Instructions
Masonry Firebox
Models MM33, MM39, MM44, MM49 and MM63
IF FIRePlaCe Is To Be InsTalled dIReCTlY onanY CoMBUsTIBle MaTeRIal,aMeTal Base
Is ReQUIRed.
saVe THIs BooK
This book is valuable. In addition to instructing you on how to install and maintain your appliance,
it also contains information that will enable you to obtain replacement parts or accessory items
when needed. Keep it with your other important papers.
This fireplace is approved for use as a wood burning fireplace or for use with a vented gas log approved
to ans Z21.60 or Z21.84 standards. It has not been tested or approved for unvented gas logs.
This wood burning fireplace complies with UL127 standard as a FACTORY BUILT APPLIANCE.
WaRnInG: Improper installation, adjustment, alteration, service or maintenance can cause injury
or property damage. Refer to this manual for correct installation and operational procedures. For as-
sistance or additional information consult a qualified installer, service agency or the gas supplier.
InsTalleR: leave this manual with the appliance.
ConsUMeR: Retain this manual for future reference.
Report No. 08-154
Do not store gasoline or other flammable vapors and
liquids in the vicinity of this or any other appliance.
ICC Evaluation Services
Report No. 2401
Download from Www.Somanuals.com. All Manuals Search And Download.
saFety
Continued
do noT Use oR sToRe GasolIne oR oTHeR
FlaMMaBle lIQUIds oR Gases In oR neaR
THe FIRePlaCe!
WaRnInG: THIs FIRePlaCe Has noT Been
TesTed FoR Use WITH an UnVenTed Gas
loG seT. To RedUCe THe RIsK oF FIRe oR
InJURY, do noT InsTall an UnVenTed Gas
loG seT InTo FIRePlaCe.
aTTenTIon: A fire or an explosion could occur
causing property damage, injury or loss of life if you
do not follow the information in this manual!
WaRnInG: THIs FIRePlaCe Has Been
TesTed FoR Use WITH oPTIonal Glass
dooRs FRoM CRoWn-BReCKInRIdGe oR
MCKenZIe-PendelTon onlY.
noTe: THIS MANUAL MUST BE REPRODUCED
ONLY IN ITS ENTIRETY.
Before Beginning the Installation
GUIdelInes FoR Use:
Read these instructions carefully before beginning
the installation of this fireplace. Also, if installing an
ANSI Z21.60 or Z21.84 Decorative Gas Log, read
the gas log appliance manufacturer’s literature
regarding sizing and suitability for the installation into
this enclosure prior to installation.
All current and future users of FMI PRODUCTS, LLC
Fireplaces are charged with the responsibility for full
knowledge of the information contained within this
manual which includes:
Strict requirements for assembly.
Detailed instructions for installation.
Cautionary guidelines for use.
statement of Intended Use:
The Grand Meridian Fireplace is a modular refractory
masonry unit designed for field assembly. The firebox
is constructed using pre-cast, interlocking refractory
blocks. The blocks are then secured to each other
using Mortar. The system includes all parts necessary
for the assembly of a complete masonry fireplace.
In addition to the basic enclosure, a standard 1-1/8”
thick, high temperature refractory brick is required to
line the interior of the firebox and can be purchased
from the manufacturer.
These fireplaces are not intended to serve as
a primary heat source, rather, the fireplace was
expressly created as a supplemental source of heat.
The unit is designed for use with solid fuels such as
cord wood.
On-going maintenance instructions.
It is the responsibility of the distributor, subcontractor
and/or the general contractor – whoever shoulders
the liability for installation of this product – to see that
it works in complete compliance with the guidelines
and instructions in this manual. Note that the general
contractor is the party accountable for seeing that
adequate clearances are provided for all firebox
surfaces per specifications in this manual.
The Grand Meridian is designed for Use only
with:
- Solid Wood Logs
WaRnInG: any application other than the
“Intended Use” as stated above is in violation
of the manufacturer’s instructions and is hereby
prohibited. such violation may cause immediate
hazard, property damage or loss of life and will
void all liabilities to the manufacturer and will
void all warranties explicit or implied.
- Plumbed LPG or Natural Gas Log Lighter.
- Plumbed ANSI Z21.60 or Z21.84 Decorative Gas
Log.
125160-01A
3
Download from Www.Somanuals.com. All Manuals Search And Download.
speciFications
37"
23 ¼"
10"
21"
28"
23"
33"
Ø 12"
18 ½"
SECTION A-A
Ø4" OUTSIDE AIR ACCESS
CAN BE INSTALLED
ON THE LEFT SIDE ALSO
22"
4 ½"
54 ⅝"
30 ½"
24 ½"
A
A
Figure 1: MM33 Fireplace Overall Dimensions
53 ¼"
22 ¼"
11"
28"
23 ⅛"
62 ⅞"
2X Ø 12"
66 ⅞"
SECTION A-A
45 ⅝"
23 ½"
4 ½"
4 ⅛"
OUTSIDE
COMBUSTION AIR
ACCESS HOLE
72 ⅞"
40 ¾"
32 ⅞"
7 ⅜"
21"
A
A
Figure 2: MM63 Fireplace Overall Dimensions
4
125160-01A
Download from Www.Somanuals.com. All Manuals Search And Download.
speciFications
Continued
E
4"
11"
28"
21"
10"
23"
C
B
A
4 ¼"
Ø F
A/2
SECTION H-H
D
4 ⅜"
63 ½"
40 ⅝"
32 ⅞"
H
H
7 ⅜"
Fireplace Overall Dimensions
Model
MM39
MM44
MM49
a
B
C
d
e
F
43″
48″
53″
39″
44″
49″
29¼″
34¼″
39¼”
27¾″
32¾″
37¾″
38¾″
43¾″
48¾″
Ø12″
Ø12″
Ø12″
Figure 3: MM39/44/49 Fireplace Overall Dimensions
125160-01A
5
Download from Www.Somanuals.com. All Manuals Search And Download.
product overview
InTRodUCTIon
We extend a warm welcome from all of us at FMI
PRODUCTS, LLC, proud manufacturers of the Grand
Meridian Fireplaces. Thank you for choosing FMI.
Internal
Wall
Installation
Corner
Installation
You may have thought long and hard before you
chose the fireplace which would grace your home.
Rest assured that every component of the Fireplace
has been tested to ensure long-term durability.
Flush
Installation
Full
Projection
Installation
PRodUCT oVeRVIeW
The Grand Meridian Fireplaces are designed as
factory-built blocks to be assembled on-site. These
fireplaces may be installed on either combustible or
non-combustible floors. In order for the fireplace to
be installed on a combustible floor though, it is nec-
essary that the fireplace be supported on a platform
or sub-floor that is non-combustible.
Figure 4: Typical Installations
Note that each of these topics will be covered in de-
tail and that the installer is expected to understand
each phase completely before going on to subse-
quent instructions.
The Four Components of the Grand Meridian
Fireplace:
• Combustible or Non-Combustible Floor
• Non-Combustible Raised Platform
• Firebox and Smoke Dome
aTTenTIon: Be advised that all the illustrations in
this manual are for general reference only. Do not
scale drawings. Actual design elements will vary
from case to case. Pay attention to specified mini-
mum clearances to combustibles.
• FMI PRODUCTS, LLC chimney system
required.
Testing and listing for these Grand Meridian Fireplac-
es has been undertaken by the PFS Corporation.
IMPoRTanT: Follow the chimney pipe
manufacturer’s instructions on the installation of
their specific flue system.
aTTenTIon: You may need a residential building
permit to install a Grand Meridian Fireplace. Consult
local jurisdictions before you get started!
If asked, advise the local authorities that the
FMI Fireplace is designed for installation per the
National Fire Protection Association Standard
for Chimneys, Fireplaces, Vents and Solid
Fuel-Burning Appliances (NFPA211).
Careful step-by-step instructions for each phase
of the installation procedure will be given for
the Grand Meridian conventional radiant heat
fireplaces. Those instructions generally fall into
the following categories:
When choosing the location of your FMI Fireplace,
keepinmindyoumustmaintain2"minimumclearance
from left, right and rear of Fireplace to surrounding
structure. Also, when choosing a location, consider
outside air requirements to determine if it will be on
the left or right side of the Fireplace. In the case of
an island installation, outside air accessibility may be
obtained through sub flooring, see Optional Outside
Air Kit on page 12.
• Spacing and clearance as it relates to combustible
materials.
• Familiarity of installation for all components.
• The strength of the floor on which it rests.
• Chimney system measurements.
• Choice of materials and craftsmanship in fireplace
and hearth finishing.
6
125160-01A
Download from Www.Somanuals.com. All Manuals Search And Download.
pre-installation preparation
seleCTInG loCaTIon
WaRnInG: do not pack required air spaces
with insulation or other materials.
To determine the safest and most efficient location
for the fireplace, you must take into consideration the
following guidelines:
Minimum/Maximum Chimney Height for
Residential Installation
1. The location must allow for proper clearances (see
Figures 6 and 7).
Minimum height of chimney, measured from base of
fireplace to flue gas outlet of termination, is 14 feet
for straight flue or 17 feet for a flue with one elbow
set. Maximum distance between elbows is 6 feet. For
systems with two elbow sets, minimum height is 22
feet. Maximum height of any system is 40 feet. This
measurement includes fireplace, chimney sections
and height of termination assembly at level of the
flue gas outlet (see Figure 20, page 16).
2. Consider a location where fireplace will not be af-
fected by drafts, air conditioning ducts, windows or
doors.
3. A location that avoids cutting of joists or roof raf-
ters will make installation easier.
4. An outside air kit is available with this fireplace
(see Optional Outside Air Kit on page 12).
MInIMUM CleaRanCe To CoMBUsTIBles
FRaMInG
The distance to be maintained from the surfaces
of the fireplace to combustibles must be observed.
Below is a list of the most common combustible
materials to name a few:
1. Frame opening for fireplace using dimensions shown
in Figures 6 and 7.
2. If fireplace is to be installed directly on carpeting,
tile (other than ceramic) or any combustible material
other than wood flooring, fireplace must be installed
upon a metal extending full width and depth of fire-
place.
