Fujitsu Server C122 H007 01EN User Manual

FUJITSU Server  
PRIMEQUEST 2000 Series  
Hardware Installation Manual  
C122-H007-01EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Preface  
Preface  
This manual describes the functions and features of the PRIMEQUEST 2000 series. The manual is intended for system  
administrators.  
For details on the regulatory compliance statements and safety precautions, see the PRIMEQUEST 2000 Series Safety  
and Regulatory Information (C122-E171XA).  
Errata and addenda for the manual  
The PRIMEQUEST 2000 Series Errata and Addenda (C122-E182EN) provides errata and addenda for the manual.  
Read the PRIMEQUEST 2000 Series Errata and Addenda (C122-E182EN) thoroughly in reference to the manual.  
Organization of this manual  
This manual is organized as follows.  
Chapter 1 provides various useful information on PRIMEQUEST 2000 series installation. The information includes device  
configuration details, device outline drawings, installation specifications, and various layout diagrams.  
Chapter 2 describes the cables used with the PRIMEQUEST 2000 series and provides an overview of cable connections.  
Chapter 3 provides notes on carrying in and installing the PRIMEQUEST 2000 series server.  
Appendix A provides various information on the mounting racks for the PRIMEQUEST 2000 series and PCI_Box.  
C122-H007-01EN  
i
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
Preface  
Revision History  
Edition  
1
Date  
Revised location (type) (*1)  
Description  
2014-02-18  
-
-
*1: Chapter, section, and item numbers in the "Revised location" column refer to those in the latest edition of the  
document. However, a number marked with an asterisk (*) denotes a chapter, section, or item in a previous  
edition of the document.  
C122-H007-01EN  
ii  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Preface  
Product operating environment  
This product is a computer intended for use in a computer room environment. For details on the product operating  
environment, see the following manual:  
PRIMEQUEST 2000 Series Hardware Installation Manual (C122-H007EN)  
Safety Precautions  
Alert messages  
This manual uses the following alert messages to prevent users and bystanders from being injured and to prevent  
property damage.  
This indicates a hazardous (potentially dangerous) situation that is likely to result in death or serious  
personal injury if the user does not perform the procedure correctly.  
This indicates a hazardous situation that could result in minor or moderate personal injury if the user  
does not perform the procedure correctly. This also indicates that damage to the product or other  
property may occur if the user does not perform the procedure correctly.  
This indicates information that could help the user use the product more efficiently.  
Alert messages in the text  
An alert statement follows an alert symbol. An alert statement is indented on both ends to distinguish it from regular text.  
Similarly, one space line is inserted before and after the alert statement.  
Only Fujitsu certified service engineers should perform the following tasks on this product and the  
options provided by Fujitsu. Customers must not perform these tasks under any circumstances.  
Otherwise, electric shock, injury, or fire may result.  
-
-
-
-
-
Newly installing or moving equipment  
Removing the front, rear, and side covers  
Installing and removing built-in options  
Connecting and disconnecting external interface cables  
Maintenance (repair and periodic diagnosis and maintenance)  
The List of important alert items table lists important alert items.  
C122-H007-01EN  
iii  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Preface  
List of important alert items  
This manual does not contain important alert items.  
Warning labels  
Never remove the warning labels.  
Warning label location (the main cabinet top)  
Warning label location (the main cabinet left)  
C122-H007-01EN  
iv  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Preface  
Warning label location (PCI_Box)  
C122-H007-01EN  
v
Download from Www.Somanuals.com. All Manuals Search And Download.  
Preface  
Notes on Handling the Product  
About this product  
This product is designed and manufactured for standard applications. Such applications include, but are not limited to,  
general office work, personal and home use, and general industrial use. The product is not intended for applications that  
require extremely high levels of safety to be guaranteed (referred to below as "safety-critical" applications). Use of the  
product for a safety-critical application may present a significant risk of personal injury and/or death. Such applications  
include, but are not limited to, nuclear reactor control, aircraft flight control, air traffic control, mass transit control, medical  
life support, and missile launch control. Customers shall not use the product for a safety-critical application without  
guaranteeing the required level of safety. Customers who plan to use the product in a safety-critical system are requested  
to consult the Fujitsu sales representatives in charge.  
Storage of accessories  
Keep the accessories in a safe place because they are required for server operation.  
Adding optional products  
For stable operation of the PRIMEQUEST 2000 series server, use only a Fujitsu-certified optional product as an added  
option.  
Note that the PRIMEQUEST 2000 series server is not guaranteed to operate with any optional product not certified by  
Fujitsu.  
Maintenance  
Only Fujitsu certified service engineers should perform the following tasks on this product and the  
options provided by Fujitsu. Customers must not perform these tasks under any circumstances.  
Otherwise, electric shock, injury, or fire may result.  
-
-
-
-
-
Newly installing or moving equipment  
Removing the front, rear, and side covers  
Installing and removing built-in options  
Connecting and disconnecting external interface cables  
Maintenance (repair and periodic diagnosis and maintenance)  
Only Fujitsu certified service engineers should perform the following tasks on this product and the  
options provided by Fujitsu. Customers must not perform these tasks under any circumstances.  
Otherwise, product failure may result. PRIMEQUEST 2000 Series General Description  
-
Unpacking an optional Fujitsu product, such as an optional adapter, delivered to the customer  
Modifying or recycling the product  
Modifying this product or recycling a secondhand product by overhauling it without prior approval  
may result in personal injury to users and/or bystanders or damage to the product and/or other  
property.  
C122-H007-01EN  
vi  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Preface  
Note on erasing data from hard disks when disposing of the product or transferring it  
Disposing of this product or transferring it as is may enable third parties to access the data on the hard disk and use it for  
unforeseen purposes. To prevent the leakage of confidential information and important data, all of the data on the hard  
disk must be erased before disposal or transfer of the product.  
However, it can be difficult to completely erase all of the data from the hard disk. Simply initializing (reformatting) the hard  
disk or deleting files on the operating system is insufficient to erase the data, even though the data appears at a glance to  
have been erased. This type of operation only makes it impossible to access the data from the operating system.  
Malicious third parties can restore this data.  
If you save your confidential information or other important data on the hard disk, you should completely erase the data,  
instead of simply carrying out the aforementioned operation, to prevent the data from being restored. To prevent important  
data on the hard disk from being leaked when the product is disposed of or transferred, you will need to take care to erase  
all the data recorded on the hard disk on your own responsibility.  
Furthermore, if a software license agreement restricts the transfer of the software (operating system and application  
software) on the hard disk in the server or other product to a third party, transferring the product without deleting the  
software from the hard disk may violate the agreement. Adequate verification from this point of view is also necessary.  
Product and service inquiries  
For all product use and technical inquiries, contact the distributor where you purchased your product, or a Fujitsu sales  
representative or systems engineer (SE). If you do not know the appropriate contact address for inquiries about the  
PRIMEQUEST 2000 series, use the Fujitsu contact line.  
Fujitsu contact line  
We accept Web inquiries. For details, visit our website:  
Warranty  
If a component failure occurs during the warranty period, we will repair it free of charge in accordance with the terms of the  
warranty agreement. For details, see the warranty.  
Before requesting a repair  
If a problem occurs with the product, confirm the problem by referring to 11.2 Troubleshooting in the PRIMEQUEST 2000  
Series Administration Manual (C122-E175ENEN). If the error recurs, contact your sales representative or a field engineer.  
Confirm the model name and serial number shown on the label affixed to the right front of the device and report it. Also  
check any other required items beforehand according to 11.2 Troubleshooting in the PRIMEQUEST 2000 Series  
Administration Manual (C122-E175ENEN).  
The system settings saved by the customer will be used during maintenance.  
C122-H007-01EN  
vii  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Preface  
Manual  
How to use this manual  
This manual contains important information about the safe use of this product. Read the manual thoroughly to understand  
the information in it before using this product. Be sure to keep this manual in a safe and convenient location for quick  
reference.  
Fujitsu makes every effort to prevent users and bystanders from being injured and to prevent property damage. Be sure to  
use the product according to the instructions in this manual.  
Manuals for the PRIMEQUEST 2000 series  
The following manuals have been prepared to provide you with the information necessary to use the PRIMEQUEST 2000  
series.  
You can access HTML versions of these manuals at the following sites:  
Title  
Description  
Manual code  
PRIMEQUEST 2000 Series  
Getting Started Guide  
Describes what manuals you should read and how to access  
important information after unpacking the PRIMEQUEST 2000  
series server. (This manual comes with the product.)  
Contains important information required for using the  
PRIMEQUEST 2000 series safely.  
C122-E170XA  
PRIMEQUEST 2000 Series  
Safety and Regulatory  
Information  
C122-E171XA  
PRIMEQUEST 2000 Series  
Errata and Addenda  
Provides errata and addenda for the PRIMEQUEST 2000 series C122-E182EN  
manuals. This manual will be updated as needed.  
PRIMEQUEST 2000 Series  
General Description  
Describes the functions and features of the PRIMEQUEST 2000 C122-B025EN  
