Lightolier Indoor Furnishings 1100F Series User Manual

READ AND UNDERSTAND THESE INSTRUCTIONS BEFORE INSTALLING FIXTURE.  
This fixture is intended for installation in accordance with the National Electrical Code and local or Federal  
code specifications. To assure full compliance with codes and regulations, check with your local electrical  
inspector before installation. To prevent electrical shock, turn off electricity at fuse box before proceeding.  
Retain these instructions for maintenance reference.  
INSTRUCTION SHEET NO.  
IS:1100F  
D0605  
Page 1of 2  
Installation of Lytecaster® Frame-in-Kit 1100F Series  
WARNING – (RISK OF FIRE) Do not install insulation within 3 inches of fixture sides or wiring  
compartments, nor above fixture in such a manner as to entrap heat.  
Fig. A  
1. Frame-In  
Fig. B  
2. Close-in  
Fig. C  
3. Snap-On  
Fig. D  
4. Push-Up  
NEW CONSTRUCTION  
1. FRAME-IN (FIG. A)  
ADJUSTABLE  
MOUNTING BARS  
LOCKING SCREW  
WOOD JOIST/METAL STUD CONSTRUCTION (FIG. E): Line up bot-  
tom edge of ADJUSTABLE MOUNTING BAR with bottom of wood joist.  
Fasten MOUNTING FRAME to wood joist by nailing MOUNTING BAR  
TAB or nail into joist.  
SUSPENDED GRID CEILING (FIG. G):  
MOUNTING FRAME  
Position notched area of ADJUSTABLE MOUNTING BARS on top of T-  
BAR for proper spacing to finished ceiling. Lock MOUNTING BARS by  
bending TAB underneath T-BAR BEAD (Fig. G1). For round T-BAR BEAD,  
use screws to lock MOUNTING BARS (Fig. G2).  
LINE UP BOTTOM  
EDGE WITH BOTTOM  
OF WOOD JOIST  
CENTERING SLOTS  
Fig. E  
WIRE TO SUPPLY LEADS:  
For cable, use built-in cable clamp in J-Box. Connect white fixture  
leads to neutral (white) supply leads. Black fixture leads to hot (black)  
supply leads. Bare fixture wire to supply ground. Use wirenuts (local  
hardware item). Place all electrical connections in the J-Box, attach J-  
Box cover.  
ADJUSTABLE MOUNTING BARS  
MOUNTING FRAME  
(NARROW SIDE)  
NOTE: ADJUSTABLE MOUNTING BARS are pre-assembled on long side of  
MOUNTING FRAME for rigidity and ease of installation (Fig. E).  
MOUNTING BARS must be removed and installed on narrow side of  
MOUNTING FRAME if installing in 16” joist spacing (Fig. F).  
LINE UP BOTTOM EDGE WITH  
BOTTOM OF WOOD JOIST  
MOUNTING BARS can be extended to 24”. The MOUNTING FRAME  
can be mounted off-center.  
Fig. F  
For suspended ceilings, make certain that bottom of MOUNTING  
FRAME is no higher than 1” above finished ceiling (Fig. G).  
2. CLOSE-IN (FIG. B)  
1-1/2" MAX.  
Install plasterboard or other dry type ceiling. Hole in board can be cut  
either on floor or after the board is secured in the ceiling. Use MOUNT-  
ING FRAME opening as cutting guide template for hole – make sure  
ROTO CLIPS are rotated out of hole area.  
ADJUSTABLE MOUNTING BARS  
G1  
G2  
NOTE: For wet plaster ceiling, use Plaster Ring Accessory No. 1961 - order  
separately.  
3. SNAP-ON (FIG. C)  
4. PUSH-UP (FIG. D)  
See separate instruction sheet  
for your choice of reflector trim.  
1" MAX  
T-BAR  
Fig. G  
U.S. Patent Nos. 5,045,985; 4,313,154; 4,327,403  
®
LIGHTOLIER a GENLYTE company.  
631 Airport Road, Fall River, MA 02720  
Download from Www.Somanuals.com. All Manuals Search And Download.  

Lenovo Laptop 24684XU User Manual
LG Electronics Blu ray Player BDP S790 User Manual
LG Electronics Table Top Game OAT100R User Manual
Lochinvar Water Heater TNR Iamp;S 02 User Manual
Lux Products Thermostat P111 User Manual
Magellan Universal Remote 605 0183 004 A User Manual
Magma Gas Grill A10 007 User Manual
Martin Audio Speaker Screen 4P User Manual
Martin Audio Stereo Amplifier MA96K User Manual
Melissa Iron 641 031 User Manual