Drywall
Sub-Flooring
Particle Board
Wood Flooring
Wood Framing
Plywood Paneling
Plywood
Mill Board
Maintain the following clearances:
3. Set fireplace directly in front of this opening and
slide unit back until nailing flanges touch side fram-
ing.
Unit sides, rear, Dome sides, rear & top..........2" min.
CombustibleFloors(MM33,39,44,49)..............6" min.
Combustible Floors (MM63 only).....................8" min.
Combustible Sheathing above opening top..18" min.
Sheathing or trim to opening sides...................8" min.
Mantel above opening..........................see Figure 5
Opening to sidewall...............................................24"
Hearth extension beyond front.............................20"
Hearth extension beyond sides............................12"
Insulation from firebox............................................2"
4. Check level of the fireplace and shim with sheet
metal if necessary.
5. Before securing fireplace to prepared framing,
ember protector (provided) must be placed between
hearth extension (not supplied) and under bottom
front edge of fireplace to protect against glowing em-
bers falling through. If fireplace is to be installed on
a raised platform, a Z-type ember protector (not sup-
plied) must be fabricated to fit your required platform
height. Ember protector should extend under fireplace
a minimum of 1 1/2". Ember protector should be made
of galvanized sheet metal (26 gauge minimum to pre-
vent corrosion.
6. Using screws or nails, secure fireplace to framing
through flanges located on sides of fireplace.
Figure 5: Mantel Clearances to Combustible
Material
125160-01A
7
Download from Www.Somanuals.com. All Manuals Search And Download.
pre-installation preparation
Continued
WaRnInG: Failure to position the parts in accordance with these diagrams or failure to use only
parts specifically approved with this appliance may result in property damage or personal injury.
MAINTAIN THE 2" CLEARANCE
TO COMBUSTIBLES ABOVE
THE DOME. DO NOT ATTACH
COMBUSTIBLE MATERIALS
ON TOP OF THE DOME.
18" MIN*
H**
8" MIN*
NON-COMBUSTIBLE
FACING (NOT SUPPLIED).
Condition
dim. H**
10"
with 6" platform
with 8" platform
without platform
12"
3"
* MINIMUM CLEARANCE TO COMBUSTIBLE MATERIALS.
** MEASURED FROM FLOOR TO TOP OF FIREBRICK LINER.
Figure 6: Framing Dimensions for Combustible Floor Systems
**IF METAL FRAMING IS USED MAINTAIN
A ½ INCH MIN. AIR SPACE FROM TOP
OF LINTEL.
*IF WOOD FRAMING IS UTILIZED IT
MUST BE HELD 18" MIN. FROM TOP
OF LINTEL AND 2" MIN.CLEARANCE
MUST BE MAINTAINED ALL AROUND
FIREPLACE DOME.
MAINTAIN THE 2" CLEARANCE TO
COMBUSTIBLES ABOVE THE DOME. DO
NOT ATTACH COMBUSTIBLE MATERIALS
ON TOP OF THE DOME.
18" MIN*
Model
MM33
MM39
MM44
MM49
MM63
W
½"
MIN**
41”
47”
52”
57”
71”
2" MIN. CLEARANCE TO
COMBUSTIBLES AROUND
SIDES, REAR AND TOP OF
FIREPLACE DOME
W
Figure 7: Framing Dimensions for Non-Combustible Floor Systems
8
125160-01A
Download from Www.Somanuals.com. All Manuals Search And Download.
pre-installation preparation
Continued
Model
MM33
MM39
MM44
MM49
MM63
A
70 ½"
82 ½"
84 ¼"
86"
91"
2” MIN
2” MIN
a
NON-COMBUSTIBLE
FACING MATERIAL
NON-COMBUSTIBLE
HEARTH EXTENSION *
8”
MIN
8”
MIN
* Not provided as part of fireplace
or sold by FMI PRODUCTS, LLC.
1’-0”
MIN
1’-0”
MIN
Figure 8: Corner Installation for Combustible Floor Systems
2” MIN. FROM
REAR AND
SIDES TO
COMBUSTIBLES
NON-COMBUSTIBLE
FACING MATERIAL
HEARTH EXTENSION
8”
MIN
8”
MIN
1’-0”
MIN
1’-0”
MIN
Figure 9: Top View for Combustible Floor Systems
125160-01A
9
Download from Www.Somanuals.com. All Manuals Search And Download.
pre-installation preparation
Continued
aTTenTIon: You will note that there will be a gap
ManTel and ManTel sHelF CleaRanCes
between the fireplace front and the extension of the
non-combustible hearth material. Be certain that
you seal this with non-combustible material.
As with any radiant heat fireplace, the Grand Merid-
ian fireplaces must comply with building code safety
clearances, per units that have openings of 6 sq. ft.
or greater. For Mantel clearances see Figure 5, page
7. Walls that Adjoin – Safety codes and all practical
outlooks insist that your fireplace cannot be installed
closer than 2 ft. to any walls in the room the fireplace
is housed in or to any walls of adjoining rooms.
These Grand Meridian Fireplaces have been
designed with clearance to combustible floors as
indicatedinPage8.Coveranypartofthecombustible
floor system left exposed with 1” (one inch) thick
ceramic fiber insulation rated up to 2,100° F.
aTTenTIon: It is critical to abide by the clearances
listed in this manual for all components specified as it
allows for movement of hot air from the fireplace into
interior areas of the chimney chase. Also, be certain
that the chimney system be installed as stated below.
Prior to starting the installation, check with local, re-
gional or state codes for any restrictions or required
permits regarding your fireplace installation.
Caution in Regards to Combustibles – If any part of
the fireplace or objects in the room (curtains, rugs,
paint, cushions, etc.) start to show warping or dis-
coloration due to heat from the fireplace, it is time to
take immediate action. Do not use the fireplace until
you have figured out how to address the problem.
You are facing a potential fire hazard. FMI PROD-
UCTS, LLC cannot be responsible for the make-up
of material on the exterior of the fireplace you have
chosen, nor can FMI PRODUCTS, LLC be held re-
sponsible for the materials in a room that may be
responding negatively to heat. However, in almost all
cases, there is a solution to the problem, either by
making adjustments to airflow or the modifications to
the room itself.
NOTE: It is required that ember protector strips must
be laid on the fiber of the non-combustible raised plat-
form (see Figure 10). These are included with the
Metal Base accessory.
WaRnInG:Hearthextensionistobeinstalled
only as shown in Figure 10.
HeaRTH exTensIon
Hearth
Extension
Seal Gap
Where the flooring material at the opening of the
fireplace is combustible, it is required that the
hearth extension be covered with a non-combustible
material.All hearth extensions must be made of code-
rated, non-combustible materials such as tile, brick,
marble, concrete or stone. The extension should be
set flush against the front of the fireplace front and
measure 20" minimum at the front and 12" minimum
beyond the sides of the fireplace opening as shown in
Figures 8 and 9 (page 9). These relative dimensions
are also covered by code.
Fireplace Front
Ember Protector
Seal Gap
Fireplace Front
Raised Hearth
Hearth
Extension
Ember Protector
If a raised hearth extension is being installed, it must
be constructed of non-combustible material and
any material under the structure must also be non-
combustible.
Hearth
Extension
Fireplace Front
Elevated
If using a raised hearth or metal base plate, note that
a combustible wood header must be no closer than
2" to the top of the dome (see Figure 6, page 8).
Ember Protector
Figure 10 - Hearth Extension
10
125160-01A
Download from Www.Somanuals.com. All Manuals Search And Download.
pre-installation preparation
Continued
2” AIRSPACE
CLEARANCE TO
COMBUSTIBLES
ON REAR AND
SIDES OF UNIT.
Figure 11: Non Combustible Floor
Figure 12: Combustible Floor
11
125160-01A
Download from Www.Somanuals.com. All Manuals Search And Download.
venting installation
Secure to Collars with Metal Tape, Screws
oPTIonal oUTsIde aIR KIT (Model MM4aK)
or Straps (Min. of 1/4" x 20" in size)
The Grand Meridian Fireplace needs enough re-
placement air to function properly and some local
building codes may require outside combustion air
to be provided. If no replacement air is provided,
improper flue drafting may occur, creating negative
pressure whereby smoke may enter the home, es-
pecially in homes that are very well insulated and
tightly sealed. Check local building codes for specific
requirements.
Air Inlet
Location
Must
Allow For
Bushes
or Snow
The installation of an outside air kit should be per-
formed during the rough framing of the fireplace due
to the nature of it's location. Outside combustion air
is accessed through a vented crawl space or through
a sidewall (Figure 13). If crawl space is used, check
local codes for proper termination.
Be sure that you carefully check the source of the
outside air before you choose the site for your air in-
take. You don’t want a place where snow will collect,
where bushes or trees will be growing or a location
that is too close to any other structure.
Vent Hood
Vented Crawl
Space (Check
Local Codes
Before Installing
in a Vented
Required
for Wall
Installation
Crawl Space)
Figure 13 - Outside Air Kit Venting
CaUTIon: Combustion air inlet ducts shall
Install Combustion Air Kit into the firebox through the
side wall opening provided. A 4" dia. hole will also be
required through the firebrick side lining (see Figure
12). The tubing that goes out of the firebox wall must
feed into a flexible metal conduit as the source for
outside combustible air. Install a screened termina-
tion cap to keep out small animals.
not terminate in attic space.
The maximum height for the air vent can not
exceed 3 feet below the flue gas outlet of the
termination.
FaCToRY BUIlT CHIMneY sYsTeMs
1) TheGrandMeridianisdesignedtobeinstalledwith
FMI PRODUCTS, LLC Metal Chimney System.
2) This Grand Meridian fireplace is intended as a
supplemental heat source only. It is not intended
as a primary heat source.
3) It is the responsibility of the contractor/installer
(not the manufacturer) to ensure that adequate
combustion air is provided for proper function of
this fireplace. Fireplaces take up a large volume of
replacement air from outside the house and if the
house is of airtight construction, smoke spillage
may occur if proper draft is not achieved.
