Heat Glo LifeStyle Indoor Fireplace ST 36TRB IPI User Manual

Para obtener un ejemplar en Español de este  
Pour demander un exemplaire en français de ce Manuel  
Owner’s Manual  
Installation and Operation  
Models:  
ST-36TRB-IPI  
PIER-36TRB-IPI  
LCOR-36TRB-IPI  
RCOR-36TRB-IPI  
NOTICE  
DO NOT DISCARD THIS MANUAL  
• Important operating  
and maintenance  
instructions included.  
• Read, understand and follow  
these instructions for safe  
installation and operation.  
• Leave this manual with  
party responsible for use  
and operation.  
WARNING  
WARNING: If the information in these  
instructions is not followed exactly, a re  
or explosion may result causing property  
damage, personal injury, or death.  
HOT SURFACES!  
Glass and other surfaces are hot during  
operation AND cool down.  
Hot glass will cause burns.  
DO NOT touch glass until it is cooled  
• NEVER allow children to touch glass  
• Keep children away  
DO NOT store or use gasoline or other am-  
mable vapors and liquids in the vicinity of this  
or any other appliance.  
• CAREFULLY SUPERVISE children in same room as  
replace.  
• Alert children and adults to hazards of high temperatures.  
• What to do if you smell gas  
- DO NOT try to light any appliance.  
High temperatures may ignite clothing or other ammable  
materials.  
• Keep clothing, furniture, draperies and other ammable  
materials away.  
- DO NOT touch any electrical switch. DO  
NOT use any phone in your building.  
- Immediately call your gas supplier from a  
neighbor’s phone. Follow the gas suppli-  
er’s instructions.  
This appliance has been supplied with an integral barrier  
to prevent direct contact with the xed glass panel. DO  
NOT operate the appliance with the barrier removed.  
- If you cannot reach your gas supplier, call  
Contact your dealer or Hearth & Home Technologies if the  
barrier is not present or help is needed to properly install one.  
the re department.  
• Installation and service must be performed  
by a qualied installer, service agency, or the  
gas supplier.  
In the Commonwealth of Massachusetts installation must be  
performed by a licensed plumber or gas tter.  
See Table of Contents for location of additional Commonwealth  
of Massachusetts requirements.  
This appliance may be installed as an OEM installation in  
manufactured home (USA only) or mobile home and must be  
installed in accordance with the manufacturer’s instructions  
and the manufactured home construction and safety standard,  
Title 24 CFR, Part 3280 or Standard for Installation in Mobile  
Homes, CAN/CSA Z240MH, in Canada.  
Installation and service of this appliance should be  
performed by qualied personnel. Hearth & Home  
Technologies suggests NFI certied or factory trained  
professionals, or technicians supervised by an NFI  
certied professional.  
This appliance is only for use with the type(s) of gas indicated  
on the rating plate.  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
1
Safety Alert Key:  
• DANGER! Indicates a hazardous situation which, if not avoided will result in death or serious injury.  
• WARNING! Indicates a hazardous situation which, if not avoided could result in death or serious injury.  
• CAUTION! Indicates a hazardous situation which, if not avoided, could result in minor or moderate injury.  
• NOTICE: Used to address practices not related to personal injury.  
Table of Contents  
A. Congratulations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2  
B. Limited Lifetime Warranty. . . . . . . . . . . . . . . . . . . . . . . . . . 5  
7 Vent Information and Diagrams  
A. Approved Pipe . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25  
B. Vent Table Key . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25  
C. Use of Elbows . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25  
D. Measuring Standards. . . . . . . . . . . . . . . . . . . . . . . . . . . . 25  
E. Vent Diagrams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26  
1 Listing and Code Approvals  
A. Appliance Certication . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7  
B. Tempered Glass Specications . . . . . . . . . . . . . . . . . . . . . 7  
C. BTU Specications. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7  
D. High Altitude Installations. . . . . . . . . . . . . . . . . . . . . . . . . . 7  
E. Non-Combustible Materials Specication. . . . . . . . . . . . . . 7  
F. Combustible Materials Specication . . . . . . . . . . . . . . . . . 7  
G. Electrical Codes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7  
H. Requirements for the Commonwealth of Massachusetts. . 8  
8 Vent Clearances and Framing  
A. Pipe Clearances to Combustibles . . . . . . . . . . . . . . . . . . 36  
B. Continue Adding Vent Components . . . . . . . . . . . . . . . . . 36  
C. Wall Penetration Framing. . . . . . . . . . . . . . . . . . . . . . . . . 37  
D. Vertical Penetration Framing . . . . . . . . . . . . . . . . . . . . . . 38  
E. Install Attic Insulation Shield. . . . . . . . . . . . . . . . . . . . . . . 39  
User Guide  
9 Appliance Preparation  
2 Operating Instructions  
A. Top Vent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40  
B. Rear Vent . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41  
C. Securing and Leveling the Appliance. . . . . . . . . . . . . . . . 42  
A. Gas Fireplace Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9  
B. Your Fireplace . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9  
C. Blower Kit (optional). . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10  
D. Clear Space . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10  
E. Decorative Doors and Fronts . . . . . . . . . . . . . . . . . . . . . . 10  
F. Fixed Glass Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . 10  
G. Remote Controls, Wall Controls and Wall Switches. . . . . 10  
H. Before Lighting Fireplace . . . . . . . . . . . . . . . . . . . . . . . . . 10  
I. Lighting Instructions (IPI) . . . . . . . . . . . . . . . . . . . . . . . . . 11  
J. After Fireplace is Lit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12  
K. Frequently Asked Questions . . . . . . . . . . . . . . . . . . . . . . 12  
10 Installing Vent Pipe (DVP and SLP Pipe)  
A. Assemble Vent Sections (DVP Pipe Only) . . . . . . . . . . . . 43  
B. Assemble Vent Sections (SLP Pipe Only) . . . . . . . . . . . . 44  
C. Assemble Slip Sections . . . . . . . . . . . . . . . . . . . . . . . . . . 44  
D. Secure the Vent Sections. . . . . . . . . . . . . . . . . . . . . . . . . 45  
E. Disassemble Vent Sections . . . . . . . . . . . . . . . . . . . . . . . 45  
F. Install Decorative Ceiling Components (SLP only). . . . . . 46  
G. Install Metal Roof Flashing. . . . . . . . . . . . . . . . . . . . . . . . 47  
H. Assemble and Install Storm Collar. . . . . . . . . . . . . . . . . . 47  
I. Install Vertical Termination Cap . . . . . . . . . . . . . . . . . . . . 48  
J. Install Decorative Wall Components (SLP only). . . . . . . . 48  
K. Heat Shield Requirements for Horizontal Termination . . . 48  
L. Install Horizontal Termination Cap (DVP and SLP Pipe) . 49  
3 Maintenance and Service  
A. Maintenance Tasks-Homeowner . . . . . . . . . . . . . . . . . . . 13  
B. Maintenance Tasks-Qualied Service Technician . . . . . . 14  
Installer Guide  
4 Getting Started  
11 Gas Information  
A. Typical Appliance System. . . . . . . . . . . . . . . . . . . . . . . . . 16  
B. Design and Installation Considerations . . . . . . . . . . . . . . 17  
C. Tools and Supplies Needed . . . . . . . . . . . . . . . . . . . . . . . 17  
D. Inspect Appliance and Components. . . . . . . . . . . . . . . . . 17  
A. Fuel Conversion. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50  
B. Gas Pressure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50  
C. Gas Connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50  
D. High Altitude Installations. . . . . . . . . . . . . . . . . . . . . . . . . 50  
5 Framing and Clearances  
12 Electrical Information  
A. Selecting Appliance Location . . . . . . . . . . . . . . . . . . . . . . 18  
B. Constructing the Appliance Chase. . . . . . . . . . . . . . . . . . 19  
C. Clearances. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19  
D. Mantel and Wall Projections. . . . . . . . . . . . . . . . . . . . . . . 21  
A. Wiring Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51  
B. Intellire Ignition System Wiring. . . . . . . . . . . . . . . . . . . . 51  
C. Optional Accessories Requirements . . . . . . . . . . . . . . . . 51  
D. Electrical Service and Repair. . . . . . . . . . . . . . . . . . . . . . 51  
E. Junction Box Installation. . . . . . . . . . . . . . . . . . . . . . . . . . 53  
F. Wall Switch Installation for Fan (Optional) . . . . . . . . . . . . 53  
6 Termination Locations  
A. Vent Termination Minimum Clearances . . . . . . . . . . . . . . 23  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
3
13 Finishing  
A. Splatter Guard . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54  
B. Mantel and Wall Projections. . . . . . . . . . . . . . . . . . . . . . . 56  
C. Facing Material. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57  
D. Finishing Material. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57  
E. Elevated Hearth Systems. . . . . . . . . . . . . . . . . . . . . . . . . 59  
14 Appliance Setup  
A. Remove Fixed Glass Assembly . . . . . . . . . . . . . . . . . . . . 60  
B. Remove the Shipping Materials . . . . . . . . . . . . . . . . . . . . 60  
C. Clean the Appliance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60  
D. Accessories . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60  
E. Lava Rock and Glowing Ember Placement . . . . . . . . . . . 60  
F. Install the Log Assembly. . . . . . . . . . . . . . . . . . . . . . . . . . 61  
G. Fixed Glass Assembly . . . . . . . . . . . . . . . . . . . . . . . . . . . 63  
H. Install Trim Kits and Surrounds . . . . . . . . . . . . . . . . . . . . 63  
I. Air Shutter Setting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63  
15 Troubleshooting  
A. Intellire Ignition System . . . . . . . . . . . . . . . . . . . . . . . . . 64  
16 Reference Materials  
A. Appliance Dimension Diagram. . . . . . . . . . . . . . . . . . . . . 66  
B. Vent Components Diagrams . . . . . . . . . . . . . . . . . . . . . . 69  
D. Contact Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82  
= Contains updated information.  
4
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
B. Limited Lifetime Warranty  
Hearth & Home Technologies Inc.  
LIMITED LIFETIME WARRANTY  
Hearth & Home Technologies Inc., on behalf of its hearth brands (”HHT”), extends the following warranty for  
HHT gas, wood, pellet, coal and electric hearth appliances that are purchased from an HHT authorized dealer.  
WARRANTY COVERAGE:  
HHT warrants to the original owner of the HHT appliance at the site of installation, and to any transferee taking ownership  
of the appliance at the site of installation within two years following the date of original purchase, that the HHT appliance  
will be free from defects in materials and workmanship at the time of manufacture. After installation, if covered compo-  
nents manufactured by HHT are found to be defective in materials or workmanship during the applicable warranty period,  
HHT will, at its option, repair or replace the covered components. HHT, at its own discretion, may fully discharge all of its  
obligations under such warranties by replacing the product itself or refunding the verified purchase price of the product  
itself. The maximum amount recoverable under this warranty is limited to the purchase price of the product. This warranty  
is subject to conditions, exclusions and limitations as described below.  
WARRANTY PERIOD:  
Warranty coverage begins on the date of original purchase. In the case of new home construction, warranty coverage  
begins on the date of first occupancy of the dwelling or six months after the sale of the product by an independent,  
authorized HHT dealer/ distributor, whichever occurs earlier. The warranty shall commence no later than 24 months  
following the date of product shipment from HHT, regardless of the installation or occupancy date. The warranty period for  
parts and labor for covered components is produced in the following table.  
The term “Limited Lifetime” in the table below is defined as: 20 years from the beginning date of warranty coverage for  
gas appliances, and 10 years from the beginning date of warranty coverage for wood, pellet, and coal appliances. These  
time periods reflect the minimum expected useful lives of the designated components under normal operating conditions.  
Warranty Period  
Parts Labor  
HHT Manufactured Appliances and Venting  
EPA  
Components Covered  
Gas  
X
Wood Pellet  
Coal Electric Venting  
Wood  
All parts and material except as  
covered by Conditions,  
Exclusions, and Limitations  
listed  
1 Year  
X
X
X
X
X
X
Igniters, electronic components,  
and glass  
X
X
X
X
X
X
2 years  
X
X
X
Factory-installed blowers  
Molded refractory panels  
3 years  
X
X
Firepots and burnpots  
Castings and baffles  
5 years 1 year  
X
X
Manifold tubes,  
HHT chimney and termination  
7 years 3 years  
X
X
10  
1 year  
years  
X
X
X
Burners, logs and refractory  
Firebox and heat exchanger  
Limited  
3 years  
Lifetime  
X
X
X
X
X
X
X
X
All replacement parts  
beyond warranty period  
90 Days  
X
X
See conditions, exclusions, and limitations on next page.  
4021-645C 12-29-10  
Page 1 of 2  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
5
Download from Www.Somanuals.com. All Manuals Search And Download.  
B. Limited Lifetime Warranty (continued)  
WARRANTY CONDITIONS:  
‡ꢀ 7KLVꢀZDUUDQW\ꢀRQO\ꢀFRYHUVꢀ++7ꢀDSSOLDQFHVꢀWKDWꢀDUHꢀSXUFKDVHGꢀWKURXJKꢀDQꢀ++7ꢀDXWKRUL]HGꢀGHDOHUꢀRUꢀGLVWULEXWRUꢁꢀ$ꢀOLVWꢀRIꢀ  
++7ꢀDXWKRUL]HGꢀGHDOHUVꢀLVꢀDYDLODEOHꢀRQꢀWKHꢀ++7ꢀEUDQGHGꢀZHEVLWHVꢁ  
‡ꢀ 7KLVꢀZDUUDQW\ꢀLVꢀRQO\ꢀYDOLGꢀZKLOHꢀWKHꢀ++7ꢀDSSOLDQFHꢀUHPDLQVꢀDWꢀWKHꢀVLWHꢀRIꢀRULJLQDOꢀLQVWDOODWLRQꢁ  
‡ꢀ &RQWDFWꢀ\RXUꢀLQVWDOOLQJꢀGHDOHUꢀIRUꢀZDUUDQW\ꢀVHUYLFHꢁꢀ,IꢀWKHꢀLQVWDOOLQJꢀGHDOHUꢀLVꢀXQDEOHꢀWRꢀSURYLGHꢀQHFHVVDU\ꢀSDUWVꢂꢀFRQWDFWꢀ  
WKHꢀQHDUHVWꢀ++7ꢀDXWKRUL]HGꢀGHDOHUꢀRUꢀVXSSOLHUꢁꢀ$GGLWLRQDOꢀVHUYLFHꢀIHHVꢀPD\ꢀDSSO\ꢀLIꢀ\RXꢀDUHꢀVHHNLQJꢀZDUUDQW\ꢀVHUYLFHꢀ  
IURPꢀDꢀGHDOHUꢀRWKHUꢀWKDQꢀWKHꢀGHDOHUꢀIURPꢀZKRPꢀ\RXꢀRULJLQDOO\ꢀSXUFKDVHGꢀWKHꢀSURGXFWꢁ  
‡ꢀ &KHFNꢀZLWKꢀ\RXUꢀGHDOHUꢀLQꢀDGYDQFHꢀIRUꢀDQ\ꢀFRVWVꢀWRꢀ\RXꢀZKHQꢀDUUDQJLQJꢀDꢀZDUUDQW\ꢀFDOOꢁꢀ7UDYHOꢀDQGꢀVKLSSLQJꢀFKDUJHVꢀ  
IRUꢀSDUWVꢀDUHꢀQRWꢀFRYHUHGꢀE\ꢀWKLVꢀZDUUDQW\ꢁ  
WARRANTY EXCLUSIONS:  
7KLVꢀZDUUDQW\ꢀGRHVꢀQRWꢀFRYHUꢀWKHꢀIROORZLQJꢅ  
‡ꢀ &KDQJHVꢀLQꢀVXUIDFHꢀILQLVKHVꢀDVꢀDꢀUHVXOWꢀRIꢀQRUPDOꢀXVHꢁꢀ$VꢀDꢀKHDWLQJꢀDSSOLDQFHꢂꢀVRPHꢀFKDQJHVꢀLQꢀFRORUꢀRIꢀLQWHULRUꢀDQGꢀ  
H[WHULRUꢀVXUIDFHꢀILQLVKHVꢀPD\ꢀRFFXUꢁꢀ7KLVꢀLVꢀQRWꢀDꢀIODZꢀDQGꢀLVꢀQRWꢀFRYHUHGꢀXQGHUꢀZDUUDQW\ꢁ  
‡ꢀ 'DPDJHꢀWRꢀSULQWHGꢂꢀSODWHGꢂꢀRUꢀHQDPHOHGꢀVXUIDFHVꢀFDXVHGꢀE\ꢀILQJHUSULQWVꢂꢀDFFLGHQWVꢂꢀPLVXVHꢂꢀVFUDWFKHVꢂꢀPHOWHGꢀLWHPVꢂꢀ  
RUꢀRWKHUꢀH[WHUQDOꢀVRXUFHVꢀDQGꢀUHVLGXHVꢀOHIWꢀRQꢀWKHꢀSODWHGꢀVXUIDFHVꢀIURPꢀWKHꢀXVHꢀRIꢀDEUDVLYHꢀFOHDQHUVꢀRUꢀSROLVKHVꢁ  
‡ꢀ 5HSDLUꢀRUꢀUHSODFHPHQWꢀRIꢀSDUWVꢀWKDWꢀDUHꢀVXEMHFWꢀWRꢀQRUPDOꢀZHDUꢀDQGꢀWHDUꢀGXULQJꢀWKHꢀZDUUDQW\ꢀSHULRGꢁꢀ7KHVHꢀSDUWVꢀ  
LQFOXGHꢅꢀSDLQWꢂꢀZRRGꢂꢀSHOOHWꢀDQGꢀFRDOꢀJDVNHWVꢂꢀILUHEULFNVꢂꢀJUDWHVꢂꢀIODPHꢀꢀJXLGHVꢂꢀOLJKWꢀEXOEVꢂꢀEDWWHULHVꢀDQGꢀWKHꢀGLVFRORU-  
DWLRQꢀRIꢀJODVVꢁ  
‡ꢀ 0LQRUꢀH[SDQVLRQꢂꢀFRQWUDFWLRQꢂꢀRUꢀPRYHPHQWꢀRIꢀFHUWDLQꢀSDUWVꢀFDXVLQJꢀQRLVHꢁꢀ7KHVHꢀFRQGLWLRQVꢀDUHꢀQRUPDOꢀDQGꢀFRP-  
SODLQWVꢀUHODWHGꢀWRꢀWKLVꢀQRLVHꢀDUHꢀQRWꢀFRYHUHGꢀE\ꢀWKLVꢀZDUUDQW\ꢁ  
‡ꢀ 'DPDJHVꢀUHVXOWLQJꢀIURPꢅꢀꢆꢇꢈꢀIDLOXUHꢀWRꢀLQVWDOOꢂꢀRSHUDWHꢂꢀRUꢀPDLQWDLQꢀWKHꢀDSSOLDQFHꢀLQꢀDFFRUGDQFHꢀZLWKꢀWKHꢀLQVWDOODWLRQꢀ  
LQVWUXFWLRQVꢂꢀRSHUDWLQJꢀLQVWUXFWLRQVꢂꢀDQGꢀOLVWLQJꢀDJHQWꢀLGHQWLILFDWLRQꢀODEHOꢀIXUQLVKHGꢀZLWKꢀWKHꢀDSSOLDQFHꢄꢀꢆꢉꢈꢀIDLOXUHꢀWRꢀ  
LQVWDOOꢀWKHꢀDSSOLDQFHꢀLQꢀDFFRUGDQFHꢀZLWKꢀORFDOꢀEXLOGLQJꢀFRGHVꢄꢀꢆꢊꢈꢀVKLSSLQJꢀRUꢀLPSURSHUꢀKDQGOLQJꢄꢀꢆꢋꢈꢀLPSURSHUꢀRSHUD-  
WLRQꢂꢀDEXVHꢂꢀPLVXVHꢂꢀFRQWLQXHGꢀRSHUDWLRQꢀZLWKꢀGDPDJHGꢂꢀFRUURGHGꢀRUꢀIDLOHGꢀFRPSRQHQWVꢂꢀDFFLGHQWꢂꢀRUꢀLPSURSHUO\ꢌꢀ  
LQFRUUHFWO\ꢀSHUIRUPHGꢀUHSDLUVꢄꢀꢆꢍꢈꢀHQYLURQPHQWDOꢀFRQGLWLRQVꢂꢀLQDGHTXDWHꢀYHQWLODWLRQꢂꢀQHJDWLYHꢀSUHVVXUHꢂꢀRUꢀGUDIWLQJꢀ  
FDXVHGꢀE\ꢀWLJKWO\ꢀVHDOHGꢀFRQVWUXFWLRQVꢂꢀLQVXIILFLHQWꢀPDNHꢃXSꢀDLUꢀVXSSO\ꢂꢀRUꢀKDQGOLQJꢀGHYLFHVꢀVXFKꢀDVꢀH[KDXVWꢀIDQVꢀRUꢀ  
IRUFHGꢀDLUꢀIXUQDFHVꢀRUꢀRWKHUꢀVXFKꢀFDXVHVꢄꢀꢆꢎꢈꢀXVHꢀRIꢀIXHOVꢀRWKHUꢀWKDQꢀWKRVHꢀVSHFLILHGꢀLQꢀWKHꢀRSHUDWLQJꢀLQVWUXFWLRQVꢄꢀꢆꢏꢈꢀ  
LQVWDOODWLRQꢀRUꢀXVHꢀRIꢀFRPSRQHQWVꢀQRWꢀVXSSOLHGꢀZLWKꢀWKHꢀDSSOLDQFHꢀRUꢀDQ\ꢀRWKHUꢀFRPSRQHQWVꢀQRWꢀH[SUHVVO\ꢀDXWKRUL]HGꢀ  
DQGꢀDSSURYHGꢀE\ꢀ++7ꢀꢆꢐꢈꢀPRGLILFDWLRQꢀRIꢀWKHꢀDSSOLDQFHꢀQRWꢀH[SUHVVO\ꢀDXWKRUL]HGꢀDQGꢀDSSURYHGꢀE\ꢀ++7ꢀLQꢀZULWLQJꢄꢀ  
DQGꢌRUꢀꢆꢑꢈꢀLQWHUUXSWLRQVꢀRUꢀIOXFWXDWLRQVꢀRIꢀHOHFWULFDOꢀSRZHUꢀVXSSO\ꢀWRꢀWKHꢀDSSOLDQFHꢁ  
‡ꢀ 1RQꢃ++7ꢀYHQWLQJꢀFRPSRQHQWVꢂꢀKHDUWKꢀFRPSRQHQWVꢀRUꢀRWKHUꢀDFFHVVRULHVꢀXVHGꢀLQꢀFRQMXQFWLRQꢀZLWKꢀWKHꢀDSSOLDQFHꢁ  
‡ꢀ $Q\ꢀSDUWꢀRIꢀDꢀSUHꢃH[LVWLQJꢀILUHSODFHꢀV\VWHPꢀLQꢀZKLFKꢀDQꢀLQVHUWꢀRUꢀDꢀGHFRUDWLYHꢀJDVꢀDSSOLDQFHꢀLVꢀLQVWDOOHGꢁ  
‡ꢀ ++7¶VꢀREOLJDWLRQꢀXQGHUꢀWKLVꢀZDUUDQW\ꢀGRHVꢀQRWꢀH[WHQGꢀWRꢀWKHꢀDSSOLDQFH¶VꢀFDSDELOLW\ꢀWRꢀKHDWꢀWKHꢀGHVLUHGꢀVSDFHꢁꢀ,QIRUPD-  
WLRQꢀLVꢀSURYLGHGꢀWRꢀDVVLVWꢀWKHꢀFRQVXPHUꢀDQGꢀWKHꢀGHDOHUꢀLQꢀVHOHFWLQJꢀWKHꢀSURSHUꢀDSSOLDQFHꢀIRUꢀWKHꢀDSSOLFDWLRQꢁꢀ&RQVLGHU-  
DWLRQꢀPXVWꢀEHꢀJLYHQꢀWRꢀDSSOLDQFHꢀORFDWLRQꢀDQGꢀFRQILJXUDWLRQꢂꢀHQYLURQPHQWDOꢀFRQGLWLRQVꢂꢀLQVXODWLRQꢀDQGꢀDLUꢀWLJKWQHVVꢀRIꢀ  
ꢀWKHꢀVWUXFWXUHꢁ  
This warranty is void if:  
‡ꢀ 7KHꢀDSSOLDQFHꢀKDVꢀEHHQꢀRYHUꢃILUHGꢀRUꢀRSHUDWHGꢀLQꢀDWPRVSKHUHVꢀFRQWDPLQDWHGꢀE\ꢀFKORULQHꢂꢀIOXRULQHꢂꢀRUꢀRWKHUꢀGDPDJLQJꢀ  
FKHPLFDOVꢁꢀ2YHUꢃILULQJꢀFDQꢀEHꢀLGHQWLILHGꢀE\ꢂꢀEXWꢀQRWꢀOLPLWHGꢀWRꢂꢀZDUSHGꢀSODWHVꢀRUꢀWXEHVꢂꢀUXVWꢀFRORUHGꢀFDVWꢀLURQꢂꢀEXEEOLQJꢂꢀ  
