You can rely on
Installation & Service Instructions
Performa
24 Eco HE
Condensing
Combination Boiler
2
Burner On
Reset
1
3
Flame Failure
0
4
Power On
bar
These instructions include the Benchmark Commissioning
Checklist and should be left with the user for safe keeping.
© Baxi Heating UK Ltd 2009
Installer Notification Guidelines
Choose Building
Regulations Notification
Route
Competent Person's
Building Control
Self Certification Scheme
Install and Commission this
appliance to manufacturer's
instructions
Contact your relevant Local
Authority Building Control
(LABC) who will arrange
an inspection or contact
a government approved
inspector
Complete the
Benchmark Checklist
If you notify via the ‘Gas Safe
Register’, the register will issue
the Building Regulations
Install and Commission this
appliance to manufacturer's
instructions
certificate on members’ behalf
Scheme Members only
Call ‘Gas Safe Register’ on:
0800 408 5577
Complete the
Benchmark Checklist
or log onto:
within 10 days
You must ensure that the
certificate number issued by
the ‘Gas Safe Register’ is written
onto the Benchmark Checklist
‘Gas Safe Register’ will issue a
Building Regulations Compliance
Certificate to the property owner
and inform the relevant LABC
LABC will record the data
and will issue a
certificate of compliance
3
© Baxi Heating UK Ltd 2009
Legislation
IMPORTANT - Installation, Commissioning, Service & Repair
This company declare that no substances harmful to health
are contained in the appliance or used during appliance
manufacture.
This appliance must be installed in accordance with the manufacturer’s instructions and
the regulations in force. Read the instructions fully before installing or using the
appliance.
The appliance is suitable only for installation in GB and IE and
should be installed in accordance with the rules in force, and
only used in a suitably ventilated location.
In GB, this must be carried out by a competent person as stated in the Gas Safety
(Installation & Use) Regulations.
In GB, the installation must be carried out by a Gas Safe
Registered Installer. It must be carried out in accordance with
the relevant requirements of the:
Definition of competence: A person who works for a Gas Safe registered company
and holding current certificates in the relevant ACS modules, is deemed competent.
• Gas Safety (Installation & Use) Regulations.
• The appropriate Building Regulations either The
Building Regulations, The Building Regulations
(Scotland), Building Regulations (Northern Ireland).
• The Water Fittings Regulations or Water Byelaws in
Scotland.
All Gas Safe registered engineers carry an ID card with their licence number and a
photograph. You can check your engineer is registered by telephoning
• The Current I.E.E. Wiring Regulations.
In IE, this must be carried out by a competent person as stated in I.S. 813 “Domestic
Gas Installations”.
Where no specific instructions are given, reference should be
made to the relevant British Standard Code of Practice.
The addition of anything that may interfere with the normal operation of the appliance
without express written permission from the manufacturer or his agent could invalidate
the appliance warranty. In GB this could also infringe the Gas Safety (Installation and
Use) Regulations.
In IE, the installation must be carried out by a competent
Person and installed in accordance with the current edition of
I.S. 813 ‘Domestic Gas Installations’, the current Building
Regulations and reference should be made to the current ETCI
rules for electrical installation.
Warning - Check the information on the data plate is compatible with local supply
All systems must be thoroughly flushed and treated with
inhibitor (see section 6.2).
conditions.
Codes of Practice, most recent version should be used
In GB the following Codes of Practice apply:
Standard
BS 6891
BS 5546
Scope
Gas Installation.
Installation of hot water supplies for
domestic purposes.
BS 5449
BS 6798
BS 5440 Part 1
BS 5440 Part 2
BS 7074
Forced circulation hot water systems.
Installation of gas fired hot water boilers.
Flues.
The boiler meets the requirements of Statutory Instrument “ The Boiler (Efficiency)
Ventilation.
o
Regulations 1993 N 3083” and is deemed to meet the requirements of Directive
Expansion vessels and ancillary equipment
for sealed water systems.
Treatment of water in domestic hot water
central heating systems.
92/42/EEC on the energy efficiency requirements for new hot water boilers fired with
liquid or gaseous fuels:-
BS 7593
In IE the following Codes of Practice apply:
Type test for purpose of Regulation 5 certified by:
Notified Body 0051.
Standard
I.S. 813
Scope
Domestic Gas Installations.
The following BS standards give valuable additional information;
BS 5546
Installation of hot water supplies for
domestic purposes.
Product/Production certified by:
Notified Body 0086.
BS 5449
BS 7074
Forced circulation hot water systems.
Expansion vessels and ancillary equipment
for sealed water systems.
BS 7593
Treatment of water in domestic hot water
central heating systems.
For GB/IE only.
4
© Baxi Heating UK Ltd 2009
Safe Manual Handling
General
The following advice should be adhered to, from when first handling the boiler to the final stages of installation, and also during maintenance.
Most injuries as a result of inappropriate handling and lifting are to the back, but all other parts of the body are vulnerable, particularly shoulders, arms and hands.
Health & Safety is the responsibility of EVERYONE.
There is no ‘safe’ limit for one man - each person has different capabilities. The boiler should be handled and lifted by TWO PEOPLE.
Do not handle or lift unless you feel physically able.
Wear appropriate Personal Protection Equipment e.g. protective gloves, safety footwear etc.
Preparation
Co-ordinate movements - know where, and when, you are both going.
Minimise the number of times needed to move the boiler - plan ahead.
Always ensure when handling or lifting the route is clear and unobstructed. If possible avoid steps, wet or slippery surfaces, unlit areas etc. and take special care
on ladders/into lofts.
Technique
When handling or lifting always use safe techniques - keep your back straight, bend your knees. Don’t twist - move your feet, avoid bending forwards and
sideways and keep the load as close to your body as possible.
Where possible transport the boiler using a sack truck or other suitable trolley.
Always grip the boiler firmly, and before lifting feel where the weight is concentrated to establish the centre of gravity, repositioning yourself as necessary. See the
‘Installation’ section of these instructions for recommended lift points.
Remember
The circumstances of each installation are different. Always asses the risks associated with handling and lifting according to the individual conditions.
If at any time when installing the boiler you feel that you may have injured yourself STOP !!
DO NOT ‘work through’ the pain - you may cause further injury.
IF IN ANY DOUBT DO NOT HANDLE OR LIFT THE BOILER - OBTAIN ADVICE OR ASSISTANCE BEFORE PROCEEDING !!
5
© Baxi Heating UK Ltd 2009
1.0 Introduction
1.1
Description
Case Front Panel
1. The Potterton Performa 24 Eco HE is a fully automatic
gas fired wall mounted condensing combination boiler. It
is room sealed and fan assisted, and will serve central
heating and mains fed domestic hot water.
2. The boiler is set to give a maximum output of
25.2 kW (condensing).
3. It is designed for use on Natural Gas (G20) and can be
converted to use Propane.
4. The boiler is suitable for use only on fully pumped
sealed heating systems. Priority is given to domestic hot
water.
5. The boiler data badge gives details of the model, serial
number and Gas Council number and is situated on the
control box. It is visible when the case front panel is
removed (Fig. 1).
6. The boiler is intended to be installed in residential /
commercial / light industrial E.M.C. environments on a
governed meter supply only.
Control Box
7. The boiler must be installed with one of the purpose
designed flues such as the standard horizontal flue kit,
part no. 5118489.
Fig. 1
Data Badge
8. All systems must be thoroughly flushed and treated
with inhibitor (see section 6.2).
1.2
Contents of Pack
The pack contains:-
Boiler
Wall Plate (inc. taps)
Set of Connections
Template
Literature Pack
6
© Baxi Heating UK Ltd 2009
2.0 General Layout
1
2.1
Layout
20
1.
Air Pressure Switch
19
2.
Expansion Vessel
3.
Burner Manifold
4.
Automatic Air Vent
5.
DHW Plate Heat Exchanger
Circulation Pump
18
17
6.
7.
Drain Off Point
8.
Safety Pressure Relief Valve
Optional Integral Timer Position
Central Heating System Pressure Gauge
Control PCB
9.
2
3
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
16
15
Control Box
3-Way Valve Assembly
Condensate Trap
Flame Sensing Electrode
Spark Electrode
4
5
13
6
Burner
Primary Heat Exchanger
Fan Assembly
Secondary Heat Exchanger
On/Off/Reset Selector Switch
Burner & Fault Indicator Neon
Power Neon
7
8
14
Flame Failure & Fault Indicator Neon
Central Heating Temperature Control
Hot Water Temperature Control
12
11
10
9
2
Burner On
Flame Failure
Power On
Reset
1
3
0
4
bar
22
25
26
9
21
23
24
10
7
© Baxi Heating UK Ltd 2009
3.0 Appliance Operation
1
NOTE: All delay timers mentioned in 3.1 and 3.2 are
overridden by domestic hot water demand.
Central Heating Circuit
27
7
3.1
Central Heating Mode (Fig. 2)
2
1. With a demand for heating, the pump circulates water
through the primary circuit. At a pre-determined flow
rate the central heating flow switch operates, initiating
the ignition sequence.
3
5
4
26
6
2. The main burner ignites at low rate, then the gas valve
controls the gas rate to maintain the heating
temperature measured by the temperature sensor.
25
24
8
23
3. When the flow temperature exceeds the setting
temperature, a 3 minute delay occurs before the burner
relights automatically (anti-cycling). The pump continues
to run during this period.
9
22
21
11
17
15
10
20
16
3.2
Domestic Hot Water Mode (Fig. 3)
18
14
13
12
19
1. Priority is given to the domestic hot water supply. A
demand at a tap or shower will override any central
heating requirement.
Fig. 2
Key
2. The flow of water will operate the DHW flow switch
which requests the 3 way valve to change position. This
will allow the pump to circulate the primary water
through the DHW plate heat exchanger.
1
2
3
4
5
6
7
8
9
Primary Heat Exchanger
Burner
Ignition Electrode
Flame Sensing Electrode
Gas Valve
15 Domestic Hot Water Outlet
16 Heating Flow
17 Pressure Gauge
18 Hydraulic Differential Pressure Sensor Microswitch
19 Automatic By-Pass
20 Hydraulic Differential Pressure Sensor
21 Diverter Valve Assembly
22 Domestic Hot Water Flow Priority Assembly
23 Domestic Hot Water Flow Priority Microswitch
24 Safety Thermostat
25 Central Heating Temperature Sensor
26 Expansion Vessel
Pump
Automatic Air Vent
Plate Heat Exchanger
Flow Sensor with Filter
3. The burner will light automatically and the
temperature of the domestic hot water is controlled by
the temperature sensor.
10 Pressure Relief Valve
11 Boiler Drain Point
12 Heating Return
13 Cold Water Inlet On/Off Valve and Filter
14 Gas Inlet
4. When the domestic hot water demand ceases the
burner will extinguish and the diverter valve will remain
in the domestic hot water mode, unless there is a
demand for central heating.
27 Secondary Heat Exchanger
1
IMPORTANT: When the selector switch is in the
‘0’ (Off) position the electrical supply to the boiler
is isolated. The boiler will not operate and the
integral timer (if fitted) will require resetting once
the selector switch is turned to either the DHW
or CH position.
