| 	
		 GOLD G V   
					W a t e r b o ile r — S e rie s 3   
					Ve n t in g S u p p le m e n t   
					S t a R-3 4   
					S p e c ia l g a s ve n t s ys t e m ve n t a n d c o m b u s t io n   
					a ir s u p p le m e n t   
					Flex-L International, Inc. StaR-34 AL29-4C®   
					Stainless Steel Special Gas Vent System may be   
					used in new installations of GV-3 through GV-6   
					boilers.   
					Hazard definitions   
					The following terms are used throughout this Venting Supplement to bring attention to the   
					presence of hazards of various risk levels or to important information concerning the life of   
					the product.   
					Indicates presence of hazards that will cause severe personal injury, death   
					or substantial property damage.   
					Indicates presence of hazards that can cause severe personal injury, death   
					or substantial property damage.   
					Indicates presence of hazards that will or can cause minor personal injury   
					or property damage.   
					Indicates special instructions on installation, operation or maintenance   
					that are important but not related to personal injury or property damage.   
					To the installer:   
					ThisVenting Supplement must only be used by a qualified installer/service   
					technician. Read these instructions completely before beginning the   
					installation. Failure to follow these instructions in proper order can cause   
					severe personal injury, death or substantial property damage.   
					To install a new vent system follow instructions in:   
					• 
					• 
					This Venting Supplement.   
					GV Boilers Vent/ Air Intake Termination Assembly Instructions, if   
					using Weil-McLain Vent/Air Intake Termination Kit. — OR —   
					• 
					GV Water Boiler Series 2 & 3 Direct vent Through-roof or Through-   
					unused-chim ney Venting Supplem ent, if using Weil-McLain   
					Through-Roof or Through-Unused-Chimney Termination Kit.   
					• 
					StaR-34 manufacturer’s instructions supplied with vent material.   
					For installations above 5,500 feet use only direct vent (ducted combustion   
					air) when sidewall venting. All of the vertical (through-roof or through-   
					unused-chimney) methods in thisVenting Supplement are acceptable. Can   
					result in severe personal injury, death or substantial property damage if   
					ignored.   
					Part Number 550-110-268/0699   
					Download from Www.Somanuals.com. All Manuals Search And Download.   
				S t a R-3 4 Ve n t in g S u p p le m e n t   
					Vent termination   
					anticipated snow line. In addition, vent termination must be   
					at least 7 feet above public walkway and 3 feet above any forced   
					air intake within 10 feet. Stay well away from trees, shrubs,   
					and decorative items. Site conditions may dictate greater   
					clearances. See Figure 1.   
					Venting method definitions   
					Direct vent — Uses outside combustion air with combustion   
					air connector piping sealed at all joints and seams.Also known as   
					“sealed combustion”.   
					Non-Direct vent — Uses inside combustion air with no   
					9. Vent must terminate at least 4 feet horizontally, and in no   
					case above or below, unless a 4 foot horizontal distance is   
					maintained, from electric meters, gas meters,regulators, relief   
					valves, and other equipment.   
					10. Locate or guard vent to prevent condensate from damaging   
					exterior finishes.   
					11. Do not extend exposed vent pipe outside of building.   
					Condensate could freeze and block vent pipe.   
					12. Vent must terminate at least 6 feet away from adjacent walls.   
					13. Do not terminate vent closer than 5 feet below roof overhang.   
					combustion air connector piping.   
					Properly locate vent termination   
					Follow instructions on this page when   
					determining vent location to avoid possibility   
					of severe personal injury,death or substantial   
					property damage.   
					1. When using direct vent method — Refer to separate   
					instructions packed with Weil-McLain direct vent termination   
					kit and vent pipe manufacturer's instructions for additional   
					locations.   
					2. For location of non-direct vent vertical termination, see vent   
					pipe manufacturer's instructions.   
					3. Gases will form white plume in winter.Plume could obstruct   
					window view.   
					4. Prevailing winds could cause freezing of condensate and   
					water/ice buildup on building, plants or roof.   
					5. Locate or guard vent to prevent accidental contact by people   
					or pets.   
