Christie Digital Systems Projector 104 006101 XX User Manual |
Stacking Frame Installation Instructions
Introduction
Use the following instructions when installing stacking frames onto the models listed in
Table 1. Only use the stacking frame provided by Christie (104-117101-01) to hoist or
stack a maximum of three projectors. The stacking frame can also be connected to the
integral rigging points on any Roadster/Mirage S+ and Roadster HD12k projectors. For
information on the rigging hardware of these models, refer to section 2.2 Installation
Considerations in the Roadster S+/HD & Mirage S+ User’s Manual.
Table 1. Projector Models
Projector Model
Christie DS+4K
Christie DS+5K/Kc
Christie DS+8K
DLV1920-DX
DLV1400-DX
Christie DW3K/Kc
Christie DW6K/Kc
Christie HD5K
Christie HD5Kc
Christie HD8K
Christie HD8Kc
Mirage S+2K
Mirage S+4K
Mirage S+8K
Mirage W3
Model Number
38-DSP104-xx
38-DSP104-xx/38-DSP104-5x
38-DSP106-xx/38-DSP106-5x
104-017101-xx
38-DS02-xx
38-DHD103-xx/38-DHD103-5x
38-DHD106-xx/38-DHD106-5x
104-006101-xx
104-007101-xx
104-0081-xx
104-018101-xx
3-DSP102-xx/38-DSP102-5x
38-DSP104-xx/38-DSP104-5x
38-DSP106-XX/38-DSP106-5X
104-012101-xx
Mirage W6
104-013101-xx
Mirage W8
104-014101-xx
Matrix 4000
38-DSP104--xx
Matrix W4
104-016101-xx
013-100342-01 (Rev.1) (08/06)
1 of 12 pages
Download from Www.Somanuals.com. All Manuals Search And Download.
Stacking Frame Installation Instructions
1. Stacking Frame Installation
WARNING
ALWAYS power down and unplug the projector prior to servicing.
Wait for the internal cooling fans to stop before unplugging the unit.
WARNING
To avoid possible injury, a minimum of two
people are required to complete this proced
1. Turn the projector OFF and disconnect the AC power cord after the cooling fans
have stopped. Allow the projector to cool for at least 45 minutes.
2. Place the projector into the stacking frame so the cut-outs in the bottom mounting
plate of the frame align with the fold mirror and adjustable feet access points on the
projector. Refer to Figure 2.
3. Use a 10mm socket wrench to tighten the six (6) M10 bolts suring the mounting
plate to the bottom of the projector. Rfer to Figure 2.
Figure 2. Projector Orientation for Stacking Frame Assembly
013-100342-01 (Rev.1) (08/06)
3 of 12 pages
Download from Www.Somanuals.com. All Manuals Search And Download.
Stacking Frame Installation Instructions
2. Stacking Multiple Projectors
Warnings
Christie stacking hardware is required to prevent the top projector from sliding
off the stack. Failure to incorporate this hardware may cause injury or death.
The frame is designed to support a maximum stacking acity of three
projectors. Always stack before hoisting.
The projectors can be stacked and hoisted in either an upright or inverted
position. Do not mix orientations in a stack (i.e. invted and upright).
Never attempt to physically carry a stack of projectors. Always follow the
Hoisting Procedure, outlined on page 6.
When hoisting a stack combining oadster/Mirage Sand Roadster HD12K
models with any of the models listed in Table 1, use the hardware provided with
the Roadster/Mirage S+ and Roadster HD12K models to hoist the stack.
1. Place the first projector in the stack on a secure table or cart.
For upright stack: Plathe projector to bpositioned on the bottom of the stack
on the table or cart. Ensure the adjustae feet are NOT retracted on the bottom
projector. When installing thsecond and third projector in the stack the feet must
be retracted. All projectors must be stacked in the same orientation.
For inverted stack: Place the projector to be positioned on the bottom of the stack
on the table or cart. Ensure tadjustable feet ARE retracted. Repeat this step when
insg a second and tird projector. All projectors must be stacked in the same
orietion.
