Bunn Coffeemaker U3 User Manual

U3  
U3A  
OPERATING & SERVICE MANUAL  
BUNN-O-MATIC CORPORATION  
POST OFFICE BOX 3227  
SPRINGFIELD, ILLINOIS 62708-3227  
PHONE: (217) 529-6601 FAX: (217) 529-6644  
To ensure you have the latest revision of the Operating Manual, or to view the Illustrated Parts  
Catalog, Programming Manual, or Service Manual, please visit the Bunn-O-Matic website, at  
manual updates. For Technical Service, contact Bunn-O-Matic Corporation at 1-800-286-6070.  
10060.0000K 10/08 ©1984 Bunn-O-Matic Corporation  
INTRODUCTION  
This brewer will brew a three gallon batch of coffee into each reservoir (one at a time). Each reservoir has  
its own dispensing faucet(s).The brewer also has a hot water faucet(s) for allied beverage use. It is only for  
indoor use on a sturdy counter where ambient temperature is in the range of 10-30°C (50-85°F). Brewer to be  
installed at a location where it can be overseen by trained personnel.  
USER NOTICES  
Carefully read and follow all notices on the brewer and in this manual. They were written for your protection.  
All notices on the brewer are to be kept in good condition. Replace any unreadable or damaged labels.  
This equipment must be installed to comply  
WARNING  
with the International Plumbing Code of the  
Fill water tank before turning - on -  
thermostat or connecting appliance  
to power source.  
International Code Council and the Food  
Code Manual of the Food and Drug Adminis-  
tration (FDA). For models installed outside  
the U.S.A., comply with the applicable  
Plumbing /Sanitation Code.  
Use only on a properly protected  
circuit capable of the rated load.  
Electrically ground the chassis.  
Follow national/local electrical codes.  
Do not use near combustibles.  
#00656.0000  
FAILURE TO COMPLY RISKS EQUIPMENT  
DAMAGE, FIRE, OR SHOCK HAZARD  
READ THE ENTIRE OPERATING MANUAL  
BEFORE BUYING OR USING THIS PRODUCT  
THIS APPLIANCE IS HEATED WHENEVER  
CONNECTED TO A POWER SOURCE  
00831.0000F 3/98 ©1998 BUNN-O-MATIC CORPORATION  
#00831.0000  
#37881.0000  
WARNING  
WARNING  
Very Hot Water  
REMOVE FUNNEL  
SLOWLY  
#03408.0000  
Use With Care!  
#12593.0000  
WARNING  
H O T  
CAUTION  
L I Q U I D  
#03409.0000  
HOT  
ATTENTION: TURN OFF WHEN UNATTENDED  
SURFACES  
#00878.0000  
#12555.0000  
#00824.0001  
10060 011708  
Page 3  
ELECTRICAL REQUIREMENTS  
CAUTION - The brewer must be disconnected from the power source until specified in Initial Set-Up.  
RED  
L2 RED  
WHITE  
L2  
L3  
L1  
208V OR 240V  
380V OR 440V  
120V A.C.  
120V A.C.  
BLUE  
208V OR 240V  
380V OR 440V  
208 OR  
240V A.C.  
208V OR 240V  
380V OR 440V  
NEUTRAL  
L1 BLACK  
BLACK  
GREEN  
GREEN  
P1841  
P1843  
U3 & U38 requires 3-wire, grounded service rated  
120/208or120/240voltsac,U3-30amp,U38-40amp,  
single phase, 60 Hz. Proceed as follows:  
U333 & U3833 requires 3-wire, grounded service  
rated 240 volt ac, 35 amp or 440 volts ac, 30 amp for  
U333,three phase, 60 Hz or 380 volts ac, 30 amp for  
U3833, three phase, 50 Hz. Proceed as follows:  
L1, L2, L3, are the 3 phases  
WHITE  
(NEUTRAL)  
N
V1 = Phase to phase voltage,  
RED  
between any 2 phases.  
L2  
L3  
L1  
BLACK  
L1  
BLUE  
V2 = Phase to neutral voltage,  
any phase to neutral.  
BLACK  
230V A.C.  
RED  
L2  
GREEN  
GREEN  
SYSTEM  
VOLTAGE  
208  
V1  
V2  
GREEN  
GREEN  
208  
240  
380  
120  
139  
220  
P1844  
240  
380  
P1842  
440  
440  
254  
U3833 requires 4-wire, grounded service rated  
380 volts ac or 440 volts ac, 30 amp, three phase, 50  
Hz. Proceed as follows:  
U3Amodelsrequire2-wire,groundedservicerated  
230 volts ac, 30 amp, single phase, 50 Hz. Proceed  
as follows:  
ELECTRICAL INSTALLATION INSTRUCTIONS  
NOTE: Electrical source should have a circuit breaker between the brewer and the main supply which breaks all  
poles with a contact separation of at least 3 mm.  
CAUTION – Improper electrical installation will damage electronic components.  
1. An electrician must provide electrical service as specified.  
2. Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.  
3. Before electrically connecting the brewer, remove the front cupola cover (some models have the thermostat  
knob on the outside of the cover) and rotate the thermostat knob fully counterclockwise to the "OFF" position.  
Keep this knob in the "OFF" position until performing the Initial Setup.  
4. Electrical service is connected at the upper rear of the single service and scrambler brewers using a junc-  
tion box. On double service brewers the rear decorative channel must be removed for access to the terminal  
block.  
5. Connect the brewer to the power source and verify the voltage at the terminal block before proceeding. Re-  
place all panels.  
6. If plumbing is to be hooked up later be sure the brewer is disconnected from the power source. If plumbing  
has been hooked up, the brewer is ready for Initial Setup.  
NOTE: Schematic wiring diagrams are included in this manual.  
10060 011708  
Page 4  
CE REQUIREMENTS  
• This appliance must be installed in locations where it can be overseen by trained personnel.  
• For proper operation, this appliance must be installed where the temperature is between 5°C to 35°C.  
• Appliance shall not be tilted more than 10° for safe operation.  
• An electrician must provide electrical service as specified in conformance with all local and national codes.  
• This appliance must not be cleaned by water jet.  
• This appliance is not intended for use by persons (including children) with reduced physical, sensory or mental  
capabilities, or lack of experience and knowledge, unless they have been given instructions concerning use of  
this appliance by a person responsible for its safety.  
• Children should be supervised to ensure they do not play with the appliance.  
If the power cord is ever damaged, it must be replaced by the manufacturer or authorized service personnel with  
a special cord available from the manufacturer or its authorized service personnel in order to avoid a hazard.  
PLUMBING REQUIREMENTS  
These brewers must be connected to a cold water system with operating pressure between 20 (138) and 90 psi (620 kPa)  
from a 1/2" or larger supply line. A shut-off valve should be installed in the line before the brewer. Install a regulator in the  
line when pressure is greater than 90 psi (620 kPa) to reduce it to 50 psi (345 kPa). The water inlet fitting is 3/8" flare.  
NOTE - Bunn-O-Matic recommends 3/8" copper tubing for installations from the 1/2" water supply line. A tight coil of  
copper tubing in the water line will facilitate moving the brewer to clean the countertop. Bunn-O-Matic does not recom-  
mend the use of a saddle valve to install the brewer. The size and shape of the hole made in the supply line by this type  
of device may restrict water flow.  
ThisequipmentmustbeinstalledtocomplywiththeInternationalPlumbingCodeoftheInternational  
Code Council and the Food Code Manual of the Food and Drug Administration (FDA). For models  
installed outside the U.S.A., you must comply with the applicable Plumbing/Sanitation Code for  
your area.  
INITIAL SETUP  
CAUTION - The brewer must be disconnected from the power source throughout the initial setup, except when specified  
in the instructions.  
IMPORTANT: Brewer must be level and installed on a sturdy structure.  
Electrician's and Plumber's Instructions are provided. These instructions should be carefully followed  
before proceeding with initial setup.  
Be sure all electrical and plumbing connections are tight.  
1. Open manual fill valve located on the bottom of the brewer. Water should start filling the tank. When water is visible  
in the hot water gauge glass (center spigot), close valve. Approximate time for filling manually is 3 minutes.  
CAUTION: Never leave brewer unattended while manually filling tank.  
2. Connect the brewer to the power source. Turn "ON/OFF" switch to the "ON" position. Water should finish filling tank  
automatically.  
NOTE: It is recommended that the "ON/OFF" switch be left in the "OFF" position at the end of the operating day or when  
unattended for a long period of time.  
3. Disconnect the brewer from the power source. Remove front cupola cover for access to thermostat knob and timer.  
On some brewers the thermostat knob is located on the front of the cupola cover.  
4. Turn the thermostat knob clockwise to an approximate 5 o'clock position. Allow 1-1/2 hours for water to heat. Time  
will vary with incoming water temperature.  
5. On initial warm-up, some water may flow thru the overflow spigot due to expansion of the cold water in the tank.  
This will not recur during the use of the brewer and may be avoided on the initial warm-up by drawing off 1/2 gallon  
decanters of water each 15 minutes till brewing temperature is reached.  
10060 102808  
Page 5  
INITIAL SETUP (cont.)  
6. Brewing cycles may be started whenever water temperature is correct. This condition is indicated by the dial  
thermometer on front of the brewer. Whenever the pointer is in the green, brewer is ready for brewing. The  
recommended brewing temperature is approximately 200° F (93°C). Water temperature may be increased by  
turning thermostat knob clockwise, decreased by turning knob counterclockwise.  
