IQ Probe
Frame Relay
Monitoring Probe
USER MANUAL
IQ Probe Unit
ESP 4-wire SW56 DBU Card
ESP V.34 DBU Card
ESP ISDN DBU Card
ESP External DCE Card
1200214L1
1204001L1
1204002L1
1204004L1
1204006L1
61200214L1-1A
August 1998
Download from Www.Somanuals.com. All Manuals Search And Download.
ABOUT THIS MANUAL
This manual is arranged so you can quickly and easily find the
information you need. The following is an overview of the
contents of this manual:
• Chapter 1, Introduction, familiarizes you with frame relay
networks and IQ Probe highlights.
• Chapter 2, Installation, describes the IQ Probe connectors (pin
assignments are given in Appendix A) and provides an
installation diagram.
• Chapter 3, Operation, explains how to operate your IQ Probe
using either the front panel or a terminal interface.
• Chapter 4, Applications, provides examples of some common
IQ Probe applications. This chapter includes network dia-
grams as well as configuration examples.
• Chapter 5, Configuration Overview, explains how to access the
IQ Probe configuration menu and provides menu trees for
both the front panel and the terminal interface.
• Chapters 6 through 9 provide brief explanations for selections
made in the Configuration menus. These chapters are based
on the first level menu branches of the Configuration menu:
DTE Port, DCE Port, Dial Backup, and System Configuration.
• Chapter 10, Statistics, describes how to access statistical
information from the IQ Probe.
• Chapter 11, Testing, explains how to access the IQ Probe
diagnostic features, including PVC loopback and ping tests.
• Chapter 12, Activating Dial Backup Options, provides infor-
mation on the dialing options accessed through the Main
menu.
• Appendix A provides pinouts for the IQ Probe connectors.
• Appendix B contains product specifications.
Download from Www.Somanuals.com. All Manuals Search And Download.
Notes provide additional useful information.
Cautions signify information that could prevent service interruption.
Warnings provide information that could prevent damage to the
equipment or endangerment to human life.
IMPORTANT SAFETY INSTRUCTIONS
SAVE THESE INSTRUCTIONS
When using your telephone equipment, please follow these basic safety precautions
to reduce the risk of fire, electrical shock, or personal injury:
1. Do not use this product near water, such as near a bath tub, wash bowl, kitchen
sink, laundry tub, in a wet basement, or near a swimming pool.
2. Avoid using a telephone (other than a cordless-type) during an electrical storm.
There is a remote risk of shock from lightning.
3. Do not use the telephone to report a gas leak in the vicinity of the leak.
4. Use only the power cord, power supply, and/ or batteries indicated in the
manual. Do not dispose of batteries in a fire. They may explode. Check with
local codes for special disposal instructions.
Download from Www.Somanuals.com. All Manuals Search And Download.
FCC regulations require that the following information be provided in this manual:
1. This equipment complies with Part 68 of the FCC rules. On the bottom of the ESP DBU card is
a label that shows the FCC registration number and ringer equivalence number (REN) for this
equipment. If requested, provide this information to the telephone company.
2. If this equipment causes harm to the telephone network, the telephone company may temporarily
discontinue service. If possible, advance notification is given; otherwise, notification is given
as soon as possible. The telephone company will advise the customer of the right to file a
complaint with the FCC.
3. The telephone company may make changes in its facilities, equipment, operations, or
procedures that could affect the proper operation of this equipment; advance notification and
the opportunity to maintain uninterrupted service are given.
4. If experiencing difficulty with this equipment, please contact ADTRAN for repair and
warranty information. The telephone company may require this equipment to be
disconnected from the network until the problem is corrected, or it is certain the equipment is
not malfunctioning.
5. This unit contains no user-serviceable parts.
6. An FCC compliant telephone cord with a modular plug is provided with this equipment. This
equipment is designed to be connected to the telephone network or premises wiring using an
FCC compatible modular jack, which is Part 68 compliant.
7. The following information may be required when applying to the local telephone company for
dial backup service:
Service Type
REN/SOC
6.0F
6.0F
FIC
USOC
RJ-48S
RJ-48S
RJ-11C
56 kbps Digital Interface
64 kbps Digital Interface
Loop Start (V.34)
04DU5-56
04DU5-64
02LS2
0.8B/ 0.4A
8. The REN is useful in determining the quantity of devices you may connect to your telephone
line and still have all of those devices ring when your number is called. In most areas, the sum
of the RENs of all devices should not exceed five. To be certain of the number of devices you
may connect to your line as determined by the REN, call your telephone company to
determine the maximum REN for your calling area.
9. This equipment may not be used on coin service provided by the telephone company.
Connection to party lines is subject to state tariffs. (Contact your state public utility
commission or corporation commission for information.)
Download from Www.Somanuals.com. All Manuals Search And Download.
FEDERAL COMMUNICATIONS COMMISSION
RADIO FREQUENCY INTERFERENCE STATEMENT:
This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to
Part 15oftheFCCRules.Theselimitsaredesignedtoprovidereasonableprotection against harmfulinterference
when the equipment is operated in a commercial environment. This equipment generates, uses, and can radiate
radio frequency energy and, if not installed and used in accordance with the instruction manual, may cause
harmful interference to radio frequencies. Operation of this equipment in a residential area is likely to cause
harmful interference in which case the user will be required to correct the interference at his own expense.
Shielded cables must be used with this unit to ensure compliance with Class A FCC limits.
Change or modifications to this unit not expressly approved by the
party responsible for compliance could void the user' s authority to
operate the equipment.
CANADIAN EMISSIONS REQUIREMENTS
This digital apparatus does not exceed the Class A limits for radio noise emissions
from digital apparatus as set out in the interference-causing equipment standard
entitled "Digital Apparatus," ICES-003 of the Department of Communications.
Cet appareil nuerique respecte les limites de bruits radioelectriques applicables aux
appareils numeriques de Class A prescrites dans la norme sur le materiel brouilleur:
"Appareils Numeriques," NMB-003 edictee par le ministre des Communications.
Download from Www.Somanuals.com. All Manuals Search And Download.
CANADIAN EQUIPMENT LIMITATIONS
Notice: The Canadian Industry and Science Canada label identifies certified
equipment. This certification means that the equipment meets certain telecom-
munications network protective, operational, and safety requirements. The
Department does not guarantee the equipment will operate to the user's satisfac-
tion.
Before installing this equipment, users should ensure that it is permissible to be
connected to the facilities of the local telecommunications company. The equip-
ment must also be installed using an acceptable method of connection. In some
cases, the company's inside wiring associated with a single line individual
service may be extended by means of a certified connector assembly (telephone
extension cord). The customer should be aware that compliance with the above
conditions may not prevent degradation of service in some situations.
Repairs to certified equipment should be made by an authorized Canadian
maintenance facility designated by the supplier. Any repairs or alterations made
by the user to this equipment, or equipment malfunctions, may give the telecom-
munications company cause to request the user to disconnect the equipment.
Users should ensure for their own protection that the electrical ground connec-
tions of the power utility, telephone lines and internal metallic water pipe
system, if present, are connected together. This precaution may be particularly
important in rural areas.
Users should not attempt to make such connections themselves, but
should contact the appropriate electric inspection authority, or an
electrician, as appropriate.
The Load Number (LN) assigned to each terminal device denotes the percentage
of the total load to be connected to a telephone loop which is used by the device,
to prevent overloading. The termination on a loop may consist of any combina-
tion of devices subject only to the requirement that the total of the Load Num-
bers of all devices does not exceed 100.
Download from Www.Somanuals.com. All Manuals Search And Download.
ISDN Service Ordering Information for the ADTRAN IQ Probe With ISDN Dial
Backup
For ADTRAN IQ Probe ISDN dial backup applications, the following guide can be
used as an aid in ordering basic ISDN service from your local telephone company.
The ADTRAN IQ Probe ISDN includes NT1 and Terminal adapter functionality and
supports data rates up to 128 kbps.
Request an ISDN Basic Rate Interface (BRI) line with the following features:
U-interface reference point
2B1Q line coding
1B+D Service (supports up to 64 kbps)
2B+D Service (supports up to 128 kbps)
The IQ Probe ISDN supports the following switch types and software protocols:
Lucent 5ESS
NT1 DMS-100
Siemens EWSD
Custom, 5E6 and later software, National ISDN-1
BCS-32 and later software (Pvc1), National ISDN-1 (Pvc2)
National ISDN-1
Request that the ISDN line allocate one DYNAMIC Terminal Endpoint Identifier
(TEI) for the number.
For service offered from an Lucent 5ESS, request a point-to-point line with the
following features:
Feature: Value
B1 Service: On Demand (DMD)
Data Line Class: Point-to-Point
Maximum B Channels: 1 (1B+D) or 2 (2B+D)
Circuit Switched Data (CSD) Bearer Channels: Any
Number of CSD Calls: 1 (1B+D) or 2 (2B+D)
Terminal Type: Type A
Download from Www.Somanuals.com. All Manuals Search And Download.
Turn the Following Features Off:
Packet Mode Data
Multi-line Hunt
Multiple Call Appearances
Electronic Key Telephone Sets (EKTS)
Shared Dictionary Numbers
Accept Special Type of Number
Intercom Groups
Network Resource Selector (Modem Pools)
Message Waiting
Hunting
InterLata Competition
For service offered from a Northern Telecom DMS-100, request a Point-to-Point
Multi-Point line with the following features:
Line Type: Basic Rate, Functional
Electronic Key Telephone Sets (EKTS): No
Call Appearance Handling (CACH): No
Non-Initializing Terminal: No
Circuit Switched Service: Yes
Packet Switched Service: No
TEI: Dynamic
Bearer Service: Circuit Switched voice and data permitted on any B channel (packet mode
data not permitted)
Download from Www.Somanuals.com. All Manuals Search And Download.
Download from Www.Somanuals.com. All Manuals Search And Download.
Table of Contents
Chapter 1. Introduction
Product overview ................................................................................................................... 1
Understanding Frame Relay ................................................................................................. 2
SNMP Management ............................................................................................................... 3
Network Manager ............................................................................................. 3
Agent ................................................................................................................... 4
MIB ...................................................................................................................... 4
TELNET.................................................................................................................................... 4
Dial Backup Operation .......................................................................................................... 4
ESP Card Options ................................................................................................................... 5
4-Wire Switched 56 DBU Card ...................................................................................... 5
V.34 DBU Card ................................................................................................................ 5
ISDN DBU Card ............................................................................................................... 5
ESP DCE Card .................................................................................................................. 5
Warranty and Customer Service .......................................................................................... 6
Chapter 2. Installation
Unpack, Inspect, Power Up ................................................................................................... 7
Receipt Inspection ........................................................................................................... 7
ADTRAN Shipments Include ................................................................................. 7
Customer Provides ................................................................................................... 8
Power Up .......................................................................................................................... 8
Rear Panel ................................................................................................................................ 9
DBU Interface Card Slot ............................................................................................... 11
DCE Interface ................................................................................................................. 11
DTE Interface ................................................................................................................. 11
LAN 10baseT Interface ................................................................................................. 12
Control Port .................................................................................................................... 12
Chapter 3. Operation
Front Panel ............................................................................................................................. 13
LCD Window .......................................................................................................... 13
Enter ......................................................................................................................... 13
Up and Down Arrows ........................................................................................... 13
Cancel ....................................................................................................................... 13
Quick Key ................................................................................................................ 14
61200214L1-1
IQ Probe User Manual
i
Download from Www.Somanuals.com. All Manuals Search And Download.
Table of Contents
Numeric Keypad .................................................................................................... 14
Next, Prev, Add, Delete ......................................................................................... 14
Shift .......................................................................................................................... 14
LED Descriptions ................................................................................................... 17
RS: Request to Send ....................................................................................... 17
CS: Clear to Send ............................................................................................ 17
TD: Transmit Data .......................................................................................... 17
RD: Receive Data ............................................................................................ 17
CD: Carrier Detect .......................................................................................... 17
TR: Data Terminal Ready .............................................................................. 17
ALM: Alarm .................................................................................................... 17
Front Panel Operation .................................................................................................. 18
VT 100 Terminal Connection and Operation ............................................................ 19
IQ Probe Menu Structure ..................................................................................................... 21
Main Menu ..................................................................................................................... 22
Configuration (CONFIG) ............................................................................... 22
View Statistics (STATS)................................................................................... 22
Test .................................................................................................................... 22
Dial (with ESP DBU card installed) .............................................................. 22
Logout (terminal menu only) ........................................................................ 22
Chapter 4. Applications
Management Applications .................................................................................................. 23
Local VT 100 Terminal Management .......................................................................... 24
Minimum Configuration Requirements for VT 100 Management ................. 24
Out-of-Band Management ........................................................................................... 25
Minimum Configuration Requirements for Out-of-Band Management ....... 26
In-Band Management ................................................................................................... 27
Local PVC Management ........................................................................................ 28
Minimum Configuration Requirements for Local PVC Management .... 29
Shared PVC Management ..................................................................................... 30
Minimum Configuration Requirements for Shared PVC Management . 31
Dedicated PVC Management ............................................................................... 32
Minimum Configuration Requirements for
Dedicated PVC Management ........................................................................ 33
Dial Backup Application ...................................................................................................... 33
Chapter 5. Configuration Overview
Local and Remote Configuration ....................................................................................... 37
ii
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Table of Contents
Chapter 6. DTE Port Configuration
Physical Layer Options (PHYS LYR OPTS)............................................................... 44
Interface Type ......................................................................................................... 44
Flow Control ........................................................................................................... 44
None .................................................................................................................. 45
Hardware ......................................................................................................... 45
FECN/ BECN ................................................................................................... 45
CTS Option .............................................................................................................. 45
Forced On ......................................................................................................... 45
Follow RTS ....................................................................................................... 45
DSR Option ............................................................................................................. 45
Forced On ......................................................................................................... 45
Normal .............................................................................................................. 45
CD Option ............................................................................................................... 45
Forced On ......................................................................................................... 46
Normal .............................................................................................................. 46
TC Clock Option (TC CLOCK OPT).................................................................... 46
Normal .............................................................................................................. 46
Inverted ............................................................................................................ 46
Frame Relay Options (FR OPTS) ................................................................................. 46
T392 .......................................................................................................................... 46
N392 and N393 ....................................................................................................... 46
Management DLCI (MGMT DLCI) ..................................................................... 47
Guidelines for Configuring Management DLCI ........................................ 47
Management PVC Option (MGMT PVC OPT) .................................................. 47
Signaling Responses (SIG RESPONSES)............................................................. 47
Always On ....................................................................................................... 47
Follows Network (FOLLOW NET) .............................................................. 48
Chapter 7. Configuring the DCE Port
DCE Port ................................................................................................................................ 49
Physical Layer Options (PHYS LYR OPTS)............................................................... 50
Interface Type ......................................................................................................... 50
Serial Bit Rate <Kbps> (RATE <Kbps>) ............................................................. 50
Frame Relay Options (FR OPTS) ................................................................................. 51
Signaling Type (SIGNAL) ............................................................................................ 51
T391 .......................................................................................................................... 51
N391 ......................................................................................................................... 52
N392 and N393 ....................................................................................................... 52
Management DLCI 1 and 2 (DLCI 1 and 2) ........................................................ 52
61200214L1-1
IQ Probe User Manual
iii
Download from Www.Somanuals.com. All Manuals Search And Download.
