INSTALLATION MANUAL
RACK MOUNT PANEL
AI-PN100B
Please follow the instructions in this manual to obtain the optimum results from this unit.
We also recommend that you keep this manual handy for future reference.
1. GENERAL DESCRIPTION
The AI-PN100B provides side-by-side rack mounting capability for up to two AI-PU200 Power Transformer
Units.
2. INSTALLATION
Step 1. Attach the AI-PU200 to the AI-PN100B panel.
Binding head screw (M3 x 8)
AI-PN100B
AI-PU200
Step 2. Mount the AI-PN100B in a standard equipment rack.
Note: Perform terminal wiring before mounting.
Fiber washer
Binding head self tapping screw (5 x 12)
Printed in Japan
133-06-241-20
Download from Www.Somanuals.com. All Manuals Search And Download.
|