series.  
SPARC Enterprise/  
Provides the necessary information and concepts you should  
understand for installation and facility planning for SPARC  
Enterprise and PRIMEQUEST installations.  
C120-H007EN  
PRIMEQUEST Common  
Installation Planning Manual  
PRIMEQUEST 2000 Series  
Hardware Installation Manual  
PRIMEQUEST 2000 Series  
Installation Manual  
Includes the specifications of and the installation location  
requirements for the PRIMEQUEST 2000 series.  
C122-H007EN  
Describes how to set up the PRIMEQUEST 2000 series server, C122-E174EN  
including the steps for installation preparation, initialization, and  
software installation.  
PRIMEQUEST 2000 Series  
User Interface Operating  
Instructions  
Describes how to use the Web-UI and UEFI to assure proper  
operation of the PRIMEQUEST 2000 series server.  
C122-E176EN  
PRIMEQUEST 2000 Series  
Administration Manual  
Describes how to use tools and software for system  
administration and how to maintain the system (component  
replacement and error notification).  
C122-E175EN  
PRIMEQUEST 2000 Series  
Tool Reference  
Provides information on operation methods and settings, including C122-E177EN  
details on the MMB, PSA, and UEFI functions.  
C122-H007-01EN  
viii  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Preface  
Title  
Description  
Manual code  
PRIMEQUEST 2000 Series  
Message Reference  
Lists the messages that may be displayed when a problem occurs C122-E178EN  
during operation and describes how to respond to them.  
PRIMEQUEST 2000 Series  
REMCS Installation Manual  
PRIMEQUEST 2000 Series  
Glossary  
Describes REMCS service installation and operation  
C122-E180EN  
Defines the PRIMEQUEST 2000 series related terms and  
abbreviations.  
C122-E179EN  
Related manuals  
The following manuals relate to the PRIMEQUEST 2000 series.  
You can access these manuals at the following site:  
Contact your sales representative for inquiries about the ServerView manuals  
Title  
Description  
Manual code  
ServerView Suite ServerView  
Operations Manager Quick  
Installation (Windows)  
Describes how to install and start ServerView Operations  
Manager in a Windows environment.  
None  
None  
ServerView Suite ServerView  
Operations Manager Quick  
Installation (Linux)  
Describes how to install and start ServerView Operations  
Manager in a Linux environment.  
ServerView Suite ServerView  
Installation Manager  
Describes the installation procedure using ServerView Installation None  
Manager.  
ServerView Suite ServerView  
Operations Manager Server  
Management  
Provides an overview of server monitoring using ServerView  
Operations Manager, and describes the user interface of  
ServerView Operations Manager.  
None  
ServerView Suite ServerView  
RAID Management User Manual  
Describes RAID management using ServerView RAID Manager. None  
ServerView Suite Basic Concepts Describes basic concepts about ServerView Suite.  
None  
ServerView Operations Manager Describes installation and update installation of ServerView Linux None  
Installation ServerView Agents for Agent.  
Linux  
ServerView Operations Manager Describes installation and update installation of ServerView  
None  
None  
Installation ServerView Agents for Windows Agent.  
Windows  
ServerView Mission Critical  
Option User Manual  
Describes the necessary functions unique to PRIMEQUEST  
(notification via the MMB, hot replacement command) and  
ServerView Mission Critical Option (SVmco), which is required for  
supporting these functions..  
ServerView RAID Manager  
VMware vSphere ESXi 5  
Installation Guide  
Describes the installation and settings required to use ServerView None  
RAID Manager on the VMware vSphere ESXi 5 server.  
C122-H007-01EN  
ix  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Preface  
Title  
Description  
Manual code  
MegaRAID SAS Software  
Provides technical information on using RAID controllers.  
Refer to the manual from the SVS-ServerView Suite ServerBooks  
DVD(Manual)2 supplied with the product or from the following  
URL:  
None  
None  
None  
The Fujitsu Technology Solutions manuals server  
MegaRAID SAS Device Driver  
Installation  
Provides technical information on using RAID controllers.  
Refer to the manual from the SVS-ServerView Suite ServerBooks  
DVD(Manual)2 supplied with the product or from the following  
URL:  
The Fujitsu Technology Solutions manuals server  
Modular RAID Controller  
Installation Guide  
Provides technical information on using RAID controllers.  
Refer to the manual from the SVS-ServerView Suite ServerBooks  
DVD(Manual)2 supplied with the product or from the following  
URL:  
The Fujitsu Technology Solutions manuals server  
Abbreviations  
This manual uses the following product name abbreviations.  
Formal product name  
Microsoft ®Windows Server ® 2012 R2 Datacenter  
Microsoft ®Windows Server ® 2012 R2 Standard  
Microsoft ®Windows Server ® 2012 Datacenter  
Microsoft ®Windows Server ® 2012 Standard  
Microsoft ® Windows Server ® 2008 R2 Standard  
Microsoft ® Windows Server ® 2008 R2 Enterprise  
Microsoft ® Windows Server ® 2008 R2 Datacenter  
Red Hat ® Enterprise Linux ® 6 (for Intel64)  
Novell (R) SUSE(R) LINUX Enterprise Server 11 Service Pack 3  
Oracle Linux 6 (x86_64)  
Abbreviation  
Windows, Windows Server 2012  
Windows, Windows Server 2008  
Linux, RHEL6, RHEL  
SLES11 SP3  
Oracle Linux, Oracle Linux 6  
VMware vSphere (R) 5  
VMware, vSphere 5.x, VMware 5, VMware 5.x  
ESXi, ESXi 5, ESXi 5.x  
VMware (R) ESXi (TM) 5  
Trademarks  
-
Microsoft, Windows, and Windows Server are trademarks or registered trademarks of Microsoft Corporation in the  
United States and/or other countries.  
-
-
-
-
Linux is a registered trademark of Linus Torvalds.  
Red Hat, the Shadowman logo and JBoss are registered trademarks of Red Hat, Inc. in the U.S. and other countries.  
Oracle and Java are registered trademark of Oracle Corporation and its related company.  
Intel, Intel logo, Intel Inside, Intel Inside logo, Intel Atom, Intel Atom Inside, Intel Core, Core Inside, Intel vPro, vPro  
C122-H007-01EN  
x
Download from Www.Somanuals.com. All Manuals Search And Download.  
Preface  
Inside, Celeron, Celeron Inside, Itanium, Itanium Inside, Pentium, Pentium Inside, Xeon, Xeon Phi, Xeon Inside,  
Ultrabook are trademarks or registered trademarks of Intel Corporation.  
-
Ethernet is a registered trademark of Fuji Xerox Co., Ltd. in Japan and is a registered trademark of Xerox Corp. in the  
United States and other countries.  
-
-
-
VMware is a trademark or registered trademark of VMware, Inc. in the United States and other countries.  
Novell and SUSE Linux Enterprise Server are trademarks of Novell, Inc.  
Xen is a trademark or registered trademark of Citrix Systems, Inc. or its subsidiaries in the United States and other  
countries.  
-
-
Other company names and product names are the trademarks or registered trademarks of their respective owners.  
Trademark indications are omitted for some system and product names in this manual.  
Notation  
This manual uses the following fonts and symbols to express specific types of information.  
Font or symbols  
Meaning  
Example  
See the PRIMEQUEST 2000 Series  
Installation Manual (C122-E174EN).  
Click the [OK] button.  
italics  
Title of a manual that you should refer to  
Window names as well as the names of  
buttons, tabs, and drop-down menus in  
windows are enclosed in brackets.  
[ ]  
Notation for the CLI (command line interface)  
The following notation is used for commands.  
Command syntax  
Command syntax is represented as follows.  
-
-
-
-
Variables requiring the entry of a value are enclosed in angle brackets < >.  
Optional elements are enclosed in brackets [ ].  
Options for optional keywords are grouped in | (stroke) separated lists enclosed in brackets [ ].  
Options for required keywords are grouped in | (stroke) separated lists enclosed in braces { }.  
Command syntax is written in a box.  
Remarks  
The command output shown in the PDF manuals may include line feeds at places where there is no line feed symbol  
(\ at the end of the line)  
Notes on notations  
-
If you have a comment or request regarding this manual, or if you find any part of this manual unclear, please take a  
moment to share it with us by filling in the form at the following webpage, stating your points specifically, and sending  
the form to us:  
The contents of this manual may be revised without prior notice.  
-
-
-
-
-
In this manual, the Management Board and MMB firmware are abbreviated as "MMB."  
In this manual, IOU_10GbE and IOU_1GbE are collectively referred to as IO Units.  
Screenshots contained in this manual may differ from the actual product screen displays.  
The IP addresses, configuration information, and other such information contained in this manual are display  
examples and differ from that for actual operation.  
C122-H007-01EN  
xi  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Preface  
-
The PDF file of this manual is intended for display using Adobe® Reader® in single page viewing mode at 100%  
zoom.  
This manual shall not be reproduced or copied without the permission of Fujitsu Limited.  
Copyright 2014 FUJITSU LIMITED  
C122-H007-01EN  
xii  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Preface  
Contents  
C122-H007-01EN  
xiii  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Preface  
Figures  
C122-H007-01EN  
xv  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Preface  
C122-H007-01EN  
xvi  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Preface  
Tables  
C122-H007-01EN  
xvii  
Download from Www.Somanuals.com. All Manuals Search And Download.  
CHAPTER 1 Installation Data  
1.1 Configuration Contents of Device  
CHAPTER 1 Installation Data  
It explains the various data used while installing various drawings for device configuration, device overview,  
installation specification and layout.  
1.1 Configuration Contents of Device  
It shows the name and contents of configuration of each device.  
TABLE 1.1 Name and Contents of Configuration of Each device  
Equipment Name  
Content Configuration  
Size  
(Height)  
10 U  
PRIMEQUEST  
2400E  
PRIMEQUEST  
2800E/2800B  
PCI_Box  
Maximum 2 SB (Maximum 4 CPU), Maximum 4 IOU are available.  
Maximum 4 SB (Maximum 8 CPU), Maximum 4 IOU are available.  
Device for extending PCI Express Slot.  
4U  
Maximum 4 units can be connected in PRIMEQUEST 2400E/2800E.  
One PCI_Box has 12 PCI Express slots.  
Remarks  
inch rack of EIA standard.  
For the details on 19 inch rack, contact the distributor where you purchased your product, or your sales  
representative.  
1.2 External Overview of Device  
This section describes the External Overview of each equipment.  
1.2.1 External Overview of Device (Main equipment)  
External Overview of device (Front view, Rear view, Top view, Right side view) of PRIMEQUEST 2000  
Series is shown below.  
PRIMEQUEST 2400E/2800E  
FIGURE 1.1 PRIMEQUEST 2400E/2800E front view  
1
C122-H007-01EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
           
