Server Installation and
Integration Guide
Using the Boxed Intel® Xeon Processor and
Boxed Intel® Server Board SE7501CW2
Download from Www.Somanuals.com. All Manuals Search And Download.
Intel Server Board SE7501CW2 Installation and Integration Guide
Table of Contents
Introduction ......................................................................................5
Target Audience ......................................................................................5
Thank you ...............................................................................................5
Prepare for Assembly ..............................................................................7
Installing Memory .................................................................................11
3
Download from Www.Somanuals.com. All Manuals Search And Download.
Intel Server Board SE7501CW2 Installation and Integration Guide
Finishing Up ..........................................................................................21
Updating the BIOS.................................................................................22
Administrator computers ..................................................................................23
Client computers..................................................................................................23
Tool)......................................................................................................24
4
Download from Www.Somanuals.com. All Manuals Search And Download.
Intel Server Board SE7501CW2 Installation and Integration Guide
Introduction
Document Overview
This guide outlines the procedures for integrating an
Intel® Server Platform using an Intel Server Board
SE7501CW2 and Intel Xeon processors.
This guide consists of the most essential information
first-time server builders need to successfully
assemble an Intel server solution. Your particular
operating system’s installation guide will cover the
installation of the server’s operating system.
Target Audience
Intel channel program members who are expanding their expertise to include server
platforms and current channel program members looking for a refresher on servers
System integrators deploying servers based on the boxed Intel Server Board
SE7501CW2
Our intent is to better enable system integrators, particularly first-time server builders, to
meet the competitive challenges they face in the server market and to keep program
members up-to-date on emerging server technologies. By following the steps outlined in
this document, you will be able to integrate an Intel Server Board SE7501CW2 with an Intel
Server Chassis SC5200 in a timely and effective manner.
The Intel Server Chassis SC5200 is used as an example and is recommended for ease of
integration and compatibility; other reference chassis may be different. Expanded
installation instructions and complete product information are available in the Intel® Server
Board SE7501CW2 Product Guide on the Resource CD. Unless otherwise noted, references
to the Intel Server Chassis SC5200 include both the base version and the base redundant
power version.
Thank you
Thank you for buying Intel Server Products.
5
Download from Www.Somanuals.com. All Manuals Search And Download.
Intel Server Board SE7501CW2 Installation and Integration Guide
Troubleshooting Guide
In the unlikely event you do encounter issues, the troubleshooting guide will help you
troubleshoot and identify possible areas of concern regarding the Intel Server Board
SE7501CW2. It will also assist you in collecting the data needed to help you work through
any concerns or issues that may arise The troubleshooting guide includes suggestions that
may help you and a list of information that we will need to assist you should you need to
call. The troubleshooting guide is available at:
If you are unable to resolve a problem using this guide, please follow these steps:
This Web site contains the latest information on known issues and their respective
solutions. If you are still unable to resolve the issue, go to the next step.
2. Send e-mail, including as much information on the issue as possible, to Intel customer
support, using the form available at this URL:
3. Channel customers can contact Intel customer support toll free at 1-866-655-6565.
Non-channel customers should use one of the numbers listed at
Minimum Hardware Requirements
Your system must meet the following minimum requirements to avoid integration difficulties
and possible board damage:
•
Processor: Minimum of one Intel Xeon processor 1.8 GHz with 512K cache support in
a 603-pin (400-MHz FSB) or 604-pin (533-MHz FSB) INT flip-chip micro pin-grid array
(INT-mPGA). For a list of tested processors, visit
•
•
Memory: Minimum of one 128-MB ECC DDR 266-compliant registered SDRAM 168-pin
gold DIMM. For a list of tested memory, visit
Power: Minimum of 450 W with 1.2A standby current which meets the SSI EPS 12V
specification. Intel provides a power budgeting tool to help you determine the power
needs of your server at
Additional resources and support for your server board, including tested chassis, qualified
chassis components, specifications, and software updates, can be found at
6
Download from Www.Somanuals.com. All Manuals Search And Download.
