GAS-FIRED, DIRECT VENT, CONDENSING, HOT WATER
BOILERS
INSTALLATION INSTRUCTIONS
These instructions must be affixed on or adjacent to the boiler
WARNING
Improper installation, adjustment, alteration, service, or maintenance can cause injury or
property damageꢀ Refer to this manualꢀ For assistance or additional information consult a
qualified installer, service agency, or gas supplierꢀ
DUNKIRK BOILERS
DUNKIRK, NEW YORK 14048 - 716 366-5500
Member: The Hydronics Institute
Download from Www.Somanuals.com. All Manuals Search And Download.
TABLE OF CONTENTS INTRODUCTION ꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 3
BOILER RATINGS AND CAPACITIES ꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 4
RULES FOR SAFE INSTALLATION AND OPERATIONꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 7
BEFORE INSTALLING THE BOILER ꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 7
Aꢀ codes ꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 7
Bꢀ boiler sizing ꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 8
Cꢀ considerations for boiler location ꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 8
Dꢀ locating the boiler ꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 8
Eꢀ combustion air and vent pipe requirements ꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 9
Fꢀ condensate drain requirementsꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 10
Gꢀ foundation requirementsꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 11
Hꢀ removing existing boiler from common venting system ꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 11
PLACING THE BOILER ꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 11
NEAR BOILER PIPING ꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 12
Aꢀ supply and return linesꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 12
Bꢀ pressure relief valveꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 16
Cꢀ expansion tank and make-up waterꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 16
Dꢀ condensate drain piping ꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 19
Eꢀ filling condensate trap ꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 19
Fꢀ chilled water piping ꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 20
COMBUSTION AIR AND VENT PIPE ꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 21
Aꢀ connections and terminations ꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 21
Bꢀ installation ꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 22
GAS SUPPLY PIPING ꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 25
Aꢀ check gas supply ꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 25
Bꢀ connecting the gas piping ꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 25
Cꢀ checking the gas piping ꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 26
ELECTRICAL WIRING ꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 27
Aꢀ electric power supply ꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 27
Bꢀ install your thermostatꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 28
Cꢀ field wiring connections ꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 29
Dꢀ schematic wiring diagram ꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 30
Eꢀ ladder wiring diagramꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 31
CONTROLS AND ACCESSORIES ꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 32
Aꢀ UT 1013-10 integrated boiler control ꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 32
Bꢀ gas control valve ꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 32
Cꢀ hot surface igniter ꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 32
Dꢀ L4006A high limit aquastat control ꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 32
Eꢀ draft inducer temperature safety switch ꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 32
Fꢀ casting temperature safety switchꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 33
Gꢀ differential pressure air proving switch ꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 33
1
Download from Www.Somanuals.com. All Manuals Search And Download.
Hꢀ draft inducerꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 33
Iꢀ circulator pumpꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ33
Jꢀ drain valveꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 33
Kꢀ relief valveꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 34
Lꢀ flame rollout safety shutoffꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 34
Mꢀ external condensate pumpꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 34
START-UPꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 34
Aꢀ water treatment and freeze protectionꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 34
Bꢀ filling boiler with water and purging air with diaphragm type expansion tanksꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 35
Cꢀ filling boiler with water and purging air with conventional closed type expansion tanksꢀꢀꢀꢀ 35
Dꢀ boiler in placingꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ36
Iꢀ for your safety read before operating
IIꢀ operating instructions
IIIꢀ to turn off gas to appliance
CHECK-OUT PROCEDURES AND ADJUSTMENTSꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 37
Aꢀ verify proper sequence of operationꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 37
Bꢀ inspect venting and air intake systemꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 38
Cꢀ inspect condensate drainꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ38
Dꢀ inspect system pipingꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ38
Eꢀ test ignition system safety shutoffꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 38
Fꢀ test high limit control and adjustꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ38
Gꢀ test other safety controlsꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ39
Hꢀ set thermostat heatꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 39
1ꢀ measure the gas input rateꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ39
Jꢀ set thermostat to desired room temperatureꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ41
Kꢀ review all instructionsꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 41
Lꢀ installation and check-out certificateꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 41
MAINTENANCE AND CLEANINGꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 43
Aꢀ beginning of each seasonꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 43
Bꢀ daily during heating seasonꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 43
Cꢀ monthly during heatingꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 44
Dꢀ periodically during heatingꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 44
Eꢀ end of each heating season -annual shut down procedureꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 44
Fꢀ annual examination and cleaning of boiler componentsꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 44
SERVICE HINTSꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 47
A flow chart/detailed sequence of operationꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 47
Bꢀ trouble shootingꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 50
Cꢀ differential air pressure switch checkꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 58
REPAIR PARTSꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ59
Aꢀ jacket and baseꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ59
Bꢀ condensate drain trap assembly ꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 61
Cꢀ block and piping assemblyꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ62
Dꢀ mixer and air pressure switch assemblyꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 64
Eꢀ flue adapter and exhauster assemblyꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ 66
2
Download from Www.Somanuals.com. All Manuals Search And Download.
INTRODUCTION
This appliance is a gas-fired direct vent hot water boiler with cast aluminum boiler sectionsꢀ A
revolutionary cast aluminum heat exchanger means better heat transfer and thermal storage than
similarly sized cast iron boilers, which results in higher efficiencyꢀ The heating system water absorbs large
amounts of heat from the cast aluminum heat exchanger, cooling the flue gases and causing
condensationꢀ Sealed combustion, premix gas burner, and low flame temperature means drastically
reduced CO and NOx emissions, which contribute to a cleaner and healthier environmentꢀ
This appliance, unlike normal residential atmospheric and induced draft units, takes its combustion air
directly from the outdoors (sealed combustion) and does not compete with building occupants for fresh
airꢀ Sealed combustion (also known as “direct vent”) is the safest and best way to obtain plenty of clean
combustion airꢀ The induced draft fan draws in the outside combustion air, then takes the cooler flue
gases from the boiler unit and provides a positive removal of the flue gases from the building through
inexpensive and readily available PVC and CPVC pipesꢀ
FIGURE 1
3
Download from Www.Somanuals.com. All Manuals Search And Download.
BOILER RATINGS AND CAPACITIES
7$%/(ꢀꢁꢀꢀꢀ6($ꢀ/(9(/ꢀ5$7,1*6ꢀꢂꢀ1$785$/ꢀ$1'ꢀ3523$1(ꢀ*$6(6
ꢄꢄꢀ+HDWLQJ
&DSDFLW\
ꢁꢂ0%+ꢃ
ꢈꢆ
1HWꢀ, % 5
5DWLQJ
ꢁꢂ0%+ꢃ
ꢉꢊ
6KLSSLQJꢀ
:HLJKWꢀ
ꢂOEVꢅꢃ
)OXH
'LDꢅ
0RGHO
,QSXWꢀꢁꢂ0%+ꢃ
ꢆꢇ
ꢌꢆ
ꢏꢇꢇ
ꢆꢇ
ꢌꢆ
ꢏꢇꢇ
ꢋꢋꢇ
ꢋꢋꢇ
ꢋꢋꢇ
ꢋ´ꢀ&39&ꢀ,ꢀ39&
ꢋ´ꢀ&39&ꢀ,ꢀ39&
ꢋ´ꢀ&39&ꢀ,ꢀ39&
ꢍꢎ
ꢊꢇ
ꢆꢊ
ꢌꢎ
ꢁꢀꢏꢀ0%+ꢀ ꢀꢏꢐꢇꢇꢇꢀ%WXKꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀꢀ%WXKꢀ ꢀ%ULWLVKꢀ7KHUPDOꢀ8QLWVꢀ3HUꢀ+RXU
These low pressure gas-fired hot water boilers are design certified by CSA International for use
with natural and propane gasesꢀ The boilers are constructed and hydrostatically tested for a
maximum working pressure of 50 psig (pounds per square inch gage) in accordance with
AꢀSꢀMꢀEꢀ (American Society of Mechanical Engineers) Boiler and Pressure Vessel Code Section
IV Standards for heating boilersꢀ
++ AFUE (Annual Fuel Utilization Efficiency) and Heating Capacity is based on the DꢀOꢀEꢀ
(Department of Energy) test procedureꢀ
The Boilers are certified in accordance with ANSI (American National Standards Institute)
Z21ꢀ13 standards as gas-fired, direct vent, condensing, hot water boilersꢀ
The Heating Capacity indicates the amount of heat available after subtracting the losses up the
stackꢀ Most of this heat is available to heat waterꢀ A small portion is heat from the jacket and
surfaces of the boiler, and it is assumed that this heat stays in the structureꢀ The Net I=B=R
Rating represents the portion of the remaining heat that can be applied to heat the radiation or
terminal units (iꢀeꢀ finned tube baseboard, cast iron radiators, radiant floor, etcꢀ)ꢀ The difference
between the Heating Capacity and the Net I=B=R Rating, called the piping and pickup
allowance, establishes a reserve for heating the volume of water in the system and offsetting
heat losses from the pipingꢀ The Net I=B R Ratings shown are based on a piping and pickup
factor of 1ꢀ15 in accordance with the I=B=R Standard as published by the Hydronics Instituteꢀ
The Net I=B=R Rating of the boiler selected should be greater than or equal to the calculated
peak heating load (heat loss) for the building or area(s) served by the boiler and associated hot
water heating systemsꢀ The manufacturer should be consulted before selecting a boiler for
installations having unusual piping and pickup requirementsꢀ
BOILERS FOR USE AT HIGH ALTITUDE
The boilers are factory equipped for operation at altitudes ranging from 0-2,000 feet above sea
levelꢀ For use of these boilers at altitudes above 2,000 feet above sea level, the gas input
ratings (MBH) must be reducedꢀ
4
Download from Www.Somanuals.com. All Manuals Search And Download.
UꢀSꢀAꢀ ONLY: For altitudes above 2,000 feet above sea level, input ratings should be reduced
as shown in tables IA, C, & E for natural gas boilers or in tables 1B, D & F for propane fired
boilersꢀ Reduced input ratings are achieved by the natural deration of the gas at higher
elevations and fine tuned by adjusting the manifold pressureꢀ
CANADA ONLY: For altitudes in the range of 2,000-4,500 feet above sea level, boilers may be
field equipped for use at high altitude by using a certified high altitude conversion kitꢀ The change
in main burner orifice size results in a 10% reduction of the boiler gas input rating (MBH)ꢀ
The conversion shall be carried out by a manufacturer’s authorized representative, in
accordance with the requirements of the manufacturer, provincial or territorial authorities having
jurisdiction, and in accordance with the requirements of the CSA-B 149ꢀ1 and CSA-B 149ꢀ2
Installation Codesꢀ The certified field conversion kit includes a conversion data plate, indicating
that the boiler has been converted for high altitude useꢀ The correct conversion information must
be entered on the conversion data plateꢀ
7$%/(ꢀꢁ$ꢀꢀ02'(/ꢂꢃꢄꢀ1$785$/ꢀ*$6ꢀ+,*+ꢀ$/7,78'(ꢀ5$7,1*6ꢀ
(/(9$7,21 ꢀ)((7ꢁ
ꢂꢃꢄꢅꢂꢂꢂ ꢆꢅꢂꢂꢂ ꢇꢅꢂꢂꢂ ꢈꢅꢂꢂꢂ ꢉꢅꢂꢂꢂ ꢊꢅꢂꢂꢂ ꢊꢅꢈꢂꢂ ꢋꢅꢈꢂꢂ
120,1$/ ,1387 ꢀ0%+ꢁ
+($7 &$3&,7< ꢀ0%+ꢁ
1(7 , % 5 5$7,1* ꢀ0%+ꢁ
*$6 25,),&( '5,// 6,=(
ꢈꢂꢌꢂ
ꢇꢈꢌꢂ
ꢆꢎꢌꢂ
ꢇꢋꢌꢂ
ꢇꢆꢌꢄ
ꢆꢊꢌꢇ
ꢇꢊꢌꢋ
ꢇꢆꢌꢂ
ꢆꢊꢌꢆ
ꢇꢊꢌꢈ
ꢇꢄꢌꢋ
ꢆꢊꢌꢍ
ꢇꢉꢌꢂ
ꢇꢍꢌꢇ
ꢆꢈꢌꢎ
ꢇꢇꢌꢂ
ꢆꢎꢌꢉ
ꢆꢇꢌꢆ
ꢇꢆꢌꢈ
ꢆꢎꢌꢄ
ꢆꢇꢌꢂ
ꢇꢄꢌꢂ
ꢆꢊꢌꢋ
ꢆꢄꢌꢋ
ꢌꢂꢉꢍꢈ ꢌꢂꢉꢍꢈ ꢌꢂꢉꢍꢈ ꢌꢂꢉꢍꢈ ꢌꢂꢉꢍꢈ ꢌꢂꢉꢍꢈ ꢌꢂꢉꢍꢈ ꢌꢂꢉꢍꢈ
0$1,)2/' 35(6685(
ꢀ,1&+(6 :$7(5 &2/801ꢁ
ꢄꢌꢈ
ꢄꢌꢊ
ꢆꢌꢂ
ꢆꢌꢄ
ꢆꢌꢍ
ꢆꢌꢂ
ꢄꢌꢋ
ꢄꢌꢊ
35(6685( 6:,7&+ 6(732,17
ꢀ,1&+(6 :$7(5 &2/801ꢁ
ꢍꢌꢈꢈ
ꢍꢌꢈꢈ
ꢍꢌꢈꢈ
ꢍꢌꢈꢈ
ꢍꢌꢈꢈ
ꢍꢌꢈꢈ
ꢍꢌꢈꢈ
ꢍꢌꢈꢈ
7$%/(ꢀꢁ%ꢀꢀ02'(/ꢂꢃꢄꢀ3523$1(ꢀ*$6ꢀ+,*+ꢀ$/7,78'(ꢀ5$7,1*6ꢀ
(/(9$7,21 ꢀ)((7ꢁ
ꢂꢃꢄꢅꢂꢂꢂ ꢆꢅꢂꢂꢂ ꢇꢅꢂꢂꢂ ꢈꢅꢂꢂꢂ ꢉꢅꢂꢂꢂ ꢊꢅꢂꢂꢂ ꢊꢅꢈꢂꢂ ꢋꢅꢈꢂꢂ
120,1$/ ,1387 ꢀ0%+ꢁ
+($7 &$3&,7< ꢀ0%+ꢁ
1(7 , % 5 5$7,1* ꢀ0%+ꢁ
*$6 25,),&( '5,// 6,=(
ꢈꢂꢌꢂ
ꢇꢈꢌꢂ
ꢆꢎꢌꢂ
ꢇꢎꢌꢂ
ꢇꢇꢌꢍ
ꢆꢋꢌꢄ
ꢇꢎꢌꢂ
ꢇꢇꢌꢍ
ꢆꢋꢌꢄ
ꢇꢎꢌꢂ
ꢇꢇꢌꢍ
ꢆꢋꢌꢄ
ꢇꢋꢌꢂ
ꢇꢆꢌꢄ
ꢆꢊꢌꢇ
ꢇꢉꢌꢈ
ꢇꢍꢌꢎꢇꢍꢌꢇ ꢌꢉꢆꢎ
ꢆꢉꢌꢆ ꢆꢈꢌꢎ
ꢇꢉꢌꢂ
ꢇꢇꢌꢂ
ꢆꢇꢌꢆ
ꢌꢂꢇꢎꢄ ꢌꢂꢇꢎꢄ ꢌꢂꢇꢎꢄ ꢌꢂꢇꢎꢄ ꢌꢂꢇꢎꢄ ꢌꢂꢇꢎꢄ ꢌꢂꢇꢎꢄ ꢌꢂꢇꢎꢄ
0$1,)2/' 35(6685(
ꢀ,1&+(6 :$7(5 &2/801ꢁ
ꢄꢌꢈ
ꢄꢌꢋ
ꢆꢌꢍ
ꢆꢌꢇ
ꢆꢌꢇ
ꢆꢌꢈ
ꢆꢌꢈ
ꢆꢌꢈ
35(6685( 6:,7&+ 6(732,17
ꢀ,1&+(6 :$7(5 &2/801ꢁ
ꢍꢌꢈꢈ
ꢍꢌꢈꢈ
ꢍꢌꢈꢈ
ꢍꢌꢈꢈ
ꢍꢌꢈꢈ
ꢍꢌꢈꢈ
ꢍꢌꢈꢈ
ꢍꢌꢈꢈ
5
Download from Www.Somanuals.com. All Manuals Search And Download.