2. Turn each stacking leg until at least 1” of thread is visible.
For upright position: Extend the legs of the projector on the top of the stack.
For inverted position: Extend the legs of the projector on the bottom of the stack.
This clearance accommodates the up-or-down movement for image alignment.
Repeat Step 2 when installing a third projector.
IMPORTANT: Ensure all stacking legs are extended equally by at least 1”.
013-100342-01 (Rev.1) (08/06)
4 of 13 pages
Download from Www.Somanuals.com. All Manuals Search And Download.
Stacking Frame Installation Instructions
3. Loosen the nuts on the rear stacking legs to provide lateral movement for easier
alignment with the stacking mounts on the other projector.
For upright position: Release the rear stacking legs on the top projector.
For inverted position: Release the rear stacking legs on the bottom projector.
4. Remove the safety pins from each stacking mount in order to fit the stacking legs
into the stacking mounts. Refer to Figure 3.
For upright position: Remove the pins from the mounts on the bottom projector.
For inverted position: Remove the pins from the mounts on the top projector.
5. With one person positioned on each side of the projector, lift thop projector onto
the bottom projector, aligning all three stacking points between projectors. The
legs should fit inside the stacking mounts.
6. Turn the adjusting wheel on each stacking mount until the hole in the top portion
of the mount lines up with the hole in the stacking g. To make alignment easier
insert a screwdriver into one of the holes and use it to align the two holes.
WARNING
Step 7 is a critical safety procedure that must bobserved.
Failure to engage thsafety lockcould ause the
projectors to separate, rsulting in possible iry or death.
7. Insert the safety pin through the holes in
the stacking mounts and stacking legs.
Ensure each pin is fully inserted to engage
the safety lock and secure the projectors.
Refer to Figure 3.
8. Before hoisting, firmly tighten the nuts on
the two rear stacking legs. If the
projectors are ready for image alignment
keep the nuts slightly oose until
alignt is complete.
9. When required, repeat Steps 1 to 8 for the
Figure 3. Stacking Mount Components
third projector.
013-100342-01 (Rev.1) (08/06)
5 of 12 pages
Download from Www.Somanuals.com. All Manuals Search And Download.
Stacking Frame Installation Instructions
Hoisting Procedure
Warnings
Remove the projector lens before hoisting.
The frame is designed to support a maximum stacking capacity of three
projectors. Always stack before hoisting.
All rigging must be in compliance with applicable local safety codes.
Only licensed riggers should perform the following procedures.
Use metric hardware only. Never force incompatible threads.
Never hoist a projector by its feet or any other component.
The projectors can be stacked and hoisted in either an ught or inverted
position. Do not mix orientations in a stack (i.e. inverted and pright).
Use this procedure to hoist one projector or a stack of projectors. To hoist a stack, first
mount two or three projectors according to the stacking procedure included in these
instructions. There are two hoisting techniques availabThese two options are used for
the various stacking combinations and for the hardware options available. These options
include, hoisting via the stacking frame handles or hoisting via the hardware on
Roadster/Mirage S+ and Roadser HD12K models.
Key Points:
•
When hoisting a stack combinng Roadster/Mirage S+ and Roadster HD12K
models with any of the models listed in Table 1, use the hardware provided with
the Roadster/Mirage S+ and oadster HD12K models to hoist the stack.
•
•
Whoisting via the stacking frame handles leave a 150mm space between the
rigging hardware.
Connect safety cables and rigging equipment to the designated locations on the
stacking frame.
•
•
Use the two eyebolts on the stacking frame as safety points.
Use hoisting and rigging equipment suitable to the application; such as clamps,
cables, eyebolts, or straps that accommodate the load rating. All integral, metric
hardware on the rigging hardware accepts an M12 thread only.
013-100342-01 (Rev.1) (08/06)
6 of 12 pages
Download from Www.Somanuals.com. All Manuals Search And Download.
Stacking Frame Installation Instructions
Hoisting via Stacking Frame Handles
WARNING
When hoisting via the stacking frame handles it is mandatory to use at least
four rigging points (two opposite sides). Straps must be placed on either side
of designated label on the stacking frame handles.
