Sony Projector Accessories PAM 200 User Manual

INSTALLATION MANUAL  
PAM-200  
Universal Projector Mount  
Sony Electronics  
16540 West Bernardo Drive  
San Diego, CA 92127  
IN-PAM200.R0  
Download from Www.Somanuals.com. All Manuals Search And Download.  
PAM-200  
Parts List  
NOTE: This mount is shipped with all proper installation hardware and components. Make sure that none of  
these parts are missing and/or damaged before beginning installation. If there are parts missing  
and/or damaged, please stop the installation and contact Sony Electronics (800) 222-7669.  
NOTE: Please review all WARNING and CAUTION statements (see Page 8) before beginning the  
installation of the PAM-200.  
PAM-200  
(Qty 1)  
#14 X 2” Wood  
Screw (Qty 3)  
M4 x 10mm  
Security Screw  
(Qty 3)  
Nylon Spacers  
(Qty 3)  
M4 x 16mm  
Security Screw  
(Qty 3)  
M4 x 12mm  
Security Screw  
(Qty 2)  
M4 External  
Washer (Qty 2)  
Installation Tools  
Phillips Head Screw Driver  
Soft Material/ Blanket  
Tape Measure  
Portable Drill  
Pencil  
Stud Finder (Commercially Available)  
M5 Security Allen Wrench (Supplied)  
Ladder  
M3 Security Allen Wrench (Supplied)  
Masonry Bit (Commercially Available)  
¼” Wood Drill Bit – Ceiling Installation  
(Commercially Available)  
5/16” Masonry Drill Bit – Concrete Installation  
(Commercially Available)  
Installation Manual  
Page - 3 -  
Download from Www.Somanuals.com. All Manuals Search And Download.  
PAM-200  
Features  
Congratulations on the purchase of your new Sony Electronics PAM-200 Projector Mount. The projector mount  
can be configured for ceiling installations. The PAM-200 features MagnaGuide™ Technology which assists the  
installer for quicker installation times and peace of mind. The PAM-200 Projector Mount is height adjustable  
from 9” to 12” to help achieve the perfect viewing height.  
A
B
Solid Structure  
Mounting Points  
Single Wooden Stud  
Mounting Points  
Ceiling Plate  
C
D
M6 x 20mm Security  
Screw  
E
F
Adjustable Suspension  
Neck  
MagnaGuide™ - Upper  
Assembly  
G
M4 x 12mm Security  
Screw and Star Washer  
Locking Tab  
Mounting Hardware  
Magnets  
H
I
J
K
MagnaGuide™-Lower  
Assembly  
L
Radial Glide™ Set  
Screw  
M
Projector Plate  
Optional Mounting Hardware  
N
M4 x 12mm Security Head  
Screw  
O
Nylon Spacer  
Selecting the Proper Mounting Hardware  
1.  
2.  
3.  
Invert the projector and locate the mounting points.  
Test each size of the screws provided.  
The correct screws should thread easily into the mounting point and not pull out when pressure is applied.  
WARNING: DO NOT OVERTIGHTEN YOUR MOUNTING SCREWS TO THE PROJECTOR CHASIS.  
USING THE INCORRECT SCREW DEPTH MAY CAUSE DAMAGE TO YOUR  
PROJECTOR.  
Page - 4 -  
Installation Manual  
Download from Www.Somanuals.com. All Manuals Search And Download.  
PAM-200  
Attaching the Mount  
Unpack the PAM-200 and review any WARNING statements that apply to the installation. Select the desired  
location for the PAM-200.  
M5 Allen Wrench  
M4 x 10mm Security Head  
Screw  
1. Locate the mounting points on the bottom of the projector  
(see arrows above for mounting point recognition).  
2. Line up the mounting holes on the PAM-200 with the  
mounting points of the projector.  
3. Use three (3) M4 x 10mm security head screws to attach the  
PAM-200 to the projector.  
4. Tighten the security head screws down with a M5  
Security Allen wrench (supplied).  
5. Do not overtighten these screws, as the threaded inserts can  
be damaged.  
Optional Hardware  
When mounting the PAM-200 to a Sony projector, it is imperative that the projector plate not cover any access plates that allow the  
user to access the interior of the projector. The following steps will allow the user to mount the PAM-200 projector bracket to the  
Sony projector without fear of blocking any ventilation access plates.  
Nylon Spacer  
M5 Allen Wrench  
M4 x 16mm Security Head  
Screw  
Nylon Spacer  
1. Locate the mounting points on the bottom of the projector  
(see arrows above for mounting point recognition).  