7$%/(ꢀꢁ&ꢀꢀ02'(/ꢂꢅꢃꢀ1$785$/ꢀ*$6ꢀ+,*+ꢀ$/7,78'(ꢀ5$7,1*6ꢀ
(/(9$7,21 ꢀ)((7ꢁ
ꢂꢃꢄꢅꢂꢂꢂ ꢆꢅꢂꢂꢂ ꢇꢅꢂꢂꢂ ꢈꢅꢂꢂꢂ ꢉꢅꢂꢂꢂ ꢊꢅꢂꢂꢂ ꢊꢅꢈꢂꢂ ꢋꢅꢈꢂꢂ
120,1$/ ,1387 ꢀ0%+ꢁ
+($7 &$3&,7< ꢀ0%+ꢁ
ꢊꢈꢌꢂ
ꢊꢂꢌꢂ
ꢉꢎꢌꢂ
ꢉꢋꢌꢂ
ꢉꢆꢌꢈ
ꢈꢋꢌꢂ
ꢈꢉꢌꢈ
ꢈꢂꢌꢎꢇꢉꢌꢋ
ꢇꢇꢌꢍ ꢇꢂꢌꢉ
ꢌꢂꢊꢉꢂ ꢌꢂꢊꢉꢂ ꢌꢂꢊꢉꢂ ꢌꢂꢊꢉꢂ ꢌꢂꢊꢉꢂ ꢌꢂꢊꢉꢂ ꢌꢂꢊꢉꢂ ꢌꢂꢊꢉꢂ
ꢈꢄꢌꢂ
ꢉꢋꢌꢂ
ꢉꢆꢌꢂ
ꢉꢄꢌꢍ
ꢉꢍꢌꢄ
ꢈꢊꢌꢄ
ꢈꢄꢌꢄ
1(7 ,
%
5 5$7,1* ꢀ0%+ꢁ
ꢈꢋꢌꢎꢈꢇꢌꢉ
ꢈꢆꢌꢋ
ꢈꢆꢌꢂ ꢌꢉꢇꢎ ꢇꢈꢌꢄ
*$6 25,),&( '5,// 6,=(
0$1,)2/' 35(6685(
ꢀ,1&+(6 :$7(5 &2/801ꢁ
ꢄꢌꢈ
ꢄꢌꢊ
ꢄꢌꢋ
ꢆꢌꢂ
ꢄꢌꢋ
ꢄꢌꢉ
ꢄꢌꢆ
ꢄꢌꢍ
35(6685( 6:,7&+ 6(732,17
ꢀ,1&+(6 :$7(5 &2/801ꢁ
ꢍꢌꢆꢈ
ꢍꢌꢆꢈ
ꢍꢌꢆꢈ
ꢍꢌꢆꢈ
ꢍꢌꢆꢈ
ꢍꢌꢆꢈ
ꢍꢌꢆꢈ
ꢍꢌꢆꢈ
7$%/(ꢀꢁ'ꢀꢀ02'(/ꢂꢅꢃꢀ3523$1(ꢀ*$6ꢀ+,*+ꢀ$/7,78'(ꢀ5$7,1*6ꢀ
(/(9$7,21 ꢀ)((7ꢁ
ꢂꢃꢄꢅꢂꢂꢂ ꢆꢅꢂꢂꢂ ꢇꢅꢂꢂꢂ ꢈꢅꢂꢂꢂ ꢉꢅꢂꢂꢂ ꢊꢅꢂꢂꢂ ꢊꢅꢈꢂꢂ ꢋꢅꢈꢂꢂ
120,1$/ ,1387 ꢀ0%+ꢁ
+($7 &$3&,7< ꢀ0%+ꢁ
ꢊꢈꢌꢂ
ꢉꢋꢌꢂ
ꢊꢂꢌꢂ
ꢉꢆꢌꢂ
ꢉꢎꢌꢂ
ꢉꢄꢌꢍ
ꢉꢊꢌꢂ
ꢉꢂꢌꢆ
ꢉꢉꢌꢂ
ꢈꢎꢌꢇ
ꢉꢇꢌꢈ
ꢈꢋꢌꢍ
ꢉꢇꢌꢂ
ꢈꢊꢌꢉ
ꢉꢄꢌꢂ
ꢈꢈꢌꢋ
1(7 ,
%
5 5$7,1* ꢀ0%+ꢁ
ꢈꢋꢌꢎꢈꢇꢌꢉ
ꢈꢆꢌꢋ
ꢈꢄꢌꢆ
ꢈꢍꢌꢈ
ꢈꢂꢌꢇ ꢌꢎꢇꢇꢋꢎꢌꢇ
*$6 25,),&( '5,// 6,=(
ꢌꢂꢉꢂꢈ ꢌꢂꢉꢂꢈ ꢌꢂꢉꢂꢈ ꢌꢂꢉꢂꢈ ꢌꢂꢉꢂꢈ ꢌꢂꢉꢂꢈ ꢌꢂꢉꢂꢈ ꢌꢂꢉꢂꢈ
0$1,)2/' 35(6685(
ꢀ,1&+(6 :$7(5 &2/801ꢁ
ꢄꢌꢈ
ꢄꢌꢇ
ꢄꢌꢆ
ꢄꢌꢄ
ꢄꢌꢄ
ꢄꢌꢄ
ꢄꢌꢆ
ꢄꢌꢆ
35(6685( 6:,7&+ 6(732,17
ꢀ,1&+(6 :$7(5 &2/801ꢁ
ꢍꢌꢆꢈ
ꢍꢌꢆꢈ
ꢍꢌꢆꢈ
ꢍꢌꢆꢈ
ꢍꢌꢆꢈ
ꢍꢌꢆꢈ
ꢍꢌꢆꢈ
ꢍꢌꢆꢈ
7$%/(ꢀꢁ(ꢀꢀ02'(/ꢂꢁꢄꢄꢀ1$785$/ꢀ*$6ꢀ+,*+ꢀ$/7,78'(ꢀ5$7,1*6ꢀ
(/(9$7,21 ꢀ)((7ꢁ
ꢂꢃꢄꢅꢂꢂꢂ ꢆꢅꢂꢂꢂ ꢇꢅꢂꢂꢂ ꢈꢅꢂꢂꢂ ꢉꢅꢂꢂꢂ ꢊꢅꢂꢂꢂ ꢊꢅꢈꢂꢂ ꢋꢅꢈꢂꢂ
120,1$/ ,1387 ꢀ0%+ꢁ
+($7 &$3&,7< ꢀ0%+ꢁ
ꢍꢂꢂꢌꢂ
ꢎꢂꢌꢂ
ꢎꢊꢌꢂ
ꢋꢊꢌꢆ
ꢎꢉꢌꢂ
ꢋꢉꢌꢇ
ꢊꢈꢌꢊ
ꢎꢈꢌꢂ
ꢎꢂꢌꢂ
ꢋꢍꢌꢂ
ꢋꢇꢌꢂ
ꢊꢈꢌꢉ
ꢋꢄꢌꢂ
ꢊꢆꢌꢋ
ꢊꢉꢌꢂ
ꢉꢋꢌꢇ
ꢋꢈꢌꢈ
1(7 ,
%
5 5$7,1* ꢀ0%+ꢁ
ꢊꢋꢌꢂ
ꢊꢇꢌꢎꢊꢇꢌꢍ
ꢊꢂꢌꢄ
ꢉꢈꢌꢈ
ꢉꢇꢌꢂ ꢌꢆꢈꢎ
*$6 25,),&( '5,// 6,=(
ꢌꢂꢋꢉꢂ ꢌꢂꢋꢉꢂ ꢌꢂꢋꢉꢂ ꢌꢂꢋꢉꢂ ꢌꢂꢋꢉꢂ ꢌꢂꢋꢉꢂ ꢌꢂꢋꢉꢂ ꢌꢂꢋꢉꢂ
0$1,)2/' 35(6685(
ꢀ,1&+(6 :$7(5 &2/801ꢁ
ꢄꢌꢈ
ꢄꢌꢎꢆꢌꢆ
ꢍꢌꢍꢊ
ꢆꢌꢊ
ꢍꢌꢍꢊ
ꢆꢌꢇ
ꢍꢌꢍꢊ
ꢆꢌꢄ
ꢍꢌꢍꢊ
ꢄꢌꢎꢄꢌꢉ
ꢍꢌꢍꢊ ꢍꢌꢍꢊ
35(6685( 6:,7&+ 6(732,17
ꢀ,1&+(6 :$7(5 &2/801ꢁ
ꢍꢌꢍꢊ
ꢍꢌꢍꢊ
7$%/(ꢀꢁ)ꢀꢀ02'(/ꢂꢁꢄꢄꢀ3523$1(ꢀ*$6ꢀ+,*+ꢀ$/7,78'(ꢀ5$7,1*6ꢀ
(/(9$7,21 ꢀ)((7ꢁ
ꢂꢃꢄꢅꢂꢂꢂ ꢆꢅꢂꢂꢂ ꢇꢅꢂꢂꢂ ꢈꢅꢂꢂꢂ ꢉꢅꢂꢂꢂ ꢊꢅꢂꢂꢂ ꢊꢅꢈꢂꢂ ꢋꢅꢈꢂꢂ
120,1$/ ,1387 ꢀ0%+ꢁ
+($7 &$3&,7< ꢀ0%+ꢁ
1(7 , % 5 5$7,1* ꢀ0%+ꢁ
*$6 25,),&( '5,// 6,=(
ꢍꢂꢂꢌꢂ
ꢎꢂꢌꢂ
ꢊꢋꢌꢂ
ꢎꢈꢌꢂ
ꢋꢈꢌꢈ
ꢊꢇꢌꢍ
ꢎꢇꢌꢂ
ꢋꢇꢌꢉ
ꢊꢆꢌꢆ
ꢎꢄꢌꢂ
ꢋꢄꢌꢋ
ꢊꢍꢌꢋ
ꢎꢄꢌꢂ
ꢋꢄꢌꢋ
ꢊꢍꢌꢋ
ꢎꢍꢌꢈ
ꢋꢄꢌꢇ
ꢊꢍꢌꢇ
ꢎꢍꢌꢈ
ꢋꢄꢌꢇ
ꢊꢍꢌꢇ
ꢎꢍꢌꢂ
ꢋꢍꢌꢎ
ꢊꢍꢌꢂ
ꢌꢂꢉꢊꢂ ꢌꢂꢉꢊꢂ ꢌꢂꢉꢊꢂ ꢌꢂꢉꢊꢂ ꢌꢂꢉꢊꢂ ꢌꢂꢉꢊꢂ ꢌꢂꢉꢊꢂ ꢌꢂꢉꢊꢂ
0$1,)2/' 35(6685(
ꢀ,1&+(6 :$7(5 &2/801ꢁ
ꢄꢌꢈ
ꢄꢌꢊ
ꢄꢌꢎꢆꢌꢍ
ꢍꢌꢍꢊ
ꢆꢌꢄ
ꢍꢌꢍꢊ
ꢆꢌꢆ
ꢍꢌꢍꢊ
ꢆꢌꢇ
ꢍꢌꢍꢊ
ꢆꢌꢈ
ꢍꢌꢍꢊ
35(6685( 6:,7&+ 6(732,17
ꢀ,1&+(6 :$7(5 &2/801ꢁ
ꢍꢌꢍꢊ
ꢍꢌꢍꢊ
ꢍꢌꢍꢊ
6
Download from Www.Somanuals.com. All Manuals Search And Download.
RULES FOR SAFE INSTALLATION AND OPERATION
lꢀ Read the entire installation manual before beginning the installationꢀ Failure to follow these
rules for safe installation and operation and these instructions could cause a malfunction of
the boiler and result in death, serious bodily injury, and/or property damageꢀ
2ꢀ Check all applicable state and local building codes and utility company requirements
before installationꢀ The installation must conform with these requirements in their
entiretyꢀ In the absence of these codes, use NFPA Installation Codes and good
industry practiceꢀ
3ꢀ Before servicing the boiler - allow the boiler to coolꢀ Always shut off any electricity and
gas supply connected to the boiler prior to servicingꢀ
4ꢀ Inspect gas line for leaksꢀ
5ꢀ Be certain gas input rate is correctꢀ Over firing may result in early failure of the boiler
sectionsꢀ This may cause dangerous operationꢀ Under firing may result in too much air
for the pre-mix burner causing poor or loss of combustionꢀ
6ꢀ Never vent the products of combustion from this boiler to an enclosed spaceꢀ Always
vent to the outdoorsꢀ Never vent to another room or to inside a buildingꢀ
7ꢀ Be sure there is adequate outdoor air supply to boilerꢀfor complete combustionꢀ
8ꢀ Follow a regular service and maintenance schedule for efficient and safe operationꢀ 9ꢀ
Keep boiler area clean of debris and free of combustible and flammable materialsꢀ
10ꢀ Proper through the wall or through the roof combustion venting shall be in accordance with the
materials and methods described in this manualꢀ Installation must comply with local codesꢀ
11ꢀ This boiler and related hot water heating systems are not do it yourself itemsꢀ They
must be installed and serviced by qualified professionalsꢀ
WARNING
This boiler has been equipped for residential installationsꢀ If used for commercial applications, any
additional code requirements must be adhered to for installationꢀ This may require additional
controls including but not limited to a low water cut off, a manual reset high temperature limit, and
wiring and/or piping modificationsꢀ The manufacturer is not responsible for any field installation
changes made to a boiler installation which are not described or acknowledged in this manualꢀ
BEFORE INSTALLING THE BOILER
Complete all of the following prior to installing the boilerꢀ
Aꢀ CODES
This boiler product is a gas-fired, direct vent, condensing boiler and must be installed in
accordance with all applicable federal, state and local building codes including, but not
limited to the following:
United States -Installation shall conform with National Fuel Gas Code (NFPA-54/ANSI
Z223ꢀ1-latest edition)
Canada -
Installation shall be in accordance with CSA B 149ꢀ1 and ꢀ2ꢀ installation
codesꢀ
7
Download from Www.Somanuals.com. All Manuals Search And Download.
Where required by the authority having jurisdiction, the installation must conform to the
American Society of Mechanical Engineers Safety Code for Controls and Safety Devices
for Automatically Fired Boilers, NoꢀCSD-1ꢀ
The installation must conform to the requirements of the authority having jurisdiction or, in the
absence of such requirements, to the National Fuel Gas Code, ANSI Z223ꢀ1 - latest revisionꢀ
Installers - Follow local regulations with respect to installation of CO (Carbon
Monoxide) Detectorsꢀ Follow maintenance recommendations in this manualꢀ
Techniciens -Veuillez vous conformer à la réglementation en vigueur concernant 1'
installations des détecteurs d'oxyde de carboneꢀ Suivre les consignes
d'entretien figurant dans le manuel d'instruction ci-jointꢀ
Bꢀ BOILER SIZING
• Check to be sure you have selected the boiler with the proper capacity before starting
the installationꢀ The I=B R Rating of the boiler selected should be greater than or equal
to the calculated peak heating load (heat loss) for the building or area(s) served by the
boiler and associated hot water heating systemsꢀ See the table "BOILER RATINGS
AND CAPACITIES"ꢀ
• Heat loss calculations should be based on approved industry methodsꢀ
Cꢀ CONSIDERATIONS FOR BOILER LOCATION
Before selecting a location for the boiler, the following should be consideredꢀ Each boiler
consideredꢀ
• Supplied with the correct type of gas (natural gas or propane)ꢀ
• Connected to a suitable combustion air intake piping system to supply the correct
amounts of fresh (outdoor) air for combustionꢀ (maximum length 80' for the Model-100
boiler, and maximum length 100' for the Model-75 and Model-50 boilers)ꢀ
• Connected to a suitable venting system to remove the hazardous products of gas
combustion (maximum length 80' for the Model-100 boiler, and maximum length 100' for
the Model-75 and Model-50 boilers)ꢀ
• Connected to a suitable hot water heating system
• Supplied with a suitable electrical supply for all boiler motors and controlsꢀ
• Connected to a properly located thermostat or operating controlꢀ (not included with
boiler)
• Placed on level surface (must NOT be installed on carpeting)
• Condensate drain line must be pitched down to floor drain or external condensate
pump with reservoir at ¼" per foot (wood frame or blocks may be used to raise boiler)ꢀ
8
Download from Www.Somanuals.com. All Manuals Search And Download.
Dꢀ LOCATING THE BOILER
7$%/(ꢁꢂ
81,7
%2,/(5ꢁ&/($5$1&(6
&20%867,%/(
$&&(66,%,/,7<ꢀ
6(59,&,1*
&216758&7,21
&/($1,1*
723
/()7ꢃ6,'(
5,*+7ꢃ6,'(
ꢀꢁ
ꢀꢁ
ꢂꢁ
ꢀꢁ
ꢅꢁ
ꢀꢁ
ꢅꢁ
ꢂꢁ
ꢀꢁ
ꢄ
ꢂꢁ
ꢀꢁ
ꢄ
%$6(
)5217
%$&ꢈ
ꢄ
ꢄ
ꢆꢇꢁ
ꢄ
ꢄ
ꢆꢇꢁ
ꢄ
ꢄ
,17$ꢈ(ꢉ9(17ꢃ3,3,1*
1($5ꢃ%2,/(5ꢃ+27ꢃ:$7(5
:$7(5ꢃ3,3,1*
ꢀꢁ
ꢄ
ꢄ
1ꢀ Select a location which is level, central to the piping systems served and as close to the
vent and air intake terminals as possibleꢀ
2ꢀ Accessibility clearances, if more stringent (iꢀeꢀ larger clearances) than required fire protection
clearances, must be used for the boiler installationꢀ Accessibility clearances may be achieved
with the use of removable walls or partitionsꢀ
3ꢀ The boiler is approved for installation in closets and on combustible floorsꢀ This boiler
shall NOT be installed on carpetingꢀ
4ꢀ The clearances shown in Table 2 indicate required clearances per IAS listingꢀ A minimum
1" clearance must be maintained between combustible construction and each of the left,
top and back surfaces of the boilerꢀ A minimum 8" clearance is required on the right side,
to allow room for the inlet air pipeꢀ An 18" clearance must be maintained at a side where
passage is required to access another side for cleaning or servicing, inspection or
replacement of any parts that normally may require such attentionꢀ Allow at least 24" at
the front and left side and 8" at the top for servicingꢀ No clearances are required to
venting or combustion air intake pipingꢀ
5ꢀ Equipment shall be installed in a location which facilitates the operation of venting and
combustion air intake piping systems as described in this manualꢀ
6ꢀ Advise owner of boiler to keep venting and combustion air intake passages free of obstructionsꢀ
both the venting and combustion air intake piping systems connected to the outdoors must
permit flow through the piping systems without restrictions for the boiler to operateꢀ
7ꢀ The boiler shall be installed such that the automatic gas ignition system components are
protected from water (dripping, spraying, rain, etcꢀ) during operation and service
(circulator replacement, control replacement, etcꢀ)ꢀ
Eꢀ COMBUSTION AIR AND VENT PIPE REQUIREMENTS
This boiler requires a dedicated direct vent systemꢀ In a direct vent system, all air for
combustionis taken directly from outside atmosphere, and all flue products are discharged to
outside atmosphereꢀ
Combustion air and vent pipe connections must terminate together in the same atmospheric
pressure zone, either through the roof or sidewall (roof termination preferred)ꢀ See Figꢀ9 & 10
for required clearancesꢀ
9
Download from Www.Somanuals.com. All Manuals Search And Download.
CAUTION
KEEP BOILER AREA CLEAN OF DEBRIS AND FREE OF FLAMABLE AND COMBUSTIBLE
MATERIALS, VAPORS AND LIQUIDS
WARNING
When vent pipe is exposed to temperatures below freezing, such as when it passes through an
unheated space or when a chimney is used as a raceway, vent pipe must be insulated with 1/2”
Armaflex or equivalentꢀ In extreme cold climate areas, use 3/4" Armaflex or equivalentꢀ
Combustion air must be clean outdoor airꢀ Combustion air must not be taken from inside struc-
ture because that air frequently is contaminated by halogens, which include fluorides, chlorides,
phosphates, bromides and iodidesꢀ These elements are found in aerosols, detergents, bleaches,
cleaning solvents, salts, air fresheners, paints, adhesives and other household productsꢀ
Locate combustion air inlet as far away as possible from swimming pool and swimming pool
pump houseꢀ
All combustion air and vent pipes must be airtight and watertightꢀ Combustion air and vent
piping must also terminate exactly as shown in Figꢀ9 or 10ꢀ
Vent connections serving appliances vented by natural draft shall not be connected into any
portion of mechanical draft systems operating under positive pressureꢀ
Solvent cements are combustibleꢀ Keep away from heat, sparks, and open flameꢀ Use only in
well ventilated areasꢀ Avoid breathing in vapor or allowing contact with skin or eyesꢀ
FAILURE TO FOLLOW THE AFOREMENTIONED WARNINGS COULD RESULT IN FIRE,
PROPERTY DAMAGE, PERSONAL INJURY, OR DEATHꢀ
Fꢀ CONDENSATE DRAIN REQUIREMENTS
Condensate drain line to be pitched down to floor drain at a minimum of 1/4" per footꢀ An external
condensate pump (not furnished) may be used if floor drain is not availableꢀ The condensate
pump must be designed for flue gas condensate application
NOTE:1ꢀ Condensate trap is built into the boiler, an external trap is not required and should not
be usedꢀ
2ꢀ Wood frame or blocks may be used to raise the boiler to maintain drain pitch or to be
above external condensate pump reservoirꢀ
3ꢀ There is a 115 volt AC receptacle provided on the service switch junction box which
is located at the boiler right side, to provide power for an external condensate
pump (if needed)ꢀ
Gꢀ FOUNDATION REQUIREMENTS
Boiler must be placed on level surfaceꢀ Boiler is NOT to be installed on carpetingꢀ
10
Download from Www.Somanuals.com. All Manuals Search And Download.