CHAPTER 1 Installation Data  
1.2 External Overview of Device  
FIGURE 1.2 PRIMEQUEST 2400E/2800E rear view  
FIGURE 1.3 PRIMEQUEST 2400E/2800E top view  
FIGURE 1.4 PRIMEQUEST 2400E/2800E right side view  
2
C122-H007-01EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
     
CHAPTER 1 Installation Data  
1.2 External Overview of Device  
PRIMEQUEST 2800B  
FIGURE 1.5 PRIMEQUEST 2800B front view  
FIGURE 1.6 PRIMEQUEST 2800B rear view  
FIGURE 1.7 PRIMEQUEST 2800B top view  
3
C122-H007-01EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
     
CHAPTER 1 Installation Data  
1.2 External Overview of Device  
FIGURE 1.8 PRIMEQUEST 2800B right side view  
4
C122-H007-01EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
CHAPTER 1 Installation Data  
1.2 External Overview of Device  
1.2.2 External Overview of Device (PCI_Box)  
Device External Overview (Front view, Rear view, Top view, Right side view) of PCI_Box is shown below.  
FIGURE 1.9 Front View of PCI_Box  
FIGURE 1.10 Rear View of PCI_Box  
FIGURE 1.11 Top View of PCI_Box  
FIGURE 1.12 Right Side View of PCI_Box  
5
C122-H007-01EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
         
CHAPTER 1 Installation Data  
1.3 Installation Specifications  
1.3 Installation Specifications  
This section explains installation specification of each equipment.  
1.3.1 Installation specifications (PRIMEQUEST 2400E)  
TABLE 1.2 Installation Specifications (PRIMEQUEST 2400E)  
Item  
Contents  
445(17.52)  
External  
Width  
Dimensions  
[mm(in.)]  
Mass [kg(lb)] (*2)  
Length(*1)  
Height  
782(30.79)  
438(17.25) 10U  
128(282)  
Conditions for Maximum Calorific value Input  
Interruptible Power  
Supply(*13)  
11,887(11,266)  
Air  
[kJ/h(BTU/h)]  
Voltage:  
200V  
Conditioning  
High efficiency Power 11,805(11,189)  
supply(*13)  
Input  
Voltage:  
100V  
Interruptible Power  
Supply(*13)  
12,528(11,874)  
Displacement  
Recommended Environmental  
temperature  
10(353)  
[m3/min(ft3/min)](*3)  
Maximum  
Operati  
ng Time  
24(848)  
(*5)  
20 to 80  
29(84.2)  
Temperature and  
Humidity Conditions(*4)  
Temperature[ºC(ºF)]  
Humidity[%RH]  
Highest Wet bulb  
Temperature[ºC(ºF)]  
Temperature[ºC(ºF)]  
Humidity[%RH]  
Down  
Time(*6  
)
0 to 50(32 to 122)  
8 to 80  
29(84.2)  
Highest Wet bulb  
Temperature[ºC(ºF)]  
Noise[dB](*7,*8)  
60  
Acoustic power level[B](*8)  
Permissible Vibration  
[m/s2(gal)]  
7.8  
Operating Time(including waiting  
time)  
4.0(400)( synthetic  
seismic wave)  
10.0(1000)( synthetic  
seismic wave)  
0.15  
200 to 240VAC±10%  
100 to 120VAC±10%  
1φ  
Down time(*9)  
Permissible dust level[mg/m3]  
Input Voltage and Pulse number  
Power  
Conditions  
Frequency and Fluctuation  
50/60 Hz+2/-4%  
4.17 kW/4.39 kVA  
Maximum Power  
Consumption  
Operating Input  
time  
Interruptible  
Voltage : Power  
/Apparent Power  
200 V  
Supply(*13)  
High efficiency  
Power  
4.04 kW/4.25 kVA  
4.42 kW/4.65 kVA  
supply(*13)  
Interruptible  
Input  
Voltage : Power  
100 V Supply(*13)  
Standby time  
0.079kW  
Power Factor(*10)  
0.95 or more  
Inrush current[A][Rush time](*11)  
Leak current[mA](*12)  
20 or less  
6.8 or less at 200V  
3.5 or less at 100V  
*1: Dimensions without protrusions (Dimensions including the front cover are 832mm(32.76in)).  
6
C122-H007-01EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
     