7. When desired temperature is reached, insert funnel support, funnel and funnel cover in position. Be sure  
the water swing spout is over the center of the funnel cover, turn "ON/OFF" switch to the "ON" position, push  
and release "START" and run a brew cycle of hot water only. At the end of this cycle, brewer will be ready for  
checking timer adjustment.  
8. The timer has been preset for a 4 minute cycle. This setting will deliver approximately 3 gallons of water per  
brewing cycle. To increase or decrease amount of water, adjust the timer as required. See Adjusting Brew  
Volumes.  
9. Having determined final settings of the thermostat and the timer, replace front cupola cover. Brewer is now  
ready for brewing coffee.  
ADJUSTING BREW VOLUMES  
CAUTION - Disconnect the power source from the brewer prior to the removal of any panel for the replacement  
or adjustment of any component.  
NOTE: Prior to setting or modifying batch sizes, check that the brewer is connected to water supply, the tank is  
properly filled, and a funnel support, funnel and funnel cover are in place.  
1. Modifying batch sizes. To modify a batch volume, first check that the SET/LOCK switch is in the “SET” posi-  
tion on the circuit board.  
To increase a batch size. Press and hold the START or BREW switch until you see three breaks in the water  
stream from the swing arm. Release the switch (Failure to release the switch within two seconds after the  
third break in the water stream causes the volume setting to be aborted and previous volume setting will  
remain in memory) and press it again one or more times. Each time the switch is pressed, two seconds are  
added to the brew time period. Allow the brew cycle to finish in order to verify that the desired volume has  
been achieved.  
To decrease a batch size. Press and release the START or BREW switch once for every two-second interval  
to be removed from the total brew time period; then immediately press and hold down the START or BREW  
switch until you see three breaks in the water stream from the swing arm. Release the switch. (Failure to  
release the switch within two seconds after the third break in the water stream causes the volume setting to  
be aborted and previous volume setting will remain in memory). Allow the brew cycle to finish in order to  
verify that the desired volume has been achieved.  
2. Setting batch sizes. To set a batch volume, first check that the SET/LOCK switch is in the “SET” position on  
the circuit board. Press and hold the START or BREW switch until you see three breaks in the water stream  
from the swing arm, and then release the switch. (Failure to release the switch within two seconds after the  
third break in the water stream causes the volume setting to be aborted and previous volume setting will  
remain in memory). View the level of the liquid being dispensed. When the desired level is reached, turn the  
ON/OFF switch to “OFF” (lower). The brewer remembers this volume and will continue to brew batches of  
this size until the volume setting procedure is repeated.  
NOTE: When brewing coffee, batch volumes will decrease due to absorption by the coffee grounds.  
NOTE: HALF-BATCH AND FULL BATCH SETTINGS MUST EACH BE SET SEPARATELY.  
3. Setting programming disable feature. If it becomes necessary to prevent anyone from changing brew times  
once programmed, you can set the SET/LOCK switch to the “LOCK” position. This will prevent any program-  
ming to be done until switch is once again placed in the “SET” position.  
10060 080900  
Page 6  
COFFEE BREWING  
1. Brewing cycles may be started whenever water temperature is correct. This condition is indicated by the dial  
thermometer on front of the brewer. Whenever the pointer is in the green, brewer is ready for brewing.  
2. Insert Bunn® filter in funnel and add desired amount of coffee.  
3. Level the bed of coffee and place funnel into the funnel support. Place funnel cover over the funnel and be  
sure the water swing spout is over the center of the funnel cover.  
4. Turn "ON/OFF" switch to the "ON" position.  
5. Push and release "START" switch to start the brew cycle.  
6. Water swing spout should not be moved as long as water is flowing into the funnel cover. When water stops  
flowing, it may then be moved for access to brewing funnel.  
7. Remove funnel cover. Funnel should not be removed from brewer until drip out of coffee has been com-  
pleted.  
8. To empty funnel, invert it over a waste container to dispose of filter and grounds. An additional flange is  
provided on the funnel to help make this step easier.  
NOTE: Hot water may be drawn from the hot water faucet during a brew cycle. However, if a large amount of  
hot water is drawn off (over 1 gallon) operator should wait to do so between brewing cycles.  
CLEANING  
NOTE: Tanks and tank components should be delimed regularly based on local water conditions. Excessive  
mineral build-up on stainless steel surfaces can initiate corrosion reactions resulting in serious leaks.  
1. Remove both funnels, funnel lids and supports, under hot water, rinse away all coffee oils. Wipe with a clean  
damp cloth.  
2. Drain both coffee reservoirs by opening coffee faucets. When empty, close faucets.  
3. Cycle two or three inches of water into each coffee reservoir and scrub entire reservoir area.  
NOTE: The brewer must NOT be rinsed or cleaned by a water jet device.  
4. Drain both coffee reservoirs and rinse. Use clean damp cloth to wipe both reservoirs.  
5. Install both coffee funnel supports, funnels and funnel lids.  
6. Remove the sight gauge cap, insert sight gauge cleaning brush into the sight gauge glass tube and clean.  
7. To clean coffee faucets, remove the faucet handle from the faucet and faucet clean out cap. Clean faucet with  
a faucet cleaning brush and wipe all parts with a damp cloth. Replace faucet seat cups periodically if badly  
stained or to stop faucet dripping. DO NOT CLEAN THE HOT WATER FAUCET.  
8 Reassemble the coffee faucets.  
9. Wipe the entire outside surface of the machine with a clean damp cloth. Wipe dry.  
FILTER HOLDER  
1. A filter holder is supplied with each U3 coffee brewer. Its purpose is to keep the filters in their originally  
formed shape to properly fit the brewer funnel.  
2. It is suggested that only one cluster of filters be placed in the holder at one time for best results.  
3. Not using the filter holder may permit the filters to gradually widen out towards a flat shape, especially so if  
humidity is present. Once a filter has lost its upright side walls, it may tend to collapse inward when placed  
in the brewing funnel. If this happens the hot water spray may cause one side to fall inwards, letting coffee  
grounds flow over the edge of filter and into the brewed coffee. Proper use of the holder should prevent this  
problem.  
10060 081106  
Page 7  
TROUBLESHOOTING  
A troubleshooting guide is provided to suggest probable causes and remedies for the most likely problems  
encountered. If the problem remains after exhausting the troubleshooting steps, contact the Bunn-O-Matic  
Technical Service Department.  
Inspection, testing, and repair of electrical equipment should be performed only by qualified service person-  
nel.  
All electronic components have 120 volt ac and low voltage dc potential on their terminals. Shorting of  
terminals or the application of external voltages may result in board failure.  
Intermittent operation of electronic circuit boards is unlikely. Board failure will normally be permanent. If  
an intermittent condition is encountered, the cause will likely be a switch contact or a loose connection at a  
terminal or crimp.  
Solenoid removal requires interrupting the water supply to the valve. Damage may result if solenoids are  
energized for more than ten minutes without a supply of water.  
The use of two wrenches is recommended whenever plumbing fittings are tightened or loosened. This will  
help to avoid twists and kinks in the tubing.  
Make certain that all plumbing connections are sealed and electrical connections tight and isolated.  
This brewer is heated at all times. Keep away from combustibles.  
WARNING – • Exercise extreme caution when servicing electrical equipment.  
• Unplug the brewer when servicing, except when electrical tests are specified.  
• Follow recommended service procedures  
• Replace all protective shields or safety notices  
PROBLEM  
PROBABLE CAUSE  
REMEDY  
Brew cycle will not start  
1. No water  
Water lines and valves to the brewer  
must be open.  
(A1) Check the terminal block for  
120voltsacacrosstheredandwhite  
terminals and the black and white  
terminal on three wire 102/208 volt  
or 120/240 volt models.  
2. No power or incorrect voltage to  
the brewer  
(A2)Checktheterminalblockfor208  
volts ac, 230 volts ac or 240 volts  
ac on "A Series" brewers across the  
red and black terminals on two wire  
single phase 208 volt, 230 volt and  
240 volt models.  
(A3)Checktheterminalblockfor208  
volts ac, 240 volts ac, 380 volts ac  
across the black and blue terminals,  
the blue and red and the black and  
red terminals on three wire three  
phase 208 volt, 240 volt and 380  
volt models.  
10060 031500  
Page 8  
TROUBLESHOOTING (cont.)  
PROBLEM  
REMEDY  
PROBABLE CAUSE  
Brew cycle will not start (cont)  
(A4) Check the terminal block for  
440 volts ac across the black and  
blue terminals, black and red termi-  
nals and the red and blue terminals  
on four wire three phase 440 volt  
models.  
2. No power or incorrect voltage to  
the brewer (cont)  
(B) Check circuit breakers or  
fuses.  
Be sure water shut-off valve is open  
and that the in-line filters or strain-  
ers are not blocking water flow. (Do  
not confuse water shut-off valve  
with the manual fill and drain valve  
underneath the brewer).  
3. Water level below pump housing.  
(Water level in the hot water gauge  
glass should be approximately half  
full).  
RefertoService-ON/OFFSwitchfor  
testing. See page 22  
4. ON/OFF Switch  
5. Start Switch  
6. Relay  
Refer to Service - Start Switches for  
testing procedures. See page 29  
Refer to Service - Relay for testing  
procedures. See page 24  
Refer to Service - Timer for testing  
procedures. See page 31 or 33  
7. Timer  
Refer to Service - Pump for testing  
procedures. See page 23  
8. Pump  
Refer to Service - Solenoid Valve for  
testing procedures. See page 27  
9. Solenoid Valve  
10. Strainer  
(A) Direction of flow arrow must be  
pointing towards brewer.  