FUDFNLQJꢀDQGꢀGLVFRORUDWLRQꢀRIꢀVWHHOꢀRUꢀHQDPHOꢀILQLVKHVꢁ  
‡ꢀ 7KHꢀDSSOLDQFHꢀLVꢀVXEMHFWHGꢀWRꢀSURORQJHGꢀSHULRGVꢀRIꢀGDPSQHVVꢀRUꢀFRQGHQVDWLRQꢁ  
‡ꢀ 7KHUHꢀLVꢀDQ\ꢀGDPDJHꢀWRꢀWKHꢀDSSOLDQFHꢀRUꢀRWKHUꢀFRPSRQHQWVꢀGXHꢀWRꢀZDWHUꢀRUꢀZHDWKHUꢀGDPDJHꢀZKLFKꢀLVꢀWKHꢀUHVXOWꢀRIꢂꢀEXWꢀ  
QRWꢀOLPLWHGꢀWRꢂꢀLPSURSHUꢀFKLPQH\ꢀRUꢀYHQWLQJꢀLQVWDOODWLRQꢁꢀ  
LIMITATIONS OF LIABILITY:  
‡ꢀ 7KHꢀRZQHU¶VꢀH[FOXVLYHꢀUHPHG\ꢀDQGꢀ++7¶VꢀVROHꢀREOLJDWLRQꢀXQGHUꢀWKLVꢀZDUUDQW\ꢂꢀXQGHUꢀDQ\ꢀRWKHUꢀZDUUDQW\ꢂꢀH[SUHVVꢀRUꢀ  
LPSOLHGꢂꢀRUꢀLQꢀFRQWUDFWꢂꢀWRUWꢀRUꢀRWKHUZLVHꢂꢀVKDOOꢀEHꢀOLPLWHGꢀWRꢀUHSODFHPHQWꢂꢀUHSDLUꢂꢀRUꢀUHIXQGꢂꢀDVꢀVSHFLILHGꢀDERYHꢁꢀ,QꢀQRꢀ  
HYHQWꢀZLOOꢀ++7ꢀEHꢀOLDEOHꢀIRUꢀDQ\ꢀLQFLGHQWDOꢀRUꢀFRQVHTXHQWLDOꢀGDPDJHVꢀFDXVHGꢀE\ꢀGHIHFWVꢀLQꢀWKHꢀDSSOLDQFHꢁꢀ6RPHꢀVWDWHVꢀ  
GRꢀQRWꢀDOORZꢀH[FOXVLRQVꢀRUꢀOLPLWDWLRQꢀRIꢀLQFLGHQWDOꢀRUꢀFRQVHTXHQWLDOꢀGDPDJHVꢂꢀVRꢀWKHVHꢀOLPLWDWLRQVꢀPD\ꢀQRWꢀDSSO\ꢀWRꢀ\RXꢁꢀ  
7KLVꢀZDUUDQW\ꢀJLYHVꢀ\RXꢀVSHFLILFꢀULJKWVꢄꢀ\RXꢀPD\ꢀDOVRꢀKDYHꢀRWKHUꢀULJKWVꢂꢀZKLFKꢀYDU\ꢀIURPꢀVWDWHꢀWRꢀVWDWHꢁꢀ(;&(37ꢀ72ꢀ  
7+(ꢀ(;7(17ꢀ3529,'('ꢀ%<ꢀ/$:ꢂꢀ++7ꢀ0$.(6ꢀ12ꢀ(;35(66ꢀ:$55$17,(6ꢀ27+(5ꢀ7+$1ꢀ7+(ꢀ:$55$17<ꢀ  
63(&,),('ꢀ+(5(,1ꢁꢀ7+(ꢀ'85$7,21ꢀ2)ꢀ$1<ꢀ,03/,('ꢀ:$55$17<ꢀ,6ꢀ/,0,7('ꢀ72ꢀ'85$7,21ꢀ2)ꢀ7+(ꢀ  
(;35(66('ꢀ:$55$17<ꢀ63(&,),('ꢀ$%29(ꢁ  
4021-645C 12-29-10  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Page 2 of 2  
6
Download from Www.Somanuals.com. All Manuals Search And Download.  
Listing and Code Approvals  
1
A. Appliance Certication  
C. BTU Specications  
Maximum  
Input  
BTU/h  
Minimum  
Input  
BTU/h  
Orice  
Size  
(DMS)  
MODELS: ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI,  
RCOR-36TRB-IPI  
Models  
(U.S. or Canada)  
US  
(0-2000 FT)  
LABORATORY: Underwriters Laboratories, Inc. (UL)  
TYPE: Direct Vent Gas Appliance Heater  
ST-36TRB-IPI  
PIER-36TRB-IPI  
LCOR-36TRB-IPI  
RCOR-36TRB-IPI  
37,000 26,000  
34,500 23,900  
32  
33  
CANADA  
(2000-4500 FT)  
STANDARD: ANSI Z21.88-2007 • CSA 2.33a-2007  
D. High Altitude Installations  
This product is listed to ANSI standards for “Vented Gas  
Appliance Heaters” and applicable sections of “Gas Burn-  
ing Heating Appliances for Manufactured Homes and  
Recreational Vehicles”, and “Gas Fired Appliances for  
Use at High Altitudes”.  
NOTICE: If the heating value of the gas has been reduced,  
these rules do not apply. Check with your local gas utility  
or authorities having jurisdiction.  
When installing above 2000 feet elevation:  
NOTICE: This installation must conform with local codes.  
In the absence of local codes you must comply with the  
National Fuel Gas Code, ANSI Z223.1-latest edition in  
the U.S.A. and the CAN/CGA B149 Installation Codes in  
Canada.  
• In the USA: Reduce input rate 4% for each 1000 feet  
above 2000 feet.  
• In CANADA: Reduce input rate 10% for elevations  
between 2000 feet and 4500 feet. Above 4500 feet,  
consult local gas utility.  
Check with your local gas utility to determine proper orice  
size.  
NOT INTENDED FOR USE AS A PRIMARY HEAT SOURCE.  
This appliance is tested and approved as either supplemen-  
tal room heat or as a decorative appliance. It should not be  
factored as primary heat in residential heating calculations.  
E. Non-Combustible Materials Specication  
Material which will not ignite and burn. Such materials are  
those consisting entirely of steel, iron, brick, tile, concrete,  
slate, glass or plasters, or any combination thereof.  
B. Tempered Glass Specications  
Hearth & Home Technologies appliances manufactured  
with tempered glass may be installed in hazardous loca-  
tions such as bathtub enclosures as dened by the Con-  
sumerProductSafetyCommission(CPSC).Thetempered  
glass has been tested and certied to the requirements  
of ANSI Z97.1 and CPSC 16 CFR 1202 (Safety Glazing  
Certication Council SGCC# 1595 and 1597. Architectur-  
al Testing, Inc. Reports 02-31919.01 and 02-31917.01).  
Materials that are reported as passing ASTM E 136,  
Standard Test Method for Behavior of Materials in a  
Vertical Tube Furnace at 750 ºC and UL763 shall be  
considered non-combustible materials.  
F. Combustible Materials Specication  
Materials made of or surfaced with wood, compressed pa-  
per, plant bers, plastics, or other material that can ignite  
and burn, whether ame proofed or not, or plastered or  
unplastered shall be considered combustible materials.  
This statement is in compliance with CPSC 16 CFR Sec-  
tion 1201.5 “Certication and labeling requirements”  
which refers to 15 U.S. Code (USC) 2063 stating “…Such  
certicate shall accompany the product or shall otherwise  
be furnished to any distributor or retailer to whom the  
product is delivered.”  
G. Electrical Codes  
NOTICE: This appliance must be electrically wired  
and grounded in accordance with local codes or, in the  
absence of local codes, with National Electric Code  
ANSI/NFPA 70-latest edition or the Canadian Electric  
Code CSA C22.1.  
Some local building codes require the use of tempered  
glass with permanent marking in such locations. Glass  
meeting this requirement is available from the factory.  
Please contact your dealer or distributor to order.  
A 110-120 VAC circuit for this product must be protected  
with ground-fault circuit-interrupter protection, in  
compliance with the applicable electrical codes, when it is  
installed in locations such as in bathrooms or near sinks.  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
7
Inspection  
Note: The following requirements reference various  
Massachusetts and national codes not contained in this  
document.  
The state or local gas inspector of the side wall horizon-  
tally vented gas fueled equipment shall not approve the  
installation unless, upon inspection, the inspector ob-  
serves carbon monoxide detectors and signage installed  
in accordance with the provisions of 248 CMR 5.08(2)(a)1  
through 4.  
H. Requirements for the Commonwealth of  
Massachusetts  
For all side wall horizontally vented gas fueled equipment  
installed in every dwelling, building or structure used in  
whole or in part for residential purposes, including those  
owned or operated by the Commonwealth and where the  
side wall exhaust vent termination is less than seven (7)  
feet above nished grade in the area of the venting, in-  
cluding but not limited to decks and porches, the following  
requirements shall be satised:  
Exemptions  
The following equipment is exempt from 248 CMR  
5.08(2)(a)1 through 4:  
• The equipment listed in Chapter 10 entitled “Equipment  
Not Required To Be Vented” in the most current edition  
of NFPA 54 as adopted by the Board; and  
• Product Approved side wall horizontally vented gas fu-  
eled equipment installed in a room or structure separate  
from the dwelling, building or structure used in whole or  
in part for residential purposes.  
Installation of Carbon Monoxide Detectors  
At the time of installation of the side wall horizontal vented  
gas fueled equipment, the installing plumber or gas tter  
shall observe that a hard wired carbon monoxide detector  
with an alarm and battery back-up is installed on the oor  
level where the gas equipment is to be installed. In addi-  
tion, the installing plumber or gas tter shall observe that  
a battery operated or hard wired carbon monoxide detec-  
tor with an alarm is installed on each additional level of  
the dwelling, building or structure served by the side wall  
horizontal vented gas fueled equipment. It shall be the  
responsibility of the property owner to secure the services  
of qualied licensed professionals for the installation of  
hard wired carbon monoxide detectors.  
MANUFACTURER REQUIREMENTS  
Gas Equipment Venting System Provided  
When the manufacturer of Product Approved side wall  
horizontally vented gas equipment provides a venting  
system design or venting system components with the  
equipment, the instructions provided by the manufacturer  
for installation of the equipment and the venting system  
shall include:  
• Detailed instructions for the installation of the venting  
system design or the venting system components; and  
In the event that the side wall horizontally vented gas fu-  
eled equipment is installed in a crawl space or an attic,  
the hard wired carbon monoxide detector with alarm and  
battery back-up may be installed on the next adjacent  
oor level.  
• A complete parts list for the venting system design or  
venting system.  
Gas Equipment Venting System NOT Provided  
In the event that the requirements of this subdivision can  
not be met at the time of completion of installation, the  
owner shall have a period of thirty (30) days to comply  
with the above requirements; provided, however, that dur-  
ing said thirty (30) day period, a battery operated carbon  
monoxide detector with an alarm shall be installed.  
When the manufacturer of a Product Approved side wall  
horizontally vented gas fueled equipment does not pro-  
vide the parts for venting the ue gases, but identies  
“special venting systems”, the following requirements  
shall be satised by the manufacturer:  
• The referenced “special venting system” instructions  
shall be included with the appliance or equipment in-  
stallation instructions; and  
Approved Carbon Monoxide Detectors  
Each carbon monoxide detector as required in accor-  
dance with the above provisions shall comply with NFPA  
720 and be ANSI/UL 2034 listed and IAS certied.  
• The “special venting systems” shall be Product Ap-  
proved by the Board, and the instructions for that sys-  
tem shall include a parts list and detailed installation  
instructions.  
Signage  
A metal or plastic identication plate shall be permanent-  
ly mounted to the exterior of the building at a minimum  
height of eight (8) feet above grade directly in line with the  
exhaust vent terminal for the horizontally vented gas fu-  
eled heating appliance or equipment. The sign shall read,  
in print size no less than one-half (1/2) inch in size, “GAS  
VENT DIRECTLY BELOW. KEEP CLEAR OF ALL OB-  
STRUCTIONS”.  
A copy of all installation instructions for all Product Ap-  
proved side wall horizontally vented gas fueled equip-  
ment, all venting instructions, all parts lists for venting  
instructions, and/or all venting design instructions shall  
remain with the appliance or equipment at the completion  
of the installation.  
See Gas Connection section for additional Common-  
wealth of Massachusetts requirements.  
8
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
User Guide  
Operating Instructions  
2
• Keep remote controls out of reach of children.  
A. Gas Fireplace Safety  
• Never leave children alone near a hot replace, whether  
operating or cooling down.  
WARNING  
HOT SURFACES!  
Teach children to NEVER touch the replace.  
Glass and other surfaces are hot during  
operation AND cool down.  
• Consider not using the replace when children will be  
present.  
Hot glass will cause burns.  
DO NOT touch glass until it is cooled  
• NEVER allow children to touch glass  
• Keep children away  
Contact your dealer for more information, or visit: www.  
hpba.org/safety-information.  
To prevent unintended operation when not using your re-  
place for an extended period of time (summer months,  
vacations, trips, etc):  
• CAREFULLY SUPERVISE children in same room as  
replace.  
• Alert children and adults to hazards of high temperatures.  
• Remove batteries from remote controls.  
• Turn off wall controls.  
High temperatures may ignite clothing or other  
ammable materials.  
• Keep clothing, furniture, draperies and other ammable  
materials away.  
• Unplug 3 volt adapter plug and remove batteries on IPI  
models.  
This appliance has been supplied with an integral barrier  
to prevent direct contact with the xed glass panel. DO  
NOT operate the appliance with the barrier removed.  
• Turn off gas controls valve on standing pilot models.  
When lighting the pilot light on replaces with a standing  
pilot, remove the xed glass assembly so you can de-  
tect presence of residual gas build-up. See Standing Pilot  
Lighting instructions and Maintenance Tasks.  
Contact your dealer or Hearth & Home Technologies if the  
barrier is not present or help is needed to properly install one.  
If you expect that small children or vulnerable adults may  
come into contact with this replace, the following precau-  
tions are recommended:  
B. Your Fireplace  
WARNING! DO NOT operate replace before read-  
ing and understanding operating instructions. Failure  
to operate replace according to operating instructions  
could cause re or injury.  
• Install a physical barrier such as:  
- A decorative rescreen.  
- Adjustable safety gate.  
• Install a switch lock or a wall/remote control with child  
protection lockout feature.  
DECORATIVE DOORS  
(NOT SHOWN)  
SECTION 2.E.  
FIXED GLASS ASSEMBLY  
SECTION 14.G.  
MANTEL  
HEARTH  
CLEAR SPACE  
SECTION 2.D.  
Figure 2.1 General Operating Parts  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
9
Download from Www.Somanuals.com. All Manuals Search And Download.  
C. Blower Kit (optional)  
If desired, a blower kit may be added. Contact your deal-  
er to order the correct fan kit.  
Blower Installation  
1. Install and wire the blower in appliance as shown in  
Figure 2.2.  
2. Wire the blower temperature sensor and adjustable  
speed control (rheostat) according to the instructions  
provided with the fan.  
3. If rheostat is required, bend rheostat attachment tab  
located in bottom of replace upward as shown in  
Figure 2.3.  
4. Attach rheostat to the rheostat attachment tab.  
Figure 2.4 Clear Space  
F. Fixed Glass Assembly  
THREADED STUD USED TO  
INSTALL TEMPERATURE SENSOR  
See Section 14.G.  
FAN  
G. Remote Controls, Wall Controls and Wall  
Switches  
Figure 2.2 Blower Location  
Follow the instructions supplied with the control installed  
to operate your replace:  
For safety:  
• Install a switch lock or a wall/remote control with child  
protection lockout feature.  
• Keep remote controls out of reach of children.  
See your dealer if you have questions.  
RHEOSTAT ATTACHMENT TAB  
Figure 2.3 Rheostat Attachment Tab Location  
D. Clear Space  
H. Before Lighting Fireplace  
WARNING! DO NOT place combustible objects in front  
of the replace or block louvers. High temperatures may  
start a re. See Figure 2.4.  
Before operating this replace for the rst time, have a  
qualied service technician:  
• Verify all shipping materials have been removed from  
inside and/or underneath the rebox.  
Avoid placing candles and other heat-sensitive objects on  
mantel or hearth. Heat may damage these objects.  
• Review proper placement of logs, ember material and/or  
other decorative materials.  
E. Decorative Doors and Fronts  
WARNING! Risk of Fire! Install ONLY doors or fronts  
approved by Hearth & Home Technologies. Unapproved  
doors or fronts may cause replace to overheat.  
• Check the wiring.  
• Check the air shutter adjustment.  
• Ensure that there are no gas leaks.  
This fireplace has been supplied with an integral  
barrier to prevent direct contact with the xed glass  
panel. DO NOT operate the replace with the barrier  
removed.  
• Ensure that the glass is sealed and in the proper position  
and that the integral barrier is in place.  
WARNING! Risk of Fire or Asphyxiation! DO NOT op-  
erate replace with xed glass assembly removed.  
Contact your dealer or Hearth & Home Technologies if  
the barrier is not present or help is needed to properly  
install one.  
For more information refer to the instructions supplied with  
your decorative door or front.  
10  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
I. Lighting Instructions (IPI)  
The IPI system may be operated with two D-cell batteries. When using batteries, unplug the transformer. To prolong battery  
life, remove them when using the transformer.  
FOR YOUR SAFETY  
LIGHTING  
READ BEFORE LIGHTING  
INSTRUCTIONS (IPI)  
WARNING: If you do not follow these instructions exactly, a re or explosion  
may result causing property damage, personal injury or loss of life.  
1. This appliance is equipped with an ignition  
device which automatically lights the burner.  
DO NOT try to light the burner by hand.  
• Immediately call your gas supplier  
from a neighbor’s phone. Follow the  
gas supplier’s instructions.  
A. This appliance is equipped with an  
intermittent pilot ignition (IPI) device  
which automatically lights the burn-  
er. DO NOT try to light the burner by  
hand.  
GAS  
VALVE  
• If you cannot reach your gas sup-  
plier, call the re department.  
B. BEFORE LIGHTING, smell all around  
the appliance area for gas. Be sure to  
smell next to the oor because some  
gas is heavier than air and will settle  
on the oor.  
C. DO NOT use this appliance if any  
part has been under water. Imme-  
diately call a qualied service tech-  
nician to inspect the appliance and  
to replace any part of the control  
system and any gas control which  
has been under water.  
2. Wait ve (5) minutes to clear out any gas.  
Then smell for gas, including near the oor. If  
you smell gas, STOP! Follow “B” in the Safety  
Information located on the left side of this la-  
bel. If you do not smell gas, go to next step.  
WHAT TO DO IF YOU SMELL GAS  
DO NOT try to light any appliance.  
3. To light the burner:  
DO NOT touch any electric switch; do  
not use any phone in your building.  
Equipped with wall switch: Turn ON/OFF switch  
to ON.  