CHAPTER 1 Installation Data  
1.3 Installation Specifications  
*2: Numeric value when each optional device is mounted for maximum number of options.  
However, rail for mounting rack (5.7kg) and cable type are not included.  
Mass as per the installation configuration can be calculated using formula as shown below.  
Device Mass: 78 + (11.1* A) + (2.5* B) + (1.8* C) + (3.3* D) [kg]  
A= Number of mounted SB (Minimum 1 to Maximum 2)  
B=Number of mounted IOU (Minimum 1 to Maximum 4)  
C=Number of mounted extended PSU (Minimum 2 to Maximum 4)  
D=Number of mounted DU (Minimum 0 to Maximum 2)  
*3: If the device is overloaded or if abnormality is detected even though the recommended environmental  
temperature is used, the FAN rotates at high-speed.  
*4: Protect from condensation  
*5: Temperature conditions changes according to installation location above sea level.  
For 0 to 1000 m (0 to 3281 ft) above sea level, temperature range at the time of installation: 5 to 35ºC  
(41 to 95.0ºF)  
For 1000 to 1500 m (3281 to 4921 ft) above sea level, temperature range at the time of installation: 5 to  
33ºC (41 to 91.4ºF)  
For 1500 to 2000 m (4921 to 6562 ft) above sea level, temperature range at the time of installation: 5 to  
31°C (41 to 87.8°F)  
For 2000 to 3000 m (6562 to 9843 ft) above sea level, temperature range at the time of installation: 5 to  
29°C (41 to 84.2°F)  
Error of + 100m in the sea level settings of the location of installation is permissible.  
*6: Downtime is the condition in which the device is packed and maintained.  
*7: Level of noise which is actually heard varies as per the mounting condition of the position from where the  
noise is heard or the position of rack.  
*8: Level of noise and level of acoustic power changes according to the Hardware configuration, the  
processing load and the environmental temperature.  
*9: Downtime is the condition in which the device is installed. However, the power is switched off.  
*10: Value at the time of operations.  
*11: Value of 1 input cable  
*12: Value of 1 device  
*13: Interruptible power supply is the built-in PSU (80 PLUS SILVER supported), high efficiency power  
supply is the built-in PSU (80 PLUS PLATINUM supported)  
7
C122-H007-01EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
CHAPTER 1 Installation Data  
1.3 Installation Specifications  
1.3.2 Installation Specifications (PRIMEQUEST 2800E)  
TABLE 1.3 Installation Specifications (PRIMEQUEST 2800E)  
Items  
Contents  
445(17.52)  
Dimensions  
[mm (in.)]  
Width  
Depth (*1)  
Length  
782(30.79)  
438(17.25) 10U  
150(331)  
Mass [kg (lb)] (*2)  
Conditions for  
air conditioner  
Max. calorific  
value  
[kJ/h (BTU/h)]  
Displacement  
[m3/min (ft3/min)]  
(*3)  
Interruptible power source  
17,712(16,787)  
High efficiency power supply (*13)  
17,388(16,480)  
12(424)  
Recommended environmental  
temperature  
Max.  
28(989)  
Temperature and  
Humidity  
conditions (*4)  
At the time  
of operation  
Temperature [°C (°F)]]  
Humidity [%RH]  
Max wet bulb  
(*5)  
20 to 80  
29 (84.2)  
temperature [°C (°F)]]  
Temperature [°C (°F)]]  
Humidity [%RH]  
Downtime  
(*6)  
0 to 50 (32 to 122)  
8 to 80  
Max wet bulb  
29 (84.2)  
temperature [°C (°F)]]  
Noise [dB] (*7, *8)  
60  
Acoustic power level [B] (*8)  
7.8  
Permissible  
Vibration [m/s2  
(gal)]  
At the time of operation (Including  
standby)  
Downtime (*9)  
4.0 (400) (Composite seismic  
wave)  
10.0 (1000) (Composite  
seismic wave)  
0.15  
Permissible dust level [mg/m3]  
Power supply  
conditions  
Input voltage and source resultant pulse number  
200 to 240 VAC±10 %  
1φ  
Frequency and fluctuating Range  
50/60 Hz + 2/-4%  
Max power  
consumption /  
apparent power  
At the time  
of operation  
Interruptible power  
source (*13)  
High efficiency power  
supply (*13)  
6.11 kW/6.43 kVA  
5.92 kW/6.23 kVA  
0.084 kW  
Downtime  
Power factor (*10)  
Inrush current [A] [Rush hours] (*11)  
Leak current [mA] (*12)  
0.95 or more  
20 or less  
6.9 or less  
*1: Dimensions without protrusions (832 mm(32.76in) including front cover)  
*2: Numeric value when each optional device is mounted for maximum number of options.  
However, rail for mounting rack (5.7kg) and cable type are not included.  
Mass as per the installation configuration can be calculated using formula as shown below.  
Device mass = 78 + (11.1 * A) + (2.5 * B) + (1.8 * C) + (3.3 * D) [kg]  
A = Number of mounted SB (Minimum 1 to Maximum 4)  
B= Number of mounted IOU (Minimum 1 to Maximum 4)  
C= Number of mounted PSU (Minimum 2 to Maximum 6)  
D= Number of mounted DU (Minimum 0 to Maximum 2)*3: There are cases when device is overloaded or  
when abnormality is detected, FAN rotates at high-speed even if recommended environmental  
temperature is used.  
*4: Protect from condensation.  
*5: Temperature condition changes according to the installation location above sea level.  
For 0 to 1000 m (0 to 3281 ft) above sea level, temperature range at the time of installation: 5 to 35°C  
(41 to 95°F)  
For 1000 to 1500 m (3281 to 4921 ft) above sea level, temperature range at the time of installation: 5 to  
33°C (41 to 91.4°F)  
For 1500 to 2000 m (4921 to 6562 ft) above sea level, temperature range at the time of installation: 5 to  
31°C (41 to 87.8°F)  
8
C122-H007-01EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
CHAPTER 1 Installation Data  
1.3 Installation Specifications  
For 2000 to 3000 m (6562 to 9843 ft) above sea level, temperature range at the time of installation: 5 to  
29°C (41 to 84.2°F)  
Error of + 100m in the sea level settings of the location of installation is permissible.  
*6: Downtime is the condition in which the device is packed and maintained.  
*7: Level of noise which is actually heard varies as per the mounting condition of the position from where the  
noise is heard or the position of rack.  
*8: Level of noise and the level of acoustic power changes according to the Hardware configuration, the  
processing load and the environmental temperature.  
*9: Downtime is the condition in which the device is installed. However, the power is switched off.  
*10: Value at the time of operations.  
*11: Value of 1 input cable  
*12: Value of 1 device  
*13: Interruptible power supply is the built-in PSU (80 PLUS SILVER supported), high efficiency power  
supply is the built-in PSU (80 PLUS PLATINUM supported)  
9
C122-H007-01EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
CHAPTER 1 Installation Data  
1.3 Installation Specifications  
1.3.3 Installation Specifications (PRIMEQUEST 2800B)  
TABLE 1.4 Installation Specifications (PRIMEQUEST 2800B)  
Items  
Contents  
445(17.52)  
Dimensions  
[mm (in.)]  
Width  
Depth (*1)  
Length  
782(30.79)  
438(17.25) 10U  
143(315)  
Mass [kg (lb)] (*2)  
Conditions for  
air conditioner  
Max. calorific  
value  
[kJ/h (BTU/h)]  
Displacement  
[m3/min (ft3/min)]  
(*3)  
Interruptible power source  
16,992(16,105)  
High efficiency power supply (*13)  
16,740(15,866)  
12(424)  
Recommended environmental  
temperature  
Max.  
28(989)  
Temperature and  
Humidity  
conditions (*4)  
At the time  
of operation  
Temperature [°C (°F)]]  
Humidity [%RH]  
Max wet bulb  
(*5)  
20 to 80  
29 (84.2)  
temperature [°C (°F)]]  
Temperature [°C (°F)]]  
Humidity [%RH]  
Downtime  
(*6)  
0 to 50 (32 to 122)  
8 to 80  
Max wet bulb  
29 (84.2)  
temperature [°C (°F)]]  
Noise [dB] (*7, *8)  
60  
Acoustic power level [B] (*8)  
7.8  
Permissible  
Vibration [m/s2  
(gal)]  
At the time of operation (Including  
standby)  
Downtime (*9)  
4.0 (400) (Composite seismic  
wave)  
10.0 (1000) (Composite  
seismic wave)  
0.15  
Permissible dust level [mg/m3]  
Power supply  
conditions  
Input voltage and source resultant pulse number  
200 to 240 VAC±10 %  
1φ  
Frequency and fluctuating Range  
50/60 Hz + 2/-4%  
Max power  
consumption /  
apparent power  
At the time  
of operation  
Interruptible power  
source (*13)  
High efficiency power  
supply (*13)  
6.00 kW/6.32 kVA  
5.81 kW/6.12 kVA  
0.084 kW  
Downtime  
Power factor (*10)  
Inrush current [A] [Rush hours] (*11)  
Leak current [mA] (*12)  
0.95 or more  
20 or less  
6.9 or less  
*1: Dimensions without protrusions  
*2: Numeric value when each optional device is mounted for maximum number of options.  
However, rail for mounting rack (5.7kg) and cable type are not included.  
Mass as per the installation configuration can be calculated using formula as shown below.  
Device mass = 77 + (9.6 * A) + (2.5 * B) + (1.8 * C) + (3.3 * D) [kg]  
A = Number of mounted SB (Minimum 1 to Maximum 4)  
B= Number of mounted IOU (Minimum 1 to Maximum 4)  
C= Number of mounted PSU (Minimum 2 to Maximum 6)  
D= Number of mounted DU (Minimum 0 to Maximum 2)  
*3: There are cases when device is overloaded or when abnormality is detected, FAN rotates at high-speed  
even if recommended environmental temperature is used.  
*4: Protect from condensation.  
*5: Temperature condition changes according to the installation location above sea level.  
For 0 to 1000 m (0 to 3281 ft) above sea level, temperature range at the time of installation: 5 to 35°C  
(41 to 95°F)  
10  
C122-H007-01EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
CHAPTER 1 Installation Data  
1.3 Installation Specifications  
For 1000 to 1500 m (3281 to 4921 ft) above sea level, temperature range at the time of installation: 5 to  
33°C (41 to 91.4°F)  
For 1500 to 2000 m (4921 to 6562 ft) above sea level, temperature range at the time of installation: 5 to  
31°C (41 to 87.8°F)  
For 2000 to 3000 m (6562 to 9843 ft) above sea level, temperature range at the time of installation: 5 to  
29°C (41 to 84.2°F)  
Error of + 100m in the sea level settings of the location of installation is permissible.  
*6: Downtime is the condition in which the device is packed and maintained.  
*7: Level of noise which is actually heard varies as per the mounting condition of the position from where the  
noise is heard or the position of rack.  
*8: Level of noise and the level of acoustic power changes according to the Hardware configuration, the  
processing load and the environmental temperature.  
*9: Downtime is the condition in which the device is installed. However, the power is switched off.  
*10: Value at the time of operations.  
*11: Value of 1 input cable  
*12: Value of 1 device  
*13: Interruptible power supply is the built-in PSU (80 PLUS SILVER supported), high efficiency power  
supply is the built-in PSU (80 PLUS PLATINUM supported)  
11  
C122-H007-01EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
CHAPTER 1 Installation Data  
1.3 Installation Specifications  
1.3.4 Installation Specifications (PCI_Box)  
TABLE 1.5 Installation Specifications (PCI_Box)  
Item  
Contents  
482 (18.98)  
Dimensions  
[mm (in)]  
Width  
Depth  
Length  
740 (29.13)  
175 (6.89) 4U  
35 (77)  
Mass [kg (lb)] (*2)  
Conditions  
for air  
conditioner  
Max. calorific value [kJ/h (BTU/h)]  
Displacement [m3/min  
(ft3/min)] (*3)  
1656 (1570)  
3 (106)  
4 (141)  
5 (177)  
(*5)  
FAN low speed (Low)  
FAN medium speed (Normal)  
FAN high speed (High)  
Temperature [°C (°F)]]  
Humidity [%RH]]  
Temperature  
and Humidity  
condition (*4)  
At time of  
operation  
20 to 80  
29 (84.2)  
Max wet bulb temperature [°C  
(°F)]]  
Downtime  
(*6)  
Temperature [°C (°F)]]  
Humidity [%RH]]  
0 to 50 (32 to 122)  
8 to 80  
Max wet bulb temperature [°C  
(°F)]]  
29 (84.2)  
Noise [dB] (*7, *8)  
(Included in  
installation)  
Acoustic power level [B] (*8)  
(Included in  
installation)  
Permissibl At the time of operation (Including standby)  
e Vibration  
4.0 (400) (Composite  
seismic wave)  
10.0 (1000)  
[m/s2  
Downtime (*9)  
(gal)]  
(Composite seismic  
wave)  
0.15  
Permissible dust level [mg/m3]  
Power  
Supply  
conditions  
Input voltage and source resultant pulse number  
200 to 240 VAC±10 %  
100 to 120 VAC±10 %  
1φ  
Frequency and fluctuating Range  
50/60 Hz + 2/-4%  
450W/475 VA  
460W/485 VA  
10W/40VA  
Max  
At the time of  
operation  
Downtime  
Input voltage: 200 V  
Input voltage: 100 V  
Input voltage: 200 V  
Input voltage: 100 V  
power  
consumpti  
on /  
10W/35 VA  
apparent  
power  
Power factor (*10)  
More than equal to  
0.95  
Inrush current [A] [Rush hours] (*11)  
Leak current [mA] (*12)  
Less than or equal to  
25  
Less than or equal to  
3.5  
*1: Dimensions without protrusions.  
*2: Numeric value when each optional device is mounted for maximum number of options.  
*3: If the device is overloaded or if abnormality is detected even though the recommended environmental  
temperature is used, the FAN rotates at high-speed.  
*4: Protect from condensation.  
*5: Temperature condition changes according to the installation location above sea level.  
For 0 to 1000 m (0 to 3281 ft) above sea level, temperature range at the time of installation: 5 to 35°C  
(41 to 95°F)  
For 1000 to 1500 m (3281 to 4921 ft) above sea level, temperature range at the time of installation: 5 to  
33°C (41 to 91.4°F)  
For 1500 to 2000 m (4921 to 6562 ft) above sea level, temperature range at the time of installation: 5 to  
31°C (41 to 87.8°F)  
For 2000 to 3000 m (6562 to 9843 ft) above sea level, temperature range at the time of installation: 5 to  
29°C (41 to 84.2°F)  
Error of + 100m in the sea level settings of the location of installation is permissible.  
*6: Downtime is the condition in which the device is packed and maintained.  
12  
C122-H007-01EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
CHAPTER 1 Installation Data  
1.4 Installation Area  
*7: Level of noise which is actually heard varies as per the mounting condition of the position from where the  
noise is heard or the position of rack.  
*8: Level of noise and level of acoustic power changes according to the environmental temperature  
*9: Downtime is the condition in which the device is installed. However, the power is switched off.  
*10: Value at the time of operations.  
*11: Value of 1 input cable  
*12: Value of 1 device  
1.4 Installation Area  
Here, the installation area and the service area when the PRIMEQUEST 2000 series or the PCI_Box is  
installed on 19-inch made by Fujitsu rack are explained.  
The installation area and the service area differ according to the installed 19-inch rack.  
For details on the 19-inch racks, contact the distributor where you purchased your product, or your sales  
representative.  
FIGURE 1.13 Service Area at the time of installing 19 inch rack model  
Number  
Description  
(1)  
(2)  
(3)  
(4)  
Rear side maintenance area  
Rack  
Front side maintenance area  
Rack width  
Model 2724/2737/2742, PCRM1 724S/742S/724A/742A 700 mm  
Model 2616/2624/2642, PCRM1 616S/624S/642S  
600 mm  
13  
C122-H007-01EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
CHAPTER 1 Installation Data  
1.5 Flow of Cooling Air and Exhaust Air of Installation  
1.5 Flow of Cooling Air and Exhaust Air of Installation  
Here, the flow of the cooling air and the exhaust of each device are explained.  
Note  
Flow of cooling air and exhaust air should be considered while studying the installation of a device. If device  
is installed without considering them, it may get affected by inhaling the exhaust air from the other device.  
Especially, the device detecting the intake air temperature may raise alarm indicating abnormality.  
1.5.1 Flow of Cooling Air and Exhaust Air (Main Cabinet)  
FIGURE 1.14 Flow of Cooling Air and Exhaust Air (Main Cabinet)  
Number  
(1)  
Description  
Inspiration  
(2)  
Exhaust  
(3)  
Location of exhaust  
1.5.2 Flow of Cooling Air and Exhaust (PCI_Box)  
FIGURE 1.15 Flow of Cooling Air and Exhaust (PCI_Box)  
Number  
(1)  
Description  
Inspiration  
(2)  
Exhaust  
(3)  
Location of exhaust  
14  
C122-H007-01EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
         