Domestic Hot Water Circuit
27
2
3
5
4
7
26
6
25
24
8
23
22
9
11
21
17
15
10
20
18
16
14
13
12
19
Fig. 3
8
© Baxi Heating UK Ltd 2009
4.0 Technical Data
Appliance Type
C12
C32
C52
Electrical Protection
IPX4D
Central Heating Primary Circuit
Pressures
Appliance Category
Heat Input CH
CAT II
2H 3P
NO Class
x
3
bar
3
2.5
0.5
1-2
Safety Discharge
Max Operating
Min Operating
Condensate Drain
1” BSP
Max
24.8
Min
Flue Terminal
Dimensions
Diameter
Projection
100mm
125mm
kW
10.6
Recommend Operating
Heat Output CH (Non-Condensing)
DHW Circuit
Pressures
Max Operating
Min Operating
bar
Max
Min
Connections
Gas Supply
Central Heating Flow
Central Heating Return
Cold Water Mains Inlet
DHW Flow
copper tails
22mm
22mm
22mm
15mm
8
0.2
kW
24
9.8
-
-
-
-
-
-
Heat Output CH (Condensing)
Min Operating Pressure
at 11.1 l/min
Max
Min
0.9
kW
25.2
10.1
15mm
15mm
Pressure Relief Discharge
Flow Rates
DHW Flow Rate
@ 30°CRise
l/min
Heat Input DHW
Max
Outercase Dimensions
Casing Height
Overall Height Inc Flue
Elbow
Casing Width
Casing Depth
11.5
9.8
kW
24.8
-
780mm
DHW Flow Rate
@ 35°CRise
Heat Output DHW
Max
-
-
-
965mm
450mm
345mm
Min Working
DHW Flow Rate
2.5
kW
24
Pump
Available Head
Max Gas Rate
(Natural Gas - G20)
(After 10 mins)
2.62
Clearances
See graph below
- (For Central Heating
Above Casing
Below Casing
Front
Front
L.H. Side
R.H. Side
200 mm Min
200 mm Min
3
m /h
Expansion Vessel
only. Integral with appliance)
450 mm Min (For Servicing)
5 mm Min (In Operation)
5 mm Min
5 mm Min (In Operation)
20mm Min (See Note*)
Burner Pressure
(Natural Gas - G20)
Max Rate
10.2 0.5
Min Rate
0.2
bar
0.5
mbar
2
Min Pre-charge Pressure
Inlet Pressure (Natural Gas - G20)
mbar 20
litre
125
1.0
*NOTE: The boiler can be operated with a
clearance of 5mm at the right. This is also
sufficient for routine maintenance. However a
clearance of 20mm is required if it is necessary to
remove the secondary heat exchanger. This
should be considered when siting the appliance
and in the event of any subsequent alterations in
the area of installation
Max Capacity of
CH System
Burner Injector (Natural Gas - G20)
15 x 1.18mm Diameter
Primary Water Content
of Boiler (unpressurised)
Electrical Supply
(Appliance must be connected to an
earthed supply)
230V~ 50H
z
Temperatures
C.H. Flow Temp (adjustable)
Power Consumption
External Fuse Rating
170W
3A
35°C to 85°C max ( 5°C)
Weights
Packaged Boiler Carton
Installation Lift Weight
kg
50
43.5
D.H.W. Flow Temp (adjustable)
35°C to 65°C max ( 5°C)
dependent upon flow rate
Internal Fuse Rating
Fuse 2A Fast Blow to BS 4265
Pump - Available Head
5
4.5
4
LPG Propane - G31
Burner Injector 15 x 0.77mm diameter
3.5
3
Burner Pressure
Propane
Max Rate Min Rate
mbar
21.8 0.5 4.4 0.2
Inlet Pressures
2.5
2
37
mbar
1.5
1
0.5
0
0
200
400
600
800
1000
1200
Flow Rate (l/h)
9
© Baxi Heating UK Ltd 2009
5.0 Dimensions and Fixings
Dimensions
A 780mm
E
At Least 1.5°
G
A
B 345mm
C 450mm
D 116mm Ø Min.
E 185mm
F 190mm
G 131mm
B
360° Orientation
C
D
Tube Ø 100mm
F
Tap Rail
28mm
Condensate
Drain
65 mm
65 mm
65 mm
65 mm
65 mm
Heating
Return
(22mm)
Pressure Relief
Heating
Flow
(22mm)
Domestic Hot
Water Outlet
(15mm)
Gas
Inlet
(22mm)
ColdWater
Inlet
(15mm)
Valve
(15mm)
10
© Baxi Heating UK Ltd 2009
6.0 System Details
6.1
Information
1. The Potterton Performa 24 Eco HE Condensing Combination
Boiler is ‘Water Byelaws Scheme - Approved Products’.
To comply with the Water Byelaws your attention is drawn to the
following installation requirements and notes (IRN).
a) IRN 001 -
See text of entry for installation
requirements and notes.
Byelaw 14.
b) IRN 302 -
2. Reference to the WRc publications, ‘Water fittings and materials
directory’ and ‘Water supply byelaws guide’ give full details of
byelaws and the IRNs.
6.2
Central Heating Circuit
1. The appliance is suitable for fully pumped SEALED SYSTEMS
ONLY.
Treatment of Water Circulating Systems
• All recirculatory water systems will be subject to
corrosion unless an appropriate water treatment is
applied. This means that the efficiency of the system will
deteriorate as corrosion sludge accumulates within the system,
risking damage to pump and valves, boiler noise and circulation
problems.
• When fitting new systems flux will be evident within the system,
which can lead to damage of system components.
• All systems must be thoroughly drained and flushed out. Using,
for example Betz-Dearborn Sentinel X300 or X400 or Fernox
Superfloc Universal Cleanser. They should be used following the
flushing agent manufacturer’s instructions.
• System additives - corrosion inhibitors and flushing
agents/descalers should comply to BS7593 requirements, e.g. Betz-
Dearborn Sentinel X100 and Fernox-Copal which should be used
following the inhibitor manufacturer’s instructions.
Failure to flush and add inhibitor to the system will invalidate
the appliance warranty.
• It is important to check the inhibitor concentration after
installation, system modification and at every service in accordance
with the manufacturer’s instructions. (Test kits are available from
inhibitor stockists.)
• For information or advice regarding any of the above contact
Technical Enquiries.
6.3
Bypass
1. The boiler is fitted with an automatic integral bypass.
6.4
System Control
1. The boiler is designed for use in a heating system that
incorporates external controls, i.e. a minimum of a timer
device.
2. Suitable timer kits are available as optional extras.
3. For optimum operating conditions and maximum economy
the fitting of a programmable room thermostat is
recommended.
11
© Baxi Heating UK Ltd 2009
6.0 System Details
6.5
System Filling and Pressurising
1. A filling point connection on the central heating
return pipework must be provided to facilitate initial
filling and pressurising and also any subsequent water
loss replacement/refilling.
Double
Check
Valve
2. There are connection points on the mains cold water
inlet and central heating return isolating taps (Fig. 5) to
which the optional filling loop kit (Part No. 248221) can
be assembled.
Stop
Valve
Stop
Valve
3. The filling method adopted must be in accordance
with all relevant water supply regulations and use
approved equipment.
Temporary
Hose
DHW
Mains
Inlet
CH
Return
4. Your attention is drawn to,
for GB: guidance G24.2 and recommendation R24.2 of
the Water Regulations Guide.
Fig. 4
for IE: the current edition of I.S. 813. “Domestic Gas
Installations”.
5. The sealed primary circuits may be filled or
replenished by means of a temporary connection
between the circuit and a supply pipe provided a
‘Listed’ double check valve or some other no less
effective backflow prevention device is permanently
connected at the inlet to the circuit and the temporary
connection is removed after use.
Fig. 5
6.6
Expansion Vessel
(Central Heating only)
1. The appliance expansion vessel is pre-charged to 0.5
bar. Therefore, the minimum cold fill pressure is 0.5 bar.
The vessel is suitable for correct operation for system
capacities up to 125 litres. For greater system capacities
an additional expansion vessel must be fitted. For GB
refer to BS 7074 Pt 1. For IE, the current edition of
I.S. 813 “Domestic Gas Installations”.
Filling Loop
6.7
Safety Pressure Relief Valve (Fig. 6)
1. The pressure relief valve is set at 3 bar, therefore all
pipework, fittings, etc. should be suitable for pressures in
excess of 3 bar.
2. The pressure relief discharge pipe should be not less
than 15mm dia, run continuously downward, and
discharge outside the building, preferably over a drain. It
should be routed in such a manner that no hazard
occurs to occupants or causes damage to wiring or
electrical components. The end of the pipe should
terminate facing down and towards the wall.
Fig. 6
Pressure Relief Valve
Discharge Pipe
3. The discharge must not be above a window,
entrance or other public access. Consideration must be
given to the possibility that boiling water/steam could
discharge from the pipe.
4. A remote relief valve kit is available to enable the
boiler to be installed in cellars or similar locations below
outside ground level (kit no. 5121379).
12
© Baxi Heating UK Ltd 2009
6.0 System Details
Other Tap
Outlets
6.8
Domestic Hot Water Circuit (Fig. 7)
1. All DHW circuits, connections, fittings, etc. should be
fully in accordance with relevant standards and water
supply regulations.
Boiler
Expansion
Vessel*
2. Your attention is drawn to:
for GB: Guidance G17 to G24 and recommendation R17
to R24 of the Water Regulations Guide.
for IE: the current edition of I.S. 813. “domestic Gas
Installations”.
Check
Valve*
Pressure Reducer
Valve*
3. The Water Regulations recommendations for England
and Wales prohibits backflow from appliances into the
wholesome water supply due to thermal expansion.
However this type of instantaneous combination boiler,
with less than 15 litres of stored capacity, does not
require any backflow prevention device as any thermal
expansion is accommodated within the appliance.
It is possible in certain circumstances that other cold
water demands (e.g. washing machines, flushing of W.C.s)
may affect the DHW function of the boiler. In these
instances the fitting of a backflow prevention device and
expansion vessel is recommended.
To Hot
Taps
Stop Tap
*See 6.8 for instances when
these items may be required
Fig. 7
4. Also if there is an existing check valve, loose jumpered
stop cock, water meter or water treatment device
already fitted to the wholesome water supply connected
to the boiler domestic hot water (DHW) inlet supply
then a suitable expansion device may be required.
5. The boiler’s maximum working mains pressure is 8 bar,
therefore all pipework, connections, fittings, etc. should
be suitable for pressures in excess of 8 bar. A pressure
reducing valve must be fitted for pressures in excess of 8
bar. The manufacturer of any outlet fittings, such as a
shower valve, may require a lower maximum pressure.
The pressure reduction must take account of all fittings
connected to the DHW system.
6.9
Showers
1. If a shower control is supplied from the appliance it
should be of the thermostatic or pressure balanced type.
Thermostatic type shower valves provide the best
comfort and guard against water at too high a
temperature. Existing controls may not be suitable - refer
to the shower valve manufacturer.
6.10
Hard Water Areas
1. If the area of the installation is recognised as a HARD
WATER AREA then a suitable device should be fitted to
treat the mains water supply to the boiler. Contact your
Water Distribution Company for advice on suitable
devices.
13
© Baxi Heating UK Ltd 2009
7.0 Site Requirements
20mm/5mm Min
See * NOTE:
450mm
5mm Min
7.1
Location
1. The boiler may be fitted to any suitable wall with the
flue passing through an outside wall or roof and discharging
to atmosphere in a position permitting satisfactory removal
of combustion products and providing an adequate air
supply. The boiler should be fitted within the building
unless otherwise protected by a suitable enclosure i.e.
garage or outhouse. (The boiler may be fitted inside a
cupboard-see Section 7.3).
200mm Min
2. If the boiler is sited in an unheated enclosure then it is
recommended to leave the ON/OFF Selector Switch in
the domestic hot water and central heating position to
give frost protection.
780mm
3. If the boiler is fitted in a room containing a bath or
shower reference must be made to the relevant
requirements.
In GB this is the current I.E.E. Wiring Regulations and
Building Regulations.
In IE reference should be made to the current edition of
I.S. 813 “Domestic Gas Installations” and the current ETCI
rules.
2
Burner On
Flame Failure
Power On
Reset
1
3
0
4
bar
4. If the boiler is to be fitted into a building of timber frame
construction then reference must be made to the current
edition of Institute of Gas Engineers Publication IGE/UP/7
(Gas Installations in Timber Framed Housing).
200mm Min
Fig. 8
7.2
Clearances (Figs. 8 & 9)
1. A flat vertical area is required for the installation of the
boiler.
2. These dimensions include the necessary clearances
around the boiler for case removal, access during routine
maintenance and air movement. Additional clearances may
be required for the passage of pipes around local
obstructions such as joists running parallel to the front face
of the boiler.
* NOTE: The boiler can be operated with a clearance
of 5mm at the right. This is also sufficient for routine
maintenance. However a clearance of 20mm is
required if it is necessary to remove the secondary
heat exchanger. This should be considered when
siting the appliance and in the event of any
450mm Min
For Servicing
Purposes
subsequent alteration in the area of installation.
5mm Min
In Operation
Fig. 9
14
© Baxi Heating UK Ltd 2009
7.0 Site Requirements
7.3
Ventilation of Compartments
1. Where the appliance is installed in a cupboard or
compartment, no air vents are required.
2. BS 5440: Part 2 Clause 4.2 refers to room sealed
appliances installed in compartments. The appliance will
run sufficiently cool without ventilation.
7.4
Gas Supply
1. The gas installation should be in accordance with the
relevant standards. In GB this is BS 6891. In IE this is the
current edition of I.S. 813 “Domestic Gas Installations”.
2. The connection to the appliance is a 22mm copper
tail located at the rear of the gas service cock (Fig. 10).
3. Ensure that the pipework from the meter to the
appliance is of adequate size. Do not use pipes of a
smaller diameter than the boiler gas connection
(22mm).
7.5
Electrical Supply
1. External wiring must be correctly earthed, polarised
and in accordance with relevant regulations/rules. In GB
this is the current I.E.e. Wiring Regulations. In IE
reference should be made to the current edition of
ETCI rules.
