Intel Server Board SE7501CW2 Installation and Integration Guide  
Table of Contents  
3
Download from Www.Somanuals.com. All Manuals Search And Download.  
Intel Server Board SE7501CW2 Installation and Integration Guide  
4
Download from Www.Somanuals.com. All Manuals Search And Download.  
Intel Server Board SE7501CW2 Installation and Integration Guide  
Introduction  
Document Overview  
This guide outlines the procedures for integrating an  
Intel® Server Platform using an Intel Server Board  
SE7501CW2 and Intel Xeonprocessors.  
This guide consists of the most essential information  
first-time server builders need to successfully  
assemble an Intel server solution. Your particular  
operating system’s installation guide will cover the  
installation of the server’s operating system.  
Target Audience  
Intel channel program members who are expanding their expertise to include server  
platforms and current channel program members looking for a refresher on servers  
System integrators deploying servers based on the boxed Intel Server Board  
SE7501CW2  
Our intent is to better enable system integrators, particularly first-time server builders, to  
meet the competitive challenges they face in the server market and to keep program  
members up-to-date on emerging server technologies. By following the steps outlined in  
this document, you will be able to integrate an Intel Server Board SE7501CW2 with an Intel  
Server Chassis SC5200 in a timely and effective manner.  
The Intel Server Chassis SC5200 is used as an example and is recommended for ease of  
integration and compatibility; other reference chassis may be different. Expanded  
installation instructions and complete product information are available in the Intel® Server  
Board SE7501CW2 Product Guide on the Resource CD. Unless otherwise noted, references  
to the Intel Server Chassis SC5200 include both the base version and the base redundant  
power version.  
Thank you  
Thank you for buying Intel Server Products.  
5
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
Intel Server Board SE7501CW2 Installation and Integration Guide  
Troubleshooting Guide  
In the unlikely event you do encounter issues, the troubleshooting guide will help you  
troubleshoot and identify possible areas of concern regarding the Intel Server Board  
SE7501CW2. It will also assist you in collecting the data needed to help you work through  
any concerns or issues that may arise The troubleshooting guide includes suggestions that  
may help you and a list of information that we will need to assist you should you need to  
call. The troubleshooting guide is available at:  
If you are unable to resolve a problem using this guide, please follow these steps:  
This Web site contains the latest information on known issues and their respective  
solutions. If you are still unable to resolve the issue, go to the next step.  
2. Send e-mail, including as much information on the issue as possible, to Intel customer  
support, using the form available at this URL:  
3. Channel customers can contact Intel customer support toll free at 1-866-655-6565.  
Non-channel customers should use one of the numbers listed at  
Minimum Hardware Requirements  
Your system must meet the following minimum requirements to avoid integration difficulties  
and possible board damage:  
Processor: Minimum of one Intel Xeon processor 1.8 GHz with 512K cache support in  
a 603-pin (400-MHz FSB) or 604-pin (533-MHz FSB) INT flip-chip micro pin-grid array  
(INT-mPGA). For a list of tested processors, visit  
Memory: Minimum of one 128-MB ECC DDR 266-compliant registered SDRAM 168-pin  
gold DIMM. For a list of tested memory, visit  
Power: Minimum of 450 W with 1.2A standby current which meets the SSI EPS 12V  
specification. Intel provides a power budgeting tool to help you determine the power  
needs of your server at  
Additional resources and support for your server board, including tested chassis, qualified  
chassis components, specifications, and software updates, can be found at  
6
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
Intel Server Board SE7501CW2 Installation and Integration Guide  
Hardware Integration  
The following installation procedures enable you to prepare a  
chassis for integration, add the needed components to your  
server board, and install the server board. The procedures are  
condensed from the more comprehensive and detailed Product  
Guides for the Intel Server Board SE7501CW2 and Intel Server  
Chassis SC5200. To access the most current and complete  
Product Guides and for more information, visit Intel Support at:  
Prepare for Assembly  
1. Gather tools needed:  
Needle nose pliers  
Flat blade screwdriver  
Phillips head screwdriver  
Antistatic wrist strap  
2. Prepare a clean, static-controlled, level workstation.  
3. Collect and organize all necessary hardware including the server board, memory,  
processor(s), and peripherals (hard drives, floppy disk drive, CD/DVD).  
