TWZ Series
Oil-Fired Hot Water Boilers
INSTALLATION INSTRUCTIONS
These instructions must be affixed on or adjacent to the boiler
Models:
• TWZ065
WARNING: Improper installation,
adjustment, alteration, service or
maintenance can cause property
damage, injury, or loss of life.
For assistance or additional
information, consult a qualified
installer, service agency or the
oil supplier. Read these instruc-
tions carefully before installing.
• TWZ075
• TWZ100
• TWZ090
• TWZ125
• TWZ150
• TWZ120
• TWZ175
• TWZ200
Manufacturer of Hydronic Heating Products
P.O. Box 14818 3633 I. Street
Philadelphia, PA 19134
7HOꢀꢁꢂꢃꢄꢅꢆꢁꢅꢇꢅꢈꢉꢊꢋꢋꢁꢁ)D[ꢀꢁꢂꢃꢄꢅꢆꢁꢅꢇꢅꢈꢊꢌꢇꢍꢁꢁZZZꢎFURZQERLOHUꢎFRP
Download from Www.Somanuals.com. All Manuals Search And Download.
TABLE 1a: GENERAL SPECIFICATIONS
Burner
Input
(Gal/hr)
0.65
0.75
1.00
0.90
1.25
1.50
1.20
DOE Heating
Number of
Sections
Capacity
(Btu/hr)
80000
I=B=R Net
Rating (Btu/hr) AFUE (%) Content (Gal)
Approx. Water
Dimensions (inches)
"A"
"B"
"C"
Boiler Model
TWZ065
TWZ075
TWZ100
TWZ090
TWZ125
TWZ150
TWZ120
TWZ175
TWZ200
3
3
3
4
4
4
5
5
5
70000
79000
104000
97000
132000
156000
128000
183000
207000
86.1
85.8
84.3
86.0
84.9
83.8
86.0
83.5
83.3
16.0
16.0
16.0
20.0
20.0
20.0
24.0
24.0
24.0
16 1/2
16 1/2
16 1/2
21 1/2
21 1/2
21 1/2
26 1/2
26 1/2
26 1/2
8 5/16
8 5/16
8 5/16
10 13/16
10 13/16
10 13/16
13 5/16
13 5/16
13 5/16
6
6
6
7
7
7
8
8
8
91000
120000
111000
152000
179000
147000
210000
238000
1.75
2.00
TABLE1b:OPTIONALTANKLESSHEATERRATINGS
Tankless Heater Rating
Notes:
Boiler Model
TWZ065
TWZ075
TWZ100
TWZ090
TWZ125
TWZ150
TWZ120
TWZ175
TWZ200
(Gal/min)
2.75
1. Net Ratings are based on piping and pick-up allowances of 1.15.
3.00
3.25
2. Burner Capacity Rating, GPH is based on #2 oil with a Gross
HeatingValueequalto140000BTU/Gal.
3.25
3.75
4.00
3.50
4.25
4.75
3. MaximumWorkingPressure,Water-50PSI.
4. Tankless Heater Ratings based on I=W=H test standard.
III Before Installing
1) Safe, reliable operation of this boiler depends upon installation by a professional heating contractor in strict
accordance with this manual and the requirements of the authority having jurisdiction.
•
•
In the absence of an authority having jurisdiction, installation must be in accordance with this manual and the latest
edition of Installation of Oil Burning Equipment (ANSI/NFPA31).
Where required by the authority having jurisdiction, this installation must conform to the latest edition of Standard for
Controls and Safety Devices for Automatically Fired Boilers (ANSI/ASME CSD-1).
2) Make sure that a properly sized chimney is available which is in good condition. Consult the authority having
jurisdiction, Part VI of this manual, and ANSI/NFPA31 for additional information on venting requirements.
Power (“Side Wall”) Venting - Important Note
Two problems arise when any oil-fired appliance is power vented:
1. There is sometimes an accelerated rate of soot buildup on the oil burner cad-cell, spinner etc.
2. There is a potential for severe damage to the side of the structure in the event that the boiler operates at a high smoke
level. This can happen for many reasons, some of which are out of the control of both the installer and appliance
manufacturer.
Crown Boiler Company recommends the use of a chimney to vent the TWZ series boilers. If a power venter must be used,
it is the responsibility of the installer and power vent manufacturer to “engineer” the power vent system. CROWN
BOILER COMPANY WILL ASSUME NO RESPONSIBILITY FOR DAMAGE TO SIDING, ETC. FROM A POWER
VENTED OIL-FIRED BOILER. THIS APPLIES REGARDLESS OF THE CAUSE OF THE SOOTING.
2
Download from Www.Somanuals.com. All Manuals Search And Download.
3) Make sure that the boiler is correctly sized:
•
For heating systems employing convection radiation (baseboard or radiators) use an industry accepted sizing
method such as the I=B=R Heat Loss Calculation Guide (Pub. #H21 or #H22) published by the Hydronics
Institute in Berkeley Heights, NJ.
•
•
For new radiant heating systems refer to the radiant tubing manufacturer’s boiler sizing guidelines.
For systems including a Crown Mega-Stor indirect water heater, size the boiler to have either the DOE
Heating Capacity required for the Mega-Stor or the net rating required for the heating system, whichever
results in the larger boiler.
•
For systems that incorporate other indirect water heaters, refer to the indirect water heater manufacturer’s
instructions for boiler output requirements.
4) In some cases, boilers installed at altitudes above 2000ft may require a different burner configuration from that at sea
level. Consult the local Crown representative for more information.
IV Locating the Boiler
1) Clearances:
•
Observe the minimum clearances shown below. Except as noted, these clearances apply to all combustible
construction, as well as noncombustible walls, ceilings and doors. Also see Figure 2.
Front – 24”
Left Side – 6”
Right Side – 6”
Rear – 6”
Top – 6”
Single Wall Chimney Connector (to combustible construction) - 18”
•
A 24” service clearance from the jacket is recommended from the top of the boiler. This clearance may be
reduced to that shown above; however, servicing the boiler will become increasingly difficult as this clearance
is reduced.
2) If listed Type L vent is used, follow vent pipe manufacturer recommendations for minimum clearances.
3) Do not install this boiler directly on a combustible surface. Where it is desired to install the TWZ over a non-carpeted
combustible surface, install the boiler on the base shown in Figure 3.
4) Do not install this boiler in a location where gasoline or other flammable vapors or liquids will be stored or used. Do
not install this boiler in an area where large amounts of airborne dust will be present, such as a workshop.
3
Download from Www.Somanuals.com. All Manuals Search And Download.
18*
6
6
24
6
FRONTVIEW
SIDE VIEW
* C LEARANC E FROM SINGLE WALL C ONNEC TORTO COMBUSTIBLE CONSTRUC TIO N
FIGURE 2: CLEARANCES
Sh e e t M e t a l (2 4 G A o r Thicker)
4“ MIN.
Combustible Surface
Openings Aligned To Permit Free Air Circulation
Hollow Masonry Blocks
FIGURE 3: INSTALLATION OVER A COMBUSTIBLE FLOOR
4
Download from Www.Somanuals.com. All Manuals Search And Download.
V Air for Combustion and Ventilation
Sufficient fresh air must be supplied for combustion and ventilation. Provisions for combustion and ventilation air for oil
burning equipment must be made in accordance with Section 1.5, Air for Combustion and Ventilation, in the latest edition
of Installation of Oil Burning Equipment (ANSI/NFPA 31).