4) There are many conditions beyond the
manufacturer’scontrolregardingimproperfireplace
operation. The manufacturer cannot ensure
“smoke free” operation, nor can the manufacturer
take on the responsibility for problems with
surrounding construction; chimneys that have not
Figure 12 - Outside Air Kit Installation
12
125160-01A
Download from Www.Somanuals.com. All Manuals Search And Download.
venting installation
Continued
been built at the correct heights; system drafts
lIneal GaIn
caused by faulty mechanical systems; adverse
weather conditions or any other environmental
situations over which the manufacturer has no
control.
PaRT no. desCRIPTIon GaIn
MM33
Fireplace
54 ⅝
"
MM39
MM44/49
Fireplace
63 ½
”
5) Inspect all fireplace & chimney components for
evidence of damage prior to starting installation.
Consult your local distributor for replacement
parts if necessary.
MM63
Fireplace
73”
6) Under no circumstances should you make any
adjustments or modifications to the chimney
system during the installation procedure. If
you do, you are not only liable for negating the
warranty, but you could very well cause a serious
malfunction of the fireplace. You must follow these
chimney instructions.
12-12DM
18-12DM
24-12DM
36-12DM
48-12DM
RLT-12D
STL-12D
Pipe Section
Pipe Section
Pipe Section
Pipe Section
Pipe Section
10 5/8"
16 5/8"
23 5/8"
34 5/8"
46 5/8"
7) Caution is urged if it is decided to add insulation
materialtoanypartoftheGrandMeridianFireplace
or Chimney system, be certain that the insulation
material is kept at least 2” away from any part of
the system. When using insulation or vapor barrier
materials, cover with a layer of plywood, particle
board or gypsum board to maintain the specified
2” clearance.
Round
Termination
7 3/4"
*
Square Chase-
Top with Slip 7
Section
"
to 15"*
8) Air spaces around firebox must remain open.
DO NOT fill these open spaces with insulation or
packing material of any kind.
* The lineal gain for the terminations is
measured to the flue gas outlet height.
CHIMneY PIPe
15" Galvanized
The FMI PRODUCTS, LLC chimney system consists
of 12", 18", 24", 36" and 48" snap-lock, double-wall
pipe segments, planned for maximum adaptability to
individual site requirements. Actual lengths gained
after fitting overlaps must be taken into consideration
(lineal gain) and are given in the lineal gain chart (see
Figure 14). Lineal Gain is the actual measurable length
of a part after two or more parts are connected.
Outer Pipe
12 3/8"
Stainless
Inner Pipe
Hemmed End
WaRnInG: The opening in the collar around
the chimney at the top of the fireplace must not
be obstructed. never use blown insulation to
fill the chimney enclosure.
Figure 14 - Lineal Gain
125160-01A
13
Download from Www.Somanuals.com. All Manuals Search And Download.
venting installation
Continued
asseMBlY and InsTallaTIon oF doUBle
Wall CHIMneY sYsTeM
Each double wall chimney section consists of a gal-
vanized outer pipe, a stainless steel inner flue pipe
and a wire spacer. The pipe sections must be as-
sembled independently as the chimney is installed.
When connecting chimney directly to the fireplace,
the inner flue pipe section must be installed first
with the lanced side up. The outer pipe section can
then be installed over the flue pipe section with the
hemmed end up. Press down on each pipe section
until the lances securely engage the hem on the fire-
place starter. The wire will assure the proper spacing
between the inner and outer pipe sections.
Screws
B
A
Figure 15 - Elbow Offset
Continue to assemble chimney sections as outlined
above, making sure that both the inner and outer
pipe sections are locked together. When installing
double wall snap-lock chimney together, it is impor-
tant to assure the joint between the chimney sections
is locked. Check by pulling chimney upward after
locking. The chimney will not come apart if properly
locked. It is not necessary to add screws to keep the
chimney together (exception, see Figure 15).
UsInG elBoW oFFseTs (30e-12dM)
1. To achieve desired offset, you may install combi-
nations of 12”, 18”, 24”, 36” and 48” length of double
wall pipe (see offset chart and Figure 15).
2. Chimney weight above offset rests on return elbow.
Straps must be securely nailed to rafters or joists (see
Figure 16, details A and B).
3. Maximum length of pipe between supports (return
elbow or 12S-12DM) is 6’ of angle run. Maximum of
two 6’ angle run sections per chimney system (see
Figure 17, page 16).
oFFseT RIse
CHIMneY lenGTH
a
B
12" 18" 24" 36" 48"
4 3/8"
9 3/4"
12 3/4"
15"
16 3/8"
25 1/2"
30 3/4"
34 3/4"
40"
ELBOW SET ONLY
4. All pipe connections between the offset and re-
turn must be secured with two screws on the outer
pipe only (see Figure 15). Do not penetrate the in-
ner stainless.
1
1
1
18"
1
1
1
1
1
1
1
21 1/4"
23 3/4"
27 3/4"
30"
46 1/4"
49 1/4"
56 3/4"
60 3/4"
66"
1
1
1
See Detail A
2"
Min.
1
33"
1
1
36"
71"
75"
38 1/4"
41 1/4"
45"
2
1
2
80 1/4"
86 3/4"
89 1/2"
97"
1
1
Straps
Straps
46 3/4"
51"
1
1
Detail B
Angle Firestop
See Detail B
1
2
53 1/4"
56 1/4"
59 1/4"
61 3/4"
64 3/4"
68 1/4"
70"
101"
106 1/4"
111 1/2"
115 1/2"
120 3/4"
127"
2
1
2
2
1
2
1
1
1
1
1
1
1
2
1
Straps
Straps
130"
1
1
74 1/4"
76 3/4"
79 3/4"
137 1/2"
141 1/2"
146 3/4"
2
2
4
Detail A
Return Elbow
OFFSET CHART (22-50 FT. SYSTEM HEIGHT)
Figure 16 - Ceiling Support Pipe 12S-12DM
14
125160-01A
Download from Www.Somanuals.com. All Manuals Search And Download.
venting installation
Continued
Return
Elbow
Return
Elbow
PeneTRaTInG RooF
To maintain a 2" clearance to the pipe on a roof with
a pitch, a rectangular opening must be cut.
Return
Elbow
Elbow
Elbow
6' Max.
6' Max.
6' Max.
1. Determine center point through which pipe will
penetrate roof.
Ceiling Support
Pipe 12S-12DM
Return
Elbow
Return
Elbow
6' Max.
2. Determine center point of roof. Pitch is distance
the roof drops over a given span, usually 12". A 6/12
pitch means that roof drops 6" for each 12" measured
horizontally down from roof rafters.
Elbow
Elbow
6' Max.
6' Max.
Elbow
a
B
C
3. Use roof opening chart (Figure 20) to determine
correct opening length and flashing required.
Figure 17 - Typical Offset Terminations
4. Remove shingles around opening measured. Cut
out this section.
FIResToP sPaCeRs (Fs-10)
Firestop spacers are required at each point where the
chimney penetrates a floor space. Their purpose is to
establish and maintain the required clearance between
the chimney and the combustible materials. When the
pipe passes through a framed opening into a living
space above, the firestop must be placed onto the ceil-
ing from below as shown in Figure 18.
5. Add next sections of pipe until end penetrates roof
line. Check to see that proper clearances are main-
tained. Extend chimney by adding sections of double
wall pipe until pipe is minimum of 30” above highest
point of roof cutout. Termination and chimney must
extend a minimum of 36” above highest point where
it passes through roof.
They also provide complete separation from one floor
space to another or attic space as required by most
codes. When the double wall pipe passes through a
framed opening into an attic space, the firestop must be
placed into an attic floor as shown in Figure 19.
19.5" Min.
30" Min.
2" Min.
2" Min.
Existing
Ceiling
2" Min.
Firestop
Frame
Spacer
Screws or
Staples
(Min. of 8)
Opening "A"
Figure 18 - Firestop Spacer with Living Space
Pitch
slope
opening Used Flashing
Above Ceiling
"a" Max.
Model no.
Firestop
Spacer
Screws or Staples
(Min. of 8)
Flat
0°
19.5"
V6F-10DM
0-6/12
26.6°
45.0°
22'
V6F-10DM
6/12-12/12
27"
V12F-10DM
Figure 20 - Roof Opening Measurements
Existing
Ceiling
Frame
Figure 19 - Firestop Spacer with Attic Above
Ceiling
125160-01A
15
Download from Www.Somanuals.com. All Manuals Search And Download.
venting installation
Continued
FlasHInG InsTallaTIon (V6F-10dM oR
V12F-10dM)
TeRMInaTIons/sPaRK aRResToR
The fireplace system must be terminated with the
listed round top or chase terminations. In any case,
refer to the installation instructions supplied with the
termination.
Determine the flashing to be used with the roof open-
ing chart. Slide flashing over pipe until base is flat
against roof. Replace as many shingles as needed
to cover exposed area and flashing base. Secure in
position by nailing through shingles (see Figure 21).
DO NOT NAIL THROUGH FLASHING CONE.
CaUTIon:donotsealopeningsontherooftop
flashing. Follow the installation instructions
provided with the termination being used.
Installing Flashing on a Metal Roof
When installing the flashing on a metal roof, it is re-
quired that putty tape be used between the flashing
and the roof. The flashing must be secured to the
roof using #8 x 3/4" screws and then sealed with roof
coating to prevent leakage through the screw holes.
A roof coating must also be applied around the pe-
rimeter of the flashing to provide a proper seal.
Storm
RTL-12D
Stainless
Inner Flue
Level of
Pipe
Flue Gas
Outlet
Secure
Termination
to Outer Pipe
with 3 Screws
Overlap Shingles
Top and Sides
Only
Collar
Flashing
Cone
Waterproof
Caulking
Storm
Nail Only
Outer
Perimeter
of Flashing
Collar
Flashing
Overlap
Shingles (Top
and Sides of
Underlap
Shingles
Underlap Shingles
at Bottom
Flashing Base)
Figure 23 - Termination
Figure 21 - Flashing Installation
CHase InsTallaTIons
storm Collar Installation (sC2-1)
Instructions for chase installations are included with
the chase style termination chosen. In a multiple
chase installation, be sure to provide adequate dis-
tance between terminations to prevent smoke spill-
age from one termination to another. We suggest
that terminations be separated at least 24", center to
center and stacked at a vertical height difference of
18" (see Figure 24, page 17).
