
(NG, LP) Exploded Parts Diagram
6
5
15
1
3
4
7 Log Assembly
2
Grate
Bar
Part number list on following page.
10
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
Service Parts List (NG, LP)
RCOR-HV-IPI
IMPORTANT: THIS IS DATED INFORMATION. The most current information is located on your dealers VIP site. When ordering,
supply serial and model numbers to ensure correct service parts.
AVAILABLE
TO SHIP IN 24
HOURS
ITEM
COMMON PARTS
SERIAL #
PART NUMBER
582-832
Burner Orifice NG (#32DMS)
Burner Orifice LP (#50DMS)
End Glass Assembly
Y
Y
Y
Y
Y
582-850
1
2
3
GLA-MS
Glass Door Assembly
Burner Assembly
GLA-6TROC
2005-006
4
5
6
7
8
Log Grate
2005-012
Side Refractory
Refractory, Back
Log Set Assembly
Log 1
SRV2005-730
SRV2005-731
LOGS-MSR
SRV2005-701
Y
9
Log 2
Log 3
Log 4
SRV2005-700
SRV2005-702
SRV2005-703
10
11
12
13
14
Log 5
Log 6
Log 7
SRV2005-704
SRV2005-705
SRV703-703
Lava Rock Bag
Flue Restrictor
Teco-Sil, 5 lb. bag
2005-790
385-128
700-790
Ember Mesh Assembly
Non-Combustible Board (side)
Non-Combustible Board (end)
Junction Box
2006-008
2006-136
2008-114
4021-013
593-593A
593-594A
060-455
Y
Y
Y
Y
3V Adaptor Plug
Battery Pack
Fiberglass Rope
Glass Latch Support Assembly
Mineral Wool
386-122A
050-721
Y
Conversion Kit NG
Conversion Kit LP
NGK-MS
LPK-MS
Y
Y
ACCESSORIES
Fan Kit
GFK-160A
Remote Control Kit
RC-SMART-HNG
SMART-STAT-HNG
RCT-MLT-HNG
WSK-MLT
Remote Control Kit
Remote Control - Multi-functional
Wall Switch, Multi-functional
Plug Adapator Kit (for WSK-MLT)
Louvers with Mesh
PLUG-ADP
MS-LOUVERS
MS-LOUVERS-EP
Louvers with Mesh - End Panel
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
11
PIER-HV-IPI, ST-HV-IPI
L&RCOR-HV-IPI
Service Parts
Beginning Manufacturing Date: 6-03
Ending Manufacturing Date: ______
(NG, LP) Exploded Parts Diagram
13
9
14
8
7
10
11
12
6
1
2
5
4
3
AVAILABLE TO
SHIP IN 24
HOURS
ITEM
DESCRIPTION
SERIAL #
PART NUMBER
060-511
1
2
ON/OFF Rocker Switch
ON/OFF Wire Assembly
Y
Y
060-521A
3
3
4
5
6
7
Valve NG
750-500
750-501
2005-009
593-592
593-590A
2005-114
Y
Y
Y
Y
Y
Y
Valve LP
Flexible Gas Connector
Module
Wire Assembly
Ember Box Assembly
8
8
9
Pilot Assembly NG
Pilot Assembly LP
Pilot Bracket
385-510A
385-511A
2005-118
Y
Y
10
11
12
13
14
Gasket Orifice
2005-166
2005-120
302-320A
385-120
385-512
NGK-DXV
LPK-DXV
446-301
446-505
446-517
Valve Bracket
Flex Ball Valve Assembly
Pilot Assembly Support
Ground Strap
Regulator, NG
Regulator, LP
Y
Y
Y
Y
Y
Y
Pilot Tube
Orifice Spud NG
Orifice Spud LP
NOTE: Replacement bulbs to be supplied by homeowner. Recommended replacements: Sylvania Mini Candelabra 75 watts.
12
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
Approvals and
Codes
1
Appliance Certification
High Altitude Installations
U.L. Listed gas appliances are tested and approved with-
out requiring changes for elevations from 0 to 2,000 feet in
the U. S. A. and in Canada.
The Heat & Glo fireplace models discussed in this Installers
Guide have been tested to certification standards and listed
by the applicable laboratories.
When installing this appliance at an elevation above 2,000
feet, it may be necessary to decrease the input rating by
changing the existing burner orifice to a smaller size. Input
rate should be reduced by 4% for each 1000 feet above a
2000 foot elevation in the U.S.A. or 10% for elevations
between 2000 and 4500 feet in Canada. If the heating value
of the gas has been reduced, these rules do not apply. To
identify the proper orifice size, check with the local gas
utility.
Certification
MODELS: PIER-HV-IPI, ST-HV-IPI,
LCOR-HV-IPI, RCOR-HV-IPI
LABORATORY: Underwriters Laboratories
TYPE: Direct Vent Gas Fireplace Heater
STANDARD: ANSI Z21.88•CGA2.22•UL307B
Installation Codes
If installing this appliance at an elevation above 4,500 feet
(in Canada), check with local authorities.
The fireplace installation must conform to local codes. Before
installing the fireplace, consult the local building code
agency to ensure that you are in compliance with all
applicable codes, including permits and inspections.
In the absence of local codes, the fireplace installation must
conform to the National Fuel Gas CodeANSI Z223.1 (in the
United States) or the CAN/CGA-B149 Installation Codes
(in Canada). The appliance must be electrically grounded
in accordance with local codes or, in the absence of local
codes with the National Electric Code ANSI/NFPA No. 70
(in the United States), or to the CSAC22.1 Canadian Electric
Code (in Canada).
These models may be installed in a bedroom or bed-sitting
room in the U.S.A. and Canada.
Heat & Glo Quality Systems
registered by SGS ICS
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
13
Inspection
NOTE: The following requirements reference various
Massachusetts and national codes not contained in
this document.
The state or local gas inspector of the side wall horizontally
vented gas fueled equipment shall not approve the installa-
tion unless, upon inspection, the inspector observes carbon
monoxide detectors and signage installed in accordance with
the provisions of 248 CMR 5.08(2)(a)1 through 4.
G. Requirements for the Commonwealth of
Massachusetts
Exemptions
The following equipment is exempt from 248 CMR 5.08(2)(a)1
through 4:
For all side wall horizontally vented gas fueled equipment
installed in every dwelling, building or structure used in
whole or in part for residential purposes, including those
owned or operated by the Commonwealth and where the
side wall exhaust vent termination is less than seven (7)
feet above finished grade in the area of the venting, includ-
ing but not limited to decks and porches, the following re-
quirements shall be satisfied:
•
The equipment listed in Chapter 10 entitled “Equipment
Not Required To Be Vented” in the most current edition
of NFPA 54 as adopted by the Board; and
•
Product Approved side wall horizontally vented gas fu-
eled equipment installed in a room or structure sepa-
rate from the dwelling, building or structure used in whole
or in part for residential purposes.
Installation of Carbon Monoxide Detectors
At the time of installation of the side wall horizontal vented
gas fueled equipment, the installing plumber or gasfitter
shall observe that a hard wired carbon monoxide detector
with an alarm and battery back-up is installed on the floor
level where the gas equipment is to be installed. In addi-
tion, the installing plumber or gasfitter shall observe that a
battery operated or hard wired carbon monoxide detector
with an alarm is installed on each additional level of the
dwelling, building or structure served by the side wall hori-
zontal vented gas fueled equipment. It shall be the respon-
sibility of the property owner to secure the services of qual-
ified licensed professionals for the installation of hard wired
carbon monoxide detectors.
MANUFACTURER REQUIREMENTS
Gas Equipment Venting System Provided
When the manufacturer of ProductApproved side wall hor-
izontally vented gas equipment provides a venting system
design or venting system components with the equipment,
the instructions provided by the manufacturer for installa-
tion of the equipment and the venting system shall include:
•
Detailed instructions for the installation of the venting
system design or the venting system components; and
•
A complete parts list for the venting system design or
venting system.
In the event that the side wall horizontally vented gas fu-
eled equipment is installed in a crawl space or an attic, the
hard wired carbon monoxide detector with alarm and bat-
tery back-up may be installed on the next adjacent floor
level.
In the event that the requirements of this subdivision can
not be met at the time of completion of installation, the
owner shall have a period of thirty (30) days to comply with
the above requirements; provided, however, that during said
thirty (30) day period, a battery operated carbon monoxide
detector with an alarm shall be installed.