Equipped with remote or wall control: Press  
ON or FLAME button.  
WARNING: CAUTION:  
Equipped with thermostat: Set temperature to  
desired setting.  
Hot while in operation. DO NOT touch.  
Keep children, clothing, furniture, gaso-  
line and other liquids having ammable  
vapors away.  
DO NOT CONNECT LINE VOLT-  
AGE (110/120 VAC OR 220/240  
VAC) TO THE CONTROL VALVE.  
4. If the appliance does not light after three tries,  
call your service technician or gas supplier.  
Improper installation, adjustment, al-  
teration, service or maintenance can  
cause injury or property damage. Re-  
fer to the owner’s information manual  
provided with this appliance.  
TO TURN OFF  
GAS TO APPLIANCE  
1. Equipped with wall switch: Turn ON/OFF switch  
DO NOT operate the appliance with  
xed glass assembly removed, cracked  
or broken. Replacement of the xed  
glass assembly should be done by a  
licensed or qualied service person.  
to OFF.  
This appliance needs fresh air for  
safe operation and must be installed  
so there are provisions for adequate  
combustion and ventilation air.  
Equipped with remote or wall control: Press  
OFF button.  
NOT FOR USE  
WITH SOLID FUEL  
Equipped with thermostat: Set temperature to  
lowest setting.  
If not installed, operated, and main- For use with natural gas and propane.  
tained in accordance with the manufac- A conversion kit, as supplied by the  
turer’s instructions, this product could manufacturer, shall be used to convert  
expose you to substances in fuel or this appliance to the alternate fuel.  
2. Service technician should turn off electric  
power to the control when performing service.  
fuel combustion which are known to  
the State of California to cause can-  
cer, birth defects, or other reproductive  
Also Certied for Installation in a  
Bedroom or a Bedsitting Room.  
593-913G  
For assistance or additional informa-  
tion, consult a qualied installer, ser-  
vice agency or the gas supplier.  
harm.  
Keep burner and control compartment  
clean. See installation and operating  
instructions accompanying appliance.  
For additional information on operating your  
Hearth & Home Technologies replace, please refer to www.replaces.com.  
Final inspection by  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
J. After Fireplace is Lit  
Initial Break-in Procedure  
• The fireplace should be run three to four hours  
continuously on high.  
• Turn the replace off and allow it to completely cool.  
• Remove xed glass assembly. See Section 14.G.  
• Clean xed glass assembly. See Section 3.  
• Replace the xed glass assembly and run continuously  
on high an additional 12 hours.  
This cures the materials used to manufacture the re-  
place.  
NOTICE! Open windows for air circulation during re-  
place break-in.  
• Some people may be sensitive to smoke and odors.  
• Smoke detectors may activate.  
K. Frequently Asked Questions  
ISSUE  
SOLUTIONS  
This is a result of gas combustion and temperature variations. As the replace warms, this  
condensation will disappear.  
Condensation on the glass  
This is a result of normal operation and the ames will begin to yellow as the replace is al-  
lowed to burn for 20 to 40 minutes.  
Blue ames  
When rst operated, this replace may release an odor for the rst several hours. This is  
caused by the curing of materials from manufacturing. Odor may also be released from nish-  
ing materials and adhesives used near the replace. These circumstances may require ad-  
ditional curing related to the installation environment.  
Odor from replace  
This is a normal result of the curing process of the paint and logs. Glass should be cleaned  
within 3 to 4 hours of initial burning. A non-abrasive cleaner such as gas replace glass clean-  
er may be necessary. See your dealer.  
Film on the glass  
Noise is caused by metal expanding and contracting as it heats up and cools down, similar to  
the sound produced by a furnace or heating duct. This noise does not affect the operation or  
longevity of the replace.  
Metallic noise  
12  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Maintenance and Service  
3
Doors, Surrounds, Fronts  
Any safety screen or guard removed for servicing must be  
replaced prior to operating the replace.  
Frequency: Annually  
By: Homeowner  
When properly maintained, your replace will give you  
many years of trouble-free service. We recommend an-  
nual service by a qualied service technician.  
Tools needed: Protective gloves, stable work surface  
• Assess condition of screen and replace as necessary.  
A. Maintenance Tasks-Homeowner  
• Inspect for scratches, dents or other damage and repair  
as necessary.  
Installation and repair should be done by a qualied service  
technician only. The replace should be inspected before  
use and at least annually by a professional service person.  
• Check that louvers are not blocked.  
• Vacuum and dust surfaces.  
The following tasks may be performed annually by the  
homeowner. If you are uncomfortable performing any of  
the listed tasks, please call your dealer for a service ap-  
pointment.  
Remote Control  
Frequency: Seasonally  
By: Homeowner  
More frequent cleaning may be required due to lint from  
carpeting or other factors. Control compartment, burner  
and circulating air passageway of the replace must be  
kept clean.  
Tools needed: Replacement batteries and remote con-  
trol instructions.  
• Locate remote control transmitter and receiver.  
• Verify operation of remote. Refer to remote control  
operation instructions for proper calibration and setup  
procedure.  
CAUTION! Risk of Burns! The replace should be turned  
off and cooled before servicing.  
Glass Cleaning  
Frequency: Seasonally  
By: Homeowner  
• Place batteries as needed in remote transmitters and  
battery-powered receivers.  
• Place remote control out of reach of children.  
Tools Needed: Protective gloves, glass cleaner, drop  
cloth and a stable work surface.  
If not using your replace for an extended period of time  
(summer months, vacations/trips, etc), to prevent unin-  
tended operation:  
CAUTION! Handle xed glass assembly with care.  
Glass is breakable.  
• Avoid striking, scratching or slamming glass  
• Avoid abrasive cleaners  
• Remove batteries from remote controls.  
• Unplug 3 volt adapter plug on IPI models.  
DO NOT clean glass while it is hot  
• Prepare a work area large enough to accommodate xed  
glass assembly and door frame by placing a drop cloth  
on a at, stable surface.  
Note: Fixed glass assembly and gasketing may have res-  
idue that can stain carpeting or oor surfaces.  
• Remove door or decorative front from replace and set  
aside on work surface.  
• See Section 14.G for instructions to remove xed glass  
assembly.  
• Clean glass with a non-abrasive commercially available  
cleaner.  
- Light deposits: Use a soft cloth with soap and water  
- Heavy deposits: Use commercial fireplace glass  
cleaner (consult with your dealer)  
• Carefully set xed glass assembly in place on replace.  
Hold glass in place with one hand and secure glass  
latches with the other hand.  
• Reinstall door or decorative front.  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
13  
Venting  
Logs  
Frequency: Seasonally  
By: Homeowner  
Frequency: Annually  
By: Qualied Service Technician  
Tools needed: Protective gloves.  
Tools needed: Protective gloves and safety glasses.  
• Inspect venting and termination cap for blockage or  
obstruction such plants, bird nests, leaves, snow, debris,  
etc.  
• Inspect for damaged or missing logs. Replace as necessary.  
Refer to Section 14 for log placement instructions.  
• Verify correct log placement and no ame impingement  
• Verify termination cap clearance to subsequent construc-  
tion (building additions, decks, fences, or sheds). See  
Section 6.  
causing sooting. Correct as necessary.  
Firebox  
Frequency: Annually  
By: Qualied Service Technician  
• Inspect for corrosion or separation.  
• Verify weather stripping, sealing and ashing remains  
Tools needed: Protective gloves, sandpaper, steel wool,  
intact.  
cloths, mineral spirits, primer and touch-up paint.  
• Inspect draft shield to verify it is not damaged or missing.  
• Inspect for paint condition, warped surfaces, corrosion  
or perforation. Sand and repaint as necessary.  
B. Maintenance Tasks-Qualied Service  
Technician  
• Replace replace if rebox has been perforated.  
The following tasks must be performed by a qualied ser-  
vice technician.  
Control Compartment and Firebox Top  
Frequency: Annually  
Gasket Seal and Glass Assembly Inspection  
Frequency: Annually  
By: Qualied Service Technician  
Tools needed: Protective gloves, vacuum cleaner, dust  
cloths  
By: Qualied Service Technician  
Tools needed: Protective gloves, drop cloth and a stable  
work surface.  
• Vacuum and wipe out dust, cobwebs, debris or pet hair.  
Use caution when cleaning these areas. Screw tips that  
have penetrated the sheet metal are sharp and should  
be avoided.  
• Inspect gasket seal and its condition.  
• Inspect xed glass assembly for scratches and nicks that  
can lead to breakage when exposed to heat.  
• Remove all foreign objects.  
• Verify unobstructed air circulation.  
• Conrm there is no damage to glass or glass frame.  
Replace as necessary.  
• Verify that xed glass assembly is properly retained and  
attachment components are intact and not damaged.  
Replace as necessary.  
14  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Burner Ignition and Operation  
Frequency: Annually  
By: Qualied Service Technician  
Tools needed: Protective gloves, vacuum cleaner, whisk  
broom, ashlight, voltmeter, indexed drill bit set, and a  
manometer.  
• Verify burner is properly secured and aligned with pilot  
or igniter.  
• Clean off burner top, inspect for plugged ports, corrosion  
or deterioration. Replace burner if necessary.  
• Replace ember materials with new dime-size pieces.  
DO NOT block ports or obstruct lighting paths. Refer to  
Section 14 for proper ember placement.  
• Verify batteries have been removed from battery back-  
up IPI systems to prevent premature battery failure or  
leaking.  
• Check for smooth lighting and ignition carryover to all  
ports. Verify that there is no ignition delay.  
• Inspect for lifting or other ame problems.  
• Verify air shutter setting is correct. See Section 14 for  
required air shutter setting. Verify air shutter is clear of  
dust and debris.  
• Inspect orice for soot, dirt and corrosion. Verify orice  
size is correct. See Service Parts List for proper orice  
sizing.  
• Verify manifold and inlet pressures. Adjust regulator as  
required.  
• Inspect pilot ame pattern and strength. See Figure 3.1  
for proper pilot ame pattern. Clean or replace orice  
spud as necessary.  
• Inspect IPI ame-sensing rod for soot, corrosion and  
deterioration. Polish with ne steel wool or replace as  
required.  
• Verify that there is not a short in ame sense circuit  
by checking continuity between pilot hood and ame-  
sensing rod. Replace pilot as necessary.  
Figure 3.1 IPI Pilot Flame Patterns  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
15  
Installer Guide  
Getting Started  
4
A. Typical Appliance System  
NOTICE: Illustrations and photos reect typical installations and are for design purposes only. Illustrations/diagrams are not  
drawn to scale. Actual product may vary from pictures in manual  
HORIZONTAL  
NON-COMBUSTIBLE ROOF FLASHING  
TERMINATION CAP  
MAINTAINS MINIMUM CLEARANCE  
(SECTION 10.M)  
AROUND PIPE (SECTION 10.D)  
VERTICAL TERMINATION CAP  
(SECTION 10.E)  
STORM COLLAR  
(SECTION 10.H)  
VENT PIPE PENETRATES ROOF  
PREFERABLY WITHOUT AFFECTING  
ROOF RAFTERS (SECTION 8.D)  
ATTIC INSULATION SHIELD (NOT  
SHOWN) MUST BE USED HERE  
TO KEEP INSULATION AWAY  
FROM VENT PIPE IF ATTIC IS  
INSULATED (SECTION 8.E)  
VENT PIPE (SECTION 9 and 10)  
FRAMING/HEADER  
(SECTION 5.B)  
FRAMING HEADED OFF  
IN CEILING JOISTS  
(SECTION 8.C)  
CEILING FIRESTOP  
ON FLOOR OF ATTIC  
(SECTION 8.C)  
OPTIONAL  
WALL SWITCH  
GAS LINE  
(SECTION 11.C)  
HEARTH EXTENSION  
Note: Dual venting configurations  
ARE NOT allowed. Appliance MUST  
be vented EITHER vertically OR  
horizontally.  
SURROUND  
MANTEL AND  
MANTEL LEG  
(SECTION 5.D)  
Figure 4.1 Typical System  
16  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
B. Design and Installation Considerations  
D. Inspect Appliance and Components  
Heat & Glo direct vent gas appliances are designed to  
operate with all combustion air siphoned from outside of  
the building and all exhaust gases expelled to the outside.  
No additional outside air source is required.  
• Carefully remove the appliance and components from  
the packaging.  
• The vent system components and decorative doors and  
fronts may be shipped in separate packages.  
Installation MUST comply with local, regional, state and  
national codes and regulations. Consult insurance carrier,  
local building inspector, re ofcials or authorities having  
jurisdiction over restrictions, installation inspection and  
permits.  
• If packaged separately, the log set and appliance grate  
must be installed.  
• Report to your dealer any parts damaged in shipment,  
particularly the condition of the glass.  
Read all of the instructions before starting the instal-  
lation. Follow these instructions carefully during the  
installation to ensure maximum safety and benet.  
Before installing, determine the following:  
• Where the appliance is to be installed.  
• The vent system conguration to be used.  
• Gas supply piping requirements.  
• Electrical wiring requirements.  
WARNING! Risk of Fire or Explosion! Damaged parts  
could impair safe operation. DO NOT install damaged, in-  
complete or substitute components. Keep appliance dry.  
• Framing and nishing details.  
Hearth & Home Technologies disclaims any responsibility for,  
and the warranty will be voided by, the following actions:  
• Whether optional accessories—devices such as a fan,  
wall switch, or remote control—are desired.  
• Installation and use of any damaged appliance or vent  
system component.  
Improper installation, adjustment, alteration, service or  
maintenance can cause injury or property damage. For  
assistance or additional information, consult a qualied  
service technician, service agency or your dealer.  
• Modication of the appliance or vent system.  
• Installation other than as instructed by Hearth & Home  
Technologies.  
• Improper positioning of the gas logs or the glass door.  
• Installation and/or use of any component part not approved  
by Hearth & Home Technologies.  
C. Tools and Supplies Needed  
Before beginning the installation be sure that the following  
tools and building supplies are available.  
Any such action may cause a re hazard.  
Tape measure  
Pliers  
Framing material  
WARNING! Risk of Fire, Explosion or Electric Shock!  
DO NOT use this appliance if any part has been under  
water. Call a qualied service technician to inspect the  
appliance and to replace any part of the control system  
and/or gas control which has been under water.  
Non-corrosive leak check solution  
Phillips screwdriver  
Framing square  
Hammer  
Gloves  
Voltmeter  
Plumb line  
Level  
Electric drill and bits (1/4 in.)  
Safety glasses  
Reciprocating saw  
Manometer  
Flat blade screwdriver  
1/2 - 3/4 in. length, #6 or #8 Self-drilling screws  
Caulking material (300ºF minimum continuous exposure  
rating)  
One 1/4 in. female connection (for optional fan).  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
17  
Framing and Clearances  
5
NOTICE: Illustrations reect typical installations and are  
FOR DESIGN PURPOSES ONLY. Illustrations/diagrams  
are not drawn to scale. Actual installation may vary due to  
individual design preference.  
A. Selecting Appliance Location  
When selecting a location for the appliance it is important to  
consider the required clearances to walls (see Figure 5.1).  
WARNING! Risk of Fire or Burns! Provide adequate  
clearance around air openings and for service access.  
Due to high temperatures, the appliance should be locat-  
ed out of trafc and away from furniture and draperies.  
36 in.  
914 mm  
LCOR  
36 in.  
36 in.  
914 mm  
914 mm  
PIER  
36 in.  
914 mm  
36 in.  
914 mm  
36 in.  
914 mm  
36 in.  
914 mm  
ST  
RCOR  
36 in.  
36 in.  
914 mm  
914 mm  
Figure 5.1 Appliance Locations  
18  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
300ºF continuous exposure rating to seal gaps. Gas line  
holes and other openings should be caulked with caulk  
with a minimum of 300ºF continuous exposure rating or  
stuffed with unfaced insulation. If the appliance is being  
installed on a cement surface, a layer of plywood may be  
placed underneath to prevent conducting cold up into the  
room.  
B. Constructing the Appliance Chase  
A chase is a vertical box-like structure built to enclose the  
gas appliance and/or its vent system. In cooler climates  
the vent should enclosed inside the chase.  
NOTICE: Treatment of ceiling restops and wall shield  
restops and construction of the chase may vary with the  
type of building. These instructions are not substitutes  
for the requirements of local building codes. Therefore,  
you MUST check local building codes to determine the  
requirements to these steps.  
C. Clearances  
NOTICE: Install appliance on hard metal or wood surfaces  
extending full width and depth. DO NOT install directly  
on carpeting, vinyl, tile or any combustible material other  
than wood.  
Chases should be constructed in the manner of all out-  
side walls of the home to prevent cold air drafting prob-  
lems. The chase should not break the outside building  
envelope in any manner.  
WARNING! Risk of Fire! Maintain specied air space  
clearances to appliance and vent pipe:  
Walls, ceiling, base plate and cantilever oor of the chase  
should be insulated. Vapor and air inltration barriers  
should be installed in the chase as per regional codes for  
the rest of the home. Additionally, in regions where cold  
air inltration may be an issue, the inside surfaces may be  
sheetrocked and taped for maximum air tightness.  
• Insulation and other materials must be secured to prevent  
accidental contact.  
• The chase must be properly blocked to prevent blown  
insulation or other combustibles from entering and  
making contact with replace or chimney.  
To further prevent drafts, the wall shield and ceiling re-  
stops should be caulked with caulk with a minimum of  
• Failure to maintain airspace may cause overheating and  
a re.  
A
E
I
F
C
B
G
D
H
A
B
C
D
E
F
G
H
I
DVP Pipe SLP Pipe  
DVP Pipe*  
Rough  
Opening  
(Height)  
Rough  
Opening  
(Width)  
ST-36TRB-IPI  
Clearance Combustible Combustible Ends of  
Sides of  
Rough  
Opening Opening  
(Width)  
Rough  
Rough  
Opening  
(Depth)  
to Ceiling  
Floor  
Flooring  
Appliance Appliance  
(Width)  
10  
8-5/8  
219  
38-1/8  
968  
23  
43  
31-5/8  
803  
0
0
0
0
1/2  
13  
36  
Inches  
254  
584  
1092  
914  
Millimeters  
* Adjust framing dimensions for interior sheathing (such as sheetrock)  
Figure 5.2 Clearances to Combustibles ST-36TRB-IPI  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
19  
Download from Www.Somanuals.com. All Manuals Search And Download.  
A
E
I
I
H
C
B
G
D
F
A
B
C
D
E
F
G
H
I
DVP Pipe SLP Pipe  
DVP Pipe*  
Rough  
Opening  
(Height)  
Rough  
Opening  
(Width)  
PIER-36TRB-IPI  
Clearance Combustible Combustible Ends of  
Sides of  
Rough  
Opening Opening  
(Width)  
Rough  
Rough  
Opening  
(Depth)  
to Ceiling  
Floor  
Flooring  
Appliance Appliance  
(Width)  
10  
8-5/8  
219  
38-1/8  
968  
23  
40  
31-5/8  
803  
0
0
0
0
1/2  
13  
36  
Inches  
254  
584  
1016  
914  
Millimeters  
* Adjust framing dimensions for interior sheathing (such as sheetrock)  
Figure 5.3 Clearances to Combustibles PIER-36TRB-IPI  
E
A
I
I
H
H
C
B
G
D
F
A
B
C
D
E
F
G
H
I
DVP Pipe SLP Pipe  
DVP Pipe*  
RCOR-36TRB-IPI  
LCOR-36TRB-IPI  
Rough  
Opening  
(Height)  
Rough  
Opening  
(Width)  
Clearance Combustible Combustible Ends of  
Sides of  
Rough  
Rough  
Rough  
Opening  
(Depth)  
to Ceiling  
Floor  
Flooring  
Appliance Appliance  
Opening Opening  
(Width)  
(Width)  
10  
8-5/8  
219  
38-1/8  
968  
24  
40  
31-5/8  
803  
0
0
0
0
1/2  
13  
36  
Inches  
254  
610  
1016  
914  
Millimeters  
* Adjust framing dimensions for interior sheathing (such as sheetrock)  
Figure 5.4 Clearances to Combustibles LCOR-36TRB-IPI and RCOR-36TRB-IPI  
20  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
D. Mantel and Wall Projections  
See-Through Non-Combustible Mantel  
WARNING! Risk of Fire! Comply with all minimum clear-  
ances as specied. Framing or nishing material closer than  
the minimums listed must be constructed entirely of noncom-  
bustible materials (i.e., steel studs, concrete board, etc).  
TO CEILING  
MAX.  
Note: All  
measurements  
in inches.  
18  
See-Through Combustible Mantel  
12  
TO CEILING  
32  
Note: All  
measurements  
in inches.  
11  
10  
MAX.  
18  
MIN.  
12  
12  
11  
9
10  
6
32  
5
9
8
8
25  
4
7
3
19  
7
6
2
18  
5
17  
1
6
4
16  
3
15  
MEASUREMENTS FROM  
TOP EDGE OF THE OPENING  
MIN.  
14  
13  
Figure 5.7 Minimum Vertical and Maximum Horizontal  
Dimensions of Non-Combustibles  
12  
2-1/2  
11  
10  
5
MEASUREMENTS FROM  
TOP EDGE OF THE OPENING  
PIER/LCOR/RCOR Non-Combustible Mantel  
Figure 5.5 Minimum Vertical and Maximum Horizontal  
Dimensions of Combustibles  
TO CEILING  
MAX.  
PIER/LCOR/RCOR Combustible Mantel  
12  
Note: All  
measurements  
in inches.  
TO CEILING  
Note: All  
MAX.  
measurements  
in inches.  
10  
9
18  
12  
11  
32  
10  
8
32  
9
MIN.  
8
25  
12  
7
7
19  
6
6
10  
18  
5
17  
9
4
16  
8
3
15  
7
MIN.  
6
14  
13  
4
12  
1
11  
MEASUREMENTS FROM  
TOP EDGE OF THE OPENING  
10  
5
Figure 5.8 Minimum Vertical and Maximum Horizontal  
Dimensions of Non-Combustibles  
MEASUREMENTS FROM  
TOP EDGE OF THE OPENING  
Figure 5.6 Minimum Vertical and Maximum Horizontal  
Dimensions of Combustibles  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
21  
Download from Www.Somanuals.com. All Manuals Search And Download.  