Place storm collar over pipe and slide down until it is
snug against the open edge of the flashing (see Figure
22). Apply waterproof caulk around the perimeter of
the collar to provide a proper seal.
Chimney
Waterproof
Pipe
Caulk
Storm
Collar
Flashing
Figure 22 - Storm Collar
16
125160-01A
Download from Www.Somanuals.com. All Manuals Search And Download.
venting installation
Continued
FInIsHInG FIRePlaCe
Combustible materials, such as wallboard, gypsum
board, sheet rock, drywall, plywood, etc. may not
make direct contact with sides and top around the fire-
place face. See clearance requirements in Figures 8
and 9 on page 9. It is important that combustible ma-
terials do not overlap the face itself. Brick, glass, tile or
other noncombustible materials may overlap the front
face provided they do not obstruct essential openings.
When overlapping with a noncombustible facing ma-
terial, use only noncombustible mortar or adhesive.
18"
Min.
Typ.
24" Min.
24" Min.
Figure 24 - Multiple Chase Installation
MasonRY (PReCasT) CHIMneY
Masonry Chimney may be used instead of the FMI
Chimney System. Parts come in 14" Diameter and
can be obtained by FMI PRODUCTS, LLC. See Ac-
cessories on page 35.
10 FooT RUle
All flue gas outlet chimney terminations must extend
a minimum of 3 feet in height above the highest point
where it passes through the roof and must be at least
2 feet above the highest point of the roof that is within
a horizontal distance of 10 feet (see Figure 25).
Level of
10'
Flue Gas
Outlet
10'
2' Min.
3' Min.
2' Min.
3' Min.
Figure 25 - 10 Foot Rule
optional gas line installation
You may elect to add a vented decorative gas appli- You can route the gas piping practically anywhere in
ance (gas log) to your Grand Meridian Fireplace. If the firebox – the floor, back wall or side walls. You
so, follow the installation instructions from the Deco- will just need a masonry drill; the instructions from
rative Gas Appliance manufacturer. Familiarize your- the gas appliance manufacturer will be very straight-
self with requirements for installation as outlined by forward.
the National Fuel Gas Code, ANSI Z223.1/NFPA 54.
This gas pipe provision should only be used on a
decorative gas appliance.
Fill in the holes you have drilled around the gas pip-
ing with the regular mortar.
Follow the Gas Log manufacturer’s instructions.
optional electrical connection installation
Like the gas line, electrical feed lines can be run
through the floor, back wall, or side walls. Follow
local building and electrical code requirements.
125160-01A
17
Download from Www.Somanuals.com. All Manuals Search And Download.
supporting Floor system installation
It is the ultimate responsibility of the installer to en- For floors supported by I-Joists, the method of an-
sure that proper concrete slab supports are used.
chorage is illustrated in Figures 27 and 28, page 19.
Figure 31, page 20 illustrates the general arrange-
ment of anchorage to floor framing.
WaRnInG to the licensed design professional
and/orbuildingcontractor:Itisyourresponsibility
to be certain that the Grand Meridian can be
properly supported by the combustible floor
system on which the fireplace will rest.
It is important to take into consideration that the load
for the Grand Meridian Fireplace must be considered
as additional dead load that will have to be supported
by the floor framing. Additional floor joists or I-joists
For fireplace support foundations installed on con- may be required as determined by the licensed de-
crete refer to Appendix I and II (pages 42 & 43) for sign professional.
specific instructions.
The dead weights for the fireplace are noted in Table
I. It is the task and responsibility of the general con-
tractor/installer to see that the proper reinforcement
for weight loads are made by a licensed design pro-
fessional prior to the fireplace installation.
ReBaR loCaTIons
Lay-out the position of the fireplace and drill holes
where the rebar will be located. Secure the #3 rebar
4 inches into the concrete foundation with ITW Epoxy
or Simpson Epoxy. Follow manufacturer’s instruc-
tions for installation of rebar into slab.
As stated above, it is desirable to place additional
framing for alignment of anchor rods. Refer to Figure
29, page 20 for anchor rod locations.
Attach the firebox side wall anchors to steel sup-
port frame by inserting all-thread rods through holes
on the bottom flange on the steel support frame as
shown in Figure 32 and 33, page 21. Secure with
two Ø 2" o.d. x Ø 9/16" i.d. x 0.10" Washers and two
1/2"-13 UNC Nuts.
Wood FlooR
Anchorage of fireplace to wood floor construction is
required. Refer to Figure 29 on page 20 for anchor-
age dimensions. Four anchors are required to attach
to the sub-flooring framing.
CRaWl sPaCe oR UPPeR FlooR:
Metal Base
assembly
For installation of firebox over combustible crawl
spaces or upper floors, anchorage of the firebox is
required. Illustrations of examples of possible an-
chorage methods are shown in Figures 26 thru 28
depending upon the type of floor framing. Final meth-
od of anchorage is to be determined by licensed de-
sign professional.
A35 Brackets
(16 required)
2
x
F
l
oo
R J
o
For conventional framing, where the floor joists are
parallel with the sides of the firebox, the addition of
floor joists to align with the anchor brackets allows the
brackets to be directly connected to the floor joists.
I
s
T
exaMPle onlY
NOTE: Additional floor joists may be required to sup-
port the weight of the firebox and chimney. Where
the floor joists run parallel to the front of the firebox,
anchorage can be accomplished in like manner as
shown in Figure 26 using blocking between the floor
joist.
2
x
F
l
oo
Floor Sheathing
not shown for
clarity
R J
o
I
s
T
Figure 26 - Floor Joist Installation
18
125160-01A
Download from Www.Somanuals.com. All Manuals Search And Download.
supporting Floor systems installation
Continued
anchor
Brackets
I-Joist
Anchoring
Bottom
View
I-Joist Anchoring
Top View
simpson
strong-Tie
a-35 or
example only
equivalent
Example Only
Figure 27 - Floor Joist Installation
Figure 28 - Floor Joist Installation
WeIGHT deTeRMInaTIon
The following are dead load weight estimates for the Grand Meridian Fireplace.
Table I
Fireplace Model
Fireplace Weight
MM33
MM39
MM44
MM49
MM63
835 lbs.
1,194 lbs.
1,250 lbs.
1,359 lbs.
1,704 lbs.
Mortar, Rebar & Ready Mix
Concrete
200 lbs.
350 lbs.
357 lbs.
364 lbs.
370 lbs.
Firebrick Lining
290 lbs.
17 lbs.
89 lbs.
333 lbs.
17 lbs.
94 lbs.
345 lbs.
17 lbs.
96 lbs.
356 lbs.
17 lbs.
435 lbs.
21 lbs.
Damper/Anchor Plate
Steel Platform
100 lbs.
132 lbs.
37" x 28"
(7.2 ft²)
42" x 28"
(8.12 ft²)
48" x 28"
(9.33 ft²)
53" x 28"
(10.30 ft²)
67" x 28"
(13 ft²)
Floor Area
other Weight Considerations:
1) Fireplace finished facing (surround): This information needs to be obtained from the contractor.
2) Weight of metal flue or Masonry Chimney System: See chimney manufacturer’s weight specifications.
Some chimney systems can weigh up to 50 lbs per lineal foot.
Table II - Deflection Limits
Construction
l
s or W
d +l1
Floor Members
I/360
---
I/240
1 For wood structural members having a moisture content of less than 16 per cent at time of installation and used under
dry conditions, the deflection resulting from L + 0.5D is permitted to be substituted for the deflection resulting from
L + D.
Note that FMI PRODUCTS, LLC cannot accept responsibility for structural floor support details. All drawings are
presented as mere illustrations to indicate the presence of the underlying floor system. It is the responsibility of the
general contractor/installer to consult with a local licensed design professional for guidance in building a proper floor
support system.
125160-01A
19
Download from Www.Somanuals.com. All Manuals Search And Download.
supporting Floor systems installation
Continued
4"
a
Model
MM33
MM39
MM44
MM49
MM63
a
32 ¾"
38 ¾"
43 ¾"
48 ¾"
62 ¾"
10"
Figure 29 - Anchorage Dimensions
Figure 30 - Hardware
exaMPle onlY
2” min
clearance
Fireplace
outline
10”
seCTIon VIeW
RoTaTed 90CW
Figure 31 - Typical Anchorage Layout
combustible Floor installation
8" MeTal Base (MMB63)
eMBeR PRoTeCToR sTRIPs:
The Metal Base (MMB63) ensures the minimum Ember protector strips (included with Metal Base Kit)
8" clearance above combustible flooring is main- are required between the front of the Fireplace Hearth
tained with Grand Meridian Model MM63.
and Hearth Extension. A minimum thickness of 26
gauge metal strip at least 4" wide can be used. The
length needs to extend 2 inches beyond each side
of the fireplace opening. If two strips are used, make
sure they overlap at least two inches in the middle.
The strip is placed about 2" into the underside of the
platform at the front (Figure 10, page 10).
A layer of 1/2" minimum Cement Board (Not Includ-
ed) is required on the top and mid section below as
shown in Figure 32, page 21. The required sizes are
shown in the table below.
1/2" Thick Cement Board Dimensions
Model
MM63
A1
A2
B1
B2
NOTE: When using an on-site constructed hearth ex-
tension, you may use a sand-cement grout between
the hearth and extension instead.
67"
28"
60"
23"
IMPORTANT: Remember to tighten up nuts below
the floor after fireplace installation in order to take up
any slack in the threads.
20
125160-01A
Download from Www.Somanuals.com. All Manuals Search And Download.
combustible Floor installation
Continued
A layer of 1" thick Insulation Blanket (Included) is re-
MaTeRIals InClUded:
• 8 - ⅜" Rebar x 12" Long
• 4 - ⅜” Rebar x 6” Long
• 4 - ⅜” Bolts x 2½” Long
• 28 - Washer
quired on the top and mid-section of the Metal Base
as shown in Figure 33. The required sizes are shown
in the following table:
1/2" Thick Cement
Board Dimensions
• 28 - Nuts
Model
MM33
MM39
MM44
MM49
A1
37"
43"
48"
53"
A2
28"
28"
28"
28"
• 4 - Floor Joist Brackets
• 2 - Ember Protector Strips
• 1 - Insulation Blanket
NOTE: The insulation (concrete) board chosen must
meet a thermal conductivity rating ≥ 0.4 Btu-in/hr-
ft²-F°.