2. Place the nylon spacers over the mounting points.  
3. Line up the mounting holes of the PAM-200 with the  
nylon spacer mounting holes.  
4. Use three (3) M4 x 16mm security head screws to attach the  
PAM-200 to the projector.  
5. Tighten the security head screws down with a M5  
Security Allen wrench (supplied).  
6. Do not overtighten these screws, as the threaded inserts can  
be damaged.  
Installation Manual  
Page - 5 -  
Download from Www.Somanuals.com. All Manuals Search And Download.  
PAM-200  
Ceiling Installation  
1. Mounting Surfaces  
NOTE: Use a 1/4” drill bit to pre-drill the mounting holes  
before securing the wood screws (supplied).  
Wood studs:Where denoted with the letter ‘A’, mark these  
locations for wood stud installation.  
NOTE: Use a masonry bit to pre-drill the mounting holes in  
the concrete surface.  
Concrete surface: Where denoted with the letter ‘B’, mark  
these locations for concrete installation.  
2. Use two (2) #14 x 2” wood screws (supplied) to attach the  
ceiling plate to the wooden ceiling stud.  
NOTE: For extra security, attach a third wood screw to the  
middle mounting point (A).  
3. Slowly raise the projector toward the upper assembly. Once  
the projector is close to the upper assembly, MagnaGuide  
Technology will pull the lower assembly into the upper  
assembly and the locking tab will engage.  
WARNING:  
THE MAGNETS ARE USED FOR GUIDING  
THE UNIT ONLY! PLEASE MAKE SURE  
THE TWO (2) M4 X 12MM SCREWS ARE  
USED TO SECURE THE PROJECTOR.  
4. Attach the two (2) M4 x 12mm security screws and  
washers that are located on each side of the locking tab.  
NOTE: Do not release your hold on the projector until the  
upper and lower assemblies are engaged and the  
locking tab is in place.  
NOTE: If you choose to use the center mounting point for  
added security, detach the adjustable suspension neck  
by removing the two (2) M6 x 12mm security screws,  
drive the wood screw in place and reattach the  
adjustable suspension neck and security screws.  
M5 Allen  
Wrench  
Adjustable  
Suspension Neck  
M6 x 12mm  
Security Screw  
After the projector has been installed, the projector must then be  
adjusted. To adjust the projector:  
1. Loosen the M5 set screw using the M5 Allen wrench (both  
sides).  
2. Adjust the projector to the correct position. Firmly grasp the  
projector in both hands, and tilt either forward or  
backward to adjust the level.  
M4 x 12mm Security  
Screw and Star Washer  
-OR-  
Firmly grasp the projector in both hands and rotate side to  
side for orientation adjustment.  
M5 Set Screw  
3. Tighten the M5 set screw on both sides using the M5 Allen  
wrench.  
Height Adjustment  
1. To adjust the height of the PAM-200, hold the weight of the  
projector and loosen the two (2) M6 x 12mm security  
screws.  
2. Slide the adjustable suspension neck into the desired  
position.  
3. Retighten the two (2) M6 x 20mm security screws.  
M6 x 20mm  
Security Screws  
NOTE: Do not release the projector until the M6 screws are  
completely tight.  
Page - 6 -  
Installation Manual  
Download from Www.Somanuals.com. All Manuals Search And Download.  
PAM-200  
Safety Warning  
M4 x 12mm  
Security Screw  
WARNING: Both M4 x 12mm security screws (located on each side of the mount) must be tightened  
securely before installation is complete. If the M4 x 12mm screws are not properly  
secured, there will be an increased risk of attachment failure, which could result in  
damage to the projector.  
Concrete Mounting  
NOTE: The PAM-200 can be mounted to a ceiling with a minimum 6” thickness. Concrete wedge anchors must be used for  
concrete installation. It is recommended that ¼” wedge anchors be used. A 5/16” masonry bit must be used to drill the pilot  
hole. These items can be purchased at your local hardware store.  
1. Begin by placing the ceiling plate into position against the ceiling, keeping it level.  
2. Mark off four holes to be used for securing the mount and place the ceiling plate aside.  
3. Next, drill holes using the appropriate masonry bit for your anchor.  
4. Insert a concrete anchor into each hole.  
5. If necessary, a hammer can be used to lightly tap each anchor into place so that they are flush with the ceiling.  
6. Once all of the anchors are in place, move the ceiling plate back into position.  
7. Attach the nut onto the threaded shaft that is protruding from the ceiling.  
8. Do not tighten until all nuts are in place.  
Technical Specifications  
All measurements are inches (mm).  