4. Verify that the components chosen for installation are listed as validated for use with the  
Intel Server Board SE7501CW2. This information is available from the Intel Support Web  
7
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
Intel Server Board SE7501CW2 Installation and Integration Guide  
Important Safety Information  
Safety Instructions and Information  
To avoid personal injury or property damage, the following safety instructions apply  
whenever working inside the chassis:  
1. Turn off all peripheral devices connected to this product.  
2. Turn off the system by pressing the power button on the front of the product.  
3. Disconnect the AC power by unplugging all AC power cords from the system or wall  
outlet.  
4. Disconnect all cables and telecommunication lines that are connected to the system.  
5. Retain all screws or other fasteners when removing access cover(s). When finished,  
refasten the access cover with original screws or fasteners.  
6. Do not access the inside of the power supply. There are no serviceable parts in the  
power supply. If the power supply is malfunctioning, return it to the manufacturer for  
servicing.  
Electrostatic Discharge (ESD)  
CAUTION  
Perform the procedures in this product guide only at an electrostatic discharge (ESD)  
workstation, because the server components are extremely sensitive to ESD. If no such  
workstation is available, you can reduce the risk of electrostatic discharge damage by doing  
the following:  
Wear an antistatic wrist strap, and attach it to a metal part of the server.  
Touch the metal on the server chassis before touching the server components.  
Keep part of your body in contact with the metal server chassis to dissipate the static  
charge while handling the components.  
Avoid moving around unnecessarily.  
Hold the server components (especially boards) only by the edges.  
Place the server components on a grounded, static-free surface. Use a conductive foam  
pad if available. Do not use the product packaging or wrapper as an antistatic surface.  
Do not slide the components over any surface.  
8
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
Intel Server Board SE7501CW2 Installation and Integration Guide  
Chassis Preparation and Server Board Installation  
About the I/O Shield  
An ATX 2.03-compliant I/O shield is provided with your server board. The shield is required  
by Electromagnetic Interference (EMI) regulations. It minimizes EMI and helps obtain proper  
cooling of the server.  
The shield fits the rectangular opening near the power supply in the back of the chassis. The  
shield has cutouts that match the external I/O connectors of the server board (such as the  
keyboard and mouse connectors).  
Attaching the Gasket to the I/O Shield  
1. Remove the two backing strips from the gasket.  
2. Press the gasket onto the inside face of the I/O shield as  
shown.  
Attaching the Label to the I/O Shield  
1. Remove the backing from the label included with your server  
board.  
2. Press the label onto the outside face of the I/O shield (A).  
Installing the I/O Shield  
Install the I/O shield from inside the chassis, with the label facing outward.  
1. Insert one edge, and rotate the I/O shield into the chassis cutout.  
2. Press firmly until the I/O shield clicks into place.  
9
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
Intel Server Board SE7501CW2 Installation and Integration Guide  
Installing Chassis Standoffs  
If your chassis does not have standoffs placed as shown,  
you must rearrange them so they match the holes in the  
server board. Failure to properly rearrange the metal  
standoffs may cause the server board to malfunction and  
permanently damage it. Your chassis may be different from  
the illustration, but you must still arrange the standoffs  
properly.  
When using an Intel Server Chassis SC5200, positions 1, 4,  
6, 20, 23, and 26 come preinstalled. You must install  
standoffs in positions 7, 18, and 19. Install standoffs in the  
eight positions marked P regardless of whether one or  
two processors will be installed. Standoffs are included  
with this chassis.  
Installing the Rubber Bumper  
Attach the rubber bumper to the chassis. The  
bumper should cover the indicated chassis standoff  
hole. On an Intel Server Chassis SC5200, the  
standoff is marked ‘S’. On other chassis, place the  
bumper approximately 3 inches (7.6 cm) below  
and to the left of the standoffs marked P as shown.  