(B) Remove the strainer and check  
for obstructions. Clear or replace.  
Brew cycle starts with brew lockout  
relay engaged.  
Refer to Service - Relay for testing  
procedures. See page 24  
1. Relay  
10060 080900  
Page 9  
TROUBLESHOOTING (cont.)  
PROBLEM  
PROBABLE CAUSE  
REMEDY  
1.ON/OFF Switch (This switch  
must be in the "ON" position for  
the refill circuit to operate.  
Tank not filling  
Refer to Service - ON/OFF Switch  
for testing procedures. See page  
22  
2. No water  
Be sure water shut-off is open and  
that in-line filters or strainers are  
not blocking water flow. (Do not  
confuse water shut-off valve with  
the manual fill and drain valve  
underneath brewer).  
3. Solenoid Valve  
Refer to Service - Solenoid Valve  
for testing procedures. See page  
27  
4. Probe  
RefertoService-Probefortesting  
procedures. See page 20  
5. Liquid Level Board  
Refer to Service - Liquid Level  
Board for testing procedures. See  
page 20  
1.Brewer not level  
2. Solenoid Valve  
Water running out of the over-  
flow  
Brewer must be level and installed  
on a sturdy structure.  
Refer to Service - Solenoid Valve  
for testing procedures. See page  
27  
3. Liquid Level Board  
4. Probe  
Refer to Service -Liquid Level  
Board for testing procedures. See  
page 20  
RefertoService-Probe fortesting  
procedures. See page 20  
5. Manual fill and drain valve un-  
derneath brewer open.  
Be sure valve is closed.  
10060 080900  
Page 10  
TROUBLESHOOTING (cont.)  
PROBLEM  
PROBABLE CAUSE  
REMEDY  
Water not hot  
1. Limit Thermostat  
Refer to Service - Limit Thermo-  
stat for testing procedures. See  
page19  
CAUTION - Do not eliminate or  
bypass limit thermostat. Use only  
Bunn-O-Matic replacement part  
#29329.1000  
2. Control Thermostat  
Refer to Service - Control Ther-  
mostat for testing procedures.  
See page 17  
3. Tank Heater(s)  
4. Contactor  
Refer to Service - Tank Heater for  
testing procedures. See page 30  
Refer to Service - Contactor for  
testing procedures. See page 15  
Circuit breaker keeps tripping  
1. Circuit Breaker  
Refer to Service - Circuit Breaker  
for testing procedures. See page  
14  
2. Tank Heater(s)  
1. Timer  
Refer to Service - Tank Heater for  
testing procedures. See page 30  
Water keeps running from swing  
spout  
RefertoService-Timerfortesting  
procedures. See page 31 or 33  
2. Start Switch  
1. Timer  
Refer to Service - Start Switch for  
testing procedures. See page 29  
Inconsistent coffee yield  
RefertoService-Timerfortesting  
procedures. See page 31 or 33  
2. Solenoid Valve  
Refer to Service - Solenoid Valve  
for testing procedures. See page  
27  
3. Lime build-up in swing spout  
and pump tubing.  
Remove swing spout and insert  
deliming rod down into pump  
tubing as far as possible.  
Use Bunn® filters made for the  
U3 brewer.  
Funnels overflow  
1. Filters  
2. Hole in bottom of funnel ob-  
structed.  
Remove obstruction.  
10060 080900  
Page 11  
TROUBLESHOOTING (cont.)  
PROBLEM  
PROBABLE CAUSE  
REMEDY  
Checkpumpowratewithawatch.  
Pumpowrateshouldbeapproxi-  
mately 24 ounces in 15 seconds.  
Be sure pump assembly is free of  
any obstructions.  
3. Pump - Flow Rate  
Funnels overflow (cont.)  
4. Soft Water  
When using a water softener, a  
coarse grind of coffee may be  
preferred. If required, a bypass  
system is available as an optional  
feature.  
Coffee reservoir overflows  
Be sure coffee reservoir is empty  
before brew cycle is started.  
1. Coffee reservoir not completely  
empty befor a brew cycle was  
started.  
RefertoService-Timer for testing  
procedures. See page 31 or 33  
2. Timer  
Checkpumpowratewithawatch.  
Pumpowrateshouldbeapproxi-  
mately 24 ounces in 15 seconds.  
Be sure pump assembly is free of  
any obstructions.  
3. Pump - Flow Rate  
Brewer is making unusal noises  
The nut on the solenoid must  
be tight or it will vibrate during  
operation.  
1. Solenoid Valve  
Plumbinglinesshouldnotberest-  
ing on the counter top.  
2. Plumbing lines  
3. Water supply  
(A)Thebrewermustbeconnected  
to a cold water line.  
(B) Water pressure to the brewer  
must not exceed 90 psi (620 kPa).  
Install a regulator if necessary to  
lower the pressure to approxi-  
mately 50 psi (345 kPa).  
Removeandcleanlimeoffthetank  
heater. See page 30  
4. Tank Heater(s)  
10060 080900  
Page 12  
SERVICE  
Contents  
Circuit Breaker .....................................................14  
Contactor ..............................................................15  
Control Thermostat...............................................17  
Fuse and Fuse Holder ...........................................18  
Limit Thermostat...................................................19  
Liquid Level Board and Level Probe .................... 20  
ON/OFF Switch......................................................22  
Pump ....................................................................23  
Relay ................................................................... 24  
Selector Switch (Half Batch) .................................26  
Solenoid ...............................................................27  
Start Switch (Brew)...............................................29  
Tank Heater(s).......................................................30  
Thermal Cut-off ................................................... 31  
Timer (Early Models).............................................31  
Digital Timer (Late Models)...................................33  
Transformer ..........................................................35  
Master ON/OFF Switch (Late Models)...................36  
Wiring Diagrams...................................... 37 thru 42  
This section provides procedures for testing and  
replacing various major components used in this  
brewer should service become necessary. Refer to  
Troubleshooting for assistance in determining the  
cause of any problem.  
WARNING - Inspection, testing, and repair of electri-  
cal equipment should be performed only by qualified  
service personnel. The brewer should be unplugged  
when servicing, except when electrical tests are re-  
quired and the test procedure specifically states to  
plug in the brewer.  
COMPONENT ACCESS  
WARNING - Disconnect the brewer from the power  
source before the removal of any panel or the replace-  
ment of any component.  
All components are accessible by the removal of  
the swing spout, front cupola cover, rear cupola cover  
and the cupola.  
Disconnect the swing spout nut from the swing  
spout base fitting. Remove swing spout.  
Remove the four #8-32 screws, two on the front and  
rear, securing front and rear cupola covers to the  
cupola.  
Slip cupola off of the component bracket.  
P1317.30  
FIG. 1 COMPONENT ACCESS  
10060 011708  
Page 13  
SERVICE (cont.)  
CIRCUIT BREAKER (120/208V and 120/240V Three  
Wire Models and 440V Four Wire Models)  
4. With the black wire removed, remove the other  
black wire from the circuit breaker.  
5. Check for continuity across the terminals on the  
circuit breaker.  
If continuity is present as described the circuit breaker  
is operating properly.  
Ifcontinuityisnotpresentasdescribed,pressthereset  
button and repeat step 5, if continuity is not present  
as described, replace the circuit breaker.  
Removal and Replacement:  
1. Remove wires from the circuit breaker.  
2. Remove the nut securing the circuit breaker to the  
component bracket.  
3. Remove circuit breaker and discard.  
4. Install new circuit breaker on component bracket  
and secure with nut.  
P2209.60  
FIG. 2 CIRCUIT BREAKER  
5. Refer to Fig. 3 and reconnect the wires.  
Location:  
The circuit breaker is located on the right rear of  
the component bracket.  
BLK from Main  
Harness  
Test Procedures:  
1. Disconnect the brewer from the power source.  
2. Disconnect the black wire from the main harness  
from the circuit breaker and the white wire on the  
pumpassembly.Withavoltmeter,checkthevoltage  
across the black wire and the white wire. Connect  
the brewer to the power source. The indication  
must be:  
BLK from ON/  
OFF Switch  
P1723  
FIG. 3 CIRCUIT BREAKER TERMINALS  
a) 120 volts ac for three wire 120/208 volt and  
120/240 volt models.  
b) 208 or 240 volts ac for four wire 440 volt mod-  
els.  
3. Disconnect the brewer from the power source.  
If voltage is present as described, reconnect the white  
wire to the pump assembly and proceed to #4. If volt-  
age is not present as described, refer to the Wiring  
Diagrams and check the brewer wiring harness.  
10060 080900  
Page 14  
SERVICE (cont.)  
CONTACTOR  
a) 120 volts ac for three wire 120/208, 120/240  
volt and 380 volt models.  
b) 230 volts ac for two wire 230 volt models.  
c) 208 or 240 volts ac for two wire 208 or 240 volt  
models.  
d) 220 or 254 volts ac for four wire 280 or 440  
volt models.  
5. Disconnect the brewer from the power source.  
If voltage is present as described, proceed to #6.  
IfvoltageisnotpresentasdescribedrefertotheWiring  
Diagrams and check the brewer wiring harness.  
6. Check for continuity between the black leads on  
the contactor coil or the left and right terminals  
on the contactor coil on 230V models.  
P2209.60  
FIG. 4 CONTACTOR  
Location:  
The contactor is located on the left front of the  
component bracket  
If continuity is present as described, reconnect the  
wires and proceed to #7.  
If continuity is not present as described, replace the  
contactor.  