					6. Do not terminate vent in window well, stairwell, alcove,   
					courtyard, or other recessed areas.   
					7. Non-Direct vent installations only — Vent must terminate   
					more than 1 foot below or to side of all doors or windows.   
					See Figure 1.   
					14. Do not terminate vent above any door or window.Condensate   
					can freeze, causing ice formations.   
					15. Do not use existing chimney as raceway if another appliance   
					or fireplace is vented into or through chimney.   
					16. Do not connect:   
					• 
					• 
					Any other appliance to vent pipe.   
					Multiple boilers to a common vent pipe.   
					17. Do not wrap or insulate vent pipe and fittings.   
					18. Canadian installations — See CAN/CGA B149.1 or B149.2   
					Installation Code.   
					19.   
					A gas vent extending through an exterior   
					wall shall not terminate adjacent to the wall   
					or below building extensions such as eaves,   
					parapets, balconies or decks. Failure to   
					comply could result in severe personal   
					injury, death or substantial property   
					damage.   
					8. Vent must terminate more than 1 foot above grade or   
					Figure 1 Vent termination locations   
					Forced   
					air intake   
					3 feet   
					If within 10 feet   
					1 foot   
					7 feet   
					1 ft   
					26808   
					Snow   
					26807   
					Part Number 550-110-268/0699   
					3 
					Download from Www.Somanuals.com. All Manuals Search And Download.   
				G O LD G V W a t e r b o ile r — S e r ie s 3   
					Installation   
					Pre-installation planning   
					1. Follow national, state, local or provincial codes or   
					regulations when venting GV boiler.   
					2. Choose vent method from those shown on page 5.   
					3. Select vent run components from Table 2. Table 3   
					states maximum vent run lengths and number of   
					elbows.Do not exceed data in Table 3. Longer vent   
					runs will slightly reduce boiler output. See Figure 2.   
					4. If installing with direct vent method, use same   
					maximum run length and number of elbows from   
					step 2. Vent and combustion air connector piping   
					configurations must match.Use suitable 3" material   
					for combustion air connector piping, such as:   
					• 
					• 
					• 
					Dryer vent   
					Galvanized steel   
					PVC (3" I.D.)   
					5. Refer to vent termination WARNING, item 19 on   
					page 3.   
					Description   
					Flex-L International, Inc.   
					Part Number (Note 1)   
					Table 2   
					Parts list   
					GV starter tee   
					--   
					GV termination coupling   
					45o elbow   
					SRAWGVT   
					SRE4503   
					90o elbow   
					SRE9003   
					6" pipe   
					SR06P03   
					1' pipe   
					SR12P03   
					2' pipe   
					SR24P03   
					3' pipe   
					SR36P03   
					5' pipe   
					SR60P03   
					Joiner band   
					SRJB-14   
					Weil-McLain Vent/Air Intake Termination Kit   
					382-200-430 (Note 2)   
					Weil-McLain Through-Roof or Through-Unused-Chimney Termination Kit 382-200-435 (Note 2)   
					Notes   
					1. Flex-L International, Inc. part number. Parts available through Flex-L International, Inc.   
					2. Weil-McLain part number. Parts available through Weil-McLain distributor.   
					Table 3   
					Figure 2 Boiler output   
					100   
					Vent and combustion air connector piping   
					lengths and number of elbows   
					GV-3   
					GV-4   
					GV-5   
					99   
					98   
					97   
					96   
					95   
					Maximum vent   
					length (feet)   
					Total number of elbows   
					0 
					2 
					3 
					4 
					5 
					6 
					7 
					8 
					GV-3 through GV-5 100 80 70 60 50 40 30 20   
					GV-6 80 60 50 40 30 20 10 --   
					GV-6   
					0 
					20   
					40   
					60   
					80   
					100   
					Total equivalent length (feet) of vent   
					(from boiler to vent termination)   
					4 
					Part Number 550-110-268/0699   
					Download from Www.Somanuals.com. All Manuals Search And Download.   