1/2 in.  
Min.  
TOP VIEW  
FIREPLACE  
OPENING  
2-3/4  
in. Min.  
Unlimited  
1 in.  
Max.  
3-1/4 in. Min.  
Note: Clearance from opening to perpendicular wall.  
Figure 5.9 Combustible Mantel Leg or Wall Projections  
(Acceptable on both sides of opening)  
SHEETROCK  
3.5 in.  
= AIR SPACE REQUIRED  
Figure 5.10 Non-Combustible Zone (PIER and ST)  
SHEETROCK  
3.5 in.  
= AIR SPACE REQUIRED  
Figure 5.11 Non-Combustible Zone (LCOR and RCOR)  
22  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Termination Locations  
6
A. Vent Termination Minimum Clearances  
A
B
6 in. (minimum) up to 20 in.  
152 mm/508 mm  
18 in. minimum  
457 mm  
WARNING  
20 in. and over  
0 in. minimum  
Fire Risk.  
Gas, Wood or Fuel Oil  
Termination Cap  
Maintain vent clearance to combustibles as  
specied.  
DO NOT pack air space with insulation or other  
materials.  
B
Failure to keep insulation or other materials away  
from vent pipe may cause overheating and re.  
A *  
Gas  
Termination  
Cap **  
HORIZONTAL  
OVERHANG  
2 FT.  
20 INCHES MIN.  
VERTICAL  
MIN.  
WALL  
LOWEST  
DISCHARGE  
OPENING  
GAS DIRECT VENT  
TERMINATION CAP  
*
If using decorative cap cover(s), this distance may need to be  
increased. Refer to the installation instructions supplied with the  
decorative cap cover.  
X
12  
In a staggered installation with both gas and wood or fuel oil  
terminations, the wood or fuel oil termination cap must be  
higher than the gas termination cap.  
**  
ROOF PITCH  
IS X/ 12  
H (MIN.) - MINIMUM HEIGHT FROM ROOF  
TO LOWEST DISCHARGE OPENING  
Figure 6.2 Staggered Termination Caps  
Roof Pitch  
H (Min.) Ft.  
Flat to 6/12...........................................................1.0*  
Over 6/12 to 7/12.................................................1.25*  
Over 7/12 to 8/12.................................................1.5*  
Over 8/12 to 9/12.................................................2.0*  
Over 9/12 to 10/12...............................................2.5  
Over 10/12 to 11/12.............................................3.25  
Over 11/12 to 12/12.............................................4.0  
Over 12/12 to 14/12.............................................5.0  
Over 14/12 to 16/12.............................................6.0  
Over 16/12 to 18/12.............................................7.0  
Over 18/12 to 20/12.............................................7.5  
Over 20/12 to 21/12.............................................8.0  
* 3 foot minimum in snow regions  
Figure 6.1 Minimum Height From Roof To Lowest Discharge  
Opening  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
23  
Download from Www.Somanuals.com. All Manuals Search And Download.  
O
N
P
R
F
C
V
Q
B
J
H or i  
B
V
B
V
V
E
X
D
V
V
G
H
M
V
V
V
V
L
H
V
A
A
K
K
Electrical  
Service  
V
V
V
X
= VENT TERMINAL  
C
V
= AIR SUPPLY INLET  
= AREA WHERE TERMINAL IS NOT PERMITTED  
A
B
= 12 inches.................clearances above grade, veranda,  
porch, deck or balcony  
Covered Alcove Applications  
(Spaces open only on one side and with an overhang)  
= 12 inches.................clearance to window or door that may  
be opened, or to permanently closed  
window  
N
= 6 inches ........... non-vinyl sidewalls  
12 inches ......... vinyl sidewalls  
= 18 inches ......... non-vinyl soft and overhang  
42 inches ......... vinyl soft and overhang  
= 8 ft.  
O
P
C
= 18 inches.................clearance below unventilated soft  
18 inches.................clearance below ventilated soft  
30 inches.................clearance below vinyl soffits and  
electrical service  
QMIN  
3 feet  
6 feet  
9 feet  
12 feet  
RMAX  
D
E
F
= 9 inches...................clearance to outside corner  
= 6 inches...................clearance to inside corner  
1 cap  
2 caps  
3 caps  
4 caps  
2 x Q ACTUAL  
1 x Q ACTUAL  
2/3 x Q ACTUAL  
1/2 x Q ACTUAL  
= 3 ft. (Canada)..........not to be installed above a gas me-  
ter/regulator assembly within 3 feet  
horizontally from the center-line of the  
regulator  
QMIN = # termination caps x 3 RMAX = (2 / # termination caps) x QACTUAL  
G
H
= 3 ft...........................clearance to gas service regulator  
vent outlet  
= 9 inches (U.S.A)  
Measure vertical clearances from this surface.  
12 inches (Canada).clearancetonon-mechanical(unpow-  
ered) air supply inlet, combustion air  
inlet or direct-vent termination  
i
= 3 ft. (U.S.A.)  
6 ft. (Canada)...........clearance to a mechanical (powered)  
air supply inlet  
All mechanical air intakes within 10 feet of a termination cap  
must be a minimum of 3 feet below termination.  
J
= 7 ft.......................... Onpublic property: clearance above  
paved sidewalk or a paved driveway.  
A vent shall not terminate directly above a sidewalk or paved  
driveway which is located between two single family dwellings  
and serves both dwellings.  
Measure horizontal clearances from this surface.  
CAUTION! Risk of Burns! Termination caps are HOT,  
consider proximity to doors, trafc areas or where people  
may pass or gather (sidewalk, deck, patio, etc.). Listed cap  
shields available. Contact your dealer.  
K
L
=
6 inches.................clearance from sides of electrical  
service  
Local codes or regulations may require different  
clearances.  
= 12 inches................clearance above electrical service  
Location of the vent termination must not interfere with access to the  
electrical service.  
Vent system termination is NOT permitted in screened  
porches.  
Vent system termination is permitted in porch areas with  
two or more sides open.  
M
= 18 inches ....................clearanceunderveranda, porch, deck,  
balcony or overhang  
42 inches ................vinyl or composite overhang  
Permitted when veranda, porch, deck or balcony is fully open  
on a minimum of 2 sides beneath the oor.  
Hearth & Home Technologies assumes no responsibility  
for the improper performance of the appliance when the  
venting system does not meet these requirements.  
Vinyl protection kits are suggested for use with vinyl siding.  
Figure 6.3 Minimum Clearances for Termination  
24  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Vent Information and Diagrams  
7
A. Approved Pipe  
This appliance is approved for use with Hearth & Home  
Technologies a DVP or SLP venting system. Refer to  
Section 16.B for vent component information.  
DO NOT mix pipe, ttings or joining methods from differ-  
ent manufacturers.  
Vertical  
The pipe is tested to be run inside an enclosed wall.  
There is no requirement for inspection openings at each  
joint within the wall.  
WARNING! Risk of Fire or Asphyxiation. This appli-  
ance requires a separate vent. DO NOT vent to a pipe  
serving a separate solid fuel burning appliance.  
8-1/2 in.  
B. Vent Table Key  
Horizontal  
The abbreviations listed in this vent table key are used in  
the vent diagrams.  
Figure 7.1  
Symbol  
Description  
D. Measuring Standards  
First section (closest to appliance) of vertical length  
V1  
Vertical and horizontal measurements listed in the vent  
diagrams were made using the following standards.  
Second section of vertical length  
V2  
H1  
H2  
First section (closest to appliance) of horizontal length  
Subsequent sections of horizontal length  
• Pipe measurements are shown using the effective length  
of pipe (see Figure 7.2).  
• Horizontal terminations are measured to the outside  
mounting surface (ange of termination cap) (see Figure  
6.3).  
C. Use of Elbows  
• Vertical terminations are measured to bottom of  
termination cap.  
Diagonal runs have both vertical and horizontal vent as-  
pects when calculating the effects. Use the rise for the  
vertical aspect and the run for the horizontal aspect (see  
Figure 7.1).  
• Horizontal pipe installed level with no rise.  
Two 45º elbows may be used in place of one 90º elbow.  
On 45º runs, one foot of diagonal is equal to 8-1/2 in. (216  
mm) horizontal run and 8-1/2 in. (216 mm) vertical run. A  
length of straight pipe is allowed between two 45º elbows  
(see Figure 7.1).  
Effective Length  
Pipe  
Inches  
4
Millimeters  
102  
DVP4  
DVP6  
6
12  
152  
305  
DVP12  
DVP24  
DVP36  
DVP48  
DVP6A  
Effective  
Height/Length  
24  
610  
36  
914  
48  
1219  
76 to 152  
3 to 6  
DVP12A 3 to 12 76 to 305  
DVP12MI 3 to 12 76 to 305  
DVP24MI 3 to 24 76 to 610  
Figure 7.2 DVP Pipe Effective Length  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
25  
Download from Www.Somanuals.com. All Manuals Search And Download.  
E. Vent Diagrams  
Note: The Multi-Sided series replaces can adapt  
To replace the rst starter elbow with two 45° elbows,  
refer to Figure 7.3. All other 90° elbows can be replaced  
with two 45° elbows.  
to SLP series vent pipe, if desired.  
When venting off the top of the unit, attach a DVP-2SLadapter to  
the appliance starting collar, immediately followed by a minimum  
48 inch vertical section of SLP series vent pipe.  
General Rules:  
• A maximum of three 90° elbows (or six 45° elbows) may  
be used in any vent conguration. Some elbows may be  
installed horizontally. See Figure 7.6.  
After the 48 inch vertical section, the venting table rules  
must be followed. The rst 48 inch vertical section is NOT  
counted as part of the vertical components in the table. It is  
still counted as part of the overall maximum run. All venting  
table rules for the vent run must still be followed.  
• Elbows may be placed back to back anywhere in the  
system as long as the rst 90° elbow is a starter elbow  
except as shown in Figure 7.3.  
Example: DVP pipe 3 ft. min. vertical = 11 ft. max. horizontal  
• When penetrating a combustible wall, a wall shield  
restop must be installed.  
SLP pipe 7 ft. min. vertical = 11 ft. max. horizontal  
• When penetrating a combustible ceiling, a ceiling restop  
must be installed.  
• Horizontal runs of vent do not require vertical rise;  
horizontal runs may be level.  
Top Vent—Horizontal Termination—Two 45° Elbows  
Note: Reference Figure 7.14 for  
special instructions for use of 45º  
elbow on rear vent appliances.  
Installation requirements to replace the rst 90° elbow with two 45° elbows:  
4 ft min.  
(1.22 m)  
16 ft max.  
(4.87 m)  
Figure 7.3  
26  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
1. Top Vent - Horizontal Termination - (continued)  
V1 Minimum  
H1 Maximum  
One Elbow  
Elbow only  
1-1/2 ft.  
457 mm  
610 mm  
914 mm  
1.8 m  
6 in.  
1 ft.  
2 ft.  
3 ft.  
4 ft.  
5 ft.  
6 ft.  
152 mm  
2-1/2 ft.  
3 ft.  
305 mm  
610 mm  
914 mm  
1.2 m  
6 ft  
9 ft.  
2.7 m  
12 ft.  
15 ft.  
18 ft.  
3.7 m  
V1  
1.5 m  
4.6 m  
H1  
1.8 m  
5.5 m  
V1 + H1 = 50 ft. (15.2 m) Maximum  
H1 = 18 ft. (5.5 m) Maximum  
Figure 7.4  
V1 Minimum  
H1 + H2 Maximum  
Two Elbows  
Elbow only  
6 in.  
2 ft.  
152 mm  
610 mm  
1.2 m  
1 ft.  
2 ft.  
3 ft.  
4 ft  
305 mm  
610 mm  
914 mm  
1.2 m  
4 ft.  
9 ft.  
2.7 m  
12 ft.  
15 ft.  
18 ft.  
3.7 m  
5 ft.  
6 ft.  
1.5 m  
4.6 m  
1.8 m  
5.5 m  
V1 + H1 + H2 = 50 ft. (15.2 m) Maximum  
H1 + H2 = 18 ft. (5.5 m) Maximum  
V1  
H2  
H1  
INSTALLED  
HORIZONTALLY  
Figure 7.5  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
27  
Download from Www.Somanuals.com. All Manuals Search And Download.  
1. Top Vent - Horizontal Termination - (continued)  
Three Elbows  
V1 Minimum  
H1 Maximum  
V2 Minimum  
H2 Maximum  
V1 + V2 Minimum H1 + H2 Maximum  
Elbow only  
1 ft.  
3 ft.  
305 mm  
914 mm  
1.8 m  
6 in.  
6 in.  
1 ft.  
2 ft.  
152 mm  
1 ft.  
2 ft.  
305 mm  
6 in.  
1 ft.  
2 ft.  
4 ft  
152 mm  
305 mm  
610 mm  
1.2 m  
1 ft.  
3 ft.  
305 mm  
914 mm  
3.7 m  
6 in.  
1 ft.  
2 ft.  
152 mm  
305 mm  
610 mm  
152 mm  
305 mm  
610 mm  
610 mm  
1.8 m  
3 m  
6 ft  
6 ft  
12 ft.  
18 ft.  
18 ft  
10 ft.*  
3 m  
10 ft.*  
5.5 m  
5.5 m  
3 ft.  
914 mm  
12 ft.*  
3.7 m  
3 ft.  
914 mm  
12 ft.*  
3.7 m  
6 ft  
1.8 m  
*H1 + H2 = 18 ft. (5.5 m) Maximum  
V1 + V2 + H1 + H2 = 50 ft. (15.2 m) Maximum  
H2  
V2  
V1  
H1  
Figure 7.6  
28  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Exhaust restrictor Instructions  
2. Top Vent - Vertical Termination  
No Elbow  
1. Remove refractory panel and exhaust bafe from pilot  
side of appliance. To remove the refractory panel use  
a 1/4 inch nut driver and remove the two screws that  
secure it in place. To remove the exhaust bafe, remove  
the three screws securing the refractory panel in place.  
See Figure 7.8.  
V1 = 60 ft. Max. (18.3 m)  
V1 = 3 ft. Min. (914 mm)  
NOTE: If installing a vertical vent/  
termination off the top of the appli-  
ance, the optional vertical termina-  
tion bafe should be used.  
Refractory Panel  
To access the  
exhaust opening,  
remove the refractory  
panel and exhaust baffle.  
To remove refractory  
panel, remove the two  
screws on top. To remove  
the exhaust baffle, remove  
the three screws securing it.  
V1  
Top Vent Application  
Exhaust restrictor  
Note: Be sure to re-  
install the exhaust  
baffle and refractory  
panel after exhaust  
restrictor installation.  
Figure 7.7  
Rear Vent Application  
Exhaust restrictor  
Exhaust restrictors are recommended for these verti-  
cally terminated products which have excessive draft.  
Exhaust restrictors will compensate for high draft, and  
restore visual ame height. If the vent conguration has  
a total vertical of 15-60 feet, an exhaust restrictor may  
be needed. The exhaust restrictor can be located in the  
appliance manual bag.  
Note: Be sure to re-  
install the exhaust  
baffle and refractory  
panel after exhaust  
restrictor installation.  
Figure 7.8  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
29  
2. Break the exhaust restrictor into two pieces. Do this  
by bending the part back and forth until it breaks (see  
Figure 7.9).  
4. Center the exhaust restrictor in the open end of the  
exhaust outlet and secure through the slots on the  
exhaust restrictor with the 2-1/4 in. self tapping screws  
provided in the appliance manual bag.  
5. Reinstall the exhaust bafe and the refractory panel.  
1
2
3
4
5
BREAK  
HERE  
SETTINGS  
Figure 7.9 Exhaust Restrictor  
1
2
3
4
5
3. Match the amount of vertical you have in the system  
with the chart to nd the appropriate position to set the  
exhaust restrictor (see Figure 7.10).  
Figure 7.10  
TOP VENT  
NG  
REAR VENT  
Vertical  
LP  
NG  
LP  
No  
No  
No  
4 ft.  
1-1  
2-2  
3-3  
3-4  
3-4  
4-4  
4-4  
5-4  
5-4  
5-5  
5-5  
Restrictor Restrictor Restrictor  
No  
8 ft.  
1-2  
3-2  
3-3  
3-3  
3-4  
3-4  
4-4  
4-4  
5-4  
5-4  
1-1  
2-2  
3-3  
3-3  
3-4  
3-4  
4-4  
4-4  
5-4  
5-4  
Restrictor  
1-2  
15 ft.  
20 ft.  
25 ft.  
30 ft.  
35 ft.  
40 ft.  
45 ft.  
50 ft.  
55 ft.  
2-3  
2-3  
3-3  
3-3  
3-4  
3-4  
4-4  
4-4  
Note: If the DVP-2SL adapter and SLP pipe is used, you  
MUST subtract one number from the table above.  
Example: Top vent 40 ft vertical with DVP pipe = 5-4  
Top vent 40 ft vertical with SLP pipe = 4-3  
30  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Two Elbows  
V1  
H1 Maximum  
V2  
*
V1 + V2 Minimum  
One Elbow  
2-1/2 ft. 762 mm  
*
*
*
*
*
*
*
*
2 ft.  
607 mm  
1.2 m  
6 ft.  
12 ft.  
18 ft.  
1.8 m  
3.7 m  
5.5 m  
*
4 ft.  
6 ft.  
*
1.8 m  
*
V1 + V2 + H1 = 50 ft (15.2 m) Maximum  
*No specic restrictions on this value EXCEPT  
V2  
V1 + V2 + H1 cannot exceed 50 ft (15.2 m)  
V1  
H1  
Figure 7.11  
V1  
ELBOW ONLY  
H1+ H2  
V2  
V1 + V2 Minimum H1+ H2 Maximum  
Three Elbows  
1 ft.  
305 mm  
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
1 ft.  
2 ft.  
305 mm  
610 mm  
1.2 m  
1 ft.  
2 ft.  
3 ft.  
4 ft  
305 mm  
610 mm  
914 mm  
1.2 m  
2 ft.  
4 ft  
610 mm  
1.2 m  
2.7 m  
3.7 m  
5.5 m  
4 ft  
9 ft.  
9 ft.  
2.7 m  
12 ft.  
18 ft.  
12 ft.  
18 ft.  
3.7 m  
6 ft.  
1.8 m  
5.5 m  
V2  
H1+ H2 = 18 ft (5.5 m) Maximum  
*No specic restrictions on this value EXCEPT  
V1+ V2 + H1+ H2 cannot exceed 50 ft (15.2 m)  
H1  
H2  
V1  
INSTALLED  
HORIZONTALLY  
Figure 7.12  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
31  
Download from Www.Somanuals.com. All Manuals Search And Download.  
3. Rear Vent - Horizontal Termination  
No Elbow  
H1 = 16 in. (406 mm) Maximum  
H1  
Figure 7.13  
One 45° Elbow  
DO NOT use a 45º elbow  
in corner installations. Use  
two 90º elbow instead.  
H1  
Figure 7.14  
32  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
3. Rear Vent - Horizontal Termination - (continued)  
H1 Maximum  
V1 Minimum  
152 mm  
H2 Maximum  
H1+ H2 Maximum  
Two Elbows  
1 ft.  
2 ft.  
3 ft.  
3 ft.  
3 ft.  
3 ft.  
3 ft.  
305 mm 6 in.  
1 ft.  
2 ft.  
305 mm  
1 ft  
3 ft.  
305 mm  
914 mm  
1.8 m  
610 mm 1 ft.  
914 mm 2 ft.  
914 mm 3 ft.  
914 mm 4 ft.  
914 mm 5 ft.  
914 mm 6 ft.  
305 mm  
610 mm  
914 mm  
1.2 m  
610 mm  
1.2 m  
2.1 m  
3 m  
4 ft  
6 ft.  
7 ft.  
9 ft.  
2.7 m  
10 ft.  
12 ft.  
15 ft.  
12 ft.  
15 ft.  
18 ft.  
3.7 m  
1.5 m  
3.7 m  
4.6 m  
4.6 m  
1.8 m  
5.5 m  
V1+ H1+ H2= 50 ft (15.2 m) Maximum H1= 3 ft (914 mm) Maximum  
*H1+ H2= 18 ft (5.5 m) Maximum  
V1  
H2  
H1  
Figure 7.15  
H1 Maximum  
V1 Minimum  
H2+ H3  
H1+ H2+ H3 Maximum  
Three Elbows  
6 in. 152 mm 6 in.  
152 mm 6 in. 152 mm  
1 ft.  
3 ft.  
6 ft.  
9 ft.  
12 ft.  
305 mm  
914 mm  
1.8 m  
1 ft. 305 mm  
3 ft. 914 mm  
3 ft. 914 mm  
3 ft. 914 mm  
1 ft.  
2 ft.  
3 ft.  
4 ft.  
305 mm  
610 mm  
914 mm  
1.2 m  
2 ft. 610 mm  
3 ft. 914 mm  
6 ft.  
9 ft.  
1.8 m  
2.7 m  
2.7 m  
3.7 m  
INSTALLED  
HORIZONTALLY  
V1+ H1+ H2+ H3= 40 ft (12.2 m) Maximum  
H1= 3 ft (94 mm) Maximum  
H1+ H2+ H3= 12 ft (3.7 m) Maximum  
H3  
H2  
V1  
H1  
Figure 7.16  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
33  
Download from Www.Somanuals.com. All Manuals Search And Download.  
4. Rear Vent - Vertical Termination  
One Elbow  
V1 Minimum  
H1 Maximum  
1 ft.  
305 mm  
610 mm  
914 mm  
1.2 m  
3 ft.  
5 ft.  
7 ft.  
8 ft  
914 mm  
2 ft.  
3 ft.  
4 ft.  
5 ft.  
1.5 m  
2.1 m  
2.4 m  
2.4 m  
1.5 m  
8 ft  
V1+ H1 = 40 ft (12.2 m) Maximum  
V1  
H1  
Figure 7.17  
V1 Minimum  
Back to Back 90° Elbows  
H1 + H2 Maximum  
Two Elbows  
3 ft.  