CHAPTER 1 Installation Data  
1.6 Installation Environment  
1.6 Installation Environment  
This section describes the installation environment of the base cabinet and PCI_Box.  
1.6.1 Dust  
Suspended Particles  
Suspended particles in a computer room should not exceed 0.15mg/m3. A computer is designed in such a  
way that it withstands the suspended particles. This value is permissible in an ordinary office. However, this  
value can be maintained in the ordinary computer room if there is less outdoor air infiltration having  
suspended particles like dust and if there is no smoke of cigarettes.  
Dust Removal  
The suspended particles like dust are collected in the filter of an air conditioner. The dust should be removed  
from the computer room by cleaning floor surfaces and underfloor periodically. Cleaning is necessary in the  
following cases.  
When the computer room is ready, and before bringing in the computers  
At the time of repairing the computer room  
At the time of shifting the computers and re-arranging the devices  
1.6.2 Corrosive Gas  
Corrosive gas and salty wind cause corrosion, malfunctioning, and damage of the device, and reduce life of  
the device remarkably.  
Corrosive gas should be removed by providing suitable air cleaning equipment. In addition, positive clear air  
pressure in the room prevents an entering of the corrosive gas from the outside. The chemical factory area,  
thermal water/ volcanic zone etc. are considered as a source of corrosive gas.  
TABLE 1.6 Permissible Level of Corrosive Gas  
Name of gas  
Hydrogen sulfide (H2S)  
Permissible level  
7.1ppb or less  
Sulfur dioxide (Sulfur oxide)(SO2)  
Hydrogen chloride (HCL)  
Chlorine (CI2)  
Hydrogen fluoride (HF)  
Nitrogen dioxide (Nitrogen oxides)(NO2)  
Ammonia(NH3)  
37ppb or less  
6.6ppb or less  
3.4ppb or less  
3.6ppb or less  
52ppb or less  
420ppb or less  
5ppb or less  
Ozone(O3)  
Fluid vapor  
0.2mg/m3 or less  
1.6.3 Sea Water (Salt Damage)  
A large number of sea-salt particles are suspended in air by the salty wind near the sea-coast. If the sea-salt  
particles remain in the computer, moisture and chemically condensed substances cause insulation failure,  
and corrosion degradation of the components. Therefore, the computer should be installed at a place which  
is far from the sea-coast.  
Installation standards to prevent damage due to sea salt particles are shown below.  
Standards: The computer should be installed at a place which is at least 0.5km away from the sea-coast  
(Excluding the case having air-conditioner which prevents an entering of air from outside)  
1.7 Safety Measures  
For details on safety measures, see “Chapter 8 Safety Measures” of “SPARC M10 System/ SPARC  
Enterprise/PRIMEQUEST Common Installation Planning Manual” (C120-H007EN).  
15  
C122-H007-01EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
           
CHAPTER 2 Connected Information  
2.1 Connection summary  
CHAPTER 2 Connected Information  
This section describes the connection summary of cable and cable used in PRIMEQUEST 2000 series.  
2.1 Connection summary  
This section shows the Device connection summary of PRIMEQUEST 2000 series.  
FIGURE 2.1 Summary of Device Connection  
16  
C122-H007-01EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
     
CHAPTER 2 Connected Information  
2.2 Connection of signal cable  
TABLE 2.1 Notes for Device connection  
Configured part Description  
Number  
*1  
*2  
*3  
*4  
SB  
PRIMEQUEST 2400E  
Maximum 2 units can  
be mounted  
Maximum 4 units can  
be mounted  
Maximum 4 units of  
IOU_1GbE or  
IOU_10GbE can be  
mounted.  
Maximum 2 units can  
be mounted  
Maximum 1 unit can be  
mounted  
Maximum 4 units can  
be mounted  
No PCI_Box can be  
mounted.  
PRIMEQUEST 2800E/2800B  
IOU  
PRIMEQUEST 2400E/2800E/2800B  
MMB  
PCI_Box  
PRIMEQUEST 2400E/2800E  
PRIMEQUEST 2800B  
PRIMEQUEST 2400E/2800E  
PRIMEQUEST 2800B  
2.2 Connection of signal cable  
This section describes the notes for connection of signal cable, cable list and cable procure.  
2.2.1 Basic interface and peripheral  
For details of basic interface of PRIMEQUEST 2000 series and cable connection of peripheral, see  
PRIMEQUEST 2000 series system mounting”  
2.2.2 Details of external interface connection  
Mounting position of external interface connecting part of PRIMEQUEST 2000 series is shown in the section  
below. When calculating the length of the connection cable, you should take account into the mounting  
position.  
17  
C122-H007-01EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
       