Gas Equipment Venting System NOT Provided
When the manufacturer of a Product Approved side wall
horizontally vented gas fueled equipment does not provide
the parts for venting the flue gases, but identifies “special
venting systems”, the following requirements shall be sat-
isfied by the manufacturer:
•
The referenced “special venting system” instructions shall
be included with the appliance or equipment installation
instructions; and
Approved Carbon Monoxide Detectors
Each carbon monoxide detector as required in accordance
with the above provisions shall comply with NFPA720 and
be ANSI/UL 2034 listed and IAS certified.
•
The “special venting systems” shall be ProductApproved
by the Board, and the instructions for that system shall
include a parts list and detailed installation instructions.
A copy of all installation instructions for all Product Ap-
proved side wall horizontally vented gas fueled equipment,
all venting instructions, all parts lists for venting instruc-
tions, and/or all venting design instructions shall remain
with the appliance or equipment at the completion of the
installation.
Signage
A metal or plastic identification plate shall be permanently
mounted to the exterior of the building at a minimum height
of eight (8) feet above grade directly in line with the ex-
haust vent terminal for the horizontally vented gas fueled
heating appliance or equipment. The sign shall read, in
print size no less than one-half (1/2) inch in size, “GAS
VENT DIRECTLY BELOW. KEEP CLEAR OF ALL OB-
STRUCTIONS”.
See Gas Connection section for additional Common-
wealth of Massachusetts requirements.
14
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
Getting Started
2
Introducing the Heat & Glo Gas Fireplaces
The Heat & Glo Warranty will be voided by, and Heat & Glo
disclaims any responsibility for, the following actions:
Heat & Glo direct vent gas fireplaces are designed to oper-
ate with all combustion air siphoned from outside of the
building and all exhaust gases expelled to the outside.
•
Installation of any damaged fireplace or vent system
component.
•
•
•
•
Modification of the fireplace or direct vent system.
Installation other than as instructed by Heat & Glo.
Improper positioning of the gas logs or the glass door.
The information contained in this Installers Guide, unless
noted otherwise, applies to all models and gas control
systems. Gas fireplace diagrams, including the dimensions,
are shown in this section.
Installation and/or use of any component part not manu-
factured and approved by Heat & Glo, not withstanding
any independent testing laboratory or other party approval
of such component part or accessory.
Pre-install Preparation
This gas fireplace and its components are tested and safe
when installed in accordance with this Installers Guide.
Report to your dealer any parts damaged in shipment,
particularly the condition of the glass. Do not install any
unit with damaged, incomplete, or substitute parts.
ANY SUCH ACTION MAY POSSIBLY CAUSE A FIRE
HAZARD.
When planning a fireplace installation, it’s necessary
to determine:
The vent system components are shipped in separate pack-
ages. The gas logs are packaged separately and must be
field installed.
• Where the unit is to be installed.
• The vent system configuration to be used.
• Gas supply piping.
Read all of the instructions before starting the instal-
lation. Follow these instructions carefully during the
installation to ensure maximum safety and benefit.
Failure to follow these instructions will void the own-
er’s warranty and may present a fire hazard.
• Electrical wiring.
• Framing and finishing details.
• Whether optional accessories—devices such as a fan,
wall switch, or remote control—are desired.
If the fireplace is to be installed on carpeting or tile,
or on any combustible material other than wood
flooring, the fireplace should be installed on a metal
or wood panel that extends the full width and depth
of the fireplace.
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
15
5-1/4
(133mm)
1/2
(13mm)
12
(306mm)
Ø8
(205mm)
12
(305mm)
42-5/8
(1082mm)
Ø8
(205mm)
ELECTRICAL
ACCESS
32-5/16
42
(820mm)
21-9/16
(547mm)
(1067mm)
GAS LINE
ACCESS
21-9/16
34-3/4
(883mm)
(547mm)
2-5/16
(58mm)
4-1/16
(102mm)
17-15/16
(455mm)
37-7/16
(950mm)
24
4-1/2
(114mm)
4-3/4
(121mm)
(610mm)
TOP VENT
COLLARS
TOP STANDOFFS
REAR VENT
COLLARS
SIDE GLASS
DOOR
GAS CONTROLS
& LABELS
GAS LINE
ACCESS
ELECTRICAL
ACCESS
Figure 1. Diagram of the PIER-HV-IPI
16
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
5-14
(133mm)
1/2
(13mm)
(4)
12
(306mm)
Ø8
(205mm)
12
(305mm)
Ø8
46-5/8
(205mm)
(1183mm)
ELECTRICAL
ACCESS
32-5/16
(821mm)
4-1/2
34-3/4
(882mm)
42
(114mm)
(1067mm)
21-9/16
(548mm)
GAS LINE
ACCESS
8-1/2
(216mm)
36-3/16
(919mm)
2-5/16
(58mm)
24
(610mm)
4-1/16
(102mm)
2-9/16
(64mm)
4-3/4
(121mm)
4-1/2
(114mm)
TOP VENT
COLLARS
TOP STANDOFFS
REAR VENT
COLLARS
GAS CONTROLS
& LABELS
SIDE GLASS
DOOR
GAS LINE
ACCESS
ELECTRICAL
ACCESS
Figure 2. Diagram of the ST-HV-IPI
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
17
1/2
(13mm)
(4)
5-1/4
(133mm)
Ø8
(205mm)
12-1/16
(306mm)
12
(305mm)
Ø8
(205mm)
42-5/8
(1083mm
17-15/16
(455mm)
ELECTRICAL
ACCESS
GAS LINE
ACCESS
34-3/4
(882mm)
21-9/16
(548mm)
21-9/16
2-9/16
(547mm)
(64mm)
42
(1067mm)
2-5/16
(58mm)
10
(254mm)
32-5/16
(821mm)
24-1/8
(612mm)
7-1/4
(184mm)
37-7/16
(950mm)
29-1/4
(743mm)
4-3/4
(121mm)
TOP STANDOFFS
TOP VENT
COLLARS
REAR VENT
COLLARS
SIDE GLASS
DOOR
END GLASS
DOOR
GAS LINE
ACCESS
GAS CONTROLS
& LABELS
ELECTRICAL
ACCESS
Figure 3. Diagram of the LCOR-HV-IPI and RCOR-HV-IPI
18
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
Installing the Fireplace
3
Step 1. Locating the Fireplace
Note: This location diagram MUST be followed when in-
stalling a Pier-HV with a Catalina shelf/marble package
since the fireplace is installed further from finished wall.
The diagram below shows space and clearance require-
ments for locating a fireplace within a room.
FINISHED
WALL
Note: Refer to Figure 4B for dimensions and appliance
locations if installing a Pier-HV unit with a Catalina shelf
and/or marble package.
GLASS
GLASS
RCOR-HV-IPI
TOP VIEW
PIER-HV-IPI
TOP VIEW
GLASS
45 -1/4 in.
(1149mm)
36"
GLASS
GLASS
36"
36"
34-1/2 in.
50-1/2 in.
7 in.
36"
36"
GLASS
47-1/2 in.
GLASS
ST-HV-IPI
TOP VIEW
LCOR-HV-IPI
TOP VIEW
36"
13/16 in.
GLASS
36"
GLASS
45-1/4 in.
Marble sizes (inches):
Header .................................. 26 x 8
Side headers .................. 45-1/2 x 8
Legs ................................ 33-1/2 x 7
Figure 4A. Fireplace Dimensions and Locations
Note: Refer to the Catalina installation instruction
included with kit for assembly and installation.
Fireplace Locations/Dimensions with
Catalina Shelf/Marble Package ONLY
Figure 4B.
Clearance Requirements
The top, back, and sides of the fireplace are defined by
stand-offs. The minimum clearance to a perpendicular wall
extending past the face of the fireplace is one inch (25 mm).
The metal ends of the fireplace may NOT be recessed into
combustible construction.
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
19
Step 2. Framing the Fireplace
Minimum Clearances
from the Fireplace to Combustible Materials
Fireplace framing can be built before or after the fireplace is
set in place. Framing should be positioned to accommo-
date wall coverings and fireplace facing material. The dia-
gram below shows framing reference dimensions.
Inches
mm
Glass Sides or Ends .......... 36 .................... 914
CAUTION: MEASURE FIREPLACE DIMENSIONS AND
VERIFY FRAMING METHODS AND WALL COVERING
DETAILS BEFORE FRAMING.
Floor ................................... 0 ....................... 0
Rear Vent...........................1/2 ..................... 13
Metal Sides or Ends ..........1/2 ..................... 13
Top ................................... 2 1/2 ................... 64
WARNING: FRAMING DIMENSIONS ASSUME
!
Ceiling* .............................. 31 .................... 787
USE OF 1/2 INCH THICK WALL COVERING
MATERIALS ON EXTERIOR OF FRAMING ONLYAND
NO SHEETROCK ON INTERIOR OF FRAMING.