914 mm  
2 ft  
610 mm  
1.2 m  
6 ft.  
9 ft.  
1.8 m  
2.7 m  
3 m  
4 ft.  
5 ft.  
6 ft.  
1.5 m  
1.8 m  
10 ft.  
12 ft.  
3.7 m  
V1+ H1 + H2= 50 ft (15.2 m) Maximum  
H1+ H2= 16 ft (4.9 m) Maximum  
V2  
INSTALLED  
HORIZONTALLY  
H1  
H2  
Figure 7.18  
34  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
4. Rear Vent - Vertical Termination - (continued)  
H1 Maximum  
1 ft. 305 mm 1 ft.  
2 ft. 610 mm 2 ft.  
V1 Minimum  
H2  
H1+ H2 Maximum  
Three Elbows  
305 mm  
610 mm  
914 mm  
1.2 m  
1 ft. 305 mm  
3 ft. 914 mm  
2 ft.  
5 ft.  
610 mm  
1.5 m  
4.6 m  
3.4 m  
4.3 m  
5.2 m  
4 ft.  
5 ft.  
6 ft.  
8 ft.  
1.2 m  
1.5 m  
1.8 m  
2.4 m  
3 ft.  
4 ft.  
5 ft.  
6 ft.  
4 ft.  
6 ft.  
8 ft.  
9 ft.  
1.2 m  
1.8 m  
2.4 m  
2.7 m  
8 ft.  
11 ft.  
14 ft.  
17 ft.  
1.5 m  
V2  
1.8 m  
H1 = 8 ft (2.4 m) Max. V1+ V2+ H1+ H2= 50 ft (15.2 m) Max.  
H1+ H2= 17 ft (5.2 m) Max.  
H2  
V1  
Figure 7.19  
H1  
H1  
H2  
H3  
V1 Minimum  
H1+ H2+ H3 Maximum  
Three Elbows  
*
*
*
*
*
*
*
*
*
8 ft.  
9 ft.  
2.4 m  
2.7 m  
3.1 m  
4 ft.  
5 ft.  
6 ft.  
1.2 m  
1.5 m  
1.8 m  
10 ft.  
*No specic restrictions on this value EXCEPT  
V1+ H1+ H2+ H3 cannot exceed 50 ft. (15.2 m) Maximum  
H1+ H2+ H3 = 6 ft. (1.8 m) Maximum  
V1  
H3  
H1  
H2  
INSTALLED  
Figure 7.20  
HORIZONTALLY  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
35  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Vent Clearances and Framing  
8
A. Pipe Clearances to Combustibles  
B. Continue Adding Vent Components  
WARNING! Risk of Fire! Maintain air space clearance to  
vent. DO NOT pack insulation or other combustibles:  
WARNING! Risk of Fire! Installation of this appliance  
may require the use of heat shield 385-920 above the  
rst 900 elbow in the venting system.  
• Between ceiling restops  
• Between wall shield restops  
• Around vent system  
• The heat shield is required above the rst elbow if the  
clearance to combustible surface above is between  
three (3) and four (4) inches. A shield is not required for  
clearances greater than four inches. See Figure 8.2.  
Failure to keep insulation or other material away from  
vent pipe may cause over heating and re.  
COMBUSTIBLE  
SURFACE  
Note: Heat shields MUST overlap by a minimum of 1-1/2 in. (38 mm).  
DVP heat shield - designed to be used on a wall 4 in. to 7-1/4 in. (102 mm to 184  
mm) thick.  
‡ ,f wall thickness is less than 4 in. the e[isting heat shields must be field trimmed. ,f  
wall thickness is greater than 7-1/4 in. a DVP-HSM-B will be required.  
SLP heat shield - designed to be used on a wall 4-3/8 in. to 7-5/8 in. (111 mm to  
194 mm thick).  
HEAT  
3 in. MIN.  
(76 mm)  
SHIELD  
(Required for clearances  
between 3 and 4 inches.)  
‡ ,f wall thickness is less than 4-3/8 the e[isting heat shields must be field trimmed.  
,f wall thickness is greater than 7-5/8 in. a DVP-HSM-B will be required.  
(DVP-SLP Pipe Shown)  
Heat  
Shield  
3 in. (76 mm)  
top clearance *  
Heat  
3 in. (76 mm)  
top clearance  
Shield  
1 in. (25 mm)  
clearance around  
vertical sections  
1 in. (25 mm)  
clearance  
bottom & sides  
Wall  
Shield  
Firestop  
WALL  
Figure 8.2  
3 in. (76 mm)  
top clearance *  
Heat  
Shield  
Heat  
Shield  
• Fasten the shield in place using the four pilot holes  
provided in the part. The shield should be oriented such  
that the 13-1/8 inch dimension (longest dimension) is  
running in the same direction the elbow is pointing. The  
shield should be centered directly above the elbow, and  
positioned so that it creates a 1/2 inch airspace between  
the shield and the combustible surface. See Figure 8.3.  
1 in. (25 mm)  
clearance  
bottom & sides  
Wall  
Shield  
Firestop  
WALL  
* When using SLP pipe, minimum clearances from the vent pipe to combustible materi-  
als at wall shield firestops are:  
Top: 2-1/2 in. (64 mm)  
Bottom: 1/2 in. (13 mm)  
Sides: 1 in. (25 mm)  
Figure 8.1 Horizontal Venting Clearances To Combustible  
Materials  
36  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
C. Wall Penetration Framing  
COMBUSTIBLE SURFACE  
CORRECT  
INCORRECT  
Combustible Wall Penetration  
DIRECTION  
UP  
Whenever a combustible wall is penetrated, you must  
frame a hole for the wall shield restop(s). The wall shield  
restop maintains minimum clearances and prevents cold  
air inltration.  
HEAT SHIELD  
90º ELBOW  
• The opening must be framed on all four sides using the  
same size framing materials as those used in the wall  
construction.  
Figure 8.3  
• SLP pipe - A wall shield restop must be placed on each  
side of an interior wall. A minimum 1-1/2 in. (38 mm)  
overlap of attached heat shields must be maintained.  
• If the combustible materials are not in place at the  
time of install the elbow heat shield may be screwed  
to the exhaust pipe (see Figure 8.4). Cut the tabs as  
shown and bend down. Secure the heat shield to the  
pipe maintaining 3 inch to 4 inch between the pipe and  
shield.  
• DVP pipe - A wall shield restop is required on one side  
only on interior walls. If your local inspector requires a  
wall shield restop on both sides, then both wall shield  
restops must have a heat shield (refer to Section 16.B)  
attached to them.  
• See Section 10.M for information for regarding the in-  
stallation of a horizontal termination cap.  
SCREW  
Non-Combustible Wall Penetration  
If the hole being penetrated is surrounded by noncom-  
bustible materials such as concrete, a hole with diameter  
one inch greater than the pipe is acceptable.  
3 in.  
(76 mm)  
Whenever a non-combustible wall is penetrated, the wall  
shield restop is only required on one side and no heat  
shield is necessary.  
Figure 8.4  
10 in.  
12 in.  
12 in.  
C
D
10 in.  
B*  
A*  
A*  
B*  
28 in.  
C
D
43-3/4 in.  
42-3/4 in.  
27 in.  
* Shows center of vent framing hole for top or rear venting. The center of the  
hole is one (1) inch (25.4 mm) above the center of the horizontal vent pipe.  
Figure 8.5 Wall Penetration  
Note: When terminating horizontally off the top of the unit  
using SLP pipe, a 10 in. x 10 in. framing hole is required.  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
37  
D. Vertical Penetration Framing  
A ceiling restop MUST be used between  
oors and attics.  
DVP pipe only - Frame an opening 10 in.  
by 10 in. (254 mm by 254 mm) whenever  
the vent penetrates a ceiling/oor (see  
Figure 8.6).  
SLP pipe only - Frame opening 9 in. x 9  
in. (229 mm x 229 mm) whenever the vent  
penetrates a ceiling/oor (see Figure 8.6).  
ATTIC ABOVE  
• Frame the area with the same sized lumber  
as used in ceiling/oor joist.  
• The ceiling restop may be installed above or  
below the ceiling joists when installed with a  
attic insulation shield. It must be under joists  
between oors that are not insulated. Refer  
to Figure 8.7.  
A
• Secure with three fasteners on each side.  
WARNING! Risk of Fire! DO NOT pack insu-  
lation around the vent. Insulation must be kept  
back from the pipe to prevent overheating.  
A
A
PIPE  
DVP  
SLP  
10 in. (254 mm)  
9 in. (229 mm)  
Figure 8.6  
INSTALL ATTIC INSULATION SHIELDS  
BEFORE OR AFTER INSTALLATION OF VENT SYSTEM  
3 FASTENERS  
PER SIDE  
CEILING FIRESTOP  
CEILING FIRESTOP  
INSTALLED BELOW CEILING  
INSTALLED ABOVE CEILING  
Figure 8.7 Installing the Attic Shield  
38  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
E. Install Attic Insulation Shield  
BEND ALL TABS INWARD 90°  
TO MAINTAIN CLEARANCE  
AND PREVENT INSULATION  
FROM FALLING INSIDE  
WARNING! Fire Risk. DO NOT allow loose materials or  
insulation to touch vent. Hearth & Home Technologies  
Inc. requires the use of an attic shield.  
The National Fuel Gas Code ANSI Z223.1 and NFPA 54  
requires an attic shield constructed of 26 gauge minimum  
metal that extends at least 2 in. (51 mm) above insulation.  
BEND 3 TABS  
OUTWARD TO  
Attic shields must meet specied clearance and be se-  
FASTEN TO CEILING  
FIRESTOP-BEND  
REMAINING TABS  
INWARD 90 DEGREES  
TO MAINTAIN  
cured in place.  
Flat Ceiling Installation  
• Remove one shield from box.  
CLEARANCE  
INSERT 3  
SCREWS  
NOTICE: Cut previously installed batt insulation to make  
room for the attic insulation shield.  
• Wrap shield around pipe if pipe is already installed in  
area to be insulated.  
• Match the three holes in each side and fasten with three  
screws to form a tube.  
• Bend three tabs on the bottom of the shield outward to  
allow attachment to the ceiling restop.  
Figure 8.8 Attic Insulation Shield  
• Bend the remaining bottom tabs inward 90° to maintain  
the air space between the pipe and the shield. Set the  
shield on the ceiling restop and attach to the restop.  
• Bend all tabs inward 90° around the top of the shield.  
These tabs must be used to prevent blown insulation  
from getting between the shield and vent pipe, and to  
maintain air space clearance.  
Vaulted Ceiling Installation  
• Remove one shield from box.  
NOTICE: Cut previously installed batt insulation to make  
room for the attic insulation shield.  
• Cut the attic insulation shield (if application is for vaulted  
ceiling) to t your ceiling pitch. Snip cut edge to recreate  
1 in. bend tabs all the way around the bottom.  
• Wrap shield around pipe if pipe is already installed in  
area to be insulated.  
• Match the three holes in each side and fasten with three  
screws to form a tube.  
• Bend three tabs on the bottom of the shield outward to  
allow attachment to the ceiling restop.  
• Bend the remaining bottom tabs inward 90° to maintain  
the air space between the pipe and the shield. Set the  
shield on the ceiling restop and attach to the restop.  
• Bend all tabs inward 90° around the top of the shield.  
These tabs must be used to prevent blown insulation  
from getting between the shield and vent pipe, and to  
maintain air space clearance.  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
39  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Appliance Preparation  
9
NOTICE: Once the vent cap has been removed it CANNOT  
A. Top Vent  
be reattached.  
CAUTION! Risk of Cuts, Abrasions or Flying Debris.  
Wear protective gloves and safety glasses during instal-  
lation. Sheet metal edges are sharp.  
NOTICE: Once appliance is set up for top or rear venting,  
it CANNOT be changed at a later time.  
Figure 9.3 Fold the center parts of the retaining band up  
and use to remove the vent cap.  
Figure 9.1 Remove the elbow heat shield by removing  
the four screws holding it to the top of the appliance. Re-  
fer to Section 6B to determine if the elbow heat shield is  
required.  
Figure 9.4 Remove and discard the seal cap, insulation  
donut, insulation plug, and the insulation basket. Attach the  
rst vent section (it will snap into place). Slide the vent  
gasket onto the vent section and then, up against the ap-  
pliance. Secure the vent gasket to the appliance with two  
self-tapping screws found in the manual bag. Note: The  
vent gasket can found in the manual bag.  
Figure 9.2 Cut the metal retaining band and fold the sides  
out.  
Proceed to Section 9. C.  
40  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
NOTICE: Once the vent cap has been removed it CANNOT  
be reattached.  
B. Rear Vent  
NOTICE: Once appliance is set up for top or rear venting,  
it CANNOT be changed at a later time.  
Figure 9.7 Discard the seal cap, insulation plug and the  
insulation basket.  
Figure 9.5 Cut the metal retaining band.  
Figure 9.8 Attach the rst vent section (it will snap into  
place). Slide the vent gasket onto the vent section and then,  
up against the appliance. Secure the vent gasket to the  
appliance with two self-tapping screws found in the manual  
bag. Note: The vent gasket can found in the manual bag.  
Figure 9.6 Remove the seal cap.  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
41  
6. Bend out nailing tabs on each side making sure to keep  
C. Securing and Leveling the Appliance  
the nailing tabs ush with the framing.  
WARNING! Risk of Fire! Prevent contact with:  
7. Using a framing square, make sure that the sides of  
the appliance are square to the bottom as shown in  
Figure 9.10.  
• Sagging or loose insulation  
• Insulation backing or plastic  
• Framing and other combustible materials  
Block openings into the chase to prevent entry of blown-  
in insulation. Make sure insulation and other materials  
are secured.  
DO NOT notch the framing around the appliance  
standoffs.  
Failure to maintain air space clearance may cause  
overheating and re.  
NOTICE: Failure to ensure that the replace opening  
is square may result in the decorative front not tting  
properly.  
The diagram shows how to properly position, level, and  
secure the appliance (see Figure 9.9). Nailing tabs are pro-  
vided to secure the appliance to the framing members.  
90º  
1. Venting - refer to Vent Clearances and Framing (Section  
8) for hole location.  
2. When installing a LCOR or RCOR replace remove  
the nailing tab located on the side of the unit and  
reattach it to the front corner of the unit as shown in  
Figure 9.9 (R-COR).  
Figure 9.10 Proper Positioning and Leveling of an Appliance  
8. Secure the appliance to the framing by using nails  
or screws through the nailing tabs. It is acceptable to  
use plumber strap to secure the unit to the framing if  
necessary. See Figure 9.11. Be sure to maintain all  
clearances to combustible material.  
Figure 9.9 Attach Nailing Tab to Front Corner of Unit  
3. Place the appliance into position, making sure to  
maintain proper clearance to combustibles.  
NAILING TABS  
4. Level the appliance from side to side and front to back. It  
is acceptable to use wood shims under the appliance.  
Figure 9.11 Securing An Appliance  
5. Fasten the appliance to the oor using the pilot holes  
located at the bottom of the appliance.  
Note: Once appliance is setup for top or rear venting, it  
CANNOT be changed at a later time.  
42  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Installing Vent Pipe (DVP and SLP Pipe)  
10  
A. Assemble Vent Sections (DVP Pipe Only)  
Attach Vent to the Firebox Assembly  
Note: The end of the pipe sections with the lanced tabs will face  
toward the appliance.  
Attach the rst pipe section to the starting collar:  
• Lanced pipe end to the starting collar  
• Inner pipe over inner collar  
• Push the pipe section until all lanced tabs snap in place  
• Lightly tug on pipe to conrm it has locked.  
Commercial, Multi-family (Multi-level exceeding two sto-  
ries), or High-Rise Applications  
All outer pipe joints must be sealed with silicone with a  
minimum of 300ºF continuous exposure rating, including  
the slip section that connects directly to the horizontal ter-  
mination cap.  
Figure 10.1 High Temperature Silicone Sealant  
• Apply a bead of silicone sealant inside the female outer  
pipe joint prior to joining sections. See Figure 10.1  
A
Lances  
• Only outer pipes need to be sealed. All unit collar, pipe,  
slip section, elbow and cap outer ues shall be sealed  
in this manner, unless otherwise stated.  
WARNING! Risk of Fire or Explosion! DO NOT break  
silicone seals on slip sections. Use care when remov-  
ing termination cap from slip pipe. If slip section seals  
are broken during removal of the termination cap, vent  
may leak.  
B
Figure 10.3  
Figure 10.2  
Assemble Pipe Sections (DVP Pipe Only)  
Note: Make sure that the seams are not aligned to prevent  
unintentional disconnection.  
Per Figure 10.2:  
• Start the inner pipe on the lanced end of section A into  
the ared end of section B.  
• Start the outer pipe of section A over the outer pipe of  
section B.  
• Once both vents sections are started, push rmly until  
all lanced tabs lock into place.  
• Lightly tug on the pipe to conrm the tabs have locked.  
It is acceptable to use screws no longer than 1/2 in. (13  
mm) to hold outer pipe sections together. If predrilling holes,  
DO NOT penetrate inner pipe.  
CORRECT  
For 90° and 45° elbows that are changing the vent direction  
from horizontal to vertical, one screw minimum should be  
put in the outer ue at the horizontal elbow joint to prevent  
the elbow from rotating. Use screws no longer than 1/2  
in. (13 mm). If predrilling screw holes, DO NOT penetrate  
inner pipe.  
INCORRECT  
Figure 10.4 Seams  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
43  
Download from Www.Somanuals.com. All Manuals Search And Download.  
B. Assemble Vent Sections (SLP Pipe Only)  
C. Assemble Slip Sections  
To attach the rst vent component to the starting collars  
of the appliance:  
• Slide the inner ue of the slip section into the inner ue of  
the pipe section and the outer ue of the slip section over  
the outer ue of the pipe section. See Figure 10.6.  
• Attach a DVP-2SL adapter to the starting collar of the  
appliance.  
• Slide together to the desired length.  
• Lock the vent components into place by sliding the pipe  
section onto the collar.  
• Align the seam of the pipe and seam of collar to allow  
engagement. Rotate the vent component to lock into  
place. Use this procedure for all vent components. See  
Figure 10.5.  
• Slide the gasket over the rst vent section and place it  
ush to the appliance. This will prevent cold air inltration.  
Caulk with a minimum of 300ºF continuous exposure  
rating may be used to hold the part in place.  
Pilot hole  
• Continue adding vent components, locking each  
succeeding component into place.  
Figure 10.6 Slip Section Pilot Holes  
• Ensure that each succeeding vent component is securely  
tted and locked into the preceding component.  
• Maintain a 1-1/2 in. (38 mm) overlap between the slip  
section and the pipe section.  
• Secure the pipe and slip section with two screws no  
longer than 1/2 in. (13 mm), using the pilot holes in the  
slip section. See Figure 10.7.  
Commercial, Multi-family (Multi-level exceeding two sto-  
ries), or High-Rise Applications  
For Installation into a commercial, multi-family (multi-level  
exceeding two stories) or high-rise applications: All outer  
pipe joints must be sealed with high temperature silicone,  
including the slip section that connects directly to the hori-  
zontal termination cap.  
• Apply a bead of silicone sealant inside the female outer  
pipe joint prior to joining sections. See Figure 10.1.  
• Only outer pipes need to be sealed. All unit collar, pipe,  
slip section, elbow and cap outer ues shall be sealed  
in this manner, unless otherwise stated.  
WARNING! Risk of Fire or Explosion! DO NOT break  
silicone seals on slip sections. Use care when remov-  
ing termination cap from slip pipe. If slip section seals  
are broken during removal of the termination cap, vent  
may leak.  
Figure 10.7 Screws into Slip Section  
• Continue adding pipe as necessary following instructions  
in “Assembling Pipe Sections.”  
NOTICE: If slip section is too long, the inner and outer ues  
of the slip section can be cut to the desired length.  
NOTICE: When installing a vent system with an HRC  
termination cap, all pipe system joints shall be sealed using  
a high temperature silicone sealant.  
Apply a bead of silicone sealant inside the female outer  
pipe joint prior to joining sections.  
Note: Align seams to engage pipe,  
then rotate counterclockwise to lock  
Only outer pipes are sealed, sealing the inner ue is not  
Figure 10.5 Adding Venting Components  
required.  
All unit collar, pipe, slip section, elbow and cap outer  
ues shall be sealed.  
44  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
D. Secure the Vent Sections  
E. Disassemble Vent Sections  
• Vertical runs of DVP pipe must be supported every 8 ft.  
(2.44 m) after the 25 ft. (7.62 m) maximum unsupported  
rise.  
• Rotate either section (see Figure 10.10) so the seams  
on both pipe sections are aligned as shown in Figure  
10.11.  
• Vertical runs of SLP pipe must be supported every 8 ft.  
(2.44 m).  
• Pull carefully to separate the pieces of pipe.  
• Horizontal sections must be supported every 5 feet  
(1.52 m).  
• Vent supports or plumbers strap (spaced 120º apart)  
may be used to support vent sections. See Figures 10.8  
and 10.9.  
• Wall shield restops may be used to provide horizontal  
support to vent sections.  
• SLP ceiling restops have tabs that may be used to  
provide vertical support.  
WARNING! Risk of Fire, Explosion or Asphyxiation!  
Improper support may allow vent to sag and separate.  
Use vent run supports and connect vent sections per in-  
stallation instructions. DO NOT allow vent to sag below  
connection point to appliance.  
Figure 10.10 Rotate Seams for Disassembly  
120º  
Figure 10.11 Align and Disassemble Vent Sections  
Figure 10.8 Securing Vertical Pipe Sections  
120º  
Figure 10.9 Securing Horizontal Pipe Sections  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
45  
F. Install Decorative Ceiling Components  
(SLP only)  
LEVEL  
A decorative ceiling thimble can be installed on a at ceil-  
ing through which the vent passes. The decorative ceiling  
thimble is used to cover the restop.  
CATHEDRAL CEILING  
SUPPORT BOX  
• Seal the gap between the vent pipe and restop using  
silicone with a minimum of 300ºF continuous exposure  
rating to prevent cold air inltration.  