Table of Contents
Management DLCI 1 and 2 Mode (DLCI 1 and 2 MODE) ...................................... 52
Maximum PVC Count (MAX PVC COUNT) ............................................................ 53
History Interval Count (HIST INT COUNT)............................................................. 53
PVC Options (PVC CONFIG) ...................................................................................... 53
DLCI ......................................................................................................................... 53
DBU DLCI ............................................................................................................... 53
CIR (Kbps) ............................................................................................................... 54
Seq Num Checking (SEQ #) .................................................................................. 54
Delay Measurement (PVC DELAY) .................................................................... 54
Next (NEXT key on front panel) .......................................................................... 54
Previous (PREV key on front panel).................................................................... 54
Add (ADD key on front panel) ............................................................................ 55
Delete (DELETE key on front panel) ................................................................... 55
Chapter 8. Configuring Dial Backup Options
Dial Backup Options ............................................................................................................ 57
Auto DBU ....................................................................................................................... 59
DBU Options .................................................................................................................. 59
Beeper Option (BEEP OPTION).................................................................... 59
Password Opt .................................................................................................. 59
DBU Password ................................................................................................. 59
Daily Lockout .................................................................................................. 59
Lockout Start .................................................................................................... 59
Lockout End ..................................................................................................... 60
Weekend Lock ................................................................................................. 60
DBU Criteria ................................................................................................................... 60
With Carrier Detect Loss (WITH DCD LOSS) ............................................ 60
With No LMI .................................................................................................... 60
DBU Timers .................................................................................................................... 60
Fail Timer (FAIL TMR x 10) ........................................................................... 60
Restore Timer (RESTORE TMR) ................................................................... 60
Redial Counter ................................................................................................. 60
Wait to Redial (REDIAL DELAY).................................................................. 61
DBU Card Configuration Options .............................................................................. 61
Modem Options ...................................................................................................... 61
Tone/ Pulse ....................................................................................................... 61
ISDN Options .......................................................................................................... 61
Switch Type ...................................................................................................... 61
B-Channel Bit Rate (B-CH BIT RATE) .......................................................... 62
Number of B-Channels (NUM B-CHANNELS) ......................................... 62
iv
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Table of Contents
SPID 1/ 2 ........................................................................................................... 62
LDN 1/ 2 ........................................................................................................... 62
DCE Options ........................................................................................................... 62
Interface Type .................................................................................................. 62
DBU Bit Rate .................................................................................................... 62
Phone Numbers 1-5 ....................................................................................................... 62
Chapter 9. System Configuration
Change Password (not available on front panel) ..................................................... 63
Ethernet Port .................................................................................................................. 63
IP Address ...................................................................................................................... 63
Subnet Mask ................................................................................................................... 64
Gateway IP Addr (GW IP ADDRESS)........................................................................ 64
Control Port Options (CTRL PORT OPTS) ................................................................ 64
Control Port Mode (CTRL PORT MODE) .......................................................... 64
Read Community (RD COMMUNITY) ..................................................................... 65
Write Community (WR COMMUNITY).................................................................... 65
Trap Mgr Options .......................................................................................................... 65
Trap Manager DLCI (TRAP DLCI)...................................................................... 65
Trap Manager IP Address (TRAP IP) .................................................................. 65
Trap Manager Port (TRAP PORT) ....................................................................... 65
Next (NEXT key on front panel) .......................................................................... 66
Previous (PREV key on front panel).................................................................... 66
Add (ADD key on front panel) ............................................................................ 66
Delete (DELETE key on front panel) ................................................................... 66
System Time/ Date ........................................................................................................ 66
History Interval Size (HIS INT SIZE) ......................................................................... 66
System LEDs Reflect ..................................................................................................... 66
Entering Letters Using the Front Panel ............................................................................. 67
Chapter 10. Statistics
Viewing Statistical Information (Terminal Interface) ...................................................... 69
Terminal Statistics Display Options ........................................................................... 70
View by Interval .............................................................................................. 70
View by Day ..................................................................................................... 71
Hot Keys ......................................................................................................................... 72
ESC=Menu ....................................................................................................... 72
D=DLCI ............................................................................................................ 72
Page (+, -).......................................................................................................... 72
Scroll (<, >) ....................................................................................................... 72
61200214L1-1
IQ Probe User Manual
v
Download from Www.Somanuals.com. All Manuals Search And Download.
Table of Contents
V=View by Day/ View by Interval ............................................................... 72
DTE Port Statistics ......................................................................................................... 73
DCE Port Statistics......................................................................................................... 76
DBU Port Statistics ........................................................................................................ 81
DLCI Statistics ................................................................................................................ 85
DLCI Statistics for a Specific DLCI ...................................................................... 86
DLCI List ................................................................................................................. 91
System Statistics ............................................................................................................. 91
Viewing Statistical Information (Front Panel Interface) ................................................. 92
DTE Port Statistics Available on Front Panel ............................................................ 92
DCE Port Statistics Available on Front Panel............................................................ 94
DBU Port Statistics Available on Front Panel ........................................................... 95
DLCI List ......................................................................................................................... 96
System Statistics Available on Front Panel ................................................................ 96
Chapter 11. Testing
PVC Loopback ..................................................................................................................... 100
Ping ....................................................................................................................................... 104
Chapter 12. Activating Dial Backup Options
Dial Options when Dial Backup is Idle ........................................................................... 105
Dial Backup .................................................................................................... 105
Stay on Leased ............................................................................................... 105
Dial Options During Dial Backup .................................................................................... 106
Hang Up ......................................................................................................... 106
Stay On Line ................................................................................................... 106
Appendix A. Pinouts ........................................................................................................ 107
Appendix B. Specifications Summary .......................................................................... 115
Acronyms and Abbreviations ......................................................................................... 117
Glossary ............................................................................................................................... 121
Index..................................................................................................................................... 131
vi
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Table of Contents
List of Tables
Table 4-A Example Settings for Dial Backup Options ................................................. 36
Table 4-B Example Settings for PVC Configuration Table ......................................... 36
Table A-A Pin Assignments for 10baseT Connector ................................................... 107
Table A-B Pin Assignments for Control Connector .................................................... 108
Table A-C EIA-232 Connector Pin Assignments ......................................................... 108
Table A-D EIA-530 Connector Pin Assignments ......................................................... 109
Table A-E Pin Assignments for DB-25 to X.21 (DB-15) Adapter Cable ....................110
Table A-F Pin Assignments for DB-25 to V.35 Adapter Cable
(Rear Panel Connector) ................................................................................. 111
Table A-G Pin Assignments for DB-25 to V.35 Adapter Cable
(DCE Card Option Connector) .....................................................................112
Table A-H Dial Backup Card Connectors ......................................................................113
List of Figures
Figure 2-1 IQ Probe Rear View ......................................................................................... 10
Figure 3-1 IQ Probe Front Panel ...................................................................................... 15
Figure 3-2 Example of Basic Front Panel Menu Navigation ........................................ 18
Figure 3-3 Terminal Login Menu ..................................................................................... 20
Figure 3-4 Terminal Main Menu ...................................................................................... 21
Figure 4-1 VT 100 Management Application Example ................................................ 24
Figure 4-2 Out-of-Band Management Application Example....................................... 26
Figure 4-3 Local PVC Management Application ........................................................... 29
Figure 4-4 Shared PVC Management Application ........................................................ 31
Figure 4-5 Dedicated PVC Management Application .................................................. 33
Figure 4-6 Dial Backup Application ................................................................................ 35
Figure 5-1 Terminal Configuration Menu ...................................................................... 38
Figure 5-2 Terminal Configuration Menu Tree .............................................................. 39
Figure 5-3 Front Panel Configuration Menu Tree ......................................................... 41
Figure 6-1 Terminal DTE Port Configuration Menu ..................................................... 43
Figure 6-2 DTE Port Menu Tree ....................................................................................... 44
Figure 7-1 Terminal DCE Port Configuration Menu .................................................... 50
Figure 7-2 Terminal DCE Port Frame Relay Options Menu ........................................ 51
Figure 8-1 DBU Options Menu (with V.34 DBU Card Installed) ................................ 57
Figure 8-2 Dial Backup Menu Tree .................................................................................. 58
Figure 9-1 System Configuration Menu ......................................................................... 64
Figure 10-1 View Statistics Menu ...................................................................................... 70
Figure 10-2 DTE Port Statistics (View by Interval) ......................................................... 73
Figure 10-3 DTE Port Statistics (View by Day) ................................................................ 74
Figure 10-4 DCE Port Statistics with DBU Card Installed (View by Interval) ............ 78
61200214L1-1
IQ Probe User Manual
vii
Download from Www.Somanuals.com. All Manuals Search And Download.
Table of Contents
Figure 10-5 DCE Port Statistics (View by Day)................................................................ 79
Figure 10-6 DBU Port Statistics (View by Interval) ......................................................... 83
Figure 10-7 DBU Port Statistics (View by Day) ............................................................... 84
Figure 10-8 DLCI Statistics for a Specific DLCI (View by Interval) .............................. 86
Figure 10-9 DLCI Statistics Summary for All Available DLCIs ..................................... 91
Figure 10-10 System Statistics Screen ................................................................................ 92
Figure 10-11Control Signal Status Screen .......................................................................... 93
Figure 10-12 Signal State Screen ......................................................................................... 93
Figure 10-13 System Statistics Screen ................................................................................ 97
Figure 11-1 Terminal Test Menu ........................................................................................ 99
Figure 11-2 Front Panel Test Menu .................................................................................. 100
Figure 11-3 PVC Loopback Menu ................................................................................... 101
Figure 11-4 Test Status Screen .......................................................................................... 103
Figure 12-1 Dial Options Menu ....................................................................................... 105
viii
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 1
Introduction
PRODUCT OVERVIEW
The ADTRAN IQ Probe provides the visibility and control
needed for both the physical and logical connections made in
frame relay networks. The IQ Probe provides logical layer
monitoring and management for frame relay. Each permanent
virtual circuit (PVC) accessed through an IQ Probe is managed
end-to-end as if it were a leased line connection. Real-time
statistics on throughput, bandwidth utilization, availability,
bursting, congestion, and network delay are collected and
stored. The statistics are viewable through the IQ Probe using
the front panel, the VT 100 interface, or the Frame IQ MIB
(management information base). This information can be
gathered by management systems via SNMP (simple network
management protocol) and used to monitor network health and
perform long-term network planning.
The unit's embedded SNMP agent provides complete SNMP
access to the unit. SNMP access is available through the DTE or
DCE port or through an integral SLIP (serial line internet
protocol) or PPP (point-to-point protocol) async port. The IQ
Probe also provides integrated 10baseT ethernet access for
SNMP.
The following are features of the IQ Probe:
• Complete and comprehensive frame relay monitoring
• Real-time measurement of bandwidth utilization, committed
61200214L1-1
IQ Probe User Manual
1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 1. Introduction
information rates (CIRs), and excess burst rates on each PVC
• True non-intrusive, in-band transmission of statistics
• Embedded SNMP and TELNET through the DTE, DCE, or
SLIP/ PPP port
• Embedded SNMP and TELNET access available through the
integrated 10baseT ethernet port
• Control port provides SLIP and async PPP access to SNMP or
VT 100 terminal configuration
• Dial backup (DBU) available with ESP DBU cards; options
include 4-wire Switched 56 (SW56), V.34, ISDN, and external
DCE card
• End-to-end network round trip delay measurements for
network optimization
• Frame IQ MIB is standard ASN.1 format compatible with
popular enterprise reporting systems
• Optional IQ View™ software system provides a cost-effective,
easy-to-use GUI (graphical user interface) for performance
management
• DTE (data terminal equipment) and DCE (data communica-
tions equipment) interfaces support interface standards of
EIA-232, V.35, X.21, and EIA-530
UNDERSTANDING FRAME RELAY
Frame relay is a wide area network (WAN) service designed to
minimize physical connections. This is accomplished by using
virtual connections within the frame relay cloud and accessing
these virtual circuits with normally one physical connection at
each location to the frame relay service. Virtual circuits are
addressed using header information at the beginning of each
frame. These frames are formatted by a device such as a router
or FRAD (frame relay access device) and monitored by the IQ
Probe.
ANSI (American National Standards Institute) standards de-
scribe how each frame must be constructed to provide interoper-
ability between CPE equipment and frame relay switching
equipment. Each frame must contain a header, at least one byte
of information data, two bytes of CRC16, and a trailing flag
0x7E.
2
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 1. Introduction
This header information contains a virtual circuit address known
as a DLCI (data link connection identifier). The header informa-
tion also contains bits used for network congestion control.
Frame relay virtual circuits may be defined as permanent (PVC)
or switched (SVC). PVCs have the same DLCI for a given path
each time a user protocol session is established. The network
service provider assigns these DLCIs at subscription time. SVCs,
on the other hand, have DLCIs dynamically assigned each time a
user protocol session is established. The CPE equipment must
request a call and the DLCI is assigned by the network switching
equipment. This DLCI is valid until the call is disconnected and
may be assigned a different value each time a call is requested.
SNMP MANAGEMENT
SNMP management capability is provided in-band with support
for RFC 1315 (frame relay DTE MIB), RFC 1213 (MIB II), and
ADTRAN Enterprise MIB. MIB files are available from
ADTRAN in the support section of the ADTRAN Web page at
www.adtran.com. TELNET capability is also supported. For
non-TCP/ IP environments, VT 100 and front panel operation are
supported.
The IQ Probe's embedded SNMP feature allows the unit to be
accessed and controlled by a network manager in-band at the
DTE or DCE interface, out-of-band at the control port via SLIP or
async PPP, or using a LAN connection.
The term SNMP broadly refers to the message protocols used to
exchange information between the network and the managed
devices, as well as to the structure of network management data
bases. The three basic components of SNMP follow:
Network Manager
Control program that collects, controls, and presents data
pertinent to the operation or management of the network
devices. It resides on a network management station.
61200214L1-1
IQ Probe User Manual
3
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 1. Introduction
Agent
Control program that resides in each connected network device.
This program responds to queries and commands from the
network manager and returns requested information or invokes
configuration changes initiated by the manager.
MIB
Index to the organized data within a network device. It defines
the operation parameters that can be controlled or monitored.
TELNET
TELNET provides a password-protected, remote login facility to
the IQ Probe. TELNET allows a user on a network manager to
control the IQ Probe through the terminal menus.
DIAL BACKUP OPERATION
The IQ Probe dial backup (DBU) option cards allow frame relay
circuit outage recovery for one user-to-network interface (UNI)
at a time. The IQ Probe can be configured to originate a call
based on physical layer conditions and/ or PVC signaling loss.
Once the criteria are met, the IQ Probe establishes a call to the
configured phone number and the connection is used to carry
traffic for the PVC(s) configured for DBU operation.
These cards allow the unit receiving the call to continue to use
the network frame relay circuit for PVCs that are not affected by
the outage, while using the DBU interface for PVCs that are
inactive due to the outage. An IQ Probe with multiple PVCs to
multiple sites can also originate a call to one site during an
outage and restore connection for PVCs to that destination.
The cards are field-installable by the customer. See the chapter
Installation for information on installing DBU cards. The DBU
cards are compatible with other ADTRAN ESP products
supporting DBU. The backup options are described in the
following section, ESP Card Options. Contact the local telco
provider to determine which services are available in your area.
See the chapter Applications for more information, including an
example of a dial backup application.
4
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 1. Introduction
ESP CARD OPTIONS
4-Wire Switched 56 DBU Card
This dial-up 4-wire SW56 DBU card allows you to pay for data
connection only for the time the unit is active. The regional
operating companies provide the 4-wire local loop service to
SW56 customers. This card is compatible with AT&T Accunet
and Sprint SW56 type services.
V.34 DBU Card
ISDN DBU Card
This module backs up the leased line application at data rates up
to 33.6 kbps over an ordinary telephone network.
2B+D Basic Rate ISDN service provides a switched 56/ 64 kbps
circuit with support for bonding of 112/ 128 kbps. This DBU
card supports a U-interface to the Basic Rate ISDN and is
compatible with National ISDN, Lucent, and DMS.
ESP DCE Card
This module connects an external DCE device to the IQ Probe for
the purpose of using an external DSU/ CSU to support access
rates up to 2.048 Mbps.
61200214L1-1
IQ Probe User Manual
5
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 1. Introduction
WARRANTY AND CUSTOMER SERVICE
ADTRAN will replace or repair this product within five years
from the date of shipment if it does not meet its published
specifications or fails while in service. For detailed warranty,
repair, and return information refer to the ADTRAN Equipment
Warranty and Repair and Return Policy Procedure.
Return Material Authorization (RMA) is required prior to
returning equipment to ADTRAN.
For service, RMA requests, or further information, contact one of
the numbers listed on the inside back cover of this manual.
6
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 2
Installation
UNPACK, INSPECT, POWER UP
Receipt Inspection
Carefully inspect the IQ Probe for any shipping damage. If
damage is suspected, file a claim immediately with the carrier
and contact ADTRAN Customer Service. If possible, keep the
original shipping container for use in shipping the IQ Probe for
repair or for verification of damage during shipment.
ADTRAN Shipments Include
The following items are included in ADTRAN shipments of the
IQ Probe:
• IQ Probe unit
• User manual
• 8-position modular to 8-position modular cable and a modular
to female DB-25 adapter for access to the Control/ SLIP/ PPP
port
• Power cord
61200214L1-1
IQ Probe User Manual
7
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 2. Installation
The ADTRAN IQ Probe MIB is available from ADTRAN in the
support section of the ADTRAN Web page at www.adtran.com.
The following items are included in ADTRAN shipments of ESP
DBU cards:
• ESP DBU card
• An 8-position modular to 8-position modular cable for the 4-
wire SW56 and ISDN DBU options or an 8-position modular to
4-position modular cable for the V.34 DBU option
Customer Provides
You must provide male interface cables for the DTE and DCE
ports. Use a standard DB-25 cable for EIA-232 or EIA-530, or use
an optional ADTRAN adapter cable for X.21 or V.35. Part
numbers for the optional cables are given later in this chapter in
the section Rear Panel.
For SNMP management not accessed through the DTE or DCE
port, you must provide access to the IQ Probe either through a
SLIP port, Async PPP port (requires a male 25-pin D-type
connector), or a 10baseT ethernet port. See the appendix Pinouts
for the pin assignments of the control port (for SLIP and Async
PPP) and the ethernet port.
Power Up
The IQ Probe is provided with an IEC-type 8-foot power cord,
terminated by a three-prong plug which connects to a grounded
power receptacle with supply voltage from 90-240 VAC.