Installing the Server Board  
1. Place the board into the chassis,  
making sure that the back panel’s  
I/O shield and chassis standoffs align  
correctly.  
2. Attach the board with the included  
screws at the ten locations shown.  
Note:  
If you are installing only one processor, you must also insert screws  
into the four standoff locations around the CPU2 socket.  
10  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
Intel Server Board SE7501CW2 Installation and Integration Guide  
Installing Memory  
The server board supports only DDR266-  
compliant DIMMs. The minimum supported  
memory configuration is 128 MB, using one  
128-MB DIMM. The maximum configurable  
memory size is 8 GB using 4 2-GB DIMMs.  
If a single DIMM is used, you must install it  
in the DIMM 1A socket. Bank 1 must be fully  
populated before you install any memory in  
Bank 2, and Bank 2 only operates with two  
DIMMs installed. DIMMs must be identical  
within each bank.  
Note:  
Use memory that has been tested for compatibility with the server  
board. For a list of tested memory, see:  
If the server board is not already installed in the chassis,  
remove the server board from its packaging and place it  
on a clean ESD-protected work surface.  
1. Open both DIMM socket levers.  
2. Insert DIMM, making sure the connector edge of the  
DIMM aligns correctly with the slot.  
3. Check that the socket levers are securely latched.  
DIMMs must be populated in identical pairs.  
11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
Intel Server Board SE7501CW2 Installation and Integration Guide  
Installing the Boxed IntelXeonProcessor  
Choosing the Processor Socket  
Use these instructions for installing your processor instead of the instructions that came  
with your boxed processor.  
If only ONE processor is to be used, it must be installed in the processor socket labeled  
CPU1, located closest to the corner of the server board. No processor terminator is  
required on a single processor system. Do not install a terminator in the Intel Server  
Board SE7501CW2.  
If installing a SECOND processor, verify that the processor is identical in voltage,  
speed, and stepping to the first processor. Do not mix processors of different types,  
frequencies, or steppings.  
To avoid touching the pins, hold the processor only by the edges when unpacking it.  
Opening the Socket Lever  
Open the lever all the way as shown. This server board has ZIF  
sockets. If the processor does not drop easily into the socket  
holes, make sure the lever is in the full-open position and the  
processor is oriented properly. Applying pressure will damage the  
processor pins.  
Attaching the Processor  
1. Align the alignment triangle mark on the  
processor with the alignment triangle  
cutout on the socket.  
2. Insert the processor in the socket.  
3. Close and latch the socket lever as  
shown.  
12  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
Intel Server Board SE7501CW2 Installation and Integration Guide  
Installing the Retention Mechanism  
1. Insert the retention brackets.  
2. Tighten the four retention screws.  
Applying Thermal Grease  
Apply thermal grease to the processor as shown.  
Attaching the Heat Sink and Retention  
Clips  
1. Place the heat sink onto the processor as shown. Heat sink  
styles may differ.  
2. Verify that the tab on the inside of the retention clip  
engages the slot on the heat sink during installation.  
3. The center slot in the clip provides room for side-to-side  
motion while you engage the retention clip slots on each  
side.  
2. Slide the clip in the direction shown. Note  
the location of the center plastic tab.  
1. Position both clips as shown. Make sure  
the tab (2) above engages in the slot on the  
heat sink base.  
4. Snap the other end in place as shown.  
3. Press downward on the end of the  
retention clip to engage the side plastic tab.  
Note:  
Install both retention clips simultaneously for the easiest installation.  
13  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
Intel Server Board SE7501CW2 Installation and Integration Guide  
Installing the Processor Wind Tunnel  
The following instructions apply to the base Intel Server Chassis SC5200 and reference  
chassis installations. Direct the airflow from the processor wind tunnel toward the rear of  
the chassis as shown.  
Attaching the Heat Sink Fan  
Install the processor wind tunnel center section over the  
heat sink. The plastic tabs on the wind tunnel center  
section must engage the tabs on the retention  
mechanism. Make sure the fan’s sticker is facing away  
from the assembly, so that the airflow is into the  
assembly.  