2 in. (51 mm) MIN. BELOW  
FINISHED CEILING  
• Install the decorative ceiling thimble by sliding it up to  
the ceiling and attaching it using the provided screws.  
Adecorative cathedral ceiling support box can be installed  
on a cathedral ceiling through which the vent passes.  
CUT HOLE 1/8 in. (3 mm)  
GREATER IN SIZE THAN  
PATTERN OF SUPPORT  
BOX AS IT IS PROJECTED  
ONTO ROOF LINE  
• Use a plumb-bob to mark the center line of the venting  
system on the ceiling and drill a small hole through the  
ceiling and roof at this point. Locate the hole and mark  
the outline of the cathedral ceiling support box on the  
outside roof.  
Figure 10.12  
• Remove shingles or other roof covering as necessary  
to cut the rectangular hole for the support box. Cut the  
hole 1/8 in. (3 mm) larger than the support box outline.  
• Lower the support box through the hole in the roof until its  
bottom is at least 2 in. (51 mm) below the ceiling (Figure  
10.12).  
• Level the support box both vertically and horizontally and  
temporarily tack it in place through the inside walls into  
the roof sheathing.  
• Use tin snips to cut the support box from the top corners  
down to the roof line and fold the resulting aps to the  
roof. See Figure 10.13.  
• Nail the aps to the roof AFTER running a bead of non  
hardening sealant between the aps and the roof.  
Figure 10.13  
WARNING! Risk of Fire! Clean out ALL materials from  
inside the support box and complete the vertical vent run  
and termination.  
46  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
G. Install Metal Roof Flashing  
• See minimum vent heights for various pitched roofs  
(Figure 10.14) to determine the length of pipe to extend  
through the roof.  
CAULK  
• Slide the roof ashing over the pipe sections extending  
through the roof as shown in Figure 10.15.  
HORIZONTAL  
OVERHANG  
2 FT.  
20 INCHES MIN.  
VERTICAL  
MIN.  
WALL  
LOWEST  
DISCHARGE  
OPENING  
Figure 10.15  
GAS DIRECT VENT  
TERMINATION CAP  
H. Assemble and Install Storm Collar  
X
CAUTION! Risk of Cuts, Abrasions or Flying Debris.  
Wear protective gloves and safety glasses during instal-  
lation. Sheet metal edges are sharp.  
12  
ROOF PITCH  
IS X/ 12  
• Connect both halves of the storm collar with two screws  
(see Figure 10.16).  
H (MIN.) - MINIMUM HEIGHT FROM ROOF  
TO LOWEST DISCHARGE OPENING  
• Wrap the storm collar around the exposed pipe section  
closest to the roof and align brackets. Insert a bolt  
(provided) through the brackets and tighten the nut to  
complete the storm collar assembly. Make sure the collar  
is tight against the pipe section.  
Roof Pitch  
H (Min.) Ft.  
Flat to 6/12........................................1.0*  
Over 6/12 to 7/12............................1.25*  
Over 7/12 to 8/12..............................1.5*  
Over 8/12 to 9/12..............................2.0*  
Over 9/12 to 10/12............................. 2.5  
Over 10/12 to 11/12......................... 3.25  
Over 11/12 to 12/12........................... 4.0  
Over 12/12 to 14/12........................... 5.0  
Over 14/12 to 16/12........................... 6.0  
Over 16/12 to 18/12........................... 7.0  
Over 18/12 to 20/12........................... 7.5  
Over 20/12 to 21/12........................... 8.0  
• Slide the assembled storm collar down the pipe section  
until it rests on the roof ashing (see Figure 10.17).  
• Caulk around the top of the storm collar (see Figure 10.18).  
* 3 foot minimum in snow regions  
Figure 10.14 Minimum Height From Roof To Lowest Discharge  
Opening  
Figure 10.16 Assembbling the Storm Collar  
NOTICE: Failure to properly caulk the roof ashing and  
pipe seams may permit entry of water.  
• Caulk the gap between the roof ashing and the outside  
diameter of the pipe.  
• Caulk the perimeter of the ashing where it contacts the  
roof surface. See Figure 10.15.  
• Caulk the overlap seam of any exposed pipe sections  
that are located above the roof line.  
Figure 10.17 Assembling the Storm Collar Around the Pipe  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
47  
I. Install Vertical Termination Cap  
K. Heat Shield Requirements for Horizontal  
Termination  
• Attach the vertical termination cap by sliding the inner  
collar of the cap into the inner ue of the pipe section  
while placing the outer collar of the cap over the outer  
ue of the pipe section.  
WARNING! Risk of Fire! To prevent overheating and re,  
heat shields must extend through the entire wall thick-  
ness.  
• Secure the cap by driving three self-tapping screws  
(supplied) through the pilot holes in the outer collar of the  
cap into the outer ue of the pipe (see Figure 10.18).  
DO NOT remove the heat shields attached to the  
wall shield restop and the horizontal termination cap  
(shown in Figure 10.20).  
• Heat shields must overlap 1-1/2 in. (38 mm) mini-  
mum.  
TERMINATION CAP  
There are two sections of the heat shield. One section  
is factory-attached to the wall shield restop. The other  
section is factory-attached to the cap. See Figure 10.20.  
If the wall thickness does not allow the required 1-1/2 in.  
(38 mm) heat shield overlap when installed, an extended  
heat shield must be used.  
• If the wall thickness is less than 4 in./102 mm (DVP)  
or 4-3/8 in./ 111 mm (SLP), the heat shields on the cap  
and wall shield restop must be trimmed. A minimum  
1-1/2 in. (38 mm) overlap MUST be maintained.  
(1 of 3)  
• Useanextendedheatshieldifthenishedwallthickness  
is greater than 7-1/4 in. (184 mm).  
STORM  
COLLAR  
• The extended heat shield may need to be cut to length  
maintaining sufcient length for a 1-1/2 in. (38 mm)  
overlap between heat shields.  
SCREWS  
CAULK  
• Attach the extended heat shield to either of the existing  
heatshieldsusingthescrewssuppliedwiththeextended  
heat shield. Refer to vent components diagrams in the  
back of this manual.  
Figure 10.18  
• Rest the small leg on the extended heat shield on top  
of the pipe section to properly space it from the pipe  
section.  
J. Install Decorative Wall Components (SLP  
only)  
A decorative wall thimble can be installed on wall through  
which the vent passes. The decorative wall thimble is used  
to cover the wall shield restop.  
Important Notice: Heat shields may not be eld constructed.  
• Slide the decorative wall thimble over the last section of  
horizontal pipe before connecting the termination cap to  
the pipe.  
• Once the pipe section and the termination cap have been  
connected, slide the wall thimble up to the interior wall  
surface and attach with screws provided. See Figure  
10.19.  
Figure 10.19 Wall Thimble  
48  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Note: When using termination caps with factory-supplied  
heat shield attached, no additional wall shield restop is  
required on the exterior side of a combustible wall.  
L. Install Horizontal Termination Cap (DVP  
and SLP Pipe)  
WARNING! Risk of Fire! The telescoping ue section of  
the termination cap MUST be used when connecting vent.  
• 1-1/2 (38 mm) minimum overlap of ue telescoping  
section is required.  
HEAT SHIELD OR  
HEAT SHIELD  
EXTENDED  
1-1/2 IN. (38 MM) MIN.  
HEAT SHIELD  
OVERLAP  
WALL SHIELD  
FIRESTOP  
Failure to maintain overlap may cause overheating and  
re.  
• Vent termination must not be recessed in the wall. Siding  
may be brought to the edge of the cap base.  
SLIP SECTION  
CAN BE EXTENDED  
• Flash and seal as appropriate for siding material at  
outside edges of cap.  
INNER VENT  
SHEATHING  
• When installing a horizontal termination cap, follow  
the cap location guidelines as prescribed by current  
ANSI Z223.1 and CAN/CGA-B149 installation codes  
and refer to Section 6 of this manual.  
OUTER VENT  
INTERIOR  
EXTERIOR  
VENT DEPTH FROM BACK OF APPLIANCE TO  
OUTSIDE SURFACE OF EXTERIOR WALL  
(SEE CHART BELOW)  
CAUTION! Risk of Burns! Local codes may require in-  
stallation of a cap shield to prevent anything or anyone  
from touching the hot cap.  
Figure 10.20 Venting through the wall  
NOTICE: For certain exposures which require superior  
resistance to wind-driven rain penetration, a ashing kit and  
HRC caps are available. When penetrating a brick wall, a  
brick extension kit is available for framing the brick.  
Cap Specication Chart  
(depth without using additional pipe sections)  
DVP-TRAPK1 DVP-TRAP1 DVP-TRAPK2 DVP-TRAP2  
Top Vent  
Depth  
Rear Vent  
Depth  
Top Vent  
Depth  
Rear Vent  
Depth  
2-7/8 in to  
4-3/4 in  
3-1/8 in.  
to 5 in.  
5-1/4 in. to  
9-1/4 in.  
5-1/2 in. to  
9-1/2 in.  
36 inch  
Multisided  
Series  
DVP-HPC1 DVP-HPC1  
DVP-HPC2 DVP-HPC2  
Top Vent  
Depth  
Rear Vent  
Depth  
Top Vent  
Depth  
Rear Vent  
Depth  
2-7/8 in.  
to 5 in.  
3-1/8 in.  
5-1/4 in.  
5 in. to  
9-1/8 in.  
5-1/4 in. to  
9-1/2 in.  
DVP-TRAP1 can adjust 1-1/2 in. (3-1/8 to 4-5/8 in.)  
DVP-TRAP2 can adjust 4 in. (5-3/8 to 9-3/8)  
DVP-HPC1 can adjust 2-1/8 in. (4-1/4 to 6-3/8)  
DVP-HPC2 can adjust 4-1/8 in. (6-3/8 to 10-1/2)  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
49  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Gas Information  
11  
A. Fuel Conversion  
C. Gas Connection  
• Make sure the appliance is compatible with available gas  
types.  
• Refer to Reference Section 16 for location of gas line  
access in appliance.  
• Conversions must be made by a qualified service  
technician using Hearth & Home Technologies specied  
and approved parts.  
• Gas line may be run through knockout(s) provided.  
• The gap between supply piping and gas access hole  
may be caulked with caulk with a minimum of 300ºF  
continuous exposure rating or stuffed with non-  
combustible, unfaced insulation to prevent cold air  
inltration.  
B. Gas Pressure  
• Optimum appliance performance requires proper input  
pressures.  
• Ensure that gas line does not come in contact with outer  
wrap of the appliance. Follow local codes.  
• Gas line sizing requirements will be determined in ANSI  
Z223.1 National Fuel Gas Code in the USA and CAN/  
CGA B149 in Canada.  
• Pipe incoming gas line into valve compartment.  
• Connect incoming gas line to the 1/2 in. (13 mm)  
connection on manual shutoff valve.  
• Pressure requirements are:  
WARNING! Risk of Fire or Explosion! Support control  
when attaching pipe to prevent bending gas line.  
Gas Pressure  
Minimum inlet pressure  
Maximum inlet pressure  
Manifold pressure  
Natural Gas  
5.0 in. w.c.  
14.0 in. w.c.  
3.5 in. w.c.  
Propane  
11.0 in. w.c.  
14.0 in. w.c.  
10.0 in. w.c.  
• A small amount of air will be in the gas supply lines.  
WARNING! Risk of Fire or Explosion! Gas build-up dur-  
ing line purge could ignite.  
WARNING! Risk of Fire/Explosion! High pressure will  
damage valve. Low pressure may cause explosion.  
• Purge should be performed by qualified service  
technician.  
• Ensure adequate ventilation.  
• Ensure there are no ignition sources such as sparks  
or open ames.  
• Verify inlet pressures. Verify minimum pressures when  
other household gas appliances are operating.  
• Install regulator upstream of valve if line pressure is  
greater than 1/2 psig.  
Light the appliance. It will take a short time for air to purge  
from lines. When purging is complete the appliance will  
light and operate normally.  
WARNING  
WARNING! Risk of Fire, Explosion or Asphyxiation!  
Check all ttings and connections with a non-corrosive  
commercially available leak-check solution. DO NOT use  
open ame. Fittings and connections could have loos-  
ened during shipping and handling.  
Fire Risk.  
Explosion Hazard.  
High pressure will damage valve.  
• Disconnect gas supply piping BEFORE  
pressure testing gas line at test pressures  
above 1/2 psig.  
WARNING! Risk of Fire! DO NOT change valve settings.  
This valve has been preset at the factory.  
• Close the manual shutoff valve BEFORE  
pressure testing gas line at test pressures  
equal to or less than 1/2 psig.  
D. High Altitude Installations  
NOTICE: If the heating value of the gas has been reduced,  
these rules do not apply. Check with your local gas utility  
or authorities having jurisdiction.  
Note: Have the gas supply line installed in accordance with  
local codes, if any. If not, follow ANSI 223.1. Installation  
should be done by a qualied installer approved and/or  
licensed as required by the locality. (In the Commonwealth  
of Massachusetts installation must be performed by a  
licensed plumber or gas tter).  
When installing above 2000 feet elevation:  
• In the USA: Reduce burner orice 4% for each 1000 feet  
above 2000 feet.  
• In the CANADA: Reduce burner orice 10% for elevations  
between 2000 feet and 4500 feet. Above 4500 feet,  
consult local gas utility.  
Note: A listed (and Commonwealth of Massachusetts ap-  
proved) 1/2 in. (13 mm) T-handle manual shut-off valve  
and exible gas connector are connected to the 1/2 inch  
(13 mm) control valve inlet.  
• If substituting for these components, please consult  
local codes for compliance.  
50  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Electrical Information  
12  
A. Wiring Requirements  
C. Optional Accessories Requirements  
NOTICE: This appliance must be electrically wired  
and grounded in accordance with local codes or, in the  
absence of local codes, with National Electric Code  
ANSI/NFPA 70-latest edition or the Canadian Electric  
Code CSA C22.1.  
• This appliance may be used with a wall switch, wall  
mounted thermostat and/or a remote control.  
Wiring for optional Hearth & Home Technologies approved  
accessories should be done now to avoid reconstruction.  
Follow instructions that come with those accessories.  
• Wire the appliance junction box to 110-120 VAC. This is  
required for proper operation of the appliance.  
D. Electrical Service and Repair  
• A 110-120 VAC circuit for this product must be pro-  
tected with ground-fault circuit-interrupter protection,  
in compliance with the applicable electrical codes,  
when it is installed in locations such as in bathrooms  
or near sinks.  
WARNING! Risk of Shock! Label all wires prior to dis-  
connection when servicing controls. Wiring errors can  
cause improper and dangerous operation. Verify proper  
operation after servicing.  
WARNING! Risk of Shock! Replace damaged wire with  
type 105° C rated wire. Wire must have high temperature  
insulation.  
• Low voltage and 110 VAC voltage cannot be shared  
within the same wall box.  
WARNING! Risk of Shock or Explosion! DO NOT wire  
110V to the valve or to the appliance wall switch. Incorrect  
wiring will damage controls.  
B. Intellire Ignition System Wiring  
• Wire the appliance junction box to 110 VAC for proper  
operation of the appliance.  
WARNING! Risk of Shock or Explosion! DO NOT wire  
IPI controlled appliance junction box to a switched circuit.  
Incorrect wiring will override IPI safety lockout.  
• Refer to Figures 12.1 and 12.2, Intellire Pilot Ignition  
(IPI) Wiring Diagram.  
• This appliance is equipped with an Intellire control valve  
which operates on a 3 volt system.  
• Plug the 3-volt AC transformer into the appliance junction  
box to supply power to the unit OR install two D cell  
batteries (not included) into the battery pack before use.  
NOTICE: Batteries should not be placed in the battery  
pack while using the transformer. Remove batteries before  
using the transformer, and unplug the transformer before  
installing the batteries. Battery polarity must be correct or  
module damage will occur.  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
51  
INTERMITTENT  
PILOT IGNITOR  
IGNITION  
MODULE 3 VAC  
I
S
TRANSFORMER  
3 VAC  
ORANGE  
WHITE  
GROUND TO  
FIREPLACE  
CHASSIS  
PLUG IN  
BLACK  
RED  
WIRES  
(TO BROWN)  
BATTERY PACK  
THERMOSTAT  
WIRE ASSEMBLY  
VALVE  
Figure 12.1 Intellire Ignition Wiring Diagram with Wall Switch or Thermostat  
INTERMITTENT  
PILOT IGNITOR  
IGNITION  
MODULE 3 VAC  
NOTE: 1. Ignition module, valve, pilot, and  
wall switch operate on 3 volts. 120 VAC is  
required at junction box unless equipped  
with battery back-up.  
I
S
TRANSFORMER  
3 VAC  
ORANGE  
WHITE  
GROUND TO  
FIREPLACE  
CHASSIS  
PLUG IN  
WIRES  
(TO BROWN)  
BATTERY PACK  
REMOTE  
PLUG IN  
VALVE  
Figure 12.2 Intellire Ignition Wiring Diagram with Remote Receiver  
52  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
E. Junction Box Installation  
The junction box must be wired from the INSIDE of the  
appliance:  
• Determine which side of the appliance the junction box  
is located on.  
ROMEX CONNECTORS  
• Pull the electrical wires from outside the appliance through  
the knockout making sure to use a Romex connector to  
fasten the electrical wires to the unit.  
• Pull enough wire into the valve compartment to easily reach  
the junction box location.  
• Remove the screw attaching the junction box to the junction  
box bracket and set it aside.  
• Route the wire through the knockout in the junction box  
bracket.  
• Wire the junction box and reattach it to the bracket by  
inserting the tab in the slot and attaching with screw  
previously removed. Ensure that a Romex connector is  
used to attach the electrical wires to the junction box.  
NOTICE: DO NOT wire  
110 VAC to wall switch.  
Figure 12.3 Junction Box Detail  
F. Wall Switch Installation for Fan (Optional)  
If the box is being wired to a wall mounted switch for use  
with a fan (See Figure 12.4):  
SWITCH  
MINIMUM 14-3 AWG  
WITH GROUND  
• The power supply for the appliance must be brought into  
a switch box.  
RED  
BLACK  
WHITE  
GREEN  
BLACK  
WHITE  
GREEN  
JUNCTION BOX  
• The power can then be supplied from the switch box to  
the appliance using a minimum of 14-3 with ground wire.  
POWER  
SUPPLY  
WIRES  
• At the switch box connect the black (hot) wire and red  
(switch leg) wire to the wall switch as shown.  
SWITCH BOX  
• At the appliance connect the black (hot), white (neutral)  
and green (ground) wires to the junction box as shown.  
KNOCKOUT  
RED  
• Add a 1/4 in. insulated female connector to the red (switch  
leg) wire, route it through the knockout in the face of the  
junction box, and connect to the top fan switch connector  
(1/4 in. male) as shown.  
Figure 12.4 Junction Box Wired to Wall Switch  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
53  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Finishing  
13  
A. Splatter Guard  
The splatter guard is a piece of corrugated material  
used to protect the appliance during the installation  
process before nishing work on the whole hearth is  
complete. Splatter guards may be factory installed or  
accompany the door of the unit, depending on the re-  
place model. Splatter guards must be removed before  
appliance is red.  
WARNING! Risk of Fire! Close the ball valve before in-  
stalling the splatter guard to prevent accidental lighting.  
Remove the splatter guard before lighting the appliance.  
Step 1. Turn off gas to valve. Red gas shutoff knob is  
located on ball valve. Disconnect the 3 volt transformer  
from the junction box. See Figure 13.1.  
Figure 13.3 Folding of Right and Left Sides of Splatter Guard  
Step 4. Center the splatter guard in front of the unit as  
shown in Figure 13.3. Place the splatter guard in the unit  
by guiding the top ap into proper position and then con-  
tinuing to guide the tabs on the side aps into the top slot  
on the left and right sides of the appliance. The top slot  
is indicated in Figure 13.5 Take care not to bend or break  
off the tabs.  
Figure 13.1  
To install the Splatter Guard:  
Step 2. Crease ap on top side of splatter guard using  
the scored line as the guide. See Figure 13.2.  
Figure 13.4 Installation of Splatter Guard  
TOP SLOT  
Figure 13.2  
Step 3. Crease aps on left and right sides of splatter guard  
using the scored line as the guide. See Figure 13.3.  
Figure 13.5 Top slot  
54  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Step 5. Fold bottom ap along score line as indicated in  
Figure 13.6 and tuck into valve access area of appliance.  
Splatter guard should t securely on front of unit.  
Figure 13.9 Securing Tabs Inside Front of Splatter Guard  
Once plumbing and wiring are complete on the replace,  
the lower access panel may be closed until the time that the  
splatter guard must be removed for ring the appliance.  
Figure 13.6 Folding Bottom Flap  
Figure 13.10 Splatter Guard with Lower Access Panel Open  
To Close the Lower Access Panel:  
Figure 13.7 Prepare to Open Lower Access Panel  
Carefully disengage the tabs from the square holes and  
bend the access panel to its original position. Bend the  
center bottom ap and insert it into the bottom of the ap-  
pliance.  
Step 6. To open lower access panel of splatter guard, place  
one hand above score line and place two ngers from other  
hand in the round holes on the front of the splatter guard.  
See Figure 13.7. Pull out and fold up the panel as shown  
in Figure 13.8. Disengage the tabs on left and right bottom  
of splatter guard and t them into the square holes. The  
tabs are now inside the front of the splatter guard; carefully  
bend them down. See Figure 13.9.  
Figure 13.11 Splatter Guard with Lower Access Panel Closed  
To Remove the Splatter Guard:  
Carefully grab splatter guard on or near the vertical center  
on the left and right sides. Pull outward gently, but rmly,  
taking care not to tear or remove the inserted tabs.  
Figure 13.8 Opening Lower Access Panel  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
55  
B. Mantel and Wall Projections  
See-Through Mantel Projection  
WARNING! Risk of Fire! Comply with all minimum clear-  
ances as specied. Framing closer than the minimums list-  
ed must be constructed entirely of noncombustible materi-  
als (i.e., steel studs, concrete board, etc.) Failure to comply  
could cause re.  