CHAPTER 2 Connected Information  
2.2 Connection of signal cable  
External interface connection (PRIMEQUEST 2400E in base cabinet)  
External interface connection figure of PRIMEQUEST 2400E in base cabinet is shown in the section below.  
The figure below is uncovered front surface (face).  
The front cover must be attached in normal operation.  
FIGURE 2.2 External interface connection figure of (PRIMEQUEST 2400E (Front surface))  
FIGURE 2.3 External interface connection figure of (PRIMEQUEST 2400E (Back surface))  
18  
C122-H007-01EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
CHAPTER 2 Connected Information  
2.2 Connection of signal cable  
External interface connection (PRIMEQUEST 2800E in base cabinet)  
External interface connection figure of PRIMEQUEST 2800E in base cabinet is shown in the section below.  
This figure is uncovered front surface (face).  
The front cover must be attached in normal operation.  
FIGURE 2.4 External interface connection figure of (PRIMEQUEST 2800E (Front surface))  
FIGURE 2.5 External interface connection figure of (PRIMEQUEST 2800E (Back surface))  
19  
C122-H007-01EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
CHAPTER 2 Connected Information  
2.2 Connection of signal cable  
External interface connection (PRIMEQUEST 2800B in base cabinet)  
External interface connection figure of PRIMEQUEST 2800B in base cabinet is shown in the section below.  
This figure is uncovered front surface (face).  
The front cover must be attached in normal operation.  
FIGURE 2.6 External interface connection figure of (PRIMEQUEST 2800B (Front surface))  
FIGURE 2.7 External interface connection figure of (PRIMEQUEST 2800B (Back surface))  
20  
C122-H007-01EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
CHAPTER 2 Connected Information  
2.2 Connection of signal cable  
Details of external interface (MMB)  
FIGURE 2.8 Details of external interface (MMB)  
Details of external interface (IOU_1GbE/IOU_10GbE)  
FIGURE 2.9 Details of external interface (IOU_1GbE)  
FIGURE 2.10 Details of external interface (IOU_10GbE)  
Details of external interface (DU)  
FIGURE 2.11 Details of external interface (DU)  
21  
C122-H007-01EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
       
CHAPTER 2 Connected Information  
2.3 Power cable connection  
Details of external interface (PCI_Box)  
FIGURE 2.12 Details of external interface (PCI_Box)  
PCIC:PCI slot  
LNKC:LINK card  
2.3 Power cable connection  
Input power system of PRIMEQUEST 2000series and PCI_Box is described in this section.  
2.3.1 Power Supply Cable Connection (PRIMEQUEST 2400E)  
Input power system diagram of PRIMEQUEST 2400E is as shown below.  
100 V Standard Power Feed Configuration (Single power feed, no Redundant Power  
Feed)  
It is necessary to arrange three PSUs, three FANUs and three power supply cables (100 V NEMA 5-15P) for  
100V standard power feed configuration (single power feed, no redundant power feed).  
FIGURE 2.13 100V Standard Power Feed Configuration (Single power feed, no Redundant Power Feed)  
Number  
(1)  
Description  
Distribution Panel AC100V AC#0system  
22  
C122-H007-01EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
       
CHAPTER 2 Connected Information  
2.3 Power cable connection  
100 V Redundant Power Feed Configuration (Single power feed, Redundant Power  
Feed)  
It is necessary to arrange four PSUs, two FANUs and four power supply cables (100 V NEMA 5-15P) for  
100V redundant power feed configuration (single power feed, redundant power feed).  
FIGURE 2.14 100V Redundant Power Feed Configuration (Single power feed, Redundant Power Feed)  
Number  
(1)  
Description  
Distribution Panel AC100V AC#0system  
Standard Configuration of 200 V (single power feed, no redundant power feed) with  
Power Distribution Box Connection  
It is necessary to arrange two PSUs, four FANUs, two power cables (200 V IEC60320 C20) and two power  
distribution boxes (200 V IEC60320 C19×3type) for standard configuration of 200 V (single power feed, no  
redundant power supply).  
When the power distribution box is used, it is necessary to secure the breaker characteristic of distribution  
FIGURE 2.15 Standard Configuration of 200 V (single power feed, no redundant power feed) with Power  
Distribution Box Connection  
Number  
Description  
(1)  
Power distribution box (200V C 19 3 type)  
23  
C122-H007-01EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
CHAPTER 2 Connected Information  
2.3 Power cable connection  
200 V Redundant Power Feed Configuration (with single power feed, redundant power  
feed) with Power Distribution Box Connection  
It is necessary to arrange three PSUs, three FANUs, three Power cables (200 V IEC60320 C20) and two  
power distribution box (200 V IEC60320 C19×3type) for of 200 V Redundant Power Feed Configuration  
(single power feed, redundant power feed).  
When the power distribution box is used, it is necessary to secure the breaker characteristic of distribution  
FIGURE 2.16 200 V Redundant Power Feed Configuration (single power feed, redundant power feed) with  
Power Distribution Box Connection  
Number  
Description  
(1)  
Power distribution box (200V C 19 3 type)  
200V Dual Power Feed Configuration with Power Distribution Box Connection  
It is necessary to arrange four PSUs, two FANUs, four power cables (200 V IEC60320 C20) and two power  
distribution box (200 V IEC60320 C19×3type) for 200 V dual power feed configuration for Japan and  
Overseas.  
When the power distribution box is used, it is necessary to secure the breaker characteristic of distribution  
FIGURE 2.17 200 V Dual Power Feed Configuration with Power Distribution Box Connection  
Number  
Description  
(1)  
Power distribution box (200V C 19 3 type)  
24  
C122-H007-01EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
CHAPTER 2 Connected Information  
2.3 Power cable connection  
2.3.2 Power Cables Connections (PRIMEQUEST 2800E/2800B)  
This section shows the figure of input power of PRIMEQUEST 2800E/2800B.  
Standard Configuration of 200 V (Single power feed and no Redundant Power Feed)  
with Power Distribution Box Connection  
It is necessary to arrange three PSUs, three FANUs, three power cables (200 V IEC60320 C20) and two  
power distribution box (200 V IEC60320 C19×3type) for 200 V standard configuration.  
When the power distribution box is used, it is necessary to secure the breaker characteristic of distribution  
FIGURE 2.18 200V Standard Configuration (single power feed and no redundant power feed) with Power  
Distribution Box Connection  
Number  
Description  
(1)  
Power distribution box (200V C 19 3 type)  
25  
C122-H007-01EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
CHAPTER 2 Connected Information  
2.3 Power cable connection  
200 V Redundant Power Feed Configuration (single power feed, redundant power feed)  
with Power Distribution Box Connection  
It is necessary to arrange four PSUs, two FANUs, four Power cables (200 V IEC60320 C20) and two power  
distribution boxes (200 V IEC60320 C19×3type) for 200 V Redundant Power Feed configuration (with single  
power feed, redundant power feed).  
When the power distribution box is used, it is necessary to secure the breaker characteristic of distribution  
FIGURE 2.19 200 V Redundant Power Feed Configuration (single power feed, redundant power feed) with  
Power Distribution Box Connection  
Number  
Description  
(1)  
Power distribution box (200V C 19 3 type)  
26  
C122-H007-01EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
CHAPTER 2 Connected Information  
2.3 Power cable connection  
200 V Dual Power Feed Configuration with Power Distribution Box Connection  
It is necessary to arrange six PSUs, six power cables (200 V IEC60320 C20) and four power distribution  
boxes (200 V IEC60320 C19×3type) for 200 V dual power feed configuration.  
When the power distribution box is used, it is necessary to secure the breaker characteristic of distribution  
FIGURE 2.20 200 V Dual Power Feed Configuration with Power Distribution Box Connection  
Number  
Description  
(1)  
Power distribution box (200V C 19 3 type)  
2.3.3 Power Cable Connections (PCI_Box)  
This section shows the figure of input power of PCI_Box.  
Remarks  
While configuring redundant power feed and dual power feed in this device, configure the same power feed  
to PCI_Box.  
100 V Configuration (single power feed, no redundant power feed)  
It is necessary to arrange PSU and power cable (100 V NEMA 5-15P) for 100 V configuration (Single power  
feed, no redundant power feed).  
FIGURE 2.21 100 V Configuration (Single power feed, no Redundant power feed)  
Number  
(1)  
Description  
Customer distribution panel AC 100V AC#0 system  
27  
C122-H007-01EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
     
