IDEAL INDUSTRIES Range BUC5034 User Manual

Buccaneer GT Combination Boiler  
Falcon GTE Combination Boiler  
Installation, Assembly and Servicing  
Oil or Gas Fired Boilers  
Assembly and Installation Instructions for Ideal Buccaneer and Falcon Oil or Gas Fired heating combination boilers should be read in  
conjunction with the Boiler Assembly Instructions enclosed and any other technical publication supplied with the burner.  
CAUTION: To avoid the possibility of injury during the installation, servicing or cleaning of this appliance care should be taken when handling  
edges of sheet steel components.  
BUC5034  
Download from Www.Somanuals.com. All Manuals Search And Download.  
1.1 Technical Specifications of Combination Boilers  
Boiler:  
MLS Calorifier:  
Maximum operating pressure  
Maximum operating temperature  
Maximum safety temperature of  
boiler (as per TRD 702)  
Boiler thermostat setting  
Safety thermostat setting  
:
:
4 bar  
100ºC  
Primary circuit (heating water)  
- Maximum operating temperature  
- Maximum operating pressure  
Secondary circuit (domestic hot water)  
- Maximum operating temperature  
- Maximum operating pressure  
:
:
95ºC  
12 bar  
:
:
:
120ºC  
30 - 85ºC  
110ºC  
:
:
95ºC  
10 bar  
Bucaneer GT - Domestic Hot Water Production  
MLS tank capacity  
3
4
5
litres  
litres/h  
150  
640  
235  
228  
150  
780  
260  
256  
150  
780  
260  
284  
Continuous flow rate (1) (2)  
Maximum flow rate over 10mn (1) (2) (3)  
Weight (Boiler and tank)  
litres/10mn  
kg  
Falcon GTE - Domestic Hot Water Production  
MLS tank capacity  
4 (150/250)  
5 (150/250)  
150/250  
780/950  
260/380  
395.5  
litres  
litres/h  
litres/10mn  
kg  
150/250  
780/950  
260/380  
354  
Continuous flow rate (1) (2)  
Maximum flow rate over 10mn (1) (2) (3)  
Weight (boiler and tank) 150 litre  
Weight (boiler and tank) 250 litre  
kg  
384  
425.5  
(1) Domestic cold water at 10ºC  
(2) Storage temperature : 60ºC  
- Domestic hot water at 45ºC - Primary at 80ºC  
20ºC  
(3) Boiler temperature  
:
80ºC - Ambient temperature  
:
Tank Details  
Note: With IDEAL boilers, the setting limits the temperature of the primary circuit at the beginning to 75ºC (adjustment is possible from  
50ºC to 95ºC).  
Tank Type  
MLS 150/III  
MLS 250/II  
Primary circuit (central heating water)  
Water capacity of coil  
Exchange surface of coil  
Secondary circuit (sanitary water)  
Water capacity  
litres  
m2  
5.9  
7.2  
1.2  
0.92  
litres  
kg  
150  
100  
250  
130  
Delivery weight  
3
Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing  
Download from Www.Somanuals.com. All Manuals Search And Download.  
GENERAL  
1.2 Main Dimensions  
Buccaneer GT Combination Boiler  
A
1" 1/4  
74  
B
141  
335  
195  
530  
F O flue  
gas  
nozzle  
thread  
heating  
outlet  
1" 1/4  
thread  
heating  
35  
35  
G
return  
348  
138  
3
/
4" dhw outlet  
Optional  
delivered  
burner  
3
/4" dhw loop return  
(optional)  
1
/2"  
tapped  
draining  
outlet  
3
/4" dcw inlet  
60  
600  
150  
1030  
300  
300  
GT  
A
B
E
O F  
G
3
4
5
686 471 1009 125 18  
813 598 1009 125 18  
940 725 1009 125 18  
BUC5000  
Falcon GTE Combination Boiler  
A
205  
355  
214  
111  
150  
B
346  
560  
O 150  
flue gas  
nozzle  
Heating outlet  
R 1 1  
4"  
/
110  
10  
Heating  
return  
R 1 1  
/4"  
20  
20  
Rp 3  
to be plugged  
/4"  
45  
Burner  
centre line  
R 3  
R 3  
/
4" outlet  
4" dhw loop  
Optional  
delivered  
burner  
/
return (optional)  
R 3  
/4" dcw inlet  
60  
150 1030 (150l), 1274 (250l)  
1180 (150l), 1424 (250l)  
600  
300  
300  
(
1
)
A
dju  
s
t
a
ble  
f
ee  
t
:
b
as  
ic  
h
e
igh  
t
10 mm wi  
t
h
9
-
15 mm  
F
a
dju  
s
t
m
e
nt  
r
a
nge  
.