For international applications, please use the appropriate IEC adapter
cable for power connection.
Power to the IQ Probe must be provided from a grounded 90-240 VAC,
50/60 Hz receptacle.
8
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 2. Installation
REAR PANEL
Connectors for the IQ Probe are located on the rear panel. The
DTE and DCE connectors provide DTE DB-25 interfaces. These
connectors can be cabled to V.35 or X.21 interfaces (using op-
tional ADTRAN adapter cables) or to an EIA-232 or EIA-530
interface (using a standard DB-25 cable). Part numbers for the
optional cables follow:
DB-25 to V.35 male adapter cable: 1200281L1
DB-25 to V.35 female adapter cable: 1200285L1
DB-25 to female DB-15 (X.21) adapter cable: 1200282L1
The DBU option card slot, control port, 10baseT LAN port, IEC
power receptacle, and power switch are also found on the rear
panel. Connector pin assignments are listed in the appendix
Pinouts. The IQ Probe rear panel is shown in Figure 2-1 with an
optional ESP DBU card installed. The connectors are described
in the sections following the figure.
61200214L1-1
IQ Probe User Manual
9
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 2. Installation
V.34, ISDN,
4-Wire Switched 56
Switched
Network
LAN
DBU Modular
Cable
10baseT
Ethernet
Cable
DBU INTERFACE
90 - 240 VAC
50 / 60HZ
LAN
10 BASE-T
DBU
TELCO
ON
OFF
DCE
DTE
CONTROL
DSU/CSU
RJ45-to-DB25
Cable
Standard DB25 Cables
(EIA-232 or EIA530)
or ADTRAN Adaptor
Cables (X.21 or V.35)
1
4
2
5
3
6
ALARM
7
CLEAR
9
8
COPY
HOME
SHIFT
#
0
Frame Relay
Router or FRAD
Frame Relay
Network
VT 100 Terminal
or device running
SLIP or async PPP
protocol
Item
Function
DBU Interface Card Slot
DCE Interface
Houses an ESP DBU card
Connects to a DSU/ CSU which
connects to the dedicated frame
relay circuit
DTE Interface
Provides high-speed DTE interface
to a FRAD
LAN 10baseT Interface
Control Port
Provides ethernet connection for
SNMP/ TELNET access
Connects to a VT 100 terminal or a
device running SLIP or async PPP
protocol
IEC Power Receptacle
Power Switch
Connects to standard IEC power
cord
Turns power on or off
Figure 2-1
IQ Probe Rear View
10
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 2. Installation
DBU Interface Card Slot
The IQ Probe rear panel has one card slot (labeled DBU INTER-
FACE) for the installation of dial backup and DCE cards. To
insert cards, perform the following procedure:
1. Remove power from the IQ Probe.
2. Slide the card into the DBU Interface rear slot until the card
panel is flush with the IQ Probe chassis.
3. Push card locks in (until they click) to secure the card and
ensure proper installation.
Remove power from the unit prior to installing or removing option
cards.
DCE Interface
Connect the IQ Probe to the dedicated frame relay circuit
through a DSU/ CSU connected to the IQ Probe DCE port. The
port provides an EIA-232 or EIA-530 interface (using a standard
DB-25 cable) or it can be cabled to an X.21 or V.35 interface
(using optional ADTRAN adapter cables). Part numbers for the
adapter cables are listed earlier in this section. The pinouts for
this connector and for the adapter cables are listed in the
appendix Pinouts.
DTE Interface
Connect a FRAD/ router to the DTE port using a standard DB-25
cable (for EIA-232 or EIA-530) or an ADTRAN adapter cable (for
X.21 or V.35). Part numbers for the adapter cables are listed
earlier in this section.
The maximum cable lengths recommended are 15 meters for
EIA-232, 60 meters for EIA-530, 60 meters for X.21, and 30 meters
for V.35. The pin assignments for this connector and for the
adapter cables are listed in the appendix Pinouts.
61200214L1-1
IQ Probe User Manual
11
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 2. Installation
To prevent possible radio frequency interference emissions, a shielded
cable is required.
LAN 10baseT Interface
This port is an 8-pin modular connector that provides a 10baseT
ethernet local area network (LAN) interface. This LAN interface
is used for SNMP and TELNET control.
Control Port
The IQ Probe has an 8-pin modular jack labeled CONTROL.
The control port provides connection to a VT 100 EIA-232
compatible interface, a device running SLIP protocol, or a device
running Async PPP protocol. An 8-foot cable with adapter
connector provides a standard DB-25 EIA-232 interface. See the
appendix Pinouts for the control port’s pin assignments. The
operation of this port is described in the Operation chapter.
12
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 3
Operation
FRONT PANEL
The IQ Probe faceplate is shown in Figure 3-1. Descriptions of
each part of the front panel follow.
LCD Window
Enter
Displays menu items and messages in 2 lines by 16 characters.
Selects active menu items. To activate a menu item, scroll to it
using the arrow keys or press the number of the item. The
flashing cursor indicates the active parameter. Press Enter to
select the active menu item.
Up and Down Arrows
Up and down arrows scroll through and activate the menu items
of the current menu. The flashing cursor indicates the active
parameter.
Cancel
Pressing the Cancel key stops the current activity and returns to
the previous menu. Repeat until the desired menu level is
reached. When a submenu item is displayed, press Cancel to
exit the current display and return to the previous menu.
61200214L1-1
IQ Probe User Manual
13
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 3. Operation
Quick Key
Pressing the Quick key returns the front panel to the Main
menu.
Numeric Keypad
The numeric keypad contains the numbers 0 through 9 and
alpha characters A through F, which are used to activate menu
items and enter information such as the IP address.
Next, Prev, Add, Delete
To activate these functions, press and release the Shift key, then
press the Next, Prev, Add, or Delete key. Use these keys when
editing tables such as the PVC Configuration table. See the
chapter Configuring the DCE Port for more information.
Shift
To activate a menu item designated by an alpha character rather
than a number, place the cursor on the menu item using the up
and down arrows or press Shift and then the letter. The flashing
cursor indicates the active parameter. Press Enter to select the
item. The Next, Prev, Add, and Delete keys are also activated
by first pressing Shift.
14
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 3. Operation
page holder for foldout Figure 3-1
61200214L1-1
IQ Probe User Manual
15
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 3. Operation
page holder for back of foldout Figure 3-1
16
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 3. Operation
LED Descriptions
The IQ Probe has seven LED indicators: RS, CS, TD, RD, CD,
TR, and ALM. These LEDs are identified as follows:
RS: Request to Send
Reflects the status of the RS pin of the DTE/ DCE interface.
CS: Clear to Send
Reflects the status of the CS pin of the DTE/ DCE interface.
TD: Transmit Data
This LED is active when the IQ Probe DTE/ DCE port is trans-
mitting data.
RD: Receive Data
This LED is active when the IQ Probe DTE/ DCE port is receiv-
ing data.
CD: Carrier Detect
This LED reflects the status of the CD pin of the DTE/ DCE
interface.
TR: Data Terminal Ready
This LED reflects the status of the TR pin of the DTE/ DCE
interface.
ALM: Alarm
This LED is active when an alarm condition exists (such as when
the network frame relay signaling state is down).
The LEDs reflect the states of either the DTE side or the DCE side.
This is selectable in the IQ Probe Configuration menu
(CONFIGURATION ->SYSTEM -> SYSTEM LEDS REFLECT).
61200214L1-1
IQ Probe User Manual
17
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 3. Operation
Front Panel Operation
To choose a menu item, press the corresponding number or
alpha character on the keypad. Press Shift to activate menu
items with alpha selections. Scrolling to the selection by press-
ing the up and down arrows also activates the menu items. The
flashing cursor indicates the active selection. Press Enter to
select the item. The following steps and Figure 3-2 illustrate how
to select IQ Probe options:
1. Activate Configuration (CONFIG) by using the arrow keys
or by pressing 1. The cursor will flash on the number next to
the activated selection. Press Enter.
2. Use the arrow keys to view submenu items.
3. Choose an item on the submenu such as DTE PORT.
4. Activate DTE PORT by using the arrow keys or by pressing
1. Press Enter.
5. Activate PHYS LYR OPTS by using the arrow keys or by
pressing 1. Press Enter.
6. Activate CTS OPTION by using the arrow keys or by
pressing 3. Press Enter.
7. Choose FORCED ON by using the arrow keys or by press-
ing 1. Press Enter.
1 INTERFACE
1 DTE PORT
1 CONFIG 2 DCE PORT
3 DIAL BACKUP
1 PHYS LYR OPTS 2 FLOW CONTROL
2 FR OPTS
3 CTS OPTION
4 DSR OPTION
5 CD OPTION
1 FORCED ON
2 FOLLOW RTS
4 CONTROL PORT
5 SYSTEM
6 TC CLOCK OPT
Figure 3-2
Example of Basic Front Panel Menu Navigation
18
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 3. Operation
VT 100 Terminal Connection and Operation
To control the IQ Probe using a VT 100 terminal, follow this
procedure:
1. Set the IQ Probe baud rate to match the terminal through the
front panel (maximum rate is 38.4k). Select 1 CONFIG, then
4 CONTROL PORT.
2. Using the ADTRAN-provided VT 100 terminal adapter,
connect the COM port of a VT 100 compatible terminal or
equivalent to the eight-pin modular jack labeled CONTROL
on the rear of the IQ Probe. This connection is used for both
local and remote configuration.
3. Open the connection and press Enter repeatedly until the
Login Menu appears (Figure 3-3).
4. Select Local Login to configure the IQ Probe unit connected
to the terminal. Select Remote Login to configure a remotely
located IQ Probe unit. For remote applications, at the remote
DLCI prompt, enter the outgoing DLCI (see the following
note) by pressing 1, then Enter, entering the DLCI number,
and pressing Enter again. Next, select Begin Remote Session
by pressing 2 and Enter.
When entering the DLCI for a remote application, enter the DLCI
associated with the local unit that you are logged in to (not the far end
DLCI).
If the wrong DLCI is entered or a network problem exists, the screen
freezes at the Press any key to continue prompt. Press CNTL + L
twice to return the unit to the Login screen.
5. Enter the password. The factory default password is adtran.
The Main menu will appear (Figure 3-4).
6. Make selections by entering the number corresponding to
the chosen parameter. Press ESC to return to the previous
screen.
61200214L1-1
IQ Probe User Manual
19
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 3. Operation
In the upper right-hand corner of the VT 100 screen, LOCAL or
REMOTE is displayed, indicating which unit the current screen
represents. See Figure 3-3.
Figure 3-3
Terminal Login Menu
20
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 3. Operation
Figure 3-4
Terminal Main Menu
IQ PROBE MENU STRUCTURE
The opening menu is the access point to all other operations.
The Main menu branches are Configuration, View Statistics, Test,
Dial, and Logout. See Figure 3-4. Each Main menu item has
several functions and submenus to identify and access specific
parameters.
The Logout selection is only available on the terminal interface. The
Dial selection is only available when an ESP DBU card is installed.
In this chapter, the terminal selections are listed first, followed by the
Front Panel selections (if the names differ).
61200214L1-1
IQ Probe User Manual
21
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 3. Operation
Main Menu
Definitions for the branches of the Main menu follow:
Configuration (CONFIG)
Configuration is used to select DTE, DCE, dial backup, and
system operating parameters. For more information on configu-
ration options, see the following chapters: Configuration Over-
view, DTE Port Configuration, Configuring the DCE Port, Configur-
ing Dial Backup Options, and System Configuration.
View Statistics (STATS)
This selection displays statistical information for the DTE port,
DCE port, dial backup port, and the system. See the chapter
Statistics for more information.
Test
Test options allow you to perform ping and PVC loopback tests.
See the chapter Testing for more information.
Dial (with ESP DBU card installed)
This selection allows you to access manual dialing capabilities.
See the chapter Activating Dial Backup Options for more informa-
tion.
Logout (terminal menu only)
This parameter logs out of the system.
22
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 3. Operation
Up and Down Arrows
Scroll through and activate
the submenu items available
in the current menu. The
flashing cursor indicates the
active parameter.
Enter Key
Selects active menu item.
TD LED
RD LED
Active when the
DTE/ DCE port
transmits data.
D
Numeric Keypad
Activates menu items and
enters numerical information.
Active when the
DTE/ DCE port
receives data.
s of the
e DTE/
ector.
IQ PROBE
G
pre
edi
A
1
B
2
C
3
ENTER
D
4
E
5
F
6
NEXT
7
PREV
8
ADD
9
A
of
the
SHIFT
QUICK
DELETE
0
CANCEL
#
*
Cancel
Stops current
activity and
returns to the
previous menu.
TR LED
Reflects status of
the DTR pin of the
DTE/ DCE
D
Next Key
Dele
entry
ro
Advances to the next
entry when editing
routing tables.
LCD Window
Displays menu items and
messages in 2 lines by 16
characters.
connector.
Shift
Activates alpha selections
and the NEXT, PREV, ADD,
and DELETE keys.
CD LED
ALM LED
Active when an
alarm condition
exists.
Reflects status of
the DCD pin of
the DTE/ DCE
connector.
Figure 3-1
IQ Probe Front Panel
IQ Probe User Manual
15
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 3. Operation
16
IQ Probe User Manual
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 4
Applications
This chapter provides examples of some common IQ Probe
management options as well as an example of a dial backup
application. The management application examples include
VT 100 management, out-of-band SNMP/ TELNET management,
and in-band PVC SNMP/ TELNET management. Descriptions
and configuration tips for these options are provided in the
sections that follow.
The application drawings in this chapter show routers as the frame
relay device. The frame relay device could be any device with frame
relay capabilities. However, to use in-band management, the manage-
ment DLCI must be RFC 1490 encapsulated IP traffic.
MANAGEMENT APPLICATIONS
One of the main advantages of the IQ Probe is management
flexibility. The IQ Probe front panel interface provides complete
configuration capabilities and viewing of key frame relay
statistics information. Other management options described in
this chapter provide configuration and diagnostics capabilities as
well as all-inclusive statistics information.
61200214L1-1
IQ Probe User Manual
23
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 4. Applications
Local VT 100 Terminal Management
Connect a VT 100 terminal to the IQ Probe CONTROL port.
This interface provides full-screen configuration and all-inclu-
sive statistics access. VT 100 management also allows for remote
configuration. Through this port, a remotely located ADTRAN
IQ device is fully accessible for configuration, diagnostics, and
statistics viewing. Figure 4-1 gives an example of a VT 100
application.
VT 100 remote mode is proprietary and non-intrusive. Therefore, you
can perform all VT 100 management functions without disrupting the
flow of data.
Router
Router
DSU IQ
C
IQ Probe
IQ Probe
A
1
DSU IQ
C
A
1
B
2
B
2
D
3
D
3
E
5
E
5
4
4
F
F
NEXT
7
NEXT
7
6
6
PREV
PREV
ADD
ADD
8
DT
0
8
DET
0
SHIFT
SHIFT
9
QUIC
#
9
QUIC
#
VT 100
A
1
DSU IQ
C
Frame
Relay
A
1
DSU IQ
C
B
2
B
2
D
3
D
3
E
5
E
5
4
4
F
F
NEXT
7
NEXT
7
6
6
PREV
PREV
ADD
ADD
8
DEL
0
8
DE
0
S
S
9
QUICK
#
9
QUICK
#
DSU/CSU
DSU/CSU
Figure 4-1
VT 100 Management Application Example
Minimum Configuration Requirements for VT 100 Management
The following options are the minimum configuration require-
ments for establishing VT 100 management access.
Baud Rate
Set the baud rate to match the VT 100 terminal rate. This is
accessible from the front panel only (select CONTROL PORT
from the CONFIGURATION menu).
24
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 4. Applications
Control Port Mode
Set the Control Port Mode for TERMINAL (which is the default
setting). This selection is found in the SYSTEM portion of the
CONFIGURATION menu (SYSTEM -> CONTROL PORT
OPTIONS -> CONTROL PORT MODE).
Out-of-Band Management
This management option (shown in Figure 4-2) is commonly
used in situations where the customer is trying to reduce the
amount of management traffic flowing through the frame relay
device. The IQ Probe can be managed though an established
TELNET session or an SNMP-based network manager like HP
OpenView®, IBM Netview®, or SunNet Manager®.
The ADTRAN IQ Probe MIB is available in the support section of the
ADTRAN Web page at www.adtran.com.
SNMP and TELNET management is provided by one of the
following interfaces:
• A device (e.g., a router) running SLIP protocol. Connection is
made through the IQ Probe's control port.
• A device (e.g., a router) running async PPP protocol. Connec-
tion is made through the IQ Probe's control port.
• A LAN. Connection is made through the 10baseT ethernet
interface.