1. If the projector is inverted retract the adjustable feet to prevent the hoisting
hardware from becoming snagged.
WARNING
Always use at least two safety cables when hoisting
and attach them to the two eyebolts on he stacking frame.
2. Attach a safety cable to at least of the eyebolts
mounted on the bottom of the stacking frame.
3. Secure the rigging componentto the
appropriate rigging points. Refer to the
designated labels on the stacking frame handles
for rigging positions.
4. It is mandatory to use four rigging points. Ensure
the straps, clamps or cabling meet the adequate
load capacity for the otal projector(s) weight.
DO NOT join the rigging saps or cables to a
common
point
—
keep
separated.
Refer to Figure 4.
Figure 4. Four Rigging Points
013-100342-01 (Rev.1) (08/06)
7 of 12 pages
Download from Www.Somanuals.com. All Manuals Search And Download.
Stacking Frame Installation Instructions
Hoisting via Roadster/Mirage S+/Roadster HD12K Hardware
WARNING
When hoisting a stack combining Roadster/Mirage S+ and Roadster HD12K
models with any of the models listed in Table 1 use the hardware on the
Roadster/Mirage S+ and Roadster HD12K models to hoist the stack.
WARNING
The four top rigging points have a maximum loading capacity of 800 lbs. each.
When hoisting from the bottom of the projector use at least four of the eight
rigging points (two opposite sets). Use metric hardware oM12 thread).
Figure 5. Hoisting via Roadster/Mirage S+/Roadster HD12K Hardware
013-100342-01 (Rev.1) (08/06)
8 of 12 pages
Download from Www.Somanuals.com. All Manuals Search And Download.
Stacking Frame Installation Instructions
1. If the projector is inverted retract the adjustable feet to prevent the hoisting
hardware from becoming snagged.
WARNING
Always use at least two safety cables when hoisting.
When hoisting a non-inverted projector or stack, add two rigging eyebolts in the
front and rear threaded holes on the top of the projector. Ensure the eyebolts are
rated adequately for the load. Secure safety cabling to both eye.
2. Attach a safety cable to each of the two eyebolts
mounted on the bottom of the projector. Refer to
Figure 6.
3. Secure the rigging components to the appropriate
rigging points. Eight sliding points are provided on
the bottom of the projector. To prevent sliding
tighten the nut at each required locatn.
4. Use at least four rigging points (two opposite
sides) and ensure the straps, clamps or cabling
meet the adequate load capacity for the tota
projector(s) weight. Refer to Section 6 of the
manual shipped with e projector for infomation
on size and weight. DO NOT join trigging
straps or cables to a common point — keep
separated. Ensure all straps are taut.
Figure 6. Safety Cables
013-100342-01 (Rev.1) (08/06)
9 of 12 pages
Download from Www.Somanuals.com. All Manuals Search And Download.
Stacking Frame Installation Instructions
Projector Alignment
Ensure the stacking legs are extended at least 1” and are slightly loose before
aligning the projectors.
Stacked projectors must be correctly aligned to one another so the resulting display is
optimized and as sharp as possible. If hoisting the stack do so first and then align. To
maintain alignment lock all stacking hardware into place.
•
Always align the fixed projector. For floor or table-mount (i.e. non-hoisted) stacks,
align the bottom projector. In hoisted stacks, align the top projector.
•
Leg nuts must be loosened before alignment; otherwise the stackmounts will
not turn and allow movement of the projector.
1. Position the fixed projector’s image as desired and align the other image(s) to it.
2. To distinguish between the images, enable Red for one display and Green for the
other. For more information, refer to the manual supplied with the projector.
3. Minimize each projector’s zoom until the images are focused.
4. Adjust the zoom and lens offset on e top projector precisely move its test
pattern display onto the bottom test pattern. When it is properly aligned all the
Red/Green grid lines in the combined image will turn Yellow.
•
•
If all lines are well-aligned, skip to Step 7 to lall stacking mounts.
If alignment needs improvement,
proceed to Step 5.