To ensure an adequate supply of air for combustion, ventilation and flue gas dilution, start by determining whether the
boiler is to be installed in a building of unusually tight construction. A building of unusually tight construction is defined as
having all of the following features:
• Walls and ceilings exposed to outside atmosphere have a continuous water vapor retarder with a rating of 1 perm
or less with openings gasketed and sealed
• Weather stripping has been added on openable windows and doors
• Caulking and sealants are applied to areas such as joints around window and door frames, between sole plates and
floors, between wall-ceiling joints, between wall panels, at penetrations for plumbing, electrical, and gas lines, and
at other openings.
ForBuildingsofOtherthanUnusuallyTightConstruction
1) Determine whether the boiler is to be installed in a confined space - A confined space is defined as having a volume
less than 50 cubic feet per 1000 BTU/hr input of all appliances installed in that space. To determine whether the boiler
room is a confined space:
a. Total the input of all appliances in the boiler room in thousands of BTU/hr. Round the result to the next highest
1000 BTU/hr.
b. Find the volume of the room in cubic feet. The volume of the room in cubic feet is:
Length (ft) x width (ft) x ceiling height (ft)
In calculating the volume of the boiler room, consider the volume of adjoining spaces only if no doors are
installed between them. If doors are installed between the boiler room and an adjoining space, do not consider the
volume of the adjoining space, even if the door is normally left open.
c. Divide the volume of the boiler room by the input in thousands of BTU/hr. If the result is less than 50, the boiler
room is a confined space.
Example:
A TWZ090 and a water heater are to be installed in a room measuring 6 ft - 3 in x 7 ft with an 8 ft ceiling. The
water heater has an input of 30000 BTU/hr:
Input of TWZ090 = 0.90 Gal/hr x 140000 BTU/Gal = 126000 BTU/hr
Total input in thousands of BTU/hr = (126000 BTU/hr + 30000 BTU/hr)/1000 = 156
Volume of room = 6.25 ft x 7 ft x 8 ft = 350 ft3
350/156 = 2.24. Since 2.24 is less than 50, the boiler room is a confined space.
2) Unconfined Space - Natural infiltration into the boiler room will normally provide adequate air for combustion and
ventilation without additional louvers or openings into boiler room.
3) Confined Space - Provide two openings into the boiler room, one near the floor and one near the ceiling. The top edge
of the upper opening must be within 12” of the ceiling and the bottom edge of the lower opening must be within 12” of the
floor (Figure 4).
•
•
•
Each opening must have a free area of 1 square inch per 1000 BTU/hr input of all fuel burning appliances in the
boiler room. The minimum opening dimension is 3 inches. Minimum opening free area is 100 square inches per
opening.
If the total volume of both the boiler room and the room to which the openings connect is less than 50 cubic feet per
1000 BTU/hr of total appliance input, install a pair of identical openings into a third room. Connect additional
rooms with openings until the total volume of all rooms is at least 50 cubic feet per 1000 BTU/hr of input.
The “free area” of an opening takes into account the blocking effect of mesh, grills, and louvers. Where screens are
5
Download from Www.Somanuals.com. All Manuals Search And Download.
FIGURE 4: BOILER INSTALLED IN CONFINED SPACE,
ALL AIR FROM INSIDE
used, they must be no finer than ¼” (4 x 4) mesh.
ForBuildingsof UnusuallyTightConstruction:
1) Openings must be installed between the boiler room and the outdoors or a ventilated space, such as an attic or crawl
space, which communicates directly with the outdoors.
2) Two openings are required. The top edge of the upper opening must be within 12 inches of the ceiling. The bottom
edge of the lower opening must be within 12 inches of the floor.
3) Size openings and ducts as follows:
•
•
•
Vertical ducts or openings directly outdoors (Figure 5, Figure 6, and Figure 7) - Each opening must have a free
cross sectional area of 1 square inch per 4000 BTU/hr of the total input of all fuel fired appliances in the boiler
room but not less than 100 square inches. Minimum opening size is 3 inches.
Openings to outdoors via horizontal ducts (Figure 8) - Each opening must have a free cross sectional area of 1
square inch per 2000 BTU/hr of the total input of all fuel fired appliances in the boiler room but not less than
100 square inches. Minimum opening size is 3 inches.
The “free area” of an opening takes into account the blocking effect of mesh, grills, and louvers. Where screens
are used, they must be no finer than ¼” (4 x 4) mesh.
6
Download from Www.Somanuals.com. All Manuals Search And Download.
FIGURE 5: ALL AIR FROM OUTDOORS,
VENTILATED CRAWL SPACE AND ATTIC
FIGURE 6: ALL AIR FROM OUTDOORS,
VIA VENTILATED ATTIC
7
Download from Www.Somanuals.com. All Manuals Search And Download.
FIGURE 7: ALL AIR FROM OUTDOORS, USING
OPENINGS INTO BOILER ROOM
FIGURE 8: ALL AIR FROM OUTDOORS, USING
HORIZONTAL DUCTS INTO BOILER ROOM
8
Download from Www.Somanuals.com. All Manuals Search And Download.
VI Venting
Vent installation must be in accordance with local building codes, or the local authority having jurisdiction.
Typical vent installation is illustrated by Figure 9. The components of vent installation are the vent connector (breeching),
barometric draft regulator, and chimney.
1) Acceptable Chimneys - The following chimneys may be used to vent a TWZ series boiler:
•
Listed Type L vent - Install in accordance with the manufacturer’s instructions, the terms of its listing, and
applicable codes.
•
Masonry Chimney - The masonry chimney must be constructed in accordance with the latest edition of Standard
for Chimneys, Fireplaces, Vents, and Solid Fuel Burning Appliances (NFPA 211) and lined with a clay liner or
other listed lining system. Do not vent a TWZ series boiler into an unlined chimney.
2) Acceptable Vent Connectors - The following may be used for vent connectors:
•
•
Listed Type L vent.
Single Wall Galvanized Pipe - Use 0.018” (26 gauge) or heavier.
FIGURE 9: TYPICAL VENT SYSTEM
INSTALLATION AND COMPONENTS
3) Chimney and Vent Connector Sizing - See Table 2 for minimum vent connector and chimney sizing. The vent connector
size must not be smaller than boiler flue collar diameter. Where two or more appliances vent into a common vent, the
cross-sectional area of the common vent should at least equal the area of largest vent plus 50% of the area in the additional
vents.
4) Do not vent this appliance into any portion of a mechanical vent system operating under positive pressure.
5) Do not connect the boiler into a chimney flue serving an open fireplace or other solid fuel appliance.
9
Download from Www.Somanuals.com. All Manuals Search And Download.
6) Prior to boiler installation, inspect chimney for obstructions or other defects and correct as required. Clean chimney
as necessary.
7) Vent pipe should slope upward from boiler not less than one inch in four feet. No portion of vent pipe should run
downward or have sags. Vent pipe must be securely supported.
8) The vertical section of vent pipe coming off the boiler should be as tall as possible, while still maintaining the proper
clearance from the horizontal vent connector to combustibles and the proper pitch called for in (7) above.
9) Vent pipe should be installed above the bottom of the chimney to prevent blockage.
10) Vent pipe must be inserted flush with inside face of the chimney liner and the space between vent pipe and chimney
sealed tight. A thimble permanently cemented in place can be used to facilitate removal of chimney connector for cleaning.
11) Install the barometric draft regulator in accordance with the regulator manufacturer’s instructions.
12) Secure all joints in the vent connector system with sheet metal screws. This includes the joint between the vent
connector and the boiler collar, as well as the barometric draft regulator. Use at least three screws at each joint.