2. The mains supply is 230V ~ 50H fused at 3A.
z
NOTE: The method of connection to the
electricity supply must facilitate complete electrical
isolation of the appliance.
Connection may be via a fused double-pole
isolator with a contact separation of at least 3mm
in all poles and servicing the boiler and system
controls only.
Fig. 10
Gas Service Cock
15
© Baxi Heating UK Ltd 2009
7.0 Site Requirements
Termination to an internal soil and vent pipe
Boiler
7.6
Condensate Drain
FAILURE TO INSTALL THE CONDENSATE
DISCHARGE PIPEWORK CORRECTLY WILL AFFECT
THE RELIABLE OPERATION OF THE BOILER
The condensate discharge pipe MUST NOT RISE at any
point along its length. There MUST be a fall of AT LEAST
2.5° (50mm per metre) along the entire run.
1. The condensate outlet terminates in a 1” BSP nut and seal
3
for the connection of 21.5mm ( /4in) plastic overflow pipe
450mm min
which should generally discharge internally into the household
drainage system. If this is not possible, discharge into an
outside drain is acceptable.
2. Ensure the discharge of condensate complies with any
national or local regulations in force.
External termination via internal
discharge branch
e.g sink waste - downstream
Boiler
BS 6798:2000 & Part H1 of the Building Regulations give
further guidance.
3. The discharge pipe should be run in a proprietary drain pipe
material e.g. PVC, PVC-U, ABS, PVC-C or PP.
Pipe must terminate
above water level but
below surrounding
surface
Sink
4. Metal pipework is NOT suitable for use in condensate
discharge systems.
5. The pipe should be a minimum of 21.5mm diameter and
must be supported using suitably spaced clips to prevent
sagging.
6. It is advisable to keep the condensate pipe internal.
7. External runs greater than 3 metres or runs in cold areas
External termination to a drain or gully
should use 32mm waste pipe.
Boiler
8. If the boiler is fitted in an unheated location the entire
condensate discharge pipe should be treated as an external
run.
Pipe must terminate above
water level but below
surrounding surface
9. In all cases discharge pipe must be installed to aid disposal
of the condensate. To reduce the risk of condensate being
trapped, as few bends and fittings as possible should be used.
10. When discharging condensate into a soil stack or waste
pipe the effects of existing plumbing must be considered. If soil
pipes or waste pipes are subjected to internal pressure
fluctuations when WC's are flushed or sinks emptied then
back-pressure may force water out of the boiler trap and
cause appliance lockout.
External termination to a purpose made soak-away
Examples are shown of the following methods of termination:-
i) to an internal soil & vent pipe
Boiler
ii) via an internal discharge branch (e.g. sink waste)
iii) to a drain or gully
500mm min
iv) to a purpose made soakaway
Holes in the soak-away must
face away from the building
16
© Baxi Heating UK Ltd 2009
Terminal Position with Minimum Distance (Fig. 11)
(mm)
7.0 Site Requirements
a
a
A
Directly below an opening, air brick, opening
windows, etc.
Above an opening, air brick, opening window etc.
Horizontally to an opening, air brick, opening window etc.
Below gutters, soil pipes or drain pipes.
Below eaves.
Below balconies or car port roof.
From a vertical drain pipe or soil pipe.
From an internal or external corner.
300
300
300
25
25
25
a
B
7.7
Flue
C
D
E
F
NOTE: Due to the nature of the boiler a plume of water
vapour will be discharged from the flue. This should be
taken into account when siting the flue terminal.
G
H
I
J
K
25
25
Above ground, roof or balcony level.
300
600
1200
600
1. The following guidelines indicate the general requirements
for siting balanced flue terminals. For GB recommendations
are given in BS 5440 Pt 1. For IE recommendations are given
in the current edition of I.S. 813 “Domestic Gas
Installations”.
From a surface or boundary line facing a terminal.
From a terminal facing a terminal (Horizontal flue).
From a terminal facing a terminal (Vertical flue).
From an opening in carport (e.g. door, window)
into the dwelling.
Vertically from a terminal on the same wall.
Horizontally from a terminal on the same wall.
From adjacent wall to flue (vertical only).
From an adjacent opening window (vertical only).
Adjacent to windows or openings on pitched and flat roofs
Below windows or openings on pitched roofs
L
1200
1500
300
300
1000
600
M
N
R
S
T
2. If the terminal discharges onto a pathway or passageway,
check that combustion products will not cause a nuisance
and that the terminal will not obstruct the passageway.
U
2000
3. If a terminal is less than 2 metres above a balcony, above
ground or above a flat roof to which people have access,
then a suitable terminal guard must be provided.
a
In addition, the terminal should be no nearer than 150 mm to an
opening in the building fabric formed for the purpose of accommodating
a built-in element such as a window frame. See BS 5440 Pt. 1.
IMPORTANT:
• Only ONE 25mm clearance is allowed per installation.
• Under car ports we recommend the use of the plume
displacement kit.
• The terminal position must ensure the safe and
nuisance - free dispersal of combustion products.
NOTE: The distance from a fanned draught appliance terminal
installed parallel to a boundary may not be less than 300mm in
accordance with the diagram below
300 min
Terminal
Assembly
Plume
Displacement Kit
IMPORTANT: If fitting a Plume
Displacement Flue Kit, the air inlet
must be a minimum of 100mm from
any opening windows or doors (see
Section 9.0).
TopView Rear Flue
Fig. 12
Property Boundary Line
T
J,K
Air Inlet
U
Opening Window
or Door
100mm
MIN.
Fig. 12a
N
R
I
D
E
A
M
I
C
I
I
S
F
B
J,K
F
L
A
A
G
H
H
I
Likely flue positions requiring
a flue terminal guard
Fig. 11
17
© Baxi Heating UK Ltd 2009
8.0 Flue Options
8.1
Horizontal Flue Systems
1. The standard flue is suitable only for horizontal
termination applications.
2. All fittings should be fully engaged. The approximate
engagement is 40mm. Apply soap solution to the seal on
each fitting to aid assembly.
Y
X
3. Maximum permissible equivalent flue lengths are:-
Horizontal Concentric 4 metres
4. Any additional “in line” bends in the flue system must be
taken into consideration.
Their equivalent lengths are:-
Concentric Pipes:
Horizontal
Flues
135° bend
93° bend
0.5 metres
1.0 metres
Twin Flue Pipe
135° bend
91.5° bend
0.25 metres
0.50 metres
The elbow supplied with the standard horizontal telescopic
flue kit is not included in any equivalent length calculations
Plume Displacement Kit 60 /100 Ø
1M Extensions, 45° & 93° bends are
also available - see Section 9.0
NOTE: Flue length is measured from point X to Y as
shown.
IMPORTANT: All flue systems must be securely
supported at least once every metre. Suitable pipe
supports are available as accessories.
NOTE: Horizontal flue pipes should always be installed with a 1.5° fall from the
terminal to allow condensate to run back to the boiler.
This bend is equivalent to
1 metre
C
A
Y
B
This bend is equivalent to
1 metre
X
Total equivalent length (up to 3m) =
A+B+C+2x90°Bends
18
© Baxi Heating UK Ltd 2009
8.0 Flue Options
Vertical
Flues
8.2
Twin & Vertical Flue Systems
(Twin Pipe)
1. Maximum permissible equivalent flue lengths are:-
Vertical Concentric
Vertical Twin Pipe
4m
12m*
Y
* Both the air and flue duct can be up to 12 metres
long each.
X
2. Any additional “in line” bends in the flue system must
be taken into consideration. Their equivalent lengths
are:-
Concentric Pipes:
45° bend
93° bend
0.5 metres
1.0 metres
Twin Flue Pipe
Vertical
Flues
45° bend
0.25 metres
0.50 metres
91.5° bend
The elbow supplied with the standard horizontal flue is
not included in any equivalent length calculations
Y
NOTE: Flue length is measured from point X to Y
as shown.
IMPORTANT: All flue systems must be securely
supported at least once every metre. Suitable pipe
supports are available as accessories.
X
Total Equivalent Length =
A+B+C+1x90°Bend
Roof
Terminal
All vertical and angled runs must be included,
measured from the boiler adaptor (point X) to the
joint with the flue terminal (point Y). One 91.5°
bend or two 135° bends can be included without
reduction of the flue length.
660mm
The total equivalent
length for this example
is = 6.5 metres.
If further elbows are required the flue length must
be reduced by the following amounts:-
Y
1 metre for each 91.5° bend
0.5 metre for each 135° bend
C
AIR DUCT
N of
fittings/pipes
o
Equivalent
Length Value
Sub total
B
1m extension
45°bend
5
2
2
5.0m
0.5m
1.0m
1m
0.25m
0.5m
91.5°bend
This bend is equivalent to
1 metre
Equivalent Length Air Duct = 6.5m
A
X
FLUE DUCT
N of
fittings/pipes
o
Equivalent
Sub total
Length Value
1m
1m extension
45°bend
5
2
2
5.0m
0.5m
1.0m
0.25m
0.5m
91.5°bend
Equivalent Length Flue Duct = 6.5m
19
© Baxi Heating UK Ltd 2009
8.0 Flue Options
8.3
Flue Accessories
Key Accessory
FLUE GROUP A
Concentric Flue System 100mm diameter
Size
Code No
A1
A
B
Horizontal Flue Terminal
Horizontal Flue Terminal (incl elbow)
Flue Extension
5111073
5118489
1000mm 5111074
A1
A
C
D
U
R
Flue Bend
93°
135°
5111075
5111085
Flue Bend (pair)
Pipe Support (painted)
Vertical Flue Adaptor
Wall Liner
100mmØ 5111080
5111070
P
5111067
S
Flue Terminal Deflector
5111068
FLUE GROUP N
Twin Flue System 80mm diameter
E
P
B
E
F
Flue Extension (pair)
Flue Bend (pair)
1000mm 5111087
90°
135°
5111072
5111086
5111079
5111084
5111081
K, K1
G
J
H
W
Flue Bend (2 pair)
Vertical Flue Boiler Adaptor Kit
Vertical Flue Adaptor
Pipe Support (pair)
80mm
FLUE GROUP A, N, G
Vertical Flue Kits
K
K1
L
M
N
Vertical Flue Terminal (use with 5111070)
Vertical Flue Terminal
5111078
5118576
5122151
246143
246144
R
D
C
Pitched Roof Flashing
Roof Cover Plate
Flat Roof Flashing
25°/50°
G
F
M
H
U,W
L
N
S
J
20
© Baxi Heating UK Ltd 2009
8.0 Flue Options
For Twin Flue Systems fit the adaptors as follows:-
8.4
Flue Duct Adaptor
Flue Duct Adaptor
Boiler Adaptor
1. Engage the flue duct adaptor on the boiler adaptor,
making sure that it is pushed down as far as possible.
Blanking Plate
8.5
Air duct adaptor
1. Undo the screws securing the blanking plate to the boiler
top panel. Discard the plate.
2. There are three restrictor plates supplied in the kit. One
marked ‘23’ and one marked ‘27’, these can be discarded
The third restrictor MUST be positioned as shown in the
diagram below.
3. Take one of the gaskets supplied in the kit and place on
the boiler top panel.
4. Align the restrictor as shown. Position the second gasket
over the restrictor.
5. Using the screws previously removed secure the inlet
adaptor to the top panel.
6. Continue to fit the twin flue system.
Position of Restrictor
Air Duct Adaptor
Gasket
Restrictor
Gasket
21
© Baxi Heating UK Ltd 2009
8.0 Flue Options
8.6
For Roof Terminals
1. In the case of a pitched roof 25 - 50 degrees, position the lead
tile to replace/flash over existing roof tiling. Make an aperture in
the roof suitable for the lower tube of the roof terminal and
ensure the integrity of the roof cover is maintained. The
Approx
1425mm
adjustable plastic collar can either be positioned on the lead tile
or the lower tube of the roof terminal prior to the final
positioning of the vertical flue through the tile. Check the collar is
correctly located to suit required roof pitch (either 25° to 38° or
37° to 50°). From inside the roof adjust the flue to a vertical
position and secure to the roof structure with the clamp supplied.
2. For flat roof installations the aluminium flashing must be
incorporated into the roof covering and the appropriate aperture
made in the roof decking. The vertical flue is lowered onto the
flashing making sure the collar of the flue locates securely with the
flashing. (A mastic seal may be necessary). From inside the roof,
adjust the flue to a vertical position and secure to the roof
structure with the clamp supplied.
Cut the same
amount off the
Air Duct &
Air Duct
Flue Duct
Flue Duct
Push Fit Adaptor
8.7
Flue Dimensions
1. The standard horizontal flue kit allows for flue lengths between
100mm and 685mm from elbow to terminal (Fig. 13).