Place 1/2" cement board
on top rails of platform
(Not Included).
a1
Place 1” Insulation
Blanket on top of
cross members
(Included).
Place Cement Board
on top rails of platform
(Not Included).
a2
a1
Place Insulation Blanket
on top of cross-members
(Included).
a2
Ember Protector Strips
26 ga. Sheet Metal
Ten (10) All-Thread Rods are secured
to the top flange of the Metal Base with
twenty (20) flat washers (2"OD x 9/16"ID x
0.10") and twenty (20) 1/2-13 UNC Nuts.
Anchor Bracket All-Thread Rods are secured to the bottom flange
of the Metal Base with eight (8) flat washers (2”OD x 9/16”ID x
0.10") and eight (8) 1/2-13 UNC Nuts.
Ember Protector Strips
26 ga. Sheet Metal
Figure 32 - MMB63 Metal Base Assembly
Eight (8) All-Thread Rods are secured to the top flange
of the Metal Base with sixteen (16) flat washers (2"OD x
9/16"ID x 0.10") and sixteen (16) 1/2"-13 UNC Nuts.
6" MeTal Base (MMB33,MMB39, MMB44,
and MMB49)
The Metal Base ensures the minimum 6" clearance
Anchor Bracket All-Thread Rods are secured to the bottom flange
of the Metal Base with eight (8) flat washers (2"OD x 9/16"ID x
0.10") and eight (8) 1/2-13 UNC Nuts.
above combustible flooring is maintained.
Figure 33 - MMB33, MMB39, MMB44 and MMB49
Metal Base Assembly
Grand Meridian
Model
Use Metal Base
Model
MM33
MM39
MM44
MM49
MMB33
MMB39
MMB44
MMB49
125160-01A
21
Download from Www.Somanuals.com. All Manuals Search And Download.
Fireplace installation
You will find that the Grand Meridian Fireplace is de-
MaTeRIals InClUded:
signed to be completely assembled on-site, consist-
ing of interlocking precast parts. Included is a thin-
set type mortar for bonding. The parts of the fireplace
are made of FMI’s incredibly strong blend of specialty
cement and a light weight aggregate.
MM33, MM39, MM44, MM49:
• 8 - ⅜" Rebar x 28" Long
• 8 - ⅜" Rebar x 12" Long
• 1 - 50 lb. bucket Mortar
• 20 - Small Wood Shims
IMPORTANT: When applying mortar, it is imperative
that the concrete blocks be maintained moist (not
soaking) so they don’t absorb the water out of the
mortar and cause adhesion to fail. Frequently run a
damp sponge to the parts before mortar is applied!
MM63:
• 10 - ⅜" Rebar x 36" Long
• 10 - ⅜" Rebar x 12" Long
• 2 - 50 lb. bucket Mortar
• 20 - Small Wood Shims
The installation of an anchor plate/damper for either
masonry chimney or pre-fabricated chimney is re-
quired but not supplied. See Accessories on page
33.
FIeld asseMBlY PRoCedURes
Mixing the mortar – The mortar comes pre-mixed
and should be dry. Be sure to use clean water and
work it up into a mixture that is pasty but not lumpy.
If it’s too thin and the surfaces don’t stay moist, the
components will not adhere. Load the mixture into a
standard grout bag.
The installation of a seismic strap kit is required but
not supplied. See Accessories on page 33.
An optional outside air kit can be used. See Acces-
sories on page 33.
Refractory Firebrick Liners also need to be installed.
These should be a minimum of 1⅛" thick. The liner
will be applied within the walls and hearth area of the
firebox. See Accessories on page 33.
When applying, use about ½" thread of mortar. The
mortar bead should be approximately ½" away from
all edges. The mortar has a considerable amount of
holding power so do not overload the components
with too much mortar. Keep the components moist
at all times by wiping them down with a clean wet
sponge.
Tools needed FoR InsTallaTIon:
• One 4 ft. level
• Roto-hammer with ½" drill bit
• Drill motor with mixer blade to mix Mortar
• Two empty 5 gallon buckets to mix Mortar
• One wheelbarrow and shovel to mix concrete
• Grout bag
Some mortar will “ooze out” when placing compo-
nents together, this is normal. Wipe excess away
with a trowel. Do not cover component surfaces com-
pletely with mortar. Do not apply the mortar in thick
bands even if the component you are working with is
larger than the rest. You will want to apply “stripes” of
mortar in these situations.
• Triangular masonry trowel
• Rubber hammer
Make sure components are level. Checking lev-
elness after each layer. It’s extremely important
that you pay careful attention to how you are as-
sembling the Grand Meridian Fireplace since ev-
ery component builds on the next. If you have to
make any kind of an adjustment, do not try to do it
“by loading an opening” with mortar, this will only
result in a fireplace that will not be plumb or level.
Use wood shims instead. You will find these small
wood shims supplied with the Fireplace and
• Sponge and 2 water buckets to wipe down and
moisten parts prior to applying mortar
MaTeRIals needed FoR InsTallaTIon:
• Epoxy for securing rebar in footing / foundation
• Three (3) - 90 lb. bags of ready mix concrete with
¼" or smaller aggregate
22
125160-01A
Download from Www.Somanuals.com. All Manuals Search And Download.
Fireplace installation
Continued
you can nudge them in between openings to achieve
Left Side Hearth 3rd
Center Hearth 2nd
the precision you need in making component adjust-
ments. Once you have removed any shims, you will
want to cover any gaps that may have resulted with
the mortar.
Right Side
Hearth 1st
assembly Instructions
Apply mortar
between joints
1) Place the hearth base on top of your non-combus-
tible floor or metal base. For concrete slabs, support-
ing floor needs to be rated at ASTM 90.
a) Combustible Floor Installations: Mix up a
batch of mortar and adhere hearth slabs to the
cement board (see Figure 32 & 33, page 21). All-
thread rods should stick up through the holes on
the hearth slabs.
67"
28"
Figure 35 - Positioning Hearth Base for MM63
Hearth section shown prepared
for Right Side position
b) non-combustible Floor Installations: Draw
an outline of the hearth area based on the dimen-
sions shown in pages 4 and 5. Position Hearth
slabs and mark rebar center locations. Drill 4
inches using Roto-hammer into concrete slab
and secure the 8 pieces (10 pieces for MM63) of
12" long rebar with epoxy. See Figure 34 & 35.
2) Mix a batch of mortar and prepare Right Side
Hearth bottom surface to be bonded as shown in Fig-
ure 36.
1/2" MORTAR
BEAD TYPICAL
APPLY MORTAR
BEAD TO ALL
MATING SURFACES
1/2" AWAY
FROM EDGES
3) Align Right Side Hearth to the outline created. The
overall width should allow for an approximate gap of
1/8" between slabs for the additional mortar to unite
the remaining slab. Check for surface flatness, level
if necessary.
Figure 36 - Preparing Hearth Base
4) Repeat step 3 for Left Side Hearth.
5) Before installing side walls, confirm placement of
outside air kit (if required). This can be installed ei-
ther side depending on which side is accessible to
outside combustion air (all diagrams in this manual
show the combustion air inlet hole on the right side).
Prepare side wall and rear wall mating surfaces with
the prepared mortar and begin assembly as shown
in Figure 37.
Left Side Hearth 2nd
Right Side Hearth 1st
Apply mortar
Two 26 ga. Ember
between joints
Protectors required
Side Wall shown prepared for Right
Side Air Access.
For Left Side, bead opposite side.
28"
Model
MM33
MM39
MM44
MM49
W
1/2" AWAY
FROM EDGES
37"
43"
48"
53"
W
12" Long Rebar
Figure 34 - Positioning Hearth Base For
MM33,39,44,49
Figure 37 - Preparing Side and Rear Wall Pieces
125160-01A
23
Download from Www.Somanuals.com. All Manuals Search And Download.
Fireplace installation
Continued
Apply mortar
6) Assemble the first layer as shown in Figure 38
Begin with the smallest
rear wall to the right
side as shown below.
and 39. Continue to the next layer sides and rear
pieces, keeping components moist, mixing mortar as
you need it and threading the mortar appropriately as
you stack each section, one onto the next. Constant-
ly check for squareness and levelness while building
each course of block. As you complete each piece,
make certain that you adhere the mortar at each and
every joint. See chart below for the number of layers
for need for this step.
Apply
mortar
Grand Meridian
Model
Number of
Layers
Combustion Air Access
Right or Left (Right shown).
MM33
MM39
MM44
MM49
MM63
2
3
3
3
3
Figure 39 - Layering walls and sides for MM63
MM63: Rear Walls are staggered on every row as
shown in Figures 40.
Rear Wall
(short)
Apply mortar
Rear Wall
Rear Wall (long)
Side Wall
Side Wall
Apply
mortar
Apply
mortar
Combustion Air Access
Right or Left (Right shown).
stagger positions of rear wall
Figure 38 - Layering walls and sides for
MM33,39,44,49
Rear Wall
(short)
Rear Wall (long)
Figure 40 - Staggering walls and sides for MM63
24
125160-01A
Download from Www.Somanuals.com. All Manuals Search And Download.
Fireplace installation
Continued
7) Insert 28" long rebar (8 total, included with fire-
Downdraft
Diverter
place) vertically through the cells, into the holes in
the hearth, adjacent to the rebar and/or all-thread
sticking up from the hearth (Figure 42). Mix approxi-
mately 2 cu. ft. of Ready-Mix Concrete (not included)
and fill all cells in walls and rear of firebox completely
(Figure 41).
Final Side Walls
Add rebar and fill all
cells with concrete mix
Figure 43 - Attaching Downdraft Diverter and
Side walls
10) Set the Lintel and Lower Rear Dome in place as
shown in Figures 44. Check that all is level. If you
need to make adjustments, use shims. Place one or
more of these shims between the lowest wall com-
ponent and the top surface of the base plate. Once
you are satisfied with the degree of levelness, you
can address any gap that may have occurred with an
appropriate amount of mortar.
