GE Indoor Furnishings RINTERxxxPSP User Manual

DEH40212 Installation Instructions  
GE Total Lighting Control  
ProSys Lighting Control System  
Catalog Number RINTERxxxPS(P)  
ProSys™ Lighting Control System Relay Panels  
RINTER2424PSP 24-Relay Interior shown with RTUB24  
DESCRIPTION  
The ProSys Lighting Control System is a small network of  
relay panels and occupant control switches linked by a 4-wire  
dataline. Together, these devices form a reconfigurable  
switching platform — one that uses “softwiring” instead of  
hardwiring to link occupant switches to relays. Scheduling  
capability can be readily added by simply mounting an  
RCLK8PS Softwired Clock to the DIN rail in any relay panel.  
This instruction sheet will show you how to:  
1. Install the Relay Panel(s)  
2. Install and Test the Dataline  
3. Document the Relay Panels  
Full descriptions of the installation and operation of Softwired  
Switches and the Softwired Clock and other optional  
automation devices are located in other sections of this  
manual and are provided with each hardware unit.  
The RINTERxxxxPS(P)1 is the interior for a ProSys  
Lighting Control System Relay Panel. The complete relay  
panel assembly will include the following:  
Before starting, read the following installation  
instructions. If you have questions, call GE Total  
Lighting Control Service at:  
1. Tub (RTUBxx)  
2. Interior (RINTERxxxxPS or RINTERxxxxPSP)  
3. Power Supply (RPWRxxx)  
4. Cover (RCOVxxxx)  
1-877-584-2685 (LTG-CNTL) in the USA and Canada.  
These instructions do not cover all details or variations in equipment nor do they provide for every possible contingency that may be met in connection with  
installation, operation or maintenance. Should further information be desired or should particular problems arise that are not covered for the purchaser's purposes,  
the matter should be referred to the GE Company.  
Download from Www.Somanuals.com. All Manuals Search And Download.  
DEH40212 Installation Instructions  
POWER UP AND TEST RELAYS  
1. Apply power to the power supply only. As shown in  
Figure 3, to the right, press the Relay Control Button next  
to each relays yellow plug-in termination to toggle it ON/  
OFF. The relay should clickand the LED status indicator  
should change state. Confirm the operation by measuring  
the continuity at the line-voltage terminations of each  
relay.  
LED INDICATOR  
Figure 3  
RELAY  
CONTROL  
BUTTON  
TO RELAY  
RR7P RELAY SHOWN  
2. Apply power to the relays. Being careful not to touch  
any line-voltage wiring, toggle each relay ON/OFF again  
and confirm that each relay controls the appropriate load.  
DOCUMENT RELAY WIRING  
Record the circuit controlled by each relay on the RELAY  
SCHEDULE which was shipped with the interior. The relays  
associated with automation channels A-H are recorded later.  
Figure 4  
PROSYS RELAY SCHEDULE  
01  
PANEL #  
RELAY # SUPPLY LOAD DESCRIPTION  
-01  
-02  
-03  
-04  
-05  
LP1-1  
LP1-2  
LP1-3  
LP1-4  
LP1-5  
OPEN OFFICE - FIRST FLOOR NW  
"
OPEN OFFICE - FIRST FLOOR NE  
"
OPEN OFFICE - FIRST FLOOR SW  
SOFTWIRING A RELAY GROUP TO A CHANNEL  
Each ProSys panel includes eight channels(A-H) which may  
be softwired to relays within the panel. Channels are used to  
group relays for common control.  
Figure 5 Softwiring a Relay Group  
H
H
FLASHING  
RED LED  
1 Press and hold the  
Channel Push Button  
for several seconds.  
When a ProSys system includes an automation module  
(RCLK8PS Softwired Clock), we strongly recommend you turn  
to the installation instructions for that automation module and  
complete the documentation before softwiring any  
relays to channels.  
PRESS  
AND  
HOLD  
CHANNEL  
PUSH  
BUTTON  
2 Select the relays to  
be controlled.  
However, if automation is to be provided by an interface to  
another system, or by using manual switches only, the  
channels may be used simply for grouping relays. Follow the  
instructions in Figure 5 to the left.  
3 Press the Channel  
Push Button again.  
FLASHING  
LED  
2
3
Test. Press the  
H
H
Channel Push Button  
to toggle the group  
ON/OFF/ON.  
3
Download from Www.Somanuals.com. All Manuals Search And Download.  
DEH40212 Installation Instructions  
DATALINE INSTALLATION  
GLOBAL (PANEL-TO-PANEL) DATALINE  
PANEL 01  
PANEL 02  
PANEL XX  
The dataline connects the relay panels, switches and optional  
control modules. Within the 4-wire dataline are two twisted  
pairs: the red and black wires, carrying data; and the blue and  
white wires, providing power to the dataline switches and  
control modules.  