TABLE2: MINIMUMRECOMMENDEDBREECHINGAND
CHIMNEYSIZE
Boiler
Min Breeching
Min. Recommended Chimney Size and Height
Round I.D. (in) Rectangular I.D. (in)
Height (ft)
Model
Dia. (inches)
TWZ065
TWZ075
TWZ100
TWZ090
TWZ125
TWZ150
TWZ120
TWZ175
TWZ200
6
6
6
7
7
7
8
8
8
6
6
6
7
7
7
8
8
8
8 x 8
8 x 8
8 x 8
8 x 8
8 x 8
8 x 8
8 x 8
8 x 8
8 x 8
15
15
15
15
15
15
15
15
15
Power (“Side Wall”) Venting - Important Note
Two problems arise when any oil-fired appliance is power vented:
1. There is sometimes an accelerated rate of soot buildup on the oil burner cad-cell, spinner etc.
2. There is a potential for severe damage to the side of the structure in the event that the boiler operates at a high smoke
level. This can happen for many reasons, some of which are out of the control of both the installer and appliance
manufacturer.
Crown Boiler Company recommends the use of a chimney to vent the TWZ series boilers. If a power venter must be used,
it is the responsibility of the installer and power vent manufacturer to “engineer” the power vent system. CROWN
BOILER COMPANY WILL ASSUME NO RESPONSIBILITY FOR DAMAGE TO SIDING, ETC. FROM A POWER
VENTED OIL-FIRED BOILER. THIS APPLIES REGARDLESS OF THE CAUSE OF THE SOOTING.
10
Download from Www.Somanuals.com. All Manuals Search And Download.
VII System Piping
CAUTION
•
INSTALLBOILERSOTHATALLELECTRICALCOMPONENTSAREPROTECTEDFROMWATER(DRIPPING,
SPRAYING,RAIN,ETC.)DURINGAPPLIANCEOPERATIONANDSERVICE(CIRCULATORREPLACEMENT,
ETC.).
•
•
OPERATION OF THIS BOILER WITH CONTINUOUS RETURN TEMPERATURES BELOW 120°F CAN CAUSE
SEVEREHEATEXCHANGERCORROSIONDAMAGE.
OPERATIONOFTHISBOILERINASYSTEMHAVINGSIGNIFICANTAMOUNTSOFDISSOLVEDOXYGENCAN
CAUSESEVEREHEATEXCHANGERCORROSIONDAMAGE.
•
DONOTUSETOXICADDITIVES,SUCHASAUTOMOTIVEANTIFREEZE,INAHYDRONICSYSTEM.
StandardPiping
Figure 10 shows typical boiler system connections on a single zone system. Additional information on hydronic system
design may be found in Installation of Residential Hydronic Systems (Pub. #200) published by the Hydronics Institute in
Berkeley Heights, NJ. The components in this system and their purposes are as follows:
1) Relief valve (Required) - Mount the relief valve on the top left side of the boiler as shown in Figure 10 using the 3/4”
nipple provided. The relief valve shipped with the boiler is set to open at 30 psi. This valve may be replaced with one
having a pressure up to the “Maximum Allowable Working Pressure” shown on the rating plate. If the valve is replaced,
the replacement must have a relief capacity in excess of the DOE heating capacity for the boiler.
Pipe the discharge of the relief valve to a location where water or steam will not create a hazard or cause property
damage if the valve opens. The end of the discharge pipe must terminate in an unthreaded pipe. If the relief valve
discharge is not piped to a drain, it must terminate at least 6 inches above the floor. Do not run relief valve discharge
piping through an area that is prone to freezing. The termination of the relief valve discharge piping must be in an area
where it is not likely to become plugged by debris.
FIGURE 10: STANDARD BOILER PIPING
11
Download from Www.Somanuals.com. All Manuals Search And Download.
DANGER
•
•
•
PIPE RELIEF VALVE TO A SAFE LOCATION
DO NOT INSTALL A VALVE IN THE RELIEF VALVE DISCHARGE LINE
DO NOT MOVE RELIEF VALVE FROM FACTORY SPECIFIED
LOCATION
•
DO NOT PLUG RELIEF VALVE DISCHARGE
2) Circulator (Required) - Figure 10 shows the ideal location of the circulator which is in the supply piping immediately
downstream of the expansion tank. A less ideal, but acceptable, location for most residential circulators is in the return
(if this is done, be sure that adequate clearance exists to open the door.
3) Expansion Tank (Required) - If this boiler is replacing an existing boiler with no other changes in the system, the old
expansion tank can generally be reused. If the expansion tank must be replaced, consult the expansion tank
manufacturer’s literature for proper sizing.
4) Fill Valve (Required) - Either a manual or automatic fill valve may be used. The ideal location for the fill is at the
expansion tank.
5) Automatic Air Vent (Required) - At least one automatic air vent is required. Manual vents will usually be required in
other parts of the system to remove air during initial fill.
6) Low Water Cut-Off (Required in some situations) - A low water cut-off is required when the boiler is installed above
radiation. In addition, some codes such as ASME CSD-1 require low water cut-offs. Codes may also require that this
low water cut-off have a manual reset function. The low water cut-off may be a float type or probe type, but must be
designed for use in a hot-water system. The low water cut-off should be piped into the boiler supply just above the
boiler with no intervening valves between it and the boiler.
Use a low water cut-off that breaks the 120 VAC supply to the boiler. Do not attempt to wire a 24-volt low water cut-
off into the boiler factory wiring.
7) Manual Reset High Limit (Required by some codes) - This control is required by ASME CSD-1 and some other codes.
Install the high limit in the boiler supply piping just beyond the boiler with no intervening valves. Set the manual reset
high limit as far above the operating limit setting as possible, but not over 240°F. Wire the control to break the 120
VAC electrical supply to the boiler.
8) Flow Control Valve (Required under some conditions) - The flow control valve prevents flow through the system unless
the circulator is operating. A flow control valve may be necessary on converted gravity systems to prevent gravity
circulation. Flow control valves are also used to prevent “ghost flows” in circulator zone systems through zones that are
not calling for heat.
9) Isolation Valves (Optional) - Isolation valves are useful if the boiler must be drained, as they will eliminate having to
drain and refill the entire system.
10) Drain Valve - The drain valve is shipped in the boiler parts bag. Install it in the tee on the boiler return as shown in
Figure 1.
IMPORTANT
THE 1 1/2” PLUGGED TAPPING ON THE BOTTOM REAR SECTION IS
PRESENT FOR MANUFACTURING PURPOSES ONLY. DO NOT ATTEMPT
TO USE THIS TAPPING AS A RETURN CONNECTION.
12
Download from Www.Somanuals.com. All Manuals Search And Download.
FIGURE 11: INDIRECT WATER HEATER
BOILER SIDE PIPING
FIGURE 12: BOILER BYPASS PIPING
PipingforSpecialSituations
Certain types of heating systems have additional requirements. Some of the more common variations follow:
1) Indirect Water Heaters - Figure 11 shows typical indirect water heater piping. Boiler piping is the same as for any two-
zone system. Figure 11 shows circulator zoning, which is usually preferred for indirect water heaters. Size the
circulator and indirect water heater piping to obtain the boiler water flow through the indirect water heater called for by
the indirect water heater manufacturer.
2) Large Water Volume Systems - The piping shown in Figure 12 will minimize the amount of time that the boiler operates
with return temperatures below 120°F on these systems. A bypass is installed as shown to divert some supply water
directly into the return water. The bypass pipe should be the same size as the supply. The two throttling valves shown
are adjusted so that the return temperature rises above 120°F during the first few minutes of operation. A three-way
valve can be substituted for the two throttling valves shown.
13
Download from Www.Somanuals.com. All Manuals Search And Download.
3) Low Temperature Systems - Some systems, such as radiant tubing systems, require the system water temperature to be
limited to a value below the temperature of the water leaving the TWZ. These systems also typically have return
temperatures well below the 120°F minimum.
