Bradley Smoker Plumbing Product S19 220BPT User Manual

Installation  
S19-220PT  
S19-220PT  
Wall-Mounted Eyewash with  
Plastic Bowl  
S19-220BPT  
Wall-Mounted Eyewash with  
Stainless Steel Bowl  
S19-220BPT  
Table of Contents  
Pre-Installation Information . . . . . . . . . . . . . . . .2  
Installation Instructions . . . . . . . . . . . . . . . . . . . .3  
S19-220PT Components and Parts List . . . . . . .4  
S19-220BPT Components and Parts List . . . . . .5  
215-1251 Rev. B; EN 06-532G  
© 2007 Bradley Corporation  
P.O. Box 309, Menomonee Falls, WI USA 53052-0309  
PHONE 1-800-BRADLEY FAX (262) 251-5817  
Page 1 of 5  
4/30/07  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Installation  
S19-220PT, S19-220BPT  
15-1/2"  
(394mm)  
S19-220PT  
Installation  
Instructions  
7-3/8"  
NOTE: Flush the water  
supply line before beginning  
installation.  
(187mm)  
4"  
(102mm)  
2-1/4"  
(57mm)  
5/16"  
8-1/4"  
(210mm)  
Supplies Required:  
• (3) 3/8" wall fasteners  
and bolts  
13-1/4"  
(337mm)  
(8mm)  
MTG.  
HOLE  
5-1/4"  
133mm)  
Ø10"  
(254mm)  
• Pipe sealant  
• Piping to 1/2" IPS water  
supply inlet on unit  
• Sign-mounting hardware  
15-7/8"  
(403mm)  
S19-220BPT  
Step 1: Install inlet  
drain fittings  
7-3/8"  
NOTE: Top of eyewash heads  
should be 33"-45" (838mm-  
1142mm) from floor.  
(187mm)  
4"  
(102mm)  
8-1/4"  
(210mm)  
2-1/4"  
(57mm)  
1. Position the inlet drain  
fitting over the 1-1/4"  
drain outlet pipe from  
wall.  
13-5/8"  
5/16"  
(346mm)  
(8mm)  
MTG.  
5-1/4"  
133mm)  
Ø10-3/4"  
(273mm)  
HOLE  
2. Using the inlet drain  
fitting as a template,  
mark the bolt hole  
locations on wall OR  
install three suitable  
fasteners (supplied by  
installer) for 3/8" bolts  
in the wall at the  
marked hole locations  
(see Figure 1).  
S19-220PT  
&
S19-220BPT  
36" (914mm)  
Suggested  
Height  
To Floor  
30-1/2" (775mm)  
Suggested  
4-1/2"  
(114mm)  
8-3/4"  
(222mm)  
Height  
To Floor  
3. Bolt the inlet drain  
fitting to the wall or  
wall fasteners using  
3/8" bolts (supplied by  
installer).  
13"  
(330mm)  
Figure 1  
Step 2: Assemble eyewash  
1. Assemble eyewash components as shown in Figure 2 on page 4.  
• Apply pipe sealant (supplied by installer) to all male-threaded pipe joints.  
• Use a strap wrench around pipes when tightening to prevent marring.  
Step 3: Connect water supply  
1. Connect the water supply piping (supplied by installer) to the 1/2" IPS inlet on the eyewash.  
2. Connect the P-trap and the tailpiece to the 1-1/4 IPS drain outlet on the eyewash.  
3. Mount the safety sign to a wall or pipe using sign-mounting hardware (supplied by installer).  
4. Open the water supply lines. Test for leaks and adequate water flow.  
Bradley Corporation • 215-1251 Rev. B; EN 06-532G  
4/30/07  
3
Download from Www.Somanuals.com. All Manuals Search And Download.  
S19-220PT, S19-220BPT  
Installation  
Assembly of Components - S19-220PT (Plastic Bowl)  
1.8  
1.7  
9
1.6  
1.5  
1
P
.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA  
TEL: 1-800-BRADLEY FAX: (262-251-5817)  
114-051  
Flow Control  
This End  
1.4  
10  
R
P.O. Box 309, Menomonee Falls, WI 53051  
TEST THIS UNIT EACH WEEK  
DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.  
ESSAI HEBDOMADAIRE  
1.3  
Test-operate valve(s) each week and sign below.  
Report any malfunctions immediately.  
Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt  
durch Unterschrift. Jegliche Störung sofort melden.  
Test le fonctionnement des valves chaque semaine et  
signe en bas. S'il  
y
à
quelque chose qui ne va pas fait  
un rapport immédiatement.  
Date  
Datum  
Date  
Signed  
Unterschrift  
Signe  
Date  
Date  
Date  
Signed  
Signed  
Signed  
1/2" IPS  
Supply Inlet  
1.2  
1.1  
4
6
2
3
5
1-1/4" IPS  
Drain Outlet  
7
4.1  
NOTE: Items 1.1 -1.8 come presasembled as Item 1.  
