READ AND UNDERSTAND THESE INSTRUCTIONS BEFORE INSTALLING FIXTURE.
This fixture is intended for installation in accordance with the National Electrical Code and local or Federal
code specifications. To assure full compliance with codes and regulations, check with your local electrical
inspector before installation. To prevent electrical shock, turn off electricity at fuse box before proceeding.
Retain these instructions for maintenance reference.
INSTRUCTION SHEET NO.
IS:1100F
D0605
Page 1of 2
Installation of Lytecaster® Frame-in-Kit 1100F Series
WARNING – (RISK OF FIRE) Do not install insulation within 3 inches of fixture sides or wiring
compartments, nor above fixture in such a manner as to entrap heat.
Fig. A
1. Frame-In
Fig. B
2. Close-in
Fig. C
3. Snap-On
Fig. D
4. Push-Up
NEW CONSTRUCTION
1. FRAME-IN (FIG. A)
ADJUSTABLE
MOUNTING BARS
LOCKING SCREW
WOOD JOIST/METAL STUD CONSTRUCTION (FIG. E): Line up bot-
tom edge of ADJUSTABLE MOUNTING BAR with bottom of wood joist.
Fasten MOUNTING FRAME to wood joist by nailing MOUNTING BAR
TAB or nail into joist.
SUSPENDED GRID CEILING (FIG. G):
MOUNTING FRAME
Position notched area of ADJUSTABLE MOUNTING BARS on top of T-
BAR for proper spacing to finished ceiling. Lock MOUNTING BARS by
bending TAB underneath T-BAR BEAD (Fig. G1). For round T-BAR BEAD,
use screws to lock MOUNTING BARS (Fig. G2).
LINE UP BOTTOM
EDGE WITH BOTTOM
OF WOOD JOIST
CENTERING SLOTS
Fig. E
WIRE TO SUPPLY LEADS:
For cable, use built-in cable clamp in J-Box. Connect white fixture
leads to neutral (white) supply leads. Black fixture leads to hot (black)
supply leads. Bare fixture wire to supply ground. Use wirenuts (local
hardware item). Place all electrical connections in the J-Box, attach J-
Box cover.
ADJUSTABLE MOUNTING BARS
MOUNTING FRAME
(NARROW SIDE)
NOTE: ADJUSTABLE MOUNTING BARS are pre-assembled on long side of
MOUNTING FRAME for rigidity and ease of installation (Fig. E).
MOUNTING BARS must be removed and installed on narrow side of
MOUNTING FRAME if installing in 16” joist spacing (Fig. F).
LINE UP BOTTOM EDGE WITH
BOTTOM OF WOOD JOIST
MOUNTING BARS can be extended to 24”. The MOUNTING FRAME
can be mounted off-center.
Fig. F
For suspended ceilings, make certain that bottom of MOUNTING
FRAME is no higher than 1” above finished ceiling (Fig. G).
2. CLOSE-IN (FIG. B)
1-1/2" MAX.
Install plasterboard or other dry type ceiling. Hole in board can be cut
either on floor or after the board is secured in the ceiling. Use MOUNT-
ING FRAME opening as cutting guide template for hole – make sure
ROTO CLIPS are rotated out of hole area.
ADJUSTABLE MOUNTING BARS
G1
G2
NOTE: For wet plaster ceiling, use Plaster Ring Accessory No. 1961 - order
separately.
3. SNAP-ON (FIG. C)
4. PUSH-UP (FIG. D)
See separate instruction sheet
for your choice of reflector trim.
1" MAX
T-BAR
Fig. G
U.S. Patent Nos. 5,045,985; 4,313,154; 4,327,403
®
LIGHTOLIER a GENLYTE company.
631 Airport Road, Fall River, MA 02720
Download from Www.Somanuals.com. All Manuals Search And Download.
|