R
p
:
T
a
pped  
eaded  
R
:
T
h
r
GTE  
A
B
C
D
E
G
H
I
J
4
5
4
5
/
/
/
/
150  
150  
250  
250  
I
I
I
I
853  
980  
853  
980  
592  
719  
592  
719  
90  
90  
738  
738  
788  
788  
475  
475  
515  
515  
270  
270  
310  
310  
65  
65  
1537  
1537  
1587  
1587  
1158  
1158  
1208  
1208  
1303  
1303  
1353  
1353  
130  
130  
105  
105  
BUC5025  
4
Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing  
Download from Www.Somanuals.com. All Manuals Search And Download.  
INSTALLATION  
2.  
INSTALLING THE BOILER  
2.1 Boiler Location  
Sufficient space shall be left clear around the boiler.  
The figure stated in metres in the drawings below are the minimum recommended dimensions for providing easy access around the  
boiler.  
Buccaneer GT  
Falcon GTE  
1357  
0
.
5
m
m
5
.
0
1030  
600  
m
5
.
GTE  
4/150 I  
5/150 I  
4/250 I  
5/250 I  
L1  
H
0
1180 1537  
1424 1587  
1
m
BUC5038  
BUC5001  
2.2 Ventilation  
WARNING  
The location of air inlets in relation to the high ventilation openings  
shall ensure that the air is renewed in the entire volume of the boiler  
room. The ventilation shall comply with any applicable national or  
local regulations.  
Please note that boilers installed in or close to  
rooms in which the atmosphere is polluted with  
chlorine or fluorine compounds may be subject  
to high corrosion.  
For example: hairdressing salons, industrial  
premises (solvents), cooling equipment etc.  
2.3 Assembly  
The upper section of the MLS 150 tank (only) is provided with marks  
allowing precise positioning of IDEAL boilers from the Buccaneer  
GT or Falcon GTE range (see leaflet provided with these units).  
Boilers installed in such locations shall not be  
covered by the warranty.  
2.4 Levelling  
Levelling of the unit is carried out using the 4 bolts H 10 x 20 (packed  
in the instruction bag) screwed into the base.  
BUC5002  
5
Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing  
Download from Www.Somanuals.com. All Manuals Search And Download.  
INSTALLATION  
2.5 Hydraulic Connections  
WARNING  
Installation must be carried out following the regulations in force,  
trade practices and the recommendations contained in this leaflet.  
If the distribution pipework is in copper, a sleeve  
in steel, cast iron or insulating material must be  
placed between the hot water outlet of the unit  
and this pipework so as to avoid any corrosion at  
the level of the branch pipe.  
WARNING  
There must be no obstructions, complete or  
partial, between the boiler and the safety valves.  
Notes:  
-
The safety unit and its connection to the tank must be at  
least of the same diameter as the tanks sanitary cold water  
supply pipework (minimum 3/4").  
WARNING  
-
-
-
The safety unit's outlet pipe must have sufficient, continuous  
slope and its section must be at least equal to that of the  
orifice for the safety unit outlet (so as to avoid slowing down  
the water flow when there is an excess of pressure).  
Heating installations must be designed and  
assembled so that central heating water and any  
products introduced into it cannot find their way  
into the drinking water system. A removable  
connection must be installed for filling the heating  
circuit according to current regulations.  
The level of the safety unit must be below that of the cold  
water inlet so it can be drained. If this is not the case, install  
a draining pipe at the lowest point of the tank (see drawing  
in Section 2.8).  
To ensure hot water as soon as the taps are opened, a  
circulation loop between the mains supply and the re-  
circulation pipes of the unit can be installed.  
Before making the hydraulic connections for the central  
heating circuit, it is essential to flush the water system to  
eliminate any dirt which may damage certain parts (safety  
valve, pumps, flap valves . . .)  
2.7 Important  
Recommendations  
for  
Be careful to isolate hydraulically the primary and secondary  
circuits using stop valves. This will facilitate matters during  
maintenance.  
Connecting the Boiler to the Heating  
Circuit and the Drinking Water Supply  
Inclusion of these valves means that maintenance of the  
unit and its parts can be carried out without having to empty  
it. They also mean that the tank can be carried out without  
having to empty it. They also mean that the tank can be  
isolated whilst a watertight pressure test is carried out if the  
test pressure is above the pressure admitted by the tank.  
The installation shall be made in keeping with applicable regulations  
and codes of practice and the recommendations contained in these  
instructions.  
The expansion vessel shall be connected to the boiler without any  
valve or stop valve between the boiler and the expansion vessel.  
The heating system shall be designed and installed in a way as to  
prevent the water from the heating circuit and any substances added  
to it from flowing back into the drinking water circuit located before  
it. The installation shall not be directly connected to the drinking  
water system.  
