IMI CORNELIUS INC g One Cornelius Place g Anoka, MN 55303-6234
Telephone (800) 238-3600 Facsimile (800) 535-4231
INSTALLATION INSTRUCTIONS, BIN STAT KIT, P/N 631500074,
631500099, 631500108, 631500109, AND 631500116
These Bin Stat kits apply to all “X” Series Ice makers
Table 1. Loose–Shipped Parts
Item No.
Part No.
630000837
07578
630460162
630900895
620045454 or
620045455 or
620045456 or
620045457 or
620050327
Name
Thermostat Asy
Screw TC 08–32
Installation Instruction, Thermostat
Hex Nut 8–32 SS Keps
Bin Stat Support
Qty.
1
2
1
1
1
2
3
4
5
1
1. Disconnect power.
2. Remove front cover of the unit and the electrical box cover plate. For 22” wide units you will need to
remove the Grill from the right side of the unit.
3. To mount bin thermostat in electrical box:
A. Route wires and connector through grommet in electrical box (see Figure 1).
B. Attach bin thermostat to electrical box with two 08–32 TC screws provided (see Figure 1).
4. Connect the bin thermostat lead to the circuit board (see Figure 2).
5. Straighten approximately 12” of capillary tube to go through hole in chassis base. Re–coil the re-
mainder. Do not disturb the tightly coiled end.
6. Insert the “1/4” diameter wire Bin Stat support into the coiled end of capillary tube. Carefully wrap 5
turns of free capillary tube tightly around the Bin Stat support. Insert the assembly through the hole
in the chassis base. Route capillary tube to follow the Bin Stat support as closely as possible (see
Figure 3).
7. Slip eye of Bin Stat support over the 8–32 weld stud in the chassis base. If a nut exists on this weld
stud remove before assembling the Bin Stat support. Secure the Bin Stat support with the 8–32
Keps nut provided in the kit (see Figure 3).
8. Any excess capillary tubing must be carefully pulled back into the compressor compartment to pre-
vent ice from damaging it during dispenser operation.
October 9, 2003
IMI CORNELIUS INC. 2001–2003
1
630460162
Rev C
Download from Www.Somanuals.com. All Manuals Search And Download.
(White Lead)
Condenser Sensor
See note 1
PRESSURE Transducer
DELAY
CLEAN
ERROR
J9
Harvest
RD
Bridge
Thickness
pot.
Off
2 1
3
Unit
Selection
Switch
On
Valve
#8
#7
Micro
FILL VALVE
Processor
(Manufacturing Date)
36430001
Off
On
GR
Dump
S3–1
DUMP VALVE
S3–2
#6
#5
#4
#3
#2
#1
FAN MOTOR (AIR COOLED)
GR
Fan
COMPRESSOR
WATER PUMP
HOT GAS
GR
Comp
GR
Pump
NEUTRAL
GR
Gas
POWER
RH Evap.
Switch
GR
YL
YL
YL
YL
N
S
5
4
3
2
N
S
Bin
Switches
LH Evap.
Switch
Transformer
In
Out
Com
Triac
Stack
Plug Bin Thermostat on Top
Two Pins of Stacking Cable Plug
1
Figure 2
October 9, 2003
630460162
Rev C
IMI CORNELIUS INC. 2001–2003
3
Download from Www.Somanuals.com. All Manuals Search And Download.
DETAIL A
SCALE 1:2
BIN STAT SUPPORT
INSERT COIL AROUND
8–32 HEX
NUT
BIN STAT
SUPPORT
CAPILLARY TUBE
SEE DETAIL
A
BIN STAT SUPPORT
Figure 3
Download from Www.Somanuals.com. All Manuals Search And Download.
|