Attaching the Fan/Intake Assembly  
1. Position the fan/intake assembly at approximately 45°,  
and engage the clip at the top of the tunnel as shown.  
2. Gently squeeze the two tabs on the assembly, and  
insert them into the two mating slots on the wind  
tunnel.  
3. Rotate the fan/intake downward to engage the mating  
clips on the wind tunnel.  
14  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
Intel Server Board SE7501CW2 Installation and Integration Guide  
Attaching the Wind Tunnel  
1. Spread the tabs outward slightly (1a). Lower the wind  
tunnel assembly onto the retention mechanism (1b).  
2. The tabs on the fan assembly (2a) slide into slots (2b) on  
the inner side of the retention mechanism.  
3. The tabs on fan assembly (3a) connect to the outside  
surface of the retention mechanism (3b).  
4. Attach the fan power cable to the corresponding server  
board CPU fan connector.  
Correct assembly should look like this:  
When installing only one processor, there is no need to install the wind tunnel assembly  
over the second processor location. Use the wind tunnel assembly over a CPU socket only  
when a CPU is installed.  
Install the rest of the internal peripherals of your server now, including any floppy, CD, and  
hard disk drives. See “Making Required Connections to the Server Board” below for the  
server board connection points.  
15  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
Intel Server Board SE7501CW2 Installation and Integration Guide  
Making Required Connections to the Server Board  
Make these connections regardless of the chassis used. Refer to your chassis documentation  
for additional connection requirements. For the Intel Server Chassis SC5200 Base or  
Redundant Power Version, connect the front system fans to the system fan 3 and 4  
connectors on the server board.  
Note:  
If the fans are not configured properly, then they will run at a faster  
rate to compensate for what the system interprets as a missing fan.  
A Main Power Connector  
G Secondary IDE Connector (upper, white connector)  
and Primary IDE Connector (lower, black connector)  
B Auxiliary Power Connector  
C +12V CPU Power Connector  
H System Fan 5  
I Floppy Disk Drive Connector  
J Chassis Intrusion Header  
D CPU1 Fan (upper connector) and  
CPU2 Fan (lower connector)  
E System Fan 1 (upper connector) and  
System Fan 2 (lower connector)  
K System Fan 3 (upper connector) and  
System Fan 4 (lower connector)  
F Front Panel Connector  
16  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
Intel Server Board SE7501CW2 Installation and Integration Guide  
Making Optional Connections to the Server Board  
These connections are required only when the corresponding component is installed.  
A
B
Hot Swap Back Plane (HSBP)  
System Fan 5  
C
Front Universal Serial Bus  
Serial B  
D
17  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
Intel Server Board SE7501CW2 Installation and Integration Guide  
Installing the Serial B Cable  
For the Intel Server Chassis SC5200, you can connect the  
Serial Port B cable to either the back of the chassis or, on a  
rack-mount system, to the front of the chassis.  
1. Use a screwdriver to remove the connector knock-out.  
2. Install the Serial B cable by inserting it into the chassis  
back panel cutout and attaching the two hex screws as  
shown.  
3. Attach the other end of the cable to the Serial B connector  
on the server board. See “Making Optional Connections to  
18  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
Intel Server Board SE7501CW2 Installation and Integration Guide  
Cable Routing – Intel Server Chassis SC5200  
To ensure proper airflow within the chassis, follow the cable routing guidelines below.  
IDE or SCSI Cables  
Cables that connect to devices in the lower  
device bays should be routed around the EPAC  
system fan carrier as shown.  
1. Route cables as shown.  
2. Replace the top half of the EPAC.  
Floppy and Front Panel Cables  
Route the floppy drive and front panel cables as  
shown.  
Installing the Access Cover  
1. Place the cover so the tabs go into the slots on the  
server. The cover should be flush against the chassis.  
2. Slide the cover forward until it stops.  
3. Tighten the two captive screws into the rear of the  
chassis.  