* The clearance to the ceiling is measured from the top of
the unit, excluding the standoffs (see Figures 37 & 38).
The distance from the unit to combustible construction is to
be measured from the unit outer wrap surface to the com-
bustible construction, NOT from the screw heads that se-
cure the unit together.
Minimum Clearances
from the Vent Pipe to Combustible Materials
Inches
mm
Vertical Sections. ............. 1 ................ 25
Horizontal Sections
Top ..................................... 3 ................ 75
Bottom ............................... 1 ................ 25
Sides ................................. 1 ................ 25
At Wall Firestops
Top .................................. 2 1/2 ............63.7
Bottom .............................. 1/2............... 13
Sides ................................. 1 ................ 25
For minimum clearances, see the direct vent termination
clearance diagrams on pages 31 and 32 in this manual.
20
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
Shows center of 10” x 12” vent framing holes for top and rear venting. The center
of the hole is one inch (25.4mm) above the center of the horizontal vent pipe.
E
D
Framing should be
constructed of 2 X 4
lumber or heavier.
PIER-HV-IPI
ST-HV-IPI
L & R-COR-HV-IPI
B
B
B
C
A
A
A
C
C
Model
A
B
C
D
E
PIER-HV-IPI
ST-HV-IPI
42-1/8
47-5/8
42-1/8
42-1/2
42-1/2
42-1/2
23
23
35-3/4
35-3/4
35-3/4
48
48
48
L&RCOR-HV-IPI
28-3/4
NOTE: DIMENSIONS SHOWN IN INCHES
Figure 5. Framing Dimensions
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
21
4
6
12
DVP4
DVP6
DVP12
14-1/4
12-3/16
MAX.
2
MIN.
24
36
DVP12A
48
9-7/8
DVP24
45.0O
10-1/4
DVP45
DVP36
11-1/4
7-1/4
1-1/4 TYP
DVP48
1/2 TYP
8-9/16
12-9/16
NOTE: PIPES OVERLAP 1-1/4 INCHES
AT EACH JOINT.
DVP
90ST
Figure 6. DVP-Series Direct Vent Component Specifications (5-inch inner pipe / 8-inch outer pipe)
22
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
Identifying Vent Components
Step 3. Installing the Vent System
The vent systems installed on this gas fireplace may in-
clude one, two, or three 90° elbow assemblies. The rela-
tionships of vertical rise to horizontal run in vent configura-
tions using 90° elbows MUST BE strictly adhered to. The
rise to run relationships are shown in the venting drawings
and tables. Refer to the diagrams on the next several pages.
A. Vent System Approvals
These models are approved to use DVP series direct vent
pipe components and terminations (see Figures 6 and 7).
Approved vent system components are labeled for identifi-
cation. This pipe is tested and listed as an approved com-
ponent of the fireplace. The pipe is tested to be run inside
an enclosed wall. There is no requirement for inspection
openings at each joint within the wall. There is no required
pitch for horizontal vent runs. NO OTHER VENTING SYS-
TEMS OR COMPONENTS MAY BE USED.
NOTE: Two 45° elbows may be used in place of one
90° elbow. Rise to run ratios in the vent system must
be followed if 45° elbows are used.
This model has a 450 elbow built into it. It may be posi-
tioned to vent either horizontal or vertical. Depending on the
installation, decide which direction the elbow should be fac-
ing. Remove the 8 screws from the corner cover plate. Po-
sition the 450 elbow as desired and replace the corner cov-
er plate with the 8 screws.
Detailed installation instructions are included with each vent
termination kit and should be used in conjunction with this
Installers Guide.
The flame and ember appearance may vary based on the
type of fuel burned and the venting configuration used.
STORM COLLAR
ROOF FLASHING
VERTICAL
TERMINATION
HORIZONTAL
TERMINATION
WALL FIRESTOP
PIPE LENGTH
Terminations Kits
90 DEGREE
ELBOW
CEILING
FIRESTOP
PVK-80
DVP-TRAP
DVP-TB1
(Required to have a minimum of 3
feet of vertical in the vent system)
DVP-TVHW
Figure 7. Vent System Components and Termination Kits
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
23
STRAIGHT UP
VERTICAL VENTING
V (FT.)
BREAK
HERE
CAP
50' MAX. (15.2 M)
NOTE: On vertical venting
configurations you may
want to install the flue re-
strictor (385-128). See flue
restrictor installation in-
structions.
Figure 10. Flue Restrictor
- CHART -
4. Match the amount of
vertical in the system
with the chart to find the
appropriate position to
set the Flue Restrictor.
Vertical
Settings
1-1
4'
8'
1-2
2-2
2-3
3-3
4-3
4-4
4-4
4-5
15'
20'
25'
30'
35'
40'
50'
Figure 8
5. Center the Flue Restrictor on vent and secure in
place using two self-tapping screws (see Figure 11).
Flue Restrictor Instructions
1. Locate the Flue Restrictor which is in the manual
1
2
3
4
5
bag.
SETTINGS
FLUE
RESTRICTOR
1
2
3
4
5
Figure 11
STRAIGHT OUT
HORIZONTALVENTING
H
Max. Run
24" (610 mm)
Figure 9
H
2. Break the Flue Restrictor into two pieces. Do this
by bending the part back and forth until it breaks
(see Figure 10).
Figure 12.
24
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
NATURAL GAS - VENTING WITH ONE 90° ELBOW
V (FT.)
1' MIN. (305mm)
2' MIN. (610mm)
3' MIN. (914mm)
4' MIN. (1.22m)
5’ MIN. (1.5m)
H (FT.)
3' MAX. (914mm)
6' MAX. (1.83m)
9' MAX. (2.7m)
12' MAX. (3.6m)
15’ MAX. (4.5m)
18’ MAX. (5.5m)
6’ MIN. (1.83m)
V + H = 50’ MAX. (15.2m)(11.3m)
PROPANE - VENTING WITH ONE 90° ELBOW
V (FT.)
H (FT.)
1' MIN. (305mm)
2' MIN. (610mm)
3' MIN. (914mm)
4' MIN. (1.22m)
5’ MIN. (1.5m)
6’ MIN. (1.83m)
2' MAX. (610mm)
4' MAX. (1.22m)
6’ MAX. (1.83m)
8' MAX. (2.4m)
10' MAX. (3.0m)
12' MAX. (3.6m)
V
V + H = 50’ MAX. (15.2m)
H
Figure 13. Venting with One 90° Elbow
H
V
NATURAL GAS
PROPANE
VENTING WITH ONE 90° ELBOW
VENTING WITH ONE 90° ELBOW
V (FT.)
H (FT.)
V (FT.)
H (FT.)
900 Elbow on top
1' MIN. (305mm)
2' MIN. (610mm)
3' MIN. (914mm)
4' MIN. (1.22m)
5’ MIN. (1.5m)
2.5’ MAX. (64mm)
3' MAX. (914mm)
6' MAX. (1.83m)
9' MAX. (2.7m)
12' MAX. (3.6m)
15’ MAX. (4.5m)
18’ MAX. (5.5m)
900 Elbow on top
1' MIN. (305mm)
2' MIN. (610mm)
3' MIN. (914mm)
4' MIN. (1.22m)
5’ MIN. (1.5m)
2’ MAX. (610mm)
2' MAX. (610mm)
4' MAX. (1.22m)
6’ MAX. (1.83m)
8' MAX. (2.4m)
10' MAX. (3.0m)
12' MAX. (3.6m)
6’ MIN. (1.83m)
6’ MIN. (1.83m)
V + H = 50’ MAX. (15.2m)
V + H = 50’ MAX. (15.2m)
Figure 14. Venting with One 90° Elbow
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
25
NATURAL GAS
H
V
1
VENTING WITH TWO 90° ELBOWS
H
1
V (FT.)
H + H (FT.)
900 Elbow on top
1' MIN. (305mm)
2' MIN. (610mm)
3' MIN. (914mm)
4' MIN. (1.22m)
5’ MIN. (1.5m)
2.5’ MAX. (64mm)
3' MAX. (914mm)
6' MAX. (1.83m)
9' MAX. (2.7m)
12' MAX. (3.6m)
15’ MAX. (4.5m)
18’ MAX. (5.5m)
6’ MIN. (1.83m)
V + H + H1 = 50’ MAX. (15.2m)
H + H1 = 18’ MAX. (5.5m)
PROPANE
VENTING WITH TWO 90° ELBOWS
1
V (FT.)
H + H (FT.)