For simplicity, we refer to a 4-wire dataline running between  
a relay panel and the dataline switches as a Local Dataline.  
The relay panel provides the low-voltage power to all of the  
intelligent devices on that section of the dataline.  
The dataline running between relay panels is known as the  
Global Dataline,and it uses only the red and black data  
wires. The blue and white wires are not connected and should  
be trimmed.  
GE RLONWIREP-S4 Dataline Wire Specifications  
Panel Addressing  
#18 AWG (7 strands x 26 AWG)  
2 independent twisted pairs black/red, blue/white  
Unshielded copper conductors  
The two rotary switches on each relay panel set its address,  
allowing the differentiation between relays in different panels.  
NOTE: The first panel address must be set at 01 and the others  
numbered sequentially 02, 03, and so on, between 02 and 30 as  
shown to the right. If the panel address is set higher than 30, the  
channel LEDs in the panel will flash. Setting the panel address to 30  
or below will return the panel to normal operation. If a panel is set to  
the same address as another panel, then the two panels will not  
operate properly. The ProSys LM panels can be setup in groups of 30  
2 inch twist lay on pairs, 6 inch twist lay on cable  
Plenum-rated copolymer jacket, 0.230" O.D.  
FEP 0.010" insulation, 0.060" O.D.  
30 pF/foot maximum capacitance  
-20°C to 150°C operating temperature range  
17 lbs. per 500 foot reel  
where the panels in a group can be numbered from 00 to 30.  
UL rated  
Note: To ensure good communications between panels,  
the installer must comply with the dataline specification.  
GE will not warrant a system using a dataline that does  
not meet our specification. To avoid questions, use GE  
RLONWIRE-4P (plenum rated). Do not run the dataline  
in conduit or wiring trays with power wires. Do not  
connect the local datalines from two different panels.  
4
Download from Www.Somanuals.com. All Manuals Search And Download.  
DEH40212 Installation Instructions  
HARDWIRE LOW-VOLTAGE SWITCHES (OPTIONAL)  
Each of the ProSys panels eight channels has a single switch  
input which will accept any of the dry-contact configurations  
shown in Figures 6 and 7, and also provides status feedback  
for that channel.  
Figure 7 Hardwired Switch Configurations  
RED/BLACK JUMPER  
ProSys panels whose catalog numbers end in Palso include  
inputs for each relay. Like the channel inputs, these support  
all of the dry-contact configurations shown.  
MAINTAINED  
ISOLATED CONTACT  
R
B
Y
W
BLACK/WHITE JUMPER  
2-WIRE MOMENTARY  
PUSH BUTTON  
Figure 6 Hardwired Switch Inputs  
R
R
R
B
B
B
Y
Y
Y
W
W
W
HARDWIRED CHANNEL SWITCHES  
HARDWIRED RELAY SWITCHES*  
STANDARD 3-WIRE  
MOMENTARY  
* The ability to hardwire a 2- or 3-wire  
switch directly to a relay is an option in  
ProSys system panels. For panels with relay  
inputs, order interiors with catalog  
numbers ending in P.  
STANDARD 3-WIRE  
MAINTAINED  
PANEL TESTING AND TROUBLESHOOTING  
Panel Testing  
The panel-to-panel dataline should be tested for continuity  
and isolation from ground.  
To test for continuity, remove the red and black dataline wires  
at panel 01 and wire nut together (short the wires together).  
Go to the last panel in the series and measure the resistance  
between the red and black terminals. It should be less than 3  
ohms. Return to panel 01 and restore the red and black wires  
to their associated terminals.  
For shorts, test from red to white and black to white  
anywhere in the low-voltage section of the panel. You should  
see an open circuit.  
5
Download from Www.Somanuals.com. All Manuals Search And Download.  
DEH40212 Installation Instructions  
GE Total Lighting Control  
GE Total Lighting Control  
41 Woodford Avenue, Plainville, CT 06062  
©2000 General Electric Company  
DEH40212 BL 0700 R02  
6
Download from Www.Somanuals.com. All Manuals Search And Download.  

EdgeStar Air Conditioner AP410W User Manual
Extron electronic Network Card SC 210 User Manual
Fender eBook Reader 1272X User Manual
Fluke Network Card PM8907 User Manual
Fujitsu All in One Printer fi 434PR User Manual
Gardena Yard Vacuum GS 1500 Art 2575 User Manual
GE Microwave Oven 49 4562 User Manual
GE Microwave Oven 164D2966P147 User Manual
GE Monogram Drill ZGG36N31YSS36 User Manual
Global Machinery Company Power Screwdriver SG18V User Manual