				S t a R-3 4 Ve n t in g S u p p le m e n t   
					For altitudes more than 5,500 feet above sea level — Do not use non-direct vent through   
					sidewall methods as shown in Figures 4 and 6 below. Can cause severe personal injury, death   
					or substantial property damage if ignored.   
					Select   
					vent   
					method   
					Figure 3 GV direct vent through sidewall   
					Figure 4 GV non-direct vent through sidewall   
					(using Weil-McLain Vent/Air Intake   
					(using Weil-McLain Vent/Air Intake   
					Termination Kit)   
					Termination Kit) (See WARNING above.)   
					Slope vent pipe downward, toward   
					boiler, minimum ¼” per foot.   
					Vent pipe   
					Vent pipe   
					ope   
					Sl   
					Sl   
					Slope vent   
					pipe   
					ope   
					Air pipe   
					downward,   
					toward boiler,   
					minimum ¼”   
					per foot.   
					StaR-34   
					StaR-34   
					26801   
					26802   
					vent starter tee   
					vent starter tee   
					Figure 5 GV direct vent (using Weil-McLain   
					Through-Roof or Through-Unused-   
					Chimney Termination Kit)   
					Figure 6 GV non-direct vent through sidewall   
					(using termination coupling)   
					(See WARNING above.)   
					Slope vent pipe   
					downward, toward   
					boiler, minimum   
					¼” per foot.   
					StaR-34   
					vent starter tee   
					26804   
					Slope vent pipe   
					downward, toward   
					boiler, minimum   
					¼” per foot.   
					Figure 7 GV non-direct vent through roof   
					Slope vent pipe   
					downward,   
					toward boiler,   
					minimum ¼”   
					per foot.   
					StaR-34   
					vent starter tee   
					StaR-34   
					vent starter tee   
					26805   
					26803   
					Part Number 550-110-268/0699   
					5 
					Download from Www.Somanuals.com. All Manuals Search And Download.   
				G O LD G V W a t e r b o ile r — S e r ie s 3   
					Installation — assembly   
					Connect vent starter   
					tee to boiler   
					Follow the instructions in the GV Series 3 Boiler Manual section IIb to connect the vent   
					starter tee to the boiler.   
					Follow vent pipe manufacturer's instructions for sealing the vent.Vent and   
					combustion air connector piping must be sealed gas-tight to prevent   
					possibility of flue gas spillage and carbon monoxide emissions, resulting in   
					severe personal injury or death.   
					Construct vent and   
					optional   
					combustion air run   
					1. Follow StaR-34 manufacturer's instructions to construct vent run and for methods of   
					supporting vent runs.   
					• 
					• 
					• 
					• 
					Clean joints before sealing. See vent pipe manufacturer's instructions to clean joints.   
					Use their specified sealant (maximum 250 0F flue temperature). Do not use screws.   
					Do not mix types or manufacturers of vent materials.   
					Maintain minimum one-inch clearance from combustible materials to vent pipe; 0"   
					clearance for noncombustible materials.   
					• 
					• 
					Install vent pipe with seams on top of vent runs.   
					If needed, male end of vent pipe may be cut to provide correct length. See vent pipe   
					manufacturer's instructions for use.   
					2. If installing with direct vent method, use instructions provided with Weil-McLain   
					termination kit. See Figures 3, 4 or 5 on page 5.   
					Ve n t in g t h ro u g h s id e w a ll   
					Connect vent run to   
					termination   
					1. If using Weil-McLain Vent/Air Intake Termination Kit, see instructions provided in that   
					kit. Applies to direct (Figure 3, page 5) or non-direct vent (Figure 4, page 5) method.   
					2. If using non-direct method with termination coupling only, see Figures 8 and 9.   
					• 
					If passing through noncombustible wall, provide hole diameter large enough to insert   
					the pipe through. Sleeve and spacers are not required.   
					3. Maintain minimum one-inch clearance from combustible materials to vent pipe; 0"   
					clearance for noncombustible materials.   
					4. Refer to vent termination WARNING, item 19 on page 3.   
					Ve n t in g t h ro u g h e xis t in g c h im n e y o r ro o f   
					1. Direct vent method — follow instructions supplied in Weil-McLain Through-Roof or   
					Through-Unused-Chimney Termination Kit to assemble termination.   