TO CEILING  
MAX.  
Note: All  
measurements  
in inches.  
18  
See-Through Mantel Projection  
12  
11  
TO CEILING  
32  
Note: All  
measurements  
MAX.  
18  
MIN.  
in inches.  
10  
9
12  
12  
11  
10  
6
32  
5
9
8
8
25  
4
7
3
19  
7
6
2
18  
5
17  
1
6
4
16  
3
15  
MEASUREMENTS FROM  
TOP EDGE OF THE OPENING  
MIN.  
14  
13  
Figure 13.14 Minimum Vertical and Maximum Horizontal  
Dimensions of Non-Combustibles  
12  
2-1/2  
11  
10  
5
MEASUREMENTS FROM  
TOP EDGE OF THE OPENING  
PIER/LCOR/RCOR Mantel Projection  
Figure 13.12 Minimum Vertical and Maximum Horizontal  
Dimensions of Combustibles  
TO CEILING  
MAX.  
PIER/LCOR/RCOR Mantel Projection  
12  
Note: All  
measurements  
in inches.  
TO CEILING  
Note: All  
MAX.  
measurements  
in inches.  
10  
9
18  
12  
11  
32  
10  
8
32  
9
MIN.  
8
25  
12  
7
7
19  
6
6
10  
18  
5
17  
9
4
16  
8
3
15  
7
MIN.  
6
14  
13  
4
12  
1
11  
MEASUREMENTS FROM  
TOP EDGE OF THE OPENING  
10  
5
Figure 13.15 Minimum Vertical and Maximum Horizontal  
Dimensions of Non-Combustibles  
MEASUREMENTS FROM  
TOP EDGE OF THE OPENING  
Figure 13.13 Minimum Vertical and Maximum Horizontal  
Dimensions of Combustibles  
56  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
D. Finishing Material  
Only doors certied for use with this appliance model may  
be used. Contact your dealer for a list of doors that may  
be used. Once you have determined what kind of door  
and nishing material is going to be used on the replace,  
you may use the table below which shows the door mod-  
els and the nishing material thickness allowed. For an  
inside t there is an available template to assist with siz-  
ing the nishing material.  
1/2 in.  
Min.  
TOP VIEW  
FIREPLACE  
OPENING  
2-3/4  
in. Min.  
Unlimited  
1 in.  
Max.  
ST-36TRB-IPI  
3-1/4 in. Min.  
FINISH MATERIAL  
DOOR  
FIT  
MAXIMUM  
THICKNESS  
SEE FIGURE  
Note: Clearance from opening to perpendicular wall.  
Aero  
Folio  
Inside  
Inside  
Any  
Any  
13.18  
13.18  
13.19  
13.20  
13.19  
13.21  
13.19  
13.20  
13.19  
13.20  
13.19  
13.21  
Figure 13.16 Combustible Mantel Leg or Wall Projections  
(Acceptable on both sides of opening)  
Overlap  
Inside  
1 inch  
Arcadia  
Halston  
Chateau  
Valencia  
Galleria  
Any  
C. Facing Material  
Overlap  
Inside  
1 inch  
• Metal front faces may be covered with non-combustible  
materials only.  
1 inch - 2 inch  
1 inch  
Overlap  
Inside  
Any  
• Facing and/or nishing materials must not interfere with  
air ow through louvers, operation of louvers or doors,  
or access for service.  
Overlap  
Inside  
1 inch  
Any  
Overlap  
Inside  
1 inch  
• Facing and/or nishing materials must never overhang  
into the glass opening.  
1 inch - 2 inch  
• Observe all clearances when applying combustible  
materials.  
PIER-36TRB-IPI  
FINISH MATERIAL  
MAXIMUM  
DOOR  
FIT  
SEE FIGURE  
• Seal joints between the nished wall and appliance top  
and sides using a 300 °F minimum sealant. Refer to  
Figure 13.17.  
THICKNESS  
Aero  
Inside  
Inside  
Inside  
Any  
Any  
Any  
13.22  
13.22  
13.22  
Chateau  
Arcadia  
WARNING! Risk of Fire! DO NOT apply combustible  
materials beyond the minimum clearances. Comply with  
all minimum clearances to combustibles as specied in  
this manual. Overlapping materials could ignite and will  
interfere with proper operation of doors and louvers.  
Finish wall material may be  
combustible - Top and Sides  
DOOR  
FINISHING MATERIAL  
4 IN. MAXIMUM THICKNESS  
FINISHING MATERIAL  
4 IN. MAXIMUM THICKNESS  
0 in.  
Stop nishing material ush with opening.  
Figure 13.18 Folio Door and Aero  
FRONT FACE OF FIREPLACE  
0 in.  
0 in.  
1 in. MAX  
FINISHING MATERIAL  
(TOP EDGE)  
High Temperature Sealant (300° F/149° C min.)  
Top and Side Seal Joint  
DOOR  
Finishing materials 1 inch maximum thick.  
Figure 13.17 Noncombustible Facing Diagram  
Stop nishing material ush with opening.  
Figure 13.19 Overlap Fit Door  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
57  
Download from Www.Somanuals.com. All Manuals Search And Download.  
FINISHING  
MATERIAL  
FINISHING  
MATERIAL  
FINISHING  
MATERIAL  
DOOR  
37 in.  
(Outside door width)  
37-1/4 in.  
(Includes 1/8 in. opening each side of door)  
33-3/4 in.  
(Inside door height)  
33-5/8 in.  
34 in.  
37 in.  
(Outside door width)  
37-1/4 in.  
(Includes 1/8 in. opening each side of door)  
37-1/4 in.  
Finishing materials over 1 inch thick.  
Figure 13.22 Pier Door Finishing  
Figure 13.20 Inside t door  
FINISHING  
MATERIAL  
FINISHING  
MATERIAL  
*IF FINISHING MATERIAL IS THICKER THAN  
2 IN., DOORS WILL ONLY OPEN  
AS FAR AS PICTURED  
DOORS  
37-1/4 IN.  
Finishing material between 1 and 2 inches thick.  
Figure 13.21 Operable hinge door  
58  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
E. Elevated Hearth Systems  
Use the table below to identify the hearth system that will be used. The table will also help identify effects on the various  
dimensions. Some hearth systems will elevate the appliance off the oor at a given dimension. For example, if appliance  
will be used with a Kenwood Cabinet with Base, the appliance will be elevated 9-1/4 inches. The 9-1/4 inch elevation  
will also have to be added to the following: Extension Wall Hole referenced in Figure 8.2 (Exterior Wall Hole) and Rough  
Opening Height (header height) referenced in Figure 5.2. Note: Finished oor thickness should also be considered when  
determining installation dimensions.  
ELEVATED APPLIANCE  
DIMENSION  
MARBLE LEG CUT  
LENGTH  
MODEL  
DESCRIPTION  
KENWOOD MANTEL  
PART #  
See Note 1  
See Note 2  
AFKDMPB  
0 (See Note 3)  
27-3/8 in.  
29-3/8 in.  
N/A  
KENWOOD MANTEL W/ BASE  
LAURENT SURROUND  
AFKDMPB W/ HTKDMPB  
LAURENT-36  
9-1/4 in.  
1-1/2 in.  
0
CAMDEN SURROUND  
CAM36PG  
N/A  
CAMDEN SURROUND W/HEARTH  
CAMDEN SURROUND W/MANTEL  
CAM36PGH  
1-3/4 in.  
0
N/A  
CAMM36PG  
N/A  
CAMDEN SURROUND W/MANTEL &  
HEARTH  
CAMM36PGH  
1-3/4 in.  
N/A  
ESSEX SURROUND  
ESSEX36PG  
ESSEX36PGH  
ESSEXM36PG  
0
1-3/4 in.  
0
N/A  
N/A  
N/A  
ESSEX SURROUND W/HEARTH  
ESSEX SURROUND W/MANTEL  
ESSEX SURROUND W/MANTEL &  
HEARTH  
ESSEXM36PGH  
1-3/4 in.  
N/A  
MONROE SURROUND  
MON36PG  
0
1-3/4 in.  
0
N/A  
N/A  
N/A  
MONROE SURROUND W/HEARTH  
MONROE SURROUND W/MANTEL  
MON36PGH  
MONM36PG  
MONROE SURROUND W/MANTEL &  
HEARTH  
MONM36PGH  
1-3/4 in.  
N/A  
Note 1. Add dimensions to Exterior Wall Hole (Figure 8.2) and Rough Opening Height (Figure 5.2).  
Note 2. Verify Marble Cut Lengths on site prior to cutting.  
Note 3. Dimensions assume use of a 3/4 in. Hearth Pad.  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
59  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Appliance Setup  
14  
A. Remove Fixed Glass Assembly  
E. Lava Rock and Glowing Ember Placement  
See Section 14G.  
WARNING! Risk of Explosion! Follow ember placement  
instructions in manual. DO NOT place embers directly over  
burner ports. Replace ember material annually. Improperly  
placed embers interfere with proper burner operation.  
B. Remove the Shipping Materials  
Remove shipping materials from inside or underneath the  
rebox.  
Placing the Ember Material  
C. Clean the Appliance  
Ember material is shipped with this gas appliance. To place  
the ember material:  
Clean/vacuum any sawdust that may have accumulated  
inside the rebox or underneath in the control cavity.  
• Embers CANNOT be placed directly over ports. Care  
should be taken not to cover the lighting trail of ports  
(from back to front).  
• When placing Glowing Embers® onto the burner care  
should be taken so that the ports are not covered. Place  
the dime-size ember pieces just in front of the port trail,  
but not on or in between the ports (see Figure 14.1).  
Failure to follow this procedure will likely cause lighting  
and sooting problems.  
D. Accessories  
Install approved accessories per instructions included  
with accessories. Contact your dealer for a list of ap-  
proved accessories.  
WARNING! Risk of Fire and Electric Shock! Use ONLY  
Hearth & Home Technologies-approved optional acces-  
sories with this appliance. Using non-listed accessories  
could result in a safety hazard and will void the warranty.  
DO NOT PLACE EMBERS  
IN THE CIRCLED AREAS  
PILOT LOCATED HERE  
Figure 14.1 Placement of Embers  
• Place Glowing Embers on top of the log attachment  
tabs to conceal their location. Ensure that the Glowing  
Embers do not obstruct the port trail.  
• Place Lava Rock on areas of base pan away from the  
burner. Use this material to give the appliance a realistic  
ash bed.  
• Save the remaining ember materials for use during  
appliance servicing. The embers provided should be  
enough for 3 to 5 applications.  
60  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
F. Install the Log Assembly  
Log Set Assembly: LOGS-2128  
Models: ST-36TRB-IPI, PIER-36TRB-IPI  
ST-36TVB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI  
CAUTION: DO NOT reposition logs that have been  
factory installed! Follow these instructions to position  
the logs that were packaged separately.  
2
1
3
PILOT  
B
D
C
A
Figure 1. Log Assembly Location  
Figure 2. Factory Installed Logs  
STEP 1. CAUTION! Logs are fragile! Carefully remove the logs and cardboard tray from the inside of the replace.  
See Figure 1. Remove the microfoam and inspect the logs for damage. Inspect the four factory installed logs for damage.  
Locate the pilot in order to verify your position in relation to the appliance. See Figure 2.  
HUMP  
NOTCH  
1
1
C
A
Figure 3. Placement of Log #1  
Figure 4. Placement of Log #1  
STEP 2. Log #1 (SRV2128-704): Mate the notch on the end of log # 1 with the hump on top of log A. Set the other  
end of Log #1 onto the smooth area on top of Log C.  
2128-935  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
61  
Download from Www.Somanuals.com. All Manuals Search And Download.  
GRATE TINES  
1
2
B
C
2
D
A
Figure 5. Placement of Log #2  
Figure 6. Placement of Log #2  
STEP 3. Log #2 (SRV2128-705): The Y-shaped end of log #2 should rest on log B and log C. The other end should  
come in contact with the second grate tine from the left. Mate the bottom of log # 2 with the notches on top of log B and the  
smooth area on top of the end of log C.  
GRATE TINES  
PILOT  
1
3
3
B
C
2
INDENTATIONS  
A
D
2
Figure 7. Placement of Log #3  
Figure 8. Placement of Log #3  
STEP 4. Log #3 (SRV2128-707): The bottom end of log #3 should come in contact with the far left grate tine. Mate  
the bottom of log # 3 with the indentations on Log D and the top of Log #2.  
62  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
G. Fixed Glass Assembly  
H. Install Trim Kits and Surrounds  
WARNING! Risk of Asphyxiation! Handle xed glass  
assembly with care. Inspect the gasket to ensure it is  
undamaged and inspect the glass for cracks, chips or  
scratches.  
• Install optional trim kits and/or surrounds using the  
instructions included with the accessory.  
• Use non-combustible materials to cover the gap between  
the sheet rock and the appliance (when applicable to the  
model).  
DO NOT strike, slam or scratch glass.  
DO NOT operate replace with glass removed, cracked,  
broken or scratched.  
I. Air Shutter Setting  
This appliance has an adjustable air shutter (which con-  
trols the primary air) factory set for the minimum vertical  
vent run (see Figure 12.15). If your installation has more  
than the minimum required vertical vent length, adjust-  
ment of the air shutter may be necessary to obtain opti-  
mal ame appearance. This should be adjusted by a  
qualied installer at the time of installation.  
Replace as a complete assembly.  
Removing Fixed Glass Assembly  
• Pull the four glass latches out of the grooves on the glass  
frame top and bottom.  
• Remove the glass door from the appliance.  
By pushing the air shutter handle towards the pilot, you will  
be closing the air shutter. To adjust loosen the wing nut.  
Care should be taken when adjusting the air shutter so as  
not to cause the appliance to soot. If sooting occurs the air  
shutter will need to be opened by pushing the handle away  
from the pilot. When nished tighten wing nut.  
• Multiple sides may be able to be removed based upon  
model.  
Replacing Fixed Glass Assembly  
• Replace the glass door on the appliance.  
• Pull out the four glass latches and place in the grooves  
on the glass frame top and bottom.  
NOTICE: If sooting occurs, provide more air by opening  
the air shutter.  
• Make sure all sides are replaced properly.  
AIR SHUTTER  
OPEN  
CLOSED  
LATCHES  
BOTH BOTTOM  
AND TOP)  
GLASS  
ASSEMBLY  
Figure 14.3 Fixed Glass Assembly  
Figure 14.4 Air Shutter  
Air Shutter Settings  
NG  
LP  
Burner  
1/8 in.  
Fully open  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
63  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Troubleshooting  
15  
With proper installation, operation, and maintenance your gas appliance will provide years of trouble-free service. If you  
do experience a problem, this troubleshooting guide will assist a qualied technician in the diagnosis of a problem and the  
corrective action to be taken. This troubleshooting guide can only be used by a qualied technician. Contact your dealer to  
arrange a service call by a qualied technician.  
A. Intellire Ignition System  
Symptom  
Possible Cause  
Corrective Action  
1. Pilot won’t light.  
The ignitor/module  
makes noise, but no  
spark.  
a. Incorrect wiring.  
Verify “S” wire (white) for sensor and “I” wire (orange) for ignitor  
are connected to correct terminals on module and pilot assembly.  
b. Loose connections or electrical  
shorts in the wiring.  
Verify no loose connections or electrical shorts in wiring from mod-  
ule to pilot assembly. Verify connections underneath pilot assembly  
are tight; also verify connections are not grounding out to metal  
chassis, pilot burner, pilot enclosure, mesh screen if present, or  
any other metal object.  
c. Ignitor gap is too large.  
d. Module.  
Verify gap of igniter to right side of pilot hood. The gap should be  
approximately .17 in. or 1/8 in. (3 mm).  
Turn ON/OFF rocker switch or wall switch to OFF position. Remove  
ignitor wire “I” from module. Place a grounded wire about 3/16 in. (5  
mm) away from “I” terminal on module. Place ON/OFF rocker switch  
or wall switch in ON position. If there is no spark at “I” terminal  
module must be replaced. If there is a spark at “I” terminal, module  
is ne. Inspect pilot assembly for shorted sparker wire or cracked  
insulator around electrode. Replace pilot if necessary.  
2. Pilot won’t light,  
there is no noise or  
spark.  
a. No power or transformer installed  
incorrectly.  
Verify that transformer is installed and plugged into module. Check  
voltage of transformer under load at spade connection on module  
with ON/OFF switch in ON position. Acceptable readings of a good  
transformer are between 3.2 and 2.8 volts AC.  
b. A shorted or loose connection in  
wiring conguration or wiring har-  
ness.  
Remove and reinstall the wiring harness that plugs into module.  
Verify there is a tight t. Verify pilot assembly wiring to module. Re-  
move and verify continuity of each wire in wiring harness. Replace  
any damaged components.  
c. Improper wall switch wiring.  
d. Module not grounded.  
Verify that 110/VAC power is “ON” to junction box.  
Verify black ground wire from module wire harness is grounded to  
metal chassis of appliance.  
e. Module.  
Turn ON/OFF rocker switch or wall switch to OFF position. Re-  
move ignitor wire “I” from module. Place ON/OFF rocker switch  
or wall switch in ON position. If there is no spark at “I” terminal  
module must be replaced. If there is a spark at “I” terminal, module  
is ne. Inspect pilot assembly for shorted sparker wire or cracked  
insulator around electrode.  
3. Pilot sparks, but  
Pilot will not light.  
a. Gas supply.  
Verify that incoming gas line ball valve is “open”. Verify that inlet  
pressure reading is within acceptable limits, inlet pressure must not  
exceed 14 in. W.C.  
b. Ignitor gap is incorrect.  
c. Module is not grounded.  
Verify that spark gap from ignitor to pilot hood is .17 in. or 1/8 in (3 mm).  
Verify module is securely grounded to metal chassis of appliance.  
d. Module voltage output / Valve/Pilot Verify battery voltage is at least 2.7 volts. Replace batteries if volt-  
solenoid ohms readings. age is below 2.7.  
64  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Intellire Ignition System - (continued)  
Symptom  
Possible Cause  
Corrective Action  
a. A shorted or loose connection in ame  
Verify all connections to wiring diagram in manual. Verify  
connections underneath pilot assembly are tight. Verify  
connections are not grounding out to metal chassis, pilot  
burner, pilot enclosure or screen if present, or any other  
metal object.  
4. Pilot lights but contin-  
ues to spark, and main  
burner will not ignite.  
(If the pilot continues  
to spark after the  
pilot ame has been lit,  
ame rectication has  
not occurred.)  
sensing rod.  
b. Poor ame rectication or contaminated With xed glass assembly in place, verify that ame is  
ame sensing rod.  
engulng ame sensing rod on left side of pilot hood. Flame  
sensing rod should glow shortly after ignition. Verify correct  
pilot orice is installed and gas inlet is set to pressure  
specications. Polish ame-sensing rod with ne steel wool  
to remove any contaminants that may have accumulated on  
ame sensing rod.  
c. Module is not grounded.  
Verify module is securely grounded to metal chassis of  
appliance. Verify that wire harness is rmly connected to  
the module.  
d. Damaged pilot assembly or contami-  
Verify that ceramic insulator around the ame sensing  
rod is not cracked, damaged, or loose. Verify connection  
from ame sensing rod to white sensor wire. Polish ame-  
sensing rod with ne steel wool to remove any contaminants  
that may have accumulated on ame sensing rod. Verify  
continuity with a multimeter with ohms set at lowest range.  
Replace pilot if any damage is detected.  
nated ame sensing rod.  
e. Module.  
Turn ON/OFF rocker switch or wall switch to OFF position.  
Remove ignitor wire “I” from module. Place ON/OFF rocker  
switch or wall switch in ON position. If there is no spark at  
“I” terminal module must be replaced. If there is a spark at  
“I” terminal, module is ne.  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
65  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Reference Materials  
16  
A. Appliance Dimension Diagram  
Dimensions are actual appliance dimensions. Use for reference only. For framing dimensions and clearances refer to Section 5.  
Ø K  
L
ELECTRICAL  
M
ACCESS  
Ø K  
N
C
O
D
J
GAS LINE  
ACCESS  
F
i
E
A
P
G
H
B
FRONT VIEW  
RIGHT VIEW  
LEFT VIEW  
Location  
Inches Millimeters  
Location  
Inches  
Millimeters  
914  
I
1-1/2  
27  
38  
A
B
C
D
E
F
36  
J
686  
203  
305  
241  
965  
880  
610  
42-1/2  
24-1/2  
33-1/2  
1
1080  
622  
K
L
8
12  
851  
M
N
O
P
9-1/2  
38  
25  
2-1/8  
4-1/8  
4-1/4  
54  
34-5/8  
24  
G
H
105  
108  
Figure 16.1 See-Through Dimensions  
66  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Ø K  
L
ELECTRICAL  
ACCESS  
M
Ø K  
N
C
O
D
J
GAS LINE  
ACCESS  
F
i
E
A
P
G
H
B
FRONT VIEW  
RIGHT VIEW  
LEFT VIEW  
Location  
Inches Millimeters  
Location  
Inches  
36  
Millimeters  
914  
I
1-1/2  
27  
38  
A
B
C
D
E
F
J
686  
203  
305  
241  
965  
880  
610  
40-1/2  
24-1/2  
33-1/2  
1
1029  
622  
K
L
8
12  
851  
M
N
O
P
9-1/2  
38  
25  
2-1/8  
4-1/8  
4-1/4  
54  
34-5/8  
24  
G
H
105  
108  
Figure 16.2 Pier Dimensions  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
67  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Ø K  
N
L
ELECTRICAL  
ACCESS  
M
Ø K  
O
C
P
D
J
GAS LINE  
ACCESS  
F
i
E
A
G
H
B
FRONT VIEW  
RIGHT VIEW  
LEFT VIEW  
Location  
Inches Millimeters  
Location  
Inches  
36  
Millimeters  
914  
I
1-1/2  
27  
38  
A
B
C
D
E
F
J
686  
203  
305  
241  
622  
965  
880  
40-1/2  
24-1/2  
33-1/2  
1
1029  
622  
K
L
8
12  
851  
M
N
O
P
9-1/2  
24-1/2  
38  
25  
2-1/8  
4-1/8  
4-1/4  
54  
G
H
105  
34-5/8  
108  
Figure 16.3 LCOR, RCOR Dimensions  
68  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
B. Vent Components Diagrams  
Effective Length  
Pipe  
10-1/2 in.  
