Installation Preparation
REQUIRED ACCESSORIES
• Order the required accessory at the same time as the
vent hood and have on site before installation.
• Each kit includes decorative duct covers, a support
frame, air deflector and charcoal filters.
This book provides step by step instructions to install
the Monogram ZV850 ceiling mounted hood for
recirculating operation.
• One of the following accessory kits is required for non-
vented ceiling mounted installations of model ZV850.
Choose the correct kit according to ceiling heights:
ZXR858 – For 8 ft. ceiling height.
ZXR859 – For 9 ft. ceiling height
ZXR8510 – For 10 ft. ceiling height.
PRODUCT DIMENSIONS
The vent hood must be installed 24″ min. and 30″ max.
above the cooking surface. 25-1/2″ is recommended for
best performance and to ensure that the duct cover
meets the ceiling. The cooking surface should be at least
36″ above the floor. Installation will be easier if the vent
hood is installed before the cooktop and countertop is
installed.
*Height
to Ceiling
8-1/4"
35-3/8"
27-1/2"
* 26-1/4” for 8 ft. Ceiling
Using ZXR858 Accessory
38-1/8” for 9 ft. Ceiling
Using ZXR859 Accessory
50-1/8” for 10 ft. Ceiling
Using ZXR8510 Accessory
*25-1/2" Recommended
* The distance between the cooking surface and the bottom of the
hood must be at least 24” and up to 30”. The 25-1/2” recommended
installation height, above the standard 36” countertop, will ensure
duct cover fit to the ceiling.
36" Reference
3
Download from Www.Somanuals.com. All Manuals Search And Download.
Installation Preparation
USING DUCT COVER ACCESSORIES
POWER SUPPLY
A duct cover accessory is required for all ceiling
heights. Use this chart to determine the correct Duct
Cover Accessory for 8-ft. to 10-ft. ceilings that must be
ordered with the hood.
IMPORTANT
- (Please read carefully)
WARNING:
FOR PERSONAL SAFETY, THIS APPLIANCE MUST
BE PROPERLY GROUNDED.
ZV850SB Installation Heights
Actual
Remove house fuse or open circuit breaker before
beginning installation.
*Possible Hood
Installation Height
Ceiling
Height
Recirculating
Accessory
24-1/2″
Do not use an extension cord or adapter plug with
this appliance. Follow National electrical codes or
prevailing local codes and ordinances.
7′ 11″
Electrical supply
25-1/2″
8′ 0″
This vent hood must be supplied with 120V, 60Hz,
and connected to an individual, properly grounded
branch circuit, and protected by a 15 or 20 amp
circuit breaker or time delay fuse.
• Wiring must be 2 wire with ground.
• If the electrical supply does not meet the above
requirements, call a licensed electrician before
proceeding.
• Route house wiring in the ceiling, as close to the
installation location as possible. Allow an addi-
tional 3 feet length from ceiling joists to reach the
junction box on the hood.
25-1/2″ to 26-1/2″
25-1/2″ to 27-1/2″
25-1/2″ to 28-1/2″
25-1/2″ to 29-1/2″
30″ max.
8′ 1″
8′ 2″
8′ 3″
8′ 4″
8′ 5″
8′ 6″
8′ 7″
8′ 8″
8′ 9″
8′ 10″
8′ 11″
9′ 0″
9′ 1″
9′ 2″
9′ 3″
9′ 4″
9′ 5″
9′ 6″
9′ 7″
9′ 8″
9′ 9″
9′ 10″
9′ 11″
10′ 0″
30″ max.
30″ max.
30″ max.
30″ max.
30″ max.
30″ max.
30″ max.
• Connect the wiring to the house wiring in accor-
dance with local codes.
Grounding instructions
The grounding conductor must be connected to a
ground metal, permanent wiring system, or an
equipment-grounding terminal or lead on the hood.
30″ max.
30″ max.
30″ max.
30″ max.
30″ max.
30″ max.
30″ max.
30″ max.
30″ max.
30″ max.
30″ max.
30″ max.
WARNING:
The improper connection of
the equipment-grounding conductor can result in a
risk of electric shock. Check with a qualified electri-
cian or service representative if you are in doubt
whether the appliance is properly grounded.