Intel Server Board SE7501CW2 Installation and Integration Guide
Hardware Integration
The following installation procedures enable you to prepare a
chassis for integration, add the needed components to your
server board, and install the server board. The procedures are
condensed from the more comprehensive and detailed Product
Guides for the Intel Server Board SE7501CW2 and Intel Server
Chassis SC5200. To access the most current and complete
Product Guides and for more information, visit Intel Support at:
Prepare for Assembly
1. Gather tools needed:
•
•
•
•
Needle nose pliers
Flat blade screwdriver
Phillips head screwdriver
Antistatic wrist strap
2. Prepare a clean, static-controlled, level workstation.
3. Collect and organize all necessary hardware including the server board, memory,
processor(s), and peripherals (hard drives, floppy disk drive, CD/DVD).
4. Verify that the components chosen for installation are listed as validated for use with the
Intel Server Board SE7501CW2. This information is available from the Intel Support Web
7
Download from Www.Somanuals.com. All Manuals Search And Download.
Intel Server Board SE7501CW2 Installation and Integration Guide
Important Safety Information
Safety Instructions and Information
To avoid personal injury or property damage, the following safety instructions apply
whenever working inside the chassis:
1. Turn off all peripheral devices connected to this product.
2. Turn off the system by pressing the power button on the front of the product.
3. Disconnect the AC power by unplugging all AC power cords from the system or wall
outlet.
4. Disconnect all cables and telecommunication lines that are connected to the system.
5. Retain all screws or other fasteners when removing access cover(s). When finished,
refasten the access cover with original screws or fasteners.
6. Do not access the inside of the power supply. There are no serviceable parts in the
power supply. If the power supply is malfunctioning, return it to the manufacturer for
servicing.
Electrostatic Discharge (ESD)
CAUTION
Perform the procedures in this product guide only at an electrostatic discharge (ESD)
workstation, because the server components are extremely sensitive to ESD. If no such
workstation is available, you can reduce the risk of electrostatic discharge damage by doing
the following:
•
•
•
Wear an antistatic wrist strap, and attach it to a metal part of the server.
Touch the metal on the server chassis before touching the server components.
Keep part of your body in contact with the metal server chassis to dissipate the static
charge while handling the components.
•
•
•
Avoid moving around unnecessarily.
Hold the server components (especially boards) only by the edges.
Place the server components on a grounded, static-free surface. Use a conductive foam
pad if available. Do not use the product packaging or wrapper as an antistatic surface.
Do not slide the components over any surface.
•
8
Download from Www.Somanuals.com. All Manuals Search And Download.
Intel Server Board SE7501CW2 Installation and Integration Guide
Chassis Preparation and Server Board Installation
About the I/O Shield
An ATX 2.03-compliant I/O shield is provided with your server board. The shield is required
by Electromagnetic Interference (EMI) regulations. It minimizes EMI and helps obtain proper
cooling of the server.
The shield fits the rectangular opening near the power supply in the back of the chassis. The
shield has cutouts that match the external I/O connectors of the server board (such as the
keyboard and mouse connectors).
Attaching the Gasket to the I/O Shield
1. Remove the two backing strips from the gasket.
2. Press the gasket onto the inside face of the I/O shield as
shown.
Attaching the Label to the I/O Shield
1. Remove the backing from the label included with your server
board.
2. Press the label onto the outside face of the I/O shield (A).
Installing the I/O Shield
Install the I/O shield from inside the chassis, with the label facing outward.
1. Insert one edge, and rotate the I/O shield into the chassis cutout.
2. Press firmly until the I/O shield clicks into place.
9
Download from Www.Somanuals.com. All Manuals Search And Download.
Intel Server Board SE7501CW2 Installation and Integration Guide
Installing Chassis Standoffs
If your chassis does not have standoffs placed as shown,
you must rearrange them so they match the holes in the
server board. Failure to properly rearrange the metal
standoffs may cause the server board to malfunction and
permanently damage it. Your chassis may be different from
the illustration, but you must still arrange the standoffs
properly.