2.6 Connection of the Domestic Hot Water  
Circuit  
The domestic hot water units can operate under a maximum service  
pressure of 10 bar. Generally, they operate at 7 bar.  
As a general rule, a check valve shall be fitted on the cold water  
supply pipe.  
Before connecting the domestic hot water circuit, the  
pipework must be flushed to wash out any metal or other dirt  
which could damage certain parts (safety units, pump, valves  
. . .).  
VERY IMPORTANT: under safety rules, a sealed safety valve  
calibrated to 7 bar shall be fitted on the cold water intake pipe  
of the hot water tank. We recommend membrane type hydraulic  
safety devices with the NF mark.  
The connection between the safety valve and the unit must  
not contain any section parts. Also, the flow pipe for the  
safety valve must not be obstructed. If the supply pressure  
exceeds 5.5 bar, a pressure reducer must be included  
"upstream" of the tank. It is advisable to site the pressure  
reducer "downflow" of the water meter so as to have the  
same pressure in all the pipes.  
During normal valve operation some drops of water are lost each  
time the water is heated. This apparent leak is not only normal, but  
is actually a sign that the valve is operating correctly.  
The safety valve shall always be placed on the cold water supply  
pipe and no valve or tap shall be fitted between the safety valve  
and the tank.  
Include a drain valve in the boiler as well as a "syphon funnel"  
for the safety unit.  
In order to ensure the continuous circulation of hot water in the  
installation and be able to draw hot water as soon as a tap is opened,  
a circulation loop may be installed between the drawing points and  
the tank recirculation tube. A non return valve shall be fitted on this  
loop.  
Connection to the cold water supply must be carried out  
according to the drawing in section 2.8. Components must  
conform to the standards and regulations in force. A stop  
valve is installed into the cold water supply.  
6
Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing  
Download from Www.Somanuals.com. All Manuals Search And Download.  
INSTALLATION  
2.8 Example of Installation  
The boiler-to-tank connection kit is placed between points A and B between the boiler and the heating circuit.  
Example: Buccaneer GT  
7
Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing  
Download from Www.Somanuals.com. All Manuals Search And Download.  
ASSEMBLY  
3
ASSEMBLY  
3.1 BUCCANEER GT COMBINATION BOILER  
Tools required:  
- Phillips head screwdriver  
- Wide flat screwdriver  
- 13mm spanner  
Packaging: the tables below show the numbers of the packages  
which make up the boiler. The packages are listed in the order in  
which they are opened for assembly.  
Boiler  
3
4
5
Boiler  
Body  
IC1  
IC2  
IC3  
Jacket  
Pack  
IC4  
IC5  
IC6  
Control Panel -  
Standard  
IC7  
IC7  
IC7  
Domestic Hot  
Water Sensor  
AD127  
BH 59  
BH 46  
AD127  
BH 59  
BH 46  
AD127  
BH 59  
BH 46  
Domestic Hot  
Water Tank  
- MLS 150  
Hydraulic  
Boiler-to-Tank  
Connection Kit  
1.  
2.  
See the assembly instruction supplied with burner.  
See the technical instructions for sensor connection. The assembly of any optional devices purchased with the boiler is described  
in the instructions supplied with the relevant device or in the control panel instructions. The list of available optional devices is  
provided in the applicable price list.  
8
Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing  
Download from Www.Somanuals.com. All Manuals Search And Download.  
ASSEMBLY  
1 Package IC1, IC2, IC3  
À
Á
A
BUC5010  
Â
Ã
2
1
2
2
1
1
2
1
3.  
Unscrew 1/2" plastic plug A from the rear section of the boiler  
Assembling the base and draining tube  
body.  
1.  
Lay a sheet of paper in front of the boiler body, take the  
boiler body off the pallet and place it standing on the furnace  
door.  
Fit the base onto the feet of the boiler and clip it onto the  
rear section.  
4.  
5.  
Screw the draining pipe onto the rear section. Make the  
connection watertight with hemp or filler.  
2.  
Remove the adjustable feet assembled on the base and  
replace them with the four protective plastic plugs supplied  
in connection kit package BH 46.  
Set the boiler body on its feet.  
9
Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing  
Download from Www.Somanuals.com. All Manuals Search And Download.  
ASSEMBLY  
2
Assembling the boiler onto the tank  
-
Place the boiler on the tank so that it is  
positioned on the first two marks on the  
front of the tank.  
-
Assemble the boiler as instructed in  
views 3 - 13 of Buccaneer GT boiler  
Assembly Instructions.  
14  
15  
*
Installing the pipes  
Assembling the tank front panel  
-
Connect the pipes between boiler and tank (package  
BH 46) - see the instructions on page13.  