TOOLS AND MATERIALS
REQUIRED (NOT SUPPLIED)
• Tape measure
• Knife
• Spirit level
• 10 mm Hex wrench/socket
• Safety glasses
• Duct tape
*Based on 36″ countertop height.
• Wire cutter/stripper
• Wire nuts
• Electric drill and 5/32” bit
• Phillips and flat-blade
screwdrivers
• Hammer
• Pliers
• Plumb
9-7/16"
ZV850SB Duct Cover Dimensions
• Gloves to protect against sharp
edges
• 120V 60Hz. 15 or 20 Amp, 2 wire
with ground. Properly grounded
branch circuit.
• Strain relief for junction cover
• 6” round duct, length to suit
installation
Recirculating
Installation
B
A
B
15″
22-1/2″
27-15/16″
14-3/16″
21-7/8″
26″
ZXR858C
A
ZXR859C
ZXR8510C
• Center punch
15-3/4"
4
Download from Www.Somanuals.com. All Manuals Search And Download.
Installation Preparation
Check contents of the required accessory,
ZXR858, ZXR859 or ZXR8510.
REMOVE THE PACKAGING
The vent hood is packed separate from the required
accessory: ZXR858, ZXR859 or ZXR8510.
• Remove the frame, cover, parts box, side bars and
packaging.
Mounting Screw Holes
• Remove junction box cover.
• Install strain relief onto junction box cover.
Check Installation Hardw are
Locate the hardware accessory box packed with the
hood and check contents.
Support Frames
With 8 Screws
And 8 Washers
Decorative Duct Covers
4 Flat Washers
2 Phillips Head
Decorative Screws
8 Frame Attachment
Screws with Washers
(attached to
accessory
support frames)
4 Hex head
wood lag screws
(6mm x 2-1/2”
or
3 Charcoal Filters
1/4 x 2-1/2")
Front of Hood
PLAN THE LOCATION
Determine the exact location of the vent hood.
• Use a plumb to check location to be sure countertop/
cooktop location below the hood will align exactly.
Template
4 (10mm) Nuts
and Lock Washers
• The hood should project forward 1-1/2 beyond the front
″
edge of the cooking appliance. See illustration.
• Observe the recommended space between the cooking
surface and bottom of hood.
Check service manual
envelope taped to the front
on the hood to be sure it
contains one stop screw.
Leave this screw in the
envelope.
Ceiling
Hood
Ducting
Centerline
Hood
3 Stainless Steel
Grease Filters
Front
13-3/4"
27-1/2"
Approx. 1-1/2"
Beyond Cooking
Surface
Cooktop
2 side bars with 4 Machine screws
Countertop
Side View
5
Download from Www.Somanuals.com. All Manuals Search And Download.
Installation Preparation
• The cross framing must be level in all directions.
Check with a spirit level and adjust if necessary.
INSTALL CEILING
SUPPORT STRUCTURE
• At the hood location, install 2 x 4 cross framing
between ceiling joists as shown.
Cross Framing
• The 2 x 4 cross framing can be installed standing or
flat. See illustration.
Top View of Support Framing
8-3/4"
Cross
Framing
8-3/4"
Ceiling
Joist
7-5/8"
Support
Frame
Opening
16"
Joist
*7-5/8"
Upper Half
Of Support
Frame
Front
of
Hood
Typical Support Frame Mounting
Height
Adjustment
Slot
– The framing should be spaced 8-5/8” on the sides and 7-5/8”
at the front from centerline to centerline to accept mounting
screws in the vent support frame.
IMPORTANT: The ceiling structure must be capable of supporting
the weight of the hood (approximately 100 pounds) and any
inadvertent user contact loads. It is recommended that the hood
support frame be supported by a minimum of 2 x 4 cross framing.
Cross
Framing
Ceiling
Finish the Ceiling
Once the ceiling is finished, mark the location of the
ceiling joist and cross framing.
• Check to be sure that ceiling is level, use shims if
necessary.
8-3/4"
Front of
Hood
1
MOUNT TEMPLATE
• Align the template with the marks on the ceiling
Side
View
and tape in place.