Figure 41- Inserting Rebar and adding Ready
Mix Concrete
8) Attach Lower Seismic Straps to rebar closest to
the front as shown in Figure 42.
Lower Rear
Dome
Lintel
Lower Seismic Straps
12 inch
rebar or
all-thread
Figure 44 - Attaching Lower Rear Dome and
Lintel
Figure 42 - Attaching Lower Seismic Straps
9) Install Downdraft Diverter and final row of Side
Walls (Figure 43). All components must be level. Mix
approximately 2 cu. ft. of Ready-Mix Concrete and fill
all cells with Ready Mix Concrete mix.
125160-01A
25
Download from Www.Somanuals.com. All Manuals Search And Download.
Fireplace installation
Continued
NOTE: Although you are cautioned to use mortar
13) MM63 onlY: Position Middle Domes so that
outer faces are flush to the lower dome as shown
in Figure 46. Carefully install Dome Middle Sides as
shown in Figure 46.
sparingly because it does have such holding power,
you should look over the firebox assembly at the end
and fill in any gaps, especially joint connections, with
the mortar.
IMPORTANT: Adjustments can only be made while
the mortar is still wet when correcting for squareness
and leveling.
Upper Dome
Dome Side
11) Assemble Lower Dome Sides as shown in Figure
46. The beveled face lines up with the inward angles
of the lintel sides. Top surfaces should be level.
Lower Dome Sides (Rating
Plate faces inside)
Figure 46 - Attaching Middle Dome
Figure 45 - Attaching Lower Dome Sides
14) Finally, set the Dome Top into position (Figure
47, page 27). Be sure that it is flush in every direc-
tion as you place it on the crest of the smoke dome
wall assembly. After this is done, proceed to section
on Installing Damper and Chimney System on page
28.
As you are connecting each component, be certain
you are following the instructions given previously for
using mortar. Stop to look at the smoke dome side,
front and rear walls to see that they are aligning cor-
rectly and that the surfaces are smooth and uniform.
Make sure connections are covered with an adequate
amount of mortar. Remember that you have the op-
tion of using shims but they must be removed and
any holes filled. Make any adjustments to the fire-
place alignment before continuing to the next step.
NOTE: The chimney hole on the Dome Top is not
centered from front to back - it should be offset closest
to the rear of the fireplace (see Figure 46).
WaRnInG: do noT PaCK ReQUIRed
aIR sPaCes WITH InsUlaTIon oR oTHeR
MaTeRIals.
12) Assemble Upper Dome and Dome Sides as
shown in Figure 46. Check your assembly here. If
things are proceeding as they should be, the finished
top surface should be flat and level.
Upper Dome Sides
Upper Dome
Front/Rear
Figure 45 - Attaching Upper Dome & Sides
26
125160-01A
Download from Www.Somanuals.com. All Manuals Search And Download.
Fireplace installation
Continued
Dome Top center of
chimney hole is offset
towards the rear.
10"
13 ½"
MM33
Center of chimney hole is
offset towards the rear.
10"
12 ½"
MM39,44,49
Center of chimney holes are
offset towards the rear.
10"
12 ½"
MM63
Figure 46 - Attaching Middle Dome
125160-01A
27
Download from Www.Somanuals.com. All Manuals Search And Download.
Fireplace installation
Continued
Place chimney adapter onto top of damper plate and
center in opening using gasket supplied with adapt-
er.
InsTallInG daMPeR / anCHoR PlaTe
(MM12aP) FoR PRe-FaBRICaTed CHIMneY
sYsTeM
Attach adapter with screws supplied by carefully drill-
ing holes into damper plate.
All chimney systems must be installed with an inte-
grated Damper System / Anchor Plate installed on
top of the fireplace. Installers are cautioned to put the
chimney system together exactly as instructed in the
Venting Installation on page 12. Any variations may
have serious consequences resulting in an accident
or malfunction. If instructions are not followed, the
warranty on the product will become null and void.
Attach damper chain stop on center rear of lintel 3”
(three inch) vertical from opening using (3) #8 ce-
ment fasteners.
aTTenTIon: Clearance to combustible construction
cannot be reduced during course of construction.
For the safe operation of the finished fireplace, these
clearances must be followed when building the
framework for the chimney system.
Apply a 1" thick ceramic fiber blanket (Included) to
the bottom of the anchor plate.
Apply balance of gasket cement in a ¼" bead on top
of smoke dome approximately 1½" around periphery
of chimney hole. Install damper assembly on top of
unit pressing damper and insulation blanket into ce-
ment (Figure 47). Secure with four 3/16" X 1¾" ma-
sonry screws (included).
NOTE: The most important aspect of the installation
is maintaining the minimum required clearances to
combustible materials according to the chimney pipe
manufacturer’s recommendations, otherwise a po-
tential fire hazard may occur.
Secure with
four 1/4" x
1-1/4"masonry
fastener.
WaRnInG:donotinterchangechimneyparts
with any other parts except those specifically
required by FMI PRodUCTs, llC otherwise a
potential hazardous condition may be created.
1" ceramic fiber blanket
under Anchor Plate.
1/4" bead of
gasket cement
Figure 47 - Installing Anchor Plate
28
125160-01A
Download from Www.Somanuals.com. All Manuals Search And Download.
Firebrick installation
er edge. The space behind does not have to be filled
(Figure 48).
Refractory Firebrick lining must be installed. There
are two options. You can obtain pre-fabricated Modu-
lar Firebrick Liner from FMI PRODUCTS, LLC (see
Accessories on page 33) or custom firebrick lining
can be installed.
CUsToM FIReBRICK lInInG
Custom Firebrick lining is can be obtained by FMI
PRODUCTS, LLC. If a custom firebrick pattern is
desired, it is required that the masonry fire rated
bricks be a minimum of 1⅛" thick. The pattern for the
firebrick lining is exclusively your choice. Before you
install the lining, remember to consider any holes
your contractor may need to drill for gas, electrical
or combustion air kit access holes.
ModUlaR FIReBRICK lInInG
If using FMI PRODUCTS, LLC Module Firebrick Lin-
ers, simply use an extra bag of the mortar we sup-
ply. Install Hearth panel first, rear panel next and side
panels last. Consider if brackets for grates will be
required also if pre-drilling is required for gas lines,
electrical or if the outside combustion air kit is to be
installed. The rear Liner Panel is straight from the
bottom to the top front edge of the Downdraft Divert-
Please use a certified mason to lay-in the brick. He
will follow the proper instructions from the fireplace
liner manufacturer and also understand the type of
adhesive or cement he is to use.
Make sure the fireplace is installed with the finished
firebrick floor of the fireplace so that it is at least 11"
above the combustible floor system.
Area behind
Disclaimer: FMI PRODUCTS, LLC wishes to ex-
press that as the manufacturer of the Grand Merid-
ian Fireplaces, they cannot take any liability or re-
sponsibility for the way the firebrick or the firebrick
mortar performs. It is not unusual in the course of
the life of the firebrick, or the firebrick mortar, for
heat stress cracks to appear. FMI PRODUCTS, LLC
cannot be responsible for this and other wear and
tear to the firebrick and mortar.
Rear Firebrick
Liner Panel can
remain empty
Figure 48 - Postion of Rear Panel
125160-01A
29
Download from Www.Somanuals.com. All Manuals Search And Download.
operation and maintenance guidlines
FIRePlaCe GRaTes
To complete your fireplace installation, a fireplace
grate will be required for safe operation. The fireplace
grate can be obtained from FMI PRODUCTS, LLC
(see Accessories on page 33) or if choosing an alter-
nate, it must be sized to 50% of the hearth maximum.
Additionally. A fireplace screen must be installed for
safety.
Doors Fully Closed
Fireplace Front
Doors
Fully Opened
sCReens
Fireplace Front
Glass dooRs
Figure 49 - Bi-Fold Glass Doors
IMPORTANT:
Only
Crown-Breckinridge
or
WaRnInG: Fireplaces equipped with glass
doors should be operated only with doors fully
opened or doors fully closed. doors, if left partly
open,maydrawgasandflameoutofthefireplace
opening creating risks of both fire and smoke.
McKenzie-Pendelton Doors by Portland-Willamette
fireplace.
For installation Instructions, see separate instruc-
tions included with doors.
Cleaning Glass
Glass doors are optional with the fireplace. When
fireplace is in operation, doors must be fully opened
or fully closed position only or a fire hazard may be
created (see Figure 49).
A fireplace equipped with glass doors operates much
differently than a fireplace with an open front. A fire-
place with glass doors has a limited amount of air for
combustion.
Clean glass with any commercial glass cleaner or
soap and water. Do not use any abrasive material to
clean glass. Do not clean glass with any cool water if
glass is still hot from the fire and smoke.
oWneR’s oPeRaTIon & PReCaUTIons
WaRnInG: do not attempt to operate your
Excessive heat within the fireplace can result if too
large a fire is built or if combustion air gate is not
completely open. The following tips should be fol-
lowed to assure that both the fireplace and glass door
retain their beauty and function properly. Both the flue
damper and glass doors must be fully opened before
starting fire. This will provide sufficient combustion air
and maintain safe temperatures in firebox.
IMPORTANT: The glass must be allowed to warm
slowly and evenly. The tempered glass will withstand a
gradual temperature rise to 375 °F, without sustaining
any damage. Termperatures as high as this or higher
are not likely to occur with normal use. Such materials
as pitch/wax laden logs, very dry mill end lumber and
large amounts of paper or cardboard boxes can create
an excessively hot fire and should not be burned in
this fireplace. Always keep the fire well back from the
doors and never allow flames to contact the glass.
fireplace without a fire safety screen installed.
CaUTIon: The manufacturer cautions
againstusingchemicalchimneycleaners.never
use charcoal or coal in the fireplace under any
circumstances.
First Lighting of the Grand Meridian – After con-
struction is completed, all elements of the fire-
place and chimney system must be complete-
ly dry. This means that the unit must stand
without any firing for a minimum of 28 days.