-
Fit the tank front panel after inserting the thermometer bulb  
in the thimble tube of the inspection plug of the tank.  
10  
Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing  
Download from Www.Somanuals.com. All Manuals Search And Download.  
ASSEMBLY  
3.2 FALCON GTE COMBINATION BOILER  
Tools required:  
- Phillips head screwdriver  
- Wide flat screwdriver  
- 13mm spanner  
Packaging: the tables below show the numbers of the packages  
which make up the boiler. The packages are listed in the order in  
which they are opened for assembly.  
Boiler  
GTE 4 150  
GTE 5 150  
GTE 4 250  
GTE 5 250  
Boiler Body  
delivered loose  
- front section  
- intermediate section  
- rear section  
1
2
1
1
3
1
1
2
1
1
3
1
- set of assembly rods  
- accessory package  
-
-
-
-
IL 4  
IL 5  
IL 4  
IL 5  
BUC5039  
BUC5040  
Mounted boiler  
body with  
accessories  
IL 24  
IC 7  
IL 25  
IC 7  
IL 24  
IC 7  
IL 25  
IC 7  
Control Panel -  
Standard  
Casing  
IL 14  
IL 15  
IL 14  
IL 15  
Domestic Hot  
Water Tank  
150  
250  
BH 59  
-
BH 59  
-
-
-
BH 9  
BH 9  
Front Panel of tank  
-
-
BH 47  
BH 46  
BH 47  
BH 46  
Hydraulic Connection  
Kit  
BH 46  
AD 127  
BH 46  
AD 127  
Domestic Hot  
Water Sensor  
AD 127  
AD 127  
The assembly of any optional devices purchased with the boiler is described in the instructions supplied with relevant device or in the  
control panel instructions.  
The list of available optional devices is provided in the applicable price list.  
1.  
Refer to the assembly instructions supplied with the burner.  
11  
Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing  
Download from Www.Somanuals.com. All Manuals Search And Download.  
ASSEMBLY  
37  
38  
Assemble the boiler as instructed in figures 1 - 16  
*
BUC5041  
Assembling the boiler on the hot water tank  
-
Place the boiler on the tank if required with a handling  
tool (if required).  
Installing the tubes  
-
Assembly the boiler as instructed in figures 17 - 33 of  
boiler assembly instructions for Falcon GTE.  
-
Connect the tubes between boiler and tank (package BH  
46) as directed in the instructions on page 13.  
39  
Assembling the tank front panel  
-
Insert the thermometer bulb in the thimble tube of the  
inspection plug of the tank (For 250 litre system - separate  
package BH 47) and fit the tank front panel.  
12  
Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing  
Download from Www.Somanuals.com. All Manuals Search And Download.  
ASSEMBLY  
3.3 Hydraulic Boiler to Tank Connections Kit (BH46)  
Assembly  
Connection kit BH46, provides connections from the tank to the IMPORTANT  
boiler.  
-
-
-
-
Ensure access to pump speed control and vent screw V  
Ensure flexible connectors are run to prevent air pockets  
The 1/2" plug 11 fitted to Tee 1 can be replaced by a drain cock  
To ensure best venting of the assembly and continued good  
operation of the installation, an automatic vent (P) not supplied,  
should be fitted on Tee 9 (1/2")  
Screw the Tee with union nut 1 and plug 2 on tank outlet D  
Fit the pump 3 to union nut 4 and Tee 1 inserting O rings 5  
Screw Tee 7 to boiler return B  
Screw Tee with tappings 9 with plug 11 to boiler flow A  
Screw valve Tee 10 with plug 11 to tank inlet C  
Connect elbow flexible 12 (1200mm) between 7 & 4 and flexible  
13 (1120mm) between 9 & 10 inserting O rings 14.  
Assemble flexible clip 16 and fitting 17 then clip them in the  
7.5mm hole E on the boiler rear panel.  
The kit consists of  
-
-
-
-
A pump with cable 3  
Insulated flexible connector 13, length 1120mm  
Insulated flexible connector with elbow 12, length 1200mm  
A bag containing:  
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
An antisyphon valve 10  
Connecting union 4  
Tee with union nut 1  
Tee 7  
Tee with tappings 9  
3 X 1/2" plugs 11  
3 X 1 1/2" O rings 5  
5 X 3/4" O rings 14  
4 X plastic plugs 15  
-
-
Fit flexible 13 in clip 16.  
-
Flexible clip 16 with fixing 17  
The pump cable allows simple connection to the boiler control  
box. See Electrical section for further information.  
13  
Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing  
Download from Www.Somanuals.com. All Manuals Search And Download.  
ASSEMBLY  
4.  
CONTROLS  
The boiler connections shall be performed by a  
qualified professional only.  