19  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
Intel Server Board SE7501CW2 Installation and Integration Guide  
Installing the Chassis Feet (Pedestal Mode)  
1. If you are installing this server into a rack system, skip  
these steps and go to “Installing into a Rack (Rack  
2. Move the chassis to the edge of your workbench.  
3. Use four screws to attach each foot to the chassis. The  
holes in the feet line up with only one set of holes in  
the chassis. On the front foot, the middle hole should  
face toward the front of the chassis. Hole locations for  
the front foot are marked “F” and “1, 2”. On the back  
foot, the middle hole should face toward the back of  
the chassis. Location holes for the rear foot are  
marked “F”.  
Installing into a Rack (Rack Mode)  
The Intel Server Chassis SC5200 is designed to be  
compatible with the EIA-310-d rack standard. Be sure to  
select a rack cabinet enclosure that is EIA-310-d  
compliant. For additional compatibility and rack cabinet  
selection information, see:  
assis/sc5200  
1. Fully extend the rails.  
2. Remove the smallest and innermost rail.  
3. Position the rail.  
4. Insert and tighten four screws.  
5. Install the rest of the rail in your rack.  
Note:  
Your rack may vary from the illustration. Refer to your  
rack documentation for information specific to your rack.  
Hold the chassis so the rails on the chassis engage the rails in  
your rack. You will need someone to help you at this point.  
Disengage the locking tab on each rail and slide the server into  
the rack.  
20  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
Intel Server Board SE7501CW2 Installation and Integration Guide  
Finishing Up  
WARNING  
Install the chassis access cover before finishing up (see ”Installing the Access  
Cover” on page 19). An electrical shock hazard exists if the chassis access cover is  
not replaced before connecting the chassis AC power.  
1. Connect your keyboard, mouse, video, and other I/O cables as shown.  
2. Connect the power cable to the back panel and to an AC outlet as shown.  
Intel Server Chassis SC5200  
Base version  
Intel Server Chassis SC5200 Base  
Redundant Power Version  
Note:  
The Intel Server Chassis SC5200 Base Redundant Power version ships  
with one power supply. To enable redundant power, a second power  
supply must be ordered and installed. To order a second power supply,  
21  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
Intel Server Board SE7501CW2 Installation and Integration Guide  
Software Installation  
Updating the BIOS  
Intel highly recommends that you go to the Intel Server Board SE7501CW2 support Web  
site and download and install the latest system BIOS update for your operating system. The  
Intel Server Board SE7501CW2 support Web site is:  
the latest BIOS at the Software and Drivers link.  
The BIOS update simplifies the BIOS update process by providing all of the necessary files  
in one download designed to fit on one floppy disk. This package is most efficient when used  
in conjunction with the System Resource CD that ships with the Intel Server Board  
SE7501CW2. See the readme file and release notes for complete installation instructions.  
Installing the Operating System  
Consult your chosen operating system’s documentation for information on setting up the  
operating system for your server. That documentation takes up where this guide leaves off,  
and steps you through setting up your server’s operating system. Be sure to install the  
System Update Package first, then format the boot drive with an appropriate Intel Server  
Management drive partition, and then install the OS. When you are finished installing the  
server OS, install Intel Server Management and the Intel Server Maintenance and Reference  
Training Tool CD (Intel SMaRT Tool).  
For a list of validated operation systems, see:  
22  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
Intel Server Board SE7501CW2 Installation and Integration Guide  
LANDesk* Client Manager  
LANDesk* Client Manager makes it easier to manage a computer and troubleshoot common  
computer problems.  
Use Client Manager to:  
View system inventory  
Monitor a computer's health  
Receive alerts for system events  
Remotely power off, power on, and reboot client computers  
Installing LANDesk Client Manager  
Client Manager has two different management consoles that you can install: a client (single,  
end-user) console and an administrator (multi-node manager) console.  
Client: The client version enables an end user to view information and manage  
alerts for a local computer. This version doesn't permit a user to select and view  
remote computers, or power on/off other computers.  