Only after that period of time can a first lighting take
place. The first fire must be small and well-controlled,
started with a small amount of kindling. Add no more
than eight pounds of wood, preferably small logs
not more than 3” (three inches) in diameter. You will
probably burn no more than three to four of these
small logs. Do not let the fire burn for more than one
hour. After this first lighting – when the fireplace has
started to “cure” Do not set another fire for at least
24 hours.
30
125160-01A
Download from Www.Somanuals.com. All Manuals Search And Download.
operation and maintenance guidlines
Continued
Second Lighting – Start the fire slowly and gradually kindling, then the softer wood and finally, the harder
as you did with the first lighting, but this time you can wood logs. As the fire burns, you can carefully lay ad-
burn up to ten pounds of firewood, probably four to ditional logs on the flame, but make sure you place
five logs that are 3" in diameter. With the second light- them gently without forcing them into the opening.
ing you can let the fire burn two hours – no more.
annUal FIRePlaCe MaInTenanCe
After First and Second Lighting – When the fireplace
Your fireplace and chimney require seasonal and
monthly tune-ups”. Like any piece of well-built equip-
ment, the Grand Meridian Fireplace and chimney
needs routine maintenance.
has been properly cured with 1st and 2nd lighting,
you will be able to add a full fuel load to the fire-
place which is about 10 to 15 pounds of firewood at
any given time. Consider that this typical fuel load is
three to four dry hardwood logs that are about 6" ) to
8" in diameter.
The manufacturer recommends that inspection of
the fireplace and chimney take place on a monthly
basis during the heating season. Start at the top,
looking for birds’ nests, leaves or any other obstruc-
tions. Also check the spark arrestor, for creosote or
soot build-up. Twice a year, you will want to clean the
firebox and chimney yourself or hire a professional
chimney sweep to do the job for you. If you elect to
do it yourself, use a plastic, wood or steel brush for
the inside of the chimney.
Without a grate for your firewood to rest on, you can-
not get the air flow you need under the fire which
makes for a hotter, more satisfying fire.
Do not “over burn” – Always remember, your Grand
Meridianfireplaceisanelegantadditiontoyourhome.
It is not an indoor incinerator! If you start to use the
fireplace and begin a routine of “over burning,” you
can permanently and unalterably damage the unit.
Under no circumstances should you be burning
household trash, including chemicals and combus-
tibles, cardboard boxes, your office papers, scrap
lumber or stray branches from your yard, particularly
pine.
For the spark arrestor, scrub with a wire brush. To
dismantle the chimney cap for cleaning of the flue,
unscrew the four screws that hold it in place. For
cleaning access from below, open the damper in the
firebox. It is best to use a flexible handle chimney
cleaning brush made especially for the job.
WaRnInG: Burning of above mentioned
materials will cause an unsafe condition and
will void your warranty!
If your fireplace system has any offset chimney sec-
tions, start cleaning with the flexible brush from the
top of the section downward to the elbow. Then clean
from the firebox up to the offset/return section.
sTaRTInG a FIRe and BasIC oPeRaTIon
Be sure that you have covered the floor of the fire-
place and out to the hearth with a damp sheet that
has been taped securely in place. When all the soot
has settled, remove the sheet and vacuum up – don’t
sweep the excess soot.
Before starting a fire in your fireplace, open the damp-
er to its’ fully open position. Crumple some paper and
place it on the log grate. Use some soft, dry wood as
kindling and put it on top of the paper. Place some
small logs or split logs atop the paper and kindling.
Good old-fashioned “elbow grease” is enough to re-
move the extraneous matter from the inside of the
firebox and chimney. Never use any chemical clean-
ers as their residue could introduce a fire hazard af-
ter the task is completed.
Finish off the fuel load with a couple of hardwood
logs or split logs – oak or hickory. Check to see that
you’re stacking the logs so that they will fall inside
the grate as they burn.
To get the most out of your wood, it is recommend-
ed that you let it set and completely dry out for nine
months to a year.
Outside Inspection – During your once a month in-
spection of the firebox and chimney, make it a point
to also check the outside of the chimney, the metal
When you are satisfied with the arrangement of your
wood load, light the paper which in turn will ignite the
125160-01A
31
Download from Www.Somanuals.com. All Manuals Search And Download.
operation and maintenance guidlines
Continued
flashing and weather seals that surround it. If you Removal of Creosote and Soot Formation – Creo-
find any cracks or openings around screws or nails, sote vapors are known to form in the relatively cool
seal them to avoid any roof or chimney chase leaks. chimney flues of slow burning fires, hence, creosote
residue collects on the flue lining. Because of soot
sURFaCe CRaCKs
and creosote build-up, it is recommended that the
fireplace and chimney cleaning be done twice a year.
In colder climates, cleaning should be done more of-
ten.
The Grand Meridian fireplaces are manufactured us-
ing high quality materials. During the drying process,
surface cracking may occur. These small cracks (un-
der 1/16” will not effect the fireplace safety or per-
formance). During the assembly process, fill surface
cracks with thin-set mortar and brush when drying for
a smooth surface finish.
Always allow the fireplace to completely cool before
you work on it, which means, of course, shutting off
all gas and electrical connections, also.
Be certain that you use only solid fuel in your fire-
place. You may use a natural or LP gas log lighter as
a method to start your wood fire.
The flue damper must be in the OPEN position when-
ever there is heat in the fireplace.
technical service
You may have further questions about installation, op- When calling please have your model and serial num-
eration, or troubleshooting. If so, contact FMI PROD- bers of your fireplace ready.
UCTS, LLC at 1-866-328-4537.
You can also visit our web site at
replacement parts
If this product is missing a part or has a broken com- When calling, have ready:
ponent, please do not return it to the store. Call FMI
PRODUCTS, LLC at 1-866-328-4537 to answer
questions and replace parts under warranty.
• your name
• your address
• model and serial numbers of your fireplace
• how fireplace was malfunctioning
• purchase date
Note: Use only original replacement parts. This will
protect your warranty coverage for parts replaced
under warranty.
32
125160-01A
Download from Www.Somanuals.com. All Manuals Search And Download.
accessories
Purchase these accessories from your local dealer. MoRTaR - 50 lB BUCKeT
If they can not supply these accessories, call FMI
PRODUCTS, LLC at 1-866-328-4537 for referral
information. You can also write to the address listed
on the back page of this manual.
MM525
4" oUTsIde aIR KIT
MM4AK
Herringbone
daMPeR / anCHoR PlaTe KIT
MM12AP - For use with FMI Chimney Systems
Running Bond
BRICK Panels
MM33SHBL - HERRINGBONE
MM33FRBL - RUNNING BOND
MM39SHBL - HERRINGBONE
MM39FRBL - RUNNING BOND
MM44SHBL - HERRINGBONE
MM44FRBL - RUNNING BOND
MM49SHBL - HERRINGBONE
MM49FRBL - RUNNING BOND
MM63SHBL - HERRINGBONE
MM63FRBL - RUNNING BOND
GRaTes
MMG3 - Fits MM33 & MM39
MMG4 - Fits MM44
MMG5 - Fits MM49
MMG6 - Fits MM63
sCReen asseMBlIes
MMS1 - Fits MM39 & MM44
MMS2 - Fits MM49 & MM63
MMS3 - Fits MM33
seIsMIC sTRaP KIT
MM115
MasonRY aRCH
MMARC
MeTal Base KIT
MMB33
MMB39
MMB44
MMB49
eMBeR PRoTeCToR
20093
MMB63
125160-01A
33
Download from Www.Somanuals.com. All Manuals Search And Download.
accessories
Continued
doUBle Wall PIPe
12-12DM, 18-12DM, 24-12DM, 36-12DM AND 48-12DM
sToRM CollaR
SC2-1
30° oFFseT and ReTURn
30E-12DM
FIResToP sPaCeR
FS-10
RooF FlasHInG
V6F-10DM - 0 TO 6/12 PITCH
V12F-10DM - 6/12 TO 12/12 PITCH
RoUnd ToP TeRMInaTIons
RLT-12D
CHIMneY sUPPoRT
12S-12DM
sQUaRe CHase-ToP TeRMInaTIon
STL-12D
STL-12DMP - Black
34
125160-01A
Download from Www.Somanuals.com. All Manuals Search And Download.
accessories
Continued
MasonRY (PReCasT) CHIMneY
14" dIaMeTeR
MCLS814K - 12 Sections, 8" each (8 ft total)
MCLS814P - 6 Sections, 8” each (4 ft total)
MCL814 - Inner Liner
MCS814 - Outer Liner
MCL414 - Inner Liner, 4" High (Starter)
MCSBL814 - Brick Ledge
MCSOS814 - Offset Elbow Section
MC14AP - Anchor Plate / Damper
125160-01A
35
Download from Www.Somanuals.com. All Manuals Search And Download.
parts
Models MM39, MM44 and MM49
Combustible Floor systems
non-Combustible Floor systems
20
18
13
10
10
13
19
21
9
9
8
8
5
5
7
7
20
12
22
12
6
6
11
11
4
2
4
2
3
3
3A
3A
1
1
17
21
16
see Page 16 thru 18
for combustible floor
and framing anchoring
illustrations.
36
125160-01A
Download from Www.Somanuals.com. All Manuals Search And Download.
parts
This list contains replaceable parts used in your firebox. When ordering parts, follow the instructions
listed under Replacement Parts on page 32 of this manual.