5. For well-aligned center lineturn the two
rear stacking mount wheels to move the top
projector. Use a screwdriver ithe holes
around the rim of each adjusting wheel for
better leverage and crol. Turned
inddently, each stacing mount acts as
a pivot point for the opposite edge of the
display. Refer to Figure 7. For example, turn
the right mount to tilt the left portion of the
image and turn the left mount to tilt the right
portion of the image. Turn the mounts
together to raise or lower the top image, or
turn the front stacker. If the center lines form
an X it indicates the projectors (and
images) are slightly tilted in relation to one
another. Turn one mount to raise one side,
and/or turn the other mount to lower the
other side. Refer to Figure 7.
Figure 7. Directional Adjustment (Tilt)
013-100342-01 (Rev.1) (08/06)
10 of 12 pages
Download from Www.Somanuals.com. All Manuals Search And Download.
Stacking Frame Installation Instructions
•
If centerlines are out by the same amount from top
to bottom — use lens offsets (on top projector) to
bring the centerlines into alignment. Refer to Figure
8.
Figure 8. Centerline Alignment
•
If centerlines are parallel, but others are not, turn
the front stacking mount wheel to bring the
centerlines into alignment. Refer to Figure 9.
6. Adjust the zoom on the top projector to align the
edges of its image with the other image and then
adjust focus. When aligned, all lines from the
combined Red/Green grids will be Yellow.
Figure 9. Centerline Alignment
WARNING
Step 7 is critical safety procdure that must be observed.
Failure to properlsecure stacking wheels could cause
the projectors to separate, resulting in possible injury or death.
7. Turn all three stacking wheels until they are firmly
secure against the rest of the acking mount.
8. Secboth rear leg nuts against the bottom of the
projector.
9. Repeat Steps 1-8 when a third projector is used.
Figure 10. Secure Hardware
013-100342-01 (Rev.1) (08/06)
11 of 12 pages
Download from Www.Somanuals.com. All Manuals Search And Download.
Stacking Frame Installation Instructions
Technical Support
NORTH AMERICA
CHRISTIE Digital Systems, Inc.
809 Wellington St. North
CHRISTIE Digital Systems, Inc.
10550 Camden Drive
Kitchener, Ontario, Canada N2G 4Y7
Tel. 519-744-8005 (General)
Toll Free 1-800-221-8025 (Technical Support)
Fax 519-749-2776 (Service)
Cypress, CA 90630 USA
Tel. 714-236-8610 (General)
Toll Free 1-800-221-8025 (Technical Support)
Fax 714-503-3375
EUROPE
CHRISTIE Digital Systems, Inc.
View Point
200 Ashville Way
Wokingham, Berkshire RG41 2PL
United Kingdom
Tel. +44-118-977-8111
Fax +44-118-977-8112
CHRISTIE Digital SysteInc.
Willicher Damm 129
D-41061 Mönchengladbach
Germany
Tel. +49-2161-664540
Fax +49-216164546
CHRISTIE Digital Systems, Inc.
7, av Georges Pompidou
92593 Levallois-Perret Cedex
France
Tel. +33-(0)1-47-48-28-07
Fax +33-(0)1-47-48-26-06
ASIA-PACIFIC / OTHE
CHRISTIE Digital Systems, Inc.
627A Aljunied Road
# 05-02 Biz Tech Centre
Singapore 389842
CHRISTIE Digital Systems, Inc.
Rm. C1109, Orient International Bldg. (Part C)
85 ou Han Guan Rd.
nghai, 200336
Tel. 65-6877-8737
Fax 65-6877-8747
People’s Republic of China
Tel. +86-21-6278-7708
Fax +86-21-6278-7707
CHRISTIE les (Canada)
Tel. 1-800-2171
Fax 519-749-3136
CHRISTIE Sales (U.S.)
Tel. 1-800-407-7727 or 1-866-880-4462
Fax 714-503-3375
013-100342-01 (Rev.1) (08/06)
12 of 12 pages
Download from Www.Somanuals.com. All Manuals Search And Download.
|