Figure 13 illustrates the use of a heat exchanger to connect the TWZ boiler to this type of system. The heat exchanger
will permit the transfer of heat from the boiler water to the low temperature system while holding the system supply and
boiler return temperatures within their limits. For this system to work properly, the heat exchanger must be properly
sized and the correct flow rates are required on either side of the heat exchanger. Consult the heat exchanger
manufacturer for sizing information. The water in the boiler is completely isolated from the water in the system. This
means that separate fill and expansion tanks are required for the heating system loop.
There are several other ways to connect low temperature systems to the non-condensing boilers like the TWZ such as
four way mixing valves and variable speed injection pumping systems.
4) Systems containing oxygen - Many hydronic systems contain enough dissolved oxygen to cause severe corrosion
damage to a cast iron boiler such as the TWZ. Some examples include:
•
•
•
Radiant systems that employ tubing without an oxygen barrier.
Systems with routine additions of fresh water.
Systems which are open to the atmosphere.
If the boiler is to be used in such a system, it must be separated from the oxygenated water being heated with a heat
exchanger as shown in Figure 13.
Consult the heat exchanger manufacturer for proper heat exchanger sizing as well as flow and temperature requirements.
All components on the oxygenated side of the heat exchanger, such as the pump and expansion tank, must be designed
for use in oxygenated water.
5) Air Handlers - Where the boiler is connected to air handlers through which refrigerated air passes, use flow control
valves in the boiler piping or other automatic means to prevent gravity circulation during the cooling cycle.
FIGURE 13: ISOLATION OF BOILER FROM SYSTEM
WITH A HEAT EXCHANGER
14
Download from Www.Somanuals.com. All Manuals Search And Download.
VIII TANKLESS HEATER PIPING
If the TWZ is installed with an optional tankless heater, pipe the heater as shown in Figure 14. The components in this
system and their functions are as follows:
1) Mixing Valve (Required) - During the heating season, the water exiting the tankless heater may be 180 degrees or
more. The mixing valve blends hot water leaving the tankless heater with cold water so as to maintain the hot water
supplied to the fixtures at a fixed temperature. This saves energy, increases the amount of usable hot water available to
the homeowner, and reduces the risk of scalding.
Install a mixing valve with a setting range of approximately 110 to 130F. Follow the manufacturer’s instructions for
installing this valve. Usually a “heat trap” will be required between the coil and the “hot” connection on the mixing valve.
WARNING
A mixing valve does not eliminate the risk of scalding.
•
•
•
Set the mixing valve and boiler low limit adjustments as low as possible.
Feel water before showering or bathing.
If anti-scald or anti-chill protection is required, use devices specifically designed for such service. Install
and maintain these devices in accordance with the manufacturer’s instructions. Do not use the mixing valve
as a substitute for pressure balancing valves or other devices required by plumbing codes to protect against
scalding.
2) Flow Restrictor (Recommended) - If water is drawn from the tankless coil at a rate in excess of the rating in Table 1b,
the temperature of the hot water may be too low to be of use. The use of a flow restrictor will prevent this problem by
limiting the rate at which water can pass through the tankless heater. If a restrictor is used, select one having a rating in
GPM approximately equal to the rating shown in Table 1b. If possible, locate this restrictor at least 3 feet from the
tankless heater inlet so that it is not subjected to excessive temperatures when no water is flowing through the coil.
3) Pressure Relief Valve (Required) - Limits the pressure in the tankless heater and piping. Use an ASME constructed
valve designed for domestic water service, such as the Watts #3L. Note that this is a pressure relief valve, not a T&P
valve. Select a valve with a pressure setting less than or equal to the working pressure marked on the tankless coil. Pipe
the discharge to a safe location using piping the same size as the discharge connection on the valve.
4) Hose Bib Valves (Recommended) - These valves permit the coil to be periodically “backflushed” to remove sediment.
5) Globe or Ball Valve (Recommended) - Used to adjust the flow through the entire tankless heater system if needed.
6) Unions (Required) - Tankless heaters may require periodic gasket replacement or other maintenance which requires
removal of the heater from the boiler. Install unions anywhere in the tankless heater piping that will facilitate removal of
the heater.
15
Download from Www.Somanuals.com. All Manuals Search And Download.
FIGURE 14: TANKLESS HEATER PIPING
IX Fuel Line Piping
Fuel line piping design, materials and construction must be in accordance with local building codes, requirements of the
local authority having jurisdiction, and, the latest edition of Installation of Oil-Burning Equipment (ANSI/NFPA 31). Refer
also to the instruction manuals provided with the burner and oil pump.
Depending on the location of the fuel oil storage tank in relation to an oil burner, there are four types of oil piping systems
generally being used:
a) ONE-PIPE GRAVITY SYSTEM - used when a fuel oil storage tank is positioned above an oil burner fuel pump. See
Figure 15. A vertical distance from top of the tank to center line of the pump (Dimension ‘H’) over 8 feet will result
in a pump inlet pressure in excess of the 3-psi limit in NFPA-31.
FIGURE 15: ONE-PIPE GRAVITY SYSTEM
16
Download from Www.Somanuals.com. All Manuals Search And Download.
b) ONE-PIPE LIFT SYSTEM (not recommended) - Used when a fuel oil storage tank is located below an oil burner
fuel pump. See Figure 16. The vertical distance from bottom of the tank to center line of the pump (Dimension ‘H’)
must not exceed that shown in the pump manufacturer’s instructions. Although all oil piping systems must be airtight,
one-pipe lift systems are particularly susceptible to nuisance lockout problems if the suction line is not completely
airtight. A two-pipe lift system is therefore recommended over a one-pipe lift system.
c) TWO-PIPE GRAVITY SYSTEM (not recommended) - Used when a fuel oil storage tank is located above an oil
burner fuel pump. See Figure 17. A vertical distance from top of the tank to center line of the pump (Dimension ‘H’)
over 8 feet will result in a pump inlet pressure in excess of the 3-psi limit in NFPA-31. This type of system should
be converted to a one-pipe gravity system, as doing so will result in lower inlet line flow and longer filter life.
d) TWO-PIPE LIFT SYSTEM - used when a fuel oil storage tank is located below an oil burner fuel pump suction port.
See Figure 18. The vertical distance from bottom of the tank to center line of the pump (Dimension ‘H’) must not
exceed that shown in the pump manufacturer’s instructions. Distance ‘H’ allowed is reduced by the number of
fittings, filters and valves installed in the line.
Once the type of system has been selected, observe the following:
1) Fuel line piping must be airtight. Do not use compression type fittings for tubing connections in fuel line piping. Use
only listed flare type fittings. Cast iron threaded fittings shall not be used for wrought iron or steel piping connections.
2) Piping shall be substantially supported and protected against physical damage and corrosion where required.
3) Refer to supplied oil pump instruction manual for proper connections. On one-pipe systems, ensure that the fuel pump
return port plug is tightened securely.
4) Some fuel pumps, such as the Suntec A and B series, are supplied with a loose bypass plug which must be installed on
two-pipe systems. If such a plug is supplied, install it as shown in the pump manufacturer’s instructions. Do not install
this bypass plug on one-pipe systems as pump seal damage will result.
5) Do not use check valves, especially on gravity feed systems.
6) Do not use Teflon tape for threaded connections. Use a listed non-hardening thread sealant instead.
7) Attach required piping between burner fuel pump and fuel oil storage tank. Install one fuel shut-off valve near the storage
tank and second fuel shut-off valve near the oil burner fuel pump. Use heavy wall copper tubing in a continuous run. On
two-pipe systems, the return line should terminate 3” - 4” above suction line depth within the storage tank. Refer to the
pump manufacturer’s instructions for tube sizing information.