ITeM P/n
QTY
ITeM P/n
MFP39-9
QTY
desCRIPTIon
desCRIPTIon
1
2
3
MFP39-1
MFP44-1
MFP49-1
HEARTH (Left or
Right)
2
9
DOME TOP Ø12"
1
MFP44-9
MFP49-9F
MFP39-2
MFP44-2
MFP49-2
2
5
1
10 MFP39-10
MFP44-10
DOME FRONT/
REAR - MIDDLE
2
REAR WALL
SIDE WALL
MFP49-10
RATING PLATE
MFP39-3
MFP44-3
MFP49-3
11 125086-01
12 125179-01†
1
1
INSULATION
BLANKET
Ø12" DAMPER /
ANCHOR PLATE
13 MM12AP*
14 MM4AK*
1
1
1
3A MFP39-3A
MFP44-3A
SIDE WALL (with
Ø4"
Outside Combus-
tion Air Hole)
MFP49-3A
Ø4" OUTSIDE
AIR KIT
4
5
6
7
8
MFP39-4
MFP44-4
MFP49-4
SMOKE SHELF
(Downdraft Di-
verter)
1
1
1
2
2
16 MMB39*
MMB44*
6" METAL BASE
MMB49*
NOT SUPPLIED
MFP39-5
MFP44-5
MFP49-5
DOME REAR -
LOWER
17
CEMENT
BOARDS
2
1
2
2
1
18 125171-01#
19 125172-01#
20 125173-01#
12" COLLAR,
SEISMIC STRAP
MFP39-6
MFP44-6
MFP49-6
LINTEL
SEISMIC STRAP,
UPPER
MFP39-7
MFP44-7
MFP49-7
DOME SIDE -
LOWER
SEISMIC STRAP,
LOWER
21
INSULATION
MM39
MM44
125178-02§
125178-03§
125178-04§
MFP39-8
MFP44-8
MFP49-8
DOME SIDE -
UPPER
MM49
† ITEMS INCLUDED IN THE MM12AP*
#
ITEMS INCLUDED IN THE MM115*
§ ITEMS INCLUDED IN METAL BASE KIT (ITEM 16)*
* ITEMS NOTED ARE SOLD SEPARATELY
ITEMS INDICATED AS “NOT SUPPLIED” CAN BE
OBTAINED FROM YOUR LOCAL HARDWARE
STORE.
125160-01A
37
Download from Www.Somanuals.com. All Manuals Search And Download.
parts
Models MM33
Combustible Floor systems
non-Combustible Floor systems
13
14
13
14
9
9
10
10
5
5
12
6
8
12
8
7
6
7
4
4
2
2
3
3
3A
1
3A
1
17
16
see Page 16 thru 18 for combustible
floor and framing anchoring
illustrations.
38
125160-01A
Download from Www.Somanuals.com. All Manuals Search And Download.
parts
This list contains replaceable parts used in your firebox. When ordering parts, follow the instructions
listed under Replacement Parts on page 32 of this manual.
ITeM
1
PaRT nUMBeR desCRIPTIon
QTY
2
MFP33-1
MFP33-2
MFP33-3
MFP33-3A
MFP33-4
MFP33-5
MFP33-6
MFP33-7
MFP33-8
MFP33-9
MFP33-10
125086-01
MM12AP*
125179-01†
MM4AK*
MMB33*
HEARTH (Left or Right)
2
REAR WALL
2
3
SIDE WALL
5
3A
4
SIDE WALL (with Ø4″ Outside Combustion Air Hole)
DOWNDRAFT DIVERTER
DOME REAR - LOWER
LINTEL
1
1
5
1
6
1
7
DOME SIDE - LOWER
2
8
DOME SIDE - MIDDLE
2
9
DOME TOP FOR 12″ FMI PIPE
DOME FRONT/REAR - MIDDLE
RATING PLATE
1
10
12
13
14
15
16
17
2
1
Ø12″ DAMPER / ANCHOR PLATE
INSULATION BLANKET
Ø4″ OUTSIDE AIR KIT
---
---
---
1
STEEL SUPPORT PLATFORM 6″ HIGH
NOT SUPPLIED CEMENT BOARD
---
1
NOT
125178-01§
INSULATION BLANKET
SHOWN
† ITEMS INCLUDED IN THE MM12AP
* ITEMS NOTED ARE SOLD SEPARATELY
§ ITEMS INCLUDED IN METAL BASE KIT (ITEM 16)*
ITEMS INDICATED AS “NOT SUPPLIED” CAN BE
OBTAINED FROM YOUR LOCAL HARDWARE STORE.
125160-01A
39
Download from Www.Somanuals.com. All Manuals Search And Download.
parts
Models MM63
Combustible Floor systems
non-Combustible Floor systems
13
14
13
14
9
9
10
10
11
11
8
8
5
4
7
6
7
5
6
4
12
12
2
2
3
3
15
15
3A
3A
1
1
17
1A
1A
16
see Page 16 thru 18 for combustible
floor and framing anchoring
illustrations.
40
125160-01A
Download from Www.Somanuals.com. All Manuals Search And Download.
parts
This list contains replaceable parts used in your firebox. When ordering parts, follow the instructions
listed under Replacement Parts on page 32 of this manual.
ITeM
1
PaRT nUMBeR desCRIPTIon
HEARTH (Left or Right)
QTY
MFP63-1
MFP63-1A
MFP63-2
MFP63-3
MFP63-3A
MFP63-4
MFP63-5
MFP63-6
MFP63-7
MFP63-8
MFP63-9F
MFP63-10
MFP63-11
125086-01
MM12AP*
125179-01†
MM4AK*
2
1A
2
HEARTH CENTER
1
REAR WALL (2 PIECES)
3 sets
3
SIDE WALL
7
3A
4
SIDE WALL (with Ø4″ Outside Combustion Air Hole)
DOWNDRAFT DIVERTER (2 PIECES)
DOME REAR - LOWER
1
1 set
5
1
1
6
LINTEL
7
DOME SIDE - LOWER & UPPER
DOME SIDE - MIDDLE
4
8
2
9
DOME TOP FOR DUAL 12″ FMI PIPE (2 PIECES)
DOME FRONT/REAR - MIDDLE
DOME FRONT/REAR - UPPER
RATING PLATE
1 set
2
10
11
12
13
14
15
16
17
2
1
Ø12″ DAMPER / ANCHOR PLATE
INSULATION BLANKET
2
2
4 INCH DIA. OUTSIDE AIR KIT
STEEL SUPPORT PLATFORM 8″ HIGH
1
MMB63*
1
NOT SUPPLIED CEMENT BOARD
125178-05 INSULATION BLANKET
1
NOT
1
SHOWN
† ITEMS INCLUDED IN THE MM12AP*
* ITEMS NOTED ARE SOLD SEPARATELY
§ ITEMS INCLUDED IN METAL BASE KIT (ITEM 16)*
ITEMS INDICATED AS “NOT SUPPLIED” CAN BE
OBTAINED FROM YOUR LOCAL HARDWARE
STORE.
125160-01A
41
Download from Www.Somanuals.com. All Manuals Search And Download.
warranty
keep this warranty
Model (located on product or identification tag)_________________
Serial No. (located on product or identification tag)______________
Date Purchased __________________
Keep receipt for warranty verification.
Fmi products, llc limited warranties
new Products
FMI PRODUCTS, LLC warrants all Grand Meridian Fireplaces to be free from defects in materials that adversely affect fireplace
performance for a period of ten (10) years from the date of purchase, subject to the terms and conditions of this limited warranty.
FMI PRODUCTS, LLC does not warrant accessory chimney, outside air ducts, gas control or burner system, ceramic logs, and
devices not manufactured by FMI PRODUCTS, LLC. Valves and electronic parts are only covered for one year parts and labor per
the log set manufacturer’s warranty.
This warranty covers only products manufactured by FMI PRODUCTS, LLC, specifically the modular concrete firebox, and NO
WARRANTY, EXPRESS OR IMPLIED, EXTENDS TO ANY OF THE HARDWARE, FOUNDATION, VENTING, DUCTS, OR
ACCESSORIES. THIS WARRANTY DOES NOT COVER DRAFTING, SMOKING, OR SOOTING OF THE FIREPLACE SYSTEM.
Factors beyond the manufacturer’s control may affect drafting, smoking, and sooting, FMI PRODUCTS, LLC cannot guarantee
these aspects of performance.
If a component is found to be defective under the terms of this warranty, the party this warranty is extended to shall notify FMI
PRODUCTS, LLC, 2701 S. Harbor Blvd. Santa Ana, CA 92704 in writing, by registered mail, within thirty (30) days following the
discovery of the defect within the warranty period. The letter shall contain (1) the date of purchase; (2) place of purchase; (3)
address of installation; (4) name, address and phone number of the homeowner; and (5) a brief description of the defect.
FMI PRODUCTS, LLC, or any entity thereof, is not responsible for any labor costs or indirect costs incurred for the replacement
of defective components.
FMI PRODUCTS, LLC is not responsible for misuse or mishandling of component parts. Nothing in this warranty makes FMI
PRODUCTS, LLC, or any entity thereof, liable in any respect for any injury or damage to the building or structure in which
the fireplace has been installed or to the persons or property therein arising out of the use, misuse, or installation of properly
manufactured FMI PRODUCTS, LLC product.
FMIPRODUCTS, LLC, ORANYENTITYTHEREOF, SHALLNOTBEHELDLIABLEFORANYINCIDENTALORCONSEQUENTIAL
DAMAGES OR EXPENSES ARISING OUT OF THE USE OF THE FIREPLACE. ALL SUCH DAMAGES AND EXPENSES ARE
HEREBY EXCLUDED.
This warranty is null and void when the fireplaces are not installed pursuant to the installation instructions provided by FMI
PRODUCTS, LLC and local building codes have not been followed completely.
This warranty applies only to those fireplaces installed in the continental United States, Hawaii, Alaska and Canada. If any part of
this warranty is found to be unenforceable,, the remaining parts shall remain in force and effect.
FMI PRODUCTS, LLC HEREBY DISCLAIMS ALL GUARANTEES AND WARRANTIES, EXPRESS OR IMPLIED, BEYOND THE
WARRANTIES SET FORTH HEREIN.
CUSTOMER SERVICE & PARTS REPLACEMENT:
Parts and accessories may be purchased from your local dealer. Additional information is available from FMI PRODUCTS, LLC.
Accessory orders will be accepted by mail, or you may call to order Monday through Friday from 8:00 a.m. to 5:00 p.m. (Central
Standard Time) at: (800) 328-4537.
Please complete the following information for future reference and warranty verification:
2701 S. Harbor Blvd.
Santa Ana, CA 92704
1-866-328-4537
125160-01
Rev. A
12/09
Download from Www.Somanuals.com. All Manuals Search And Download.
|