NOTE:
1ꢀ If boiler is not level condensate drain lines will not function properlyꢀ Adjustable
feet are located on the boiler to make up for minor surface irregularities or tiltꢀ
2ꢀ Wood frame or blocks may be used to raise boiler to maintain drain pitch or to be
above external condensate pump reservoirꢀ
Hꢀ REMOVAL OF EXISTING BOILER FROM COMMON VENT SYSTEM
When an existing boiler is removed from a common venting system, the common venting
system is likely to be too large for proper venting of the appliances remaining connected to itꢀ
At the time of removal of an existing boiler, the following steps shall be followed with each
appliance remaining connected to the common venting system placed in operation, while the
other appliances remaining connected to the common venting system are not in operationꢀ
1ꢀ Seal any unused openings in the common venting systemꢀ
2ꢀ Visually inspect the venting system for proper size and horizontal pitch and determine
there is no blockageꢀ or restrictions, leakage, corrosion and other deficiencies which could
cause an unsafe conditionꢀ
3ꢀ Insofar as is practical, close allꢀ building doors and windows and all doors between the
space in which the appliances remaining connected to the common venting system are
located and other spaces of the buildingꢀ Turn on clothes dryer and any appliance not
connected to the common venting systemꢀ Turn on any exhaust fans, such as range
hoods and bathroom exhaust, so they will operate at maximum speedꢀ Do not operate a
summer exhaust fanꢀ Close fire dampersꢀ
4ꢀ Place in operation the appliance being inspectedꢀ Follow the lighting instructionsꢀ Adjust
thermostat so appliances will operate continuouslyꢀ
5ꢀ Test for spillage at the draft hood relief opening after 5 minutes of main burner operationꢀ
Use the flame of a match or candle, or the smoke from a cigarette, cigar or pipeꢀ
6ꢀ After it has been determined that each appliance remaining connected to the common venting
system properly vents when tested as outlined above, return doors, windows, exhaust fans
and any other gas-burning appliance to their previous condition of useꢀ
7ꢀ Any improper operation of the common venting system should be corrected so the
installation conforms with the National Fuel Code, NFPA-54/ANSI -Z223ꢀ1-latest revision,
or section 5 of CSA-B 149 for Canadian standardsꢀ When resizing any portion of the
common venting system, the common venting system should be resized to approach the
minimum size as determined using the appropriate tables in part 11 in the National Fuel
Gas Code, NFPA-54/ANSI- Z223ꢀ1-latest revision, or section 5 of CSA-B 149 for
Canadian standardsꢀ
PLACING THE BOILER
The boiler should be placed to provide the most direct connections to the combustion air, vent
and system piping as possibleꢀ
Place crated boiler as close to selected location as possible and uncrate boilerꢀ The uncrated
boiler may be moved into position with an appliance dolly or 2-wheel hand truckꢀ The dolly or hand
truck should be inserted under the left hand side of the boilerꢀ It is possible to slide the boiler for a
short distance on a smooth floor or surfaceꢀ
NOTE: Refer to manual section “LOCATING THE BOILER” for required clearances for servic
ing and maintenanceꢀ
11
Download from Www.Somanuals.com. All Manuals Search And Download.
NEAR BOILER PIPING
CAUTION
Copper supply and return pipingꢀ must NOT be installed directly into aluminum boiler section
casings due to galvanic corrosion between dissimilar metalsꢀ Iron or steel bushings or pipe
nipples should be used between copper system piping and boiler to make final connection to
boilerꢀ Also, the use of dielectric unions is acceptableꢀ The packaged boiler is furnished with iron
piping in the front boiler section for the supply and return connectionsꢀ
When the installation of the boiler is for a new heating system, first install all of the radiation
units (panels, radiators, baseboard, or tubing) and the supply and return mainsꢀ After all heating
system piping and components have been installed, make final connection of the system piping
to the boilerꢀ A hot water boiler installed above radiation level must be equipped with a low water
cut off deviceꢀ A periodic inspection is necessary us is flushing of float type devices, per low
water cut off manufacturers specific instructionsꢀ
A$ SUPPLY AND RETURN LINES
The packaged boiler unit is set up to receive 1 1/4" NPT supply and return piping from top
accessꢀ The boiler unit can also be piped from the left side by turning the supply elbow, and
from the rear of the unit by removing plugs in the rear boiler sectionꢀ
NOTE: The circulator pump and isolation valves are furnished within a carton inside the boiler
cabinet and can be installed at the installer preferred locationꢀ
12
Download from Www.Somanuals.com. All Manuals Search And Download.
FIGURE 2 SINGLE ZONE BOILER PIPING
13
Download from Www.Somanuals.com. All Manuals Search And Download.
FIGURE 3 MULTI ZONE BOILER PIPING WITH ZONE VALVES
14
Download from Www.Somanuals.com. All Manuals Search And Download.
NOTE: When zoning with circulators, the furnished circulator pump should be used as one of the
zone pumpsꢀ Each stripped end of the electrical wires for the circulator pump inside the junction
box should be taped or wire nutted to prevent short circuitsꢀ Unplug the circulator pump wiring at
the integrated boiler controlꢀ
FIGURE 4 MULTI ZONE BOILER PIPING WITH CIRCULATORS
15
Download from Www.Somanuals.com. All Manuals Search And Download.
FIGURE 5 SINGLE ZONE BOILER PIPING
Bꢀ PRESSURE RELIEF VALVE
The boiler is furnished with a factory installed relief valve in the top of the boilerꢀ Provide ¾”
piping from the supplied relief valve to a local floor drain, but leave an air gap between piping
and drainꢀ No shutoff of any description shall be placed between safety relief valve and the
boiler, or on the discharge pipes between such safety valve and the atmosphereꢀ Installation
of the safety relief valve shall conform to ANSI/ASME Boiler and Pressure Vessel Code,
Section IVꢀ The manufacturer is not responsible for any water damageꢀ
Cꢀ EXPANSION TANK AND MAKE-UP WATER
Determine required system fill pressure, system design temperature, and system water
contentꢀ Boiler contains 2ꢀ6 gallons (UꢀSꢀ)ꢀ Size expansion tank accordinglyꢀ Consult
expansion tank manufacturer for proper sizing informationꢀ Connect properly sized
expansion tank (not furnished) as shown in Figꢀ 6 for diaphragm type expansion tank and
Figꢀ 7 for conventional closed type expansion tanksꢀ For diaphragm type expansion tanks,
adjust the tank air pressure to match the system fill pressureꢀ Install air vent (furnished) as
shown for diaphragm type expansion tank system onlyꢀ Install make-up water connections
as shown per local codesꢀ If a pressure reducing valve is used, adjust to match the system
fill pressureꢀ In connecting the cold make-up water supply to the boiler, make sure that clean
water supply is availableꢀ When the water supply is from a well or pump, sand strainer
should be installed at the pumpꢀ
16
Download from Www.Somanuals.com. All Manuals Search And Download.
FIGURE 6 DIAPHRAGM TYPE EXPANSION TANK PIPING
17
Download from Www.Somanuals.com. All Manuals Search And Download.
FIGURE 7 CONVENTIONAL (closed type) EXPANSION TANK PIPING
18
Download from Www.Somanuals.com. All Manuals Search And Download.
FIGURE 8 CONDENSATE - DRAIN PIPING
Dꢀ CONDENSATE DRAIN PIPING
The condensate trap is built into the boiler, an external trap is not required and should NOT be usedꢀ
Provide ½” PVC condensate drain and fittingsꢀ Condensate drain to be pitched down to floor drain at
a minimum of ¼” per footꢀ
Install furnished ½” PVC tee to overflow fitting as shown in Figꢀ 8ꢀ
The ½” diameter schedule 40 PVC or CPVC condensate drain and pipe fittings must conform to ANSI
standards and ASTM D 1785 or D2846ꢀ Schedule 40 PVC or CPVC cement and primer must conform
to ASTM D2564 or F493ꢀ In Canada, use CSA or ULC certified schedule 40 PVC or CPVC drain pipe
cementꢀ
A condensate pump with a reservoir (not furnished) may be used to remove condensate to a drain line
(sanitary line) above boiler if a floor drain is not available or its in accessibleꢀ
19
Download from Www.Somanuals.com. All Manuals Search And Download.
Eꢀ FILLING CONDENSATE TRAP WITH WATER ON THE INITIAL START UP THE CONDEN
SATE TRAP MUST BE MANUALLY FILLED WITH WATER
The following are the steps required to initially fill the condensate trap for start up, these steps
are only required at the initial start up or if maintenance requires draining of the condensate trap:
1ꢀ Disconnect the vent condensate drain line from the bottom of the vent tee on the boilerꢀ
2ꢀ Pour about 1 cup of cold tap water into the vent drain line with a proper funnelꢀ
3ꢀ Excess water should go through the overflow and out through the condensate drain lineꢀ
Verify proper operation of the drain line (or external condensate pump if used)ꢀ
4ꢀ Reinstall the vent drain lineꢀ
Fꢀ CHILLED WATER PIPING
The boiler, when used in connection with a refrigeration system, must be installed so the
chiller medium is piped in parallel with the boiler with appropriate valves to prevent the chilled
medium from entering the boilerꢀ
The boiler piping system of a hot water boiler connected to heating coils is located in air
handling units where they may be exposed to refrigerated air circulation must be equipped
with flow control valves or other automatic means to prevent gravity circulation of the boiler
water during cooling cycleꢀ
COMBUSTION AIR AND VENT PIPE
Aꢀ CONNECTIONS AND TERMINATION
For boilers connected to gas vents or chimneys, vent installations shall be in accordance with
part 7, Venting of Equipment, of the National Fuel Gas Code, ANSI 2223ꢀ1-latest revision,
CAN/CGA-B 149ꢀ1 and B 149ꢀ2, and applicable provisions of the local building codesꢀ
Provisions for combustion and ventilation air must be in accordance with section 5ꢀ3, Air For
Combustion and Ventilation, of the National Fuel Gas Code,ANSI 2223ꢀ1-latest revision,
CAN/CGA-B 149ꢀ1 and B 149ꢀ2, or applicable provisions of the local building codeꢀ
These boilers require a dedicated direct vent systemꢀ All air for combustion is taken directly
from outdoors through the combustion air intake pipeꢀ All flue products are discharged to the
outdoors through the vent pipeꢀ
1ꢀ See Figꢀ9 & 10 for combustion air and vent pipe roof and sidewall terminationꢀ (Roof termi
nation is preferred) Combustion air and vent pipes must terminate together in same atmo
spheric pressure zone as shownꢀ Construction through which vent and air intake pipes
may be installed is a maximum 24 inches, minimum 1/4" thicknessꢀ
2ꢀ Combustion air and vent pipe fittings must conform to American National Standards Insti
tute (ANSI) standards and American Society for Testing and Materials (ASTM) standards
D1784 (schedule-40 CPVC), D1785 (schedule-40 PVC), D2665 (PVC-DWV), D2241
(SDR-21 and SDR-26 PVC), D2661 (ABS-DWV), or F628 (schedule-40 ABS)ꢀ Pipe cement
and primer must conform to ASTM standards D2564 (PVC) or D2235 (ABS)ꢀ
20
Download from Www.Somanuals.com. All Manuals Search And Download.
In Canada construct all combustion air and vent pipes for this unit of CSA or ULC certified
schedule-40 CPVC, schedule-40 PVC, PVC-DWV or ABS-DWV pipe and pipe cementꢀ
SDR pipe is NOT approved in Canadaꢀ
3ꢀ Combustion air and vent piping connections on boiler are sized for 2" pipeꢀ Any pipe size
change (to 3") must be made outside of the boiler casing in a vertical run of pipe to allow
for proper drainage of vent condensateꢀ Due to potential for flue gas temperatures over
155°F, the first five (5) feet of vent pipe must be CPVC, the remaining vent pipe can be
PVCꢀ If any elbows are employed within the first 5 feet of vent, they must be CPVC tooꢀ
Two (2) - 30" pieces of 2" CPVC pipe are furnished with the boilerꢀ
NOTE: The transition from 2" pipe to 3" pipe must be made in a vertical runꢀ
4ꢀ Combustion air and vent piping lengths,
%2,/(5ꢀꢀꢀꢀꢀ
6,=(
ꢁꢂꢀ3,3(
0,1,080
9(17,1*
ꢁꢂꢀ3,3(
0$;,080
9(17,1*
ꢃꢂꢀ3,3(
0,1,080
9(17,1*
ꢃꢂꢀ3,3(
0$;,080
9(17,1*
ꢁꢀ)((7ꢀ,1
/(1*7+
ꢆ
ꢄꢊꢀ)((7ꢀ,1
/(1*7+
$1'ꢀ83ꢀ72
ꢇꢈꢉꢅž
ꢄꢊꢀ)((7ꢀ,1
/(1*7+
ꢆ
ꢋꢅꢀ)((7ꢀ,1
/(1*7+
$1'ꢀ83ꢀ72
ꢇꢈꢉꢅž
ꢄꢅꢅ
ꢇꢈꢉꢅž
ꢇꢈꢉꢅž
(/%2:6
(/%2:6
(/%2:6
(/%2:6
ꢁꢀ)((7ꢀ,1
/(1*7+
ꢆ
ꢁꢅꢀ)((7ꢀ,1
/(1*7+
$1'ꢀ83ꢀ72
ꢇꢈꢉꢅž
ꢁꢅꢀ)((7ꢀ,1
/(1*7+
ꢆ
ꢄꢅꢅꢀ)((7ꢀ,1
/(1*7+
$1'ꢀ83ꢀ72
ꢇꢈꢉꢅž
ꢌꢊ
$
ꢊꢅ
ꢇꢈꢉꢅž
ꢇꢈꢉꢅž
(/%2:6
(/%2:6
(/%2:6
(/%2:6
The first 5 feet of “TOTAL EQUIVALENT LENGTH” of vent piping run must be CPVC:
The length of pipe is counted from the boiler jacket (air intake pipe) or from vent tee (vent
pipe)ꢀFor additional elbows, reduce the maximum vent length as shown:
2" 90 degree elbow -1 ½ feet per additional elbowꢀ
3" 90 degree elbow - 3 feet per additional elbowꢀ
Example: To add 2 additional 90 degree elbows to a 3" pipe for a 75 boilerꢀ
Each elbow is 3 additional feet per 90 degree elbow for a total of 6 feetꢀ (1 elbow @ 3
feet + 1 elbow @ 3 feet = 6 additional feet of pipe) The total additional pipe is then
subtracted from the maximum allowable pipe length to give the new maximum length
of 94 feet with 6, 90 degree elbowsꢀ (“TOTAL EQUIVALENT LENGTH”: Original 100
feet maxꢀ - 6 feet for 2 additional elbows = new 94 feet maximum length)ꢀ
5ꢀ Combustion air and vent piping to be pitched back to boiler at minimum ¼” per foot from
intake and vent terminals so that all moisture in combustion air and vent piping drains to
boilerꢀ Pipes must be pitched continuously with no sags or low spots where moisture can
accumulate and block the flow of air or flue gasꢀ Combustion air and vent pipes must be
airtight and watertightꢀ
21
Download from Www.Somanuals.com. All Manuals Search And Download.
6ꢀ Consideration for the following should be used when determining an appropriate location
for termination of combustion air and vent pipingꢀ
• Comply with all clearances required as stated in paragraph 7ꢀ
• Termination should be positioned where vent vapors will not damage plants/shrubs or air
conditioning equipmentꢀ
• Termination should be positioned so that it will not be effected by wind eddy, air born
leaves, snow, or recirculated flue gasesꢀ
• Termination should be positioned where it will not be subjected to potential damage by
foreign objects, such as stones, balls, etcꢀꢀ
• Termination should be positioned where vent vapors are not objectionableꢀ
• Put vent on a wall away from the prevailing winter windꢀ Locate or guard the vent to
prevent accidental contact with people or petsꢀ
• Terminate the vent above normal snowlineꢀ Avoid locations where snow may drift and
block the ventꢀ Ice or snow may cause the boiler to shut down if the vent becomes
obstructedꢀ
• Under certain conditions, flue gas will condense, forming moisture, and may be corrosiveꢀ
In such cases, steps should be taken to prevent building materials at the vent from being
damaged by exhaust of flue gasꢀ
7ꢀ The venting system shall terminate at least 3 feet above any forced air inlet (except the
boiler’s combustion air inlet) within 10 feetꢀ The venting system shall terminate at least 12
inches from any air opening into any buildingꢀ The bottom of the vent shall be located at
least 12 inches above gradeꢀ Termination of the vent shall be not less than 7 feet above an
adjacent public walkwayꢀ The vent terminal shall not be installed closer than 3 feet from the
inside corner of an L shaped structureꢀ Termination of the vent should be kept at least 3
feet away from vegetationꢀ The venting system shall terminate at least 4 feet horizontally
from, and in no case above or below, unless a 4 foot horizontal distance is maintained, from
electric meters, gas meters, regulators, and relief equipmentꢀ
FIGURE 9 ROOF VENT/INTAKE TERMINATIONS
22
Download from Www.Somanuals.com. All Manuals Search And Download.
FIGURE 10 SIDEWALL VENT/INTAKE TERMINATIONS
23
Download from Www.Somanuals.com. All Manuals Search And Download.
FIGURE 11 COMBUSTION AIR AND VENT PIPING
24
Download from Www.Somanuals.com. All Manuals Search And Download.
Bꢀ INSTALLATION
1ꢀ Attach combustion air intake piping to supplied Fernco 2" coupling on mixerꢀ Attach
vent piping to furnished 2" CPVC vent tee on draft inducer outletꢀ
NOTE: All pipe joints are to be water tightꢀ
2ꢀ Working from the boiler to the outside, cut pipe to required length(s)ꢀ
3ꢀ Deburr inside and outside of pipeꢀ
4ꢀ Chamfer outside edge of pipe for better distribution of primer and cementꢀ
5ꢀ Clean and dry all surfaces to be joinedꢀ
6ꢀ Check dry fit of pipe and mark insertion depth on pipeꢀ
NOTE: It is recommended that all pipes be cut, prepared, and pre-assembled before
permanently cementing any jointꢀ
7ꢀ After pipes have been cut and pre-assembled, apply cement primer to pipe fitting
socket and end of pipe to insertion markꢀ Quickly apply approved cement to end of pipe
and fitting socket (over primer)ꢀ Apply cement in light, uniform coat on the inside of
socket to prevent buildup of excess cementꢀ Apply second coatꢀ
8ꢀ While cement is still wet, insert pipe into socket with a’/a turn twistꢀ Be sure pipe is fully
inserted into fitting socketꢀ
9ꢀ Wipe excess cement from jointꢀ A continuous bead of cement will be visible around
perimeter of a properly made jointꢀ
10ꢀ Handle pipe joint carefully until cement setsꢀ
11ꢀ Support combustion air and vent piping a minimum of every 5 feet using pre-formed
metal hanging strapsꢀ Do not rigidly support pipesꢀ Allow movement due to expansion
and contractionꢀ
12ꢀ Slope combustion air and vent pipes toward boiler a minimum of 1/4" per linear foot with
no sags between hangersꢀ
13ꢀ Use appropriate methods to seal openings where vent and combustion air pipes pass
through roof or side wallꢀ
GAS SUPPLY PIPING
Aꢀ CHECK GAS SUPPLY
The gas pipe to your boiler must be the correct size for the length of run and for the total
BTU per hour input of all gas utilization equipment connected to itꢀ See Table 3 for the
proper sizeꢀ Be sure your gas line complies with local codes and gas company
requirementsꢀ
The boiler and its individual shutoff valve must be disconnected from the gas supply piping
system during any pressure testing of that system at test pressures in excess of ‘/z psig (3ꢀ5kpa)ꢀ
The boiler must be isolated from the gas supply piping system by closing its individual
manual shutoff valve during any pressure testing of the gas supply piping system at test
pressures equal to or less than ‘/z psig (3ꢀ50ka)ꢀ
1$785$/ꢀ*$6
ꢁꢂ´ꢀZꢃFꢃ
3523$1(ꢀ*$6
ꢁꢄ´ꢀZꢃFꢃ
0$;,080ꢀ*$6ꢀ6833/<ꢀꢀ35(6685(
0,1,080ꢀ*$6ꢀ6833/<ꢀ35(6685(
ꢅ´ꢀZꢃFꢃ
ꢁꢂ´ꢀZꢃFꢃ
25
Download from Www.Somanuals.com. All Manuals Search And Download.