4.1 Description  
Strict compliance with these operating and  
connecting instructions is a precondition for the  
correct operation of the boiler  
9
6
10  
7
2
3
6
5
3
7
9
4
8
TEST STB  
30  
AUT  
oc  
6,3 AT  
BUC5037  
8
4
1
5
9.  
Location for MB1 module (also refer to the instructions  
supplied with the device).  
1.  
2.  
On / Off switch.  
Burner switch: turning the heating off (summer position  
)
10.  
Location for an optional time counter.  
or on (winter position ) by turning off/on the burner and the  
pump (domestic hot water production continues).  
Boilers with the domestic hot water facility:  
For an MB1 domestic hot water priority module the switch  
is disabled by the control device.  
A potentiometer for setting the temperature of the  
domestic hot water is located on the MB1 module casing  
(graduated from 1-8).  
3.  
Heating pump switch: used to turn the heating pump off  
(summer position ) or on (winter position ).  
4.2 Operating Principle  
For an MB1 module it must be set to the winter position  
Boiler thermometer.  
.
Control Panel  
4.  
5.  
The boiler temperature is regulated either by the boiler thermostat  
or any room thermostat. The safety of the installation is achieved  
via the safety thermostat with manual reset.  
Three-position switch:  
: manual position, used when the boiler is not fitted  
with a room thermostat.  
Heating Regulation  
The boiler temperature is regulated by boiler thermostat 7.  
The heating is regulated in different ways (manual mixing valve,  
thermostatic valves etc.). It is up to the fitter to explain to the user  
how the heating is regulated.  
This position may be used to test the burner of installations  
fitted with a room thermostat.  
AUTO : automatic position, used for normal operation of  
boilers. The boiler temperature is regulated by the connected  
device.  
Domestic Hot Water Regulation (Versions with MB1)  
The presence of a filling pump and an antithermosiphon valve on  
the primary circuit of the hot water production system means that  
the domestic hot water temperature is kept correctly regulated. The  
temperature of the domestic hot water is set by means of a  
potentiometer located on the MB1.  
TEST STB : momentary use to test the safety thermostat.  
Safety thermostat with manual reset (factory setting 110ºC).  
6.  
7.  
Boiler thermostat with 30 - 85ºC adjustment range.  
However, the built-in stop limits the maximum temperature  
to 75ºC. The stop may be moved if required.  
When the domestic hot water is reheated, the burner and the primary  
filling pump are started up, whilst the heating pump is stopped. The  
boiler temperature is controlled by the limiting thermostat built into  
the MB1 module (the thermostat is factory set to 80ºC). When the  
need for hot water is met, the burner is turned off and the filling  
pump continues to operate for 4 minutes after the burner stops (the  
delay is adjustable from 30 sec to 15 min). In this way, the residual  
heat accumulated in the heating elements is used to complete  
reheating the tank.  
The boiler thermostat must necessarily be set to the  
maximum position if a room thermostat is used.  
8.  
6.3 AT fuse.  
14  
Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing  
Download from Www.Somanuals.com. All Manuals Search And Download.  
ASSEMBLY  
The connecting cables may be brought inside the boiler through  
the cut-outs provided in the cover of the boiler, which may be used  
along with purchased cable channels.  
4.3 Electrical Connections  
The electrical wiring has been carefully checked in the factory and  
the internal connections of the control panel must not be modified  
in any event.  
Fasten the cables to the rear plate of the control panel by means of  
the cable clamps (supplied in the instructions bag), after mounting  
them on the plate.  
The electrical connections of the boiler shall be made in compliance  
with applicable standards and regulations in force.  
The pump cable has a connector fitted. Discard the connector.  
The unit shall be powered by a circuit with an omnipole switch with  
an opening distance greater than 3 mm.  
WARNING  
VERY IMPORTANT: never place sensor cables  
(extra low voltage) and 230 V power supply cables  
in the same cable channel or duct.  
WARNING  
Electrical connections shall be carried out by a  
qualified professional only.  
All the connections shall be made to the connection strip provided  
for that purpose outside the volume of the control panel.  
Refer to Boiler Assembly Instructions for Control Panel Installation  
4.4 Installation with MB1 Domestic Hot water  
Priority and Regulation Mode  
Fitting and Connecting the MB1 Module  
Fit the MB1 module on the front of the control panel. Proceed as  
follows:  
1.  
Remove the cover: cut the four fixing studs of the cover with  
a knife and fold it outward.  
2.  
Install and connect the MB1 module as directed on pages  
16-18.  
BUC5042  
15  
Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing  
Download from Www.Somanuals.com. All Manuals Search And Download.  