8) All systems require an oil filter. On TWZ065 and TWZ075 boilers, the use of a Garber cartridge type filter is
recommended.
9) Use only #2 Fuel Oil with physical and chemical characteristics meeting the requirements of ASTM D-396.
FIGURE 16: ONE-PIPE LIFT SYSTEM
17
Download from Www.Somanuals.com. All Manuals Search And Download.
FIGURE 17: TWO-PIPE GRAVITY FEED SYSTEM
FIGURE 18: TWO-PIPE LIFT SYSTEM
18
Download from Www.Somanuals.com. All Manuals Search And Download.
X Wiring
WARNING
All wiring and grounding must be done in accordance with the authority having jurisdiction or, in the absence of such
authority, with the National Electric Code (ANSI/NFPA70).
SingleZoneWiring
1) 120 Volt Wiring - The boiler should be provided with its own 15A branch circuit with fused disconnect. All 120 volt
connections are made inside the L8148 or L8124 aquastat relay as follows (also see Fig. 19):
•
•
•
Hot (“black”) - Terminal “L1”
Neutral (“white”) - Terminal “L2”
Ground (“green” or bare) - Ground screw on case of L8148 or L8124
2) Thermostat Wiring - Follow thermostat manufacturer instructions. To insure proper thermostat operation, avoid
installation in areas of poor air circulation, hot spots (near any heat source or in direct sunlight), cold spots (outside
walls, walls adjacent to unheated areas, locations subject to drafts). Provide Class II circuit between thermostat and
boiler. Connect thermostat wire leads to terminals “T” and “T” inside L8148 or L8124 aquastat relay.
Wiring Variations
1) Multiple Circulator Zones – Figure 20 shows wiring for two or more circulator zones using Honeywell R845As. One
R845A is required for each circulator zone. Circulator terminals “C1” and “C2” on the L8148 are not used. A DPST
Honeywell RA832A may be substituted in place of the R845A using the “X” and “X” terminals in place of the “5” and
“6” terminals on a R845A.
A call for heat from any thermostat will energize the DPST relay in that zone’s R845A. When this relay is energized,
electrical continuity is created between terminals 3 and 4, energizing the circulator for that zone. At the same time,
electrical continuity is created between terminals 5 and 6 on the R845A, creating a current path from terminal “T” to
“T” on the L8148 or L8124. Assuming that the supply water temperature is below the high limit setting, the normal
ignition sequence will be initiated.
2) Multiple Zones using Zone Valves – Figure 21 shows wiring for multiple zones using Honeywell V8043F zone valves.
This wiring diagram may be used for other 24-volt zone valves as long as they are equipped with end switches. Do not
attempt to use the transformer on the L8148 or L8124 to power the zone valves; use a separate transformer. Up to five
V8043Fs may be powered by one 48VA transformer, such as the Honeywell AT87A.
A call for heat from a given thermostat will result in the application of 24 volts across the TH and TR terminals on the
corresponding zone valve, energizing the zone valve motor. The zone valve opens and the end switch contacts are then
made. The end switches are connected in parallel with each other and to the “T” and “T” thermostat connections so that
any zone valve that opens will also start the circulator and fire the boiler (assuming the high limit is not open). Zone
valve terminal TH/TR has no internal connection on the zone valve; it is merely a “binding post” used to connect two or
more wires.
19
Download from Www.Somanuals.com. All Manuals Search And Download.
HO NEYWELL
L8 1 4 8 O R L8 12 4
AQUASTAT RELAY
L1
INTERRUPTED
IN TERM ITTEN T
BURNER M OTOR
LIM IT
VALVE
L2
CAD
CELL
NOTE:
1) BURNER WIRING SHO WN IS FO R BEC KETT
AFG BURNERS. C O NSULT BURNER INSTRUC TIO N
MANUAL FOR OTHER BURNERS
2) AQUASTATPICTURED ISL8148. TERMINAL3
AND JUMPERFROM L1 TO 3 ARENOTPRESENT
ON L8124. L8124 HASTWO TERMINALS,
MARKED ZC AND ZR, WHICH ARENOTUSED.
FIGURE 19: WIRING DIAGRAM, SINGLE HEATING ZONE ONLY
FIGURE 20: WIRING DIAGRAM, CIRCULATOR ZONE WIRING USING HONEYWELL R845A’s
(FACTORY BOILER WIRING NOT SHOWN - SEE FIGURE 19)
20
Download from Www.Somanuals.com. All Manuals Search And Download.
FIGURE 21: WIRING DIAGRAM, ZONE WIRING USING HONEYWELL V8043F ZONE VALVES
(FACTORY BOILER WIRING NOT SHOWN - SEE FIGURE 19)
XI Start-up and Checkout
WARNING
•
•
NEVERATTEMPTTOFILLAHOTEMPTYBOILER.
MAKE SURE THAT THE AREA AROUND THE BOILER IS CLEAR AND FREE FROM COMBUSTIBLE
MATERIALS,GASOLINE,ANDOTHERFLAMMABLEVAPORSANDLIQUIDS.
•
•
SAFE RELIABLE OPERATION OF THIS BOILER REQUIRES THAT THE BURNER BE CHECKED AND
ADJUSTEDBYAQUALIFIEDOILSERVICEMANUSINGCOMBUSTIONTESTINSTRUMENTS.
FAILURE TO PERFORM ALL OF THE CHECKS OUTLINED IN THE FOLLOWING PROCEDURE
COULD RESULT IN UNRELIABLE OPERATION, DAMAGE TO THE BOILER NOT COVERED UNDER
WARRANTY,PROPERTYDAMAGE,ORUNSAFEOPERATION.
Use the following procedure for initial start-up of the boiler:
1) Ensure that the boiler and entire heating system are filled with water.
2) Check all new piping for leaks and purge heating system piping sections that are air bound.
3) Verify that the vent system is complete and free of obstructions prior to start-up of the boiler.
4) Inspect all wiring for loose or uninsulated connections, proper size fuses installed, etc.
5) Verify that oil tank is filled with #2 fuel oil meeting ASTM D396 specifications, oil piping has been tested and is air
tight, and shutoff valve(s) are closed.
21
Download from Www.Somanuals.com. All Manuals Search And Download.
6) Check initial settings of oil burner air band and air shutter, head setting etc., and readjust if needed. See Table 3 for setup
and combustion data pertaining to a particular boiler/ burner combination.
7) Attach plastic hose to oil pump vent fitting and provide a container to catch oil during oil pump bleeding procedure.
8) Install 0-200 PSI pressure gauge into oil pump gauge port.
9) Open all oil line shutoff valves.
10) Open flame observation port cover on burner swing door to see flame.
11) Adjust system thermostat to highest setting.
12) Set boiler controls (high limit, low limit, etc.) to suit individual requirements of the installation.
13) Turn the line service switch to “ON” position.
14) Crack open vent fitting on the oil pump and allow burner to run until a solid oil stream, free of air bubbles, flows for 15
seconds into container. As the vent fitting is closed, the burner should fire and flame should be visible through observation
port immediately (or after prepurge timing has expired, if a burner is so equipped). Refer to burner instructions for more
details.
15) Immediately upon firing the boiler, check the smoke level. If the smoke level is in excess of a #1, open the air
adjustment to bring the smoke level below a #1.
16) Make sure that the oil pressure matches that shown in Table 3 for the burner supplied. Adjust pressure if required.
17) Check the vacuum at the inlet of the fuel pump. Make sure that the vacuum does not exceed the fuel pump
manufacturer’s limit (consult the pump manufacturer’s instructions).