61200214L1-1
IQ Probe User Manual
25
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 4. Applications
Router
SLIP/PPP
10BaseT Ethernet
Router
A
1
DSU IQ
C
IQ Probe
IQ Probe
A
1
DSU IQ
C
B
2
B
2
D
3
D
3
E
5
E
5
4
4
F
F
NEXT
7
NEXT
7
6
6
PRE
PREV
ADD
ADD
8
DEETE
0
8
DEEE
0
SHIFT
SHIFT
9
QUIC
#
9
QI
#
A
1
DSU IQ
C
3
Frame
Relay
A
1
DSU IQ
C
3
B
2
B
2
D
4
D
E
5
E
5
4
F
6
F
6
NEXT
7
NEXT
7
PRE
8
PREV
ADD
ADD
8
DELETE
0
SHIFT
SHIFT
9
QUI
#
9
QI
#
DELETE
0
NMS
DSU/CSU
DSU/CSU
Figure 4-2
Out-of-Band Management Application Example
Minimum Configuration Requirements for Out-of-Band Management
The following options (all found in the SYSTEM portion of the
CONFIGURATION menu) are the minimum configuration
requirements for establishing out-of-band SNMP or TELNET
access. Once these options are configured, the unit may be
accessed using SNMP/ TELNET.
Control Port Mode
If necessary, select SLIP or PPP as the IQ Probe control port
mode. If ethernet is the interface type, this parameter does not
affect setup.
IP Address
Enter the IQ Probe IP address.
Subnet Mask
Enter the subnet mask number assigned to the network formed
by the IQ Probe and the other FRAD/ routers across the frame
relay network. The subnet mask is available from the network
administrator.
26
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 4. Applications
Gateway IP Address (if required)
Enter the Gateway node IP address. This address is applicable
only if the IQ Probe and the network manager are connected
through a Gateway node. This address is available from the
network administrator.
The next five settings are applicable for SNMP access only:
Read Community
Set the Read Community name to match the NMS (network
management system) settings.
Write Community
Set the Write Community name to match the NMS settings.
Trap Manager DLCI
Identify the virtual circuit used for all traps generated by the IQ
Probe. This selection is found under TRAP MGR OPTIONS in
the SYSTEM portion of the CONFIGURATION menu.
Trap Manager IP Address
Enter the IP address of the SNMP manager to which the IQ
Probe sends traps. This selection is found under TRAP MGR
OPTIONS in the SYSTEM portion of the CONFIGURATION
menu.
Trap Manager Port
Enter the IQ Probe port used to transmit traps to the SNMP
manager. This selection is found under TRAP MGR OPTIONS in
the SYSTEM portion of the CONFIGURATION menu.
You may assign up to five possible trap destinations in the TRAP MGR
OPTIONS table.
In-Band Management
The ADTRAN IQ Probe supports three modes of in-band
management using the frame relay structure of PVCs. These
modes are local (see Figure 4-3), shared (see Figure 4-4), and
dedicated PVC management (see Figure 4-5). All three types
support complete SNMP management as well as TELNET
capabilities.
61200214L1-1
IQ Probe User Manual
27
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 4. Applications
All PVC-based in-band management traffic must be noncompressed IP
and use RFC 1490 encapsulation.
Local PVC Management
Local PVC management refers to a PVC created between the IQ
Probe and the frame relay router on the DTE interface of the IQ
Probe. This type of management is ideal when local manage-
ment is needed but an ethernet connection is not available. To
support this type of management, all traffic on the selected PVC
must be RFC 1490 encapsulated, noncompressed IP traffic.
The local PVC is sent out of the WAN serial port of the router as
normal WAN traffic and is terminated in the IQ Probe. Since the
IQ Probe responds to Inverse ARP, it is not necessary to set up a
static route in the router. The router will discover the IP address
automatically; however, it will be necessary to set up a local PVC
between the router and the IQ Probe. Accomplish this by setting
a value (between 16 and 1007) for the DTE management DLCI on
the IQ Probe to a value not used by the frame relay network.
Local PVC management can be used at any location that has a
router. Therefore, remote sites can be accessed through the
remote router. One consideration when using local PVC man-
agement is that if the remote router goes down, access to the
remote IQ Probe is lost.
28
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 4. Applications
Router
Router
A
1
DSU IQ
C
IQ Probe
IQ Probe
A
1
DSU IQ
C
B
2
B
2
D
3
D
3
E
5
E
5
4
4
F
F
NEXT
7
NEXT
7
6
6
PREV
PREV
ADD
ADD
8
DELT
0
8
DELE
0
SHIFT
SHIFT
9
QUIC
#
9
QUIC
#
NMS
A
1
DSU IQ
C
Frame
Relay
A
1
DSU IQ
C
3
B
2
B
2
D
3
D
4
E
5
E
5
4
F
F
6
NEXT
7
NEXT
6
PREV
PREV
7
ADD
ADD
8
DELETE
0
8
DELETE
0
SHIFT
SHIFT
9
QUICK
#
9
QUICK
#
DSU/CSU
DSU/CSU
Figure 4-3
Local PVC Management Application
Minimum Configuration Requirements for Local PVC
Management
The following options are the minimum configuration require-
ments for establishing in-band local PVC management. Once
these options are configured, the unit may be accessed using
SNMP/ TELNET. All options (with the exception of the Manage-
ment DLCI option) are found in the SYSTEM portion of the
CONFIGURATION menu.
IP Address
Enter the IQ Probe IP address.
Management DLCI
Enter a DLCI number (between 16 and 1007) that is not used by
the frame relay service. This option is found in the FRAME
RELAY OPTIONS portion of the DTE PORT CONFIGURATION
menu.
The next five settings are applicable for SNMP access only:
Read Community
Set the Read Community name to match the NMS settings.
61200214L1-1
IQ Probe User Manual
29
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 4. Applications
Write Community
Set the Write Community name to match the NMS settings.
Trap Manager DLCI
Identify the virtual circuit used for all traps generated by the IQ
Probe. This selection is found under TRAP MGR OPTIONS in
the SYSTEM portion of the CONFIGURATION menu.
Trap Manager IP Address
Enter the IP address of the SNMP manager to which the IQ
Probe sends traps. This selection is found under TRAP MGR
OPTIONS in the SYSTEM portion of the CONFIGURATION
menu.
Trap Manager Port
Select DTE PORT. The port will then be used to transmit traps to
the SNMP manager. This selection is found under TRAP MGR
OPTIONS in the SYSTEM portion of the CONFIGURATION
menu.
You may assign up to five possible trap destinations in the TRAP MGR
OPTIONS table.
Shared PVC Management
Shared PVC management refers to a PVC that is used for normal
data traffic between locations. The IQ Probe monitors this PVC
for packets that contain its IP address. When the IQ Probe
detects a packet containing a destination IP address that matches
the IQ Probe IP address, the unit intercepts the packet and
processes its TCP/ IP information. To support this type of
management, all traffic on the selected PVC must be RFC 1490
encapsulated, noncompressed IP traffic.
Shared PVC management is used to manage remote ADTRAN
IQ devices without being dependent on services from the remote
router. This usually requires a static route at the host location.
By setting a local PVC management and shared PVC management on
the remote IQ Probe, its IP address can be found through Inverse ARP.
30
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 4. Applications
Since the unit is set up for shared PVC management, all management
traffic will be intercepted prior to reaching the remote router.
Router
Router
A
1
DSU IQ
C
IQ Probe
IQ Probe
A
1
DSU IQ
C
B
2
B
2
D
3
D
3
E
5
E
5
4
4
F
F
NEXT
7
NEXT
7
6
6
PREV
PREV
ADD
ADD
8
DELETE
0
8
DELETE
0
SHIFT
SHIFT
9
QUICK
#
9
QUICK
#
NMS
A
1
DSU IQ
C
Frame
Relay
A
1
DSU IQ
C
B
2
B
2
D
3
D
3
E
5
E
5
4
4
F
F
NEXT
7
NEXT
7
6
6
PREV
PREV
ADD
ADD
8
DELETE
0
8
DELETE
0
SHIFT
SHIFT
9
QUICK
#
9
QUICK
#
DSU/CSU
DSU/CSU
Figure 4-4
Shared PVC Management Application
Minimum Configuration Requirements for Shared PVC
Management
The following options are the minimum configuration require-
ments for establishing in-band shared PVC management. Once
these options are configured, the unit may be accessed using
SNMP/ TELNET. All options (with the exception of the Manage-
ment DLCI options) are found in the SYSTEM portion of the
CONFIGURATION menu.
IP Address
Enter the IQ Probe IP address.
Management DLCI 1 and/or DLCI 2
Enter the management DLCI(s) used to carry management traffic
to and from the network. This option is found in the DCE Port
Configuration menu.
Management DLCI 1 and/or DLCI 2 Mode
Set to DEDICATED if the management DLCI is used only to
manage the IQ Probe (and not used to carry customer traffic). If
set to DEDICATED, the router is not notified of that DLCI. Set to
61200214L1-1
IQ Probe User Manual
31
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 4. Applications
SHARED if the DLCI is used to carry customer traffic as well as
management data. This option is found in the DCE Port Con-
figuration menu.
The IQ Probe unit supports management from two network DLCIs
either shared or dedicated.
The next five settings are applicable for SNMP access only:
Read Community
Set the Read Community name to match the NMS settings.
Write Community
Set the Write Community name to match the NMS settings.
Trap Manager DLCI
Identify the virtual circuit used for all traps generated by the IQ
Probe. This selection is found under TRAP MGR OPTIONS in
the SYSTEM portion of the CONFIGURATION menu.
Trap Manager IP Address
Enter the IP address of the SNMP manager to which the IQ
Probe sends traps. This selection is found under TRAP MGR
OPTIONS in the SYSTEM portion of the CONFIGURATION
menu.
Trap Manager Port
Select DCE PORT. The port will then be used to transmit traps
to the SNMP manager. This selection is found under TRAP
MGR OPTIONS in the SYSTEM portion of the CONFIGURA-
TION menu.
You may assign up to five possible trap destinations in the TRAP
MGR OPTIONS table.
Dedicated PVC Management
Dedicated PVC management refers to the ability to have a PVC
originated from the network and terminated in the IQ Probe.
This is an ideal configuration for third-party management. It
isolates the customer’s data traffic from network management
32
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 4. Applications
traffic, and it also acts as a fire-wall that restricts management
data to the IQ Probe. Dedicated PVC management is also ideal
when the user wants to guarantee access to a remote IQ Probe
regardless of the state of the remote LAN.
Carrier NMS
Router
Router
A
1
DSU IQ
C
IQ Probe
A
1
DSU IQ
C
3
IQ Probe
B
2
B
2
D
3
D
E
5
E
5
4
4
F
F
6
NEXT
7
NEXT
7
6
PREV
PREV
ADD
ADD
8
DELETE
0
8
DELETE
0
SHFT
SHIFT
9
QUICK
#
9
QUICK
#
A
1
DSU IQ
C
Frame
Relay
A
1
DSU IQ
C
B
2
B
2
D
3
D
3
E
5
E
5
4
4
F
F
NEXT
7
NEXT
7
6
6
PREV
PREV
ADD
ADD
8
DELETE
0
8
DELETE
0
SHFT
SHIFT
9
QUICK
#
9
QUICK
#
DSU/CSU
DSU/CSU
Figure 4-5
Dedicated PVC Management Application
Minimum Configuration Requirements for Dedicated PVC
Management
The configuration requirements for dedicated PVC management
are identical to those listed for shared PVC management. See the
previous section, Minimum Configuration Requirements for Shared
PVC Management, for more information.
DIAL BACKUP APPLICATION
The IQ Probe dial backup (DBU) options allow frame relay
circuit outage recovery for one user to network interface (UNI) at
a time. Therefore, if the host site goes down, only one remote
site (the primary remote) is backed up. The IQ Probe can be
configured to originate a call based on physical layer conditions
and/ or PVC signaling loss. Once the criteria are met, the IQ
Probe establishes a call to the configured phone number (see
Table 4-A) and the connection is used to carry traffic for the
PVC(s) configured for DBU operation.
61200214L1-1
IQ Probe User Manual
33
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 4. Applications
During dial backup, the IQ device receiving the call continues to
use the frame relay circuit for PVCs that are not affected by the
outage, while using the DBU interface for PVCs that are inactive
due to the outage. This is done (without the attached DTE
device's intervention) by modifying the status of PVCs that are
in DBU state to active when the PVC status is given to the DTE.
An IQ Probe with multiple PVCs to multiple sites can also
originate a call to one site during an outage and restore connec-
tion for PVCs to that destination. Since the IQ Probe can only
make one call at a time, the other PVCs to other sites in this
scenario will be inactive.
Information entered into the PVC Configuration Table (see Table
4-B) marks PVCs for DBU operation. The key element in each
entry of the table is the DBU DLCI. For each PVC connecting
two sites for DBU operation, the DLCI field represents the PVC
DLCI at the local UNI and the DBU DLCI represents the PVC
DLCI at the remote site UNI. The IQ Probe uses this information
in the outbound side to change the PVC DLCI so the far end
DTE device receives frames on the DBU PVC addressed in the
same manner as when the frame relay circuit is operational. For
PVCs not used for DBU operation, leave the DBU DLCI field set
to zero.
The DBU DLCI information is only required for the IQ Probe
originating the call. In cases such as remote sites establishing
calls to host sites, the remote site should have only non-zero
values for the DBU DLCI fields in the PVC Configuration Table.
Only PVCs that are used in DBU should have the DBU DLCI set to a
non-zero value.
The range for the DBU DLCI field is from 16-1007. Therefore,
you cannot manually enter 0 for the PVCs not used in DBU.
When an entry is first created with the ADD selection, it is set to
0 by default. To reset a previously configured DBU DLCI to 0,
delete the entry and then add it back in (using the DELETE and
ADD selections).
34
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 4. Applications
See Figure 4-6 for an example of a dial backup application.
Tables 4-A and 4-B provide example setups for the DBU Options
(CONFIG ->DIAL BACKUP) and the PVC Configuration Table
(CONFIG ->DCE PORT ->PVC CONFIG). The tables are based
on the example application shown in Figure 4-6. Please note that
the configuration selections given may need modification based
on your network configuration.
DSU/CSU
A
1
DSU IQ
C
B
2
D
3
4
E
5
F
NEX
7
T
6
PREV
ADD
8
DET
0
SHIF
9
QU
#
16
17
116
117
SITE B
Router
IQ Probe
DCE
Frame Relay
DTE
A
1
DSU IQ
C
B
2
D
3
4
E
5
F
NEX
7
T
6
PE
ADD
8
DE
0
HI
T
9
QUICK
#
A
1
DSU IQ
C
B
2
D
3
4
E
5
DBU
F
NEX
7
T
6
PREV
ADD
8
DEE
0
SHIF
IQ Probe
DCE
T
9
QUICK
#
DSU/CSU
SITE A
DSU/CSU
Router
DTE
IQ Probe
DCE
SITE C
Router
DBU
DTE
DBU
ISDN or
POTS Network
Figure 4-6
Dial Backup Application
61200214L1-1
IQ Probe User Manual
35
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 4. Applications
Table 4-A
Example Settings for Dial Backup Options
Enable
AUTO DBU
WITH CARRIER DETECT LOSS Disable
WITH NO LMI
FAIL TIMER
Enable
10 seconds
1 minute
5
RESTORE TIMER
REDIAL COUNTER
WAIT TO REDIAL
15 seconds
PHONE NUMBERS
Enter phone number
to reach far end.
Table 4-B
Example Settings for PVC Configuration Table
SITE A
(ENTRY #1)
SITE A
(ENTRY #2)
SITE B
SITE C
16
17
117 or 0 **
Enable
116
16
117
17
DLCI
116 or 0 *
Enable
DBU DLCI
SEQ #
Enable
Enable
Enable
Enable
Enable
Enable
PVC DELAY
* DBU DLCI should be zero if Site B is not designated as the primary remote.
** DBU DLCI should be zero if Site C is not designated as the primary remote.
Both DBU DLCI entries for Site A should be zero if only the remotes are to originate the call.
36
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 5
Configuration Overview
LOCAL AND REMOTE CONFIGURATION
The IQ Probe can be configured locally, or communications can
be established so that a local IQ Probe can configure a remote IQ
Probe using a VT 100 interface. See the chapter Operation for
information on selecting Local or Remote operation.
The Configuration menu consists of submenus relating to
specific interfaces or functions of the IQ Probe requiring setup:
DTE Port
DCE Port
Dial Backup (if ESP DBU card is installed)
Control (front panel only)
System
The terminal configuration menu is shown in Figure 5-1.
For detailed information on configuration, see the chapters DTE
Port Configuration, Configuring the DCE Port, Configuring Dial
Backup Options, and System Configuration.
61200214L1-1
IQ Probe User Manual
37
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 5. Configuration Overview
Configuration menu trees are shown in Figures 5-2 (for the
terminal) and 5-3 (for the front panel interface).