Test Procedures:  
1. Disconnect the brewer from the power source.  
2A. 120/208V,120/240V,380VTHREEWIREMODELS,  
380V and 440V FOUR WIRE MODELS  
Disconnect the black wire from the contactor coil  
to the limit thermostat and black wire from the  
white wire on the main harness.  
7. On all brewers, with a voltmeter, check the voltage  
across the upper left terminal and the upper right  
terminal on the contactor. Connect the brewer to  
the power source. The indication must be:  
a) 120 volts ac for three wire 120/208, 120/240  
volt and 380 volt models.  
2B. 208V or 240V TWO WIRE MODELS (Prior to  
# U300004095), 208V and 240V THREE WIRE  
MODELS  
b) 230 volts ac for two wire 230 volt models.  
c) 208 or 240 volts ac for two wire 208 or 240 volt  
models.  
d) 220 or 254 volts ac for four wire 280 or 440  
volt models.  
Disconnect the black wire from the contactor coil  
to the limit thermostat and black wire from the red  
wire on the main harness.  
8. Disconnect the brewer from the power source.  
2C. 230V MODELS (S/N U300004095 - UP)  
Disconnect the red wire from contactor coil to the  
limit thermostat and the black wire from the main  
harness.  
3. Connect the brewer to the power source.  
4. Check the voltage across the coil wire and the wire  
from the the main harness.The indication must  
be:  
If voltage is present as described, proceed to #9.  
Ifvoltageisnotpresentasdescribed,refertotheWiring  
Diagrams and check the brewer wiring harness.  
10060 080900  
Page 15  
SERVICE (cont.)  
CONTACTOR (cont.)  
Removal and Replacement:  
9. Check for continuity across the terminals on the  
left side of the contactor by manually closing the  
contacts. Continuity must not present when the  
contact is released.  
1. Disconnect all the wires from the contactor.  
2. Remove the two #8-32 screws securing the con-  
tactor to the contactor mounting bracket, remove  
contactor and protective shield. Discard contac-  
tor.  
3. Installnewcontactorwithshieldbetweenmounting  
bracket and contactor and secure with two #8-32  
screws  
10. Check for continuity across the terminals on the  
right side of the contactor by manually closing the  
contacts.Continuity must not be present when the  
contact is released.  
4. Refer to Fig. 5 and reconnect the wires.  
If continuity is present as described, the contactor is  
operating properly.  
If continuity is not present as described, replace the  
contactor.  
BLK to Right Tank  
Heater (T1)  
BLK to Terminal  
Block (L1)  
RED to Left Tank  
BLK Thermal Fuse  
to Right Tank Heater  
BLK to Terminal  
Block (L1)  
RED Thermal Fuse  
to Left Tank Heater  
Heater (T2)  
RED to Terminal  
Block(L2)  
BLK to Terminal  
Block (L2)  
BLK to left  
Tank Heater  
(L1)  
RED to Terminal  
Block (L2)  
BLK Thermal  
Fuse to Left  
Tank Heater  
RED to Right  
Tank Heater  
(L2)  
WHI from Main Harness  
RED to Limit  
Thermostat  
(120/208V,120/240V,380V  
Three Wire Models, 380V and  
440V Four Wire Models)  
RED from Main Harness  
(208V, 240V Two Wire Models  
and 208, 240V Three Wire  
Models)  
BLK to Limit  
Thermostat  
RED Thermal Fuse  
to Right Tank  
Heater  
230V - CE Models  
120/208V, 120/240V, 208V,  
240V, 380V 440V MODELS  
P1725  
FIG.5 CONTACTOR TERMINALS  
10060 080900  
Page 16  
SERVICE (cont.)  
CONTROL THERMOSTAT  
not be present when the thermostat is in the "OFF"  
position (fully counterclockwise).  
If continuity is present as described, the control ther-  
mostat is operating properly.  
If continuity is not present as described, replace the  
control thermostat.  
Removal and Replacement:  
1. Disconnect the wires from the control thermo-  
stat.  
2. Remove the thermostat capillary bulb by firmly  
pulling up on the capillary at the component  
bracket. This will disengage the grommet from  
the component bracket.  
P2209.60  
FIG. 6 CONTROL THERMOSTAT  
3. Remove the #8-32 screw securing the control  
thermostatandmountingbrackettothecomponent  
bracket. Remove control thermostat and bracket  
as an assembly.  
Location:  
The control thermostat is mounted on the right  
front of the component bracket.  
4. Remove knob from control thermostat.  
5. Removethetwo#6-32screwssecuringthecontrol  
thermostat to the thermostat mounting bracket.  
Remove and discard thermostat.  
Test Procedures:  
1. Disconnect the brewer from the power source.  
2. Locate the thermostat and the voltage check  
points.  
6. Install new control thermostat on thermostat  
mounting bracket and secure with two #6-32  
screw.  
3. Connect the brewer to the power source.  
Model  
120/208V & 120  
240V - 3 wire w/  
ground single phase  
Check Voltage Across  
Voltage  
Black wire on thermostat 120V  
frommainharnesstowhite  
wire in terminal block.  
7. Install knob on thermostat.  
8. Install thermostat and mounting bracket on the  
component bracket and secure with one #8-32  
screw.  
Red wire on thermostat 230V  
frommainharnesstoblack  
wire in terminal block.  
230V - 2 wire w/  
ground single  
phase  
9. Carefully bend the capillary tube so that the tube  
and bulb inside the brewer are in the vertical posi-  
tion.  
NOTE:Thecapillarytubemustbeclearofanyelectrical  
termination and not kinked.  
Black wire on thermostat 208V or  
from main harness to red 240V  
wire in the terminal block.  
208V or 240V - 2  
wire w/ground  
single phase  
10. Refer to Fig. 7 and reconnect the wires.  
11. Adjust the control thermostat as required.  
Black wire on thermostat 220V or  
frommainharnesstowhite 254V  
wire in terminal block.  
280V or 440V - 4  
wire w/ground 3  
phase  
BLK from Main Har-  
ness (All Models Ex-  
cept 230V CE Models  
RED from Main  
Harness (230V CE  
Models)  
Black wire on thermostat 120V  
frommainharnesstowhite  
wire on step down trans-  
former.  
380V - 3 wire w/  
ground 3 phase  
w/ stepdown  
transformer  
4. Disconnect the brewer from the power source.  
If voltage is present as described, proceed to #5.  
Ifvoltageisnotpresentasdescribed,refertotheWiring  
Diagrams and check the brewer wiring harness.  
BLK to Limit Thermostat  
(All Models Except 230V CE  
Models  
RED to Limit Thermostat  
(230V CE Models)  
P1730.80  
5. Disconnect the black wires from the control ther-  
mostat.  
6. Check for continuity across the terminals on the  
control thermostat with the control thermostat in  
the"ON"position(fullyclockwise),continuitymust  
FIG. 7 CONTROL THERMOSTAT TERMINALS  
10060 080900  
Page 17  
SERVICE (cont.)  
Removal and Replacement:  
Fuse:  
1. Remove the cap from the fuse holder.  
2. Removefusefromthefuseholder,inspect,ifblown  
discard.  
FUSE AND FUSE HOLDER (208V, 240V, 230V Two  
Wire Models and 380V Three Wire Models)  
3. Install new 5 amp fuse in the fuse holder.  
4. Reinstall fuse holder cap.  
Fuse Holder:  
1. Disconnect the wires from the rear of the fuse  
holder.  
2. Remove the nut securing the fuse holder to the  
component bracket.  
3. Pushfuseholderthroughtheholeinthecomponent  
bracket.  
4. Install new fuse holder and fuse through the hole  
in the component bracket and secure with nut.  
5. Refer to Fig. 9 and reconnect the wires.  
P1731.55  
BLK from ON/OFF Switch  
(208V, 240V Two Wire  
Models and 380V Three  
Wire Models)  
FIG.8 FUSE AND FUSE HILDER  
Location:  
The fuse and fuse holder are located on the right  
rear of the component bracket.  
RED from ON/OFF Switch  
(230V Two Wire Models)  
Test Procedures:  
1. Disconnect the brewer from the power source.  
2. Remove the cap and fuse from the fuse holder.  
3. Remove fuse from the cap.  
BLK from Main Harness  
(208V and 240V Two Wire  
Models)  
BLK from Transformer  
(380V Three Wire Models)  
RED from Main Harness  
(230V Two Wire Models)  
4. Check for continuity through the fuse.  
Ifcontinuityispresentasdescribed, reinstallthefuse,  
the fuse is operating properly.  
If continuity is not present as described replace the  
fuse.  
P1331  
FIG. 9 FUSE HOLDER TERMINALS  
10060 031599  
Page 18  
SERVICE (cont.)  
LIMIT THERMOSTAT  
Removal and Replacement:  
1. Remove the wires from the limit thermostat ter-  
minals.  
2. Carefully slide the limit thermostat out from under  
the retaining clip and remove the limit thermo-  
stat.  
3. Carefully slide the new limit thermostat into the  
retaining clip.  
4. Refer to Fig. 11 and reconnect the wires.  
P2209.60  
FIG. 10 LIMIT THERMOSTAT  
Location:  
The limit thermostat is located on the center front  
of the component bracket behind the timer mounting  
bracket.  
BLK to Contactor  
(All Models Except  
230V CE Models)  
Red to Contactor  
BLK to Control  
Thermostat(All  
Models Except  
230V CE Models)  
RED to Control  
Thermostat  
(230V Models)  
Test Procedures:  
(230V CE Models)  
1. Disconnect the brewer from the power source.  
2. Disconnect the black wires or the red wires from  
the limit thermostat.  
3. With an ohmmeter, check for continuity across  
the limit thermostat terminals.  