900 Elbow on top
1' MIN. (305mm)
2' MIN. (610mm)
3' MIN. (914mm)
4' MIN. (1.22m)
5’ MIN. (1.5m)
2’ MAX. (610mm)
2' MAX. (610mm)
4' MAX. (1.22m)
6’ MAX. (1.83m)
8' MAX. (2.4m)
10' MAX. (3.0m)
12' MAX. (3.6m)
6’ MIN. (1.83m)
1
V + H + H = 50’ MAX. (15.2m)
H + H1 = 12’ MAX. (3.6m)
NATURAL GAS
VENTING WITH TWO 90° ELBOWS
V + V1 (FT.)
H (FT.)
900 Elbow on top
1' MIN. (305mm)
2' MIN. (610mm)
3' MIN. (914mm)
4' MIN. (1.22m)
5’ MIN. (1.5m)
2.5’ MAX. (64mm)
3' MAX. (914mm)
6' MAX. (1.83m)
9' MAX. (2.7m)
12' MAX. (3.6m)
15’ MAX. (4.5m)
18’ MAX. (5.5m)
V
1
6’ MIN. (1.83m)
V
V + V1 + H = 50’ MAX. (15.2m)
H
PROPANE
VENTING WITH TWO 90° ELBOWS
V + V1 (FT.)
H (FT.)
900 Elbow on top
1' MIN. (305mm)
2' MIN. (610mm)
3' MIN. (914mm)
4' MIN. (1.22m)
5’ MIN. (1.5m)
6’ MIN. (1.83m)
1
2’ MAX. (610mm)
2' MAX. (610mm)
4' MAX. (1.22m)
6’ MAX. (1.83m)
8' MAX. (2.4m)
10' MAX. (3.0m)
12' MAX. (3.6m)
V + V + H = 50’ MAX. (15.2m)
Figure 15. Venting with Two 90° Elbows
26
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
NATURAL GAS
PROPANE
VENTING WITH TWO 90° ELBOWS
VENTING WITH TWO 90° ELBOWS
1
V (FT.)
H + H (FT.)
1
V (FT.)
H + H (FT.)
1' MIN. (305mm)
2' MIN. (610mm)
3' MIN. (914mm)
4' MIN. (1.22m)
5’ MIN. (1.5m)
6’ MIN. (1.83m)
3' MAX. (914mm)
6' MAX. (1.83m)
9' MAX. (2.7m)
12' MAX. (3.6m)
15’ MAX. (4.5m)
18’ MAX. (5.5m)
1' MIN. (305mm)
2' MIN. (610mm)
3' MIN. (914mm)
4' MIN. (1.22m)
5’ MIN. (1.5m)
2' MAX. (610mm)
4' MAX. (1.22m)
6’ MAX. (1.83m)
8' MAX. (2.4m)
10' MAX. (3.0m)
12' MAX. (3.6m)
6’ MIN. (1.83m)
V + H + H1 = 50’ MAX. (15.2m)
1
V + H + H = 50’ MAX. (15.2m)
1
H + H = 18’ MAX. (5.5m)
1
H + H = 12’ MAX. (3.6m)
H
1
V
H
Figure 16.
Venting with Two 90° Elbows
NATURAL GAS
PROPANE
VENTING WITH TWO 90° ELBOWS
VENTING WITH TWO 90° ELBOWS
1
V (FT.)
H + H (FT.)
1
V (FT.)
H + H (FT.)
1' MIN. (305mm)
2' MIN. (610mm)
3' MIN. (914mm)
4' MIN. (1.22m)
5’ MIN. (1.5m)
6’ MIN. (1.83m)
3' MAX. (914mm)
6' MAX. (1.83m)
9' MAX. (2.7m)
12' MAX. (3.6m)
15’ MAX. (4.5m)
18’ MAX. (5.5m)
1' MIN. (305mm)
2' MIN. (610mm)
3' MIN. (914mm)
4' MIN. (1.22m)
5’ MIN. (1.5m)
2' MAX. (610mm)
4' MAX. (1.22m)
6’ MAX. (1.83m)
8' MAX. (2.4m)
10' MAX. (3.0m)
12' MAX. (3.6m)
6’ MIN. (1.83m)
V + H + H1 = 50’ MAX. (15.2m)
1
V + H + H = 50’ MAX. (15.2m)
V
1
H + H = 18’ MAX. (5.5m)
1
H + H = 12’ MAX. (3.6m)
H
1
H
Figure 17. Venting with Two 90° Elbows
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
27
NATURAL GAS
PROPANE
VENTING WITH THREE 90° ELBOWS
VENTING WITH THREE 90° ELBOWS
1
1
V + V (FT.)
H + H (FT.)
1
1
V + V (FT.)
H + H (FT.)
1' MIN. (305mm)
2' MIN. (610mm)
3' MIN. (914mm)
4' MIN. (1.22m)
5’ MIN. (1.5m)
3' MAX. (914mm)
6' MAX. (1.83m)
9' MAX. (2.7m)
12' MAX. (3.6m)
15’ MAX. (4.5m)
18’ MAX. (5.5m)
1' MIN. (305mm)
2' MIN. (610mm)
3' MIN. (914mm)
4' MIN. (1.22m)
5’ MIN. (1.5m)
2' MAX. (610mm)
4' MAX. (1.22m)
6’ MAX. (1.83m)
8' MAX. (2.4m)
10' MAX. (3.0m)
12' MAX. (3.6m)
6’ MIN. (1.83m)
6’ MIN. (1.83m)
V+ V1 + H + H1 = 50’ MAX. (15.2m)
1
+ H + H = 50’ MAX. (15.2m)
V+ V1
1
H + H = 18’ MAX. (5.5m)
1
H + H = 12’ MAX. (3.6m)
V
1
V
H
1
H
V
H
2
H
1
H
NATURAL GAS
VENTING WITH THREE 90° ELBOWS
PROPANE
VENTING WITH THREE 90° ELBOWS
1
1
2
V + V (FT.)
1' MIN. (305mm)
2' MIN. (610mm)
3' MIN. (914mm)
4' MIN. (1.22m)
5’ MIN. (1.5m)
H + H + H (FT.)
3' MAX. (914mm)
6' MAX. (1.83m)
9' MAX. (2.7m)
12' MAX. (3.6m)
15’ MAX. (4.5m)
18’ MAX. (5.5m)
1
1
2
V + V (FT.)
H + H + H (FT.)
2' MAX. (610mm)
4' MAX. (1.22m)
6’ MAX. (1.83m)
8' MAX. (2.4m)
10' MAX. (3.0m)
12' MAX. (3.6m)
1' MIN. (305mm)
2' MIN. (610mm)
3' MIN. (914mm)
4' MIN. (1.22m)
5’ MIN. (1.5m)
6’ MIN. (1.83m)
6’ MIN. (1.83m)
V+ V1 + H + H1 + H2 = 50’ MAX. (15.2m)
V+ V1 + H + H1 + H2 = 50’ MAX. (15.2m)
1
H + H
= 18’ MAX. (5.5m)
+ H2
1
H + H
= 12’ MAX. (3.6m)
+ H2
Figure 18. Venting with three 90° elbows
28
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
H
1
V
1
V
H
NATURAL GAS
VENTING WITH THREE 90° ELBOWS
1
1
V + V (FT.)
H + H (FT.)
900 Elbow on top
1' MIN. (305mm)
2' MIN. (610mm)
3' MIN. (914mm)
4' MIN. (1.22m)
5’ MIN. (1.5m)
2.5’ MAX. (64mm)
3' MAX. (914mm)
6' MAX. (1.83m)
9' MAX. (2.7m)
12' MAX. (3.6m)
15’ MAX. (4.5m)
18’ MAX. (5.5m)
6’ MIN. (1.83m)
V+ V1 + H + H1 = 50’ MAX. (15.2m)
1
H + H = 18’ MAX. (5.5m)
PROPANE
VENTING WITH THREE 90° ELBOWS
1
1
V + V (FT.)
H + H (FT.)
900 Elbow on top
1' MIN. (305mm)
2' MIN. (610mm)
3' MIN. (914mm)
4' MIN. (1.22m)
5’ MIN. (1.5m)
2’ MAX. (610mm)
2' MAX. (610mm)
4' MAX. (1.22m)
6’ MAX. (1.83m)
8' MAX. (2.4m)
10' MAX. (3.0m)
12' MAX. (3.6m)
6’ MIN. (1.83m)
1
+ H + H = 50’ MAX. (15.2m)
V+ V1
V
H + H1 = 12’ MAX. (3.6m)
1
H
1
V
H
Figure 19. Venting with three 90° elbows
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
29
Venting Out Vertically
B. Installing Vent Components
After determining which direction the 45O elbow will be used
follow venting instructions accordingly.