The maximum permissible equivalent flue length is: 4 metres
NOTE: Each additional 45° of flue bend will account for an
equivalent flue length of 0.5m.
eg. 45° = 0.5m,
90° = 2 x 45° = 1m etc.
Flue Deflector
8.8
Flue Trim
1. The rubber flue trim supplied may be fitted to either the
outside wall or on the inner wall of installation.
Fig. 13
8.9
Terminal Guard (Fig. 14)
1. When codes of practice dictate the use of terminal guards, they
can be obtained from most Plumbers’ and Builders’ Merchants.
Fig. 13a
2. There must be a clearance of at least 50mm between any part
of the terminal and the guard.
3. When ordering a terminal guard, quote the appliance name and
model number.
4. The flue terminal guard should be positioned centrally over the
terminal and fixed as illustrated.
8.10
Flue Deflector (Fig. 13a)
1. If required a flue deflector is available from your Potterton
stockist.
Fig. 14
2. Push the flue deflector over the terminal end and rotate to the
optimum angle for deflecting plume. Secure the deflector to the
terminal with screws provided.
22
© Baxi Heating UK Ltd 2009
93° Elbow/Plume
Outlet Assembly
9.0 Plume Displacement
60Ø Support
Bracket
9.1
Plume Displacement Kit (Fig. 14b)
O Ring
Kit No 5118638
Content of kit
0.9 metres
1
1
1
2
1
1
3
1
1
0.9m 60/100 Concentric Flue
1m 60 Dia Exhaust Flue Pipe
Adaptor
60Ø Exhaust
Flue Pipe
60 Dia Support Brackets
93° Elbow/Plume Outlet Assembly
Flexible Flue Trim
60Ø Support
Bracket
“O” Rings
‘Jubilee Clip
O Ring
Adaptor
O Ring
Fig. 14a
Boiler Elbow
Flexible Flue
Trim
1. This kit is recommended for installations where the
condensate plume emitted from the flue may cause a nuisance
or affect the surroundings.
‘Jubilee’ Clip
2. The terminal must be positioned outside the building with
the air inlet facing downward and outlet connection upwards.
Elbow
3. The plume outlet must always be at least 45° to the wall,
with the ‘peak’ uppermost to prevent rain entry (Figs. 15 &
16), and be at least 2 metres above ground level. It must be
secured as shown in Fig. 12a. The plume outlet must also be
at least 500mm from the air inlet in any direction (Fig. 16).
60/100Ø
Concentric Flue
Fig. 14b
Outlet must be at
least 45° from
wall face
NOTE: The outlet must be positioned so that any
condensate plume is directed away from adjacent surfaces.
There must be a constant fall along the entire length of the
flue system from the outlet back to the boiler.
45°
‘Peak’ Uppermost
45°
4. It is possible to reduce or increase (with the addition of
extensions) the length of either or both the 60/100 concentric
and 60Ø exhaust.
5. Standard concentric flue extension kits may be added
between the boiler elbow and the terminal assembly.
6. The minimum length of the concentric flue is 100mm when
measured from the edge of the flue elbow.
500mm Min.
IMPORTANT: The maximum equivalent length of
concentric flue is:- 2.5 metres
Additional bends may be fitted in the concentric flue, but
the equivalent length must be reduced by 1 metre (93°
bend) or 0.5 metres (45° bend).
Fig. 15
Air Inlet at Bottom
7. 60Ø 1 metre extensions (including support bracket), and
additional 93° & 45° elbows are available. Any additional 93°
& 45° elbows must be accounted for when calculating flue
lengths.
Fig. 16
NOTE: Permitted positions of the plume outlet relative to
doors, windows etc. are the same as for conventional
concentric flues as detailed in the main Installation &
Servicing Instructions and BS5440 Pt. 1. It is NOT
necessary to fit a terminal guard over the air inlet or the
plume outlet.
23
© Baxi Heating UK Ltd 2009
9.0 Plume Displacement
3
3
9.2
Determining Permissible Lengths
2
2
In the graph the solid line diagonal represents the
relationship between the concentric flue assembly (and any
extensions) and the 60Ø exhaust (and any extensions or
additional bends).
1
0
1
0
Example 1 - Not Permissible
If, for instance, a concentric length of 2 metres was required
and the 60Ø exhaust needed to be 1.5 metres the graph
shows that this combination would NOT be permissible as
the intersection point would be above the solid diagonal line.
3
3
1
2
1
2
0
0
Concentric 60/100 Flue (metres)Y
Concentric 60/100 Flue (metres)Y
Example 1
Example 2
Flue Lengths - Not Permissible
Flue Lengths - OK
3
Example 2 - Flue Lengths OK
Where both lengths have been determined they can be
applied to the graph to check that the installation is
permissible. For example, if it was known that 1 metre of
concentric flue and 1.5 metres of 60Ø exhaust were
required, the values could be applied to the graph as shown
in Example 2.. As the point of intersection of the dotted lines
is below the solid diagonal line, the combination of lengths is
shown to be acceptable.
2
1
Example 3 - Flue Lengths OK
In the example shown, assume that the concentric part of
the flue needs to be 1 metres long. Find the position of ‘1’ on
the horizontal axis of the graph and then project upwards to
the solid diagonal line. This is represented by the vertical
thick dotted line. Where this dotted line intersects with the
solid diagonal line on the graph, project across to the vertical
axis. As can be seen this corresponds with 2 metres.
Therefore, the total equivalent length of the 60Ø exhaust
can be up to 2 metres. Any bend equivalencies must be
accounted for i.e. 93° bends are equal to 1 metre, each 45°
bend to 0.5 metres.
0
3
1
2
0
Concentric 60/100 Flue (metres)Y
Example 3
Flue Lengths - OK
60Ø Exhaust
X
Support
Bracket
Y
Flue Length - Worked Example
Potterton Performa 24 Eco HE
93° Elbow
In Fig. 18 opposite an additional 93° bend has been included
in the 60Ø exhaust. with 2 x 1metre extensions which have
been cut to 0.25metres and fitted. The waste is discarded.
Extension
Concentric 60/100 Flue
Concentric Flue
To calculate total length:-
Fig. 17
2 x 0.25 metre Lengths =
1 x 93° Elbow =
0.5 metres
1 metre
Total 60Ø Exhaust =
1.5 metres
After consulting the table in Example 3 it can be determined
that the concentric flue could be up to approximately 0.5
metres long.
Additional Accessories
A - 93° Elbow
B - 45° Elbow (Pair)
5117381
5117382
Fig. 18
C - 1 metre 60Ø Extension 5117380
24
© Baxi Heating UK Ltd 2009
9.0 Plume Displacement
9.3
General Fitting Notes
1. Cut a hole in the external wall which the concentric flue
assembly will pass through. The hole should allow the flue
to fall back to the boiler at an angle of 1.5° to 3°.
2. When completed the terminal must be at least 2 metres
above ground level (Fig. 19).
Min. 2 metres
3. Measure and cut to size the concentric assembly and any
extensions that are being used.
4. Insert the concentric assembly through the hole from
outside the building.
5. If required, the flexible flue trim should be fitted prior to
this as it cannot be fitted after. Use the large ‘Jubilee’ clip to
secure the trim to the flue (See Fig. 20, trim shown
dotted), with the screw part of the clip at the bottom.
Fig. 19
6. Connect any extensions or elbows that are being used
to the concentric assembly. Engage the extension, elbow
or concentric assembly in the boiler flue elbow. Fit the
boiler flue elbow to the boiler adaptor.
Flue Trim
7. Ensure that the concentric assembly and any extensions
fall back to the boiler at an angle of 3° and that the
external air inlet is to the bottom.
8. Use suitable brackets to support the concentric
assembly and any extensions, and make good inside and
outside.
Spigot
9. The 60Ø exhaust can now be fitted. Slide the adaptor
over the plain end of the 60Ø exhaust (Fig. 22) and engage
the exhaust in the terminal. Slide the adaptor down over
the spigot. Mark and drill the adaptor, using a 2mm bit, as
shown in Fig. 21. Secure the adaptor to the spigot using
one of the screws supplied.
Position of ‘Jubilee’ Clip
screw
Fig. 20
50mm
Adaptor
10. If it is necessary to shorten the 60Ø exhaust or any of
the extensions, the excess material must be cut from the
plain end of the pipe.
Fig. 22
11. Determine the position of the 60Ø exhaust and mark
on the wall a suitable position for the support bracket. If
extensions are being used, a support bracket is supplied in
each kit.
30mm
Fig. 21
12. Drill the wall, and fit the bracket(s) using the plug and
screw provided.
30mm
13. Mark and drill the 60Ø exhaust, using a 2mm bit, as
shown in Fig. 23. Complete the installation of the 60Ø
exhaust, securing in the brackets.
Fig. 23
14. Fit the 93° elbow/plume outlet and secure with the
two remaining screws supplied. Ensure the plume outlet is
at least 45° to the wall and that the ‘peak’ is uppermost
(Fig. 24).
Fig. 24
25
© Baxi Heating UK Ltd 2009
9.0 Plume Displacement
Plume Outlet
Elbow
9.3
General Fitting Notes (cont.)
15. For aesthetic purposes it is permissible to route the
60Ø exhaust in an enclosed box, but the air inlet and
plume outlet MUST remain in free air.
16. It is also possible to separate the plume outlet from the
93° elbow to allow the flue to be installed as shown in
Fig. 25.
17. To do this, first slacken the two screws retaining the
plume outlet to the elbow, and remove the outlet (Fig. 26).
The elbow can now be used to connect the vertical to
horizontal 60Ø exhaust (Fig. 25). Retighten the screws in
the elbow.
Fig. 25
18. The outlet can now be fitted into the female end of an
60Ø extension piece. It must be secured using two of the
screws supplied in the bag with the ‘Jubilee’ clip.
19. Mark the female end of the extension at 30mm as
shown in two positions, directly opposite each other
(Fig. 27).
Fig. 26
30mm
20. Using a suitable bit (e.g. 2mm), drill through the
extension and outlet. Secure using two of the screws
supplied.
21. The remaining screw must be used to secure the
adaptor to the concentric terminal.
Fig. 27
22. When the plume outlet is positioned under a balcony
or other projection (Fig. 28) it must protrude at least
200mm (it is not necessary to extend it further than this).
200mm Min.
23. When under balconies or projections it is permissible to
rotate the concentric flue length up to 70°, clockwise or
anti-clockwise (Fig. 29), if there is insufficient space to
connect vertically.
24.This will allow the connection of the exhaust to the
outlet spigot.
25. All other minimum & maximum dimensions must be
adhered to, and the air inlet positioned such that it will not
be subject to rain entry.
Fig. 28
70°
Concentric Flue Length
(shown end-on)
Outlet Spigot
Fig. 29
26
© Baxi Heating UK Ltd 2009
10.0 Installation
10.1
Initial Preparation
The gas supply, gas type and pressure must be
checked for suitability before connection (see Section
7.4).
1. After considering the site requirements
(see Section 7.0) position the fixing template on the
wall ensuring it is level both horizontally and vertically.
2. Mark the position of the two most suitable fixing slots
for the wall plate and boiler lower fixing holes. It is
preferable to use the horizontal fixing slots.
190mm
3. Mark the position of the centre of the flue hole (rear
exit). For side flue exit, mark as shown (Fig. 30).
4. Note the shaded area on the template. Pipework
may be routed upwards behind the boiler, providing it
does not conflict with the shaded area.
5. If required, mark the position of the gas and water
pipes. Remove the template.
For Side Flue Exit
6. Cut the hole for the flue (minimum diameter
116mm).
Fig. 30
7. Drill the wall as previously marked to accept the wall
plugs supplied. Secure the wall plate using the fixing
screws.
8. Using a spirit level ensure that the plate is level
before finally tightening the screws.
9. Connect the gas and water pipes to the valves on the
wall plate using the copper tails supplied. Ensure that
the sealing washers are fitted between the connections.
10.2
Flushing
1. Connect a tube to the central heating flow or return
pipe (Fig. 31).
2. Flush thoroughly (see System Details, Section 6.2).
10.3
Preparing The Boiler
Flushing Tube
1. Remove all packaging.
2. Stand the boiler on its base by using the rear lower
edge as a pivot.
NOTE: A small amount of water may drain from
the boiler in the upright position.
Fig. 31
Central Heating Return
27
© Baxi Heating UK Ltd 2009
10.0 Installation
Wall Plate
10.4
Fitting The Boiler
1. Remove the sealing caps from the boiler connections.
NOTE: A small amount of water may drain from the
boiler once the caps are removed.