Bꢀ CONNECTING THE GAS PIPING
Refer to Figꢀ12 for the general layout at the boilerꢀ It shows the basic fittings you will needꢀ
The gas line enters the boiler from the right side jacket panelꢀ The boiler may receive the gas
supply pipe through the left side, or rear jacket panel by relocating the gas valve connector
and pipe assemblyꢀ The boiler is equipped with a ‘/z” NPT connection on the gas valve for
supply pipingꢀ The following rules apply:
1ꢀ Use only those piping materials and joining methods listed as acceptable by the authority
having jurisdiction, or in the absence of such requirements, by the National Fuel Gas
Code, ANSI Z223ꢀ1- latest revisionꢀ In Canada, follow the CSA- B 149ꢀ1 and ꢀ2
Installation Codes for Gas Burning Appliances and Equipmentꢀ
2ꢀ Use pipe joint compound suitable for liquefied petroleum gas on male threads onlyꢀ
3ꢀ Use ground joint unionsꢀ
4ꢀ Install a sediment trap upstream of gas controlsꢀ
5ꢀ Use two pipe wrenches when making the connection to the gas valve to keep it from
turningꢀ
6ꢀ Install a manual shutoff valve in the vertical pipe about 5 feet above floorꢀ
7ꢀ Tighten all joints securelyꢀ
8ꢀ Propane gas connections should only be made by a licensed propane installerꢀ
9ꢀ Two stage regulation should be used by the propane installerꢀ
10ꢀ Propane gas piping should be checked out by the propane installerꢀ
Cꢀ CHECKING THE GAS PIPING
After all connection have been made, check immediately for leaksꢀ Open the manual shutoff
valveꢀ Test for leaks by applying soap suds (or a liquid detergent) to each jointꢀ Bubbles forming
indicate leakꢀ CORRECT EVEN THE SMALLEST LEAK AT ONCEꢀ
WARNING
NEVER USE A MATCH OR OPEN FLAME TO TEST FOR LEAKSꢀ
TABLE 3 GAS PIPE SIZES
1$785$/ꢆ*$6
/HQJWKꢆRIꢆꢆꢆꢆꢆꢆꢆꢆꢆ
3LSHꢆ&DSDFLW\ꢆꢋꢆ%78ꢆ3HUꢆ+RXUꢆ,QSXWꢆ,QFOXGHVꢆ)LWWLQJV
3LSHꢆꢋꢆ)Wꢌ
ꢀꢁꢂꢃ
ꢄꢁꢅꢃ
ꢄꢀꢃꢂꢃꢃꢃ
ꢄꢅꢃꢂꢃꢃꢃ
ꢀꢃ
ꢀꢆꢀꢁꢅꢃ
ꢂꢇ
ꢅꢇ
ꢈꢇ
ꢀꢁꢂꢃꢃꢃ
ꢇꢅꢂꢃꢃꢃ
ꢆꢃꢂꢃꢃꢃ
ꢅꢆꢃꢂꢃꢃꢃ
ꢁꢈꢆꢂꢃꢃꢃ
ꢄꢀꢆꢂꢃꢃꢃ
ꢇꢁꢆꢂꢃꢃꢃ
ꢈꢈꢆꢂꢃꢃꢃ
ꢅꢇꢆꢂꢃꢃꢃ
ꢄꢃꢆꢂꢃꢃꢃ
3523$1(ꢆ*$6
3LSHꢆ&DSDFLW\ꢆꢋꢆ%78ꢆ3HUꢆ+RXUꢆ,QSXWꢆ,QFOXGHVꢆ)LWWLQJV
&RSSHUꢆ7XELQJꢍ ,URQꢆ3LSH
ꢉꢁꢊꢃ
/HQJWKꢆRIꢆꢆꢆꢆꢆꢆꢆꢆꢆ
3LSHꢆꢋꢆ)Wꢌ
ꢄꢁꢅꢃ
ꢀꢁꢂꢃ
ꢄꢁꢅꢃ
ꢂꢇ
ꢅꢇ
ꢈꢇ
ꢄꢅꢄꢂꢃꢃꢃ
ꢀꢃꢂꢃꢃꢃ
ꢊꢁꢂꢃꢃꢃ
ꢁꢄꢇꢂꢃꢃꢃ
ꢄꢈꢆꢂꢃꢃꢃ
ꢄꢁꢄꢂꢃꢃꢃ
ꢄꢉꢀꢂꢃꢃꢃ
ꢄꢁꢀꢂꢃꢃꢃ
ꢄꢃꢅꢂꢃꢃꢃ
ꢅꢀꢅꢂꢃꢃꢃ
ꢁꢇꢊꢂꢃꢃꢃ
ꢁꢄꢊꢂꢃꢃꢃ
ꢋꢌ2XWVLGHꢌGLDPHWHU
26
Download from Www.Somanuals.com. All Manuals Search And Download.
The length of pipe or tubing should be measured from the gas meter or propane second stage regulatorꢀ
FIGURE 12 GAS PIPING
ELECTRICAL WIRING
WARNING
TURN OFF ELECTRICAL POWER AT FUSE BOX BEFORE MAKING ANY LINE
VOLTAGE CONNECTIONSꢀ FOLLOW LOCAL ELECTRICAL CODESꢀ
All electrical work must conform to local codes as well as the National Electrical Code, ANSI/
NFPA70, latest revisionꢀ In Canada, electrical wiring shall comply with the Canadian Electrical
Codes, CSAC22ꢀ1 and ꢀ2
Aꢀ ELECTRIC POWER SUPPLY
Prior to making any line voltage connections, service switch at boiler should be in the off
position and the power turned off at the fuse box
Run a separate 120 volt circuit from a sperate over current protection device in the
electrical service entrance panelꢀ This should be a 15 ampere circuitꢀ A service switch has
been pre-wired and located on the exterior boiler jacketꢀ See Figꢀ 13 for diagram showing
location of service switch junction box and power supply connection pointsꢀ Connect black
(hot) lead from the power supply
27
Download from Www.Somanuals.com. All Manuals Search And Download.
to either of the unused brass screws on the service switchꢀ Connect the white (neutral) lead from
the power supply to the white screw on the service switchꢀ Connect the green (ground) lead
from the power supply to the ground (green) screw on the service switchꢀ The receptacle on the
service switch is always powered regardless of whether the switch is on or off, and could be
used as a power supply for an external condensate pump if one is usedꢀ
The boiler, when installed, must be electrically grounded in accordance with the requirements of
the authority having jurisdiction or, in the absence of such requirements, with the National Elec-
trical Code, ANSI/NFPA-70, latest revisionꢀ In Canada, electrical wiring shall comply with the
Canadian Electrical Codes, CSA-C22ꢀ1 and ꢀ2ꢀ
Run a 14 gauge or heavier copper wire from the boiler to a grounded connection in the service
panel or a properly driven and electrically grounded ground rodꢀ
Bꢀ INSTALL YOUR THERMOSTAT
The thermostat location has an important effect on the operation of your boiler systemꢀ BE
SURE TO FOLLOW THE INSTRUCTIONS INCLUDED WITH YOUR THERMOSTATꢀ
Locate the thermostat about five feet above the floor on an inside wallꢀ It may be mounted di-
rectly on the wall or on a vertical mounted outlet boxꢀ It should be sensing average room tem-
peratureꢀ Avoid the Following:
DEAD SPOTS:
COLD SPOTS:
HOT SPOTS:
Behind doors
Concealed pipes or ducts Concealed pipes
Lamps
Comers and alcoves Stairwells - drafts
Unheated rooms on
Fireplace
TV sets
Radios
Direct sunlight
Kitchens
other side of wall
Set heat anticipator at 0ꢀ7 ampsꢀ Connect 24 volt thermostat leads to the two(2) yellow wires
located in service switch junction box, located on outer jacket of boilerꢀ See Figꢀ13 for service
switch junction box and thermostat field wiring connectionsꢀ
Cꢀ Connect Circulator Pump Wiring
See Figꢀ13 for service switch junction box and circulator pump field wiring connectionsꢀ A 5 feet
wiring harness with flexible metal conduit is supplied to connect the circulator pump to the ser-
vice switch junction boxꢀ If the two 120 volt circulator wire terminals inside the junction box are
not used, please leave the two wire nuts to prevent the short circuitꢀ
CAUTION
LABEL ALL WIRES PRIOR TO DISCONNECTION WHEN SERVICING CONTROLSꢀ WIRING
ERRORS CAN CAUSE IMPROPER AND DANGEROUS OPERATIONꢀ VERIFY PROPER
OPERATION AFTER SERVICINGꢀ
28
Download from Www.Somanuals.com. All Manuals Search And Download.
Cꢀ
FIGURE 13 FIELD WIRING CONNECTIONS
29
Download from Www.Somanuals.com. All Manuals Search And Download.
If any of the original wire as supplied with this appliance must be replaced, it must be replaced
with type 150°C Thermoplastic wire or its equivalent
Dꢀ
FIGURE 14 SCHEMATIC WIRING DIAGRAM
30
Download from Www.Somanuals.com. All Manuals Search And Download.
Eꢀ
FIGURE 15 LADDER WIRING DIAGRAM
31
Download from Www.Somanuals.com. All Manuals Search And Download.
CONTROLS AND ACCESSORIES
This section provides a brief description of the key controls and accessories found in this boilerꢀ
See the Troubleshooting section of the Service Hints chapter of this installation manual for detailed
sequences of operation and troubleshooting proceduresꢀ See the Repair Parts chapter of this manual for
locations of all control components and accessories describedꢀ
Aꢀ INTEGRATED BOILER CONTROL (IBC)
The Integrated Boiler Control (IBC) is a microprocessor based controller for a high efficiency gas
boiler that monitors all safety controls and which controls the operation of the combustion air blower,
circulator pump, burner, and a combination hot surface igniter/flame sensorꢀ This controller is not
intended for use with a vent damperꢀ This controller is mounted on the control panel inside of the
boiler and contains four (5) diagnostic indicator lightsꢀ
Bꢀ GAS CONTROL VALVE
The electrically controlled 24 Volt Honeywell Model VR8205 Combination Gas Control Valve is
designed to meet the requirements for use with hot surface ignition systems found in this boilerꢀ
The valve is piped to the gas/air mixerꢀ
Cꢀ HOT SURFACE IGNITER
The 120 volt Hot Surface Igniter heats up to 1800 °F to initiate combustion of the gas in the burnerꢀ
The igniter is mounted next to the burner through the gas/air mixerꢀ The igniter also serves as a
means for proving the main burner flame by flame rectificationꢀ In the event of a lack of flame signal
on three (3) consecutive trials for ignition, the IBC will lockoutꢀ The “VALVE” and “FLAME” diagnostic
indicator lamps (lamp “D” and “E” on the IBC, See Figꢀ 16) will blink indicating the failure mode as a
lack of flame signalꢀ The IBC is manually reset from lockout by either removing and reestablishing the
thermostat’s call for heat, or by turning the service switch off, then back onꢀ
Dꢀ HIGH LIMIT AQUASTAT CONTROL
The High Limit Aquastat Control determines the maximum boiler water temperature and also
provides a means for protecting the boiler and heating system from unsafe operating conditions
which could damage the boilerꢀ The aquastat is mounted in the ½" NPT control well and ¾”x½”
bushing on the top of the front boiler section at the hot water outletꢀ The aquastat is tied in with the
IBC and is factory set at 180 °F water temperatureꢀ The high limit setpoint is field adjustable and may
be set anywhere between 100 °F and 200 °Fꢀ The field setpoint adjustment for each installation
depends on heating system requirementsꢀ The aquastat automatically resets when the boiler water
temperature decreases (5-30 °F adjustable differential)ꢀ The differential can be adjusted with the
(white) Differential Adjustment Wheel on the aquastat and gives the flexibility for boiler operationꢀ The
larger the differential, the longer the run cycle of the boilerꢀ
NOTE: The maximum setpoint of the Aquastat must not exceed 200 °Fꢀ
Eꢀ DRAFT INDUCER TEMPERATURE SAFETY SWITCH
The Draft Inducer Temperature Safety Switch is a disc thermostat (180 °F setpoint) located on the
induced draft fan outlet portꢀ The switch protects the inducer and vent pipe from a potential high
temperature condition for the discharging flue gasesꢀ This condition would typically be a result of
higher aquastat setting or over firingꢀ The temperature safety switch automatically resets when the
32
Download from Www.Somanuals.com. All Manuals Search And Download.
higher aquastat setting or over firingꢀ The temperature safety switch automatically resets
when the vent temperature decreasesꢀ (15 °F switch differential)ꢀ
Fꢀ CASTING TEMPERATURE SAFETY SWITCH
In the event of lack of or loss of water in the boiler, the Casting Temperature Safety Switch
(300 °F setpoint) installed on the top of the aluminum boiler section shuts off the boiler by
shutting off power to the Integrated Boiler Control (IBC) and causes the Power Indicator Light
to go outꢀ This fault requires manual reset of the casting temperature safety switch to restart
the boilerꢀ Verify that the boiler is properly filled with water before resetting this switchꢀ
WARNING-Never run cold water into a hot empty boilerꢀ
Gꢀ DIFFERENTIAL PRESSURE AIR PROVING SWITCH
The diaphragm type differential pressure switch is connected by vinyl tubing to the pressure
signal hose adaptersꢀ The pressure switch monitors air flow by sensing the diffential
pressure measured in inches of water(“ wꢀcꢀ)ꢀ The factory settings on these switches are
1ꢀ00 “wꢀcꢀ for Model-100, 1ꢀ35 “wꢀcꢀ for Model-75 and 1ꢀ55 “wꢀcꢀ for Model-50ꢀ The contacts
are normally open, and close when the draft inducer is running and causing the diffential
pressure at the switch to exceed the settingꢀ The closed switch proves there is adequate air
flow for combustionꢀ The pressure switch shuts off the main burner if the differential pressure
is inadequate due to a blocked vent pipe or a blocked air intake or blocked boiler sections or
blocked draft inducerꢀ After five (5) minutes of lack of the adequate differential pressure, the
IBC will lockoutꢀ The “PURGE” indicator light will blink, indicating a failure to prove adequate
combustion air flow or flue gas flowꢀ The IBC is manually reset from lockout as described in
the Sequence of Operation section of this chapterꢀ
Hꢀ DRAFT INDUCER
The draft inducer (blower) provides a means for pulling combustion air into and through the
mixer, the burner, the flue ways of the cast aluminum boiler sections and the flue adapter
before being discharged through the vent piping to the outdoorsꢀ See applicable sections for
proper sizing and installation of combustion air and vent piping in this manualꢀ
Iꢀ CIRCULATOR PUMP
Every forced hot water system requires at least one circulating pumpꢀ The circulating pump
imparts the necessary energy to move the water through the closed loop supply and return
piping systems, terminal heating equipment (iꢀeꢀ finned tube radiators, etcꢀ) and back
through the boiler for reheatingꢀ To provide the required hot water flow rates, the circulator
pump must be properly sized to overcome frictional losses (usually measured in feet of
water, also referred to as “pump head loss”) of the supply and return piping systems and
boilerꢀ The circulator pump is furnished in a carton within the boiler cabinet for a single zone
or zone valve controlled heating system and should be correctly located on the downstream
(iꢀeꢀ, pumping away) side of the expansion tankꢀ For a pump controlled system (where there
is a circulator for each zone) the circulator provided with the boiler can work for one zoneꢀ
For more details on piping and circulators, see Near Boiler Piping section of this manualꢀ
Jꢀ DRAIN VALVE
The manual drain valve provides a means of draining the water in the heating system, including
the boiler and hot water supply and return piping systems installed above the drain valveꢀ This
drain valve is installed in the 3/4" tapping at the bottom of the front boiler sectionꢀ Any piping
installedbelow the elevation of this drain valve will require additional drain valves to be installed
at low points in the piping systems in order to drain the entire systemꢀ
33
Download from Www.Somanuals.com. All Manuals Search And Download.