Figure 5-1
Terminal Configuration Menu
38
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 5. Configuration Overview
Page holder for foldout page (Figure 5-2)
61200214L1-1
IQ Probe User Manual
39
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 5. Configuration Overview
Page holder for back of foldout page (Figure 5-2)
40
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 5. Configuration Overview
Pageholder for foldout page (Figure 5-3)
61200214L1-1
IQ Probe User Manual
41
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 5. Configuration Overview
Page holder for back of foldout page (Figure 5-3)
42
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 5. Configuration Overview
1 X.21
1 INTERFACE TYPE
2 FLOW CONTROL
3 CTS OPTION
2 V.35
3 EIA-530
4 EIA-232
1 NONE
2 HARDWARE
3 FECN/BECN
1 FORCED ON
2 FOLLOW RTS
4 DSR OPTION
1 FORCED ON
2 NORMAL
5 CD OPTION
1 NORMAL
2 INVERTED
1 T392
1 PHYSICAL LAYER OPTIONS
2 FRAME RELAY OPTIONS
6 TC CLOCK OPTION
2 N392
PORT
3 N393
4 MANAGEMENT DLCI
5 MANAGEMENT PVC OPTION
1 INTERFACE TYPE
1 X.21
1 PHYSICAL LAYER OPTIONS
2 FRAME RELAY OPTIONS
2 SERIAL BIT RATE (Kbps)
2 V.35
1 NONE
3 EIA-530
4 EIA-232
6 SIGNALING RESPONSES
1 SIGNAL TYPE
2 T391
2 LMI
3 ANSI T1.617-D
4 ITU-T Q.933-A
5 AUTO
3 N391
3 MANAGEMENT DLCI 1
4 MANAGEMENT DLCI 2
4 N392
5 N393
5 MANAGEMENT DLCI 1 MODE
6 MANAGEMENT DLCI 2 MODE
7 MAXIMUM PVC COUNT
8 HISTORY INTERVAL COUNT
9 PVC OPTIONS
1 SHARED
2 DEDICATED
1 DLCI
PORT
2 DBU DLCI*
3 CIR (Kbps)
4 SEQ NUM CHECKING
5 DELAY MEASUREMENT
6 NEXT
1 DISABLED
2 ENABLED
BACKUP*
See the chapter Configuring Dial Backup Options
for this portion of the menu tree.
7 PREVIOUS
8 ADD
9 DELETE
1 CHANGE PASSWORD
2 ETHERNET PORT
1 ENABLED
2 DISABLED
3 IP ADDRESS
4 SUBNET MASK
5 GATEWAY IP ADDR
6 CONTROL PORT OPTIONS
7 READ COMMUNITY
8 WRITE COMMUNITY
9 TRAP MGR OPTIONS
10 SYSTEM TIME
1 TRAP MANAGER DLCI
1 CONTROL PORT MODE
1 TERMINAL
2 SLIP PROTOCOL
3 PPP PROTOCOL
2 TRAP MANAGER IP ADDRESS
TEM
3 TRAP MANAGER PORT
4 NEXT
5 PREVIOUS
6 ADD
7 DELETE
1 NONE
2 DTE PORT
3 DCE PORT
4 CONTROL PO
5 ETHERNET POR
11 SYSTEM DATE
1 5 MINUTES
2 10 MINUTES
3 15 MINUTES
4 20 MINUTES
5 30 MINUTES
12 HISTORY INTERVAL SIZE
13 SYSTEM LEDS REFLECT
1 DTE STATES
2 DCE STATES
le if an ESP DBU card is installed.
Figure 5-2
Terminal Configuration Menu Tree
IQ Probe User Manual
39
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 5. Configuration Overview
40
IQ Probe User Manual
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 5. Configuration Overview
X.21
V.35
EIA-530
EIA-232
1 INTERFACE
2 FLOW CONTROL
3 CTS OPTION
NONE
HARDWARE
FECN/BECN
FORCED ON
FOLLOW RTS
4 DSR OPTION
5 CD OPTION
FORCED ON
NORMAL
1 PHYS LYR OPTS
2 FR OPTS
6 TC CLOCK OPT
NORMAL
INVERTED
PORT
1 T392
2 N392
3 N393
4 MGMT DLCI
5 MGMT PVC OPT
ENABLED
DISABLED
X.21
1 INTERFACE
2 RATE (Kbps)
V.35
6 SIG RESPONSES
ALWAYS ON
FOLLOW NET
EIA-530
EIA-232
1 PHYS LYR OPTS
PORT
AUTO
ITU-T
ANSI
LMI
NONE
2 FR OPTS
1 SIGNAL
2 T391
3 N391
4 N392
5 N393
3 DLCI 1
4 DLCI 2
5 DLCI 1 MODE
6 DLCI 2 MODE
7 MAX PVC COUNT
8 HIST INT COUNT
9 PVC CONFIG
SHARED
DEDICATED
1 DLCI
2 DBU DLCI*
3 CIR (KBPS)
4 SEQ #
DISABLED
ENABLED
BACKUP*
See the chapter Configuring Dial Backup Options
for this portion of the menu tree.
DISABLED
ENABLED
5 PVC DELAY
1 ETHERNET PORT
2 IP ADDRESS
9600
19.2K
38.4K
3 SUBNET MASK
4 GW IP ADDRESS
5 CTRL PORT OPTS
6 RD COMMUNITY
7 WR COMMUNITY
8 TRAP MGR OPTS
9 SYSTEM TIME
NTROL PORT
1 BAUD RATE
TERMINAL
SLIP PROTOCOL
PPP PROTOCOL
1 CTRL PORT MODE
1 TRAP DLCI
2 TRAP IP
3 TRAP PORT
NONE
DTE PORT
TEM
A SYSTEM DATE
B HST INT SIZE
DCE PORT
CONTROL PORT
ENET PORT
5 MIN
10 MIN
15 MIN
20 MIN
30 MIN
C LEDS REFLECT
DTE
DCE
e if an ESP DBU card is installed.
Figure 5-3
Front Panel Configuration Menu Tree
IQ Probe User Manual
41
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 5. Configuration Overview
42
IQ Probe User Manual
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 6
DTE Port Configuration
Configure the physical layer and frame relay protocol options for
the DTE port located on the rear of the IQ Probe by selecting
DTE PORT from the Configuration menu. Figure 6-1 illustrates
the terminal Configuration menu for the DTE Port. The menu
tree in Figure 6-2 shows the choices available in this menu.
Figure 6-1
Terminal DTE Port Configuration Menu
61200214L1-1
IQ Probe User Manual
43
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 6. DTE Port Configuration
In this chapter, the terminal selections are listed first followed by the
Front Panel selections in parenthesis (if the names differ).
1 X.21
2 V.35
3 EIA-530
4 EIA-232
1 INTERFACE TYPE
1 NONE
2 HARDWARE
3 FECN/BECN
2 FLOW CONTROL
3 CTS OPTION
1 FORCED ON
2 FOLLOW RTS
1 PHYSICAL LAYER OPTIONS
4 DSR OPTION
5 CD OPTION
1 FORCED ON
2 NORMAL
1 DTE PORT
6 TC CLOCK
1 NORMAL
2 INVERTED
1 T392
2 N392
2 FRAME RELAY OPTIONS
3 N393
4 MANAGEMENT DLCI
5 MANAGEMENT PVC OPTION
1 ENABLED
2 DISABLED
6 SIGNALING RESPONSES
1 ALWAYS ON
2 FOLLOW NETWORK
Figure 6-2
DTE Port Menu Tree
Physical Layer Options (PHYS LYR OPTS)
Interface Type
Select the DTE interface type. The choices are X.21, V.35, EIA-
530, and EIA-232.
Flow Control
This option determines how the IQ Probe responds to congestion
during DBU operation.
44
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 6. DTE Port Configuration
None
No flow control is used and the IQ Probe drops frames during
severe congestion while in DBU operation.
Hardware
The IQ Probe varies the DTE TC clock as necessary to relieve
congestion during DBU operation.
FECN/BECN
While in a congested state during DBU operation, frames across
the DBU PVCs have FECN or BECN set depending on the
direction. Frames outbound to the network have FECN set,
while frames inbound to the attached DTE device have BECN
set. This method is useful if the attached DTE devices can
respond to congestion notification.
CTS Option
DSR Option
CD Option
Set the CTS lead to FORCED ON or FOLLOW RTS.
Forced On
The CTS lead is always on and the RTS lead is ignored.
Follow RTS
The CTS lead is on when the RTS lead is on (and off when the
RTS lead is off).
Set the DSR lead to FORCED ON or NORMAL.
Forced On
The DSR lead is always on.
Normal
The DSR lead is off when the IQ Probe does not receive DSR
from the DSU/ CSU on the DCE port.
Set the CD lead to FORCED ON or NORMAL.
61200214L1-1
IQ Probe User Manual
45
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 6. DTE Port Configuration
Forced On
The CD lead is always on.
Normal
The CD lead is off when the IQ Probe does not receive CD from
the DSU/ CSU on the DCE port.
TC Clock Option (TC CLOCK OPT)
Normal
Clock for DTE's transmit data normal phase.
Inverted
Clock for DTE's transmit data inverted phase. May be used in
high speed circuits (>512 kbps) when the DTE's V.35 interface
has high delay. This is usually indicated by HDLC errors on the
IQ Probe's DTE port.
Frame Relay Options (FR OPTS)
These selections apply to the signaling between the router or
FRAD and the IQ Probe DTE port.
T392
Set the timeout (in seconds) between polling intervals. This
parameter needs to be a few seconds longer than the T391 setting
of the attached frame relay device.
N392 and N393
These parameters define the error threshold for the UNI (user to
network interface) formed by the IQ Probe DTE port and the
attached frame relay device. If the error threshold is met, the
signaling state status is changed to down, which indicates a
service-affecting condition. This condition is cleared once N393
consecutive error-free events are received. N392 defines the
number of errors required in a given event window, while N393
defines the number of polling events in each window.
46
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 6. DTE Port Configuration
For example:
If N392=3 and N393=4, then if three errors occur within any four
events, the interface is determined inactive.
The status of the connection can be viewed in the Status menu
under DTE Port Signaling State. The status will return to active
once the threshold is no longer exceeded.
Management DLCI (MGMT DLCI)
To use local PVC management, enter the management data link
connection identifier (DLCI). The management DLCI is a special
DLCI used between the attached DTE device and the IQ Probe to
carry SNMP and TELNET packets to/ from the IQ Probe on the
DTE port.
Guidelines for Configuring Management DLCI
If the attached router or FRAD is used to route SNMP/ TELNET
frames to the IQ Probe, set the Management DLCI to a unique
value (between 16 and 1007) that identifies the virtual circuit
between the router/ FRAD and the IQ Probe. The router/ FRAD
must also be configured to route the IQ Probe IP address to this
DLCI. The IP address and subnet mask for the DTE port must
also be set in the System Configuration menu.
Management PVC Option (MGMT PVC OPT)
If this option is set to ENABLED, the management DLCI is
included in the Full Status response to the router. Enable this
option when the management DLCI is used to route manage-
ment traffic to the IQ Probe.
Signaling Responses (SIG RESPONSES)
This option determines when PVC signaling responses are sent
to the router.
Always On
If ENABLED, PVC signaling responses are sent to the router
regardless of the network signaling state. Enable this option
when the IQ Probe is used for dial backup.
61200214L1-1
IQ Probe User Manual
47
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 6. DTE Port Configuration
Follows Network (FOLLOW NET)
If ENABLED, PVC signaling responses are sent to the router
only when the network signaling state is up. Enable this option
when the router is going to use an alternate path for dial backup.
48
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 7
Configuring the DCE Port
DCE PORT
Access the DCE port menus by selecting DCE PORT from the
Configuration menu. Full menu trees for the DCE Configuration
selections are shown in Figures 5-2 (Terminal Configuration Menu
Tree) and 5-3 (Front Panel Configuration Menu Tree) of the Configu-
ration Overview chapter. The DCE port terminates the user end
of the frame relay UNI interface. The IQ Probe supports three
standard PVC signaling formats: LMI (gang of four), ANSI
T1.617-D (Annex D), and ITU Q.933-A (Annex A). The selected
signaling format is used to poll the DCE end of the UNI interface
and retrieve virtual circuit information. Optionally, the polling
process can be disabled.
When configuring from a terminal, the screen in Figure
7-1 will appear when DCE Port is selected.
In this chapter, the terminal selections are listed first followed by the
Front Panel selections in parenthesis (if the names differ).
61200214L1-1
IQ Probe User Manual
49
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 7. Configuring the DCE Port
Figure 7-1
Terminal DCE Port Configuration Menu
Physical Layer Options (PHYS LYR OPTS)
The following sections describe the physical layer options
available for the DCE port:
Interface Type
Select the DCE interface type. The choices are X.21, V.35, EIA-
530, and EIA-232.
Serial Bit Rate <Kbps> (RATE <Kbps>)
Set the Serial Bit Rate to match the speed of the attached DSU/
CSU. The IQ Probe uses this information for statistical analysis.
If this field is not set correctly, it could cause some statistics to be
inaccurate.
50
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 7. Configuring the DCE Port
Frame Relay Options (FR OPTS)
The terminal screen in Figure 7-2 appears when Frame Relay
Options is selected from the DCE Port Configuration Menu.
Figure 7-2
Terminal DCE Port Frame Relay Options Menu
Signaling Type (SIGNAL)
Set the signaling type option to match the DCE signaling type.
Choices are none, LMI (gang of four), ANSI T1.617-D (Annex D),
ITU-T Q.933-A (Annex A), or auto. AUTO mode forces the IQ
Probe to use the same signaling type as the attached frame relay
DTE. If AUTO is selected and there is no DTE device attached,
the IQ Probe uses ANSI T1.617-D signaling type.
T391
Set the time (in seconds) between polls to the frame relay net-
work.
61200214L1-1
IQ Probe User Manual
51
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 7. Configuring the DCE Port
N391
Determine how many link integrity polls occur in between full
status polls.
N392 and N393
These parameters define the error threshold for the UNI formed
by the IQ Probe DCE port and the frame relay switch. If the
error threshold is met, the signaling state status is changed to
down, which indicates a service-affecting condition. This
condition is cleared once N393 consecutive error-free events are
received. N392 defines the number of errors required in a given
event window, while N393 defines the number of polling events
in each window.
For example:
If N392=3 and N393= 4, then if three errors occur within any four
events the interface is determined inactive.
The status of the connection can be viewed in the Statistics menu
under DCE Port Signaling State. The status will return to active
again once the threshold is no longer exceeded.
The network service provider should recommend the values entered into
the T391, N391, N392, and N393 fields.
Management DLCI 1 and 2 (DLCI 1 and 2)
Enter the management data link connection identifiers (DLCIs).
These DLCIs are used to carry management traffic to and from
the network.
Management DLCI 1 and 2 Mode (DLCI 1 and 2 MODE)
Set to DEDICATED if the management DLCI is used only to
manage the IQ Probe (and not used to carry customer traffic). If
set to DEDICATED, the router is not notified of that DLCI. Set to
SHARED if the management DLCI is used for carrying customer
traffic and management data.
52
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 7. Configuring the DCE Port
Maximum PVC Count (MAX PVC COUNT)
Sets the maximum number of PVCs that the IQ Probe will
monitor for statistical information. This value determines the
amount of history intervals available for storage. To get the
maximum amount of statistical history storage, set this value
equal to the number of PVCs assigned to the frame relay port. A
smaller value increases history interval count but puts some of
the PVC statistics into the unknown category.
History Interval Count (HIST INT COUNT)
Sets the number of history intervals to store for statistics. His-
tory intervals are displayed in the View by Interval portions of
the Statistics menus. These views provide data divided into
columns grouped by the interval of time selected in the History
Interval Size field (see the chapter System Configuration for more
information). The History Interval Count field determines how
many intervals can be stored at a time. The maximum value
allowed is affected by the previously mentioned PVC Count
selection.
PVC Options (PVC CONFIG)
The PVC Options table enables optional features such as delay
measurement for each PVC. DLCI numbers and their corre-
sponding CIRs are supplied by the service provider.
When configuring PVC options using the front panel, the Next, Prev,
Add, and Delete keys are used. See the chapter Operation for more
information on front panel operation.
DLCI
Enter the DCE port's DLCI.
DBU DLCI
Enter the far end DLCI for each PVC used for dial backup. Only
the IQ Probe that originates the call is required to have this
option set.
61200214L1-1
IQ Probe User Manual
53
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 7. Configuring the DCE Port
Only PVCs that are used in DBU should have the DBU DLCI set to a
non-zero value.
The range for the DBU DLCI field is from 16-1007. Therefore,
you cannot manually enter 0 for the PVCs not used in DBU.
When an entry is first created with the ADD selection, it is set to
0 by default. To reset a previously configured DBU DLCI to 0,
delete the entry and then add it back in (using the Delete and
Add selections/ keys).
CIR (Kbps)
Enter the CIR (committed information rate) in kbps for the
corresponding DLCI. The information is supplied by your
service provider and must be entered for each PVC to ensure
accuracy of statistical information.