Figure 2a  
8
Item Part No.  
Qty  
1
Description  
Item Part No.  
Qty  
1
Description  
Elbow 1/2" IPS Street  
1/2" Ball Valve with Nut  
Nut only  
1
S90-293  
111-061  
124-028  
154-058  
173-025  
S21-071  
113-1185  
S05-091  
107-371  
113-006LQ  
Plastic Eyewash Assembly  
Inlet-Drain Fitting  
Gasket  
3
4
169-025  
S27-282  
110-215  
128-135  
142-002DA  
269-167  
269-142  
114-051  
204-421  
1.1  
1.2  
1.3  
1.4  
1.5  
1.6  
1.7  
1.8  
2
1
1
1
4.1  
5
1
1
Plastic Eyewash Bowl  
Cup Strainer  
1
Handle Assembly  
Lockwasher  
1
6
1
1
Supply Stem  
7
1
Tailpiece  
1
Spacer, Drain  
8
1
Trap  
1
Eyewash Yoke  
9
1
Safety Sign  
2
Dust Cover  
10  
1
Emergency Inspection Tag  
1
Pipe 1/2" IPS x 3-1/2" Long  
Prepack S45-122 includes items 4, 4.1, 5, 6  
Prepack S45-123 includes items 4.1, 5, 6  
Prepack S45-1785 includes items 1.2, 1.4, 1.5, 1.6  
4
4/30/07  
Bradley Corporation • 215-1251 Rev. B; EN 06-532G  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Installation  
S19-220PT, S19-220BPT  
Assembly of Components - S19-220BPT (Stainless Steel Bowl)  
1.8  
1.7  
9
1.6  
1.5  
1
P
.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA  
TEL: 1-800-BRADLEY FAX: (262-251-5817)  
114-051  
Flow Control  
This End  
1.4  
10  
R
P.O. Box 309, Menomonee Falls, WI 53051  
1.3  
TEST THIS UNIT EACH WEEK  
DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.  
ESSAI HEBDOMADAIRE  
Test-operate valve(s) each week and sign below.  
Report any malfunctions immediately.  
Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt  
durch Unterschrift. Jegliche Störung sofort melden.  
Test le fonctionnement des valves chaque semaine et  
signe en bas. S'il  
y
à
quelque chose qui ne va pas fait  
un rapport immédiatement.  
Date  
Datum  
Date  
Signed  
Unterschrift  
Signe  
Date  
Date  
Date  
Signed  
Signed  
Signed  
1/2" IPS  
Supply Inlet  
1.2  
1.1  
4
6
2
3
5
1-1/4" IPS  
Drain Outlet  
7
4.1  
NOTE: Items 1.1 -1.8 come presasembled as Item 1.  
Figure 2b  
8
Item Part No.  
Qty  
1
Description  
Item Part No.  
Qty  
1
Description  
Elbow 1/2" IPS Street  
1/2" Ball Valve with Nut  
Nut only  
1
S90-295  
111-061  
124-028  
187-053  
173-009  
S21-071  
113-1159  
S05-091  
107-371  
113-006LQ  
Stainless Steel Eyewash Assembly  
Inlet-Drain Fitting  
Gasket  
3
4
169-025  
S27-282  
110-215  
128-135  
142-002DA  
269-167  
269-142  
114-051  
204-421  
1.1  
1.2  
1.3  
1.4  
1.5  
1.6  
1.7  
1.8  
2
1
1
1
4.1  
5
1
1
Stainless Steel Bowl  
Cup Strainer  
1
Handle Assembly  
Lockwasher  
1
6
1
1
Supply Stem  
7
1
Tailpiece  
1
Spacer, Drain  
8
1
Trap  
1
Eyewash Yoke  
9
1
Safety Sign  
2
Dust Cover  
10  
1
Emergency Inspection Tag  
1
Pipe 1/2" IPS x 3-1/2" Long  
Prepack S45-122 includes items 4, 4.1, 5, 6  
Prepack S45-123 includes items 4.1, 5, 6  
Prepack S45-1782 includes items 1.2, 1.4, 1.5, 1.6  
Bradley Corporation • 215-1251 Rev. B; EN 06-532G  
4/30/07  
5
Download from Www.Somanuals.com. All Manuals Search And Download.  

Black Decker Can Opener KEC500 User Manual
Briggs Stratton Portable Generator 30213 User Manual
Britax Car Seat BB0 633 00 User Manual
Bryant Furnace 363AAP 361AAN User Manual
Canon Satellite TV System DT 9500 CI User Manual
Centurion Oxygen Equipment CP72SR5 User Manual
Century Welder IM10008 User Manual
Chamberlain Garage Door Opener 182665D User Manual
Char Broil Fryer 10101480 User Manual
Cisco Systems IP Phone OL 14625 01 User Manual