Kꢀ AꢀSꢀMꢀEꢀ RATED PRESSURE RELIEF VALVE
Each boiler must have a properly sized and installed American Society of Mechanical Engi-
neers rated pressure relief valveꢀ Water expands as it is heated by the burner/boiler sectionsꢀ
If there is no place for the water to expand its volume, (iꢀeꢀ a properly sized and properly
functioning expansion tank) pressure on the inside of the boiler and heating system will
increaseꢀ The furnished relief valve will automatically open at 30 psig pressure to relieve the
strain on the boiler and heating system from the increasing pressureꢀ The pressure relief
valve discharge must be piped with piping same size as the valve discharge opening to an
open drain, tub or sink, or other suitable drainage point not subject to freezing, in accordance
with AꢀSꢀMꢀEꢀ specificationsꢀ Failure to provide the pressure relief valve with piping as herein
described may cause water damage and/or serious bodily injuryꢀ The boiler manufacturer is
not responsible for any water damage or personal injuryꢀ
Lꢀ FLAME ROLLOUT SAFETY SHUTOFF
As required, this boiler is equipped with a manual reset flame rollout safety shutoff means,
which shuts off main burner gas in the event that the flow of combustion products through
the flueways is reducedꢀ In the event of blocked flueways, enough air will not be available to
support combustion, and the S9301 Integrated Boiler Control (IBC) will lockout due to loss of
adequate air flow (after 3 trials for ignition)ꢀ The “PURGE” diagnostic indicator lamp (lamp “B”
on the IBC, see Figꢀ16) will blink indicating the failure mode as a lack of adequate air flowꢀ
The IBC is manually reset from lockout by either removing and reestablishing the
thermostat’s call for heat, or by turning the service switch off, then back onꢀ If the boiler
cannot be restored to normal operating condition by resetting the control, contact a qualified
service agency to check heat exchanger flueways for blockageꢀ
Mꢀ (OPTIONAL) EXTERNAL CONDENSATE PUMP
For installations where there is no floor drain or other appropriate drainage receptacle avail-
able to receive condensate from the boiler, an external float activated condensate pump with
integral sump is requiredꢀ This unit can be installed to pump the condensate to a remote tie
in point to a sanitary sewer systemꢀ For this application, the boiler must be installed so that
proper pitch of piping to the external condensate reservoir (sump) can be accomplishedꢀ Use
wood frame or blocks to raise boiler as required for proper installationꢀ
START - UP
Aꢀ WATER TREATMENT AND FREEZE PROTECTION
1ꢀ When filling the boiler and heating system, water treatment is generally not required or
desiredꢀ For localities where the water is unusually hard (above 7 grains hardness) or for
low pH water conditions (below 7ꢀ0), consult a local water treatment specialistꢀ
aꢀ This boiler is designed for use in a closed hydronic heating system ONLY!
bꢀ Excessive feeding of fresh make-up water to the boiler may lead to premature failure
of the boiler sectionsꢀ
2ꢀ Use clean fresh tap water for initial fill and make-up of boilerꢀ
aꢀ A sand filter must be used if fill and make-up water from a well is to be usedꢀ
bꢀ Consideration should be given to cleaning the heating system, particularly in
retrofit situations, where a new boiler is being installed in an older piping systemꢀ
34
Download from Www.Somanuals.com. All Manuals Search And Download.
cꢀ In older system, obviously discolored, murky, or dirty water, or a pH reading below 7, are
indications that the system should be cleanedꢀ
dꢀ A pH reading between 7 and 8 is preferredꢀ
3ꢀ Antifreeze if needed, must be of a type specifically designed for use in closed hydronic heating
systems and with aluminumꢀ
aꢀ Choice and use of antifreeze must be in accordance with local plumbing codesꢀ
b Only INTERCOOL NFP-50 is approved for useꢀ
Ÿ Use of any antifreeze other than INTERCOOL NFP-50 will void warrantyꢀ
Ÿ Antifreeze must be maintained per manufacturers specifications, failure to do so will
result in the warranty being voidedꢀ
cꢀ Do not use automotive antifreeze as the type of corrosion inhibitors used will coat the boiler’s
heat transfer surfaces and greatly reduce capacity and efficiencyꢀ
dꢀ Consult antifreeze manufacturer’s literature for compatibility of antifreeze with
aluminum boilerꢀ For approved manufactured antifreeze (INTERCOOL NFP-50 Coolant)
please contact Interstate Chemical Coꢀ New York Customer Service at 1-800-422-2436ꢀ
Some brands have corrosion inhibitors that break down more rapidly or become ineffective at
higher operating temperatures when used with aluminumꢀ Follow the antifreeze manufacturers
instructions on determining the proper ratio of antifreeze to water for the expected low
temperature conditions, and for maintaining the quality of the antifreeze solutions from year to
yearꢀ
eꢀ Use of antifreeze in any boiler will reduce capacity by as much as 10 to 20%, due to differing
heat transfer and pumping characteristicsꢀ This must be taken into consideration when sizing
the heating system, pump(s), and expansion tankꢀ Consult antifreeze manufacturer’s literature
for specific information on reduced capacityꢀ
fꢀ Water content of the boiler is 2ꢀ6 gallonsꢀ (10 liters)
Bꢀ FILLING BOILER WITH WATER AND PURGING ARE FOR SYSTEMS WITH DIAPHRAGM
TYPE EXPANSION TANKSꢀ
Refer to appropriate “Near Boiler Piping” diagramsꢀ
1ꢀ Close all zone service valves on the supply and return pipingꢀ Open the feed valve and fill boiler
with waterꢀ Make sure air vent is openꢀ Hold relief valve open until water runs air free for five
seconds to rapidly bleed air from boiler, then let the relief valve snap shutꢀ
2ꢀ Open the zone service valve on the supply pipe for the first zoneꢀ Open the purge valve on the
first zoneꢀ Feed water will fill the zone, pushing air out the purge valveꢀ Close the purge valve
when the water runs air freeꢀ Close the zone service valveꢀ
3ꢀ Repeat step 2 for all remaining zonesꢀ
4ꢀ Open all service valvesꢀ Any air remaining trapped in the return lines between the service valves
and the boiler will be pushed towards the air vent when the boiler is placed in operationꢀ
5ꢀ Inspect piping systemꢀ Repair any leaks immediatelyꢀ
Cꢀ FILLING BOILER WITH WATER AND PURGING AIR FOR SYSTEMS WITH
CONVENTIONAL CLOSED TYPE EXPANSION TANKS
Refer to appropriate “Near Boiler Piping” diagramsꢀ
1ꢀ Close all zone service valves on the supply and return piping and close the expansion tank service
valveꢀ Drain expansion tankꢀ Open the feed valve and fill boiler with waterꢀ Hold relief valve open
until water runs air free for five seconds to rapidly bleed air from boiler, then let the relief valve
snap shutꢀ
2ꢀ Open the zone service valve on the supply pipe for the first zoneꢀ Open the purge valve on the
first zoneꢀ Feed water will fill the zone, pushing air out the purge valveꢀ Close the purge valve
when the water runs air freeꢀ Close the zone service valveꢀ
3ꢀ Repeat step 2 for all remaining zonesꢀ
35
Download from Www.Somanuals.com. All Manuals Search And Download.
4ꢀ Open the expansion tank service valve and the tank ventꢀ Fill the tank to the proper level
and close the tank ventꢀ Remove the handle from the expansion tank service valve so
the homeowner doesn’t accidentally close itꢀ
5ꢀ Open all service valvesꢀ Any air remaining trapped in the return lines between the
service valves and the boiler will be pushed towards the expansion tank when the boiler
is placed in operationꢀ
6ꢀ Inspect piping systemꢀ Repair any leaks immediatelyꢀ
NOTE: DO NOT use stop leak compoundsꢀ Leaks in threaded connections in the
aluminumboiler sections must be repaired immediatelyꢀ Aluminum threads will not
seal themselvesꢀ
Dꢀ PLACING BOILER IN OPERATION
FOR YOUR SAFETY READ BEFORE OPERATING
WARNING: If you do not follow these instructions exactly, a fire or explosion
may result causing property damage, personal injury or loss of life
Aꢀ
Bꢀ
This appliance is equipped with an ignition device which
automatically lights the pilotꢀ Do not try to light the pilot
by handꢀ
· If you cannot reach your gas supplier, call the fire
departmentꢀ
Cꢀ
Dꢀ
Use only your hand to move the system control switchꢀ
Never use toolsꢀ If the switch will not move by hand,
don't try to repair it, call a qualified service technicianꢀ
Force or attempted repair may result in a fire or
explosionꢀ
BEFORE OPERATING smell all around the appliance
area for gasꢀ Be sure to smell next to the floor because
some gas is heavier than air and will settle on the floorꢀ
WHAT TO DO IF YOU SMELL GAS
· Do not try to light any applianceꢀ
Do not use this appliance if any part has been under
waterꢀ Immediately call a qualified service technician
to inspect the appliance and to replace any part of the
control system and any gas control which has been
· Do not touch any electrical switch; do not use any phone
in your buildingꢀ
· Immediately call your gas supplier from a neighbor's
phoneꢀ Follow the gas supplier's instructionsꢀ
under waterꢀ
OPERATING INSTRUCTIONS
5ꢀ Remove the front jacket panelꢀꢀ
1ꢀ STOP! Read the safety information above on this labelꢀ
2ꢀ Set thermostat to lowest settingꢀ
6ꢀ Turn the gas control knob clockwise
to “OFF”ꢀ
7ꢀ Wait five (5) minutes to clear out any gasꢀ Then smell for
gas, including near the floorꢀ If you smell gas, STOP!
Follow “B” in the safety information above on this labelꢀ If
you don’t smell gas go on to next stepꢀ
3ꢀ Turn off all electric power to the applianceꢀ
4ꢀ This appliance is equipped with an ignition device which
automatically lights the burnerꢀ DO NOT try to light the
burner by handꢀ
8ꢀ Turn the gas control knob counter clockwise
“ON”ꢀ
to
9ꢀ Replace front jacket panelꢀ
10ꢀ Turn on all electrical power to the applianceꢀ
11ꢀ Set the thermostat to desired settingꢀ
12ꢀ Iftheappliancewillnotoperate, followtheinstructions“To
TurnOffGasToAppliance”andcallyourservicetechnician
or gas supplierꢀ
TO TURN OFF GAS TO APPLIANCE
1ꢀ Set the thermostat to lowest settingꢀ
2ꢀ Turn off all electric power to the appliance if service is to
be preformedꢀ
4ꢀ Turn gas control knob clockwise
5ꢀ Replace the front jacket panelꢀ
to “OFF”ꢀ
3ꢀ Remove the front jacket panelꢀ
Safe lighting and other performance criteria were met with the gas manifold and control assembly
provided on the boiler when the boiler underwent tests specified in ANSI Z21ꢀ13-latest revisionꢀ
36
Download from Www.Somanuals.com. All Manuals Search And Download.
CHECK OUT PROCEDURE AND ADJUSTMENT
FIGURE 16 INDICATOR LAMPS
Aꢀ VERIFY PROPER SEQUENCE OF OPERATION
The sequence can be followed via the diagnostic indicator lamps on the Honeywell S9301A
integrated boiler control in Figꢀ 16ꢀ This is the normal sequence of operationꢀ A more detailed
sequence of operation containing potential faults can be found in the service hints sectionꢀ
',$*1267,&
,1',&$725
/$036
6(48(1&(ꢀ2)ꢀ23(5$7,21
3RZHUꢀ21ꢁꢀERLOHUꢀVWDQGLQJꢀE\ꢂꢀꢀ/DPSꢀ$ꢀLVꢀLOOXPLQDWHGꢀLQGLFDWLQJꢀꢃꢀYROWꢀSRZHUꢀLV
EHLQJꢀVXSSOLHGꢀWRꢀWKHꢀLQWHJUDWHGꢀFRQWUROꢂ
7KHUPRVWDWꢀFDOOVꢀIRUꢀKHDWꢁꢀHQHUJL]LQJꢀV\VWHPꢀFLUFXODWRU
,QWHJUDWHGꢀERLOHUꢀFRQWUROꢀJRHVꢀWKURXJKꢀVHOIꢀFKHFNꢀRIꢀLQWHUQDOꢀFLUFXLWU\ꢀꢄꢅꢆꢃꢀVHFRQGVꢇ
DQGꢀHQHUJL]HVꢀGUDIWꢀLQGXFHU
'UDIWꢀLQGXFHUꢀFRPHVꢀXSꢀWRꢀVSHHGꢀDQGꢀHVWDEOLVKHVꢀFRPEXVWLRQꢀDLUIORZꢁꢀFDXVLQJꢀWKH
QRUPDOO\ꢀRSHQꢀGLIIHUHQWLDOꢀSUHVVXUHꢀDLUꢀSURYLQJꢀVZLWFKꢀFRQWDFWVꢀWRꢀFORVHꢂꢀꢀ/DPSꢀ%ꢀLV
LOOXPLQDWHGꢀLQGLFDWLQJꢀWKDWꢀFRPEXVWLRQꢀDLUIORZꢀLVꢀSURYHGꢀDQGꢀWKHꢀꢅꢈꢀVHFRQGꢀSUHꢀSXUJH
F\FOHꢀLVꢀXQGHUꢀZD\ꢂ
37
Download from Www.Somanuals.com. All Manuals Search And Download.
$IWHUꢀSUHꢀSXUJHꢁꢀ/DPSꢀ%ꢀJRHVꢀRXWꢀDQGꢀ/DPSꢀ&ꢀLOOXPLQDWHVꢁꢀLQGLFDWLQJꢀWKHꢀKRWꢀVXUIDFHꢀ
LJQLWHUꢀLVꢀSRZHUHGꢀIRUꢀWKHꢀꢂꢃꢀVHFRQGꢀLJQLWHUꢀZDUPꢄXSꢀSHULRGꢅꢀ7KHꢀEULJKWꢀ\HOORZꢀRUDQJHꢀ
JORZꢀRIꢀWKHꢀKRWꢀVXUIDFHꢀLJQLWHUꢀFDQꢀEHꢀREVHUYHGꢀWKURXJKꢀWKHꢀREVHUYDWLRQꢀSRUWꢀLQꢀWKHꢀ
IURQWꢀERLOHUꢀVHFWLRQꢀMXVWꢀDERYHꢀWKHꢀLJQLWHUꢅ
$ꢅꢀè
%ꢅꢀè
&ꢅꢀî
'ꢅꢀè
(ꢅꢀè
$ꢅꢀî
%ꢅꢀè
&ꢅꢀî
'ꢅꢀî
(ꢅꢀë
$IWHUꢀLJQLWHUꢀZDUPꢄXSꢁꢀWKHꢀJDVꢀYDOYHꢀLVꢀHQHUJL]HGꢁꢀDQGꢀRSHQVꢀRQꢀWKHꢀQRUPDOꢀILULQJꢀUDWHꢀ
UHJXODWRUꢀꢆꢂꢅꢇ'ꢀZꢅFꢅꢈꢀIRUꢀDꢀꢉꢀVHFRQGꢀWULDOꢀIRUꢀLJQLWLRQꢅꢀ/DPSꢀ'ꢀLOOXPLQDWHVꢅꢀ7KHꢀEOXHꢀRUDQJHꢀ
JORZꢀRIꢀWKHꢀEXUQHUꢀFDQꢀEHꢀVHHQꢀWKURXJKꢀWKHꢀREVHUYDWLRQꢀSRUWꢅ
7ZRꢀVHFRQGVꢀODWHUꢁꢀ/DPSꢀ&ꢀJRHVꢀRXWꢀDVꢀSRZHUꢀLVꢀWXUQHGꢀRIIꢀWRꢀWKHꢀKRWꢀVXUIDFHꢀLJQLWHUꢅꢀ
'XULQJꢀWKHꢀODVWꢀWZRꢀVHFRQGVꢀRIꢀWKHꢀꢉꢀVHFRQGVꢀWULDOꢀIRUꢀLJQLWLRQꢁꢀPDLQꢀEXUQHUꢀIODPHVꢀLVꢀ
SURYHQꢀE\ꢀIODPHꢀUHFWLILFDWLRQꢀWKURXJKꢀWKHꢀKRWꢀ'XULQJꢀVXUIDFHꢀLJQLWHUꢁꢀSURYLGLQJꢀIODPHꢀ
UHFWLILFDWLRQꢀWRꢀWKHꢀLQWHJUDWHGꢀERLOHUꢀFRQWUROꢀDQGꢀIXOO\ꢀLOOXPLQDWLQJꢀ/DPSꢀ(ꢅꢅꢀ7KHꢀJDVꢀYDOYHꢀ
UHPDLQVꢀHQHUJL]HGꢁꢀDQGꢀWKHꢀERLOHUꢀUXQVꢅ
$ꢅꢀî
%ꢅꢀè
&ꢅꢀè
'ꢅꢀî
(ꢅꢀî
$ꢅꢀî
%ꢅꢀî
&ꢅꢀè
'ꢅꢀè
(ꢅꢀè
7KHUPRVWDWꢀHQGVꢀFDOOꢀIRUꢀKHDWꢁꢀGHꢄHQHUJL]LQJꢀJDVꢀYDOYHꢀDQGꢀV\VWHPꢀFLUFXODWRUꢅꢀ%XUQHUꢀ
VWRSVꢀILULQJꢁꢀDQGꢀ/DPSꢀ'ꢀJRHVꢀRXWꢅꢀ'UDIWꢀLQGXFHUVꢀUHPDLQVꢀSRZHUHGꢅꢀ/DPSꢀ%ꢀLOOXPLQDWHVꢁꢀ
LQGLFDWLQJꢀGUDIWꢀLQGXFHUꢀLVꢀUXQQLQJꢀIRUꢀꢊꢃꢀVHFRQGꢀSRVWSXUJHꢅ
$ꢅꢀî
%ꢅꢀè
&ꢅꢀè
'ꢅꢀè
(ꢅꢀè
$IWHUꢀꢊꢃꢀVHFRQGVꢁꢀGUDIWꢀLQGXFHUꢀLVꢀGHꢄHQHUJL]HGꢅꢀ/DPSꢀ%ꢀJRHVꢀRXWꢅꢀ%RLOHUꢀVWDQGVꢀE\ꢀIRUꢀ
QH[WꢀFDOOꢀIRUꢀKHDWꢅ
NOTE: First couple of cold starts may be rough due to gas line not being completely purged
of air, causing low firing rate and high excess air levelsꢀꢀ
Bꢀ INSPECT VENTING AND AIR INTAKE SYSTEM
Operate the boiler and verify that all vent/air intake connections are gastight and watertightꢀ
Repair any leaks immediatelyꢀ
Cꢀ INSPECT CONDENSATE DRAIN
Verify that all connections are watertight, and that condensate flows freelyꢀ Repair any leaks
immediatelyꢀ
Dꢀ INSPECT SYSTEM PIPING
Verify that all connections are watertightꢀ Repair any leaks immediatelyꢀ
Eꢀ TEST IGNITION SYSTEM SAFETY SHUTOFF DEVICE
1ꢀ Turn off manual gas valve
2ꢀ Set thermostat to call for heat
3ꢀ Boiler begins normal sequence of operation
4ꢀ After approximately 40 seconds (pre purge and igniter warm-up period), lamp D illumi
nates, indicating gas valve is powered
5ꢀ After 6 seconds, gas valve closes, lamp D goes out as integrated boiler control senses
that flame is not present
6ꢀ To restart system, follow operating instructions under “START-UP PLACE IN OPERATION”
38
Download from Www.Somanuals.com. All Manuals Search And Download.
Fꢀ TEST HIGH LIMIT CONTROL AND ADJUST
While burner is operating, move indicator on high limit control below actual boiler water
temperatureꢀ Burner should go off while circulator continues to operateꢀ Raise limit setting
above boiler water temperature and burner should reignite after pre purge and igniter warm-
up periodꢀ Set the high limit control to the design temperature requirements of the systemꢀ
Maximum high limit setting is 200°Fꢀ Minimum high limit setting is 100°Fꢀ
Gꢀ TEST OTHER SAFETY CONTROLS
If the boiler is equipped with a low water cut off, a manual reset high limit, or additional safety
controls, test for operation as outlined by the control manufacturerꢀ Burner should be operat-
ing and should go off when controls are testedꢀ When safety controls are restored, burner
should reigniteꢀ
Hꢀ SET THERMOSTAT HEAT ANTICIPATOR (IF USED) AND VERIFY THERMOSTAT OPERATION
For a single thermostat connected to the yellow thermostat lead wires in the furnished field
wiring junction box, the heat anticipator should be set at 0ꢀ7 ampsꢀ For other wiring configura-
tions, refer to the instructions provided by the thermostat manufacturer regarding adjustment
of heat anticipatorꢀ Cycle boiler with thermostatꢀ Raise the thermostat to the highest setting
and verify boiler goes through normal start up cycleꢀ Lower thermostat to lowest setting and
verify boiler goes offꢀ
Iꢀ MEASURE THE NATURAL GAS INPUT RATE
Correct input rate is essential for proper and efficient operation of the burner and boilerꢀ
1ꢀ Determine elevation at installation siteꢀ
2ꢀ See page 4 and 5 of this manual to determine the correct input rate for the local elevationꢀ
3ꢀ Obtain the yearly average heating value of the local gas supply from the gas utilityꢀ At sea
level elevation, it should be approximately 1000 Btu’s per standard cubic footꢀ
4ꢀ Operate boiler for 5 minutesꢀ
5ꢀ Turn off all other gas appliances, extinguishing standing pilots where applicableꢀ
6ꢀ At gas meter, measure time in seconds required to use one cubic foot of gasꢀ
7ꢀ Calculate input rate according to the following formula:
3600xheating value from step 3
Btuh input rate = time from step 6
8ꢀ Measured input rate should be within +/-2% of the input rating from step 2ꢀ If within 2%, go
to step 9ꢀ If not, adjustment is required, proceed as follows:
aꢀ Turn boiler off
bꢀ Set up U-tube manometer or differential pressure gauge for measuring manifold pres
sure, see FIGꢀ 17ꢀ
cꢀ Manometer or gauge must be able to read at least 0ꢀ0 to 3ꢀ0 inches water column of
pressure, and resolve to at least 0ꢀ1 inches water columnꢀ
dꢀ Turn boiler onꢀ
eꢀ Manifold pressure has been nominally set at 2ꢀ5 inches wꢀcꢀ Manifold pressure and input
rate must always be measured with pressure regulator cover screw installedꢀ Cover screw
must be removed for adjustmentꢀ Manifold pressure reading will change (increase) when
cover screw is removedꢀ
39
Download from Www.Somanuals.com. All Manuals Search And Download.