18) Close the flame observation cover.
19) After chimney has warmed-up to operating temperature, adjust barometric draft regulator for a draft of -0.02 inch w. c.
over the fire.
20) Check the CO2 and confirm that it is between the minimum and maximum limits shown in Table 3. Adjust if necessary.
21) Verify that the smoke level still does not exceed #1 and that the draft over fire is -0.02 inch w.c.
22) Turn off the burner and remove pressure gauge. Install and tighten gauge port plug, then restart the burner.
23) Check for clean cutoff of the burner. Air in the oil line between fuel pump and nozzle will compress, while burner is
running, and expand, when burner shuts off, causing oil line pressure to drop and nozzle drip after burner stops. Cycle
burner on and off 5 to 10 times to purge air completely.
24) Check thermostat operation by raising or lowering its set point as required, cycling burner on and off.
25) Verify primary control operation and safety features according to procedure outlined in the instructions furnished with
control.
26) Check high limit control operation. Jump thermostat terminals and allow burner to run until boiler water temperature
exceeds high limit setting. The burner should shut down, and circulator continue running. Allow the temperature to drop
below the control setting. The burner must restart. Boiler installation is not complete unless these checks are made and are
satisfactory. Remove thermostat jumper and reconnect thermostat upon check completion.
27) After the boiler has operated for approximately 30 minutes, check the boiler and heating system for leaks. Repair any
leaks found at once.
After the above checks have been completed, leave thermostat(s) at desired setting. Leave all instructions provided with the
boiler with owner or in boiler room, displayed near boiler.
CAUTION
ATTEMPTS TO USE BURNERS OR BURNER CONFIGURATIONS OTHER THAN THOSE SHOWN
IN TABLE 3 COULD RESULT IN RELIABILITY PROBLEMS, PROPERTY DAMAGE OR UNSAFE
OPERATION.
22
Download from Www.Somanuals.com. All Manuals Search And Download.
TABLE 3a: BECKETT BURNER CONFIGURATION AND SETUP DATA
TWZ120 TWZ175 TWZ200
TWZ065 TWZ075 TWZ100 TWZ090 TWZ125 TWZ150
BOILER MODEL
KSZ120
AFG
KSZ175
AFG
KSZ200
AFG
KSZ065
AFG
KSZ075
AFG
KSZ100
AFG
KSZ090
AFG
KSZ125
AFG
KSZ150
AFG
BURNER MODEL
AIR TUBE COMBO.
HEAD TYPE
70MMAQ 70MMAQ 70MMAQ 70MMAQ 70MDAQ 70MDAQ 70MLAQ 70MLAQ 70MLAQ
L1
L1
L1
L1
V1
V1
V1
V1
V1
STATIC PLATE
LOW FIRING RATE
BAFFLE
INSERTION LENGTH
PITCH ANGLE
STANDARD
3 3/8
3 3/8
3 3/8
3 3/8
2 3/4
2 3/4
NONE
NONE
NONE
BECKETT BECKETT
NONE
NONE
NONE
NONE
NONE
NONE
NONE
#3708
2 1/4
2
#3708
2 1/4
2
2 1/4
2
HAGO
2 1/4
2
DEL.
2 1/4
2
HAGO
2 1/4
2
HAGO
2 1/4
2
HAGO
2 1/4
2
HAGO
2 1/4
2
HAGO
HAGO
HAGO
NOZZLE
ALTERNATE
NOZZLE
0.90/60B 1.35/45B 1.50/45B
DEL. DEL. DEL.
0.90/60B 1.35/45B 1.50/45B
0.55/60B 0.65/60B 0.85/60B 0.75/60B 1.00/60B 1.25/60B
DEL. DEL. DEL. HAGO DEL. DEL.
0.55/60W 0.65/60W 0.85/60W 0.75/60B 1.00/60B 1.25/60B
PUMP PRESS (psi)
HEAD SETTING
STARTING:
140
NA
140
NA
140
NA
140
NA
140
0
140
0
175
0
175
3
175
4
SHUTTER SETTING
BAND SETTING
DRAFT OVER FIRE
(in w.c.)
MAX. SMOKE
(bacharach scale)
FLUE CO2 (%)
MIN.
8
1
6
6
8
4
1
1
10
2
5
2
7
0
10
0.5
10
6
-0.02
-0.02
-0.02
-0.02
-0.02
-0.02
-0.02
#1
-0.02
#1
-0.02
#1
#1
#1
#1
#1
#1
#1
11.0
12.5
11.0
12.5
11.0
12.5
11.0
12.5
11.0
12.5
11.0
12.5
11.0
12.5
11.0
12.5
11.0
12.5
MAX
PREPURGE
15 SECONDS
None
IGNITION MODE
INTERUPTED
TABLE 3b: CARLIN BURNER CONFIGURATION AND SETUP DATA
TWZ065 TWZ075 TWZ100 TWZ090 TWZ125 TWZ150 TWZ120 TWZ175 TWZ200
BURNER MODEL
STANDARD
NOZZLE
EZ-1HP
DEL.
EZ-1HP
HAGO
EZ-1HP
HAGO
EZ-1HP
DEL.
EZ-1HP
DEL.
EZ-1HP
HAGO
EZ-1HP
HAGO
EZ-2HP
DEL.
0.55/70B 0.60/60ES 0.85/60B 0.75/60A 1.00/60A 1.25/60B 1.00/60B 1.50/60A
PUMP PRESS (psi)
HEAD BAR
150
0.50
150
150
150
0.75
150
150
150
150
1.50
0.60-0.65 0.85-1.00
0.85-1.00 1.10-1.25 0.85-1.00
STARTING
BAND SETTING
DRAFT OVER FIRE
(in w.c.)
MAX. SMOKE
(bacharach scale)
FLUE CO2 (%)
MIN.
0.55
0.60
0.75
0.75
1.00-1.10 1.25-1.35
0.90
1.75
-0.02
-0.02
-0.02
-0.02
-0.02
#1
-0.02
#1
-0.02
-0.02
#1
#1
#1
#1
#1
#1
11.0
12.5
11.0
12.5
11.0
12.5
11.0
12.5
11.0
12.5
11.0
12.5
11.0
12.5
11.0
12.5
MAX
PREPURGE
IGNITION MODE
NONE
INTERRUPTED
23
Download from Www.Somanuals.com. All Manuals Search And Download.
TABLE 3c: RIELLO BURNER CONFIGURATION AND SETUP DATA
TWZ120 TWZ175 TWZ200
TWZ065 TWZ075 TWZ100 TWZ090 TWZ125 TWZ150
BURNER MODEL
STANDARD
NOZZLE
40F5
DEL
40F5
DEL
40F5
DEL.
40F10
DEL
40F10
HAGO
1.35/45B 1.65/45B
40F10
DEL
0.60/60A 0.85/60W
1.00/60A 1.25/60B
PUMP PRESS (psi)
TURBULATOR
AIR
150
0
150
2
150
4
150
1
150
1.5
150
2
SHUTTER SETTING
DRAFT OVER FIRE
(in w.c.)
3
3.8
2.60
2.85
4
3
-0.02
-0.02
-0.02
-0.02
-0.02
-0.02
MAX. SMOKE
(bacharach scale)
FLUE CO2 (%)
MIN.
#1
#1
#1
#1
#1
#1
11.0
12.5
11.0
12.5
11.0
12.5
11.0
12.5
11.0
12.5
11.0
12.5
MAX
XII Service and Maintenance
The following procedure should be performed on an annual basis:
1) Turn off electrical power and oil supply to the boiler.