2. Lift the boiler as indicated by the shaded areas. The
boiler should be lifted by TWO PEOPLE. Engage the slots
at the top rear of the boiler on the wall plate (Fig. 35)
(see Safe Manual Handling page 5).
3. Insert the sealing washers between the valves and
pipes on the wall plate and the boiler connections. The
rubber washers must be used on the gas connection.
Fig. 32
4. Tighten all the connections.
10.5
Fitting the Safety Pressure Relief
Discharge Pipe (Fig. 33)
Suggested Lifting Points
shown as shaded area
1. Remove the discharge pipe from the kit.
2. Determine the routing of the discharge pipe in the
vicinity of the boiler. Make up as much of the pipework as
is practical, including the discharge pipe supplied.
3. The pipework must be at least 15mm diameter and
run continuously downwards to a discharge point outside
the building. See section 6.7 for further details.
4. Utilising one of the sealing washers, connect the
discharge pipe to the adaptor and tighten the nut.
5. Complete the discharge pipework and route it to the
outside discharge point.
IMPORTANT: Make all soldered joints before
connecting to the safety pressure relief valve.
Pressure Relief Valve
Fig. 33
Discharge Pipe
28
© Baxi Heating UK Ltd 2009
10.0 Installation
10.6
Condensate Drain (see section 7.6)
1. Connect the condensate drain using the 1” BSP nut
and seal supplied.
Ensure the discharge of condensate complies with
any national or local regulations in force (see British
Gas “Guidance Notes for the Installation of
Domestic Gas Condensing Boilers”.
Fig. 34
2. The condensate outlet terminates in a 1” BSP nut and
seal for the connection of 21.5mm ( /4in) plastic
3
overflow pipe which should generally discharge internally
into the household drainage system. If this is not
possible, discharge into an outside drain is acceptable.
10.7
Fitting The Flue
HORIZONTAL FLUE
Wall Thickness
1. The standard flue is suitable for lengths between
100mm minimum and 685mm maximum, as measured
from the edge of the flue elbow outlet to the joint
between the terminal and air duct (Fig. 34).
Flue Elbow
(X)
2. Locate the flue elbow on the adaptor at the top of
the boiler. Set the elbow to the required orientation
(Fig. 35).
Adaptor
NOTE: The flue elbow is angled at 91.5 degrees to
ensure a fall back to the boiler.
3. Measure the distance from the outside wall face to
the elbow. This dimension will be known as ‘X’ (Fig. 36).
4. To dimension ‘X’ add 50mm. This dimension to be
known as ‘Y’.
IMPORTANT: Check all dimensions before cutting.
Fig. 35
(X)
Wall Thickness
Fig. 36
29
© Baxi Heating UK Ltd 2009
10.0 Installation
10.7
Fitting the Flue (Cont)
Waste
Y
5. Mark dimension ‘Y’ on the flue as shown (Fig. 37).
Carefully cut the waste material from the flue, ensuring
that the ducts are square and free from burrs.
6. The inner flue duct support bracket may be in the
waste portion of the flue. In this case retrieve the
bracket before discarding the waste.
Flue
Fig. 37
7. Take the inner flue support bracket (if not already
fitted) and engage it over the flue duct. This will
centralise the flue and air ducts, and ease assembly
(Fig. 38).
8. Insert the flue through the hole in the wall. Fit the
elbow to the boiler adaptor, ensuring that it is pushed
fully in.
Inner Flue Support Bracket
9. Draw the flue back through the wall and engage it in
the elbow. It may be necessary to use soap solution or
similar to ease assembly of the elbow adaptor and flue
(Fig. 39).
10. Make good between the wall and air duct outside
the building.
Fig. 38
11. Fit the flue trim if required, and if necessary fit a
terminal guard (see Section 8.8 & 8.9).
VERTICAL FLUE
1. Only a flue approved with the Potterton Performa 24
Eco HE can be used.
Flue Elbow
Fig. 39
30
© Baxi Heating UK Ltd 2009
10.0 Installation
10.8
Making The Electrical Connections
To connect the mains input cable proceed as follows:-
1. Slacken the facia securing screws and lift the
outercase panel so that its locating tabs are clear of the
facia. Remove the panel.
2. Completely undo the screws securing the facia panel
and hinge it down (Fig. 40).
Control Box Cover
Fig. 41
3. Remove the control box cover securing screws.
Disengage the barbs on the control box from the
cover. Remove the cover (Fig. 41).
4. Slacken the cable clamp on the LH side of the boiler
chassis (Fig. 42). Insert the cable through the clamp and
route it to the terminal block.
5. Slacken the screws in the terminal block, connect
the input cable, and tighten the screws.
Fig. 40
Fig. 42
Facia Panel
Cable Clamp
6. If an external control is to be connected it can be
done at this point. Run the input cable from the
external control through the second cable clamp on
the boiler chassis. Refer to the instructions supplied
with the control.
Frost Thermostat
br
b
L
Fuse
N
L
N
External Clock
g/y
bk
bk
7. To connect external control(s) remove the link
between terminals 1 & 2. The 230V supply at terminal
1 must be connected to the external control. The
switched output from the external control must be
connected to terminal 2 (Fig. 43).
Fused supply 3A
230V ~ 50Hz
Always fit fast
blow 2A fuse
1
230 V
SL
N
2
br
b
Live (brown)
Neutral (blue)
g/y
bk
bk
Earth (green/yellow)
Room Thermostat
NOTE: If the room thermostat being used
incorporates an anticipator it MUST be wired as
shown in Fig. 43
1
2
230V
IMPORTANT: If an integral timer is fitted to the boiler
an external frost thermostat wired as shown will not
operate correctly. Only external timers may be used in
such installations, as in the diagram.
IMPORTANT: The external control MUST be
suitable for 230V switching.
Terminal Block
Fig. 43
8. Ensure that both mains input and, where fitted,
external control input cables have sufficient slack to
allow the control box to drop down. Tighten the cable
clamp(s) on the boiler chassis.
Functional Flow Diagram
Pump
Fan
L
External
Controls
230 V
br
br
b
b
N
bk
b
br
br
Pressure Switch
9. If the optional integral timer is to be used it should
be fitted at this point. Refer to the instructions supplied
with the timer. NOTE: An external frost thermostat
cannot be used with the integral timer.
br
b
Selector /
Reset Switch
N
bk
b
b
Flue Thermostat
Safety Overheat Thermostat
r
Central Heating
NTC Sensor
b
r
r
g
DHW
NTC Sensor
bk
g
10.9
Preliminary Electrical Checks
PCB
bk
bk
Gas Valve Modulator
Spark Electrode
Gas Valve
1. Prior to commissioning the boiler preliminary
electrical system checks should be carried out.
b
br
bk
Key to Wiring
b - blue
br - brown
bk - black
r - red
Condensate Trap
2. These should be performed using a suitable meter,
and include checks for Ground Continuity,
Flame Sensing Electrode
r
Hydraulic Differential Pressure Switch
DHW Flow Priority Microswitch
g - green
Resistance to Ground, Short Circuit and Polarity.
r
g
g
Fig. 44
31
© Baxi Heating UK Ltd 2009
11.0 Commissioning the Boiler
11.1
Commissioning the Boiler
Screw
1. Reference should be made to BS 5449 Section 5
when commissioning the boiler.
2. At the time of commissioning complete all relevant
sections of the Benchmark Commissioning Checklist at
the rear of this publication.
Automatic Air
Vent
3. Open the mains water supply to the boiler.
4. Open all hot water taps to purge the DHW system.
5. Ensure that the filling loop is connected and open,
then open the heating flow and return valves on the
boiler.
6. Open the screw on the automatic air vent
(Fig. 45).
7. The system must be flushed in accordance with BS
7593 (see Section 6.2) and the flushing agent
manufacturers instructions.
Pump
Fig. 45
8. Pressurise the system to 1.0 bar then close and
disconnect the filling loop.
9. Turn the gas supply on and purge according to in GB
BS 6891 and in IE I.S. 813 “Domestic Gas Installations”.
2
1
3
0
4
10. Test for gas soundness.
bar
11. If at any time during commissioning it is required to
terminate a particular cycle, e.g. the pump overrun
period, turn the selector to the OFF position and then
Selector Switch
Fig. 46
Pressure Gauge
back to either ( ) or (
) (Fig. 47).
2
Burner On
Reset
1
3
Flame Failure
Power On
0
4
bar
Power On
Neon
Hot Water
Temperature Control
Central Heating
Temperature Control
Fig. 47
32
© Baxi Heating UK Ltd 2009
11.0 Commissioning the Boiler
Pressure Test Point
Sealing Screw
11.2
Checking the Burner Pressure
1. Turn on the gas and electrical supplies to the boiler
and ensure that all external controls are calling for
heat.
Gas Valve
2. Set the temperature controls to maximum and the
selector switch to the Off position (Fig. 51).
3. Slacken the pressure test point sealing screw on the
gas valve and connect a pressure gauge (Fig. 48).
Fig. 48
4. Undo the screws securing the inner door panel. Lift
the panel slightly to disengage it from the studs on top
of the case.
Plastic
Protection
Cap
5. Turn the selector switch fully anticlockwise against
the spring pressure to the reset position and hold for
2 seconds to reset the boiler (Fig. 51).
6. Turn the selector switch to the Cental Heating and
Domestic Hot Water position (
neon ( ) will illuminate (Fig. 51).
). The power On
Modulator
Wire
Maximum Rate
Adjustment Nut
7. Turn a hot water tap on to give a flow rate of at
least 10l/min.
Minimum Rate
Adjustment Nut
Fig. 49
NOTE: Gas Valve Electrical
Plug/Igniter not shown for clarity.
8. The pressure should be :-
NG
Propane
10.2mbar
21.8mbar
If not, check that the gas supply pressure is correct
(Natural Gas 20mbar, and Propane 37mbar).
2
9. The pressure can be adjusted if required.
1
3
0
4
10. To check and set minimum pressure first remove
one of the modulator wires.
bar
Selector Switch
Pressure Gauge
Fig. 50
Adjusting the Pressure (Fig 49)
11. Remove the plastic protection cap from the
pressure adjustment nuts on the valve.
2
Burner On
Reset
1
3
Flame Failure
Power On
0
4
bar
12. The smaller nut (5mm) adjusts minimum pressure
and the larger nut (8mm) maximum pressure.
Power On
Neon
13. Using a suitable spanner adjust the relevant nut
until the correct pressure is achieved.
Central Heating
Temperature Control
Hot Water
Temperature Control
Fig. 51
14. Once the pressure has been set turn the boiler off
and disconnect the pressure gauge.
15. Tighten the pressure test screw and refit the
modulator to the valve. Reassemble in reverse order.
33
© Baxi Heating UK Ltd 2009
12.0 Completion
12.1
Completion
Case Front Panel
1. Refit the case front panel and tighten the securing
screws (Fig. 52).
2. Instruct the user in the operation of the boiler and
system, explaining the operational sequence.
3. Carefully read and complete all sections of the
Benchmark Commissioning Checklist at the rear of this
publication that are relevant to the appliance and
installation. These details will be required in the event of
any warranty work. The publication must be handed to
the user for safe keeping and each subsequent regular
service visit recorded.
4. For IE, it is necessary to complete a “Declaration of
Conformity” to indicate compliance with I.S. 813. An
example of this is given in I.S. 813 “Domestic Gas
Installations”. This is in addition to the Benchmark
Commissioning Checklist.
5. Hand over the Users Operating, Installation and
Servicing Instructions, giving advice on the necessity of
regular servicing.
Facia Panel
Fig. 52
34
© Baxi Heating UK Ltd 2009
13.0 Servicing the Boiler
Case Front Panel
13 .1 Annual Servicing
1. For reasons of safety and economy, it is
recommended that the boiler is serviced annually.
Servicing must be performed by a competent person.
2. After servicing, complete the relevant Service Interval
Record section of the Benchmark Commissioning
Checklist at the rear of this publication.
3. Ensure that the boiler is cool.
4. Ensure that both the gas and electrical supplies to
the boiler are isolated.
5. Slacken the screws securing the facia panel. Lift the
outercase panel so that its securing tabs are clear of the
facia. Remove the panel (Fig. 53).
Fig. 53
6. Remove the screws securing the inner door panel. Lift
the panel slightly to disengage it from the studs on top
of the case (Fig. 54).
Facia Panel Securing
Screws
7. Note the positions of the three wires on the fan
motor and remove them. Remove the sensing tube
from the fan spigot (Fig. 55).
Fan Wires
Fan
8. Slacken the screws on the fan spigot outlet pipe
clamp. Ease the clamp to the left over the pipe.