P1800  
FIG. 11 LIMIT THERMOSTAT TERMINALS  
Ifcontinuityispresentasdescribed,thelimitthermostat  
is operating properly.  
If continuity is not present as described, replace the  
limit thermostat.  
10060 080900  
Page 19  
SERVICE (cont.)  
LIQUID LEVEL BOARD AND LEVEL PROBE  
7. Touchingthefreeendofthejumpertothebrewer's  
frame simulates a "FULL" condition, preventing  
jumperfromtouchingthebrewer'sframesimulates  
"NEED WATER" condition. Connect the brewer to  
the power source, simulate the conditions in the  
chart below while measuring the voltage between  
T1 and T3 0n the liquid level board. Repeat these  
several times. There is an approximate five second  
delay for output to stabilize.  
Voltage -  
Jumper  
Touching  
Frame  
Voltage -  
Jumper  
Not Touching  
Frame  
Model  
P2209.60  
FIG.12 LIQUID LEVEL BOARD AND  
LEVEL PROBE  
0
120V  
230V  
120/208V &  
120/240V - 3  
wire w/ground  
single phase  
Location:  
The liquid level board is located on the left rear of  
the component bracket. The level probe is located on  
the right rear of the component bracket.  
0
230V - 2 wire  
w/ground  
single phase  
Test Procedures:  
1. Disconnect the brewer from the power source.  
2. Disconnect the blue wire (T1) and the pink wire  
(T4).  
3. Check the voltage across terminals (T2) and (T3)  
with the ON/OFF switch in the "ON" position. The  
indication must be:  
0
0
208V or  
240V  
208V or 240V -  
2 wire wground  
single phase  
0
0
220V or  
254V  
280V or 440V -  
4 wire w/ground  
3 phase  
a) 120 volts ac for 120/208 volt, 120/240 volt and  
380 volt models.  
b) 208 volts ac or 240 volts ac for two wire 208  
volt or 240 volt models.  
d) 230 volts ac for two wire 230 volt models.  
e) 220 volts ac or 440 volts ac for four wire 280  
volt or 440 volt machines.  
0
120V  
380V - 3 wire  
w/ground 3  
phase w/  
stepdown trans-  
former  
4. Disconnect the brewer from the power source.  
If voltage is present as described, proceed to #5.  
If voltage is not present as described, refer to Wiring  
Diagrams and check the brewer wiring harness.  
8. Disconnect the brewer from the power source and  
remove the jumper wire from terminal 4.  
If voltage is present as described, liquid level board  
is operating properly, proceed to #9.  
If voltage is not present as described, replace the  
liquid level board.  
5. Reconnect the blue wire to T1 on the liquid level  
board.  
6. Carefully connect a piece of insulated jumper wire  
to terminal 4. Keep the other end of this wire away  
from any metal surface of the brewer.  
10060 080900  
Page 20  
SERVICE (cont.)  
14. Disconnect the brewer from the power source.  
LIQUID LEVEL BOARD AND LEVEL PROBE (cont.)  
9. Reconnect the pink wire to terminal 4.  
10. Remove the two #8-32 screws securing the level  
probe to the component bracket.  
11. Gentlypulltheprobeoutofthecomponentbracket  
and inspect for corrosion. Replace if necessary.  
12 Place the probe so that neither end is in contact  
with any metal surface of the brewer.  
If voltage is present as described, reinstall the level  
probe, the liquid level board and level probe are op-  
erating properly.  
If voltage is not present as described, check the  
pink wire on the level probe from liquid level board  
terminal 4.  
13. Connect the brewer to the power source. Check  
the voltage across terminals 1 and 3, refer to  
chart below. There is an approximate delay of five  
seconds for output to stabilize.  
Removal and Replacement:  
1. Remove all wires from the liquid level board.  
2. Removethe#10-32screwandatwashersecuring  
the protective shield to the component bracket.  
3. Remove the #10-32 screw and internal tooth  
lockwasher securing the liquid level board to the  
component bracket.  
4. Remove liquid level board and discard.  
5. Installnewliquidlevelboardoncomponentbracket  
and secure with a #10-32 screw and internal tooth  
lockwasher.  
Voltage -  
Jumper  
Touching  
Frame  
Voltage -  
Jumper  
Not Touching  
Frame  
Model  
0
120V  
230V  
120/208V &  
120/240V - 3  
wire w/ground  
single phase  
6. Install protective shield and secure with #10-32  
screw and flat washer.  
7. Refer to Fig. 13 and reconnect the wires.  
0
230V - 2 wire  
w/ground  
T1 BLU to Solenoid Valve  
single phase  
T2 BLK to ON/OFF Switch (All models  
except 230V-CE models)  
0
0
208V or  
240V  
208V or 240V -  
2 wire wground  
single phase  
T3 WHI to Main Harness  
(120/208V, 120/240V,  
four wire 380V and 440V  
models)  
T3 WHI to Transformer  
(380V three wire models)  
T3 RED to Main Harness  
(208V, 240V single phase  
and three phase models)  
T3 BLK to Main Harness  
(230V two wire models)  
0
0
220V or  
254V  
280V or 440V -  
4 wire w/ground  
3 phase  
0
120V  
380V - 3 wire  
w/ground 3  
phase w/  
stepdown trans-  
former  
T4 PIN to Level Probe  
P1733  
FIG.13 LIQUID LEVEL BOARD TERMINALS  
10060 080900  
Page 21  
SERVICE (cont.)  
ON/OFF SWITCH  
5. Disconnect the wires on the ON/OFF switch.  
6. a) 120/208V, 120/240V, 208V, 240V, 380V and  
440V Models - Check for continuity across the  
terminals on the rear of the switch with the switch  
in the "ON" (upper) position. Continuity must not  
be present when the switch is in the "OFF" (lower)  
position.  
b) 230V - CE Models - Check for continuity across  
the center terminal (2) and the lower terminal (1)  
when the switch is in the "ON" (upper) position.  
Continuity must not present when the switch is in  
"OFF" (lower) position.  
P2209.60  
FIG.14 ON/OFF SWITCH  
Location:  
The ON/OFF switch is located on the left side of the  
switchmountingbracket.Theswitchmountingbracket  
is mounted on the front of the component bracket.  
If continuity is present as described, the switch is  
operating properly.  
If continuity is not present as described, replace the  
switch.  
Test Procedures:  
1. Disconnect the brewer from the power source.  
2. a)120/208V, 120/240V, 208V and 240V Models  
Remove the black wire on the ON/OFF switch from  
the fuse holder or circuit breaker and the red wire  
on the power indicator light.  
Removal and Replacement:  
1. Remove the wires from the switch terminals.  
2. Compress the clips on the back side of the switch  
mounting bracket and gently push the through the  
opening.  
b) 380V and 440V Models - Remove the black wire  
on the ON/OFF switch from the fuse holder or  
circuit breaker and the white wire from the power  
indicator light.  
3. Push the new switch into the opening and spread  
the clips to hold switch in the mounting bracket.  
NOTE: ON 230V - CE models terminal (3) must be  
on the top.  
c) 230V - CE Models - Remove the red wire on the  
ON/OFF switch from the fuse holder and the black  
wire on the power indicator light.  
4. Refer to Fig. 15 and reconnect the wires.  
BLK from Main Harness  
3. Connect the brewer to the power source. With a  
voltmeter, check the voltage across the removed  
wires. The indication must be:  
a) 120 volts ac for 120/208 volt, 120/240 volt and  
380 volt models.  
b) 208 volts ac for two or three wire 208 volt  
models.  
BLK to Start Switch, Brew  
Timer & Liuqid Level Board  
L2  
c)240voltsacfortwowire240voltmodelspriorto  
#U300004095 and three wire 240 volt models.  
d) 230 volts ac for two wire 230 volt models  
#U300004095 and up).  
e) 208 or 240 volts ac for four wire 440 volt mod-  
els.  
120/208V, 120/240V, 208V, 240V, 380V AND 440V  
MODELS  
BLK from Main Harness  
RED to Main Harness  
4. Disconnect the brewer from the power source.  
RED to Start Switch, Brew  
Timer & Liquid Level Board  
If voltage is present as described, reconnect the wires  
and proceed to #5  
Ifvoltageisnotpresentasdescribed,refertotheWiring  
Diagrams and check the brewer wiring harness.  
230V - CE Models  
P1735  
FIG. 15 ON/OFF SWITCH TERMINALS  
10060 080900  
Page 22  
SERVICE (cont.)  
PUMP ASSEMBLY  
Removal and Replacement (Refer to Fig. 17):  
1. Disconnect the wires from the pump assembly.  
2. Loosen the #8-32 screw (2) securing the clamp  
(3) on the fill tube (1) and slide the clamp (3) up  
the fill tube (1).  
3. Disengagethelltube(1)fromthepumpassembly  
(4).  
4. Remove the four #8-32 screws (6) securing the  
pump assembly (4) to the component bracket  
(7).  
5. Remove pump assembly (4).  
6. Remove pump gasket (5) and inspect, replace if  
necessary.  
P2209.60  
FIG.16 PUMP ASSEMBLY  
7. Position gasket (5) on component bracket (7).  
8. Install new pump assembly (4) on component  
bracket (7) and secure with four #8-32 screws  
(6).  
Location:  
The pump is located on the center rear of the  
component bracket.  
9. Install fill tube (1) on pump assembly (4).  
10. Slide clamp (3) down into position on the fill tube  
(1) and tighten screw (2).  
Test Procedures:  
1. Disconnect the brewer from the power source.  
2. Disconnect the black wire from the black lead on  
the pump and the white wire from the black lead  
on the pump.  