2) Clean the boiler as follows:
a) Remove vent connector and piping.
b) Remove barometric draft regulator.
c) Remove top jacket panel to gain access to boiler flue collector.
d) Unscrew four wing nuts and remove canopy retaining carriage bolts, lift off the canopy and ceramic fiber sealing
strips.
e) Unplug the burner, disconnect the oil lines (if the pump is hard piped), and remove the two 5/16” bolts securing the
burner door. Open the burner swing door.
f) Thoroughly brush boiler flueways from the top and diagonally between casting pin rows. Be careful when brushing
the rear passage not to damage the rear target wall insulation.
g) Vacuum soot and debris from combustion chamber.
h) Check condition of rear target wall insulation, combustion chamber liner, and burner door insulation; replace if
required.
i) Check burner head for signs of deterioration. Clean the head of any deposits.
j) Close burner door, reinstall 5/16” bolts, reconnect fuel oil and electrical lines.
k) Installation of boiler canopy, jacket top panel barometric draft regulator and breeching piping is done in reverse
order of removal. Make sure canopy is sealed tight to the casting; replace ceramic fiber sealing strips as needed. All
vent piping joints must be flue gas leak free and secured with sheet metal screws.
24
Download from Www.Somanuals.com. All Manuals Search And Download.
IMPORTANT
•
•
CLEANTHEBOILEREVENIFTHEREARENOSIGNIFICANTSOOTDEPOSITS. FAILURETO
REMOVEALLSULFURANDASHDEPOSITSANNUALLYCANCAUSESEVERECORROSION
DAMAGE.
WHEN CLEANING THE REAR FLUE PASSAGE, BE CAREFUL NOT TO PUSH THE BRUSH TOO FAR
BEYOND THE BOTTOM OF THE PINS. DOING SO MAY DAMAGE THE TARGET WALL.
3) Inspect the vent system:
a) Make sure that the vent system is free of obstructions and soot.
b) Make sure that all vent system supports are intact.
c) Inspect joints for signs of condensate or flue gas leakage.
d) Inspect venting components for corrosion or other deterioration. Replace any defective vent system components.
4) Service the oil burner:
a) Replace oil nozzle with identical make and model (see Table 3).
b) Inspect the electrodes. Replace if they are deteriorated. Make sure that the electrode position is set according to the
burner manufacturer’s instructions.
c) Remove and clean fuel pump strainer.
d) Remove any accumulations of dust, hair, etc. from the air shutter, blower wheel, and other air handling parts of the
burner.
5) Replace the fuel oil line filter element and gaskets.
6) Inspect all oil piping and fittings for kinks and leaks. Repair any found.
7) Inspect the hydronic piping, tankless coil gasket, and boiler plugs for water leaks. Repair any leaks found immediately.
8) Verify operation of relief valve by manually lifting lever; replace relief valve immediately if valve fails to relieve
pressure.
9) Open fuel line shut-off valve(s) and restore electrical power to the boiler.
10) Fire the boiler and check it out using the procedure outlined in “Start-up and Checkout” . This must include checking
the burner adjustments using instruments. Check for proper operation of all controls.
CAUTION
WATERLEAKSCANCAUSESEVERECORROSIONDAMAGETOTHEBOILEROROTHERSYSTEM
COMPONENTS.REPAIRANYLEAKSFOUNDIMMEDIATELY.
25
Download from Www.Somanuals.com. All Manuals Search And Download.
Important Product Safety Information
Refractory Ceramic Fiber Product
Warning:
The Parts list designates parts that contain refractory ceramic fibers (RCF).
RFC has been classified as a possible human carcinogen. When exposed to
temperatures about 1805°F, such as during direct flame contact, RFC changes
into crystalline silica, a known carcinogen. When disturbed as a result of
servicing or repair, these substances become airborne and, if inhaled, may be
hazardous to your health.
AVOID Breathing Fiber Particulates and Dust
Precautionary Measures:
Do not remove or replace RCF parts or attempt any service or repair work
involving RCF without wearing the following protective gear:
1. A National Institute for Occupational Safety and Health (NIOSH)
approved respirator
2. Long sleeved, loose fitting clothing
3. Gloves
4. Eye Protection
• Take steps to assure adequate ventilation.
• Wash all exposed body areas gently with soap and water after contact.
• Wash work clothes separately from other laundry and rinse washing
machine after use to avoid contaminating other clothes.
• Discard used RCF components by sealing in an airtight plastic bag. RCF
and crystalline silica are not classified as hazardous wastes in the United
States and Canada.
First Aid Procedures:
• If contact with eyes: Flush with water for at least 15 minutes. Seek
immediate medical attention if irritation persists.
• If contact with skin: Wash affected area gently with soap and water.
Seek immediate medical attention if irritation persists.
• If breathing difficulty develops: Leave the area and move to a location
with clean fresh air. Seek immediate medical attention if breathing
difficulties persist.
• Ingestion: Do not induce vomiting. Drink plenty of water. Seek
immediate medical attention.
26
Download from Www.Somanuals.com. All Manuals Search And Download.
QUANTITY PER BOILER OR CROWN P.N.
QTY. OR
CROWN P.N.
1 ea.
KEY #
DESCRIPTION
175
270015
1 ea.
1 ea.
3 ea.
4 ea.
4 ea.
2 ea.
2 ea.
1 ea.
2 ea.
10 ea.
4 ea.
1 ea.
1 ea.
200
270015
1 ea.
1 ea.
3 ea.
4 ea.
4 ea.
2 ea.
2 ea.
1 ea.
2 ea.
10 ea.
4 ea.
1 ea.
1 ea.
65
270013
1 ea.
1 ea.
1 ea.
2 ea.
2 ea.
2 ea.
2 ea.
1 ea.
2 ea.
10 ea.
4 ea.
1 ea.
1 ea.
75
270013
1 ea.
1 ea.
1 ea.
2 ea.
2 ea.
2 ea.
2 ea.
1 ea.
2 ea.
10 ea.
4 ea.
1 ea.
1 ea.
100
270013
1 ea.
1 ea.
1 ea.
2 ea.
2 ea.
2 ea.
2 ea.
1 ea.
2 ea.
10 ea.
4 ea.
1 ea.
1 ea.
90
270014
1 ea.
1 ea.
2 ea.
3 ea.
3 ea.
2 ea.
2 ea.
1 ea.
2 ea.
10 ea.
4 ea.
1 ea.
1 ea.
125
270014
1 ea.
1 ea.
2 ea.
3 ea.
3 ea.
2 ea.
2 ea.
1 ea.
2 ea.
10 ea.
4 ea.
1 ea.
1 ea.
150
270014
1 ea.
1 ea.
2 ea.
3 ea.
3 ea.
2 ea.
2 ea.
1 ea.
2 ea.
10 ea.
4 ea.
1 ea.
1 ea.
120
270015
1 ea.
1 ea.
3 ea.
4 ea.
4 ea.
2 ea.
2 ea.
1 ea.
2 ea.
10 ea.
4 ea.
1 ea.
1 ea.
1
*
COMPLETE HEAT EXCHANGER ASSY.
FRONT SECTION
275050
275060
275055
275070
275075
275030
275035
270021
900415
900102
900410
270022
900400
*
REAR SECTION
*
INTERMEDIATE SECTION
LOWER PUSHNIPPLE
*
*
UPPER PUSHNIPPLE
2
3
4
5
6
7
8
9
BURNER SWING DOOR HINGE
FRONT SECTION HINGE
SWING DOOR INSULATION†
5/16-18 X 1-1/2 HX HEAD CAP SCREW
5/16 FLAT WASHER
5/16-18 X 1 HX HEAD CAP SCREW
FLAME INSPECTION COVER
5/16-18 X 3/4 HEX HEAD CAP SCREW
10
11
12
20
21
22
23
24
25
TARGET WALL (REPLACEMENT KIT)†
REFRACTORY BLANKET†
SWING DOOR
270025
1 ea.