THE FOLLOWING STEPS AND DIAGRAM INDICATE THE LOCATION OF THE CONNECTION
POINTS REQUIRED TO MEASURE THE MANIFOLD PRESSUREꢀ
THE MANIFOLD PRESSURE MAY BE MEASURED USING A U-TUBE MANOMTERE OR A
DIFFERENTILA PRESSURE GAUGEꢀ THE DIAGRAM SHOWS THE CONNECTION OF BOTH
MEASURING DEVICES BUT ONLY ONE DEVICE IS REQUIRED TO MEASURE THE MANIFOLD
PRESSUREꢀ
© REMOVE THE PLUGꢀ INSTALL APPROPRIATE BARBED FITTING AND CONECT THE PRESSURE
SIDE LINE FROM THE U-TUBE MANOMETER OR THE DIFFERENTIAL PRESSURE GAUGEꢀ
REFER TO “CHECK OUT PROCEDURE AND ADJUSTMENTS” IN THIS MANUAL WHEN READING
MANIFOLD PRESSUREꢀ
WHEN MEASUREMENT IS COMPLETE, DISCONNECT U-TUBE MANOMETER OR DIFFERENTIAL
PRESSURE GAUGEꢀ BE SURE TO REINSTALL 1/8" PLUG, USING APPROPRIATE PIPE THREAD
SEALANT APPROVED FOR USE WITH NATURAL AND LIQUIFIED PETROLEUM GASESꢀ
FIGURE 17 MANIFOLD PRESSURE MEASUREMENT DETAIL
Top view of gas control
NOTE: Regulator cover screw must be installed
at all times unless adjusting manifold
pressureꢀ Firing rate and manifold
pressure must only be measured with
cover screw firmly installedꢀ
FIGURE 18 GAS VALVE
40
Download from Www.Somanuals.com. All Manuals Search And Download.
Iꢀ Remove regulator cover screw on top of gas valve, and insert an appropriate screw-
driver into adjustment screwꢀ
IIꢀ Turn adjustment screw clockwise to increase input rate, or counter clockwise to de-
crease input rateꢀ
IIIꢀ Replace cover screw, or cover hole temporarily with your finger to check new mani-
fold pressure settingꢀ Do not set manifold pressure lower than 2ꢀ0 inches wꢀcꢀ or
higher than 3ꢀ0 inches wꢀcꢀ when adjusting input rateꢀ
IVꢀ Measure new input rate (cover screw must be installed)ꢀ Repeat steps Iꢀ-IV until the
input rate is within +/-2% of the nameplate input ratingꢀ
Vꢀ If the actual input rate can not be set to within 2% of the correct input rating by adjust-
ing manifold pressure, a change in gas orifice size is requiredꢀ Consult the boiler
manufacturer for information on correct orifice sizingꢀ The specific gravity (G) and the
higher heating value (HHV) of the local natural gas must be obtained from the local
gas utility in order to determine the proper orifice sizeꢀ
fꢀ After adjusting input rate, turn boiler off, remove manometer or pressure gauge, reinstall
1/8" plug on gas valveꢀ Turn boiler onꢀ
9ꢀRestore all gas appliances that may have been shut off (while measuring boiler input
rate) to normal operating conditionsꢀ
Jꢀ SET THERMOSTAT TO DESIRED ROOM TEMPERATURE
Observe several operating cycles to verify proper operationꢀ
K REVIEW ALL INSTRUCTIONS
Review all instructions shipped with this boiler with owner or maintenance personꢀ Instructions
must be affixed on or adjacent to the boilerꢀ
Lꢀ COMPLETE AND SIGN THE INSTALLATION AND CHECK-OUT CERTIFICATE ON THE
FOLLOWING PAGEꢀ
41
Download from Www.Somanuals.com. All Manuals Search And Download.
INSTALLATION AND CHECK-OUT CERTIFICATE
Boiler Model
Serial #
Date Installed___________
Measured BTU/HR input____________
¡ Installation instructions have been followed
¡ Checkout procedure and adjustments performed
¡ Maintenance and Service issues reviewed with owner/ maintenance person
¡ Installation booklet affixed on or adjacent to boiler
Installer (Company)
Address
Phone
Installer’s Name
Signature
42
Download from Www.Somanuals.com. All Manuals Search And Download.
MAINTENANCE AND CLEANING
Maintenance as outlined below can be performed by the owner unless otherwise notedꢀ
The acidic nature of flue gasses condensing on the aluminum boiler sections will cause the
formation of aluminum oxideꢀ This oxide formation is normal, is generally uniform throughout the
boiler sections, and represents a negligible mass of aluminum that is consumed by oxidation
during the life of the boilerꢀ If left unchecked, this buildup may eventually cause blockage of the
flue gas passages in the boiler sections, reducing efficiency, and ultimately shutting down the
boiler due to lack of combustion air flowꢀ Regular service and maintenance by a qualified service
agency must be performed to assure safe trouble free operation and maximum efficiencyꢀ
Aꢀ BEGINNING OF EACH HEATING SEASON
1ꢀ Annual service call by a qualified service agency, which includes:
aꢀ Examine flue passages between boiler sections, burner, and condensate lines, and
clean if necessary following the annual examination and cleaning instructions in para
graph “F” on the next pageꢀ
bꢀ Visually inspect venting and air intake system for proper function, deterioration or
leakageꢀ If the vent or air intake show any signs of deterioration or leakage, repair or
replace them, immediatelyꢀ Insure proper reassembly and resealing of the vent and air
intake systemꢀ cꢀCheck for and remove any obstruction to the flow of combustion air
or venting of flue gasesꢀ Check the air baffle located inside 1 1/2"x2" flexible coupling
on the mixer, clean it if necessary and make sure to put it backꢀ Refer to repair parts
diagram of mixer and pressure switch assembly for exact locationꢀ
dꢀ Follow instructions for “PLACING BOILER IN OPERATION”ꢀ
eꢀ Follow instructions for” CHECK OUT PROCEDURE AND ADJUSTMENTS”ꢀ
fꢀ Visually inspect condensate drain line for proper operation and deteriorationꢀ Check
for plugged condensate drain lineꢀ
gꢀ Check the silicone rubber seals between boiler sectionsꢀ Insure that there are no
leaksꢀ Use RTV silicone rubber adhesive sealant (available in caulking gun tubes)
rated for at least 400° F to replace or repair seals in locations where original seals
have deterioratedꢀ
hꢀ Check all gasketed joints for leakage, and tighten bolts or replace gaskets if necessaryꢀ
iꢀ Remove jacket front and top panels and check for piping leaks around relief valve and
other fittingsꢀ Repair, if foundꢀ DO NOT use stop leak compoundsꢀ
2ꢀ Check that boiler area is free from combustible materials, gasoline, and other flammable
vapors and liquidsꢀ
3ꢀ Circulator pump and blower motor furnished with boiler are permanently lubricated from
factory and require no further lubricationꢀ Additional or non-factory supplied pumps and/or
motors should be lubricated according to the pump and/or motor manufacturer’s instructionꢀ
Bꢀ DAILY DURING HEATING SEASON
1ꢀ Check for and remove any obstruction to the flow of combustion air or venting of flue gasesꢀ
2ꢀ Check that boiler area is free from combustible materials, gasoline, and other flammable
vapors and liquidsꢀ
43
Download from Www.Somanuals.com. All Manuals Search And Download.
Cꢀ MONTHLY DURING HEATING SEASON
1ꢀ Remove jacket front and top panels and check for piping leaks around relief valve and
other fittingsꢀ If found, contact a qualified service agency to repairꢀ DO NOT use stop leak
compoundsꢀ
2ꢀ Test relief valveꢀ Refer to valve manufacturers instructions packaged with relief valveꢀ
3ꢀ Visually inspect venting and air intake system for proper function, deterioration, or
leakageꢀ If the vent or air intake show any signs of deterioration or leakage, contact a
qualified service agency to repair or replace them immediately and to insure proper
reassembly and resealing of the vent and air intake systemꢀ
4ꢀ Visually inspect the clear vinyl condensate lines and the PVC condensate drain pipe for
proper operation, leakage, and deteriorationꢀ If the condensate lines or drain pipe show
any signs of blockage, leakage, or deterioration contact a qualified service agency to
clean, repair, or replace them immediatelyꢀ
5ꢀ Check the air baffle located inside 1 1/2"x 2" flexible coupling, clean it if necessary and
make sure to put it backꢀ Refer to repair parts diagram, mixer and pressure switch
assemblyꢀ
Dꢀ PERIODICALLY DURING HEATING SEASON
1ꢀ Where low water cut offs are used, a periodic inspection of the low water cut off is
necessary, including flushing of float type devicesꢀ Refer to low water cut off
manufacturer’s specific instructionsꢀ
Eꢀ END OF EACH HEATING SEASON - ANNUAL SHUTDOWN PROCEDUR
1ꢀ Follow instructions “TO TURN OFF GAS TO APPLIANCE”ꢀ
2ꢀ If heating system is to remain out of service during freezing weather, and does not contain
antifreeze, drain system completelyꢀ If boiler will be exposed to freezing temperatures,
drain condensate linesꢀ Otherwise, do not drain system or boilerꢀ
Fꢀ ANNUAL EXAMINATION AND CLEANING OF BOILER COMPONENTS
The following service procedures must be performed only by a qualified service
agencyꢀ Boiler owner should not attempt these proceduresꢀ
1ꢀ Before Servicing, turn off electrical power to boiler at service switchꢀ Close manual gas
valve to turn off gas supply to boilerꢀ
2ꢀ Cleaning Flue passages between boiler sectionsꢀ
aꢀAny buildup of sediment or aluminum oxide (white powdery or flaky substance) in the
flue passages must be cleaned as follows:
bꢀRemove jacket front and top panelsꢀ Disconnect condensate drain line from the barbed
fitting on the bottom of the boilerꢀ Keep the open end of the drain line above the water
level in the condensate trap to prevent the trap from drainingꢀ Disconnect pressure switch
hose from barbed fitting on gas valveꢀ Disconnect 1½ x 2” flexible coupling from air inletꢀ
Disconnect air by-pass (½” transparent vinyl tube) from the bottom of the mixerꢀ
44
Download from Www.Somanuals.com. All Manuals Search And Download.
cꢀ Remove air baffle from 1%z” x2" flexible coupling and clean air baffle if necessaryꢀ
Refer to repair parts diagram, mixer and pressure switch assemblyꢀ
dꢀ Confirm that manual gas valve is closed and disconnect gas line to gas valve at unionꢀ
Disconnect wires to gas valveꢀ and igniterꢀ
eꢀ Loosen but do not remove five (5) nuts attaching mixer assembly to boilerꢀ Remove
two (2) igniter screws and very carefully remove the igniterꢀ Use care when removing
the igniter, it is very brittle!!
fꢀ Remove five (5) nuts and remove mixer assemblyꢀ Remove burner and mixer gasketꢀ
gꢀ Aluminum oxide deposits are water soluble and may be rinsed away with spraying or
running waterꢀ Before rinsing, connect a ‘/z” IꢀDꢀ hose to the barbed fitting on the
bottom of the boiler and run the hose to a bucket or drainꢀ
hꢀ After rinsing, remove any remaining loosened sediment using a shop vacuum with a
snorkel attachmentꢀ
i Inspect burner for any foreign matter in the flame ports or inside the burnerꢀ Any for-
eign matter should be removed by blowing with compressed air or vacuumingꢀ
jꢀ Inspect interior of mixer for any signs of sediment or aluminum oxide and clean if necessaryꢀ
kꢀ Reinstall burner and mixer gasket and position mixer assembly over studsꢀ Install five
(5) nuts but do not tightenꢀ Reinstall igniter and igniter gasket and fasten with two (2)
screwsꢀ Use care when installing the igniterꢀ It is very brittle!! Tighten five (5) nuts
holding mixer assemblyꢀ
lꢀ Connect:
• gas line to gas valve
• condensate drain line to boiler
• pressure switch hose to gas valve
• air by-pass to mixer
• 1 1/2" x2" flexible coupling to air inlet and make sure to put air baffle back to
correct position
• igniter wires
• gas valve wires
3ꢀ Visually inspect condensate lines leading from the boiler sections and the vent tee to the
condensate trapꢀ Refer to repair parts diagramsꢀ Any foreign material or debris that is
visible in the condensate lines needs to be cleaned out as follows: ꢀ
aꢀ Raise condensate trap and drain condensate lines completelyꢀ
bꢀ Once the condensate trap is emptied of water, disconnect condensate lines from the
fittings on the boiler, the vent tee, and the condensate outletꢀ
cꢀ Remove the condensate trap and run cold water through the condensate lines to
thoroughly flush out any sediment or debris in the linesꢀ
45
Download from Www.Somanuals.com. All Manuals Search And Download.
dꢀ Reinstall and connect the condensate trap, using the hose clamps to secure the various
condensate lines to their fittingsꢀ
eꢀ Follow the instructions under “NEAR BOILER PIPING” for”filling condensate trap with
water”
4ꢀ Inspection of the flue connector requires the following steps (Refer to the repair parts diagramꢀ)
aꢀ Loosen the clamp on the draft inducer end of the 2" flexible coupling that connects the
vent tee to the draft inducerꢀ Disconnect (unplug) wiring harness from draft inducer motor
and draft inducer temperature safety switchꢀ Remove four (4) bolts that attach draft in
ducer to flue connectorꢀ
bꢀ Remove draft inducer and gasket from top of flue connectorꢀ
cꢀ Inspect interior of flue connectorꢀ Any buildup of sediment or aluminum oxide on the
inside surface must be cleanedꢀ Position the draft inducer gasket and the draft inducer
and fasten with four (4) screwsꢀ Be sure to connect ground wire from draft inducer motor
to one of the four mounting screwsꢀ
dꢀ Connect wiring harness leads to the draft inducer motor and the draft inducer tempera
ture safety switchꢀ
eꢀ Connect the 2" flexible coupling to the draft inducer outletꢀ
46
Download from Www.Somanuals.com. All Manuals Search And Download.
SERVICE HINTS
DETAILED SEQUENCE OF OPERATION
47
Download from Www.Somanuals.com. All Manuals Search And Download.
DETAILED SEQUENCE OF OPERATION
48
Download from Www.Somanuals.com. All Manuals Search And Download.
END OF NORMAL SEQUENCE OF OPERATION
DETAILED SEQUENCE OF OPERATION
49
Download from Www.Somanuals.com. All Manuals Search And Download.
!!WARNING!!
FIRE, EXPLOSION OR SHOCK HAZARD MAY CAUSE
PROPERTY DAMAGE, SEVERE INJURY OR DEATHꢀ
DO NOT ATTEMPT TO MODIFY THE PHYSICAL OR ELECTRICAL
CHARACTERISTICS OF THIS BOILER IN ANY WAYꢀ
IMPORTANT
1ꢀ IN A RESET FROM LOCKOUT CONDITION, ALL ELECTRICAL METER READINGS AT THE GAS
CONTROL VALVE (24 VAC) MUST BE TAKEN WITHIN THE TRIAL FOR IGNITION PERIODꢀ
2ꢀ IF ANY COMPONENT DOES NOT FUNCTION PROPERLY, MAKE SURE IT IS CORRECTLY INSTALLED
AND WIRED BEFORE REPLACING ITꢀ
3ꢀ STATIC ELECTRICITY DISCHARGE CAN DAMAGE THE INTEGRATED BOILER CONTROL (IBC)ꢀ
TOUCH METAL SURFACE TO DISCHARGE STATIC ELECTRICITY BEFORE TOUCHING IBCꢀ
4ꢀ THE IBC CANNOT BE REPAIREDꢀ IF IT MALFUNCTIONS IT MUST BE REPLACEDꢀ
5ꢀ ONLY TRAINED, EXPERIENCED SERVICE TECHNICIANS SHOULD SERVICE THE IBC SYSTEMSꢀ
FOLLOWING TROUBLESHOOTING, CHECK OUT THE SYSTEM FOLLOWING THE SEQUENCE OF
OPERATION SECTION OF THIS CHAPTER FOR A NORMAL LIGHT OFF SEQUENCEꢀ
6ꢀ ALL CONTROLS ARE FACTORY TESTED IN THE ASSEMBLY PROCESS AND A DEFECTIVE
CONTROL IS GENERALLY THE LEAST LIKELY CAUSEꢀ IF YOU SUSPECT YOU HAVE A DEFECTIVE
CONTROL, READ THROUGH THE TROUBLESHOOTING CHART BEFORE YOU REPLACE ITꢀ
7ꢀ IT IS EXTREMELY UNLIKELY THAT THE TWO CONSECUTIVE CONTROLS ARE DEFECTIVEꢀ IF IT
SEEMS TO BE HAPPENING, CHANCES ARE THAT EITHER THERE IS NOTHING WRONG WITH THE
CONTORL OR IT IS BEING DAMAGED BY SOME OTHER PROBLEM (AN ELECTRICAL SHORT
BURNING OUT A TRANSFORMER, FOR EXAMPLE)ꢀ
INITIAL SERVICE CHECKS
1ꢀ BEFORE TROUBLESHOOTING:
Aꢀ MAKE SURE THAT CIRCUIT BREAKER IS ON OR FUSE IS OK AT ELECTRICAL PANELꢀ
Bꢀ MAKE SURE THAT SERVICE SWITCH IS ONꢀ
Cꢀ MAKE SURE THAT GAS IS ON AT THE GAS METER, AT ALL APPROPRIATE MANUAL
SHUTOFF VALVES AND AT THE GAS CONTROL VALVEꢀ
Dꢀ MAKE SURE THAT THE THERMOSTAT IS CALLING FOR HEATꢀ
Eꢀ CHECK THAT WIRE CONNECTORS AT THE INTEGRATED BOILER CONTROL AND AT THE
ORIGINATING CONTROL ARE SECURELY PLUGGED IN OR CONNECTEDꢀ
Fꢀ CHECK THAT HOSES ARE SECURELY CONNECTED AND ARE NOT PLUGGED IN OR
DAMAGEDꢀ
2ꢀ TROUBLESHOOTING TOOLS:
Aꢀ VOLTMETER TO CHECK 120 VAC AND 24 VAC
Bꢀ CONTINUITY TESTERꢀ
Cꢀ INCLINED MANOMETER OR PRESSURE GAUGE WITH 0-2ꢀ0” RANGE (0ꢀ01” SCALE) FOR
MEASURING SUCTION PRESSURES AT PRESSURE SWITCHꢀ
Dꢀ U-TUBE MANOMETER OR DIFFERENTIAL PRESSURE GAUGE WITH 0-14” RANGE (0ꢀ1”
SCALE) FOR MEASURING INLET AND MANIFOLD GAS PRESSURESꢀ
3ꢀ WHAT IS SYSTEM STATUS?