11. Refer to Fig. 17 and reconnect the wires.  
3. With a voltmeter, check the voltage across the  
black wire and the white wire. Connect the brewer  
to the power source. The indication must be:  
a)120voltsacforthreewire120/208volt,120/240  
volt and 380 volt models).  
WHI from Brew Timer  
BLK from Brew Timer  
1
2
b) 208 volts ac for two or three wire 208 volt  
models.  
c) 240 volts ac for two or three wire 240 volt  
models.  
3
6
d) 230 volts ac for two wire 230 volt models.  
e) 208 or 240 volts ac for four wire 440 volt mod-  
els  
4
5
4. Disconnect the brewer from the power source.  
7
If voltage is present as described, reconnect the wires  
to the pump. Install swing spout and position over the  
reservoir.PlacetheON/OFFinthe"ON"(upper)position  
and push the start switch and release. If pump does  
not run, replace the pump.  
Ifvoltageisnotpresentasdescribed,refertotheWiring  
Diagrams and check the brewer wiring harness.  
P1737  
FIG.17 PUMP INSTALLATION  
10060 080900  
Page 23  
SERVICE (cont.)  
RELAY (BREWERS W/BREW LOCKOUT)  
If continuity is present as described, reconnect the  
wires, the relay is operating properly.  
If continuity is not present as described, replace the  
relay.  
230V - CE Models  
1. Disconnect the brewer from the power source.  
2. Disconnect the black wire from relay terminal "A"  
and the red wire from relay terminal "B". Check  
the voltage across the black and red wire with a  
voltmeter.Connectthebrewertothepowersource.  
The indication must be 230 volts ac.  
If voltage is present as described, proceed to #3.  
If voltage is not present as described, refer to the Wir-  
ing Diagrams and check the brewer wiring harness.  
3. Disconnect the brewer from the power source.  
4. Check for continuity across relay terminals "A" &  
"B"  
P1731.55  
FIG.18 RELAY  
Location:  
The relay is located on the front part of the com-  
ponent bracket, mounted on the top of the timer  
bracket.  
If continuity is present as described, reconnect the  
wires to terminals "A" & "B" and proceed to #5.  
If continuity is not present as described, replace the  
relay.  
Test Procedures:  
All Models Except 230V - CE Models  
1. Disconnect the brewer from the power source.  
2. Disconnect the wires from relay terminals "A" &  
"B". Check for continuity between terminals "A" &  
"B".  
5. With the thermostat in the "ON" position and the  
relay engaged disconnect the brewer from the  
power source.  
6. Disconnect the blue wires from relay terminals 1  
and 7. Check for continuity across terminals 1 and  
7.  
If continuity is present as described, reconnect the  
wires to terminals "A" & "B" and proceed to #3.  
If continuity is not present as described replace the  
relay.  
If continuity is present as described, proceed to #7  
If continuity is not present as described, replace the  
relay.  
3. Disconnect the wires from relay terminals 2 & 7.  
4. Check for continuity across terminals 2 & 7.  
7. Turn the thermostat to the "OFF" position, con-  
nect the brewer to the power source and turn the  
thermostat back to the "ON" position. Continuity  
should not be present across terminals 1 & 7.  
If continuity is present as described, reconnect the  
wires to terminals 2 & 7 and proceed to # 5.  
If continuity is not present as described, replace the  
relay.  
If continuity is not present as described, the relay is  
operating properly.  
If continuity is present as described, replace the  
relay.  
5. Disconnect the wires from relay terminals 5 & 7.  
6. Check for continuity across terminals 5 & 7 by  
manually closing relay contact. Continuity must  
not be present when contact is released.  
10060 080900  
Page 24  
SERVICE (cont.)  
RELAY (BREWERS W/BREW LOCKOUT)  
BLU from  
Start Switch  
BLU from  
Brew Timer  
Removal and Replacement:  
3
1. Disconnect the wires from the relay.  
2. For 120/208V, 120/240V, 208V, 380V, 440V and  
240V models prior to #U300004095 remove the  
#6-32screwsecuringtherelaytotherelaymount-  
ing bracket. For 230V models #U300004095 and  
up, remove the two screws securing the relay to  
the relay mounting bracket.  
2
1
4
B
7
BLK to Control  
Thermostat  
A
RED from  
Main Harness  
120/208V, 120/240V, 208V, 380V, 440V AND 240V  
MODELS PRIOR TO #U300004095  
3. Remove relay and discard.  
4. For 120/208V,120/240V, 208V, 380V, 440V and  
240V models prior to #U300004095, install new  
relay on relay mounting bracket and secure with  
a #6-32 screw. For 230V models #U300004095  
andup,installnewrelayonrelaymountingbracket  
and secure with two #6-32 screws.  
BLU to Start  
Switch  
BLU from  
Brew Timer  
3
2
6
1
5
5. Refer to Fig. 19 and reconnect the wires.  
4
8
RED to Control  
7
Thermostat  
A
BLK from  
Main Harness  
230V MODELS #U300004095 AND UP  
P1739  
FIG.19 RELAY TERMINALS  
10060 080900  
Page 25  
SERVICE (cont.)  
SELECTOR SWITCH (HALF BATCH OPTION)  
Removal and Replacement:  
1. Remove the wires from the switch terminals.  
2. Compress the clips on the back side of the switch  
mounting bracket and gently push the through the  
opening.  
3. Push the new switch into the opening and spread  
the clips to hold switch in the mounting bracket.  
4. Refer to Fig. 21 and reconnect the wires.  
P1317.30  
FIG. 20 SELECTOR SWITCH (HALF BATCH)  
Location:  
GRY to Brew Timer  
PNK to Brew Timer  
The selector switch is located in the upper center  
of the switch mounting panel.  
Test Procedures:  
1. Disconnect the brewer from the power source.  
2. Disconnect the wires from the switch terminals.  
3. Check for continuity across the switch terminals  
with the switch in the "CLOSED" (left - half) posi-  
tion. Continuity must not present when the switch  
is in the "OPEN" (right - full) position.  
P1740  
FIG. 21 SELECTOR SWITCH TERMINALS  
If continuity is present as described, the switch is  
operating properly.  
If continuity is not present as described, replace the  
switch.  
10060 080900  
Page 26  
SERVICE (cont.)  
SOLENOID  
C) For 230V - CE two wire single phase models,  
disconnect the red wire from the liquid level board  
#2 and the black wire from the solenoid. With a  
voltmeter,checkthevoltageacrosstheredwireand  
the black wire. Connect the brewer to the power  
source. The indication must be 230 volts ac.  
3. Disconnect the dispenser from the power  
source.  
If voltage is present as described, proceed to #4.  
Ifvoltageisnotpresentasdescribed,refertothebrewer  
Wiring Diagrams and check the wiring harness.  
P2209.60  
FIG. 22 SOLENOID  
4. Disconnect the blue wire and the white wire, the  
blue wire and the red wire or blue wire and black  
wire from the solenoid terminals.  
5. Check for continuity across the solenoid valve coil  
terminals.  
Location:  
The solenoid is mounted on the upper left rear of  
the component bracket.  
Test Procedures:  
1. Disconnect the dispenser from the power  
source.  
If continuity is present as described, reconnect the  
wires to the solenoid.  
2. A) For 120/208 volt and 120/240 volt three wire,  
single phase models, 380 volt three wire, three  
phase models and 380 volt, 440 volt four wire,  
three phase models, disconnect the black wire  
from the liquid level board #2 and the white wire  
onthesolenoid.Withavoltmeter,checkthevoltage  
across the black and the white wire. Connect the  
brewer to the power source. The indication must  
be:  
If continuity is not present as described, replace the  
solenoid valve.  
6. Check the solenoid valve for coil action. Connect  
thedispensertothepowersource. Listencarefully  
in the vicinity of the solenoid valve for a "clicking"  
sound as the coil magnet attracts.  
If the sound is heard as described and water will not  
pass through the solenoid valve, there may be a block-  
age in the water line before the solenoid valve or, the  
solenoid valve may require inspection for wear, and  
removal of waterborne particles.  
If the sound is not heard as described, replace the  
solenoid valve.  
a) 120 volts ac for 380 volt three wire, three phase  
models and 208 0r 240 volts ac for four wire three  
phase 440 volt models.  
b) 208 volts ac for three wire 120/208 volt mod-  
els.  
c) 240 volts ac for three wire 120/240 volt mod-  
els.  
B) For 208 volt, 240 volt two wire single phase and  
208 volt, 240 volt three wire three phase models,  
disconnect the black wire from the liquid level  
board #2 and the red wire from the solenoid. With  
avoltmeter, checkthe voltageacrosstheblackand  
redwires.Connectthebrewertothepowersource.  
The indication must be:  
a) 208 volts ac for 208 volt two wire single phase  
and 208 volt three wire three phase models.  
b) 240 volts ac for 240 volt two wire single phase  
and 240 volt three wire three phase models.  
Removal and Replacement:  
1. Remove the wires from the solenoid valve.  
2. Turn off the water supply to the dispenser.  
3. Disconnect the water inlet line from the connector  
on the solenoid valve.  
4. Remove the #10-32 screw and the flat washer  
securing the liquid level board, shield and the  
solenoid to the component bracket.  
5. Remove solenoid, connectors, air chamber and  
tank inlet tube as an assembly.  
10060 080900  
Page 27  
SERVICE (cont.)  
SOLENOID  
WHI from Main Harness  
(120/208V,120/240V,380V  
and 440V Models)  
BLU from Liquid Level  
Board #1  
6. Remove the tank inlet tube grommet and dis-  
card.  
