Installation Guide
CB-TP12
Rough-In Box for 12" Wall/Flush Mount Touch Panels
Overview
Installing a 12" NXD panel within a Rough-In Box
The procedures outlined in this document apply to the 1200V-and 1200VG-
Series of touch panels.
The Rough-In Box must be mounted prior to continuing this section. Verify that
all necessary cables have been threaded through the knockouts on the Rough-In
Box and the connections have been tested prior to installation of the touch panel.
Wall Mount panels (NXDs) are contained within a metallic outer housing (back
box). This back box is not removed when installing the NXD into a CB-TP12
Rough-In Box. The back box is only removed to gain access for the replacement
of the Compact Flash component or upgrade to the VESA housing.
1.
Verify the incoming RJ-45, Ethernet, USB, and any other audio/video
cables have been properly threaded through the wiring knockouts (from
their terminal locations) on the Rough-In Box. Leave enough slack in the
wiring to accommodate any re-positioning of the panel.
2.
The CB-TP12 Rough-In Boxes are optional metallic boxes that are secured onto
stud beams prior to the installation of a solid surface. Installation procedures and
configurations can vary.
3.
Connect all data and power wiring connectors to their corresponding loca-
tions along the side of the (un-powered) NXD touch panel.
Verify the terminal end of the power cable is not connected to a power
supply before plugging in the 2-pin power connector.
Specifications
•
•
CB-TP12 (FG031-10) Specifications
Dimensions (HWD) • 11.52" x 11.60" x 3.50"
• 29.27 cm x 29.47 cm x 8.89 cm
The USB connectors can be from either a USB extension cable, or
a wireless USB RF transmitter.
Included
Accessories
Rough-In Box Installation Kit (SA2001-02) (one kit per CB)
• 4 Phillips pan-head (#4-40 x 0.375 Black) screws (80-0115)
• 4 Phillips pan-head (#4-40 x 0.625 Black) screws (80-0118)
Note: Don’t disconnect the connectors from the touch panel. The unit must be
installed with the attached connectors before being inserted into the Rough-In
Box.
Certifications
• cTUVus Listed
4.
Test the incoming wiring by connecting the panel connections to their
terminal locations and applying power. Verify the panel is receiving power
and functioning properly to prevent repetition of the installation.
Disconnect the terminal end of the power cable from the connected PSN
power supply.
WARNING: INSTALLER, LEAVE A GAP BETWEEN THE STUD AND ROUGH-
IN BOX TO ACCOMMODATE THE DRYWALL/SHEETROCK.
This gap allows the installation of the drywall/sheetrock after the Rough-In Box
has been installed.
5.
6.
7.
8.
Insert and secure the four securing #4-40 Mounting Screws into their
corresponding holes located along the sides of the NXD.
Note: The most important thing to remember when mounting this Rough-In Box
is that the mounting tabs must be mounted flush against the outside of the
sheetrock.
Make sure to align the Microphone, Light, and PIR Motion sensor locations
to their respective openings on the front bezel/faceplate.
Pre-Wall Installation of the CB-TP12 Rough-In Box
1.
Fasten the CB-TP12 to a stud through the stud fastening holes, located on
the inside of the Rough-In Box (FIG. 1), by using either nails or screws.
Remove any necessary wiring knockouts from the Rough-In Box (C in
the touch panel.
9.
Connect the terminal RJ-45, Ethernet, and any optional audio/video wiring
to their respective locations (outside the Rough-In Box) on either the AVB
breakout box, Ethernet port, or NetLinx Master.
2.
10. Reconnect the terminal power connector on the PSN and apply power
3.
4.
Thread the incoming RJ-45, Ethernet, and any other audio/video wiring
through the knockouts.
Install the drywall/sheetrock before inserting the main NXD unit into the
CB-TP12.
Stud
Knockouts should be located on the left-side of the
Rough-In Box, alongside the connectors
Drywall/
sheetrock
CB-TP12 Rough-In Box
Stud fastening holes
Use the four #4-40
Mounting Screws to
secure the NXD to the
Rough-In Box at these
locations
Mounting tabs
for NXD panel should
be flush with the outside of the sheetrock
FIG. 1 Screw locations for Rough-In Box attachment in a pre-wall installation