Aꢀ CONSULT THE CHART ON THE FOLLOWING PAGEꢀ
Bꢀ FIGURE 15 ON PAGE 29 SHOWS THE LOCATION ON THE BOILER OF THE DIAGNOSTIC
INDICATOR LAMPSꢀ
TROUBLE SHOOTING
50
Download from Www.Somanuals.com. All Manuals Search And Download.
6<67(0ꢀ67$786
UC@ꢀDI9D86UPSꢀGDBCUTꢀUS68ꢂꢀUC@ꢀPQ@S6UDIBꢀT@RV@I8@ꢁꢀꢀDAꢀUC@ꢀT`TU@HꢀGP8ꢂTꢀ
PVUꢅꢀUC@ꢀGDBCUTꢀDI9D86U@ꢀUC@ꢀQPDIUꢀDIꢀUC@ꢀT@RV@I8@ꢀPAꢀPQ@S6UDPIꢀXC@S@ꢀ
GP8ꢂPVUꢀP88VSTꢁꢀꢀDAꢀUCDTꢀU67G@ꢀ9P@TꢀIPUꢀS@69DG`ꢀQSPWD9@ꢀUC@ꢀS@6TPIꢀAPSꢀ
7PDG@SꢀH6GAVI8UDPIꢀPSꢀIPIꢄPQ@S6UDPIꢅꢀS@A@SꢀUPꢀUC@ꢀAPGGPXDIBꢀQ6B@TꢀAPSꢀ
HPS@ꢀ9@U6DG@9ꢀUSPV7G@TCPPUDIBꢀQSP8@9VS@Tꢁ
/,*+7 67$786
,1',&$7(6
D78ꢀDTꢀ@I@SBDa@9ꢀUCSPVBCꢀ!#ꢀWPGUꢀUS6ITAPSH@Sꢁ
D78ꢀDTꢀIPUꢀ@I@SBDa@9ꢁ
PI
32:(5
385*(
PAA
7GDIꢂDIB D78ꢀS@8@DW@TꢀHPS@ꢀꢀUC6Iꢀ#ꢃꢀW68
PI
D78ꢀDTꢀ@I@SBDaDIBꢀUC@ꢀ9S6AUꢀDI9V8@Sꢀ6I9ꢀ6DSꢀAGPXꢀDTꢀQSPW@Iꢁ
PAAꢀ9VSDIBꢀQVSB@ꢀ8`8G@ꢄ9S6AUꢀDI9V8@SꢀDTꢀIPUꢀQPX@S@9ꢀPSꢀ6DSꢀAGPX
DTꢀIPUꢀQSPW@Iꢁ
PAA
PAAꢀ9VSDIBꢀDBIDU@Sꢀ6I9ꢀSVIꢀ8`8G@ꢄIPSH6GꢀPQ@S6UDPIꢅꢀQVSB@
8`8G@ꢀ8PHQG@U@ꢁ
D78ꢀDTꢀGP8ꢂ@9ꢀPVUꢁꢀꢀQSP7G@Hꢀ8PVG9ꢀDI9D86U@ꢀA6GT@ꢀQPTDUDW@ꢀQSPPA
PAꢀ6DSꢀAGPXꢁꢀꢀ7GP8ꢂ@9ꢀW@IUꢀPSꢀDIU6ꢂ@ꢀ6DSꢀQDQ@ꢀPSꢀAGV@ꢀX6`ꢁ
D78ꢀDTꢀ@I@SBDaDIBꢀDBIDU@S
7GDIꢂDIB
PI
PAA
PI
,*1,7(5
9$/9(
)/$0(
DBIDU@SꢀDTꢀIPUꢀ@I@SBDa@9
D78ꢀDTꢀ@I@SBDaDIBꢀB6Tꢀ8PIUSPGꢀW6GW@ꢀUPꢀPQ@Iꢁ
B6Tꢀ8PIUSPGꢀW6GW@ꢀDTꢀ8GPT@9ꢁ
PAA
D78ꢀDTꢀGP8ꢂ@9ꢀPVUꢁꢀꢀQSP7G@HꢀDTꢀAG6H@ꢀC6TꢀIPUꢀ7@@IꢀQSPW@IꢀDI
7GDIꢂDIB
UCS@@ꢀꢆ"ꢇꢀDBIDUDPIꢀ6UU@HQUTꢁꢀꢀH6`ꢀ7@ꢀ9V@ꢀUPꢀ7SPꢂ@IꢀDBIDU@SꢀPS
ꢀG68ꢂꢀPAꢀPSꢀGPXꢀAG6H@ꢀTDBI6GꢅꢀPSꢀIPꢀB6Tꢁ
PI
AG6H@ꢀQSPW@I
PAA
AG6H@ꢀVIQSPW@I
TROUBLE SHOOTING
51
Download from Www.Somanuals.com. All Manuals Search And Download.
TROUBLESHOOTING CHART 1
ELE
THE FO
DANGE
TOUC
MUST B
WHAT T
—
—
—
—
SHOULD
FAIL TO
THE EL
SHUT O
APPLIAN
DO NOT
CONTR
QUALIFI
BOILER
SYSTEM
UNDER
USE ON
KNOBꢀ N
BY HAN
ATTEM
EXPLOS
TROUBLE SHOOTING
52
Download from Www.Somanuals.com. All Manuals Search And Download.
TROUBLESHOOTING CHART 2
TROUBLE SHOOTING
53
Download from Www.Somanuals.com. All Manuals Search And Download.
TROUBLESHOOTING CHART 3
TROUBLE SHOOTING
54
Download from Www.Somanuals.com. All Manuals Search And Download.
TROUBLESHOOTING CHART 4
TROUBLE SHOOTING
55
Download from Www.Somanuals.com. All Manuals Search And Download.
TROUBLESHOOTING CHART 5
TROUBLE SHOOTING
56
Download from Www.Somanuals.com. All Manuals Search And Download.
TROUBLESHOOTING CHART 6
TROUBLE SHOOTING
57
Download from Www.Somanuals.com. All Manuals Search And Download.
The following steps and diagram
indicate the locations of the
connection points required to check
the differential air pressureꢀ
The differential air pressure switch is
a safety device which will prevent the
boiler from firing if there is an air
intake, boiler heat exchanger or vent
blockageꢀ
Turn off service switch, or lower
thermostat settingꢀ
Remove vinyl caps from Tee and 4-
way connectorꢀ
Install testing lines as shown to
inclined manometer or differential
pressure gauge with the ability to
read 0ꢀ01” to 2ꢀ0” wꢀcꢀ
Turn on service switch and set
thermostat to call for heatꢀ
Boiler Status
Not Running
Setpoint
Differential Pressure (wꢀcꢀ)
Pressure Switch Connects
Normally Open
0”
1ꢀ00” for Model-100
1ꢀ35” for Model-75
1ꢀ55” for Model-50
Running Without
Blockage
Greater Than Setpoints
Closed
Open
Running With
Blockage
Less Than or Equal to
Setpoints
If manometer readings do not correspond to the chart above, check for possible causes:
- Blockage or moisture in suction lines
- Blockage in air intake or vent pipes
- Undersized air intake or vent pipes
- Loose blower wheel or motor shaft
- Inncorect pressure switch or pressure switch setpoint
When pressure reading is proper and the pressure switch is operating properly, remove testing
lines and reinstall vinyl caps to Tee and 4-way connectorꢀ
Cꢀ
DIFFERENTIAL AIR PRESSURE SWITCH CHECK
58
Download from Www.Somanuals.com. All Manuals Search And Download.
Aꢀ
JACKET AND BASE ASSEMBLY
REPAIR PARTS
59
Download from Www.Somanuals.com. All Manuals Search And Download.
-$&ꢀ(7ꢁ$1'ꢁ%$6(ꢁ$66(0%/<
'(6&5,37,21
ꢀꢁ
ꢀ(<
ꢀ
,7(0 180%(5
48$17,7<
ꢂ
ꢆ
ꢇ
ꢈ
ꢄ
ꢊ
ꢃ
ꢋ
ꢌ$
ꢌ%
ꢌ&
ꢂꢅ
ꢂꢂ
ꢂꢆ
ꢂꢇ
ꢂꢈ
ꢂꢄ
ꢂꢊ
ꢂꢃ
ꢂꢋ
ꢂꢌ
ꢆꢅ
ꢆꢂ
ꢆꢆ
ꢃꢄꢅꢅꢅꢂꢅꢆꢅ
ꢃꢄꢅꢅꢅꢂꢅꢆꢂ
ꢃꢄꢅꢅꢅꢂꢅꢆꢆ
ꢃꢄꢅꢅꢅꢂꢅꢆꢇ
ꢃꢄꢅꢅꢅꢂꢅꢆꢈ
ꢃꢄꢅꢅꢅꢂꢅꢆꢄ
ꢃꢄꢅꢅꢅꢂꢅꢆꢊ
ꢂꢈꢊꢊꢆꢋꢅꢂ
ꢂꢈꢊꢇꢂꢇꢂꢆ
ꢂꢈꢊꢇꢂꢅꢂꢅ
ꢂꢈꢊꢇꢂꢅꢈꢈ
ꢂꢈꢊꢊꢆꢋꢅꢇ
ꢂꢈꢊꢇꢂꢅꢌꢂ
ꢂꢈꢊꢇꢂꢂꢆꢅ
ꢂꢈꢊꢇꢂꢇꢂꢊ
ꢀ)5217ꢀꢀ3$1(/ꢀ
ꢂ
ꢂ
ꢂ
ꢂ
ꢂ
ꢂ
ꢂ
ꢂ
ꢂ
ꢂ
ꢂ
ꢂ
ꢈ
ꢂ
ꢂ
ꢀ5,*+7ꢀ3$1(/ꢀ
ꢀ/()7ꢀ3$1(/ꢀ
ꢀ%$&ꢉꢀ3$1(/ꢀ
ꢀ723ꢀ3$1(/ꢀ
ꢀ%$6(ꢀ
ꢀ&21752/ꢀ3$1(/
ꢀ$7ꢂꢈꢅ%ꢂꢅꢂꢊꢀ75$16)250(5ꢀꢆꢈꢀ9$&
ꢀ336ꢂꢅꢂꢂꢂꢍꢆꢊꢋꢅꢀ$,5ꢀ35(6685(ꢀ6:,7&+ꢀꢎꢂꢅꢅꢏ
ꢀ336ꢂꢅꢂꢂꢂꢍꢆꢊꢋꢂꢀ$,5ꢀ35(6685(ꢀ6:,7&+ꢀꢎꢃꢄꢏ
ꢀ336ꢂꢅꢂꢂꢂꢍꢆꢊꢋꢆꢀ$,5ꢀ35(6685(ꢀ6:,7&+ꢀꢎꢄꢅꢏ
ꢀ87ꢀꢂꢅꢂꢇꢍꢂꢅꢀ,17(*5$7('ꢀ%2,/(5ꢀ&21752/ꢀ
ꢀ&2ꢍꢆꢇꢊꢊꢀ*/,'(ꢀ
ꢀ+(<&2ꢀ2&%ꢍꢂꢄꢅꢅꢀ%86+,1*ꢀ
ꢀ5$&2ꢀꢆꢇꢆꢀꢈꢈꢆꢀ%2;
ꢀ
ꢀ3(6ꢀ6:,7&+ꢀꢊꢌꢂꢍ,
ꢀ&29(5ꢀ3/$7(ꢀꢀ5$&2ꢀꢌꢅꢆꢍꢋꢅꢆ
ꢀꢈꢂꢌꢍꢂ$$ꢂꢀꢆò´ꢀ3/8*
ꢀꢈꢂꢄꢍꢂ$$ꢂꢀꢂò´ꢀ3/8*
ꢀ%3)ꢀꢇꢀò´ꢀ3/8*
ꢂꢈꢊꢇꢂꢇꢂꢌ
ꢂꢈꢊꢇꢂꢇꢂꢋ
ꢂꢈꢊꢇꢂꢂꢃꢈ
ꢂꢈꢊꢇꢂꢂꢃꢂ
ꢂꢈꢊꢇꢂꢂꢃꢊ
ꢂꢈꢊꢇꢂꢂꢃꢄ
ꢃꢄꢅꢅꢅꢂꢅꢆꢃ
ꢂ
ꢂ
ꢆ
ꢇ
ꢂ
ꢆ
ꢂ
ꢀꢈꢆꢂꢍꢂ$$ꢂꢀꢇ´ꢀ3/8*
ꢀ/2:(5ꢀ)5217ꢀ3$1(/ꢀꢍꢀ%/8(
&,ꢍꢅꢅꢂꢐꢅꢇ
ꢂꢈꢊꢆꢊꢅꢈꢇ
&,ꢍꢅꢅꢊꢐꢅꢂ
ꢂꢈꢊꢆꢊꢅꢈꢇ
ꢈꢇꢇꢅꢅꢋꢆꢊ
ꢂꢈꢊꢇꢂꢇꢂꢄ
ꢃꢄꢅꢅꢅꢂꢅꢅꢆ
ꢀ7$&2ꢀ&,5&8/$7,1*ꢀ3803
ꢀ7$&2ꢀ,62/$7,21ꢀ9$/9(ꢀ6(7
ꢀ*581')26ꢀ&,5&8/$7,1*ꢀ3803
ꢀ*581')26ꢀ,62/$7,21ꢀ9$/9(ꢀ6(7
ꢀ&,5&8/$7,1*ꢀ3803ꢀ+$51(66
ꢀ:,5,1*ꢀ+$51(66
ꢂ
ꢂ
ꢂ
ꢂ
ꢂ
ꢂ
ꢍ
Á
Á
Á
Á
Á
Á
ꢀ-$&ꢉ(7ꢀ&203/(7(
REPAIR PARTS
60
Download from Www.Somanuals.com. All Manuals Search And Download.
Bꢀ
CONDENSATE DRAIN TRAP ASSEMBLY
&21'(16$7(ꢁ'5$,1ꢁ75$3ꢁ$66(0%/<
ꢀꢁ
ꢀ(<
ꢀ
,7(0 180%(5
'(6&5,37,21
48$17,7<
ꢂ
ꢂꢃꢄꢅꢂꢆꢅꢇ
ꢀꢇꢈꢆꢂꢈꢀꢀò´,'[ꢂꢉꢊ´ꢀ7+ꢋꢀ9,1</ꢀ78%,1*
$6ꢀ5(48,5('
ꢌꢂꢃꢄꢅꢂꢂꢃꢂ
ꢀꢇꢍꢂꢅꢃꢀꢀô´ꢀ61$3ꢀ*5,3ꢀ&/$03
ꢄ
ꢅ
ꢃ
ꢇ
ꢄ
ꢍ
ꢊ
ꢂꢃꢄꢅꢂꢅꢌꢆ
ꢂꢃꢄꢅꢂꢂꢆꢂ
ꢂꢃꢄꢅꢂꢅꢌꢂ
ꢂꢃꢄꢅꢂꢅꢆꢄ
ꢂꢃꢄꢅꢂꢆꢌꢆ
ꢂꢃꢄꢅꢂꢅꢌꢅ
ꢀꢄꢌꢆꢄꢍꢀꢀò´,'ꢀ+26(ꢀ7((
ꢂ
ꢂ
ꢂ
ꢂ
ꢂ
ꢂ
ꢀꢄꢌꢆꢂꢍꢀꢀò´137[ꢀò´,'ꢀ78%(ꢀ675$,*+7
ꢀò´ꢀ39&ꢀ&283/,1*ꢎꢀ6&+ꢀꢊꢆ
ꢀò´ꢃ´ꢀ39&ꢀ1,33/(ꢎꢀ6&+ꢀꢊꢆ
ꢀò´,'ꢀò´,'ꢀò´137ꢀ78%(ꢀ7((
ꢀ6ꢏꢀ6ꢏꢀ&/$03ꢎꢀ6,=(ꢀꢂꢄꢀꢐꢂꢅꢉꢂꢄ´aꢂꢀò´ꢑ
REPAIR PARTS
61
Download from Www.Somanuals.com. All Manuals Search And Download.
REPAIR PARTS
62
Download from Www.Somanuals.com. All Manuals Search And Download.
%2,/(5ꢁ%/2&ꢀꢁ$1'ꢁ3,3,1*ꢁ$66(0%/<
'(6&5,37,21
+2))0$1ꢅ9(17ꢅꢆꢇꢇ
ôꢋꢅ[ꢅꢀꢌꢍꢋꢅ%86+,1*
ôꢋꢅ%/$&!ꢅ7((
ôꢋꢅ[ꢅꢉꢊžꢅ675((7ꢅ(/%2:
ôꢋꢅ[ꢅꢂòꢋꢅ1,33/(
ôꢋꢅ$60(ꢅ5(/,()ꢅ9$/9(
ôꢋ[ꢅꢈꢋꢅ1,33/(
óꢋꢎꢈꢊꢅ+(;ꢅ187ꢅ:ꢌ6(55$7('ꢅ:$6+(5ꢅ+($'
ꢍꢎꢃꢈꢅ[ꢅꢃꢌꢀꢂꢋꢅ62&ꢅ+'ꢅ&$3ꢅ6&5(:
ꢃꢂ7ꢈꢂꢎꢁꢈꢉꢃꢊꢅ&$67,1*ꢅ7(03ꢏꢅ6$)(7<ꢅ6:,7&+
óꢋꢎꢈꢊꢅ[ꢅꢀòꢋꢅ62&ꢅ+'ꢅ&$3ꢅ6&5(:
óꢋꢎꢈꢊꢅ[ꢅꢀóꢋꢅ678'ꢅ7+5($'('
7(67('ꢅ%/2&!ꢅꢐ,1&/8'(6ꢅꢍꢑꢀꢀꢑꢀꢁꢅ$1'ꢅꢈꢊꢑꢈꢈꢒ
óꢋꢅ[ꢅꢀóꢋꢅ&$55,$*(ꢅ%2/7
ꢂꢈꢊꢀꢇꢅòꢋꢅ137ꢅ[ꢅòꢋꢅ,'ꢅ78%(ꢅ675$,*+7
ꢀóꢋꢅ[ꢅꢈòꢋꢅ1,33/(ꢅ%/$&!