CHAPTER 2 Connected Information  
2.3 Power cable connection  
100 V Redundant Power Feed Configuration (single power feed, redundant power feed)  
It is necessary to arrange two PSUs and two power cables (100 V NEMA 5-15P) for 100 V redundant power  
feed configuration (single power feed, redundant power feed).  
FIGURE 2.22 100 V Redundant power feed configuration (Single power feed, redundant power feed)  
Number  
(1)  
Description  
Customer distribution panel AC100 V AC#0 system  
200 V Standard configuration (single power feed, no redundant power feed) with power  
distribution box connection  
It is necessary to arrange PSU, power cable (200 V IEC 60320 C14) and power distribution box (200 V  
IEC60320 C134 types) for 200 V Standard configuration (single power feed, no redundant power feed).  
FIGURE 2.23 200V Standard configuration (single power feed, no redundant power feed) power distribution  
box connection  
Number  
(1)  
Description  
Power distribution box (200 V C134 type)  
28  
C122-H007-01EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
CHAPTER 2 Connected Information  
2.3 Power cable connection  
200 V Redundant power feed configuration (single power feed, redundant power feed)  
power distribution box connection  
It is necessary to arrange two PSUs, two power cables (200 V IEC60320 C14) and power distribution box  
(200 V IEC60320 C13×4type) for 200 V redundant power feed configuration (single power feed, redundant  
power supply).  
FIGURE 2.24 200 V Redundant Power Feed Configuration (Single power feed, Redundant Power Feed)  
Power Distribution Box Connection  
Number  
(1)  
Description  
Power distribution box (200 V C134 type)  
200 V Dual Power Feed Configuration with Power Distribution Box Connection  
It is necessary to arrange two PSUs, two power cables (200 V IEC60320 C14) and two power distribution  
boxes (200 V IEC60320 C13×4type) for 200 V dual power feed configuration.  
FIGURE 2.25 200 V Dual Power Feed Configuration with Power Distribution Box Connection  
Number  
(1)  
Description  
Power distribution box (200V C134 type)  
29  
C122-H007-01EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
CHAPTER 2 Connected Information  
2.4 Connection Specifications of Input Power  
2.4 Connection Specifications of Input Power  
This section describes the connection specifications of Input power of the base cabinet or PCI_Box of  
PRIMEQUEST 2000 series.  
2.4.1 Input Power Connection Specifications (Base Cabinet)  
Following table shows the input power connection specifications of the main unit.  
TABLE 2.2 Power Cable Specifications (Base Cabinet)  
Destination  
100 V  
Plug format  
Parallel 2-pole plug  
with earthing-contact  
“NEMA standard 5-  
15P”  
Remarks  
Connection at wall-mount power distribution  
Recipient power distribution  
format  
Power distribution “NEMA  
standard 5-15R” for parallel  
2-pole plug with earthing -  
contact (125V 15A)  
200 V  
IEC60320-C20 type  
Connection at power distribution box  
Recipient outlet format IEC60320-C19type  
Remarks  
-
Power cable supplied with the device and power cord supplied with the option part, are used for the  
power cable which is connected to the device. However, the supplied power cable is not used for the  
other products.  
-
Power distribution box which is suitable to recipient power distribution format is used  
2.4.2 Input Power Supply Connection Specifications (PCI_Box)  
Following table shows the input power supply connection specifications of PCI_Box.  
TABLE 2.3 Power Cable Specification (PCI_Box)  
Destination  
Plug format  
Parallel 2-pole plug with  
earthing-contact  
Remarks  
100V  
Connection at wall-mount power distribution  
Connection at power  
distribution box  
Power distribution  
“NEMA standard 5-  
15R” for parallel 2-  
pole plug with  
“NEMA standard 5-15P”  
earthing- contact  
(125V 15A)  
200V  
IEC60320-C14 type  
Connection at power distribution box  
Recipient outlet  
format  
IEC60320-C13 type  
Remarks  
-
Power cable supplied with the device and power cord supplied with the option part, are used for the  
power cable which is connected to the device. However, the supplied power cable is not used for the  
other products.  
-
Power distribution box which is suitable to recipient power distribution format is used  
30  
C122-H007-01EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
         
CHAPTER 2 Connected Information  
2.5 Free Access Underfloor Connection of Power Cable  
2.4.3 Power Distribution Box and Distribution Panel  
Following table shows the power supply cable specifications of power distribution box and distribution panel.  
TABLE 2.4 Power Supply Cable Specifications of Power Distribution Box and Distribution Panel  
Destination  
200V for countries NEMAL6-30P  
other than Japan  
Plug format  
Remarks  
NEMA L6-30R (30A-  
Recipient power  
distribution format  
220V)  
200V for Brazil  
IEC60309-32A  
Recipient power  
distribution format  
IEC60309-32A (32A-  
250V)  
Remarks  
Power cable supplied with the device and power cord supplied with the option part, are not used for the  
power cable which is connected to the device. However, the supplied power cable is not used for the other  
products.  
2.5 Free Access Underfloor Connection of Power Cable  
If the height of underfloor is less than 300mm (11.8 in.), the power distribution is set to sideways.  
FIGURE 2.26 When Underfloor Height is less than 300mm (11.8 in)  
Number  
(1)  
Description  
Free access floor  
(2)  
(3)  
Less than 300mm (11.8 in)  
Recipient power distribution  
The connector format and cable bend radius of power cable are considered at the time of connecting the  
power cable of power distribution box (or base cabinet, PCI_Box) under the free access floor. It is  
recommended that the under floor height is 300 mm (11.8 in) or more.  
The recipient power distribution should be arranged near the device.  
FIGURE 2.27 When the under floor height is 300 mm (11.8 in) or more.  
31  
C122-H007-01EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
         
CHAPTER 2 Connected Information  
2.6 Cutoff Characteristics of Distribution Panel (At the time of connecting power distribution box)  
Number  
(1)  
Description  
Free access floor  
(2)  
(3)  
(4)  
200 mm (9.8 in)  
300 mm (11.8 in) or more  
Recipient power distribution  
Remarks  
The above figure shows an example of 19-inch rack made by Fujitsu Limited mounted with the device.  
2.6 Cutoff Characteristics of Distribution Panel (At the time  
of connecting power distribution box)  
At the time of connecting the distribution panel through power distribution box, protection should be  
coordinated so that the breaker of the device (or power distribution box) trips before the breaker of the  
distribution panel trips. Such protection should be maintained. Therefore, the distribution panel should have  
It is necessary to use Distribution panel Breaker suitable to these conditions.  
TABLE 2.5 Characteristic Condition of Distribution Panel Breaker  
Breaker capacity of Distribution panel Breaker  
Power input  
Device Name  
For Japan/general  
overseas/North America  
30A  
For Europe  
32A  
AC200 - 240 V  
Power distribution box  
Cutoff characteristic is Long-time delay type and the cutoff characteristic equivalent to D (IEC898or IN0641  
part II) shown in FIGURE 2.28 Characteristics of Breaker of Distribution Panelor cutoff characteristics  
slower than these characteristics is used.  
32  
C122-H007-01EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
CHAPTER 2 Connected Information  
2.6 Cutoff Characteristics of Distribution Panel (At the time of connecting power distribution box)  
FIGURE 2.28 Characteristics of Breaker of Distribution Panel  
Number  
Description  
(1)  
(2)  
(3)  
(4)  
Operating time  
Minutes  
Seconds  
Electric current (Amplification of rated current)  
33  
C122-H007-01EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
CHAPTER 3 Notes on Carrying In and Installing the Product  
3.1 Elevator Load Conditions  
CHAPTER 3 Notes on Carrying In and  
Installing the Product  
This chapter provides notes on carrying in and installing the PRIMEQUEST 2000 series server.  
3.1 Elevator Load Conditions  
The rack with the device mounted is wider than the average computer. Therefore, to use an elevator to carry  
in the rack, the rack may need the side boards or doors removed before loading on the elevator. When using  
an elevator to carry in the rack, see the elevator load conditions in TABLE 3.1 Elevator load conditionsand  
confirm that you are properly loading the rack on the elevator.  
TABLE 3.1 Elevator load conditions  
Width  
(*1)  
Depth  
(*1)  
Height  
(*1)  
Width  
(*2)  
Height  
(*2)  
Rack  
Models  
2742/2737/2724/  
2642/2624/2616  
Models  
Load  
capacity  
[kg]  
Elevator  
code  
1740/1640/1624  
Cannot be loaded  
Cannot be loaded  
Can be loaded  
Can be loaded  
P-6-C0  
P-9-C0  
P-11-C0  
P-13-C0  
450  
600  
750  
900  
1400  
1400  
1400  
1600  
1600  
1800  
1800  
2000  
1800  
2000  
2000  
2150  
850  
2300  
2300  
2300  
2300  
800  
800  
800  
900  
2100  
2100  
2100  
2100  
1100  
1350  
1350  
1500  
1300  
1500  
1350  
1700  
1500  
1750  
1600  
900  
P-15-C0  
P-17-C0  
P-20-C0  
P-24-C0  
1000  
1150  
1350  
1600  
2300  
2300  
2300  
2300  
2100  
2100  
2100  
2100  
Can be loaded  
Can be loaded  
Can be loaded  
Can be loaded  
1000  
1000  
1100  
1000  
1100  
1100  
*1 Interior dimensions of the cab [mm]  
*2 Door opening dimensions [mm]  
3.2 Earthquake Preparedness Measures  
The purpose of the earthquake preparedness measures is to prevent the computer from falling and breaking,  
and to ensure operator safety as well as quick system recovery. To prevent damage to the computer system  
from an earthquake, Fujitsu provides an earthquake countermeasure called "fixed construction." (A fixed  
construction prevents the device from falling by fixing it in place.)  
The necessity of a fixed construction is determined from the following factors:  
-
-
-
Magnitude of floor vibrations at the installation site  
Whether the floor is a raised floor  
Device structure  
Before choosing an earthquake countermeasure and performing the actual work for earthquake  
preparedness, consult with Fujitsu's engineering works department.  
34  
C122-H007-01EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
       