Seq Num Checking (SEQ #)
Set to ENABLE only if there are IQ products on both ends of the
PVC. When enabled, the IQ Probe tags each frame with a
sequence number which is then used by the remote IQ device to
detect lost packets. Lost packet counts are given in the Statistics
menus.
Delay Measurement (PVC DELAY)
Set to ENABLE only if there are IQ products on both ends of the
PVC. When enabled, the IQ Probe periodically transmits a
loopback frame to the remote IQ device which is then returned
to measure round trip delay of each PVC. Minimum, maximum,
and average delay measurements are given in the Statistics
menus.
Next (NEXT key on front panel)
Edit the next entry in the PVC Options table.
Previous (PREV key on front panel)
Edit the previous entry in the PVC Options table.
54
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 7. Configuring the DCE Port
Add (ADD key on front panel)
Add a new entry to the PVC Options table.
Delete (DELETE key on front panel)
Delete the current entry in the PVC Options table.
61200214L1-1
IQ Probe User Manual
55
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 7. Configuring the DCE Port
56
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 8
Configuring Dial Backup Options
DIAL BACKUP OPTIONS
The Dial Backup Configuration menu (Figure 8-1) is available
only when an optional ESP DBU card is installed in the IQ Probe.
Use this menu to configure DBU options such as auto DBU
capability, DBU criteria, DBU timer functions, and DBU phone
numbers. See Figure 8-2 for a complete menu tree of the DBU
selections.
Figure 8-1
DBU Options Menu (with V.34 DBU Card Installed)
61200214L1-1
IQ Probe User Manual
57
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 8. Configuring Dial Backup Options
1 AUTO DBU
1 DISABLE
2 ENABLE
1 BEEPER OPTION
2 PASSWORD OPT
3 DBU PASSWORD
4 DAILY LOCKOUT
5 LOCKOUT START
6 LOCKOUT END
7 WEEKEND LOCK
1 DISABLE
2 ENABLE
2 DBU OPTIONS
1 DISABLE
2 ENABLE
1 DISABLE
2 ENABLE
3 DBU CRITERIA
1 WITH CARRIER
DETECT LOSS
1 DISABLE
2 ENABLE
1 CONFIG
3 DBU
2 WITH NO LMI
1 FAIL TIMER
4 DBU TIMERS
2 RESTORE TIMER
3 REDIAL COUNTER
4 WAIT TO REDIAL
With V.34 DBU option card installed
1 TONE/PULSE
5 MODEM OPTIONS
1 TONE
2 PULSE
With ISDN DBU option card installed
1 SWITCH TYPE
1 LUCENT 5ESS
2 DMS100
3 NATIONAL
4 NEC
5 ISDN OPTIONS
2 B-CHANNEL BIT RATE
1 56K
2 64K
3 NUMBER OF B-CHANNELS
1 1
2 2
4 SPID 1
5 SPID 2
6 LDN 1
7 LDN 2
With external DCE option card installed
1 INTERFACE TYPE
1 EIA-232
2 V.35
5 DCE OPTIONS
2 DBU BIT RATE
NUM 1-5
0-2048 kbps
6 PHONE NUMBERS
Figure 8-2
Dial Backup Menu Tree
58
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 8. Configuring Dial Backup Options
In this chapter, the terminal selections are listed first followed by the
Front Panel selections in parenthesis (if the names differ).
At
The AUTOMATIC DBU option specifies whether the unit
automatically enters dial backup mode or waits for manual
setup. The factory default setting is DISABLE.
DBU Options
Beeper Option (BEEP OPTION)
If enabled, the IQ Probe issues an intermittent beep while in dial
backup.
Password Opt
When enabled, the passwords entered in the DBU PASSWORD
fields of both the near and far end IQ devices are required to
match before a dial backup connection can be made. The setting
in this field must also be identical in both units (i.e., they both
must be set to either ENABLED or DISABLED).
DBU Password
Enter the authentication string used for making a dial backup
connection. The near and far end IQ devices must have identical
DBU passwords. If using front panel entry, see the section
Entering Letters Using the Front Panel in the chapter System
Configuration for more information.
Daily Lockout
Enable this field to disable dial backup during a certain time
period each day. The time period is specified in the LOCKOUT
START and LOCKOUT END fields.
Lockout Start
Enter the hour that the daily lockout begins and dial backup is
disabled (0 to 23). This setting only applies if the DAILY LOCK-
OUT parameter is enabled.
61200214L1-1
IQ Probe User Manual
59
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 8. Configuring Dial Backup Options
Lockout End
Enter the hour that the daily lockout ends and dial backup is
reactivated (0 to 23). This setting only applies if the DAILY
LOCKOUT parameter is enabled.
Weekend Lock
If enabled, no backup will occur from midnight Friday to
midnight Sunday.
DBU Criteria
With Carrier Detect Loss (WITH DCD LOSS)
When enabled, the IQ Probe enters backup mode when a loss of
carrier detect signal is detected on the DCE port. The factory
default setting is ENABLE.
With No LMI
When enabled, the IQ Probe enters backup mode when a loss of
signaling from the frame relay switch is detected. The default
setting is ENABLE.
DBU Timers
Fail Timer (FAIL TMR x 10)
This option sets the amount of time the dedicated circuit failure
condition must be active before the IQ Probe attempts backup.
The value entered is multiplied by 10. The amount of time can
be up to 990 seconds (i.e., an entry of 99). The factory default
setting is 10 seconds (an entry of 1).
Restore Timer (RESTORE TMR)
Once the circuit is down, the IQ Probe remains in backup until
the circuit is active for the length of time specified for the restore
timer. The selection is entered in minutes (up to 255). If set to 0,
the line must be restored manually. The factory default setting is
1 minute.
Redial Counter
This option sets the number of times the IQ Probe redials the far
end when entering backup mode. The redial count, which is
manually entered, can be up to a maximum of 99 attempts. If the
60
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 8. Configuring Dial Backup Options
IQ Probe encounters a busy or reorder, it attempts to establish
the call the specified number of times. The factory default
setting is 5.
Wait to Redial (REDIAL DELAY)
This option works in conjunction with the preceding Redial
Counter. It selects the amount of time between redial attempts to
connect the backup line. The amount of time, which is manually
entered, can be up to 99 seconds. The factory default setting is
15 seconds.
DBU Card Configuration Options
The following selections are dependent upon the type of ESP
DBU card installed (if any). If no card is installed or if the ESP 4-
Wire SW56 card is installed, then the selections in this section do
not appear.
Modem Options
The Modem Options field is available when the ESP V.34 DBU
card is installed.
Tone/Pulse
Select the dialing method for the dial backup service.
ISDN Options
The ISDN Options field is available when the ESP ISDN DBU
card is installed.
Switch Type
Select which type of telco CO switch is providing the ISDN
service. There are four options for ISDN switch types:
• Lucent 5ESS
• DMS100
• National
• NEC
61200214L1-1
IQ Probe User Manual
61
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 8. Configuring Dial Backup Options
B-Channel Bit Rate (B-CH BIT RATE)
Select the channel bit rate for the ISDN service. Select 64k unless
your service only provides 56k.
Number of B-Channels (NUM B-CHANNELS)
Select the number of B-channels supported by the ISDN service.
Select 2 if bonding is used.
SPID 1/2
For ISDN dial backup, enter the service profile identifier (SPID)
for both B-channels. The SPID is a sequence of digits identifying
ISDN terminal equipment to the ISDN switch when more than
one ISDN set has been attached to the same central office line.
The SPID is assigned by the telco when the ISDN line is installed
and normally resembles the phone number.
Only the Lucent 5ESS switch is capable of recognizing a point-to-
point configuration, eliminating the need for a SPID. All other
switch types require a SPID.
LDN 1/2
For ISDN dial backup, enter the LDN for both B-channels.
DCE Options
The DCE Options field is available when the ESP External DCE
option card is installed.
Interface Type
Select the connector type for the DCE interface. The choices are
EIA-232 and V.35.
DBU Bit Rate
Set to the operating speed of the DBU interface (0-2048 kbps) to
ensure accurate statistical information.
Phone Numbers 1-5
The IQ Probe stores up to 5 numbers of 36 digits each. Edit a
phone number by reentering the entire number. This process
overwrites the previously stored number.
62
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 9
System Configuration
Access System configuration selections by first choosing CON-
FIGURATION from the Main menu. Then choose SYSTEM from
the Configuration menu. Full menu trees for the System con-
figuration selections are shown in Figures 5-2 (Terminal Configu-
ration Menu Tree) and 5-3 (Front Panel Configuration Menu Tree).
The Terminal System configuration menu is shown in Figure 9-1.
In this chapter, the terminal selections are listed first followed by the
Front Panel selections in parenthesis (if the names differ).
Change Password (not available on front panel)
Enter a new password of ten characters or less. The default
password is adtran.
Ethernet Port
IP Address
Choose to either enable or disable the LAN 10baseT ethernet
port. Set to disable if the IQ Probe's IP address is not a member
of the local ethernet subnet.
Enter the IQ Probe IP (internet protocol) address.
61200214L1-1
IQ Probe User Manual
63
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 9. System Configuration
Subnet Mask
Enter the subnet mask assigned to the LAN that the LAN
10baseT port is attached to.
Figure 9-1
System Configuration Menu
Gateway IP Addr (GW IP ADDRESS)
Enter the Gateway IP address. The gateway is used when an
ethernet packet is transmitted from the IQ Probe to a foreign
subnet.
Control Port Options (CTRL PORT OPTS)
Control Port Mode (CTRL PORT MODE)
Set the Control port for terminal, SLIP protocol, or PPP protocol
mode. Set for SLIP or PPP when using the Control port for an
SNMP/ TELNET path.
64
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 9. System Configuration
Changing this option causes a complete system configuration and unit
reset.
Read Community (RD COMMUNITY)
Enter the authentication strings used for SNMP management.
Match the IQ Probe to the SNMP manager for read privileges. If
using front panel entry, see the section Entering Letters Using the
Front Panel in this chapter for more information.
Write Community (WR COMMUNITY)
Enter the authentication strings used for SNMP management.
Match the IQ Probe to the SNMP manager for write privileges.
If using front panel entry, see the section Entering Letters Using
the Front Panel in this chapter for more information.
Trap Mgr Options
The Trap Manager Options table defines routes for up to five
SNMP managers.
Trap Manager DLCI (TRAP DLCI)
If the trap manager port is set for DCE or DTE, this parameter
identifies the virtual circuit used for all traps generated by the IQ
Probe.
Trap Manager IP Address (TRAP IP)
Enter the IP address of the SNMP manager to which the IQ
Probe sends traps.
Trap Manager Port (TRAP PORT)
Enter the IQ Probe port used to transmit traps to the SNMP
manager. Choices are none, DTE port, DCE port, control port,
and ethernet port.
61200214L1-1
IQ Probe User Manual
65
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 9. System Configuration
Next (NEXT key on front panel)
Edit the next entry in the Trap Manager Options table.
Previous (PREV key on front panel)
Edit the previous entry in the Trap Manager Options table.
Add (ADD key on front panel)
Add a new entry to the Trap Manager Options table.
Delete (DELETE key on front panel)
Delete the current entry in the Trap Manager Options table.
System Time/Date
Set the current hour, minute, day, month, and year. This is used
to date/ time stamp all statistical data captured by the IQ Probe.
History Interval Size (HIS INT SIZE)
The time entered in this field affects the Interval View in the
Statistics menus. The Interval View provides historical data for
the current day. The data is divided into columns grouped by
the interval of time (5, 10, 15, 20, or 30 minutes) selected in this
field. The IQ Probe stores up to 288 intervals. Once the maxi-
mum is reached, new information overwrites existing informa-
tion, beginning with the least current.
If data is not retrieved before the Total Time Stored is exceeded, it is
overwritten and cannot be restored. Total Time Stored = History
Interval Size x History Interval Count.
System LEDs Reflect
Select DTE STATES or DCE STATES. This selection determines
which interface the LEDs on the unit's front panel reflect.
66
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 9. System Configuration
ENTERING LETTERS USING THE FRONT PANEL
Configuring the Read/ Write Community names requires the
entry of letters rather than numbers. When configuring the unit
using the front panel, special steps must be taken in order to
perform these entries. The following example of entering the
Write Community name illustrates this procedure:
1. Select WRITE COMMUNITY from the System configuration
menu.
2. Press the up arrow to scroll to the desired character.
3. Press Enter.
4. Repeat steps 2 and 3 until all characters have been selected.
5. Press the Enter key to complete the entry.
61200214L1-1
IQ Probe User Manual
67
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 9. System Configuration
68
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 10
Statistics
For descriptions of the terminal statistics menus, see the follow-
ing section, Viewing Statistical Information (Terminal Interface). For
front panel menu descriptions, see the section Viewing Statistical
Information (Front Panel Interface).
VIEWING STATISTICAL INFORMATION (TERMINAL INTERFACE)
Select View Statistics from the Main menu to access the View
Statistics Menu shown in Figure 10-1. From this menu, select to
view statistics for the ports (DTE, DCE, or DBU), all available
DLCIs, or the system. Select Reset Statistics to clear all current
information.
61200214L1-1
IQ Probe User Manual
69
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 10. Statistics
Figure 10-1
View Statistics Menu
Terminal Statistics Display Options
DTE port, DCE port, DBU port, and DLCI statistics are given in
two formats: View by Interval and View by Day.
View by Interval
In this view, the first column is a running total for the current
day. All other columns are grouped into user-configured time
frames with the most recent information displayed on the left.
The first column's header displays the current date, and the
interval columns display the time the intervals began. In order
to categorize the interval columns by date also, the midnight
time stamp is replaced with the date. Note that this column still
represents the timed interval (not a day's worth of information).
70
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 10. Statistics
To configure the interval time frame, go to the System Configu-
ration menu under History Interval Size and select the time you
want the history interval to be set for (from 5 to 30 minutes, in
five minute intervals). The IQ Probe gathers and displays the
information according to the time selected.
The IQ Probe cuts the first gathering session short in order to begin
falling on the selected time boundary. For example: If the unit or the
statistics information was last reset at 12:03 and the History Interval is
set for five minutes, then the first interval session will last only two
minutes. Therefore, the first interval column (i.e., the column farthest
to the right if no columns have been deleted yet) normally represents a
time shorter than the other columns.
View by Day
This view provides historical information for the last seven days
(not including the current day). The most recent information is
displayed on the left.
The first day' s column (i.e., the column furthest to the right) does not
represent a full day' s worth of information (unless the unit or the
statistics information was reset at exactly 12 AM).
61200214L1-1
IQ Probe User Manual
71
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 10. Statistics
Hot Keys
Once you have entered one of the statistics menus, hot keys are
displayed across the bottom of the screen, allowing you to
quickly access other menus or navigate within the current menu.
These keys vary depending on the menu currently displayed.
ESC=Menu
Press the ESC key to return to the main View Statistics menu
(shown in Figure 10-1).
D=DLCI
When viewing DCE port statistics, press D to view the DLCI
Statistics menu shown in Figure 10-8.
Page (+, -)
Press the + and - keys to scroll through statistics menu pages.
The Shift key must be used in conjunction with the + key in order to
advance a menu page.
Scroll (<, >)
Press the < and > keys to scroll left and right on a statistics menu
page.
The Shift key must be used in conjunction with the < and > keys in
order to scroll a menu page.
V=View by Day/View by Interval
Press V to change the view format.
72
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 10. Statistics
The following sections describe the information given on the
DTE port, DCE port, DBU port, DLCI, and System Statistics
menus.
DTE Port Statistics
Information given is for the DTE port since the last reset. See
Figures 10-2 and 10-3 for the two DTE Port Statistics screen
formats.
Leads On
If a lead is active on the selected port, it is listed in the View
Statistics menu. See Figure 10-2.
RTS
Request to send
Data terminal ready
Clear to send
Data set ready
Data carrier detect
DTR
CTS
DSR
DCD
Figure 10-2
DTE Port Statistics (View by Interval)
61200214L1-1
IQ Probe User Manual
73
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 10. Statistics
Figure 10-3
DTE Port Statistics (View by Day)
Interval Remaining
Number of seconds remaining in the current timed interval.
This field is only shown in View by Interval menus.
Signaling State
Indicates if the frame relay signaling state is currently up or
down.
Local PVC Rx Frames
Total frames received by the DTE port across the local
management PVC.
Local PVC Rx Bytes
Total bytes received by the DTE port across the local
management PVC.
Local PVC Tx Frames
Total frames transmitted by the DTE port across the local
management PVC.
74
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 10. Statistics
Local PVC Tx Bytes
Total bytes transmitted by the DTE port across the local
management PVC.
Signal Down Time
Time in seconds the signaling state is down.
Signal Error
Number of signal frames received with PVC signaling protocol
violations.
Signal Timeouts
Number of T392 timeouts that have occurred.
Signal State Change
Number of changes in the signaling protocol state.
Rx Full Status
Number of full status polls received on the DTE side.
Rx LI Only
Number of link integrity (LI) only polls received on the DTE
side.