9. Remove the four screws securing the combustion
box door and remove the door (Fig. 54).
Sensing
Tube
Ease Outlet Pipe Clamp
To The Left
Fig. 55
Combustion
Box Door
Fig. 54
Inner Door
Panel
35
© Baxi Heating UK Ltd 2009
Baffle
Tab
Spring Clip
13.0
Servicing the Boiler
13.1
Annual Servicing (Cont)
10. Ease the front edge of the left hand baffle upwards,
disengaging the spring clip. Disengage the tab on the
baffle from the slot in the fan hood (Fig. 56).
11. Undo the screws securing the fan and hood to the
appliance back panel. Draw the assembly forwards
(Fig. 57).
Fig. 56
12. Undo the screws securing the burner to the injector
manifold. Draw the burner out of the combustion box,
pulling the electrode grommets from the slots in the
combustion box lower panel (Fig. 58).
Fan and Hood
Assembly
Fig. 57
13. Disconnect the electrode leads and grommets from
the electrodes. Completely remove the burner (Fig. 58).
14. Brush any deposits from the injectors. Do not use a
pin or wire to clean them.
15. Brush the burner blades and venturis and clean the
combustion box.
16. Ensure that the heat exchanger fins are clear of any
obstruction.
Electrode
Grommets
NOTE: If necessary the secondary heat exchanger
may be dismantled - see section 14.24.
DHW Filters (Fig. 60)
17. If the flow of domestic hot water is diminished, it
may be necessary to clean the filters.
18. Initially check the cold water inlet tap filter.
Fig. 58
Threaded
Bush
19. Turn the tap off. Undo the blanking cap and remove
the thread bush (Fig. 59).
Fig. 59
Burner
20. Extract the filter and rinse thoroughly in clean water.
Reassemble and check the flow. If required clean the
manifold filter as described below.
Cartridge
Body
21. Undo the filter cartridge from the inlet/return
manifold.
Filter Gauze
22. Dismantle the cartridge and carefully remove the
flow regulator and filter gauze. Rinse them thoroughly in
clean water and reassemble in reverse order.
Blanking Cap
Cold Water
Inlet Tap
23. Check that the pressure vessel charge is 0.5bar and
reassemble in reverse order of dismantling and
recommission.
Flow
Regulator
Venturi
24. Turn the selector switch fully anticlockwise against
the spring pressure to the reset position and hold for 2
seconds to reset the boiler.
Fig. 60
25. Complete the relevant Service Interval Record
section of the Benchmark Commissioning Checklist at
the rear of this publication and then hand it back to the
user.
Inlet/Return Manifold
36
© Baxi Heating UK Ltd 2009
14.0 Changing Components
IMPORTANT: When changing components ensure
that both the gas and electrical supplies to the
boiler are isolated before any work is started.
When the new component has been fitted turn the
selector switch fully anticlockwise against the spring
pressure to the ‘Reset’ position and hold for 2
seconds to reset the boiler before recommissioning.
Pressure
Switch
Sensing
Tubes
See Section 13.1 “Annual Servicing” for removal of case
panel, door etc.
14.1
Fan (Figs. 62 & 63)
Fig. 61
1. Note the positions of the sensing tube on the outlet
elbow and three wires on the fan motor and remove
them.
Pressure
Switch Wires
2. Slacken the screw on the fan spigot outlet pipe clamp.
Ease the clamp to the left over the pipe.
3. Remove the four screws securing the combustion box
door and remove the door.
Fan Wires
Fan
4. Ease the front edge of the left hand baffle upwards,
disengaging the spring clip. Disengage the tab on the
baffle from the slot in the fan hood.
5. Undo the screws securing the fan hood to the
appliance back panel, and draw the fan and hood
assembly forwards.
Sensing
Tube
6. Remove the screws and spring washers securing the
fan to the hood, and the screw securing the outlet pipe.
Ease Outlet Pipe Clamp
To The Left
7. Transfer the outlet pipe and clamp to the new fan.
8. Fit the new fan to the hood using the screws and
spring washers previously removed.
Fig. 62
9. Reassemble in reverse order of dismantling.
14.2
Pressure Switch (Fig. 61)
Fan Spigot
Outlet Pipe
1. Remove the fan and hood assembly as described in
section 14.1.
2. Note the positions of the two sensing tubes and
wires and remove them.
Baffle
Tab
Spring Clip
3. Remove the two screws holding the pressure switch
to the bracket on the combustion box top panel.
Fan
4. Fit the new pressure switch and reassemble all
components in reverse order of dismantling.
Fan Hood
Fig. 63
Spring Washer
Securing Screw
37
© Baxi Heating UK Ltd 2009
14.0 Changing Components
14.3
Heat Exchanger (Fig. 64)
1. Remove the fan as described in section 14.1.
2. Drain the primary circuit. Prise the three pipe
connecting clips off the joints in the flow and return
pipes. Remove the heat exchanger return pipe.
3. Lift the heat exchanger to disconnect the flow pipe
joint. Withdraw it from the appliance, taking care not to
damage the rear insulation piece.
Pipe Connecting
Clips
Heat Exchanger
Return Pipe
4. Fit the new heat exchanger.
5. Reassemble in reverse order of dismantling, and
repressurise the system.
14.4
Burner (Fig. 65)
1. Remove the four screws securing the combustion box
door and remove the door.
Flow Pipe
2. Undo the screws securing the burner to the injector
manifold. Draw the burner out of the combustion box,
pulling the electrode grommets from the slots in the
combustion box lower panel.
Fig. 64
Heat Exchanger
3. Disconnect the electrode leads and grommets from
the electrodes. Completely remove the burner.
4. Undo the screws securing the electrodes to the
burner. Examine the condition of the electrodes,
replacing if necessary. Fit the electrodes to the new
burner.
5. Engage the burner location brackets over the studs on
the injector manifold and reassemble in reverse order.
Burner
Electrodes
Electrode
Grommets
Fig. 65
Electrode
Leads
38
© Baxi Heating UK Ltd 2009
14.0 Changing Components
Injector
Manifold
Inlet Elbow
14.5
Injectors (Fig. 66)
1. Remove the burner as described in Section 14.4.
2. Undo the screws securing the injector manifold to
the inlet elbow and remove the manifold.
Gasket
3. Unscrew and replace injectors as required and
examine the sealing gasket, replacing as necessary.
Reassemble in reverse order.
Injector
14.6
Electrodes (Fig. 66)
Burner
Electrodes
1. Remove the four screws securing the combustion
box door and remove the door.
Fig. 66
Electrode
Grommets
2. Undo the screws securing the burner to the
injector manifold. Draw the burner out of the
combustion box, pulling the electrode grommets from
the slots in the combustion box lower panel.
Electrode
Leads
3. Disconnect the lead and grommet from the
electrode being replaced. Undo the securing screw
and withdraw the electrode to the burner.
4. Reassemble in reverse order.
14.7
Insulation (Fig. 67)
1. Remove the four screws securing the combustion
box door and remove the door.
2. Slide the side insulation pieces carefully out of their
carriers.
3. To replace the rear insulation piece it is necessary
to remove the heat exchanger as described in Section
14.3 and slide out the side pieces.
Side Insulation
4. The combustion box door insulation piece can be
replaced by carefully bending up the two retaining
tabs.
Rear Insulation
5. Replace all insulation pieces and reassemble in
reverse order.
13.8
Side Insulation
Combustion Box
Door
Front Insulation
Fig. 67
39
© Baxi Heating UK Ltd 2009
14.0 Changing Components
14.8
Gas Valve (Fig. 68)
1. Undo the nut on the gas feed pipe under the boiler.
Modulator
Wires
2. Completely undo the securing screws and hinge the
facia panel down.
Ignition
Lead
Gas Valve
3. Disconnect the wires from the valve modulator and
the ignition lead from the spark generator. Disconnect
the pressure sensing pipe from the valve. Undo the
screw securing the spark generator electrical plug to the
valve and disconnect the plug.
4. Pull the earth wire off the spade terminal on the valve.
5. Remove the screws securing the inlet pipe flange to
the boiler bottom panel and those securing the outlet
manifold to the burner manifold.
Electrical Plug
6. Remove the valve from the boiler.
Earth Wire
Inlet Pipe
7. Note the orientation of the inlet pipe and outlet
manifold. Undo the securing screws and remove the
pipe and manifold.
Gas Feed
Pipe
8. Examine the ‘O’ ring seals for damage, replacing as
necessary.
Fig. 68
9. Fit the inlet pipe and outlet manifold to the new valve,
ensuring that the ‘O’ ring seals are in place.
10. Reassemble in reverse order and check the burner
pressure (Section 11.2).
Flow Pipe
14.9
Temperature Sensor (Fig. 69)
1. Ease the retaining tab on the sensor away and
disconnect the electrical plug.
Safety Thermostat
2. Unscrew the sensor from it’s pocket and reassemble
in reverse order. The plug will only fit one way.
14.10 Safety Thermostat (Fig. 69)
1. Pull the electrical connections off the thermostat.
2. Remove the screws securing the thermostat to the
mounting plate on the flow pipe.
Temperature
Sensor
3. Reassemble in reverse order. The thermostat is not
polarised - either wire can fit either terminal on the
thermostat.
Fig. 69
40
© Baxi Heating UK Ltd 2009
14.0 Changing Components
14.11 Pump - Head Only (Fig. 71)
1. Drain the primary circuit and remove the socket
head screws securing the pump head to the body and
draw the head away.
2. Undo the screw on the pump wiring cover and
remove the cover. Using a suitable flat bladed screw
driver press the cable securing levers downwards to
release each wire after noting their position.
3. A standard Grundfos 15-60 replacement head can
now be fitted. Connect the wiring to the new head.
The pump speed must be set to 3 (Fig. 72).
4. Reassemble in reverse order.
14.12 Pump - Complete (Fig. 73)
1. Drain the primary circuit and unscrew the automatic
air vent from the pump body. Undo the two screws
securing the body to the pipe and manifold and draw
the pump forwards.
Pump Wiring
Cover
Pump Body
2. Undo the screw on the pump wiring cover and
remove the cover. Using a suitable flat bladed screw
driver press the cable securing levers downwards to
release each wire after noting their position.
Socket Headed
Screw
3. Connect the wiring to the new pump. Examine the
‘O’ ring seals on the return pipe and manifold, replacing
if necessary.
Pump Head
4. Fit the air vent to the pump body and reassemble in
reverse order.
Fig. 71
14.13 Automatic Air Vent (Fig. 73)
1. Drain the primary circuit and unscrew the automatic
air vent from the pump body.
Pump Setting
Automatic Air
Vent
2. Examine the ‘O’ ring seal, replacing if necessary, and
fit it to the new automatic air vent.
Fig. 72
3. Reassemble in reverse order.
Pump Wiring
Cover
Fig. 73
41
© Baxi Heating UK Ltd 2009
14.0 Changing Components
14.14 Pressure Gauge (Figs. 74 & 75)
1. Drain the primary circuit and undo the nut on the
pressure gauge capillary.
2. Remove the timer cover and ease the timer wiring
aside. Undo the screws securing the gauge retaining
bracket.
Fig. 74
Pressure Gauge
Capillary
3. Remove the bracket and gauge assembly. Depress
the barbs on the side of the gauge and remove the
retaining bracket.
Gauge Retaining
Bracket
4. Reassemble in reverse order.
14.15 Expansion Vessel (Fig. 76)
Timer Cover
1. To replace the expansion vessel it is necessary to
remove the boiler from the wall.
Pressure Gauge
Fig. 75
Note: Alternatively a vessel of equivalent
capacity can be fitted on the system return
pipe as close as possible to the boiler.
Expansion Vessel
2. Drain the system and undo all gas, water and
condensate drain connections. Remove the flue elbow.
3. Lift the boiler off the wall plate and lay it on it’s side
on a clean flat surface.
4. Undo the nut on the vessel outlet spigot, and
remove the locknut and spring washer securing the
spigot to the boiler chassis.
Retaining Clip
5. Undo the screws and remove the appliance upper
cross member. Slide the expansion vessel out of the
retaining clips.
Vessel Outlet Spigot
Boiler Chassis
Lock Nut
6. Reassemble in reverse order. Fully recommission
the appliance and system.
Spring
Washer
14.16 Condensate Trap (Fig. 77)
Fig. 76
1. Disconnect the two sensing wires from the trap
connections.
Inlet Pipe
Sensing Wires
2. Squeeze together the wire spring clip to release and
ease the inlet pipe from the trap spigot.
Wire Spring
Clip
3. Undo the nut securing the condensate drain pipe to
the trap. Disconnect the pipe and sealing washer.