If the vertical vent component is over 4 feet, you may want
to install the flue restrictor (located in the bag containing
the install manual) to improve flame appearance. Center
the flue restrictor on the 5” flue being used, and with self
tapping screws secure the restrictor to the inside of the
firebox as shown in Figure 22.
•
This fireplace comes ready to vent vertically.
•
To vent off the unit horizontally, the elbow cover plate
must first be removed from the unit (see Figure 20).
•
The elbow can be removed from the unit by aligning the
seams of the elbow to the arrows on the surrounding
heat shield (see Figure 21).
•
•
•
Position the elbow in the vertical position. Snap in place
with the starting collar.
FLUE
RESTRICTOR
Replace the elbow cover plate aligning it with the elbow
and secure in place with the 8 screws.
Place the rope ring around the first section of pipe and
slide it up against the cover plate.
NOTE: The rope ring is needed for heat management
and to prevent cold air infiltration.
ELBOW COVER PLATE
Figure 22
1. Attach the First Vent Component to the
Starting Collars
To attach the first vent component to the starting collars
of the fireplace:
• Slide the first vent section onto the unit and push in until
they snap lock in position.
Figure 20
HEAT
• Rotate this section to the desired position.
• Using the two tabs provided on the elbow cover plate,
secure the first section of venting to the fireplace with
two screws.
ARROWS
SHIELD
Refer to Cinch Pipe and Termination Cap installation
instructions.
If the installation is for a termination cap attached directly
to the fireplace, skip to the sections, Install Firestops and
Vent Termination.
ELBOW
SEAM
ELBOW
FRONT VIEW
Figure 21
TOP VIEW
30
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
2. Continue Adding Vent Components
HEAT SHIELD
Refer to Cinch Pipe and Termination Cap installation in-
structions.
TRIM HEAT
SHIELD IF TOO
LONG, ADD TO
SHIELD IF TOO
SHORT
• Continue adding vent components, locking each succeed-
ing component into place.
• Ensure that each succeeding vent component is secure-
ly fitted and locked into the preceding component in the
vent system. Securing pipe sections with a maximum of
two screws is recommended.
EXTERIOR
FIRESTOP
INTERIOR
FIRESTOP
• 90° elbows may be installed and rotated to any point
around the preceding component’s vertical axis. If an el-
bow does not end up in a locked position with the pre-
ceding component, attach with a minimum of two (2)
sheet metal screws.
Figure 24. Heat Shield, Interior & Exterior Firestops
3. Install Support Brackets
Refer to Cinch Pipe and Termination Cap installation in-
structions.
For Vertical Runs - One ceiling firestop is REQUIRED at
the hole in each ceiling through which the vent passes.
To install firestops for vertical runs that pass through ceilings:
4. Install Firestops
• Position a plumb bob directly over the center of the verti-
cal vent component.
For Horizontal Runs - Firestops are REQUIRED on both
sides of a combustible wall through which the vent passes.
NOTE: Model DVP-TRAP does not need an exterior fir-
estop on an exterior combustible wall. The firestop is
built into the cap.
• Mark the ceiling to establish the centerpoint of the vent.
• Drill a hole or drive a nail through this centerpoint.
To install firestops for horizontal runs that pass through either
interior or exterior walls:
• Check the floor above for any obstructions, such as wir-
ing or plumbing runs.
• Cut a 10” x 12” (254mm X 305mm) hole through the wall.
• Reposition the fireplace and vent system, if necessary,
to accommodate the ceiling joists and/or obstructions.
NOTE: The center of the hole is one (1) inch (25.4mm)
above the center of the horizontal vent pipe.
• Cut an 10-inch X 10-inch (254mm x 254mm) hole through
the ceiling, using the centerpoint previously marked.
• Position the firestops on both sides of the hole previ-
ously cut and secure the firestops with nails or screws.
• Frame the hole with framing lumber the same size as the
ceiling joists.
• The heat shields of the firestops MUST BE placed to-
wards the top of the hole.
• Continue the vent run through the firestops.
NOTE: There must be NO INSULATION or other
combustibles inside the framed firestop opening.
10" (254mm)
10" (254mm)
CHIMNEY
HOLE
10"
INTERIOR
WALL SHIELD
EXISTING CEILING
JOISTS
NEW
FRAMING
MEMBERS
CEILING
12"
Figure 25 Hole & New Framing Members
Figure 23. 10" x 12" Hole and Vent Pipe
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
31
If the area above the ceiling is NOT an attic, position and
secure the ceiling firestop on the ceiling side of the previously
cut and framed hole.
C. Vent Termination
For Horizontal Terminations - To attach and secure the
termination to the last section of horizontal vent refer to the
Cinch Pipe and Termination Cap installation instructions.
• Push on and snap lock as described at the beginning of
the Installing Vent Components section.
• The termination kit should pass through the wall firestops
from the exterior of the building.
JOIST
• Adjust the termination cap to its final exterior position on
the building and interlock the flue sections.
WARNING: THE TERMINATION CAPMUST BE
POSITIONED SO THAT THE ARROW IS
POINTING UP.
!
CEILING
For trapezoidal cap termination kits:
NAILS (4 REQUIRED)
CEILING FIRESTOP
• Using screws secure the cap to the exterior wall through
the flanges in the cap.
Figure 26. Ceiling Firestop (Ceiling Side)
WARNING: VENTING TERMINALS SHALL
NOT BE RECESSED INTO A WALL OR SID-
!
If the area above the ceiling IS an attic, position and secure
the firestop on top of the previously framed hole.
NOTE: Keep insulation away from the vent pipe at least 1
inch (25mm).
ING. VENT TERMINATION CLEARANCES MUST
BE FOLLOWED TO AVOID FIRE DANGER. SEE
VENT TERMINATION MINIMUM CLEARANCES DI-
AGRAM ON FOLLOWING PAGE.
NOTE: There must be NO INSULATION or other
combustibles inside the framed firestop opening.
NAILS (4 REQUIRED)
RAFTER
7 1/4"
(184mm)
Figure 28. Trapezoid Termination Cap
CEILING
CEILING FIRESTOP
Figure 27. Attic Firestop
32
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
M
N
P
R
G
v
A
H
D
Q
(See Note 2)
V
v
B
L
U.S.
(3 FT)
B
T
v
v
v
B
v
S
S
Electrical
Service
V
V
F
v
M
I
D*
V
v
X
A
J or K
X
= VENT TERMINAL
=AIR SUPPLY INLET
= AREA WHERE TERMINAL IS NOT PERMITTED
V
A
B
= 12" ....................... clearances above grade, veran-
6 ft. (Canada) ......... clearance to a mechanical
air supply inlet
(See Note 1)
da, porch, deck or balcony
= 12" ....................... clearances to window or door
that may be opened, or to per-
L** = 7 ft. ......................... clearance above paved
sidewalk or a paved driveway
(See Note 1)
located on public property
manently closed window.
M*** = 18" ......................... clearance under veranda,
D*
= 18" ....................... vertical clearance to unventilat-
ed soffit or to ventilated soffit lo-
porch, deck, balcony or over-
hang.
cated above the terminal
36” ......................... vinyl
*36” ...................... for vinyl clad soffits and below
electrical service
N
P
= 6” ........................... non-vinyl sidewalls
12” ......................... vinyl sidewalls
F
=
9" ........................ clearance to outside corner
= 8 ft.
G
H
= 6" ......................... clearance to inside corner
= 3 ft. (Canada) ...... not to be installed above a gas
meter/regulator assembly within
______________________________Q___M_I_N___________________________________
_____1___c__a_p__________________3___f_e_e__t_________________2__x__Q____A_C_T_U_A_L____
______2__c__a_p__s________________6___f_e_e__t_________________1__x__Q____A_C_T_U_A_L____
______3__c__a_p__s_________________9__f_e_e__t_______________2_/_3__x___Q___A_C_T_U_A__L___
4 caps 12 feet 1/2 x Q ACTUAL
RMAX
3 feet (90cm) horizontally from the
center-line of the regulator
I
= 3 ft. ....................... clearance to gas service regu-
lator vent outlet
= 9" (U.S.A.)
Î
J
QMIN = # termination caps x 3
RMAX = (2 / # termination caps) x QACTUAL
12" (Canada) ........ clearance to non-mechanical air
supply inlet to building or the
combustion air inlet to any other
appliance
S = 6" .......................... clearance from sides of elec-
(See Note 5)
trical service
T
= 12" ......................... clearance above electrical
K
= 3 ft. (U.S.A.)
(See Note 5)
service
NOTE 3: Local codes or regulations may require different
clearances.
** a vent shall not terminate directly above a sidewalk or paved
driveway which is located between two single family dwellings
and serves both dwellings.
NOTE 4: Termination caps may be hot. Consider their proximity to
doors or other traffic areas.