ꢀóꢋꢅ[ꢅôꢋꢅ[ꢅꢀóꢋꢅ7((
ꢀ(<ꢁꢂ
ꢀ
,7(0ꢁ180%(5
ꢀꢁꢂꢃꢀꢀꢄꢂ
ꢀꢁꢂꢉꢃꢊꢊꢀ
ꢀꢁꢂꢉꢃꢊꢇꢂ
ꢀꢁꢂꢉꢃꢊꢁꢊ
ꢀꢁꢂꢊꢇꢊꢊꢈ
ꢀꢁꢂꢈꢈꢊꢀꢀ
ꢀꢁꢂꢊꢇꢈꢊꢀ
ꢀꢁꢂꢉꢄꢍꢀꢊ
ꢀꢁꢂꢉꢄꢍꢊꢈ
ꢀꢁꢂꢃꢀꢊꢊꢊ
ꢀꢁꢂꢉꢄꢍꢊꢀ
ꢀꢁꢂꢉꢄꢍꢊꢄ
ꢁꢀꢍꢊꢊꢉꢀꢊ
ꢀꢁꢂꢉꢄꢊꢁꢊ
ꢀꢁꢂꢃꢀꢀꢊꢀ
ꢀꢁꢂꢊꢇꢊꢁꢁ
ꢀꢄꢀꢊꢊꢊꢀ
48$17,7<
ꢀ
ꢀ
ꢀ
ꢈ
ꢈ
ꢀ
ꢀ
ꢉ
ꢈ
ꢀ
ꢄ
ꢉ
ꢀ
ꢁ
ꢀ
ꢈ
ꢈ
ꢀ
ꢀꢈ
ꢀ
ꢀ
ꢀ
ꢀ
ꢀ
ꢀ
ꢀ
ꢀ
ꢀ
ꢈ
ꢃ
ꢁ
ꢄ
ꢂ
ꢇ
ꢍ
ꢉ
ꢀꢊ
ꢀꢀ
ꢀꢈ
ꢀꢃ
ꢀꢁ
ꢀꢄ
ꢀꢂ
ꢀꢇ
ꢀꢍ
ꢀꢉ
ꢈꢊ
ꢈꢀ
ꢈꢈ
ꢈꢃ
ꢈꢁ
ꢈꢄ
ꢈꢂ
ꢈꢇ
ꢈꢍ
ꢀꢁꢂꢈꢈꢊꢊꢊ
ꢀꢁꢂꢉꢃꢊꢄꢂ
ꢀꢁꢂꢀꢉꢊꢊꢈ
ꢀꢁꢂꢉꢃꢊꢄꢍ
ꢀꢁꢂꢉꢃꢊꢊꢁ
ꢀꢁꢂꢂꢈꢍꢊꢁ
ꢀꢁꢂꢃꢀꢃꢈꢁ
ꢀꢁꢂꢉꢃꢊꢊꢀ
ꢀꢈꢂꢊꢊꢊꢂ
ôꢋꢅ'5$,1ꢅ9$/9(
ꢀꢋꢅ64ꢅ62&!(7ꢅ3/8*
(03,5(ꢅ6,*+7ꢅ*/$66
ôꢋꢅ64ꢅ+'ꢅ3/8*
ôꢋꢅ[ꢅòꢋꢅ%86+,1*
ꢀꢈꢃꢍꢂꢉ$ꢅ&21752/ꢅ:(//ꢅòꢋꢅ137
/ꢁꢊꢊꢂ$ꢅꢈꢀꢄꢄ%ꢅ+,ꢅ/,0,7ꢅ$48$67$7
ôꢋꢅ[ꢅꢀꢌꢍꢋꢅ%86+,1*
7(03ꢅ1ꢅ35(6685(ꢅ*$8*(
6,*+7ꢅ*/$66ꢅ$'$37(5
ꢀꢁꢂꢃꢀꢊꢊꢁ
ꢀꢁꢂꢃꢀꢊꢊꢄ
ꢀꢌꢍꢋꢅ137ꢅóꢋꢅ+26(ꢅ,'ꢅ%5$66ꢅ%$5%ꢅ),77,1*
REPAIR PARTS
63
Download from Www.Somanuals.com. All Manuals Search And Download.
Dꢀ
MIXER AND AIR PRESSURE SWITCH ASSEMBLY
REPAIR PARTS
64
Download from Www.Somanuals.com. All Manuals Search And Download.
0,;(5ꢁ$1'ꢁ$,5ꢁ35(6685(ꢁ6:,7&+ꢁ$66(0%/<
'(6&5,37,21
ꢀ%851(5ꢀ*$6ꢈ(7ꢀ
ꢀꢂꢆꢆꢀ%851(5ꢀꢉ%6,ꢊ
ꢀꢋꢌꢀ%851(5ꢀꢉ%6,ꢊ
ꢀꢌꢆꢀ%851(5ꢀꢉ%6,ꢊ
ꢀ0,;(5ꢀ*$6ꢈ(7ꢀ
ꢀó´ꢏꢇꢆꢀ+(;ꢀ187ꢀ:ꢐ6(55$7('ꢀ:$6+(5ꢀ+($'
ꢀ0,;(5ꢀ&$67,1*ꢀ0$&+,1('
ꢀꢇ´ꢂò´ꢀ)/(;,%/(ꢀ&283/,1*
ꢀꢂꢆꢆꢀ$,5ꢀ%$))/(
ꢀꢋꢌꢀ$,5ꢀ%$))/(
ꢀꢌꢆꢀ$,5ꢀ%$))/(
ꢀ$,5ꢀ,1/(7
ꢀꢇ´ꢀ)(51&2ꢀ&283/,1*
ꢀꢂꢆꢏꢅꢇ´[ꢅꢐꢍ´ꢀ0$&+,1(ꢀ6&5(:ꢀ
ꢀ+27ꢀ685)$&(ꢀ,*1,7(5ꢀꢉ)25ꢀꢌꢆꢐꢋꢌꢊ
ꢀ+27ꢀ685)$&(ꢀ,*1,7(5ꢀꢉ)25ꢀꢂꢆꢆꢊ
ꢀ+27ꢀ685)$&(ꢀ,*1,7(5ꢀ*$6ꢈ(7ꢀ
ꢀ0,;(5ꢀ%86+,1*
ꢀ(<ꢀꢁ
ꢂ
ꢇ$
ꢇ%
ꢇ&
ꢅ
ꢃ
ꢌ
ꢄ
ꢋ$
ꢋ%
ꢋ&
ꢍ
ꢎ
ꢂꢆ
ꢂꢂ$
ꢂꢂ%
ꢂꢇ
ꢂꢅ
ꢂꢃ
ꢂꢌ
ꢂꢄ
ꢂꢋ
ꢂꢍ
ꢂꢎ
ꢇꢆ
ꢇꢂ
ꢇꢇ
ꢇꢅ
ꢇꢃ
,7(0ꢀ180%(5
ꢂꢃꢄꢅꢂꢆꢇꢅ
ꢂꢃꢄꢅꢂꢆꢆꢄ
ꢂꢃꢄꢅꢂꢆꢆꢋ
ꢂꢃꢄꢅꢂꢆꢆꢍ
ꢂꢃꢄꢅꢂꢆꢇꢌ
ꢂꢃꢄꢎꢌꢍꢂꢆ
ꢂꢇꢂꢆꢂꢆꢆꢍ
ꢂꢃꢄꢅꢂꢅꢂꢂ
ꢃꢇꢌꢅꢂꢂꢆꢆ
ꢃꢇꢌꢅꢂꢂꢆꢂ
ꢃꢇꢌꢅꢂꢂꢆꢇ
ꢃꢇꢌꢅꢂꢂꢆꢅ
ꢂꢃꢄꢅꢂꢆꢂꢌ
ꢂꢃꢄꢎꢌꢍꢆꢎ
ꢃꢅꢍꢆꢆꢆꢂꢅ
ꢃꢅꢍꢆꢆꢆꢂꢃ
ꢂꢃꢄꢅꢂꢆꢇꢃ
ꢂꢃꢄꢅꢂꢅꢆꢎ
ꢂꢃꢄꢆꢋꢅꢆꢂ
ꢂꢃꢄꢎꢅꢍꢆꢌ
ꢂꢃꢄꢅꢂꢅꢆꢋ
ꢂꢃꢄꢅꢂꢅꢆꢍ
ꢂꢃꢄꢅꢂꢂꢆꢃ
ꢂꢃꢄꢅꢂꢅꢂꢅ
ꢂꢃꢄꢅꢂꢂꢃꢅ
ꢂꢃꢄꢅꢂꢂꢌꢂ
ꢂꢃꢄꢅꢂꢆꢅꢅ
ꢂꢃꢄꢅꢂꢅꢂꢃ
ꢂꢃꢄꢇꢎꢆꢆꢅ
ꢂꢃꢄꢅꢂꢅꢂꢇ
ꢂꢃꢄꢅꢂꢆꢂꢆ
ꢂꢃꢄꢅꢂꢆꢃꢃ
ꢂꢃꢄꢅꢂꢂꢆꢅ
ꢂꢃꢄꢅꢂꢅꢂꢆ
ꢂꢃꢄꢅꢂꢆꢇꢎ
ꢂꢃꢄꢅꢂꢆꢅꢆ
ꢂꢃꢄꢅꢂꢆꢅꢇ
ꢂꢃꢄꢅꢂꢆꢅꢄ
ꢂꢃꢄꢅꢂꢆꢅꢋ
48$17,7<
ꢂ
ꢂ
ꢂ
ꢂ
ꢂ
ꢌ
ꢂ
ꢂ
ꢂ
ꢂ
ꢂ
ꢂ
ꢂ
ꢇ
ꢂ
ꢂ
ꢂ
ꢂ
ꢂ
ꢅ
ꢂ
ꢂ
ꢂ
ꢂ
ꢀò´ꢀꢅ´ꢀ67'ꢀ%/$&ꢈꢀ1,33/(
ꢀꢂꢐꢍ¶¶ꢀ137ꢀ%5$66ꢀ3/8*ꢀ±ꢀꢅꢐꢂꢄ¶¶ꢀ+(;ꢀ62&ꢈ(7
ꢀ+21(<:(//ꢀ*$6ꢀ9$/9(ꢀ95ꢍꢇꢆꢌ
ꢀꢌꢐꢂꢄꢏꢇꢃꢂꢐꢃꢀ+26(ꢀ,'ꢀ%5$66ꢀ%$5%ꢀ),77,1*
ꢀꢄꢇꢆꢄꢃꢀꢀó´,'ꢀ78%(ꢀ7((
ꢀó´,'ꢀ78%(ꢀꢀꢃꢏ:$<ꢀ&211(&725
ꢀꢅꢐꢍ´ꢀ+26(ꢀ&/$03ꢀ+&ꢏꢄ67
ꢂꢆ
ꢇ
ꢀ3&ꢇꢌꢆꢏꢂꢇ9,1</ꢀ&$3
ꢀꢌꢎꢆꢆꢄꢀó´,'[ꢅꢐꢍ´2'ꢀ9,1</ꢀ78%,1*
ꢀꢂꢐꢃ¶¶,'ꢅꢐꢍ´2'ꢀ9,1</ꢀ78%,1*ꢀꢉ5('ꢊ
ꢀꢂꢐꢃ´ꢀ,'ꢀ6,/,&21(ꢀ78%,1*
$6ꢀ5(48,5('
$6ꢀ5(48,5('
$6ꢀ5(48,5('
ꢇꢌ$
ꢇꢌ%
ꢇꢌ&
ꢇꢄ
ꢇꢋ$
ꢇꢋ%
ꢇꢋ&
ꢇꢋ'
ꢇꢋ(
ꢇꢋ)
ꢀ336ꢂꢆꢂꢂꢂꢏꢇꢄꢍꢆꢀ$,5ꢀ35(6685(ꢀ6:,7&+ꢀꢉꢂꢆꢆꢊ
ꢀ336ꢂꢆꢂꢂꢂꢏꢇꢄꢍꢂꢀ$,5ꢀ35(6685(ꢀ6:,7&+ꢀꢉꢋꢌꢊ
ꢀ336ꢂꢆꢂꢂꢂꢏꢇꢄꢍꢇꢀ$,5ꢀ35(6685(ꢀ6:,7&+ꢀꢉꢌꢆꢊ
ꢀꢄꢇꢆꢃꢅꢀò¶¶ꢀ137ꢂꢐꢇ´,'ꢀ78%(ꢀ(/%2:
ꢀ*$6ꢀ25,),&(ꢀ±ꢀ1$785$/ꢑꢀꢂꢆꢆ1ꢀꢉꢆꢒꢆꢍꢄꢆꢑꢀꢁꢃꢃꢊ
ꢀ*$6ꢀ25,),&(ꢀ±ꢀ1$785$/ꢑꢀꢋꢌ1ꢀꢉꢆꢒꢆꢋꢄꢆꢑꢀꢁꢃꢍꢊ
ꢀ*$6ꢀ25,),&(ꢀ±ꢀ1$785$/ꢑꢀꢌꢆ1ꢀꢉꢆꢒꢆꢄꢂꢌꢊ
ꢀ*$6ꢀ25,),&(ꢀꢏꢀ3523$1(ꢑꢀꢂꢆꢆ3ꢀꢉꢆꢒꢆꢄꢋꢆꢑꢀꢁꢌꢂꢊ
ꢀ*$6ꢀ25,),&(ꢀ±ꢀ3523$1(ꢑꢀꢋꢌ3ꢀꢉꢆꢒꢆꢄꢆꢌꢊ
ꢀ*$6ꢀ25,),&(ꢀ±ꢀ3523$1(ꢑꢀꢌꢆ3ꢀꢉꢆꢒꢆꢃꢎꢇꢊ
ꢂ
ꢂ
ꢂ
ꢂ
ꢂ
ꢂ
ꢂ
ꢂ
ꢂ
ꢂ
REPAIR PARTS
65
Download from Www.Somanuals.com. All Manuals Search And Download.
Eꢀ
FLUE ADAPTER AND EXHAUST ASSEMBLY
)/8(ꢁ$'$37(5ꢁ$1'ꢁ(;+$867(5ꢁ$66(0%/<
ꢀ(<ꢀꢁ ,7(0ꢀ180%(5
'(6&5,37,21
(;+$867ꢀ7((ꢀ$66(0%/<ꢀꢇꢀꢂꢇ$ꢈ%ꢈ&ꢈ'ꢈ(ꢀꢉꢀ)
ꢋꢄꢅꢂꢍꢀꢂꢎꢄ´137[ꢂꢎꢄ´,'ꢀ78%(ꢀ675$,*+7
39&ꢀꢂꢀꢂꢎꢄ´ꢀ0$/(ꢀ6/,3ꢀ[ꢀꢂꢎꢄ´ꢀ)(0$/(ꢀ137
39&ꢀ6&+ꢀꢊꢅꢀꢄ´[ꢂꢇꢂꢎꢄ´ꢀ5('8&(5
ꢌꢎꢊ¶¶ꢀ$/80,180ꢀ)/$7ꢀ:$6+(5
ꢄ´ꢀ&39&ꢀꢀ7((ꢈꢀ6&+ꢀꢃꢅ
ꢄ´ꢀ&39&ꢀ3,3(ꢄꢇꢂꢎꢄ¶¶ꢈꢀ6&+ꢀꢊꢅ
9(17ꢀ6:,7&+ꢀ*$6*(7
ꢌꢋ7;ꢂꢂꢇꢄꢄꢊꢆꢂꢀ,1'8&(5ꢀ7(03ꢀ6$)(7<ꢀ6:,7&+
ꢁꢊꢇꢄꢅ[ꢂꢎꢊ´ꢀ+:+ꢀ3/$67ꢀ)250ꢀ6&5(:
ꢂꢂꢋꢏꢂꢋꢇꢂꢂꢀ,1'8&('ꢀ'5$)7ꢀ%/2:(5
%/2:(5ꢀ*$6*(7
48$17,7<
ꢂ
ꢂ$
ꢂ%
ꢂ&
ꢂ'
ꢂ(
ꢂ)
ꢄ
ꢂꢃꢄꢅꢅꢆꢅꢅꢄ
ꢂꢊꢋꢌꢂꢂꢅꢂ
ꢂꢊꢋꢌꢂꢅꢂꢌ
ꢂꢊꢋꢌꢂꢅꢂꢊ
ꢂꢊꢋꢆꢏꢃꢂꢏ
ꢂꢊꢋꢌꢂꢌꢅꢏ
ꢂꢊꢋꢌꢂꢌꢅꢊ
ꢂꢊꢋꢌꢂꢅꢄꢃ
ꢂꢊꢋꢌꢂꢌꢅꢌ
ꢂꢊꢋꢆꢏꢃꢅꢃ
ꢂꢊꢋꢌꢂꢅꢍꢍ
ꢂꢊꢋꢌꢂꢅꢄꢋ
ꢂꢄꢂꢅꢂꢅꢄꢂ
ꢂꢊꢋꢌꢂꢅꢄꢍ
ꢂꢊꢋꢆꢏꢃꢂꢅ
ꢂꢊꢋꢆꢌꢃꢅꢊ
ꢂꢊꢋꢌꢂꢂꢅꢌ
ꢂꢊꢋꢌꢂꢂꢊꢂ
ꢂꢊꢋꢌꢂꢅꢌꢏ
ꢂꢊꢋꢌꢂꢌꢅꢂ
ꢂꢊꢋꢌꢂꢌꢅꢄ
ꢂꢊꢋꢌꢂꢂꢏꢂ
ꢂꢊꢋꢌꢂꢂꢊꢌ
ꢂ
ꢂ
ꢂ
ꢂ
ꢂ
ꢂ
ꢂ
ꢂ
ꢂ
ꢄ
ꢂ
ꢂ
ꢂ
ꢂ
ꢊ
ꢂ
ꢂ
ꢌ
ꢊ
ꢏ
ꢋ
ꢍ
ꢃ
ꢆ
)/8(ꢀ&211(&725
5(&29(5<ꢀ&2,/ꢀ*$6*(7
ꢂꢎꢊ´ꢇꢄꢅꢀ+(;ꢀ187ꢀ:ꢎ6(55$7('ꢀ:$6+(5ꢀ%/2&*
ꢂꢎꢃ,ꢀ137ꢀꢂꢎꢊ,ꢀ+26(ꢀ,'ꢀ%5$66ꢀ%$5%ꢀ),77,1*
ꢋꢄꢅꢊꢌꢀꢂꢎꢄ¶¶ꢀ137ꢂꢎꢄ¶¶ꢀ,'ꢀ78%(ꢀ(/%2:
ꢏꢍꢂꢌꢊꢀꢌꢎꢊ¶¶ꢀ61$3ꢀ*5,3ꢀ&/$03
ꢏꢆꢅꢂꢆꢀò¶¶ꢀ,'ꢂꢎꢃꢀ7+*ꢀ9,1</ꢀ78%(
+26(ꢈꢀꢌ´ꢀ/21*ꢀꢀꢄꢇꢌꢎꢃ´ꢀ,'ꢀ;ꢀꢄꢇꢌꢎꢊ´ꢀ2'
6ꢐꢀ6ꢐꢀ&/$03ꢈꢀ6,=(ꢀꢊꢊ
ꢂꢅ
ꢂꢂ
ꢂꢄ
ꢂꢌ
ꢂꢊ
ꢂꢏ
ꢂꢋ
ꢂꢍ
ꢄ
$6ꢀ5(48,5('
ꢂ
ꢄ
ꢄ
ꢄ
3&ꢄꢏꢅꢇꢂꢄꢀ9,1</ꢀ&$3
ꢌꢎꢃ,ꢀ+26(ꢀ&/$03ꢀ+&ꢇꢋ67
REPAIR PARTS
14683301
66
Rev, 3, August 2003
Download from Www.Somanuals.com. All Manuals Search And Download.
|
Pyramid Technologies Power Supply PS 3KX User Guide
Raymarine GPS Receiver RS12 User Guide
RCA MP3 Player M3804 User Guide
RCA Portable CD Player RCD025 User Guide
Revolabs Wireless Office Headset 500 PBX User Guide
Samsung Cell Phone 9330 User Guide
Samsung Computer Hardware SSC 12P User Guide
Samsung Computer Monitor 181T User Guide
Samsung Portable Media Storage GT B9150 User Guide
Savin All in One Printer 9940DP User Guide