RED from Main Harness  
(208V and 240V Models)  
7. Install new tank inlet tube grommet.  
8. Install new solenoid assembly.  
9. Installliquidlevelboard,shieldandsecuresolenoid  
assembly and shield to the component bracket  
with a #10-32 screw and flat washer..  
10. Install water inlet tube to connector on the sole-  
noid.  
EARLY MODELS  
11. Turn on the water supply to the brewer.  
12. Refer to Fig. 23 and reconnect the wires.  
BLU from Liquid  
Level Board #1  
BLK from Main Har-  
ness  
EARLY 230V - CE MODELS  
LATE MODELS  
WHI from Main Harness  
(120/208V,120/240V,380V  
and 440V Models)  
BLU from Liquid Level  
Board #1  
RED from Main Harness  
(208V and 240V Models)  
P1741  
FIG. 23 SOLENOID TERMINALS  
10060 081106  
Page 28  
SERVICE (cont.)  
START SWITCH (BREW)  
Removal and Replacement:  
1. Remove the wires from the switch terminals.  
2. Compress the clips on the back side of the switch  
mounting bracket and gently push the through the  
opening.  
3. Push the new switch into the opening and spread  
the clips to hold switch in the mounting bracket.  
4. Refer to Fig. 25 and reconnect the wires.  
BLU to Brew Timer or  
Brew Lockout Relay  
P1317.30  
FIG. 24 START SWITCH (BREW)  
Location:  
The brew start switch is located on the upper right  
side of the brewer component housing.  
BLK from ON/OFF Switch  
Test Procedures:  
ALL MODELS EXCEPT 230V - CE MODELS  
1. Disconnect the brewer from the power source.  
2. Remove the wires from the start switch termi-  
nals.  
3. Check for continuity across the switch terminals  
when the switch is held in the lower position.  
Continuity must not be present when the switch  
is in the upper position.  
BLU to Brew Timer or  
Brew Lockout Relay  
RED from ON/OFF  
Switch  
230V - CE MODELS  
P1743  
If continuity is present as described, reconnect the  
wires the switch is operating properly.  
FIG.25 BREW START SWITCH TERMINALS  
If continuity is not present as described, replace the  
switch.  
10060 031599  
Page 29  
SERVICE (cont.)  
TANK HEATERS  
Test Procedures:  
1. Disconnect the brewer from the power source.  
2. Disconnect the wires from the tank heater.  
3. Check for continuity across the tank heater termi-  
nals.  
If continuity is present as described, proceed to #4.  
If continuity is not present as described, replace the  
tank heater.  
Removal and Replacement:  
1. Remove the wires or thermal fuses from the tank  
heater.  
2. Remove the four #8-32 screws securing the tank  
heater to the component bracket.  
3. Remove tank heater and gasket.  
4. Positionnewtankheaterandgasketonthecompo-  
nent bracket and secure with four #8-32 screws.  
5. Refer to Fig. 27 and reconnect the wires.  
P2209.60  
FIG. 26 TANK HEATER  
Location:  
The tank heaters are located on the right center  
and the left center of the component bracket.  
RED to Contactor T2 (All  
Models Except 230V-CE  
Models)  
BLK to Contactor T1 (All  
Models Except 230V-CE  
Models)  
RED (Thermal Fuse) to Con-  
tactor Top Right Terminal)  
(230V-CE Models)  
BLK (Thermal Fuse) to  
ContactorTopLeftTermi-  
nal) (230V-CE Models)  
BLK to Contactor L1  
(120/208V,120/240Three  
Wire Single Phase, 208V  
and 240V Two Wire,  
Single Phase)  
RED to Contactor L2  
(120/208V, 120/240 Three  
Wire Single Phase, 208V  
and240VTwoWire,Single  
Phase)  
BLU to Main Harness  
(208V, 240V, 380V Three  
Wire ,Three Phase and  
380V,440V Four Wire,  
Three Phase  
BLU to Main Harness  
(208V, 240V, 380V Three  
Wire ,Three Phase and  
380V,440V Four Wire,  
Three Phase  
BLK (Thermal Fuse to  
Contactor Lower Left  
Terminal)(230V-CEMod-  
els)  
RED (Thermal Fuse) to  
Contactor Lower Right  
Terminal)  
RIGHT  
LEFT  
P1746  
FIG. 27 TANK HEATER TERMINALS  
10060 031599  
Page 30  
SERVICE (cont.)  
TIMER (Early Models)  
THERMAL FUSES (230V-CE MODELS ONLY)  
2
J
1
J
1
2
T
TL  
4
TL  
TL  
L5  
T
OLD STYLE  
FIG. 29 TIMER  
P1722.55  
P1750.65  
FIG. 28 THERMAL FUSES  
Location:  
Location:  
The timer is located on the front center of the  
component bracket.  
The thermal fuses are mounted on the tank heater  
terminals and the contactor terminals.  
Test Procedures:  
Test Procedures:  
1. Disconnect the brewer from the power source.  
2. Disconnectthepolarized,threepinconnectorfrom  
the brewer main harness and rotate the brew timer  
dial fully counterclockwise.  
3. With a voltmeter, check the voltage across sockets  
P2 and P3 (white and black wire or red wire) of  
the female connector on the main wiring harness  
when the "ON/OFF" switch is in the "ON" (upper)  
position. Connect the brewer to the power source.  
The indication must be:  
1. Disconnect the brewer from the power source.  
2. Disconnect the thermal fuse from the tank heater  
terminal and the contactor terminal.  
3. Check for continuity across the terminals on the  
ends of the thermal fuse.  
If continuity is present as described, the thermal is  
operating properly.  
If continuity is not present as described, replace the  
thermal fuse.  
a)120voltsacforthreewire120/208volt,120/240  
volt, 380 volt models and 208 or 240 volts ac for  
four wire 440 volt models.  
b) 208 volts ac for two and three wire 208 volt  
models.  
c) 240 volts ac for two and three wire 240 volt  
models.  
Removal and Replacement:  
1. Disconnect the thermal fuse from the tank heater  
terminal and the contactor and discard.  
2. Connect the new thermal fuse to the tank heater  
terminal and the contactor terminal.  
d) 230 volts ac for two wire 230 volt CE models.  
4. Disconnect the brewer from the power source.  
If voltage is present as described, proceed to #5.  
Ifvoltageisnotpresentasdescribed,refertotheWiring  
Diagrams and check the brewer wiring harness.  
10060 080900  
Page 31  
SERVICE (cont.)  
Removal and Replacement:  
1. Separateallconnectorsbetweenthebrewerwiring  
harness and the timer.  
2. Disconnect the timer leads from the pump  
leads.  
3. Remove the two #8-32 screws securing the brew  
timer to the component bracket and remove  
timer.  
4. InstallnewtimercircuitboardasdescribedinLate  
Model Timer section on the following pages.  
5. Refer to Fig. 33 to reconnect the wires.  
6. Install the Timer Setting Decal, provided with the  
timer replacement kit, on the back of the front  
access panel.  
TIMER (Early Models)(cont.)  
5. With a voltmeter, check the voltage across the  
sockets P1 and P2 (blue and white wires) of the  
female connector on the main harness when the  
"ON/OFF" switch is in the "ON" (upper) position  
and the start switch pressed. Connect the brewer  
to the power source. The indication must be:  
a)120voltsacforthreewire120/208volt,120/240  
volt, 380 volt models and 208 or 240 volt ac for  
four wire 440 volt models.  
b) 208 volts ac for two and three wire 208 volt  
models.  
c) 240 volts ac for two and three wire 240 volt  
models.  
7. Adjust the timer as required. Refer to Late Model  
Timer section on the following pages.  
d) 230 volts ac for two wire 230 volt CE models.  
6. Disconnect the brewer from the power source.  
7. Reconnect the three pin connector from the main  
wiring harness to the connector on the timer.  
If voltage is present as described, proceed to #8.  
Ifvoltageisnotpresentasdescribed,refertotheWiring  
Diagrams and check the brewer wiring harness.  
Three Pin Connector from  
Half/Full Batch Switch  
8. Disconnect the black and white wires to the  
pump.  
9. With a voltmeter, check the voltage across the  
black and white wires when the "ON/OFF" switch  
is in the "ON" (upper) position and the start switch  
pressedtothestartpositionandreleased.Connect  
the brewer to the power source. The indication  
must be:  
To Three Pin Female  
Connector on Main  
Harness  
a)120voltsacforthreewire120/208volt,120/240  
volt, 380 volt and 208 or 240 volt ac for four wire  
440 volt models.  
b) 208 volts ac for two and three wire 208 volt  
models.  
BLK to Pump  
Lead  
c) 240 volts ac for two and three wire 240 volt  
models.  
d) 230 volts ac for two wire 230 volt CE models.  
WHI to Pump Lead  
OLD STYLE  
P1751  
FIG. 31 TIMER TERMINALS  
If voltage is present as described, the brew timer is  
operating properly. Reset the timer dial as required,  
to obtain the desired brew volume.  
If voltage is not present as described, replace the  
timer.  
10060 080900  
Page 32  
SERVICE (cont.)  
6. Withavoltmeter,checkthevoltageacrossterminals  
TL1 and TL4 when the "ON/OFF" switch is in the  
"ON" position. Connect the brewer to the power  
source. The indication must be 0 volts.  
DIGITAL TIMER (Late Models)  
If voltage is as described, proceed to #7.  
If voltage is not as described, disconnect the brewer  
from the power source and replace the timer.  