*** only permitted if veranda, porch, deck or balcony is fully open on
a minimum of 2 sides beneath the floor, or meets Note 2.
NOTE 5: Location of the vent termination must not interfere with
access to the electrical service.
NOTE 1: On private property where termination is less than 7 feet
above a sidewalk, driveway, deck, porch, veranda or balcony, use of
a listed cap shield is suggested.
WARNING: In the U.S: Vent system termination is NOT permitted
in screened porches. You must follow side wall, overhang and
ground clearances as stated in the instructions.
NOTE 2: Termination in an alcove space (spaces open only on one side
and with an overhang) are permitted with the dimensions specified for
vinyl or non-vinyl siding and soffits. 1. There must be 3 feet minimum
between termination caps. 2. All mechanical air intakes within 10 feet
of a termination cap must be a minimum of 3 feet below the termination
cap. 3. All gravity air intakes within 3 feet of a termination cap must be
a minimum of 1 foot below the termination cap.
In Canada: Vent system termination is NOT permitted in screened
porches. Vent system termination is permitted in porch areas
with two or more sides open. You must follow all side walls,
overhang and ground clearances as stated in the instructions.
Heat & Glo assumes no responsibility for the improper perfor-
mance of the fireplace when the venting system does not meet
these requirements.
Figure 29. Vent Termination Minimum Clearances
CAUTION: IF EXTERIOR WALLS ARE FINISHED WITH VINYL SIDING, IT IS SUGGESTED THAT A VINYL PROTECTOR KIT BE
INSTALLED.
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
33
To seal the roof hole, and to divert rain and snow from the
vent system:
For Vertical Terminations - To locate the vent and install
the vent sections:
• Locate and mark the vent centerpoint on the underside
of the roof, and drive a nail through the centerpoint.
• Attach a flashing to the roof using nails, and use a non-
hardening mastic around the edges of the flashing base
where it meets the roof.
• Make the outline of the roof hole around the centerpoint
nail.
• Attach a storm collar over the flashing joint to form a
water-tight seal. Place non-hardening mastic around the
joint, between the storm collar and the vertical pipe.
• The size of the roof hole framing dimensions depend on the
pitch of the roof. There MUST BE a 1-inch (25.4mm) clear-
ance from the vertical vent pipe to combustible materials.
• Slide the termination cap over the end of the vent pipe
and snap into place.
• Mark the roof hole accordingly.
HORIZONTAL
OVERHANG
• Cover the opening of the installed vent pipes.
• Cut and frame the roof hole.
2 FT.
MIN.
20 INCH MIN.
VERTICAL
WALL
• Use framing lumber the same size as the roof rafters
and install the frame securely. Flashing anchored to the
frame must withstand heavy winds.
LOWEST
DISCHARGE
OPENING
TERMINATION
CAP
• Continue to install concentric vent sections up through
the roof hole (for inside vent installations) or up past the
roof line until you reach the appropriate distance above
the roof (for outside terminations).
X
12
ROOF PITCH
IS X/ 12
H (MIN.) - MINIMUM HEIGHT FROM ROOF
TO LOWEST DISCHARGE OPENING
WARNING: MAJOR U.S. BUILDING CODES
SPECIFY MINIMUM CHIMNEY AND/OR
!
VENT HEIGHTABOVE THE ROOF TOP. THESE MIN-
IMUM HEIGHTS ARE NECESSARY IN THE INTER-
EST OF SAFETY. SEE THE FOLLOWING DIAGRAM
FOR MINIMUM HEIGHTS, PROVIDED THE TERMI-
NATION CAP ISAT LEAST 20 INCHES FROMAVER-
TICAL WALLAND 2-FEET BELOWAHORIZONTAL
OVERHANG.
Roof Pitch
H (min.) ft.
flat to 6/12
6/12 to 7/12
over 7/12 to 8/12
over 8/12 to 9/12
over 9/12 to 10/12
over 10/12 to 11/12
over 11/12 to 12/12
over 12/12 to 14/12
over 14/12 to 16/12
over 16/12 to 18/12
over 18/12 to 20/12
over 20/12 to 21/12
1.0
1.25
1.5
2.0
2.5
3.25
4.0
5.0
6.0
7.0
7.5
8.0
NOTE: This also pertains to vertical vent systems in-
stalled on the outside of the building.
Figure 30. Minimum Height from Roof to
Lowest Discharge Opening
34
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
Step 4. Positioning, Leveling, and Securing
the Fireplace
Step 5. The Gas Control System
WARNING: THIS UNIT IS NOT FOR USE WITH
!
The diagram below shows how to properly position, level,
and secure the fireplace.
SOLID FUEL.
FLAME
SENSOR
ROD
IPI PILOT
NAILING
TABS
(BOTH SIDES)
Figure 32. Gas Control System
Intermittent Pilot Ignition (IPI) System
This system includes a 3V control valve, electronic module
and intermittent pilot.
WARNING: CONTINUOUS 110-120 VAC
SERVICE MUST BE WIRED DIRECTLY TO
!
THE FIREPLACE JUNCTION BOX IN A IPI SYSTEM.
Figure 31. Proper Positioning, Leveling, and
Securing of a Fireplace
• Place the fireplace into position.
• Level the fireplace from side to side and from front to
back.
• Shim the fireplace with non-combustible material, such
as sheet metal, as necessary.
• Secure the fireplace to the framing by nailing or screwing.
• Holes are provided in the base pan for securing the unit
to the floor.
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
35
Step 6. The Gas Supply Line
NOTE: Have the gas supply line installed in accordance
with local building codes by a qualified installer
approved and/or licensed as required by the locality.
(In the state of Massachusetts installation must be
performed by a licensed plumber or gas fitter).
USE A WRENCH ON
SHUT-OFF VALVE
WHEN TIGHTENING
GAS LINE.
NOTE: Before the first firing of the fireplace, the gas
supply line should be purged of any trapped air.
MANUAL
SHUT-OFF
VALVE
NOTE: Consult local building codes to properly size
the gas supply line leading to the 1/2 inch
(13 mm) hook-up at the unit.
FLEX CONNECTOR
GAS VALVE
This gas fireplace is designed to accept a 1/2 inch
(13 mm) gas supply line.
GAS LINE
ACCESS
CONTROL VALVE
To install the gas supply line:
Figure 33. Gas Supply Line
• Alisted (and State of Massachusetts approved) 1/2 inch
(13mm) tee-handle manual shut-off valve and a listed
flexible gas connector are connected to the 1/2 inch
(13mm) inlet of the control valve. NOTE: If substituting
for these components, please consult local codes for
compliance.
Step 7. Gas Pressure Requirements
Pressure requirements for Heat & Glo gas fireplaces
are shown in the table below.
• Locate the gas line access hole in the outer casing of
the fireplace.
• The gas line may be run from either side of the fireplace
provided the hole in the outer wrap does not exceed 2” in
diameter and it does not penetrate the actual firebox.
Pressure
Natural Gas
Propane
Minimum
Inlet Pressure
5.0 inches
w.c.
11.0 inches
w.c.
• Open the fireplace lower grille, insert the gas supply line
through the gas line hole, and connect it to the shut-off
valve.
Maximum Inlet
Gas Pressure
14.0 inches
w.c.
14.0 inches
w.c.
• When attaching the pipe, support the control so that the
lines are not bent or torn.
Manifold
Pressure
3.5 inches
w.c.
10.0 inches
w.c.
• After the gas line installation is complete, all connec-
tions must be tightened and checked for leaks with a
commercially-available, non-corrosive leak check solu-
tion. Be sure to rinse off all leak check solution following
testing.
A one-eighth (1/8) inch (3 mm) N.P.T. plugged tapping is
provided on the inlet and outlet side of the gas control for a
test gauge connection to measure the manifold pressure.
The fireplace and its individual shut-off valve must be
disconnected from the gas supply piping system during
any pressure testing of the system at test pressures in
excess of one-half (1/2) psig (3.5 kPa).
WARNING: DO NOT USE AN OPEN FLAME
!
TO CHECK FOR GAS LEAKS.
• Insert insulation from the outside of the fireplace and
pack the insulation tightly to totally seal between the
pipe and the outer casing.
The fireplace must be isolated from the gas supply piping
system by closing its individual shut-off valve during any
pressure testing of the gas supply piping system at test
pressures equal to or less than one-half (1/2) psig (3.5 kPa).
• At the gas line access hole the gap between the supply
piping and gas access hole can be plugged with non-
combustible insulation to prevent cold air infiltration.