Condensate
Trap
4. From underneath the boiler remove the screws
securing the trap bracket.
Bracket
5. Remove the trap and bracket from the boiler. Undo
the locknut securing the trap to the bracket.
Fig. 77
Condensate
Drain Pipe
6. Reassemble in reverse order.
42
© Baxi Heating UK Ltd 2009
14.0 Changing Components
14.17 Pressure Relief Valve (Fig. 78)
1. Drain the primary circuit.
2. Disconnect the discharge pipe from the valve. Using a
suitable hexagon key undo the grub screw sufficiently to
release the valve.
3. Note the orientation of the valve, rotate it and
withdraw it from the manifold.
4. Fit the new valve and ‘O’ ring seal and set to the
previously noted orientation. Reassemble in reverse
order.
‘O’ ring seal
14.18 P.C.B. (Fig. 80)
1. Note the settings of the temperature control knobs.
Rotate the knobs fully anticlockwise and carefully pull
them off the drive pins.
Grub Screw
Pressure Relief Valve
2. Completely undo the screws securing the control box
cover and release the cover retaining barbs from their
slots. Disengage the rear of the cover from the control
box hinge pin (Fig. 79).
Fig. 78
Discharge Pipe
3. Note the position of all plugs and wires on the P.C.B.
and disconnect them.
4. Undo the securing screws and remove the P.C.B.
Transfer the control knob drive pins to the new P.C.B.
and turn them fully anticlockwise.
5. Reassemble in reverse order, ensuring that the
temperature controllers are reset to their previous
positions.
Control Box Cover
P.C.B.
Fig. 79
14.19 Selector Switch (Fig. 80)
1. Note the setting of the selector switch knob and
carefully pull it off the facia.
2. Completely undo the screws securing the control box
cover and release the cover retaining barbs from their
slots. Disengage the rear of the cover from the control
box hinge pin (Fig. 79).
Selector
Switch
Drive Pins
3. Note the position of the electrical connections and
the orientation of the switch. Remove the electrical
connections.
4. Remove the screws securing the switch to the facia
panel.
5. Fit the new switch, ensuring that it is correctly
positioned and reassemble in reverse order.
Facia
Fig. 80
Selector Switch Knob
Temperature Control Knobs
43
© Baxi Heating UK Ltd 2009
14.0 Changing Components
Plate Heat Exchanger
14.20 Plate Heat Exchanger (Fig. 67)
1. Drain the primary circuit.
2. While supporting the heat exchanger undo the
screws securing it to the brass manifolds.
3. Withdraw the heat exchanger upwards and to the
left of the gas valve, taking care not to damage any
wires or controls.
Rubber Seal
Seals
4. There are four rubber seals between the manifolds
and heat exchanger which may need replacement.
Fig. 81
5. Ease the seals out of the manifold. Replace carefully,
ensuring that the seal is inserted into the manifold
parallel and pushed fully in.
6. When fitting the new heat exchanger note that the
left hand location stud is offset towards the centre
more than the right hand one.
7. Reassemble in reverse order.
14.21 Diverter Valve Assembly
(Figs. 82 & 83)
The diverter valve assembly comprises of a central
heating pressure differential valve and a domestic hot
water pressure differential valve. These are connected
to a manifold which is joined to the plate heat
exchanger.
Sensing Pipes
Diverter Manifold
DHW Pressure Differential Valve (Fig. 83)
1. Drain the primary circuit.
Microswitch
Bracket
2. Undo the screw securing the microswitch bracket to
the valve (Fig. 82).
Grub Screws
3. Disconnect the two sensing pipes and slacken the
grub screws securing the valve to the diverter manifold.
DHW Pressure
Differential Valve
Fig. 82
4. Draw the valve away from the diverter manifold. The
valve may now be replaced or split to examine the
diaphragm.
Diaphragm
5. To examine the diaphragm hold the valve body
securely and carefully remove the six screws. The
diaphragm spring will force apart the two halves of the
valve.
Diaphragm
Spring
6. Remove the plastic disc and pushrod assembly.
Carefully examine the diaphragm and replace it if there
is any damage.
Plastic Disc
Pushrod
7. Reassemble in reverse order.
Fig. 83
44
© Baxi Heating UK Ltd 2009
14.0 Changing Components
Central Heating Pressure
Differential Valve
Microswitch / Bracket
14.21 Diverter Valve Assembly (Cont)
Sensing Pipe
Pressure Differential Valve (Fig. 84)
1. Remove the pressure differential valve as described
above.
By-pass Pipe
Diaphragm
2. From the brass diverter manifold undo the nut on
the heating flow pipe. Remove the screw securing the
diverter manifold to the appliance lower bracket.
Spring Clip
3. Disconnect the pressure gauge capillary from the
diverter manifold and remove the two wires from the
microswitch.
Heating Flow
Pipe
4. Prise off the spring clip securing the by-pass pipe to
the diverter manifold and disconnect the sensing pipe.
Diverter Manifold
5. Ease the diverter manifold out of the plate heat
exchanger manifold. Remove the assembly from the
appliance.
Fig. 84
Pressure Gauge
Capillary
6. Undo the screw securing the microswitch bracket
to the valve body. The sensor may now be dismantled
to examine the diaphragm.
7. To examine the diaphragm hold the assembly
securely and carefully remove the four screws. The
diaphragm spring will force the two halves of the valve
apart.
8. Carefully examine the diaphragm and replace it if
there is any damage.
9. Reassemble in reverse order.
CH Pressure Microswitch (Fig. 84)
1. Remove the two wires from the Pressure
microswitch.
2. Undo the screw securing the microswitch bracket
to the valve body.
3. Reassemble in reverse order.
Cartridge
Body
14.22 Flow Regulator (Figs. 85 & 86)
Filter Gauze
1. Undo the filter cartridge from the inlet/return
manifold.
Fig. 85
2. Unscrew the venturi and remove the flow regulator.
Flow
Regulator
Fig. 86
3. Check the cleanliness of the filter gauze, rinsing
thoroughly in clean water as necessary. Fit the new
flow regulator and reassemble in reverse order.
Venturi
Inlet/Return Manifold
45
© Baxi Heating UK Ltd 2009
14.0
Changing Components
Secondary
Heat Exchanger
14.23 Secondary Heat Exchanger (Fig. 87)
1. Drain the primary circuit
Pipe Connecting Clip
2. Undo the four screws securing the right hand case
panel. Remove the panel.
3. Prise the connecting clips from the heat exchanger
return pipe and the boiler return pipe. Remove the
pipes.
Outer Drum
4. Remove the fan and hood assembly as described in
Section 14.1
Boiler Return Pipe
5. Remove the nut securing the elbow to the secondary
heat exchanger. Draw the elbow and outlet pipe
forwards.
Heat Exchanger
Return Pipe
Elbow
Fig. 87
6. Remove the secondary heat exchanger from the
outer drum by easing it forward.
7. Reassemble in reverse order of dismantling.
14.24 Flue Overheat Thermostat (Fig. 88)
NOTE: The flue overheat thermostat includes a
reset button. Check that the thermostat will not
reset before replacing.
1. Remove the fan and hood assembly as described in
Section 14.1
2. Pull the two wires off the terminals on the flue
overheat thermostat. Unscrew the thermostat from the
adaptor in the outlet elbow.
3. Reassemble in reverse order of dismantling.
Fig. 88
Overheat Thermostat
46
© Baxi Heating UK Ltd 2009
15.0 Illustrated Wiring Diagram
Pump
Mains Input
Link
g/y
On/Off/Reset
Selector Switch
b
br
Fuse
Temperature Sensor
bk
g/y
bk
br
b
8
b
b
b
9
Hydraulic Differential
Pressure Switch
10
br
1
bk
2
bk
11
r
3
1
4
br
12
13
14
15
16
17
br
r
2
3
4
5
6
7
br
bk
18
19
20
b
r
Flue Thermostat
r
M3
b
r
Optional Timers
Gas Valve
M1
35
b
bk
Control PCB
36
37
38
39
M2
M7
bk
br
b
44
43
42
M4
bk
bk
Safety Thermostat
32
31
30
29
28
b
b
Air Pressure
Switch
3-Way Valve
Microswitch
br
br
27
g/y
M5
FA2
Fan
g/y
Flame
Sensing
Electrode
Condensate
Trap
br - brown
bk - black
b
r
- blue
- red
y
- yellow
g/y - green / yellow
w - white
gr - grey
47
© Baxi Heating UK Ltd 2009
16.0 Fault Finding
Carry out initial fault finding checks
1. Check that gas, water and electrical supplies are available at the boiler. Electrical supply = 230V ~ 50 Hz.
CH water system pressurised to 0.5 bar when the boiler is cold. The preferred minimum gas pressure is 19.5mbar (natural gas),
or 36mbar (propane).
2. Carry out electrical system checks, i.e. Ground Continuity, Resistance to Ground, Short Circuit and Polarity with a suitable meter.
NOTE: These checks must be repeated after any servicing or fault finding.
3. Ensure all external controls are calling for heat and check all external and internal fuses. Before any servicing or replacement of parts
ensure the gas and electrical supplies are isolated.
Refer to Section 13.1 “Illustrated Wiring Diagram” for position of numbered terminals
Central Heating - Follow operational sequence
NOTE: When instructed to turn the Selector to
Turn selector to
neon illuminated
the reset position turn the Selector Switch fully
anticlockwise against the spring pressure and hold
for 2 seconds to reset the boiler.
NO
Go to section ‘A’
YES
Go to section ‘B’
YES
Turn
thermostat
to max.
Pump runs
External controls and, where
fitted, integral timer calling for
heat
Ensure controls are set to
demand and verify the
contacts are closed
NO
NO
YES
NO
NO
Primary flow switch operated
YES
Go to section ‘C’
Turn the selector switch to
the ‘Reset’ position and hold
for at least 2 seconds. If
regular resetting is required,
or appliance still does not
operate, investigation is
necessary
Go to sections ‘J’, ‘L’ & ‘D’
Fan runs at max speed
YES
NO
NO
Air pressure
switch proved
Go to section ‘E’
YES
YES
Spark at ignition electrodes
for up to 10 seconds
Turn selector to the reset
position. If the light does not
extinguish go to sections
H & K
illuminated
NO
YES
Replace PCB
NO
YES
Burner on
neon
Go to section ‘F’
Go to section ‘I’
illuminated
YES
Burner extinguishes
after 10 seconds
NO
Burner output
modulates until set
temperature is reached
NO
YES
Go to section ‘G’
Fan stops
YES
YES
YES
Operation sequence correct
Burner goes out
Pump stops
48
© Baxi Heating UK Ltd 2009
16.0 Fault Finding
Domestic Hot Water - Follow operational sequence
Turn selector to
neon illuminated
NO
Replace diaphragm
Go to section ‘A’
YES
YES
Is mains water
filter and differential
assembly clean?
YES
DHW flow valve diaphragm
damaged
NO
YES
Turn
thermostat to max.
NO
DHW flow rate more than
2.5l/min.
DHW flow valve rod
obstructed
Open DHW tap fully. DHW
flow switch operated
YES
NO
YES
Replace DHW flow
microswitch
Continuity across DHW flow
microswitch terminals and
PCB - M1 connector
terminals 13 & 14 (terminals
12-14 open)
Primary water is diverted
from CH system to DHW
heat exchanger and flow
microswitch operated
NO
Replace PCB
YES
NO
NO
NO
Pump runs
YES
Go to section ‘B’
Go to section ‘C’
Primary flow switch operated
YES
Turn the selector switch to
the ‘Reset’ position and hold
for at least 2 seconds. If
regular resetting is required,
or appliance still does not
operate investigation is
necessary
Go to section ‘J’, ‘L’ & ‘D’
Fan runs at max speed
YES
NO
NO
Go to section ‘E’
Air pressure switch proved
YES
Turn the selector to the reset
position. If the light does not
extinguish go to section
H & K
YES
neon illuminated
NO
Spark at ignition electrodes
for up to 10 seconds
YES
Replace PCB
NO
YES
Burner on
neon
Go to section ‘F’
Go to section ‘I’
illuminated
YES
Burner extinguishes
after 10 seconds
NO
Reduce the DHW flow rate.
If burner does not modulate
clean temperature sensor and
DHW heat exchanger. If
modulation does not occur
go to section ‘G’
NO
Burner output modulates to
maintain temperature set at
thermostat
YES
Close DHW tap
YES
DHW flow valve
senses no flow.
Primary water diverted to
CH system. DHW flow
switch released off
NO
NO
Diverter valve spindle
assembly faulty
YES
YES
YES
Operation sequence correct
Burner goes out
Fan stops
Pump stops
49
© Baxi Heating UK Ltd 2009
Fault Finding Solutions Sections A to F
16.0 Fault Finding
Is there 230V at:
A
NO
1.