When using an Intel Server Chassis SC5200, positions 1, 4,
6, 20, 23, and 26 come preinstalled. You must install
standoffs in positions 7, 18, and 19. Install standoffs in the
eight positions marked P regardless of whether one or
two processors will be installed. Standoffs are included
with this chassis.
Installing the Rubber Bumper
Attach the rubber bumper to the chassis. The
bumper should cover the indicated chassis standoff
hole. On an Intel Server Chassis SC5200, the
standoff is marked ‘S’. On other chassis, place the
bumper approximately 3 inches (7.6 cm) below
and to the left of the standoffs marked P as shown.
Installing the Server Board
1. Place the board into the chassis,
making sure that the back panel’s
I/O shield and chassis standoffs align
correctly.
2. Attach the board with the included
screws at the ten locations shown.
Note:
If you are installing only one processor, you must also insert screws
into the four standoff locations around the CPU2 socket.
10
Download from Www.Somanuals.com. All Manuals Search And Download.
Intel Server Board SE7501CW2 Installation and Integration Guide
Installing Memory
The server board supports only DDR266-
compliant DIMMs. The minimum supported
memory configuration is 128 MB, using one
128-MB DIMM. The maximum configurable
memory size is 8 GB using 4 2-GB DIMMs.
If a single DIMM is used, you must install it
in the DIMM 1A socket. Bank 1 must be fully
populated before you install any memory in
Bank 2, and Bank 2 only operates with two
DIMMs installed. DIMMs must be identical
within each bank.
Note:
Use memory that has been tested for compatibility with the server
board. For a list of tested memory, see:
If the server board is not already installed in the chassis,
remove the server board from its packaging and place it
on a clean ESD-protected work surface.
1. Open both DIMM socket levers.
2. Insert DIMM, making sure the connector edge of the
DIMM aligns correctly with the slot.
3. Check that the socket levers are securely latched.
DIMMs must be populated in identical pairs.
11
Download from Www.Somanuals.com. All Manuals Search And Download.
Intel Server Board SE7501CW2 Installation and Integration Guide
Installing the Boxed Intel Xeon Processor
Choosing the Processor Socket
Use these instructions for installing your processor instead of the instructions that came
with your boxed processor.
•
If only ONE processor is to be used, it must be installed in the processor socket labeled
CPU1, located closest to the corner of the server board. No processor terminator is
required on a single processor system. Do not install a terminator in the Intel Server
Board SE7501CW2.
•
•
If installing a SECOND processor, verify that the processor is identical in voltage,
speed, and stepping to the first processor. Do not mix processors of different types,
frequencies, or steppings.
To avoid touching the pins, hold the processor only by the edges when unpacking it.
Opening the Socket Lever
Open the lever all the way as shown. This server board has ZIF
sockets. If the processor does not drop easily into the socket
holes, make sure the lever is in the full-open position and the
processor is oriented properly. Applying pressure will damage the
processor pins.
Attaching the Processor
1. Align the alignment triangle mark on the
processor with the alignment triangle
cutout on the socket.
2. Insert the processor in the socket.
3. Close and latch the socket lever as
shown.
12
Download from Www.Somanuals.com. All Manuals Search And Download.
Intel Server Board SE7501CW2 Installation and Integration Guide
Installing the Retention Mechanism
1. Insert the retention brackets.
2. Tighten the four retention screws.
Applying Thermal Grease
Apply thermal grease to the processor as shown.
Attaching the Heat Sink and Retention
Clips
1. Place the heat sink onto the processor as shown. Heat sink
styles may differ.
2. Verify that the tab on the inside of the retention clip
engages the slot on the heat sink during installation.
3. The center slot in the clip provides room for side-to-side
motion while you engage the retention clip slots on each
side.
2. Slide the clip in the direction shown. Note
the location of the center plastic tab.
1. Position both clips as shown. Make sure
the tab (2) above engages in the slot on the
heat sink base.
4. Snap the other end in place as shown.
3. Press downward on the end of the
retention clip to engage the side plastic tab.
Note:
Install both retention clips simultaneously for the easiest installation.