36
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
I
BULB SOCKET
ASSEMBLY (3)
IGNITION MODULE 3 VAC
INTERMITTENT
PILOT IGNITOR
S
PLUG-IN
3V TRANSFORMER
ON/OFF
WALL SWITCH
FLAME SPARKER/
SENSOR
IGNITION
MODULE
(3V)
WHT
ORG
BLK
WHT
GROUND TO
FIREPLACE
CHASSIS
LOW VOLTAGE
SEE NOTE 1
VALVE
REMOTE
CONTROL
GROUND
NEUTRAL
HOT
SCALE 1/1
TERMINAL BLOCK
ELECTRIC EMBERS
FLAME ON/OFF
Note: An alternate electric ember
switch can be installed on the wall
by connecting a minimum 14 gage
Romex™ to the leads supplied on
the back of the electric ember
switch.
3 VAC
TRANSFORMER
WHITE WIRE
CAN BE
BLACK WIRE CAN BE
VALVE
PLUGGED INTO ANY OF
#1 - #5 LOCATIONS
ON THE HOT SIDE
PLUGGED
INTO ANY
OF #1 - #5
LOCATIONS
ON THE
NEUTRAL
SIDE
LCOR & RCOR JUNCTION BOX
PLUG IN
Figure 34. Intermittent Pilot Ignition
(IPI) Wiring Diagram
Step 8. Wiring the Fireplace
WARNING
NOTE: Electrical wiring must be installed by a licensed
electrician.
Shock Hazard
CAUTION: DISCONNECT REMOTE CONTROLS IF AB-
SENT FOR EXTENDED TIME PERIODS. THIS WILL PRE-
VENTACCIDENTAL FIREPLACE OPERATION.
Disconnect 110V before servicing.
• Electric ember lighting uses 110V.
Operation using Battery Power
For Intermittent Pilot Ignition Wiring
This fireplace has an optional battery operation. The sys-
tem is fully functional with the use of two “D” size batteries
without ordinary 110-120 VAC power.
Appliance Requirements
This appliance requires that 110-120 VAC be wired to the
junction box. Maintain correct polarity when wiring the junc-
tion box.
Wiring to the battery pack should be left disconnected in
order to conserve battery life. In the case of a loss of power,
simply connect red and black wire leads to activate battery
power (connect red to red, black to black). The fireplace can
be used as necessary. Once power (110 VAC) is restored,
disconnect red and black wire leads to extend battery life.
WARNING
Wire 110V to electrical junction box.
Do NOT wire 110V to valve.
Do NOT wire 110V to wall switch.
• Incorrect wiring will damage millivolt valves.
• Uninterrupted or continuous power is required at all times
in IPI system EXCEPT when using battery back-up.
• Incorrect wiring will override IPI safety lockout and may
cause explosion.
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
37
NOTE: If any of the original wire as supplied with
the appliance must be replaced, it must be replaced
with the type 105oC rated wire.
TEMPERATURE
SENSOR SWITCH
FAN
JUNCTION
BOX
SPEED CONTROL
(RHEOSTAT)
DETAIL A
SCALE 1/1
SEE DETAIL A
Figure 35. Fan Wiring Diagram
Optional Accessories
Wall Switch
Position the wall switch in the desired position on a wall.
Run a maximum of 25 feet (7.8 m) or less length of 18A.W.G.
minimum wire and connect it to the fireplace ON/OFF switch
pigtails.
Optional fan and remote control kits require that 110-120
VAC be wired to the factory installed junction box before
the fireplace is permanently installed.
CAUTION: LABEL ALL WIRES PRIOR TO DISCONNEC-
TION WHEN SERVICING CONTROLS. WIRING ERRORS
CAN CAUSE IMPROPERAND DANGEROUS OPERATION.
VERIFY PROPER OPERATION AFTER SERVICING.
Fan Installation
Recommended fan locations for the type of fireplace you
have (see Figures 36 and 37).
FAN
FAN
Figure 37. ST & PIER fan location
ST & Pier fan location
Figure 36. Corner fan location
Corner fan location
It is recommended to position the fan on the same side of
the fireplace as the vent collars are on. This will provide the
best air flow (see Figure 37).
It is recommended to position the fan in this location as
shown. This will provide the best air flow (see Figure 36).
38
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
Wall Switch Installation for Fan (Optional)
If the box is being wired to a wall mounted switch for use
with a fan (See Figure 38):
•
•
•
•
•
The power supply for the appliance must be brought into
a switch box.
The power can then be supplied from the switch box to
the appliance using a minimum of 14-3 with ground wire.
At the switch box connect the black (hot) wire and red
(switch leg) wire to the wall switch as shown.
At the appliance connect the black (hot), white (neutral)
and green (ground) wires to the junction box as shown.
Add a 1/4 inch insulated female connector to the red
(switch leg) wire, route it through the knockout in the
face of the junction box, and connect to the top fan switch
connector (1/4 inch male) as shown.
SWITCH
MINIMUM 14-3 AWG
WITH GROUND
Red
Black
White
Green
Black
White
Green
JUNCTION BOX
POWER
SUPPLY WIRES
SWITCH BOX
Red
Figure 38. Junction Box Wired to Wall Switch
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
39
CAUTION: IF JOINTS BETWEEN THE FIN-
ISHED WALLS AND THE FIREPLACE SUR-
ROUND (TOP AND SIDES) ARE SEALED, A
300° F. MINIMUM SEALANT MATERIAL
MUST BE USED. THESE JOINTS ARE NOT
REQUIRED TO BE SEALED. ONLY NON-
COMBUSTIBLE MATERIAL (USING 300° F.
MINIMUM ADHESIVE, IF NEEDED) CAN BE
APPLIED AS FACING TO THE FIREPLACE
SURROUND. SEE THE DIAGRAM BELOW.
Step 9. Finishing
Figures 39 and 40 show the minimum vertical and corresponding
maximum horizontal dimensions of fireplace mantels or other
combustible projections above the top front edge of the fireplace. See
Figures 4 and 5 for other fireplace clearances. Only non-combustible
materials may be used to cover the black fireplace front.
WARNING: WHEN FINISHING THE FIREPLACE, NEVER
OBSTRUCT OR MODIFY THE AIR INLET/OUTLET GRILLES
!
IN ANY MANNER.
NOTE: Sheetrock or other combustible mate-
rial such as wood can be placed on the top
edge and sides of the fireplace.
12”
MANTEL
11”
10”
9”
8”
ST-HV-IPI
7”
6”
TOP EDGE
5”
Mantel dimensions shown are
for standard hood on models:
PIER-HV-IPI, LCOR-HV-IPI,
and RCOR-HV-IPI.
4”
*
16”
3”
15”
SIDE EDGE
14”
13”
2”
5”
12”
11”
1”
10”
9”
8”
7”
To use mantel dimensions
shown the fireplace must have
the standard hood replaced
with a larger hood (060-143)
on model: ST-HV-IPI.
6”
*
0” GAP
PIER-HV-IPI and L&RCOR-HV-IPI
TOP EDGE
HOOD
*
NOTE: 12” mantel
at 16” above hood.
Minimum Vertical and Maximum Horizontal
Dimensions of Combustibles above Fireplace
SIDE EDGE
Figure 39.
12”
MANTEL
11”
10”
9”
8”
Mantel dimensions shown are
for standard hood on model:
ST-HV-IPI
*
0” GAP
7”
6”
5”
Figure 41. Sealant Material
4”
3”
2”
1”
Hearth Extensions
23”
22”
A hearth extension may be desirable for
aesthetic reasons. However,ANSI or CAN/CGA
testing standards do not require hearth
extensions for gas fireplace appliances.
21”
20”
19”
18”
17”
16”
15”
14”
13”
12”
HOOD
NOTE: 12” mantel at
23” above hood.
*
Minimum Vertical and Maximum Horizontal
Dimensions of Combustibles above Fireplace
Figure 40.
40
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
Preparing Electric Ember Bed and Lava Rock
Step 10. Installing Trim, Logs & Ember Material
The electric ember bed must be prepared before the logs
are set up (see Figure 42).
Installing the Trim
Combustible materials may be brought up to the specified
clearances on the side and top front edges of the fireplace,
but MUST NEVER overlap onto the front face. The joints
between the finished wall and the fireplace top and sides
can only be sealed with a 300° F. (149° C) minimum sealant.
WARNING: WHEN FINISHING THE FIREPLACE,
NEVER OBSTRUCT OR MODIFY THE AIR INLET/
!
OUTLET GRILLES IN ANY MANNER.
Install optional marble and brass trim surround kits as
desired. Marble, brass, brick, tile, or other non-combustible
materials can be used to cover up the gap between
combustible material (sheetrock or wood) and the fireplace.
Do not obstruct or modify the air inlet/outlet grilles. When
overlapping on both sides, leave enough space so that the
bottom grille can be lowered and the trim door removed.