Support
Frame
– Be sure the template is oriented correctly, with the
front of the hood.
• Use a plumb to be sure the mounting holes will
provide parallel alignment with the countertop
below.
Note: The cross framing must be spaced 8-3/4" on the side from
centerline to centerline in order to accept the hood mounting
screws.
• Center punch all hole
locations.
• Drill pilot holes in the 4 screw
locations. Use a 5/32″ bit and
drill approximately 1-1/2″
deep.
• Cut wire access hole
approximately 1″ dia.
• Arrange cross framing in the ceiling to suit the
existing structure. See examples.
– Secure each 2 x 4 block with at least four (4), #10
wood screws, 3″ long (minimum size screws, not
supplied). Use 8 wood screws total for the two
supports.
Front of Hood
• The cross framing must be accurately aligned to
assure correct positioning of the hood.
Wire Access Hole
6
Download from Www.Somanuals.com. All Manuals Search And Download.
Installation Instructions
2
3
INSTALL UPPER SUPPORT FRAME
INSTALL LOWER SUPPORT FRAME
• Install the plastic upper duct connector to the
upper support frame by inserting from the bottom
and snapping into the opening of the air deflector
(already installed).
• Secure the upper support frame to the ceiling joists
and/or cross framing with the 4 screws provided.
For maximum rigidity and strength, the screws must
be driven into the center of the joists and/or cross
framing.
• Insert lower support frame (from required accessory
ZXR858, ZXR859 or ZXR8510) into the upper
support frame and loosely secure with 8 screws and
washers (4 on the front and 4 on the back sides).
• Adjust the lower support frame up or down to the
desired height above the countertop. Tighten screws.
• Check to be sure the support frame is level,
vertically and horizontally.
Hood
Mounting
Flange
Lower Support
13-5/8
*39-1/8"
Air
Deflector
25-1/2" Recommended
**75-1/8"
to Floor
Upper
Plastic Upper
Front
Support
Duct Connector
Of
Frame
Hood
Countertop
Support
Frame
Opening
Check Level in
Both Direction
Lower
Support
Frame
*Note: 39-1/8” to top of hood flange can be increased up to
42” max.
**75-1/8” min to floor, 77-7/8” max.
Important: Again, check to be sure the support is
level in both directions. There is no way to level the
hood after the hood is secured to the frame.
7
Download from Www.Somanuals.com. All Manuals Search And Download.
Installation Instructions
4
5
SECURE WIRING
SIZE AND INSTALL DUCTWORK
• Route house wiring through the ceiling hole and
pull a length to reach the hood junction box,
approximately 6″ below the support.
• Measure from top duct connector (Dim. A) to
bottom of support frame.
– Add at least 1″ for duct overlap at the top.
– Subtract 1-3/4″ for hood insertion into the bottom
of the frame.
Ceiling
• Cut the 6″ dia. duct to the required length.
Front Side
Ceiling
Support
Frames
Duct Connector
Tape
Side
View
Support
Required
Frame
Duct
Length
Dim. A
Duct
House
Wiring
Duct Connection
To Hood
1-3/4"
• Tape the wire to the front of the frame support to
prevent damage during installation and service.
Bottom Support
Frame Flange
Note: The top and bottom of the duct are external
(female) connections. The bottom end should be
flared slightly, to facilitate installation of the hood.
• Install duct up through support frames onto the top
duct connector. Push duct up until it is 1-3/4″ from
the bottom of support frame flange. See illustration.
8
Download from Www.Somanuals.com. All Manuals Search And Download.
Installation Instructions
6
INSTALL DECORATIVE DUCT COVERS
Top Duct
Cover
Install Screw on
Each Side
Pretap
2 Screw
Holes
Bottom Duct Cover
Top Duct
Cover
Bottom Duct
Cover
Top Duct
Cover
Stop Screw
Install Stop
Screw in One
of 3 Holes
• Pretap or drive decorative screw into the screw holes
on the support frame. This will make screw installation
easier.
• Separate the two decorative duct covers.
• Select the inside (top) cover, which has vent hole
pattern at the top.
• Slide the lower decorative duct over the installed upper
duct and push up, past the stop screw location.