13
Download from Www.Somanuals.com. All Manuals Search And Download.
Intel Server Board SE7501CW2 Installation and Integration Guide
Installing the Processor Wind Tunnel
The following instructions apply to the base Intel Server Chassis SC5200 and reference
chassis installations. Direct the airflow from the processor wind tunnel toward the rear of
the chassis as shown.
Attaching the Heat Sink Fan
Install the processor wind tunnel center section over the
heat sink. The plastic tabs on the wind tunnel center
section must engage the tabs on the retention
mechanism. Make sure the fan’s sticker is facing away
from the assembly, so that the airflow is into the
assembly.
Attaching the Fan/Intake Assembly
1. Position the fan/intake assembly at approximately 45°,
and engage the clip at the top of the tunnel as shown.
2. Gently squeeze the two tabs on the assembly, and
insert them into the two mating slots on the wind
tunnel.
3. Rotate the fan/intake downward to engage the mating
clips on the wind tunnel.
14
Download from Www.Somanuals.com. All Manuals Search And Download.
Intel Server Board SE7501CW2 Installation and Integration Guide
Attaching the Wind Tunnel
1. Spread the tabs outward slightly (1a). Lower the wind
tunnel assembly onto the retention mechanism (1b).
2. The tabs on the fan assembly (2a) slide into slots (2b) on
the inner side of the retention mechanism.
3. The tabs on fan assembly (3a) connect to the outside
surface of the retention mechanism (3b).
4. Attach the fan power cable to the corresponding server
board CPU fan connector.
Correct assembly should look like this:
When installing only one processor, there is no need to install the wind tunnel assembly
over the second processor location. Use the wind tunnel assembly over a CPU socket only
when a CPU is installed.
Install the rest of the internal peripherals of your server now, including any floppy, CD, and
hard disk drives. See “Making Required Connections to the Server Board” below for the
server board connection points.
15
Download from Www.Somanuals.com. All Manuals Search And Download.
Intel Server Board SE7501CW2 Installation and Integration Guide
Making Required Connections to the Server Board
Make these connections regardless of the chassis used. Refer to your chassis documentation
for additional connection requirements. For the Intel Server Chassis SC5200 Base or
Redundant Power Version, connect the front system fans to the system fan 3 and 4
connectors on the server board.
Note:
If the fans are not configured properly, then they will run at a faster
rate to compensate for what the system interprets as a missing fan.
A Main Power Connector
G Secondary IDE Connector (upper, white connector)
and Primary IDE Connector (lower, black connector)
B Auxiliary Power Connector
C +12V CPU Power Connector
H System Fan 5
I Floppy Disk Drive Connector
J Chassis Intrusion Header
D CPU1 Fan (upper connector) and
CPU2 Fan (lower connector)
E System Fan 1 (upper connector) and
System Fan 2 (lower connector)
K System Fan 3 (upper connector) and
System Fan 4 (lower connector)
F Front Panel Connector
16
Download from Www.Somanuals.com. All Manuals Search And Download.
Intel Server Board SE7501CW2 Installation and Integration Guide
Making Optional Connections to the Server Board
These connections are required only when the corresponding component is installed.
A
B
Hot Swap Back Plane (HSBP)
System Fan 5
C
Front Universal Serial Bus
Serial B
D
17
Download from Www.Somanuals.com. All Manuals Search And Download.
Intel Server Board SE7501CW2 Installation and Integration Guide
Installing the Serial B Cable
For the Intel Server Chassis SC5200, you can connect the
Serial Port B cable to either the back of the chassis or, on a
rack-mount system, to the front of the chassis.
1. Use a screwdriver to remove the connector knock-out.
2. Install the Serial B cable by inserting it into the chassis
back panel cutout and attaching the two hex screws as
shown.
3. Attach the other end of the cable to the Serial B connector
on the server board. See “Making Optional Connections to
the Server Board” on page 17.
18
Download from Www.Somanuals.com. All Manuals Search And Download.