(267 mm)  
Inches  
4
Millimeters  
102  
°
45  
DVP4  
Effective  
Height/Length  
DVP6  
6
12  
152  
305  
DVP12  
DVP24  
DVP36  
DVP48  
DVP6A  
4-7/8 in.  
( 276 mm)  
24  
610  
36  
914  
10-7/8 in.  
(276 mm)  
48  
1219  
76 to 152  
DVP Pipe (see chart)  
3 to 6  
°
DVP45 (45 Elbow)  
DVP12A 3 to 12 76 to 305  
DVP12MI 3 to 12 76 to 305  
DVP24MI 3 to 24 76 to 610  
11-3/8 in.  
(289 mm)  
10 in.  
(254 mm)  
1 in.  
(25 mm)  
7-3/8 in.  
(187 mm)  
1-1/4 in. (32 mm)  
10 in.  
(254 mm)  
9-1/4 in.  
(235 mm)  
Assembled  
Height: 24 in./610 mm  
Diameter: 10 in./254 mm  
1/2 in. TYP  
(13 mm)  
13-1/4 in.  
(337 mm)  
DVP-AS2  
DVP-FS (Ceiling Firestop)  
DVP90ST (90° Elbow)  
12 in.  
(305 mm)  
1 in.  
(25 mm)  
8 in.  
(203 mm)  
1- 1/2 in.  
(38 mm)  
10 in.  
(254 mm)  
14 in.  
(356 mm)  
UP  
5 in.  
(127 mm)  
12 in.  
(305 mm)  
6 in.  
(152 mm)  
DVP-HVS (Vent Support)  
DVP-WS (Wall Shield Firestop)  
Figure 16.4 DVP vent components  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
69  
Download from Www.Somanuals.com. All Manuals Search And Download.  
B. Vent Components Diagrams (continued)  
Note: Heat shields MUST overlap by a minimum of 1-1/2 in. (38 mm). The heat shield is designed to be  
used on a wall 4 in. to 7-1/4 in. (102 mm to 184 mm) thick. If wall thickness is less than 4 in. (102 mm) the  
existing heat shields must be field trimmed. If wall thickness is greater than 7-1/4 in. (184 mm) a DVP-HSM-B  
will be required.  
8 in.  
(203 mm)  
Heat  
Shield  
15-1/8 in.  
(384 mm)  
Minimum  
Effective Length  
Maximum  
Effective Length  
Term Cap  
Trap1  
Max  
Effective  
Length  
3-1/8 in.  
79 mm  
4-5/8 in.  
117 mm  
9-3/8 in.  
238 mm  
12 in.  
(305 mm)  
5-3/8 in.  
137 mm  
DVP-TRAP  
Horizontal Termination Cap  
Trap2  
DVP-TRAP2  
DVP-TRAP1  
DVP-TRAPK2  
DVP-TRAPK1  
DVP-HPC2  
DVP-HPC1  
Figure 16.5 DVP vent components  
70  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
B. Vent Components Diagrams (continued)  
31 in.  
(787 mm)  
13-1/4 in.  
(367 mm)  
24-5/8 in.  
(625 mm)  
27-1/2 in.  
(127 mm)  
24-5/8 in.  
(625 mm)  
13-1/4 in.  
(367 mm)  
RF6M  
RF12M  
Roof Flashing Multi-pak  
Roof Flashing Multi-pak  
5 in.  
(127 mm)  
11-7/8 in.  
(302 mm)  
5 in.  
(127 mm)  
13-3/4 in.  
(349 mm)  
13-7/8 in.  
(352 mm)  
13-3/4 in.  
(349 mm)  
DVP-BEK2  
DVP-HPC Cap Brick Extension  
BEK  
Trap Cap Brick Extension  
11-5/8 in.  
(295 mm)  
12-1/8 in.  
(308 mm)  
7-1/8 in.  
(181 mm)  
5-3/4 in.  
(146 mm)  
DVP-TRAPFL  
COOL-ADD  
Cap Shield  
Flashing  
13-7/8 in.  
(352 mm)  
9-1/2 in.  
(241 mm)  
26 in.  
660 mm  
14 in.  
(356 mm)  
DVP-HSM-B  
Extended Heat Shield  
DRC-RADIUS  
Cap Shield  
Figure 16.6 DVP vent components  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
71  
Download from Www.Somanuals.com. All Manuals Search And Download.  
B. Vent Components Diagrams (continued)  
7-3/8 in.  
(187 mm)  
1-1/2 in.  
(38 mm)  
3-7/8 in.  
(98 mm)  
17-3/4 in.  
(451 mm)  
14 in.  
(356 mm)  
10-1/2 in.  
(267 mm)  
DVP-TV  
VerticalTermination Cap  
12 in.  
(305 mm)  
DVP-TB1  
BasementVent Cap  
12 in.  
305 mm  
9 in.  
(229 mm)  
12-1/2 in.  
(317 mm)  
2-3/4 in.  
(70 mm)  
7-1/4 in.  
(184 mm)  
11-1/2 in.  
(292 mm)  
12-1/2 in.  
(318 mm)  
5-1/4 in.  
(133 mm)  
12-1/4 in.  
(311 mm)  
16 in.  
(406 mm)  
DVP-TVHW  
PVK-80  
VerticalTermination Cap (Highwind)  
(For use with IPI and DSI appliances only.)  
7-1/4 in.  
(184 mm)  
1 in.  
(25 mm)  
14 in.  
(356 mm)  
16-7/8 in.  
(429 mm)  
14 in.  
(356 mm)  
12 in.  
(305 mm)  
7-1/8 in.  
12-1/8 in.  
(181 mm)  
(314 mm)  
3/8 in. (10 mm)  
1 in. (25 mm)  
8-3/4 in.  
(222 mm)  
7-3/4 to 10-3/8 in.  
(197 to 264 mm)  
1-5/8 in.  
(41 mm)  
DVP-FBHT  
FireBrickTermination Cap  
DVP-HPC  
High Performance Cap  
Figure 16.7 DVP vent components  
72  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
B. Vent Components Diagrams (continued)  
8-1/8 in.  
(206 mm)  
13 in.  
(330 mm)  
15 in.  
(381 mm)  
DVP-HRC-SS  
13-5/8 IN.  
346 mm  
Optional Wire Harness  
EFFECTIVE LENGTH  
32 IN. (813 mm) MIN.  
35 IN. (889 mm) MAX.  
DESCRIPTION  
PART NUMBER  
PVI-WH10  
10 ft. PV Wire Harness  
20 ft. PV Wire Harness  
40 ft. PV Wire Harness  
60 ft. PV Wire Harness  
80 ft. PV Wire Harness  
100 ft. PV Wire Harness  
PVI-WH20  
12-1/2 IN.  
318 mm  
PVI-WH40  
PVI-WH60  
PVI-WH80  
PVI-WH100  
20-3/4 IN.  
527 mm  
Note: Wire harnesses required to power the PVI-SLP  
connect to the appliance and are ordered separately from  
PVI-SLP. Contact your dealer to order.  
PVI-SLP  
Power Vent Inline  
16 IN.  
406 mm  
4-1/2 IN.  
114 mm  
15 IN.  
(381 mm)  
9-3/16 IN.  
(233 mm)  
13-5/8  
(346 mm)  
16-11/16 IN.  
424 mm  
16-11/16 IN.  
(424 mm)  
SLP-LPC  
SLP Low Prole Cap  
12-1/2 IN.  
(318 mm)  
Figure 16.8 Vent Components  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
73  
Download from Www.Somanuals.com. All Manuals Search And Download.  
B. Vent Components Diagrams (continued)  
6-1/2 in.  
165 mm  
6-1/2 in.  
165 mm  
6-1/2 in.  
165 mm  
8-3/4 in.  
222 mm  
9-1/4 in.  
235 mm  
6 in.  
152 mm  
6-5/8 in.  
168 mm  
6-5/8 in.  
168 mm  
9-7/8 in.  
251 mm  
SLP45  
45° Elbow  
SLP90  
90° Elbow  
Effective Height/Length  
Pipe  
SLP4  
inches  
4
mm  
102  
Effective  
Height/  
Length  
SLP6  
6
152  
SLP12  
12  
305  
SLP24  
24  
610  
EFFECTIVE HEIGHT/  
LENGTH  
SLP36  
36  
914  
SLP48  
48  
1219  
51-152  
51-305  
610  
SLP-FLEX-PIPE  
SLP6A  
2 - 6  
2 - 12  
24  
SLP-PIPE  
SLP12A  
SLP-FLEX-2  
SLP-FLEX-3  
SLP-FLEX-5  
SLP-FLEX-10  
36  
914  
60  
1524  
3048  
120  
SLP-FS  
Ceiling Firestop  
SLP-HVS  
Horizontal Pipe  
Support  
SLP-WS  
Wall Shield Firestop  
Figure 16.9 SLP Series Vent Components  
74  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
B. Vent Components Diagrams (continued)  
Note: Heat shields MUST overlap by a minimum of 1-1/2 in. (38 mm). The heat shield is designed to be  
used on a wall 4 in. to 7-1/4 in. (102 mm to 184 mm) thick. If wall thickness is less than 4 in. (102 mm)  
the existing heat shields must be field trimmed. If wall thickness is greater than 7-1/4 in. (184 mm) a  
DVP-HSM-B will be required.  
8 in.  
(203 mm)  
Heat  
Shield  
15-1/8 in.  
(384 mm)  
Minimum  
Effective Length  
Maximum  
Effective Length  
Term Cap  
Trap1  
Max  
3-1/8 in.  
79 mm  
4-3/4 in.  
121 mm  
9-1/4 in.  
235 mm  
Effective  
Length  
12 in.  
(305 mm)  
5-1/4 in.  
133 mm  
Trap2  
SLP-TRAP  
Horizontal Termination Cap  
DVP-FBHT  
Horizontal  
Termination Cap  
SLP-TVHW  
Vertical  
Termination Cap  
SLP-CCS-BK  
Cathedral Ceiling  
Support Box-Black  
SLP-SNKD  
Snorkel  
Termination Cap  
26 in.  
660 mm  
DVP-HSM-B  
Extended Heat Shield  
DVP-2SL  
Adapter  
SL-2DVP  
Adapter  
SLP-DCF-BK  
Ceiling Firestop  
Black  
SLP-WT-BK  
Wall Thimble-Black  
Figure 16.10 SLP Series Vent Components  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
75  
Download from Www.Somanuals.com. All Manuals Search And Download.  
ST-36TRB-IPI  
C. Service Parts  
Beginning Manufacturing Date: Nov. 2008  
Ending Manufacturing Date:______  
36” See Through Direct Vent Gas Fireplace  
Log Set Assembly  
4
5
1
B
3
C
A
2
D
6
8
7
10  
12  
9
11  
IMPORTANT: THIS IS DATED INFORMATION. When requesting service or replacement  
parts for your appliance please provide model number and serial number. All parts listed  
in this manual may be ordered from an authorized dealer.  
Stocked  
at Depot  
ITEM  
DESCRIPTION  
COMMENTS  
PART NUMBER  
LOGS-2128  
SRV2128-701  
SRV2128-702  
SRV2128-703  
SRV2128-706  
SRV2128-704  
SRV2128-705  
SRV2128-707  
2128-118  
Log Set Assembly  
Log A  
Y
A
B
C
D
1
Log B  
Log C  
Log D  
Log 1  
2
Log 2  
3
Log 3  
4
Sheetrock Ledge  
Refractory Left  
Refractory Right  
Burner NG, LP  
2129-017  
5
2129-016  
6
7
2128-007  
Y
2128-005  
Base Pan/Grate Assembly  
Qty 2 req  
GLA-750TR  
2118-170  
8
Glass Door Assembly  
Y
Y
9
Thermostat Wire  
2128-124  
10  
11  
12  
Pilot Shield  
4021-013  
Junction Box  
Y
2128-128  
Junction Box Bracket  
Surround Overlay (contains overlay for top, bottom and sides)  
SRV2128-FACE  
Additional service part numbers appear on following page.  
76  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
PIER-36TRB-IPI  
C. Service Parts  
Beginning Manufacturing Date: Nov. 2008  
Ending Manufacturing Date: ______  
36” Pier Direct Vent Fireplace  
Log Set Assembly  
14  
4
5
1
B
3
C
A
2
6
D
7
9
8
12  
11  
13  
10  
IMPORTANT: THIS IS DATED INFORMATION. When requesting service or replacement  
parts for your appliance please provide model number and serial number. All parts listed  
in this manual may be ordered from an authorized dealer.  
Stocked  
at Depot  
ITEM  
DESCRIPTION  
COMMENTS  
PART NUMBER  
LOGS-2128  
SRV2128-701  
SRV2128-702  
SRV2128-703  
SRV2128-706  
SRV2128-704  
SRV2128-705  
SRV2128-707  
2130-118  
Log Set Assembly  
Log A  
Y
A
B
Log B  
C
D
1
Log C  
Log D  
Log 1  
2
Log 2  
3
Log 3  
4
Sheetrock Ledge (side)  
Refractory Panel  
Burner NG, LP  
Pilot Shield  
2129-016  
5
6
2128-007  
Y
2128-124  
7
2128-005  
8
Base Pan/Grate Assembly  
Glass Door Assembly (Side)  
Thermostat Wire  
Qty 2 req  
GLA-750TR  
2118-170  
9
Y
Y
Y
10  
11  
12  
13  
14  
4021-013  
Junction Box  
2128-128  
Junction Box bracket  
GLA-2130  
Glass Door Assembly (End)  
Sheetrock Ledge (End)  
Y
2130-126  
Surround Overlay (contains overlay for top, bottom and sides)  
SRV2130-FACE  
Additional service part numbers appear on following page.  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
77  
Download from Www.Somanuals.com. All Manuals Search And Download.  
LCOR-36TRB-IPI  
C. Service Parts  
Beginning Manufacturing Date: Nov. 2008  
Ending Manufacturing Date:______  
36” Left Corner Direct Vent Fireplace  
12  
4
Log Set Assembly  
1
5
B
3
C
A
2
D
8
6
7
11  
10  
9
IMPORTANT: THIS IS DATED INFORMATION. When requesting service or replacement  
parts for your appliance please provide model number and serial number. All parts listed  
in this manual may be ordered from an authorized dealer.  
Stocked  
at Depot  
ITEM  
DESCRIPTION  
COMMENTS  
PART NUMBER  
LOGS-2128  
SRV2128-701  
SRV2128-702  
SRV2128-703  
SRV2128-706  
SRV2128-704  
SRV2128-705  
SRV2128-707  
GLA-2130  
Log Set Assembly  
Log A  
Y
A
B
C
D
1
Log B  
Log C  
Log D  
Log 1  
2
Log 2  
3
Log 3  
4
Glass Door Assembly (End)  
Burner NG, LP  
Y
Y
5
2128-007  
2128-124  
6
Pilot Shield  
2128-005  
7
Base Pan/Grate Assembly  
Glass Door Assembly (Side)  
Thermostat Wire  
GLA-750TR  
2118-170  
8
Y
Y
Y
9
4021-013  
10  
11  
12  
Junction Box  
2128-128  
Junction Box Bracket  
2130-118  
Sheetrock Ledge (Side)  
Refractory (End)  
2129-016  
2130-126  
Sheetrock Ledge (End)  
Surround Overlay (contains overlay for top, bottom and sides)  
SRV2132-FACE  
Additional service part numbers appear on following page.  
78  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
RCOR-36TRB-IPI  
C. Service Parts  
Beginning Manufacturing Date: Nov. 2008  
Ending Manufacturing Date: ______  
36” Right Corner Direct Vent Fireplace  
Log Set Assembly  
4
5
14  
1
B
3
C
6
A
2
D
9
7
8
12  
11  
10  
13  
IMPORTANT: THIS IS DATED INFORMATION. When requesting service or replacement  
parts for your appliance please provide model number and serial number. All parts listed  
in this manual may be ordered from an authorized dealer.  
Stocked  
at Depot  
ITEM  
DESCRIPTION  
COMMENTS  
PART NUMBER  
LOGS-2128  
SRV2128-701  
SRV2128-702  
SRV2128-703  
SRV2128-706  
SRV2128-704  
SRV2128-705  
SRV2128-707  
2130-118  
Log Set Assembly  
Log A  
Y
A
B
Log B  
C
D
1
Log C  
Log D  
Log 1  
2
Log 2  
3
Log 3  
4
Sheetrock Ledge (Side)  
Refractory (End)  
Burner NG, LP  
Pilot Shield  
2129-016  
5
6
2128-007  
Y
2128-124  
7
2128-005  
8
Base Pan/Grate Assembly  
Glass Door Assembly (Side)  
Thermostat Wire  
GLA-750TR  
2118-170  
9
Y
Y
Y
10  
11  
12  
13  
14  
4021-013  
Junction Box  
2128-128  
Junction Box bracket  
GLA-2130  
Glass Door Assembly (End)  
Sheetrock Ledge (End)  
Y
2130-126  
Surround Overlay (contains overlay for top, bottom and sides)  
SRV2132-FACE  
Additional service part numbers appear on following page.  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
79  
Download from Www.Somanuals.com. All Manuals Search And Download.  
ST-36TRB-IPI, PIER-36TRB-IPI,  
LCOR-36TRB-IPI, RCOR-36TRB-IPI  
Service Parts  
Beginning Manufacturing Date: Nov. 2008  
Ending Manufacturing Date: ______  
#15 Valve Assembly  
15.1  
15.2  
15.4  
15.3  
15.11  
15.10  
15.9  
15.5  
15.6  
15.7  
15.8  
IMPORTANT: THIS IS DATED INFORMATION. When requesting service or replacement  
parts for your appliance please provide model number and serial number. All parts listed  
in this manual may be ordered from an authorized dealer.  
Stocked  
at Depot  
ITEM  
DESCRIPTION  
Shutter Bracket Assembly  
COMMENTS  
PART NUMBER  
15.1  
2118-121  
2090-012  
2090-013  
530-302A  
302-320A  
582-832  
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Pilot Assembly NG  
Pilot Assembly LP  
Flexible Gas Connector  
Flex Ball Valve Assembly  
Orice NG (#32C)  
Orice LP (#50C)  
Valve NG  
15.2  
15.3  
15.4  
15.5  
15.6  
582-850  
750-500  
Valve LP  
750-501  
15.7  
15.8  
Module  
593-592  
Battery Pack  
593-594A  
593-590A  
593-593A  
2118-104  
2012-206  
15.9  
Module Wire Assembly  
3 Volt Transformer  
15.10  
15.11 Valve Bracket  
2 in Jumper Wires  
Y
Additional service part numbers appear on following page.  
80  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
C. Service Parts List  
ST-36TRB-IPI,PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI  
IMPORTANT: THIS IS DATED INFORMATION. When requesting service or replacement  
parts for your appliance please provide model number and serial number. All parts listed  
in this manual may be ordered from an authorized dealer.  
Stocked  
at Depot  
ITEM  
DESCRIPTION  
COMMENTS  
PART NUMBER  
385-105  
Exhaust Bafe  
385-128  
Flue Restrictor  
Pkg of 2  
33858/2  
Glass Latch Assembly  
Gasket Assembly  
Y
2128-081  
Contains Vent, Seal Cap, Burner Neck, Shutter Bracket  
and Valve Plate Gaskets  
2005-790  
050-721  
Lava Rock  
Mineral Wool  
Touch Up Paint  
TUP-GBK-12  
NGK-MS36  
LPK-MS36  
593-528  
Conversion Kit NG  
Conversion Kit LP  
Pilot Orice NG  
Pilot Orice LP  
Regulator NG  
Y
Y
Y
Y
Y
Y
593-527  
NGK-DXV  
LPK-DXV  
Regulator LP  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
81  
Download from Www.Somanuals.com. All Manuals Search And Download.  
D. Contact Information  
Heat & Glo, a brand of Hearth & Home Technologies Inc.  
7571 215th Street West, Lakeville, MN 55044  
Please contact your Heat & Glo dealer with any questions or concerns.  
For the location of your nearest Heat & Glo dealer,  
- NOTES -  
________________________________________________________________________________  
________________________________________________________________________________  
________________________________________________________________________________  
________________________________________________________________________________  
________________________________________________________________________________  
________________________________________________________________________________  
________________________________________________________________________________  
________________________________________________________________________________  
________________________________________________________________________________  
NOTICE  
DO NOT DISCARD THIS MANUAL  
• Important operating  
and maintenance  
instructions included.  
• Read, understand and follow  
these instructions for safe  
installation and operation.  
• Leave this manual with  
party responsible for use  
and operation.  
This product may be covered by one or more of the following patents: (United States) 5328356, 5601073, 5613487,  
5647340, 5890485, 5941237, 5947112, 5996575, 6006743, 6019099, 6053165, 6145502, 6170481, 6374822, 6484712,  
6601579, 6769426, 6863064, 7077122, 7098269, 7258116, 7470729 or other U.S. and foreign patents pending.  
2000-945  
Printed in U.S.A. - Copyright 2011  
82  
Heat & Glo • ST-36TRB-IPI, PIER-36TRB-IPI, LCOR-36TRB-IPI, RCOR-36TRB-IPI • 2128-900 Rev. H • 8/11  
Download from Www.Somanuals.com. All Manuals Search And Download.  

Graco Inc Paint Sprayer 232900 User Manual
Graco Yard Vacuum 3000cc User Manual
Harbor Freight Tools Smoker 92388 User Manual
Harman Kardon Stereo Receiver HK 3390 User Manual
Hotpoint Washer AQXGF 149 PI User Manual
Hunter Fan Outdoor Ceiling Fan 25860 User Manual
Husqvarna Blower 115 149727 R01 User Manual
Hypertec Carrying Case TARS0501HY User Manual
Impex Home Gym SB 240 User Manual
Impex Home Gym TSA 660 User Manual