Appendix A Racks  
A.1 Rack Mounting  
Appendix A Racks  
This appendix provides various information on the mounting racks for the PRIMEQUEST 2000 series and  
PCI_Box.  
A.1 Rack Mounting  
The PRIMEQUEST 2000 series (including peripheral devices) has been developed and its operation  
guaranteed with the basic assumption that it is mounted in a Fujitsu rack. For safe use of a unit mounted in a  
Fujitsu rack, contact the distributor where you purchased your product, or your sales representative.  
When mounting the PRIMEQUEST products in a rack manufactured by another company, customers need  
to confirm on their own responsibility that the rack meets the PRIMEQUEST product specifications and  
requirements.  
A.2 Rack Mounting Requirements  
This section describes rack mounting requirements.  
A.2.1 Requirements for mounting in a Fujitsu 19-inch rack  
This section explains the requirements for mounting in a Fujitsu 19-inch rack. For safe use of the  
PRIMEQUEST 2000 series server mounted in a Fujitsu 19-inch rack, observe the mounting requirements  
described below.  
Recommended racks for mounting  
The following table lists the recommended racks for mounting the PRIMEQUEST 2000 series server and  
PCI_Box.  
TABLE A.1 Recommended racks for mounting  
Fujitsu 19-inch rack  
Model 2742  
Model 2737  
Model 2724  
Model 2642  
Depth (mm)  
1,050  
1,050  
1,050  
1,050  
1,050  
1,050  
1,050  
1,050  
1,050  
1,050  
1,050  
1,050  
1,050  
Open area ratio  
80%  
80%  
80%  
80%  
80%  
75%  
80%  
80%  
75%  
75%  
75%  
80%  
Model 2624  
Model 2616  
PCR M1 742S  
PCR M1 724S  
PCR M1 642S  
PCR M1 624S  
PCR M1 616S  
PCR M1 742A  
PCR M1 724A  
80%  
TABLE A.2 PRIMEQUEST 2000 series external dimensions  
Model  
Height  
438 mm (10U)  
Width  
445 mm  
Depth  
782 mm  
PRIMEQUEST 2000 series  
Note  
The Fujitsu 19-inch rack comes with a blank panel covering the front of each empty space that has no  
mounted device.  
If warm exhaust air from the device circulates to the front of the rack and reenters the device, it may cause a  
temperature alarm and lead to a device failure.  
Be sure to use the blank panel to cover the front of an empty space that has no mounted device.  
35  
C122-H007-01EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
           
Appendix A Racks  
A.2 Rack Mounting Requirements  
Rack mounting requirements  
The following table lists the requirements for mounting in one rack.  
Number of  
mountable units  
Model  
Mounting area  
The bottom of the mounted device must not be  
below 1U. (*1)  
The top of the mounted device must not be above  
1,066 mm from floor. (*2).  
PRIMEQUEST 2000 series  
PCI_Box  
3
No mounting requirements  
(*1) For the models 2742/2737/2724/2642/2624/2616 and PCR M1 742S/724S/642S/624S/616S/742A/724A,  
the bottom of the mounted device must not be below 2U.  
(*2) For the models 2742/2737/2724/2642/2624/2616 and PCR M1 742S/724S/642S/624S/616S/742A/724A,  
the top of the mounted device is 22U (1,020 mm).  
For details, contact the distributor where you purchased your product, or your sales representative.  
FIGURE A.1 Example of rack mounting  
Number  
(1)  
(2)  
(3)  
(4)  
Description  
Example 1 of rack mounting for model 2642  
Example 2 of rack mounting for model 2642  
1,022 mm  
1,060 mm  
36  
C122-H007-01EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
Appendix A Racks  
A.2 Rack Mounting Requirements  
A.2.2 Requirements for mounting in a third party's rack  
When mounting the PRIMEQUEST products in a rack manufactured by another company, customers need  
to confirm on their own responsibility that the rack meets the PRIMEQUEST product specifications and  
requirements.  
Note  
Fujitsu does not guarantee there will be no problems arising from the mounting of the PRIMEQUEST 2000  
series server (including peripheral devices) in a rack manufactured by another company.  
Examples: Cooling problem due to an insufficient supply of cooling air because of the rack structure, and  
insufficient earthquake-resistance because the rack manufactured by another company is not strong enough  
If mounting in a rack manufactured by another company cannot be avoided, confirm that the rack satisfies all  
of the following structural requirements.  
TABLE A.3 Structural condition of rack  
Number of Check  
Length of rack  
Check1  
Term  
Condition  
Reference  
Allowable spacing between  
posts  
Length between front post and 860mm(33.9 in.) or more  
front cover  
Length between front post and 60mm(2.4 in.) or more  
front cover  
685 to 790mm  
(26.7 to 31.1 in.)  
Check2  
Check3  
Width of rack  
Check4  
distance between the left and  
right posts (common to the  
front and rear posts)  
450mm(17.7 in.) or more  
Check5  
Check6  
Distance between holes on the 465mm(18.3 in) or more  
left and right device mounting  
posts (common to the front  
and rear posts):  
(EIA standard)  
Bracket installation space  
There must not be interference thing  
(post for reinforcement or option) in  
the shaded portion of figure.  
Format of rack  
Check7  
Pitch of hole  
EIA standard, universal pitch  
Check8  
Check9  
Check10  
Format and size of hole  
Length of each side of a square hole:  
9x9(0.35 in.) to 10x10 mm (0.39 in.)  
The cable can be taken out of the  
bottom or rear .  
Total weight must be less than  
loading Carrying Capacity of rack.  
Note  
Cable takeout port  
-
Loading Carrying Capacity of  
rack  
Loading Carrying Capacity of rack  
may change when anti-earthquake  
measures are given.  
Check11  
Check12  
Open area ratio of rack  
Open area ratio of rack of front cover  
and rear cover must be more than  
60%.  
Measure to prevent the rack from  
toppling must be performed.  
-
-
Measure to prevent the rack  
from toppling  
37  
C122-H007-01EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
Appendix A Racks  
A.2 Rack Mounting Requirements  
FIGURE A.2 Length of rack  
Number  
Description  
(1)  
(2)  
(3)  
(4)  
Front cover  
Front post  
Rear post  
Rear cover  
Width of rack  
FIGURE A.3 Width of rack  
Number  
(1)  
Description  
Front cover  
(2)  
(3)  
(4)  
(5)  
(6)  
(7)  
(8)  
Front post  
Rear post  
Rear cover  
Bracket installation area  
Width of Bracket installation  
Width of chassis of PRIMEQUEST  
Chassis of PRIMEQUEST  
38  
C122-H007-01EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
   
Appendix A Racks  
A.2 Rack Mounting Requirements  
Format of rack posts  
FIGURE A.4 Format of rack posts  
Other conditions  
Besides structural conditions, the following conditions must also be considered.  
-
Cooling of devices mounted in the rack  
Install the rack such that the temperature inside the rack satisfies the temperature conditions in 1.3  
Especially, cover the front of empty spaces in the rack and take other such necessary measures to  
prevent exhaust air from devices from recirculating to the air intake.  
Securing the maintenance work area (service area)  
-
Secure the service area required for the maintenance work performed by a Fujitsu certified service  
engineer.  
Referring to the Fujitsu rack service areas in 1.4 Installation Area and to the installation manual of the  
rack used, determine the service areas.  
39  
C122-H007-01EN  
Download from Www.Somanuals.com. All Manuals Search And Download.  
 
Download from Www.Somanuals.com. All Manuals Search And Download.  

Coleman Outdoor Fireplace 5059 707 User Manual
Craftsman Blower 79938 User Manual
Crate Amplifiers Musical Instrument Amplifier GX212 User Manual
Cuisinart Egg Cooker CEC 7 User Manual
Cuisinart Popcorn Poppers WPM 25A User Manual
Digicom Network Router Wireless ADSL Router User Manual
Ducane Gas Grill 20529917 User Manual
Electro Voice Speaker System EVID 42 User Manual
GE DVD Player GE1101P User Manual
Gefen Switch GTB MHDMI13 441 User Manual