1 ea.
275003
1 ea.
1 ea.
275003
1 ea.
1 ea.
275003
1 ea.
1 ea.
275004
1 ea.
1 ea.
275004
1 ea.
1 ea.
275004
1 ea.
1 ea.
275005
1 ea.
1 ea.
275005
1 ea.
1 ea.
275005
1 ea.
270020
900145
1 ea.
1/2" x 1" SEALING STRIP†
4.0 ft
4.0 ft
4.0 ft
4.8 ft
4.8 ft
4.8 ft
5.7 ft
5.7 ft
5.7 ft
FLUE COLLECTOR
270123
2 ea.
270123
2 ea.
270123
2 ea.
270124
2 ea.
270124
2 ea.
270124
2 ea.
270125
2 ea.
270125
2 ea.
270125
2 ea.
1/4-20 x 3" CARRIAGE BOLT
1/4-20 x 3-1/2" CARRIAGE BOLT
1/4" USS FLAT WASHER
1/4-20 WING NUT
900126
900127
90-215
900125
2 ea.
2 ea.
2 ea.
2 ea.
2 ea.
2 ea.
2 ea.
2 ea.
2 ea.
4 ea.
4 ea.
4 ea.
4 ea.
4 ea.
4 ea.
4 ea.
4 ea.
4 ea.
4 ea.
4 ea.
4 ea.
4 ea.
4 ea.
4 ea.
4 ea.
4 ea.
4 ea.
30
31
32
33
34
TANKLESS HEATER GASKET
TANKLESS HEATER (OPTIONAL)
HEATER OPENING COVER PLATE
3/8-16 X 7/8 HX HEAD CAP SCREW
3/8 USS FLAT WASHER
270001
270002
270003
900450
90-036
1 ea.
1 ea.
1 ea.
6 ea.
6 ea.
1 ea.
1 ea.
1 ea.
6 ea.
6 ea.
1 ea.
1 ea.
1 ea.
6 ea.
6 ea.
1 ea.
1 ea.
1 ea.
6 ea.
6 ea.
1 ea.
1 ea.
1 ea.
6 ea.
6 ea.
1 ea.
1 ea.
1 ea.
6 ea.
6 ea.
1 ea.
1 ea.
1 ea.
6 ea.
6 ea.
1 ea.
1 ea.
1 ea.
6 ea.
6 ea.
1 ea.
1 ea.
1 ea.
6 ea.
6 ea.
† SEE PAGE 26 FOR WARNING REGARDING THE HANDLING OF PARTS THAT CONTAIN REFRACTORY CERAMIC FIBERS.
27
Download from Www.Somanuals.com. All Manuals Search And Download.
28
Download from Www.Somanuals.com. All Manuals Search And Download.
QUANTITY PER BOILER OR CROWN P.N.
QTY. OR CROWN
P.N.
KEY #
DESCRIPTION
LEFT SIDE JACKET PANEL
65
75
100
270233
270223
1 ea.
90
270234
270224
1 ea.
270244
1 ea.
1 ea.
15 ea.
8 ea.
1 ea.
1 ea.
1 ea.
1 ea.
2 ea.
2 ea.
1 ea.
1 ea.
1 ea.
125
270234
270224
1 ea.
150
270234
270224
1 ea.
120
270235
270225
1 ea.
175
270235
270225
1 ea.
200
270235
270225
1 ea.
40
41
*
1 ea.
1 ea.
270233
270223
1 ea.
270243
1 ea.
1 ea.
15 ea.
8 ea.
1 ea.
1 ea.
1 ea.
1 ea.
2 ea.
2 ea.
1 ea.
1 ea.
1 ea.
270233
270223
1 ea.
270243
1 ea.
1 ea.
15 ea.
8 ea.
1 ea.
1 ea.
1 ea.
1 ea.
2 ea.
2 ea.
1 ea.
1 ea.
1 ea.
RIGHT SIDE JACKET PANEL
REAR JACKET PANEL
TOP JACKET PANEL
FRONT PANEL
270220
1 ea.
43
44
45
46
47
48
49
49
51
52
*
270243
1 ea.
270244
1 ea.
270244
1 ea.
270245
1 ea.
270245
1 ea.
270245
1 ea.
270210
270215
90-212
900420
35-1006
3503020
3503305
96-001
90-052
90-053
96-010
96-019
95-069
UPPER FRONT PANEL
#10 X 1/2" SHEET METAL SCREW
5/16-18 X 1/2 PAN HEAD SCREW
1/2" LONG WELL
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
15 ea.
8 ea.
15 ea.
8 ea.
15 ea.
8 ea.
15 ea.
8 ea.
15 ea.
8 ea.
15 ea.
8 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
AQUASTAT (L7248C1048)
AQUASTAT (L7224A1008)
JUNCTION BOX
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
8-32 X 1/2 SCREW
2 ea.
2 ea.
2 ea.
2 ea.
2 ea.
2 ea.
8-32 HEX NUT
2 ea.
2 ea.
2 ea.
2 ea.
2 ea.
2 ea.
54
55
56
TWIST RECEPTICAL
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
TWIST RECEPTICAL COVER
TRIDICATOR GAUGE
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
60
60
60
*
BECKETT BURNER ASSY. (NOTE #1)
CARLIN BURNER ASSY. (NOTE #1)
RIELLO BURNER ASSY. (NOTE #1)
BURNER CORD ASSY. (BCKT./CARLIN)
BURNER CORD ASSY. (RIELLO)
1 ea.
1 ea.
130511
130521
130512
130522
130532
1 ea.
130513
130523
130533
1 ea.
130514
130524
130515
130525
130535
1 ea.
130516
130526
130536
1 ea.
130517
130527
130518
130519
1 ea.
130538
1 ea.
130539
1 ea.
960275
960276
1 ea.
1 ea.
1 ea.
*
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
61
62
5/16-18 X 1-1/4 STUD
5/16-18 HEX NUT
90-012
90-010
3 ea.
3 ea.
3 ea.
3 ea.
3 ea.
3 ea.
3 ea.
3 ea.
3 ea.
3 ea.
3 ea.
3 ea.
3 ea.
3 ea.
3 ea.
3 ea.
3 ea.
3 ea.
70
*
3/4" RELIEF VALVE (30 psi)
CIRCULATOR (TACO 007)
1-1/2" TACO FLANGE SET
3/4" BOILER DRAIN
95-040
95-012
950150
95-041
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
1 ea.
*
*
* NOT PICTURED
NOTE #1: PART NUMBERS PROVIDED ARE FOR FULLY CONFIGURED BURNERS AND INCLUDE NOZZLES, BURNER CORD
ASSEMBLIES, AND (WHERE APPLICABLE) LOW FIRING RATE BAFFLES.
29
Download from Www.Somanuals.com. All Manuals Search And Download.
30
Download from Www.Somanuals.com. All Manuals Search And Download.
Manufacturer of Hydronic Heating Products
P.O. Box 14818 3633 I. Street
Philadelphia, PA 19134
7HOꢀꢁꢂꢃꢄꢅꢆꢁꢅꢇꢅꢈꢉꢊꢋꢋꢁꢁ)D[ꢀꢁꢂꢃꢄꢅꢆꢁꢅꢇꢅꢈꢊꢌꢇꢍꢁꢁZZZꢎFURZQERLOHUꢎFRP
PN980270 Rev609/10
Download from Www.Somanuals.com. All Manuals Search And Download.
|