Administrator: The administrator version enables you to manage remote client  
computers on the network. This means you can view information, generate reports,  
receive alerts, and power on/off other computers remotely. To remotely reboot,  
power off, or power on client computers, the administrator version must be installed  
on at least one computer that is attached to the network. The administrator console  
is not designed to be a mobile management console. The best way to manage client  
computers from multiple locations is to connect to your administrator console via  
Internet Explorer* 5.5 from various computers on your network.  
Installation instructions and further information on LANDesk Client Manager are available in  
the documentation included on the Server Board SE7501CW2 Resource CD.  
LANDesk System Requirements  
To run Client Manager on your network, the administrator and client computers must  
comply with these system requirements.  
Administrator computers  
Windows* 2000 or Windows XP for the administrator console  
64 MB of RAM for Windows 2000, 128 MB of RAM for Windows XP  
Client computers  
Windows 98 Second Edition, Windows Me, Windows NT* 4.x (Service Pack 6a or  
later), Windows 2000, or Windows XP for the client console  
24 MB of RAM for Windows 98 Second Edition, 32 MB of RAM for Windows Me or  
Windows NT, 64 MB of RAM for Windows 2000, 128 MB of RAM for Windows XP  
23  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
Intel Server Board SE7501CW2 Installation and Integration Guide  
Intel Server Maintenance and Reference Training Tool CD  
(Intel SMaRT Tool)  
The Intel Server Maintenance and Reference Training Tool CD (Intel SMaRT Tool) is an  
interactive software tool providing support information to assist with the maintenance and  
repair of Intel processor-based server systems and accessories. The Intel SMaRT Tool  
features visual, step-by-step instructions for replacing parts; a complete Field Replacement  
Unit (FRU) database containing part numbers and images; product spares lists; and  
worldwide Intel support information.  
You can install the software on a server or on a workstation used to manage the server. The  
information here describes installation on a system running a Microsoft Windows operating  
system, which is the only operation system that is compatible with the Intel SMaRT Tool.  
Installing the Intel SMaRT Tool  
Follow the instructions below to install the Intel SMaRT Tool on your system.  
1. Insert the Intel® Server Board SE7501CW2 Resource CD into the system’s CD-ROM  
drive.  
2. Click Intel SMaRT Tool in the menu on the left side of the screen.  
3. In the green Make a Selection drop-down menu, select SMaRT Tool Install Guide.  
Print the Guide, and keep it on hand for reference.  
4. Review the Intel SMaRT Tool Install Guide prior to proceeding.  
5. In the Make a Selection drop-down menu, select Install SMaRT Tool.  
6. Click the Run Installer icon to launch the Intel SMaRT Tool Setup program.  
7. Follow the on-screen installation instructions. Review the Intel Software License  
Agreement, and click Accept. When installation is complete, launch Intel SMaRT Tool.  
8. On the Welcome page, click Systems.  
9. Select System > Servers > Xeon > SE7501CW2 SC5200, and then follow the on-  
screen instructions to download the SE7501CW2 SC5200 server system module. You  
must have Internet access to download the server system module. When the download  
is complete, Intel SMaRT Tool will restart.  
10.Select System > Servers > Xeon > SE7501CW2 SC5200 to access information on  
your new server system.  
24  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
Intel Server Board SE7501CW2 Installation and Integration Guide  
Thank you for purchasing Intel products!  
For additional integration resources, please visit www.support.intel.com.  
25  
Download from Www.Somanuals.com. All Manuals Search And Download.  

Infrasonic Computer Monitor BLOW5 User Manual
iSymphony MP3 Docking Station V1BLUE User Manual
JBL Stereo Amplifier DA1002 User Manual
Jet Tools Saw HBS 916W User Manual
John Deere Lawn Mower JS46 User Manual
JVC Digital Camera GR D640E User Manual
JVC Stereo System CA HXZ3R User Manual
Kenmore Cooktop 7904055 User Manual
King Canada Planer KC 385FX User Manual
KitchenAid Range KGST300 User Manual