					2. Non-Direct vent method (only through the roof, not through chimney):   
					• 
					• 
					Vent pipe must extend through roof flashing, jacket or thimble. See Figure 10.   
					Vent may pass through floor, inside wall or concealed space when installed according   
					to vent pipe manufacturer's instructions.   
					3. Maintain minimum one-inch clearance from combustible materials to vent pipe.   
					6 
					Part Number 550-110-268/0699   
					Download from Www.Somanuals.com. All Manuals Search And Download.   
				S t a R-3 4 Ve n t in g S u p p le m e n t   
					Figure 8 Sidewall termination installation (non-direct venting)   
					¼" to ¾" between stop   
					on termination and   
					metal plate   
					4" galvanized sleeve   
					(through 4¹⁄₈" hole for   
					combustible wall)   
					Pipe section   
					Metal plate   
					Metal plate   
					Spacers (2)   
					(to support and   
					center vent in   
					sleeve)   
					Pipe section   
					Sealant   
					Sealant   
					Termination coupling   
					26809   
					Figure 9 Non-direct vent through sidewall (using   
					Figure 10 Non-Direct vent through roof   
					Follow StaR-34 manufacturer’s instructions   
					for proper installation of vent runs, including   
					slope and support.   
					termination coupling)   
					Follow StaR-34 manufacturer’s instructions   
					for proper installation of vent runs, including   
					slope and support.   
					StaR-34   
					vent starter tee   
					StaR-34   
					vent starter tee   
					26805b   
					26804b   
					Part Number 550-110-268/0699   
					7 
					Download from Www.Somanuals.com. All Manuals Search And Download.   
				G O LD G V W a t e r b o ile r — S e r ie s 3   
					Installation — assembly continued   
					Finish the vent   
					installation   
					In s t a llin g c o n d e n s a t e t u b in g   
					Figure 11   
					1. See Figure 11 to install condensate tubing   
					(provided by others). Use condensate pump   
					if floor drain is higher than condensate drain   
					on boiler.   
					Installation of condensate tubing   
					StaR-34   
					vent starter tee   
					If required:   
					• 
					• 
					use a low-profile pump — OR —   
					set boiler on foundation (see GV Series   
					3 Boiler Manual) to allow gravity flow   
					to pump.   
					2. Size pump in gal/hr. (boiler model):   
					• 
					• 
					• 
					• 
					0.78 (GV-3)   
					1.17 (GV-4)   
					1.56 (GV-5)   
					1.95 (GV-6)   
					5/8" O.D. tubing,   
					provided by   
					others   
					26806   
					Refer to pump manufacturer's instructions.   
					Drain to a non-freezing area.   
					If ve n t p ip e o r c o m b u s t io n a ir p ip e m u s t b e re a s s e m b le d   
					When vent pipe or combustion air pipe is disconnected for any reason, it must be reassembled   
					and resealed according to thisVenting Supplement,the direct vent termination kit instructions   
					and the vent pipe manufacturer's instructions.   
					Sealant recommended by vent pipe manufacturer must be used as indicated   
					in their instructions. Vent and combustion air connector piping must be   
					sealed gas-tight to prevent possibility of flue gas spillage and carbon   
					monoxide emissions, resulting in severe personal injury or death.   
					Weil-McLain   
					500 Blaine Street   
					Michigan City, IN 46360-2388   
					
					8 
					Part Number 550-110-268/0699   
					Download from Www.Somanuals.com. All Manuals Search And Download.   
				 | 
Whirlpool Range 9782474A User Manual
White Sewing Machine W1750C User Manual
Wolfgang Puck Food Processor BFPR0040 User Manual
Wolfgang Puck Fryer BDFR0040 User Manual
Woods Equipment Compact Loader 211822 User Manual
Zanussi Cooktop ZCGHL50 User Manual
Zanussi Dishwasher ZSF 6150 S User Manual
Zanussi Freezer ZO 25 N User Manual
Zanussi Refrigerator Z1163TR User Manual
Zhone Technologies Network Card zPON User Manual