2.
3.
Main terminals L and N
Main terminal fuse
Check electrical supply
Replace fuse
YES
NO
neon
illuminated
Replace PCB
NO
Selector terminals a & b and a
& 3. PCB - M1 connector
terminals 9 & 10
Check wiring
Replace selector
Is there 230V at:
B
NO
NO
1.
2.
Pump
If pump jammed, release
Replace pump
Replace PCB
PCB - M1 connector terminals 8 & 15
YES
Change pump supply cable
NO
1.
2.
CH system pressure 0.5 to 1.5 bar
Re-pressurise system
C
D
NO
Check the tap of the automatic air
vent is opened
Open the automatic air vent
YES
3.
Primary flow valve diaphragm damaged
NO
Replace diaphragm
Flow valve rod obstructed
1.
2.
3.
Continuity across flow
NO
Replace microswitch
Replace sensor
microswitch and PCB M2
connector terminals 3 & 4
Primary temperature sensor faulty.
Cold resistance approx. 11K ohms
(resistance reduces with increase in temp.)
YES
Fan connections correct at fan.
YES
YES
PCB - M5 connector, is 230V
Fan jammed or faulty winding
Replace PCB
Replace fan
across terminals 28 & 29
NO
Check and correct if necessary
1. Electrical and pressure tube connections
2. Blockage of pressure tubes
3. Restriction in flue
E
F
NO
Replace air pressure
switch
4. Venturi
NO
Gas at burner
Ensure gas is on and purged
YES
PCB - M4 connector is approx 230V AC, terminals
36 & 38
Replace gas valve
NO
YES
Turn selector switch to
‘Reset’ position
neon illuminated
NO
Replace PCB
50
© Baxi Heating UK Ltd 2009
Fault Finding Solutions Sections G to L
16.0 Fault Finding
G
1.
2.
Check the burner setting pressure of the
gas valve
(see Section 11.2 of Commissioning)
Voltage at modulating coil of gas valve is:
Max. burner press.approx 9V DC (13V DC LPG)
Min. burner press.approx 1V DC
YES
NO
Replace gas valve
Replace PCB
Current at modulating coil of gas valve is:
(Use an instrument with average function for this
measure)
30 ÷ 230 mA DC (45 ÷ 310 mA DC LPG)
NO
Check and correct if necessary
1. Ignition electrode and lead
2. Electrode connection
H
I
Replace PCB
230V at Main PCB - M4
connector across terminals
37 & 38. Check wiring
YES
YES
Replace gas valve
electrical plug/igniter
assy
3. Spark gap and position
Ensure that mains input terminal L
is Live (230V) and N is Neutral
(0V)
YES
Check and correct if necessary
1. Flame sensing electrode and lead connections
2. Electrode position
YES
NO
Replace PCB
Flame current should be 1 μA approx.
Replace flame sensing electrode
Boiler overheat thermostat operated
NO
Allow to cool. Continuity across
thermostat terminals more than
1.5 ohm
J
YES
Replace boiler overheat
thermostat
or faulty, i.e. continuity across
thermostat terminals
YES
Replace PCB
NO
Check terminal 1 of ON/OFF/RESET selector is in connection
with PCB - M1 connector terminal 16
Check electrical continuity across terminals 1 & a of
ON/OFF/RESET selector when turned to ‘Reset’ position
Replace ON/OFF/RESET selector
K
L
YES
Replace PCB
Press the reset button on the flue overheat thermostat. If the
boiler does not relight or repeatedly cuts out check the operation
of the flue system or replace the flue overheat thermostat. If the
flue overheat thermostat has not been activated see section ‘D’
51
© Baxi Heating UK Ltd 2009
17.0 Fault Indication Display
17.0
Fault Indication Display
1. The boiler has three neon indicators. The upper two
function as boiler on and fault indicators.
A
2. Depending on the nature of the fault the upper two neons
will illuminate, go off or flash.
Burner On
Flame Failure
Power On
Off
Fast Flashing (2 every second)
3. There are five possible combinations, each indicating one
or more fault conditions. These are described below.
On
A
The flue or flue terminal is blocked or obstructed in some
way, or there is an internal fault.
B
B
Burner On
Flame Failure
Power On
Off
Slow Flashing (1 every 2 seconds)
On
The circulating pump is faulty or the system pressure has
dropped. Check the system pressure. If the pressure is in the
normal range a pump fault is indicated.
C
A fault on the boiler temperature sensor is indicated.
D
C
The primary system or the boiler has overheated. Allow the
boiler to cool. Turn the selector switch fully anti-clockwise
against the spring pressure to the ‘Reset’ position and hold for
at least 2 seconds.
Burner On
Flame Failure
Power On
Slow Flashing (1 every 2 seconds)
Slow Flashing (1 every 2 seconds)
On
If the boiler does not relight after resetting it is possible that
the flue has overheated.
E
The burner has failed to light, or incomplete lighting of the
burner has occurred. Turn the selector switch fully anti-
clockwise against the spring pressure to the ‘Reset’ position
and hold for at least 2 seconds.
D
Burner On
Flame Failure
Power On
Slow Flashing (1 every 2 seconds)
If the boiler does not relight after resetting blockage of the
condensate drain or trap has occurred.
On
On
E
Burner On
Flame Failure
Power On
Off
On
On
52
© Baxi Heating UK Ltd 2009
18.0 Short Parts List
Short Parts List
Key
No.
G.C.
No.
Description
Manufacturers
Part No.
44
140
22
23
32
41
44
59
63
Fan
5112627
5112999
5112431
5112770
248210
22
Pressure Switch
Heat Exchanger
Burner
131
135
A
E66 402
E66 408
E66 411
Injector - 1.18 NG
Electrode Lead
63
248037
Spark or Sensing
Electrode
247384
248042
72
Pump
101
102
103
131
135
140
154
169
371
A
E66 432
E66 434
343 619
Hydraulic Outlet Assy. 248061
154
Valve - 3 Way Assy.
248062
23
Pressure Differential Assy.248063
Temperature Sensor
5108265
E66 697
Safety Limit Thermostat 248078
Gas Valve
PCB
5107339
5112657
248090
41
E66 453
Pressure Gauge
72
Igniter/Gas Valve Cable 5112385
101
Flue Overheat
Thermostat
5112395
59
102
103
371
32
169
53
© Baxi Heating UK Ltd 2009
GAS BOILER SYSTEM COMMISSIONING CHECKLIST
This Commissioning Checklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstrating
compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.
Failure to install and commission this equipment to the manufacturer’s instructions may invalidate the warranty but does not affect statutory rights.
Customer Name
Address
Telephone Number
Boiler Make and Model
Boiler Serial Number
Commissioned by (print name)
Company Name
CORGI ID Number
Telephone Number
Company Address
Commissioning Date
To be completed by the customer on receipt of a Building Regulations Compliance Certificate :
*
Building Regulations Notification Number (if applicable)
CONTROLS Tick the appropriate boxes
Time and Temperature Control to Heating
Room Thermostat and
Programmer/Timer
Programmable
Room Thermostat
Load/Weather
Compensation
Optimum Start
Control
Time and Temperature Control to Hot Water
Heating Zone Valves
Cylinder Thermostat and Programmer/Timer
Combination Boiler
Not Required
Not Required
Not Required
Not Required
Provided
Fitted
Fitted
Fitted
Fitted
Hot Water Zone Valves
Thermostatic Radiator Valves
Automatic Bypass to System
Boiler Interlock
ALL SYSTEMS
The system has been flushed and cleaned in accordance with BS7593 and boiler manufacturer’s instructions
Yes
What system cleaner was used?
What inhibitor was used?
Quantity
litres
ft3/hr
CENTRAL HEATING MODE Measure and Record:
m3/hr
mbar
OR
OR
Gas Rate
Burner Operating Pressure (if applicable)
Central Heating Flow Temperature
Central Heating Return Temperature
Gas Inlet Pressure
mbar
°C
°C
COMBINATION BOILERS ONLY
Is the installation in a hard water area (above 200ppm)?
If yes, has a water scale reducer been fitted?
What type of scale reducer has been fitted?
DOMESTIC HOT WATER MODE Measure and Record:
Gas Rate
Yes
Yes
No
No
ft3/hr
m3/hr OR
mbar OR
Burner Operating Pressure (at maximum rate)
Cold Water Inlet Temperature
Gas Inlet Pressure (at maximum rate)
mbar
°C
Hot water has been checked at all outlets
Water Flow Rate
Yes
Temperature
°C
l/min
CONDENSING BOILERS ONLY
The condensate drain has been installed in accordance with the manufacturer’s instructions and/or BS5546/BS6798
Yes
ALL INSTALLATIONS
If required by the manufacturer, record the following
CO2
%
OR CO
ppm OR CO/CO2 Ratio
The heating and hot water system complies with the appropriate Building Regulations
Yes
Yes
Yes
Yes
The boiler and associated products have been installed and commissioned in accordance with the manufacturer’s instructions
The operation of the boiler and system controls have been demonstrated to and understood by the customer
The manufacturer’s literature, including Benchmark Checklist and Service Record, has been explained and left with the customer
Commissioning Engineer’s Signature
Customer’s Signature
(To confirm satisfactory demonstration and receipt of manufacturer’s literature)
All installations in England and Wales must be notified to Local Authority Building Control (LABC) either directly or through a Competent Persons Scheme.
A Building Regulations Compliance Certificate will then be issued to the customer.
*
54
©Heating and Hotwater Industry Council (HHIC)
SERVICE RECORD
It is recommended that your heating system is serviced regularly and that the appropriate Service Record is completed.
Service Provider
Before completing the appropriate Service Record below, please ensure you have carried out the service as described in the manufacturer’s
instructions.
Always use the manufacturer’s specified spare part when replacing controls.
SERVICE 1 Date
Energy Efficiency Checklist completed?
Engineer Name
SERVICE 2 Date
Energy Efficiency Checklist completed?
Engineer Name
Yes
Yes
Yes
Yes
Yes
No
No
No
No
No
Yes
Yes
Yes
Yes
Yes
No
No
No
No
No
Company Name
Company Name
Telephone Number
CORGI ID Number
Comments
Telephone Number
CORGI ID Number
Comments
Signature
Signature
SERVICE 3 Date
Energy Efficiency Checklist completed?
Engineer Name
SERVICE 4 Date
Energy Efficiency Checklist completed?
Engineer Name
Company Name
Company Name
Telephone Number
CORGI ID Number
Comments
Telephone Number
CORGI ID Number
Comments
Signature
Signature
SERVICE 5 Date
Energy Efficiency Checklist completed?
Engineer Name
SERVICE 6 Date
Energy Efficiency Checklist completed?
Engineer Name
Company Name
Company Name
Telephone Number
CORGI ID Number
Comments
Telephone Number
CORGI ID Number
Comments
Signature
Signature
SERVICE 7 Date
Energy Efficiency Checklist completed?
Engineer Name
SERVICE 8 Date
Energy Efficiency Checklist completed?
Engineer Name
Company Name
Company Name
Telephone Number
CORGI ID Number
Comments
Telephone Number
CORGI ID Number
Comments
Signature
Signature
SERVICE 9 Date
Energy Efficiency Checklist completed?
Engineer Name
SERVICE 10 Date
Energy Efficiency Checklist completed?
Engineer Name
Company Name
Company Name
Telephone Number
CORGI ID Number
Comments
Telephone Number
CORGI ID Number
Comments
Signature
Signature
55
All descriptions and illustrations provided in this leaflet have been
carefully prepared but we reserve the right to make changes and
improvements in our products which may affect the accuracy of the
information contained in this leaflet. All goods are sold subject to our
standard Conditions of Sale which are available on request.
POTTERTON
A Trading Division of Baxi Heating UK Ltd (3879156)
A Division of Baxi Group
Brooks House, Coventry Road, Warwick. CV34 4LL
After Sales Service 08706 017 017 Technical Enquiries 08706 049 049
e&oe
o
© Baxi Heating UK Ltd 2009
Comp N 5111811 - Iss 6 - 3/09
|
Alpine Electronics Car Video System IVE W535HD User Manual
Audiovox Jensen Phase Linear UMP400 User Manual
Audiovox VBP500 User Manual
Cuisinart BFM 1000 User Manual
Custom Brackets Two Way System Horizontal Configuration CSC2264H User Manual
Eizo CG223W User Manual
Focal Polyglass 100 CVX User Manual
Hitachi LL 401 User Manual
HP (Hewlett Packard) HP 19 INch LCD Monitor LP1965 User Manual
JVC GR DVL355 User Manual