ASSEMBLY  
-
-
Install domestic hot water sensor cable A(e.g. for Buccaneer GT)  
as shown and fix it with plastic clips B.  
-
-
Connect as directed in the diagram on the following pages.  
Insert the bulb of the limiting thermostat in the thimble tube  
on the rear of the boiler.  
Insert the sensor in the thimble tube of the tank.  
Tank Sensor  
Boiler Sensor  
BUC5043  
BUC5044  
4.5 MB1 Domestic Hot Water Sensor  
Operating and Installation - Package AD127  
6
5
7
4
8
3
2
1
MB  
The MB1 module allows for regulation of the storage temperature  
and ensures priority for the production of hot water for sanitary  
systems. When there is a demand for the sanitary hot water to be  
reheated, the MB 1 module activates the burner and the tank  
charging pump, and stops the circulation of the heating system.  
The period during which the heating circulator is switched off  
depends on the volume of water being pumped round the system,  
the power of the boiler which is connected, and the performance  
values of the sanitary hot water preparation unit.  
A limiter thermostat, set at the factory to 80ºC, regulates the  
temperature of the boiler during the charging of the sanitary system.  
The timing device of the pump overrun (4 minutes), after the burner  
has been switched off, allows for the residual heat accumulated in  
the body of the heating unit to complete the reheating of the  
preparation unit.  
16  
Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing  
Download from Www.Somanuals.com. All Manuals Search And Download.  
ASSEMBLY  
1.  
Instructions for use  
Regulating the storage temperature of hot water for sanitary  
systems:  
4
5
The regulating button A allows for the average temperature of stored  
sanitary hot water to be adjusted between 10 and 80ºC, with a hard  
point at 6 (about 60ºC).  
3
6
2
7
1
8
In the event of prolonged absence:  
In order to ensure that the sanitary hot water tank is protected against  
frost, set the regulating button A to the position 1 (this setting  
corresponds to a temperature of about 10ºC).  
A
2.  
Adjusting the timing of the charging pump  
The timing device for stopping the charging pump allows the pump  
to keep operating for 4 minutes (factory setting) after the setting  
temperature for the sanitary system has been reached. This allows  
the residual heat accumulated in the body of the heating unit to be  
used to complete the reheating of the sanitary hot water.  
Adjustment: This timing device can be adjusted from 3 to 6 minutes,  
with the aid of the potentiometer located on the back of the unit.  
TEMPO  
MINI  
MAXI  
Taking the timing device out of operation: To take the timer out  
of operation, remove the bridge unit located on the back of the  
device, as shown in the drawing opposite.  
T
T=0  
3.  
Adjusting the limiter thermostat  
It is possible to change the setting of the limiter thermostat, over a  
range from 30 to 90ºC, the original setting being 80ºC. To do this:  
90ºC  
80ºC  
30ºC  
-
-
-
-
Take the module out of the boiler console, if applicable;  
Remove the setting button, by drawing it towards yourself;  
Unhook the PCB;  
30  
C
90  
C
80  
C
5
6
7
4
8
3
2
MB  
1
Adjust the limiter thermostat in accordance with the reference  
settings shown in the diagram opposite, with the aid of a flat  
screwdriver;  
-
Reassemble the unit by proceeding in the reverse order.  
4.  
Installation and Connection  
For all boilers:  
-
Remove the TL bridge, connected to the terminal strip of  
the boiler control console, with terminals 1 and 2 to terminals  
1 and 3.  
-
Withdraw the LP bridge at terminals 4 and 5 in order to do  
away with an ECS priority.  
Main  
Terminal  
Strip  
-
-
Remove the panel A from the control console of the boiler  
(refer to the technical instruction plate).  
Connect the connector elements B and C of the module to  
the connectors D and E coming from the boiler control  
console (blue on blue, red on red).  
-
Attach the earthing wire F to an earthing terminal of the  
control console.  
17  
Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing  
Download from Www.Somanuals.com. All Manuals Search And Download.  
ASSEMBLY  
-
-
Introduce the bulb G of the limiter thermostat into the boiler  
pocket.  
Connect the charging pump to the boiler control console,  
ensuring that the terminals live (L), neutral (N) and earth (  
are properly attached.  
)
-
-
Connect the probe bulb to the boiler control console.  
Introduce the probe bulb into the pocket of the sanitary hot  
water tank.  
If the tank is already fitted with a thermostat, it will not be used :  
accordingly replace the bulb of this thermostat with the tank probe.  
WARNING  
IMPORTANT: Under no circumstances may the  
wires of the probe (very low voltage) and wires  
carrying 230 V supply feed be placed in the same  
conduit or cable duct. Make sure that a minimum  
interval of 10 cm is maintained between them.  
Failure to do so can cause interference and lead  
to malfunction of the control system and the  
deterioration of the electronic circuits.  