Figure 42
Positioning the Logs
If the gas logs have been factory installed they should not
need to be positioned. If the logs have been packaged
separately, refer to the instructions that accompany the
logs. Save the log instructions with this manual.
Start by applying the teco-sil (granulated glass) to the base
pan (see Figure 43).
If sooting occurs, the logs might need to be repositioned
slightly to avoid excessive flame impingement.
Shutter Settings
NG
LP
___________________________________________
PIER-HV-IPI
3/8”
FULL OPEN
___________________________________________
ST-HV-IPI
3/8”
FULL OPEN
___________________________________________
L&RCOR-HV-IPI
3/8”
FULL OPEN
Figure 43.
Glass Specifications
Model
Type
PIER-HV-IPI
TEMPERED
ST-HV-IPI
TEMPERED
Pile a thin layer and follow the pattern on the base pan
(see Figure 44).
L&RCOR-HV-IPI TEMPERED
Heat & Glo fireplaces manufactured with tempered glass
may be installed in hazardous locations such as bathtub
enclosures as defined by the CPSC. The tempered glass
has been tested and certified to the requirements of ANSI
Z97.1-1984 and CPSC 16 CFR 1202. (Safety Glazing Certi-
fication Council SGCC # 1595 and 1597. Architectural Test-
ing, Inc. Reports 02-31919.01 and 02-31917.01.)
This statement is in compliance with CPSC 16 CFR Sec-
tion 1201.5 “Certification and labeling requirements” which
refers to 15 USC 2063 stating “…Such certificate shall ac-
company the product or shall otherwise be furnished to any
distributor or retailer to whom the product is delivered.”
Figure 44.
Some local building codes require the use of tempered glass
with permanent marking in such locations. Glass meeting
this requirement is available from the factory. Please con-
tact your dealer or distributor to order.
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
41
Now the Lava rock can be applied (see Figure 45).
Make sure to paint the glass from both sides (see
Figure 48).
Figure 45.
Figure 48.
The lava rock should cover the remaining base pan area
(see Figure 46). Do not put lava rock on top of the glass
(teco-sil).
The ember bed is now complete (see Figure 49.)
Figure 49.
Figure 46.
Turn on the electric ember lights and paint the glass to a
darkness as desired (see Figure 47).
Figure 47.
42
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
Placing the Ember Material
Ember Light Bulb Replacement
Ember material is shipped with this gas fireplace. The bag
labeled Glowing Ember (050-721) is standard glowing em-
ber material.
In the lower gas valve compartment you will find three ac-
cess panels for the three light bulbs (see Figure 51).
ACCESS PANEL
To place the ember material:
•
•
Remove the glass door from the unit.
Place dime size pieces of ember material about 1/2 inch
apart near port holes in burner top. Do NOT press em-
bers into burner ports. Cover the top of the burner with a
single layer of ember material.
•
•
Save the remaining ember materials for use during fire-
place servicing. The bag of embers provided is sufficient
for 3 to 5 applications.
Figure 51.
Replace the glass door and a front trim door on the unit.
Using a 5/16” nut driver remove the two bolts (see
Figure 52).
ACCESS PANEL
Figure 52.
Figure 50. Placement of the Ember Material
Pull the access panel to expose the light bulb. Wearing
clean cotton gloves replace the bulb. Any skin oils which
get on a new bulb will greatly shorten the life of the bulb.
The bulb can be cleaned with isopropyl alcohol (see Figure 53).
Figure 53
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
43
Step 12. Lighting the Fireplace
Step 11. Before Lighting the Fireplace
Before lighting the fireplace, be sure to do the following:
Remove all paperwork from underneath the fireplace.
Review safety warnings and cautions
You’ve reviewed all safety warnings, you’ve checked the
fireplace for gas leaks, you know the vent system is
unobstructed, and you’ve checked for faulty components.
Now you’re ready to light the fireplace.
• Read the Safety and Warning Information section at
the beginning of this Installers Guide.
WARNING: PLEASE REFER TO THE USER’S
MANUAL FORALL CAUTIONS, SAFETY, AND
WARNING INFORMATION PERTAINING TO THE
LIGHTING AND OPERATION OF THE FIREPLACE.
Double-check for gas leaks
!
•
Before lighting the fireplace, double-check the unit for
possible gas leaks.
Double-check vent terminations and front grilles for
obstructions.
After the Installation
• Before lighting the fireplace, double-check the unit for
possible obstructions that could be blocking the vent ter-
minations or the front grilles.
LEAVE THIS INSTALLATION MANUAL WITH
!
THE APPLIANCE FOR FUTURE REFERENCE.
Double-check for faulty components
• Any component that is found to be faulty MUST BE re-
placed with an approved component. Tampering with the
fireplace components is DANGEROUS and voids all war-
ranties.
A small amount of air will be in the gas supply lines. When
first lighting the fireplace, it will take a few minutes for the
lines to purge themselves of this air. Once the purging is
complete, the fireplace will light and will operate normally.
Subsequent lightings of the fireplace will not require this
purging of air from the gas supply lines, unless the gas
valve has been turned to the OFF position, in which
case the air would have to be purged.
NOTE: The fireplace should be run 3 to 4 hours on the initial
start-up. Turn it off and let it cool completely. Remove and
clean the glass. Replace the glass and run the fireplace for
an additional 8 hours. This will help to cure the products
used in the paint and logs.
During this break-in period it is recommended that some
windows in the house be opened for air circulation. This will
help avoid setting off smoke detectors, and help eliminate
any odors associated with the fireplace’s initial burning.
44
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
Maintaining and Servicing Your Fireplace
4
Fireplace Maintenance
Although the frequency of your fireplace servicing and main-
tenance will depend on use and the type of installation, you
should have a qualified service technician perform an appli-
ance check-up at the beginning of each heating season.
See the table below for specific guidelines regarding each
fireplace maintenance task.
IMPORTANT: TURN OFF THE GAS BEFORE SERVICING
YOUR FIREPLACE.
Replacing old ember material
Frequency: Once annually, during the checkup.
By: Qualified service technician.
MAKE SURE THE FLAMES
ARE STEADY—NOT
LIFTING OR FLOATING.
Task: Brush away loose ember material near the burner.
Replace old ember material with new dime-size and shape
pieces of Golden Ember (GE-93) and Glowing Ember (050-
721). New ember material should be placed alternately on
top of the burner - a layer of Golden Ember, a layer of
Glowing Ember, and so on. Save the remaining ember
material and repeat this procedure at your next servicing.
For more information, see Placing Ember Material.
Figure 54. Burner Flame Patterns
Checking Vent System
Frequency: Before initial use and at least annually
thereafter, more frequently if possible.
Cleaning Burner and Controls
Frequency: Once annually.
By: Qualified service technician.
Task: Brush or vacuum the control compartment, fireplace
logs and burner areas surrounding the logs.
By: Qualified service technician/Home owner.
Task: Inspect the external vent cap on a regular basis to
ensure that no debris is interfering with the flow of air. Inspect
entire vent system for proper function.
Cleaning Glass Door
Frequency: After the first 3 to 4 hours of use. As neces-
sary after initial cleaning.
Cleaning Flame Sensor Rod (IPI Systems)
Frequency: Periodically.
By: Qualified service technician.
By: Home owner.
Task: Remove and clean glass after the first 3 to 4 hours of
use. After the initial cleaning, clean as necessary, particu-
larly after adding new ember (flame colorant) material. Film
deposits on the inside of the glass door should be cleaned
off using a household glass cleaner. NOTE: DO NOT handle
or attempt to clean the door when it is hot and DO
NOT use abrasive cleaners.
Task: Make a visual check of the straight flame sensor rod.
Use emery cloth to carefully remove any existing white film
or deposits.
Checking Flame Patterns, Flame Height
Frequency: Periodically.
By: Qualified service technician/Home owner.
Task: Make a visual check of your fireplace’s flame patterns.
Make sure the flames are steady - not lifting or floating.
See Figure 54. The flame sensor (IPI) tip should be covered
with flame. See Figure 32.
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06
Download from Www.Somanuals.com. All Manuals Search And Download.
45
|
Graco Coffeemaker TI12743a User Manual
Graco Stroller PD246480A User Manual
Grizzly Planer G1021 User Manual
Haier Flat Panel Television P37K1 User Manual
Haier Washer XPB10 LAP User Manual
Honeywell Scanner MS7180 User Manual
Hotpoint Dishwasher DWF70 User Manual
Hunter Fan Fan 23964 User Manual
Husqvarna Snow Blower ST 276EP User Manual
IMC Networks Network Card E1 User Manual