7. With a voltmeter, check the voltage across ter-  
minals TL1 and TL4 when the "ON/OFF" switch  
is in the "ON" position. Connect the brewer to the  
power source and press the "START" switch. The  
indication must be as follows:  
a)120voltsacforthreewire120/208volt,120/240  
volt and 380 volt models.  
b) 208 volts ac for two wire 208 volt models.  
c) 240 volts ac for two wire 240 volt models.  
d) 230 volts ac for two wire 230 volt CE models.  
e) 208 or 240 volts ac for four wire 440 volt mod-  
els.  
P2209.60  
FIG. 32 DIGITAL TIMER  
Location:  
The timer is located on the front center of the  
component bracket.  
Test Procedure.  
If voltage is present as described, the brew timer is  
operating properly. Reset the timer as required, to  
obtain the desired brew volume.  
If voltage is not present as described, disconnect the  
brewer from the power source and replace the timer.  
NOTE:Donotremoveorinstallwireswhiletimerboard  
is installed. Pressure applied to one side may cause  
damage to the board.  
1. Disconnect the brewer from the power source.  
2. Remove the two #8-32 screws securing circuit  
board to the mounting bracket.  
Removal and Replacement:  
3. Remove circuit board and spacers (as required).  
4. Withavoltmeter,checkthevoltageacrossterminals  
TL1 and TL2 when the "ON/OFF" switch is in the  
"ON" position. Connect the brewer to the power  
source. The indication must be:  
1. Remove the two #8-32 screws securing circuit  
board to the mounting bracket.  
2. Remove circuit board and spacers (as required).  
3. Remove all wires from the timer.  
4. Attach all wires to the replacement timer board  
prior to installation to the component mounting  
bracket. Refer to FIG. 33 when reconnecting the  
wires.  
5. Installnewcircuitboardwithspacers(asrequired)  
to the component mounting bracket.  
a)120voltsacforthreewire120/208volt,120/240  
volt and 380 volt models.  
b) 208 volts ac for two wire 208 volt models.  
c) 240 volts ac for two wire 240 volt models.  
d) 230 volts ac for two wire 230 volt CE models.  
e) 208 or 240 volts ac for four wire 440 volt mod-  
els.  
6. Adjust the timer as described below.  
Timer Setting:  
5. Disconnect the brewer from the power source.  
NOTE: Prior to setting or modifying volumes, check  
that the brewer is connected to water supply, the  
tank is properly filled, and a funnel and server are in  
place.  
If voltage is present as described, proceed to #6.  
Ifvoltageisnotpresentasdescribed,refertotheWiring  
Diagrams and check the brewer wiring harness.  
10060 080900  
Page 33  
SERVICE (cont.)  
DIGITAL TIMER (Late Models)  
NOTE: The brewer remembers this volume and will  
continue to brew batches of this size until the volume  
setting procedure is repeated.  
NOTE: All volume settings must be done with the  
sprayhead installed.  
NOTE: When brewing coffee, volume will decrease  
due to absorption by the coffee grounds.  
NOTE: Half-Batch and full batch settings must each  
be set separately.  
1. Modifying brew volumes. To modify a brew vol-  
ume, first check that the SET/LOCK switch is in the  
“SET” position on the circuit board.  
To increase a brew volume, place the ON/OFF  
switch in the “ON” position, press and hold the START  
switch until you see three breaks in the water stream  
from the swing arm. Release the switch and press it  
again one or more times. (Failure to release the switch  
within two seconds after the third break in the water  
stream causes the volume setting to be aborted and  
previous volume setting will remain in memory.) Each  
time the switch is pressed, two seconds are added to  
the brew time period. Allow the brew cycle to finish  
in order to verify that the desired volume has been  
achieved.  
3. Setting programming disable feature. If it be-  
comes necessary to prevent anyone from changing  
brew time once programmed, you can set the SET/  
LOCK switch to the “LOCK” position. This will prevent  
any further programming until switch is once again  
put into the “SET” position.  
To decrease a brew volume, place the ON/OFF  
switch in the “ON” position, press and release the  
START switch once for every two-second interval  
to be removed from the total brew time period; then  
immediately press and hold down the START switch  
until you see three breaks in the water stream from the  
swing arm. Release the switch. (Failure to release the  
switch within two seconds after the third break in the  
water stream causes the volume setting to be aborted  
and previous volume setting will remain in memory).  
Allow the brew cycle to finish in order to verify that  
the desired volume has been achieved.  
2. Setting brew volumes. To set a brew volume,  
first check that the SET/LOCK switch is in the “SET”  
position on the circuit board. Place the ON/OFF switch  
in the “ON” position, press and hold the START switch  
until you see three breaks in the water stream from  
the swing arm and then release the switch. (Failure to  
release the switch within two seconds after the third  
break in the water stream causes the volume setting  
to be aborted and previous volume setting will remain  
in memory.)  
BLU/BLK wire from TL5 to P1  
WHI/GRN wire from TL4 to (WHI) Pump  
WHI/BLU wire from TL3 to (BLK) Pump  
WHI wire from TL2 to P2  
BLK wire from TL1 to P3  
J2 - Three Pin connector from Half/Full Batch  
Switch  
View the level of the liquid being dispensed. When  
the desired level is reached, turn the ON/OFF switch  
to “OFF”.  
P2037  
FIG. 33 DIGITAL TIMER TERMINALS  
10060 080900  
Page 34  
SERVICE (cont.)  
TRANSFORMER (380V THREE WIRE MODELS ONLY)  
If voltage is present as described, the transformer is  
operating properly  
If voiltage is not present as described, replace the  
transformer.  
Removal and Replacement:  
1. Disconnect all the wires from the transformer.  
2. Remove the two #8-32 screws securing the trans-  
form to the transformer mounting bracket.  
3. Remove the transformer and discard.  
4. Positionnewtransformerontransformermounting  
bracket and secure with two #8-32 screws.  
5. Refer to Fig. 35 and reconnect the wires.  
P1752.55  
FIG. 34 TRANSFORMER  
RED from  
Terminal Block  
WHI from Main  
Harness  
Location:  
The transformer is located on the top rear of the  
timer mounting bracket.  
Test Procedures:  
1. Disconnect the brewer from the power source.  
2. Disconnect black wire and the red wire from the  
terminal block at the transformer.  
3. With a voltmeter, check the voltage across the  
black wire and the red wire. Connect the brewer  
to the power source. The indication must be 380  
volts ac.  
4. Disconnect the brewer from the power source.  
If voltage is present as described, proceed to #5.  
If voltage is not present as described, refer to wiring  
diagram and check the brewer wiring harness.  
BLK from  
BLK from  
Terminal Block  
Main Harness  
5. Reconnect the black wire and the red to the trans-  
former.  
6. Disconnect the black wire and the white wire from  
the transformer terminals.  
P1753  
FIG. 35 TRANSFORMER TERMINALS  
7. With a voltmeter, check the voltage across the  
transformer terminals. Connect the brewer to the  
power source. The indication must be 120 volts  
ac.  
10060 031599  
Page 35  
SERVICE (cont.)  
MASTER ON/OFF SWITCH (Late Models)  
Removal and Replacement:  
1. Remove all wires from the switch terminals.  
2. Remove the two screws from the outside of the  
base and gently push the switch through the  
opening.  
3. Locate the new switch into the opening and se-  
cure with screws removed in step 2.  
4. Refer to FIG. 37 when reconnecting the wires.  
Incoming Power Supply  
L1 - BLK  
P1752.55  
L2 - RED  
FIG. 36 MASTER ON/OFF SWITCH LOC.  
Location:  
Main Wiring harness  
BLK  
The Master ON/OFF switch is located in the top hous-  
ing at the rear, FIG. 36.  
RED  
Test Procedure:  
1. Disconnect the brewer from the power source  
and remove the wires from all terminals of the  
Master ON/OFF switch.  
P3955  
FIG. 37 MASTER ON/OFF SWITCH WIRING  
2. Check for continuity across the two terminals on  
the switch at L1 BLK and BLK to Main Harness  
when it is held in the lower position, Fig. 32.  
Check for continuity across the two terminals on  
the switch at L2 RED and RED to Main Harness  
when it is held in the lower position.  
Continuity must not be present across these  
terminals in the upper position.  
If continuity is present as described, reconnect the  
wires, the switch is operating properly.  
If continuity is not present as described, replace the  
switch.  
10060 011708  
Page 36  
L1  
N
L2  
MAIN ON/OFF SWITCH  
(Late Models only)  
BLK  
RED  
120/208 VOLTS AC  
120/240 VOLTS AC  
3 WIRE + GND  
SINGLE PHASE  
10060 011708  
Page 37  
10060 080900  
Page 38  
SCHEMATIC WIRING DIAGRAM U3A & U38A  
(BREWERS PRIOR TO U300004095)  
10060 080900  
Page 39  
SCHEMATIC WIRING DIAGRAM U3A - CE  
(BREWERS S/N U300004095 - UP)  
10060 080900  
Page 40  
SCHEMATIC WIRING DIAGRAM U3833  
10060 080900  
Page 41  
SCHEMATIC WIRING DIGRAM U3833  
10060 080900  
Page 42  

Mr Coffee SPR 101006 User Manual
Maxtor 20302300 User Manual
LG Electronics LX350 User Manual
LG Electronics L1400i User Manual
JVC KD SX855R User Manual
HP Hewlett Packard Routing Services HP UX 11i v2 User Manual
Emerson CKD9905 User Manual
Boss Audio Systems CD Player BV7300 User Manual
Blackberry SWD 1000192 0414013325 001 User Manual
ABB TPS48 H32 User Manual