Securing the module  
Mount the module by the front so as to secure it with the help of the  
two screws located on the front section (use a cruciform (Phillips)  
screwdriver).  
Connections (Installation with MB1 Module)  
-
-
-
Move bridge TL from terminals 1-2 to terminals 1-3.  
Remove bridge LP from terminals 4-5.  
WARNING  
If the installation includes an MB1 module and no  
room thermostat (TAM), set three position switch  
5 (see page 14) to  
Connect the power supply, the heating pump and the tank  
load pump as shown.  
.
-
Connect the tank sensor.  
If the installation includes an MB1 module and a  
room thermostat (TAM), set three position switch  
5 (see page 14) to AUTO.  
18  
Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing  
Download from Www.Somanuals.com. All Manuals Search And Download.  
ASSEMBLY  
4.6 Heating and Domestic Hot Water  
Installation (with MB1 module)  
WARNING  
IMPORTANT: If the installation includes an MB1  
module and no room thermostat (TAM), set three  
position switch 5 (see page 14) to  
.
If the installation includes an MB1 module and a  
room thermostat (TAM), set three position switch  
5 (see page 14) to AUTO.  
ZG F 6,3AT  
L
8
(RG)*  
(TAM)*  
(RG)*  
25  
BA  
11  
10  
21  
23  
18  
Remove  
bridge LP  
to benefit  
from the  
heating  
pump  
22  
9
BA  
BA  
13  
BA  
4
5
LP  
TF*  
BA  
(TL)*  
TEST  
STB  
1
2
12  
ZT  
24  
19  
20  
16  
26  
q
logic  
ZEH 1  
3
q
q
TS  
TCH  
20  
24  
23  
17  
16  
BA  
BA  
BA  
BA  
BA  
A
P*  
(CH)*  
(B)  
14  
L1  
T1  
T2  
N
B4  
S3  
BA  
19  
22  
BA  
BA  
h
ZEH 2  
ZG  
7
N
BA  
A
B
BA  
CH  
CS  
Heating pump  
Burner  
Connection strip  
Time counter  
Safety contact  
RG  
Control unit  
Room thermostat  
Boiler thermostat  
Flue gas thermostat  
Limiting thermostat  
Safety thermostat  
Alarm indicator  
ZEH2  
Heating pump Summer/  
Winter switch  
Main switch  
Test switch  
Optional  
TAM  
TCH  
TF  
TL  
TS  
ZG  
ZT  
*
F6, 3AT Fuse  
L
Connecting strip  
Connector  
Phase  
VA  
LP  
N
P
Pump logic  
Neutral  
Filling pump  
V3V  
ZEH1  
Three-way valve  
Burner Summer/  
Winter switch  
BUC5031  
4.7 Connecting the Burner  
The boiler is fitted with a cable with a 7-pin European connecting  
plug which can be plugged into the socket supplied with the burners  
(see the instructions supplied with the burner).  
19  
Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing  
Download from Www.Somanuals.com. All Manuals Search And Download.  
ASSEMBLY  
5.  
COMMISSIONING  
-
Ensure connections are watertight.  
-
Vent the tank heat exchanger as follows:  
1. Unscrew the auto vent cap (P)* a few turns.  
2. Turn the antisyphon valve screw 10 to open position (O)  
3. Close the vent (P)* when water flows continuously.  
4. Return the antisyphon valve screw 10 to the automatic  
position (A)  
5. To vent the pump, unscrew the protection cover in the  
pump head and turn the pump shaft (V) left and right a  
few times.  
Make sure that safety thermostat 6 is set by unscrewing the  
hexagonal cap and pressing the reset button with a  
screwdriver.  
Turn On/Off switch 1 to On  
.
Turn burner switch 2 to Winter  
.
If the boiler is fitted with an MB1 domestic hot water module, this  
switch is disabled by the optional unit.  
6. Leave the pump running with cold water for a few minutes  
to prime the system.  
(* Not supplied)  
Turn heating pump switch 3 to Winter  
.
Note: We advise you never to set the boiler thermostat below mark  
4 (40ºC) in order to avoid the risk of combustion products  
condensing on the walls of the boiler.  
5.1 Starting Up  
Initial starting up shall be performed by a qualified professional.  
5.2 Commissioning Secondary Circuit  
Before turning the boiler on, make sure that the installation is filled  
with water.  
If needed, flush the sanitary circuit (especially if re-starting)  
and fill the tank using the sanitary cold water inlet pipe.  
Perform the start-up operations in the chronological order given  
below, referring to the diagram on page 14.  
Bleed the secondary circuit (tank and distribution system)  
in order to avoid any noise caused by trapped air moving  
during re-heating and drawing off. To do this, fill it completely  
with water, leaving a hot water tap open; close this tap only  
when the flow of water is continuous and noise-free.  