On the DTE side, transmit and receive counts for full status and link
integrity polls would be identical. Therefore, only receive counts are
given.
Discard Frame
Number of frames discarded by the IQ Probe due to bad IP
frames received on the management DLCI, transmission errors,
or link violations. This count includes aborts, CRC errors, octet
align, and length errors.
Aborts
Number of frames received without a closing flag. This trans-
mission error is also reflected in the Discard Frame field.
CRC Errors
Number of frames received with CRC violations. This transmis-
sion error is also reflected in the Discard Frame field.
61200214L1-1
IQ Probe User Manual
75
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 10. Statistics
Octet Align
Number of frames received with a bit count that does not fall on
8-bit boundaries. This transmission error is also reflected in the
Discard Frame field.
Length Error
Number of frames received with fewer than 5 octets or greater
than 4500 octets. This link violation is also reflected in the
Discard Frame field.
EA Violation
Number of frames received with an error in the extended
address (EA) bit field of the frame relay header.
Encapsulation Error
Number of frames received on the management DLCI that have
RFC 1490 errors.
Inactive DLCI
Number of frames received on an inactive DLCI.
Invalid DLCI
Number of frames received on a DLCI that is out of range. The
valid DLCI range is 16-1007.
Unrouteable
Number of frames received on the management DLCI with an IP
address that does not match the IQ Probe IP address.
DCE Port Statistics
Information given is for the DCE port since the last reset. See
Figures 10-4 and 10-5 for both formats of the DCE Port Statistic
screens.
Leads On
If a lead is active on the DCE port, it is listed in the View Statis-
tics menu.
Signaling State
Indicates if the signaling state is currently up or down.
76
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 10. Statistics
Interval Remaining
Number of seconds remaining in the current timed interval.
This field is only shown in View by Interval menus.
DBU State
Current state of the DBU circuit. This field is only shown if an
ESP DBU card is installed.
Rx Frames
Number of frames received by the DCE port.
Rx Bytes
Number of bytes received by the DCE port.
Maximum Rx Throughput
Maximum throughput sample in the receive direction for the
given interval. This is displayed in kbps.
Average Rx Throughput
Average throughput in the receive direction for the given
interval. This is displayed in kbps.
Maximum Rx Utilization
Maximum utilization sample in the receive direction for the
given interval. Utilization is displayed as a percentage of the
Serial Bit Rate (set in the DCE Configuration menu).
Average Rx Utilization
Average utilization sample in the receive direction for the given
interval. Utilization is displayed as a percentage of the Serial Bit
Rate (set in the DCE Configuration menu).
Tx Frames
Number of frames transmitted by the DCE port.
Tx Bytes
Number of bytes transmitted by the DCE port.
61200214L1-1
IQ Probe User Manual
77
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 10. Statistics
Figure 10-4
DCE Port Statistics with DBU Card Installed (View by Interval)
Maximum Tx Throughput
Maximum throughput sample in the transmit direction for the
given interval. This is displayed in kbps.
Average Tx Throughput
Average throughput in the transmit direction for the given
interval. This is displayed in kbps.
Maximum Tx Utilization
Maximum utilization sample in the transmit direction for the
given interval. Utilization is displayed as a percentage of the
Serial Bit Rate (set in the DCE Configuration menu).
Average Tx Utilization
Average utilization sample in the transmit direction for the given
interval. Utilization is displayed as a percentage of the Serial Bit
Rate (set in the DCE Configuration menu).
78
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 10. Statistics
Figure 10-5
DCE Port Statistics (View by Day)
Port UA Time
Time in seconds the DCE port is unavailable for data delivery.
This means that the data link is down or in test, or that the frame
relay signaling state is down.
Signal Down Time
Time in seconds the signaling state has been down.
Signal Error
Number of signal frames received with PVC signaling protocol
violations.
Signal Timeouts
Number of T391 timeouts that have occurred.
Signal State Change
Number of changes in the signaling protocol state.
61200214L1-1
IQ Probe User Manual
79
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 10. Statistics
Rx Full Status
Number of full status responses received on the DCE side.
Tx Full Status
Number of full status polls transmitted by the IQ Probe.
Rx LI Only
Number of link integrity (LI) only responses received on the
DCE side.
Tx LI Only
Number of link integrity polls transmitted by the IQ Probe.
Async Status
Number of asynchronous status messages received by the IQ
Probe.
Discard Frame
Number of frames discarded by the IQ Probe due to bad IP
frames received on the dedicated management DLCI, transmis-
sion errors, or link violations.
Aborts
Number of frames received without a closing flag. This trans-
mission error is also reflected in the Discard Frame field.
CRC Errors
Number of frames received with CRC violations. This transmis-
sion error is also reflected in the Discard Frame field.
Octet Align
Number of frames received with a bit count that does not fall on
8-bit boundaries. This transmission error is also reflected in the
Discard Frame field.
DCD State Change
Count of carrier detect (CD) state changes for the DCE port.
DSR State Change
Count of data set ready (DSR) state changes for the DCE port.
80
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 10. Statistics
Length Error
Number of frames received with fewer than 5 octets or greater
than 4500 octets. This link violation is also reflected in the
Discard Frame field.
EA Violation
Number of frames received with an error in the extended
address (EA) bit field of the frame relay header.
Encapsulation Error
Number of frames received on a dedicated management DLCI
that have RFC 1490 errors. These errors are also reflected in the
Discard Frames field.
If both management DLCIs are shared, the Encapsulation Error field is
N/A. See the section Management DLCI Mode in the chapter
Configuring the DCE Port for more information.
Inactive DLCI
Number of frames received on an inactive DLCI.
Invalid DLCI
Number of frames received on a DLCI that is out of range. The
valid DLCI range is 16-1007.
Unrouteable
Number of frames received on a dedicated management DLCI
with an IP address that does not match the IQ Probe IP address.
If both management DLCIs are shared, the Unrouteable field is
N/A. See the section Management DLCI Mode in the chapter
Configuring the DCE Port for more information.
DBU Port Statistics
Information given is for the dial backup port since the last reset.
These menus are only available if an ESP DBU card is installed.
See Figures 10-6 and 10-7 for both formats of the DBU Port
Statistic screens.
61200214L1-1
IQ Probe User Manual
81
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 10. Statistics
DBU State
Current state of the DBU circuit.
Interval Remaining
Number of seconds remaining in the current timed interval.
This field is only shown in View by Interval menus.
Rx Frames
Number of frames received by the DBU port.
Rx Bytes
Number of bytes received by the DBU port.
Maximum Rx Throughput
Maximum throughput sample in the receive direction for the
given interval. This is displayed in kbps.
Average Rx Throughput
Average throughput in the receive direction for the given
interval. This is displayed in kbps.
Maximum Rx Utilization
Maximum utilization sample in the receive direction for the
given interval. Utilization is displayed as a percent of DBU port
bandwidth.
Average Rx Utilization
Average utilization sample in the receive direction for the given
interval. Utilization is displayed as a percent of DBU port
bandwidth.
Tx Frames
Number of frames transmitted by the DBU port.
Tx Bytes
Number of bytes transmitted by the DBU port.
Maximum Tx Throughput
Maximum throughput sample in the transmit direction for the
given interval. This is displayed in kbps.
82
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 10. Statistics
Average Tx Throughput
Average throughput in the transmit direction for the given
interval. This is displayed in kbps.
Maximum Tx Utilization
Maximum utilization sample in the transmit direction for the
given interval. Utilization is displayed as a percent of DBU port
bandwidth.
Average Tx Utilization
Average utilization sample in the transmit direction for the given
interval. Utilization is displayed as a percent of DBU port
bandwidth.
Figure 10-6
DBU Port Statistics (View by Interval)
Time in DBU
Time in seconds that the DBU port was active.
Discard Frame
Number of frames discarded by the IQ Probe due to bad IP
61200214L1-1
IQ Probe User Manual
83
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 10. Statistics
frames received on the dedicated management DLCI, transmis-
sion errors, or link violations.
Aborts
Number of frames received without a closing flag. This trans-
mission error is also reflected in the Discard Frame field.
CRC Errors
Number of frames received with CRC violations. This transmis-
sion error is also reflected in the Discard Frame field.
Octet Align
Number of frames received with a bit count that does not fall on
8-bit boundaries. This transmission error is also reflected in the
Discard Frame field.
Figure 10-7
DBU Port Statistics (View by Day)
84
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 10. Statistics
Length Error
Number of frames received with fewer than 5 octets or greater
than 4500 octets. This link violation is also reflected in the
Discard Frame field.
Encapsulation Error
Number of frames received on a dedicated management DLCI
that have RFC 1490 errors. These errors are also reflected in the
Discard Frames field.
If both management DLCIs are shared, the Encapsulation Error field is
N/A. See the section Management DLCI Mode in the chapter
Configuring the DCE Port for more information.
Unrouteable
Number of frames received on a dedicated management DLCI
with an IP address that does not match the IQ Probe IP address.
If both management DLCIs are shared, the Unrouteable field is
N/A. See the section Management DLCI Mode in the chapter
Configuring the DCE Port for more information.
DLCI Statistics
Access specific DLCI statistics by pressing D from the DCE
Statistics menu. Enter the DLCI number for information on a
specific DLCI (displayed in the View by Interval and Day
formats). For a status summary of all available DLCIs, select
DLCI LIST from the View Statistic menu shown in Figure 10-1.
Figure 10-8 shows the statistics menu for a specific DLCI.
61200214L1-1
IQ Probe User Manual
85
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 10. Statistics
Figure 10-8
DLCI Statistics for a Specific DLCI (View by Interval)
DLCI Statistics for a Specific DLCI
Throughput (Tx and Rx)
Displays the current throughput sample for this PVC. This is
displayed in kbps.
Utilization (Tx and Rx)
Displays the current CIR utilization sample for this PVC.
Remaining
Number of seconds remaining in the current timed interval.
Rx Frames
Number of frames received by the DCE port on the specified
DLCI.
Rx Bytes
Number of bytes received by the DCE port on the specified
DLCI.
86
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 10. Statistics
Maximum Rx Throughput
Maximum throughput sample in the receive direction for the
given interval. This is displayed in kbps.
Average Rx Throughput
Average throughput in the receive direction for the given
interval. This is displayed in kbps.
Maximum Rx Utilization
Maximum utilization sample in the receive direction for the
given interval. Utilization is displayed as a percentage of CIR.
Average Rx Utilization
Average utilization in the receive direction for the given interval.
Utilization is displayed as a percentage of CIR.
Tx Frames
Number of frames transmitted by the DCE port on the specified
DLCI.
Tx Bytes
Number of bytes transmitted by the DCE port on the specified
DLCI.
Maximum Tx Throughput
Maximum throughput sample in the transmit direction for the
given interval. This is displayed in kbps.
Average Tx Throughput
Average throughput in the transmit direction for the given
interval. This is displayed in kbps.
Maximum Tx Utilization
Maximum utilization sample in the transmit direction for the
given interval. Utilization is displayed as a percentage of CIR.
61200214L1-1
IQ Probe User Manual
87
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 10. Statistics
Average Tx Utilization
Average utilization sample in the transmit direction for the given
interval. Utilization is displayed as a percentage of CIR.
Time in DBU
Time (in seconds) that the specified DLCI is in DBU mode.
PVC IA Time
Time in seconds that the PVC is in the inactive state.
Rx FECN
Number of frames received on the DCE port over the specified
DLCI with the FECN bit of the frame relay header enabled.
Tx FECN
Number of frames transmitted from the DCE port over the
specified DLCI with the FECN bit of the frame relay header
enabled.
Rx BECN
Number of frames received on the DCE port over the specified
DLCI with the BECN bit of the frame relay header enabled.
Tx BECN
Number of frames transmitted from the DCE port over the
specified DLCI with the BECN bit of the frame relay header
enabled.
Rx DE
Number of frames received on the DCE port over the specified
DLCI with the discard eligibility (DE) bit of the frame relay
header enabled.
Tx DE
Number of frames transmitted from the DCE port over the
specified DLCI with the DE bit of the frame relay header en-
abled.
Rx CR
Number of frames received on the DCE port over the specified
DLCI with the CR bit of the frame relay header enabled.
88
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 10. Statistics
Tx CR
Number of frames transmitted from the DCE port over the
specified DLCI with the CR bit of the frame relay header en-
abled.
Lost Frames
Number of frames lost across the PVC. This field is applicable
only if the DCE port's Sequence Number Checking option
(accessed through the DCE Port Configuration menu) is EN-
ABLED.
Remote Lost Frames
Number of lost frames reported by the remote IQ device. This
field is applicable only if the DCE port's Sequence Number
Checking option (accessed through the DCE Port Configuration
menu) is ENABLED.
Rx Burst Seconds
Amount of time (in seconds) that throughput in the receive
direction is greater than the CIR.
Tx Burst Seconds
Amount of time (in seconds) that throughput in the transmit
direction is greater than the CIR.
Minimum Rx Frame
Size of smallest frame received across the DLCI.
Maximum Rx Frame
Size of largest frame received across the DLCI.
Average Rx Frame
Average size of frames received across the DLCI.
Minimum Tx Frame
Size of smallest frame transmitted across the DLCI.
Maximum Tx Frame
Size of largest frame transmitted across the DLCI.
61200214L1-1
IQ Probe User Manual
89
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 10. Statistics
Average Tx Frame
Average size of frames transmitted across the DLCI.
Minimum Frame Delay
Minimum round trip delay of the DLCI. This field is applicable
only if the DCE port's PVC Delay Measurement option (accessed
through the DCE Port Configuration menu) is ENABLED.
Maximum Frame Delay
Maximum round trip delay of the DLCI. This field is applicable
only if the DCE port's PVC Delay Measurement option (accessed
through the DCE Port Configuration menu) is ENABLED.
Average Frame Delay
Average round trip delay of the DLCI. This field is applicable
only if the DCE port's PVC Delay Measurement option (accessed
through the DCE Port Configuration menu) is ENABLED.
PVC State Change
Number of changes in the PVC state.
90
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 10. Statistics
DLCI List
This menu lists all available DLCIs and classifies them as active
(A), inactive (I), or unknown (U). See Figure 10-9. A byte and
frame break out of each DLCI is also provided including an in/
out count and a count of how many frames were received with
FECN, BECN, or DE enabled.
Figure 10-9
DLCI Statistics Summary for All Available DLCIs
System Statistics
The system time and date (as set in the System Configuration
menu), the software revision, and the ethernet address are
displayed in this menu. Also, the elapsed time since the unit
was turned on (or since the last restart) is given in seconds. The
buffer information provided in this menu is used mainly by
ADTRAN technical support in troubleshooting situations. See
Figure 10-10.
61200214L1-1
IQ Probe User Manual
91
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 10. Statistics
Figure 10-10
System Statistics Screen
VIEWING STATISTICAL INFORMATION (FRONT PANEL INTERFACE)
Select STATS from the Main menu. From this menu, choose to
view DTE, DCE, DBU, DLCI, or System statistics or to reset the
statistics. Once a selection (other than Reset) is made, the first
Statistics screen of that category appears. Scroll through the
remaining screens using the arrow keys. The character dis-
played in reverse video in the upper right-hand corner of the
screen indicates which port the displayed information applies to
(1=DTE, N=DCE, D=DBU). Statistic counts are running totals
for the current day (i.e., since 12 AM).
DTE Port Statistics Available on Front Panel
The following information is displayed when the DTE port is
selected.
Control Signal Status Screen
An asterisk (*) indicates that the signal is active for the DTE port.
See Figure 10-11.
92
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 10. Statistics
RS
TR
CS
CD
SR
request to send
data terminal ready
clear to send
carrier detect
data set ready
1
RS TR CS CD SR
*
*
Figure 10-11
Control Signal Status Screen
Signal State
Current signaling state of DTE port (up or down). See Figure 10-
12.
1
SIGNAL STATE
DOWN
Figure 10-12
Signal State Screen
Signal State Change
Number of changes in the signaling protocol state.
Signal Timeouts
Total T392 timeouts that have occurred since the last reset.
61200214L1-1
IQ Probe User Manual
93
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 10. Statistics
Signal Errors
Total signal frames received with PVC signaling protocol viola-
tions.
Errored Frames
Total errored frames received since last reset.
CRC Errors
Number of frames received with CRC violations.
Abort Frames
Total frames received without a closing flag.
Octet Align
Number of frames received with a bit count that does not fall on
8-bit boundaries.
Signal Down Time
Time in seconds that signaling state has been down.
DCE Port Statistics Available on Front Panel
Control Signal Status Screen
An asterisk (*) indicates that the signal is active for the DCE port.
RS
TR
request to send
data terminal ready
CS
CD
SR
clear to send
carrier detect
data set ready
DBU Status
Current state of the incoming DBU circuit (only appears if an
ESP DBU card is installed).
Signal State
Current state of the DCE port (up or down).
Signal State Change
Number of changes in the signaling protocol state.