Installation Manual  
Page - 7 -  
Download from Www.Somanuals.com. All Manuals Search And Download.  
PAM-200  
Warranty  
Limited Lifetime Warranty  
All Sony products carry a limited lifetime warranty from ship date against defects in materials and workmanship. Sony is not liable for improper  
installation that results in damage to mounts, adapters, display equipment or personal injury. Any modification to the existing mount will void the  
manufacturers’ warranty.  
DISCLAIMER OF WARRANTY.  
THE FOREGOING WARRANTY IS IN LIEU OF ALL OTHER WARRANTIES, EXPRESS OR IMPLIED, INCLUDING BUT NOT  
LIMITED TO THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE.  
Contact Sony Electronics  
In the event of missing and/or damaged equipment, or technical questions, the following information can help in the completion of the installation.  
Customer Service – (800) 222-7669  
Warning Statements  
WARNING: SONY DOES NOT WARRANT AGAINST DAMAGE CAUSED BY THE USE OF ANY SONY PRODUCT FOR PURPOSES  
OTHER THAN THOSE FOR WHICH IT WAS DESIGNED OR DAMAGE CAUSED BY UNAUTHORIZED ATTACHMENTS  
OR MODIFICATIONS, AND IS NOT RESPONSIBLE FOR ANY DAMAGES, CLAIMS, DEMANDS, SUITS, ACTIONS OR  
CAUSES OF ACTION OF WHATEVER KIND RESULTING FROM, ARISING OUT OF OR IN ANY MANNER RELATING  
TO ANY SUCH USE, ATTACHMENTS OR MODIFICATIONS.  
THE CEILING STRUCTURE MUST BE CAPABLE OF SUPPORTING 25LBS. IF NOT, THE CEILING STRUCTURE MUST  
BE REINFORCED. PROPER INSTALLATION PROCEDURE BY A QUALIFIED SERVICE TECHNICIAN, AS OUTLINED IN  
THE INSTALLATION INSTRUCTIONS, MUST BE ADHERED TO. FAILURE TO DO SO COULD RESULT IN SERIOUS  
PERSONAL INJURY, OR EVEN DEATH.  
WARNING:  
SAFETY MEASURES MUST BE PRACTICED AT ALL TIMES DURING THE INSTALLATION OF THIS PRODUCT. USE  
PROPER SAFETY GEAR AND TOOLS FOR THE INSTALLATION PROCEDURE TO PREVENT PERSONAL INJURY.  
WARNING:  
WARNING:  
PRIOR TO THE INSTALLATION OF THIS PRODUCT, THE INSTALLATION INSTRUCTIONS SHOULD BE READ AND  
COMPLETELY UNDERSTOOD. THE INSTALLATION INSTRUCTIONS MUST BE READ TO PREVENT PERSONAL  
INJURY AND PROPERTY DAMAGE. KEEP THESE INSTALLATION INSTRUCTIONS IN AN EASILY ACCESSIBLE  
LOCATION FOR FUTURE REFERENCE.  
Indicates that the power plug is to be disconnected from the  
Contact Sony with any questions – (800) 222-7669.  
power outlet.  
Safety precautions must be taken at all times.  
Warning and Caution statements.  
Do not install on a structure that is prone to vibration, movement or chance of impact. Failure to do so could result in damage to the projector  
and/or damage to the mounting surface.  
Do not install near heater, fireplace, direct sunlight, air conditioning or any other source of direct heat energy. Failure to do so may result in  
damage to the projector and could increase the risk of fire.  
A qualified person should perform the installation procedure. Injury and/or damage can result from dropping or mishandling the projector  
Sony Electronics  
16540 West Bernardo Drive  
San Diego, CA 92127  
Page - 8 -  
Installation Manual  
IN-PAM200.R0  
Download from Www.Somanuals.com. All Manuals Search And Download.  

Sennheiser Two Way Radio LV307 User Manual
SIIG Computer Hardware 04 0343C User Manual
Sony Flat Panel Television 4 136 111 110 User Manual
Sony Portable CD Player D E341 User Manual
Sony VCR CCD TR411E User Manual
SRS Labs Projector 8953H User Manual
Stairmaster Treadmill 2100 LC User Manual
Sterling Plumbing Indoor Furnishings C7111FSS User Manual
Sunbeam Microwave Oven SMW992 User Manual
Sylvania CRT Television SRT2323 User Manual