• Install the supplied temporary stop screw in one of 3
holes in the support frame or the top duct cover to
prevent the bottom decorative duct cover from sliding
down.
• Slide the decorative duct cover over the support frame
and push to the ceiling.
• Attach to the hood support at the top with 2 supplied
decorative screws.
• Locate the stop screw in the envelope taped to the
front of the hood. Set aside.
CAUTION:
The stop screw must be installed.
Failure to do so could result in personal injury or damage
to the duct cover.
9
Download from Www.Somanuals.com. All Manuals Search And Download.
Installation Instructions
7 INSTALL HOOD
Bottom
Duct
Cover
Align Duct
Connector to
House Duct
Align
Mounting
Stop Screw
Studs
Install
4 lock
washer
and 4 Nuts
• Check hood level in both directions.
• Check to be sure that the duct is positioned over the
hood connector.
Note: TWO PEOPLE ARE REQUIRED TO COMPLETE
THIS INSTALLATION!
• Seal the duct connection with duct tape.
Note: Do not drive screws through this duct connection.
Doing so will prevent proper damper operation.
• Lift the hood up to the support frame. Carefully align
the hood mounting studs into the support frame holes,
and at the same time, guide the hood duct connector
into the duct.
• Install 4 nuts and lock washers. Tighten with a 10mm
wrench.
8 CONNECT ELECTRICAL
Verify that power is turned off at the source.
WARNING:
If house wiring is not 2-wire
with a ground wire, a ground must be provided by
the installer. When house wiring is aluminum, be
sure to use UL approved anti-oxidant compound and
aluminum-to-copper connectors.
• Install strain relief onto the knockout of the
junction box cover.
• Insert house wiring through strain relief and
tighten.
• Connect white leads to branch circuit white lead.
• Connect black leads to branch circuit black lead.
• Connect green/yellow leads to branch circuit green
or bare ground lead.
• Secure all connections with wire nuts on each
electrical connector.
• Push wires into junction box and replace cover. Be
sure wires are not pinched.
10
Download from Www.Somanuals.com. All Manuals Search And Download.
Installation Instructions
Install Charcoal Filters
9 SLIDE DUCT COVER DOWN,
INSTALL SIDE UTILITY BARS
Upper Charcoal
Filter Slots
Grasp Tab,
Lift and Pull Forward
• Remove protective film on charcoal filters.
• Tip charcoal filters into the upper (top) slots at the
rear of the opening. Grasp the filter tab, lift and
pull forward until it rests in the front slots.
• Install all 3 charcoal filters.
• Hold the decorative duct cover and remove the
temporary stop screw from the support frame.
Return the screw to the service manual envelope
for future use.
• Slide the lower duct cover down onto the hood.
Install Grease Filters
Lower
Filter Slots
• Remove protective film from grease filters.
• Tip the grease filter into the lower slots at the rear
of the opening. Lift the filter and pull the knob
forward until the filter rests on the slots.
• Install all 3 grease filters.
• Install the side utility bars with screws as shown.
• To remove the filters, grasp the knob, push the
filter towards the rear and tilt downwards. Grasp
tabs on charcoal filters, push towards the rear and
tilt downwards.
10 INSTALL FILTERS
Upper Charcoal
Filter Slots
Lower Grease
Filter Slots
11 FINALIZE INSTALLATION
• Remove the protective film covering the control
panel on the front face of the hood, and any other
packaging materials.
• Refer to the Owner’s Manual for operating
instructions.
• There are two slots inside the back and front of the
hood. These slots will hold the charcoal filters and
stainless steel grease filters in place.
11
Download from Www.Somanuals.com. All Manuals Search And Download.
Note: While performing installations described in this book,
safety glasses or goggles should be worn.
TM
For Monogram local service in your area, call
1.800.444.1845.
Note: Product improvement is a continuing endeavor at
General Electric. Therefore, materials, appearance and
specifications are subject to change without notice.
Pub. No. 49-80045-2
04/07 JR
GE Consumer & Industrial
GE Appliances
General Electric Company
Louisville, KY 40225
Printed in Italy
monogram.com
©2007 GE Company
Download from Www.Somanuals.com. All Manuals Search And Download.
|