Intel Server Board SE7501CW2 Installation and Integration Guide
Cable Routing – Intel Server Chassis SC5200
To ensure proper airflow within the chassis, follow the cable routing guidelines below.
IDE or SCSI Cables
Cables that connect to devices in the lower
device bays should be routed around the EPAC
system fan carrier as shown.
1. Route cables as shown.
2. Replace the top half of the EPAC.
Floppy and Front Panel Cables
Route the floppy drive and front panel cables as
shown.
Installing the Access Cover
1. Place the cover so the tabs go into the slots on the
server. The cover should be flush against the chassis.
2. Slide the cover forward until it stops.
3. Tighten the two captive screws into the rear of the
chassis.
19
Download from Www.Somanuals.com. All Manuals Search And Download.
Intel Server Board SE7501CW2 Installation and Integration Guide
Installing the Chassis Feet (Pedestal Mode)
1. If you are installing this server into a rack system, skip
these steps and go to “Installing into a Rack (Rack
2. Move the chassis to the edge of your workbench.
3. Use four screws to attach each foot to the chassis. The
holes in the feet line up with only one set of holes in
the chassis. On the front foot, the middle hole should
face toward the front of the chassis. Hole locations for
the front foot are marked “F” and “1, 2”. On the back
foot, the middle hole should face toward the back of
the chassis. Location holes for the rear foot are
marked “F”.
Installing into a Rack (Rack Mode)
The Intel Server Chassis SC5200 is designed to be
compatible with the EIA-310-d rack standard. Be sure to
select a rack cabinet enclosure that is EIA-310-d
compliant. For additional compatibility and rack cabinet
selection information, see:
assis/sc5200
1. Fully extend the rails.
2. Remove the smallest and innermost rail.
3. Position the rail.
4. Insert and tighten four screws.
5. Install the rest of the rail in your rack.
Note:
Your rack may vary from the illustration. Refer to your
rack documentation for information specific to your rack.
Hold the chassis so the rails on the chassis engage the rails in
your rack. You will need someone to help you at this point.
Disengage the locking tab on each rail and slide the server into
the rack.
20
Download from Www.Somanuals.com. All Manuals Search And Download.
Intel Server Board SE7501CW2 Installation and Integration Guide
Finishing Up
WARNING
Install the chassis access cover before finishing up (see ”Installing the Access
not replaced before connecting the chassis AC power.
1. Connect your keyboard, mouse, video, and other I/O cables as shown.
2. Connect the power cable to the back panel and to an AC outlet as shown.
Intel Server Chassis SC5200
Base version
Intel Server Chassis SC5200 Base
Redundant Power Version
Note:
The Intel Server Chassis SC5200 Base Redundant Power version ships
with one power supply. To enable redundant power, a second power
supply must be ordered and installed. To order a second power supply,
21
Download from Www.Somanuals.com. All Manuals Search And Download.
Intel Server Board SE7501CW2 Installation and Integration Guide
Software Installation
Updating the BIOS
Intel highly recommends that you go to the Intel Server Board SE7501CW2 support Web
site and download and install the latest system BIOS update for your operating system. The
Intel Server Board SE7501CW2 support Web site is:
the latest BIOS at the Software and Drivers link.
The BIOS update simplifies the BIOS update process by providing all of the necessary files
in one download designed to fit on one floppy disk. This package is most efficient when used
in conjunction with the System Resource CD that ships with the Intel Server Board
SE7501CW2. See the readme file and release notes for complete installation instructions.
Installing the Operating System
Consult your chosen operating system’s documentation for information on setting up the
operating system for your server. That documentation takes up where this guide leaves off,
and steps you through setting up your server’s operating system. Be sure to install the
System Update Package first, then format the boot drive with an appropriate Intel Server
Management drive partition, and then install the OS. When you are finished installing the
server OS, install Intel Server Management and the Intel Server Maintenance and Reference
Training Tool CD (Intel SMaRT Tool).
For a list of validated operation systems, see:
22
Download from Www.Somanuals.com. All Manuals Search And Download.