Set boiler thermostat 7 to the selected position (move the  
stop if required).  
WARNING  
Then bleed in succession all hot water pipes by opening the  
corresponding taps.  
IMPORTANT: if the boiler is fitted with a room  
thermostat, set boiler thermostat 7 to the maximum  
position.  
Bleed the tank's exchanger circuit using the vent made for  
the purpose.  
Check all safety units (especially the safety valve or group)  
referring to the leaflet supplied with the component.  
Set the domestic hot water temperature setting potentiometer  
to the desired temperature (versions with MB1).  
WARNING  
Check the position of three-position switch 5, which must be  
as follows:  
During the heating of domestic hot water, some  
water may escape through the safety valve or  
group as a result of the expansion of water in the  
unit. There is no cause for concern as this is  
entirely normal. Do no attempt to prevent this from  
happening  
-
-
either set to manual : boilers without room thermostats  
or set to AUTO (automatic): boilers with room  
thermostats.  
20  
Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SERVICING  
Magnesium anode  
6.  
MAINTENANCE AND PERIODIC CHECKS  
The magnesium anode must be checked at least every two years.  
Starting with the first check and taking account of the wear to the  
anode, the frequency of the following checks must be decided. The  
anode can be checked according to one of the following two  
methods:  
Safety valve or group  
WARNING  
IMPORTANT: The safety unit must be used  
periodically (at least once per month). To do  
this, place the safety group in the draining position.  
This allows the evacuation of any deposits which  
could eventually obstruct the safety group valve.  
Non-compliance with this requirement could  
result in a deterioration of the unit's tank (see  
notice enclosed with the safety unit).  
-
Visual check:  
The anode must be replaced if its diameter is less than 15mm  
(initial diameter = 33mm)  
-
Check by measurement:  
-
-
Disconnect the earth wire to the anode.  
Measure the current between the tank and the anode; if  
the current is less than 0.1 mA, the anode must be  
replaced.  
De-scaling:  
in hard water regions, it is advisable to ask the installer to  
carry out an annual de-scaling of the tank exchanger so that  
it will retain its performance.  
The outside of the unit can be cleaned with soapy water.  
Replace the inspection cover taking care to place the salt  
rod at the bottom and refit the washer:  
Operations to be carried out during the de-scaling, visual checks  
and replacement of the magnesium anode.  
-
-
-
position the lip seal in the inspection hole, being careful  
to place its tongue outside the tank.  
Shut off the cold water supply and drain the tank. To drain it  
via the safety unit, put the latter into the drainage position  
and open a hot water tap so that air can enter.  
position the retaining ring around the seal, placing the  
tongue above the ring.  
Refit the cover, salt rod at the bottom, on the flange,  
tightening the 6 bolts evenly across the diameter of the  
cover.  
Take off the front panel and the probes.  
Take off the cover (13 mm spanner).  
If necessary, replace the anode.  
Remove all the scaling deposits from the bottom of the tank.  
The exchanger must be de-scaled in order to guarantee its  
proper operation.  
21  
Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing  
Download from Www.Somanuals.com. All Manuals Search And Download.  
NOTES  
22  
Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing  
Download from Www.Somanuals.com. All Manuals Search And Download.  
NOTES  
23  
Buccaneer GT, Falcon GTE - Installation, Assembly & Servicing  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Caradon Plumbing Limited, P.O. Box 103, NationalAve, Kingston upon Hull, HU5 4JN. Telephone:  
01482 492 251 Fax: 01482 448 858. Registration No. London 322 137.  
Caradon Plumbing Limited  
pursues a policy of continuing  
improvement in the design and  
performance of its products. The  
right is therefore reserved to vary  
specification without notice.  
Technical Training  
The Caradon Plumbing Limited Technical Training Centre  
offers a series of first class training courses for domestic,  
commercial and industrial heating installers, engineers and  
system specifiers.  
For details of courses please ring:............... 01482 498432  
July 2006  
156597 A02  
Ideal Installer/Technical Helpline: 01482 498 376  
Download from Www.Somanuals.com. All Manuals Search And Download.  

Grizzly Planer G0544 User Manual
Grundig CRT Television MF 72 6510 8 User Manual
Haier Dishwasher HDW700BI User Manual
Haier Saw HRF 498FR A1 User Manual
Healthrider Treadmill HATL512050 User Manual
Heatiator Indoor Fireplace CL36D User Manual
Hotpoint Range JB400DP1BB User Manual
HP Hewlett Packard Laptop 14 2166SE User Manual
Hunter Fan Ventilation Hood 81003 User Manual
iLive MP3 Docking Station IC308B User Manual