Intel Server Board SE7501CW2 Installation and Integration Guide
LANDesk* Client Manager
LANDesk* Client Manager makes it easier to manage a computer and troubleshoot common
computer problems.
Use Client Manager to:
•
•
•
•
View system inventory
Monitor a computer's health
Receive alerts for system events
Remotely power off, power on, and reboot client computers
Installing LANDesk Client Manager
Client Manager has two different management consoles that you can install: a client (single,
end-user) console and an administrator (multi-node manager) console.
•
•
Client: The client version enables an end user to view information and manage
alerts for a local computer. This version doesn't permit a user to select and view
remote computers, or power on/off other computers.
Administrator: The administrator version enables you to manage remote client
computers on the network. This means you can view information, generate reports,
receive alerts, and power on/off other computers remotely. To remotely reboot,
power off, or power on client computers, the administrator version must be installed
on at least one computer that is attached to the network. The administrator console
is not designed to be a mobile management console. The best way to manage client
computers from multiple locations is to connect to your administrator console via
Internet Explorer* 5.5 from various computers on your network.
Installation instructions and further information on LANDesk Client Manager are available in
the documentation included on the Server Board SE7501CW2 Resource CD.
LANDesk System Requirements
To run Client Manager on your network, the administrator and client computers must
comply with these system requirements.
Administrator computers
•
•
Windows* 2000 or Windows XP for the administrator console
64 MB of RAM for Windows 2000, 128 MB of RAM for Windows XP
Client computers
•
Windows 98 Second Edition, Windows Me, Windows NT* 4.x (Service Pack 6a or
later), Windows 2000, or Windows XP for the client console
•
24 MB of RAM for Windows 98 Second Edition, 32 MB of RAM for Windows Me or
Windows NT, 64 MB of RAM for Windows 2000, 128 MB of RAM for Windows XP
23
Download from Www.Somanuals.com. All Manuals Search And Download.
Intel Server Board SE7501CW2 Installation and Integration Guide
Intel Server Maintenance and Reference Training Tool CD
(Intel SMaRT Tool)
The Intel Server Maintenance and Reference Training Tool CD (Intel SMaRT Tool) is an
interactive software tool providing support information to assist with the maintenance and
repair of Intel processor-based server systems and accessories. The Intel SMaRT Tool
features visual, step-by-step instructions for replacing parts; a complete Field Replacement
Unit (FRU) database containing part numbers and images; product spares lists; and
worldwide Intel support information.
You can install the software on a server or on a workstation used to manage the server. The
information here describes installation on a system running a Microsoft Windows operating
system, which is the only operation system that is compatible with the Intel SMaRT Tool.
Installing the Intel SMaRT Tool
Follow the instructions below to install the Intel SMaRT Tool on your system.
1. Insert the Intel® Server Board SE7501CW2 Resource CD into the system’s CD-ROM
drive.
2. Click Intel SMaRT Tool in the menu on the left side of the screen.
3. In the green Make a Selection drop-down menu, select SMaRT Tool Install Guide.
Print the Guide, and keep it on hand for reference.
4. Review the Intel SMaRT Tool Install Guide prior to proceeding.
5. In the Make a Selection drop-down menu, select Install SMaRT Tool.
6. Click the Run Installer icon to launch the Intel SMaRT Tool Setup program.
7. Follow the on-screen installation instructions. Review the Intel Software License
Agreement, and click Accept. When installation is complete, launch Intel SMaRT Tool.
8. On the Welcome page, click Systems.
9. Select System > Servers > Xeon > SE7501CW2 SC5200, and then follow the on-
screen instructions to download the SE7501CW2 SC5200 server system module. You
must have Internet access to download the server system module. When the download
is complete, Intel SMaRT Tool will restart.
10.Select System > Servers > Xeon > SE7501CW2 SC5200 to access information on
your new server system.
24
Download from Www.Somanuals.com. All Manuals Search And Download.
Intel Server Board SE7501CW2 Installation and Integration Guide
Thank you for purchasing Intel products!
25
Download from Www.Somanuals.com. All Manuals Search And Download.
|