94
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 10. Statistics
Signal Timeouts
Total T391 timeouts that have occurred since the last reset.
Signal Errors
Total signal frames received with PVC signaling protocol viola-
tions.
Frames In
Total received frames since last reset.
Frames Out
Total transmitted frames since last reset.
Errored Frames
Total errored frames received since last reset.
CRC Errors
Number of frames received with HDLC CRC violations.
Abort Frames
Total frames received without a closing flag.
Octet Align
Number of frames received with a bit count that does not fall on
8-bit boundaries.
Port UA Time
Time in seconds the DCE port is unavailable for data delivery.
This can mean that the data link is down or in test, or that the
PVC signaling state is down.
DBU Port Statistics Available on Front Panel
DBU statistics are only available if an ESP DBU card is installed.
DBU Status
Current state of the DBU circuit.
Time in DBU
The amount of time (in seconds) that the unit has been in dial
backup mode.
61200214L1-1
IQ Probe User Manual
95
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 10. Statistics
Frames In
Total received frames since the unit went into dial backup mode
(or since last reset).
Frames Out
Total transmitted frames since the unit went into dial backup
mode (or since last reset).
Errored Frames
Total errored frames received since the unit went into dial
backup mode (or since last reset).
CRC Errors
Number of frames received on the dial backup circuit with CRC
violations.
Abort Frames
Total frames received on the dial backup circuit without a
closing flag.
Octet Align
Number of frames received on the dial backup circuit with a bit
count that does not fall on 8-bit boundaries.
DLCI List
Select DLCI List to display a list of all DLCIs and their current
states. Scroll through the list by pressing Shift + Next and Shift
+ Prev.
System Statistics Available on Front Panel
Select SYS from the STATS menu to display the software version,
checksum, the current time and date, and the ethernet address.
The first of four System Statistics screens is shown in Figure 10-
13. Use the arrow keys to scroll through the screens. Press
Cancel to return to the STATS menu.
96
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 10. Statistics
VERSION CHKSUM
VER 601a
3F34
Figure 10-13
System Statistics Screen
61200214L1-1
IQ Probe User Manual
97
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 10. Statistics
98
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 11
Testing
This menu allows you to perform diagnostics by initiating PVC
loopback tests and ping tests. See Figure 11-1 for the terminal
Test menu. See Figure 11-2 for the Front Panel menu tree.
Figure 11-1
Terminal Test Menu
61200214L1-1
IQ Probe User Manual
99
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 11. Testing
FRAMES RX
FRAMES TX
1 DLCI
1 PVC LOOPBACK
2 START TEST
3 STOP TEST
4 VIEW TEST
MIN RESP TIME
MAX RESP TIME
AVG RESP TIME
LOST FRAMES
RMT LOST FRAMES
3 TEST
1 PING ADDRESS
2 START PING
PINGS TX
2 PING
PINGS RX
MIN RESP TIME
MAX RESP TIME
AVG RESP TIME
Figure 11-2
Front Panel Test Menu
In this chapter, the terminal selections are listed first followed by the
Front Panel selections in parenthesis (if the names differ).
PVC Loopback
A PVC loopback test is a non-intrusive loopback option for each
PVC. During this test, the IQ Probe periodically sends test
frames to the remote IQ device which are then returned for
analysis. The bandwidth required is approximately 1 kbps for
each PVC in test. See Figure 11-3 for the terminal menu.
100
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 11. Testing
Figure 11-3
PVC Loopback Menu
DLCI <0 = all> (DLCI)
Enter the DLCI of the PVC to be tested (or enter 0 to test all
available PVCs).
Test Length
Amount of time (in minutes) that you want the test to take place.
Enter 0 for a continuous test. This option is not available on the
front panel.
Start Test
Stop Test
Starts the test.
Ends the test in progress prematurely or terminates a continuous
test.
61200214L1-1
IQ Probe User Manual
101
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 11. Testing
View Test
Displays the Test Statistics menu shown in Figure 11-4. Descrip-
tions of each field in the Test Statistics menu follow:
PVC Active/Inactive/Undefined
Displays current state of the selected PVC as determined by the
switch (only available in the terminal menu).
• Active: The PVC is currently operational.
• Inactive: There is currently a physical or frame relay layer
problem at the remote end of the PVC, or a problem exists
inside the frame relay cloud for the selected PVC.
• Undefined: The PVC is undefined for the switch.
Test Active/No Test Active
Displays current testing state of the IQ Probe (only available in
the terminal menu).
Frames Rx
Number of frames received on the selected PVC during the
current loopback test.
Frames Tx
Number of frames transmitted across the selected PVC during
the current loopback test.
Lost Frames
Number of frames lost in the receiving direction (traveling from
the remote IQ device to the local IQ Probe).
Remote Lost Frames
Number of frames lost in the transmitting direction (traveling
from the local IQ Probe to the remote IQ device).
Minimum Loop Response Time (MIN RESP TIME)
Minimum round-trip time (in seconds) for the current test.
Maximum Loop Response Time (MAX RESP TIME)
Maximum round-trip time (in seconds) for the current test.
102
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 11. Testing
Average Loop Response Time (AVG RESP TIME)
Average round-trip time (in seconds) for the current test.
Figure 11-4
Test Status Screen
Reset Test Stats
View DLCI List
Resets the information shown in the Test Statistics menu (only
available in the terminal menu).
See the section DLCI List in the chapter Statistics for a description
of this menu (only available in the terminal menu).
61200214L1-1
IQ Probe User Manual
103
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 11. Testing
Ping
Select PING to send a ping request to a specific address. Ping
testing is only available when the ethernet port is enabled
(CONFIG -> SYSTEM -> ETHERNET PORT).
Address to Ping (PING ADDRESS)
Enter the IP address of the unit the IQ Probe is sending an echo
request (ping) to.
Start Ping
The Start Ping command causes the IQ Probe to send ten ping
requests to the target station. At the end of the ten-ping test, the
following results are shown. During front panel operation, use
the arrow keys to scroll through the results.
Pings Transmitted (PINGS TX)
This field shows the number of pings sent (always 10).
Ping Responses (PINGS RX)
This field shows the number of responses received from the
pinged device.
Min Response Time (MIN RESP TIME)
This field shows the shortest round-trip delay (in ms) of the
received responses. Round-trip delay is counted from the time
the ping is sent until the response is received.
Max Response Time (MAX RESP TIME)
This field shows the longest round-trip delay (in ms) of the
received responses. If a response is not received before the unit
times out, the delay is not calculated in.
Avg Response Time (AVG RESP TIME)
This field shows the average response time (in ms) based on all
received responses.
104
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 12
Activating Dial Backup Options
The dial backup options available from the Main menu
(4=DIAL) appear in Figure 12-1. These options are only avail-
able when an ESP DBU card is installed.
Dial Backup Idle
1 DIAL BACKUP
1 DIAL STORED #
Select stored number.
Enter number to dial.
4 DIAL
2 STAY ON LEASED
2 ENTER DIAL #
During Dial Backup
1 HANG UP
2 STAY ON LINE
Figure 12-1
Dial Options Menu
Dial Options when Dial Backup is Idle
Dial Backup
The IQ Probe prompts to dial a stored number or enter a number
to dial for dial backup.
Stay on Leased
The IQ Probe remains on the leased line and does not enter dial
backup mode.
61200214L1-1
IQ Probe User Manual
105
Download from Www.Somanuals.com. All Manuals Search And Download.
Chapter 12. Activating Dial Backup Options
Dial Options During Dial Backup
Hang Up
Terminates the dial backup connection and attempts to reestab-
lish communication on the data line.
Stay On Line
This IQ Probe remains in dial backup mode and returns to the
Statistics menu.
106
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Appendix A
Pinouts
The following tables give the pin assignments for the IQ Probe
connectors, adapter cables, and card options. For more informa-
tion, see the chapter Installation.
Table A-A
Pin Assignments for 10baseT Connector
Pin
Name
Description
The positive signal for the TD differential
pair. This signal contains the serial output
data stream transmitted onto the network.
1
TD+
The negative signal for the TD differential
pair (pins 1 and 2).
2
3
TD-
The positive signal for the RD differential
pair. This signal contains the serial input
data stream received from the network.
RD+
4, 5
6
N/A
RD-
not used
The negative signal for the RD differential
pair (pins 3 and 6).
7, 8
N/A
not used
61200214L1-1
IQ Probe User Manual
107
Download from Www.Somanuals.com. All Manuals Search And Download.
Appendix A. Pinouts
Table A-B
Pin Assignments for Control Connector
RJ Pin#
Function
GND
RTS
Direction
1
2
3
4
5
6
7
8
I
I
TD
DSR
RD
CTS*
DTR
DCD
O
O
O
I
O
*Used for hardware flow control.
Table A-C
EIA -232 Connector Pin Assignments
Pin
1
2
3
4
5
6
7
8
EIA
AA
BA
BB
CA
CB
CC
AB
CF
-
Description
Protective Ground (PG)
Transmit Data (SD)
Receive Data (RD)
Request to Send (RS)
Clear to Send (CS)
Data Set Ready (SR)
Signal Ground (SG)
Received Line Signal Detector (CD)
+12 Test Point
9
10
15
17
18
20
21
22
24
25
-
-12 Test Point
DB
DD
-
CD
-
CE
DA
-
Transmit Clock (TC)
Receive Clock (RC)
Local Loopback (LL)
Data Terminal Ready (TR)
Remote Loopback (RL)
Ring Indicator (RI)
External Tx Clock (ETC)
Test Indicator (TI)
108
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Appendix A. Pinouts
Table A-D
EIA-530 Connecotr Pin Assignments
Pin
1
EIA
-
Description
Shield
2
3
BA
BB
Transmit Data
Receive Data
4
CA/CJ Request to Send/Ready for Receiving
5
6
7
8
CB
CC
AB
CF
DD
CF
DA
DB
CB
BA
DB
BB
DD
LL
Clear to Send
DCE Ready
Signal Ground
Received Line Signal Detector
Receive Signal Element Timing (DCE source)
Received Line Signal Detector
Transmit Signal Element Timing (DTE source)
Transmit Signal Element Timing (DCE source)
Clear to Send
Transmit Data (return)
Transmit Signal Element Timing (DCE source)
Receive Data (return)
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
Receive Signal Element Timing (DCE source)
Local Loopback
CA/CJ Request to Send/Ready for Receiving (return)
CD
RL
CE
AC
DA
TM
DTE Ready
Remote Loopback
Ring Indicator
DTE Ready (return)
Transmit Signal Element Timing (DTE source)
Test Mode
61200214L1-1
IQ Probe User Manual
109
Download from Www.Somanuals.com. All Manuals Search And Download.
Appendix A. Pinouts
Table A-E
Pin Assignments for DB-25 to X.21 (DB-15) Adapter Cable
DB25 Pin#
X.21 Pin#
Function
1
2
1
2
SHIELD
TX (A)
3
4
RX (A)
4
3
CONTROL (A)
GROUND
INDICATION (A)
SIGNAL TIMING (B)
INDICATION (B)
CONTROL (B)
TX (B)
7
8
8
5
9/12
10
19
14
15/17
16
13
12
10
9
6
11
SIGNAL TIMING (A)
RX (B)
110
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Appendix A. Pinouts
Table A-F
Pin Assignments for DB-25 to V.35 Adapter Cable
(Rear Panel Connector)
DB25
Pin#
V.35
Pin#
Description
CCITT
1
2
A
P
Protective Ground (PG)
101
103
104
105
106
107
102
109
115
113
114
115
103
114
104
115
-
Transmitted Data (SD-A)
3
R
Received Data (RD-A)
4
C
D
E
Request to Send (RTS)
5
Clear to Send (CTS)
6
Data Set Ready
7
B
Signal Ground (SG)
8
F
Received Line Signal Detector (CD)
Receiver Signal Element Timing (SCR-B)
External TX Signal Element (SCX-B)
Transmitter Signal Element Timing (SCT-B)
Receiver Signal Element Timing (SCR-A)
Transmitted Data (SD-B)
9
X
11
12
13
14
15
16
17
18
19
20
21
24
25
W
AA
V
S
Y
Transmitter Signal Element Timing (SCT-A)
Received Data (RD-B)
Receiver Signal Element Timing (SCR-A)
Ring Indicator (RI)
Transmitted Data (SD-A)
Data Terminal Ready (DTR)
T
V
J
P
103
-
H
BB
U
K
External TX Signal Element (SCX-A)
113
61200214L1-1
IQ Probe User Manual
111
Download from Www.Somanuals.com. All Manuals Search And Download.
Appendix A. Pinouts
Table A-G
Pin Assignments for DB-25 to V.35 Adapter Cable
(DCE Card Option Connector)
DB25 Pin# V.35 Pin#
Function
DTEx Port
Direction
DCE Port
Direction
1
2
3
4
5
6
7
8
9
A
FGND
TD(EIA-232)
RD(EIA-232)
RTS
I
O
I
O
O
O
I
O
I
C
D
E
B
F
CTS
DSR
GND
DCD
I
O
I
NEG
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
POS
AA
Y
V
TC-B(V.35)
TC-A(V.35)
RC-A(V.35)
RD-B(V.35)
TC(EIA-232)
RD-A(V.35)
RC
TD-B(V.35)
TD-A(V.35)
DTR
O
O
O
O
O
O
I
I
I
I
I
I
T
R
S
P
H
W
I
I
I
I
O
O
O
O
ETC-B(V.35)
U
X
ETC-A(V.35)
ETC(EIA-232)
RC-B(V.35)
I
I
O
O
O
I
112
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Appendix A. Pinouts
Table A-H
Dial Backup Card Connectors
Pin
Name
Description
4-wire Switched 56
1
2
3-6
7
R1
T1
-
T
R
Transmit Data from DSU to Network-Ring 1
Transmit Data from DSU to Network-Tip 1
Not Used
Receive Data from Network to DSU-Tip
Receive Data from Network to DSU-Ring
8
V.34 and 2B+D ISDN
1-3
4
5
-
T
R
-
Not Used
Network-Tip
Network-Ring
Not Used
6 - 8
61200214L1-1
IQ Probe User Manual
113
Download from Www.Somanuals.com. All Manuals Search And Download.
Appendix A. Pinouts
114
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Appendix B
Specifications Summary
SPECIFICATIONS AND FEATURES
This appendix provides the standard specifications and features
of the IQ Probe.
Operating Modes
100 DLCIs supported
Frame relay using EIA-232, V.35, EIA-530, X.21 interface proto-
cols
DTE/DCE Data Rates
Frame relay 56 kbps to 2.048 Mbps synchronous
DTE/DCE Interface
Standard DB-25 for EIA-530 and EIA-232
Adapter cable for V.35 and X.21
Configuration
Front panel
Local and remote VT 100 terminal via the Control port
Remote via frame relay network connection
TELNET and SNMP
Control Port Interface
Electrical: EIA-232
Physical: RJ-48S (female DB-25 adapter provided)
Data rates: Async 9.6 to 38.4 kbps
61200214L1-1
IQ Probe User Manual
115
Download from Www.Somanuals.com. All Manuals Search And Download.
Appendix B. Specifications Summary
SLIP/PPP Port Interface
Electrical: EIA-232
Physical: female DB-25 (provided female DB-25 adapter)
Data rates: Async 9.6 to 38.4 kbps
Diagnostics
IP Ping mode
PVC testing with test patterns
PVC round trip delay
SNMP/TELNET
Integrated SLIP/ PPP (async) port
RJ-48S and DB-25 access
10baseT interface
MIB II RFC 1315 compliant
ADTRAN Enterprise MIB for frame monitoring and control
Agency Approvals
FCC Part 15, Class A
UL 1950 3rd edition
Physical
Operating temperature: 0 to 50 oC (32 to 122 oF)
Storage: -20 to 70 oC (-4 to 158 oF)
Relative humidity: Up to 95%, non-condensing
Dimensions: 2.4"H, 8.0"W, 10.4"D
Weight: 4.5 lbs
Power: 90-240 VAC, 50/ 60 Hz, 7 W
116
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Acronyms and Abbreviations
ACK ........................................................ acknowledgment
ALM ........................................................ alarm
ANSI ....................................................... American National Standards Institute
ARP ......................................................... address resolution protocol
ASCII ...................................................... American National Standards Code for Infor-
mation Interchange
async ....................................................... asynchronous
BECN ...................................................... backward explicit congestion notification
bps ........................................................... bits per second
CCITT ..................................................... Consultive Committee for International Tele-
phony and Telegraphy
CD ........................................................... carrier detect
CIR .......................................................... committed information rate
CO ........................................................... central office
CPE ......................................................... customer premise equipment
CR, C/ R.................................................. command response
CRC ......................................................... cyclic redundancy check
CS ............................................................ clear to send
CSU ......................................................... channel service unit
CTS .......................................................... clear to send
dB ............................................................ decibel
DBU ........................................................ dial backup
DCD ........................................................ data carrier detect
DCE......................................................... data communications equipment
DDS ......................................................... digital data service
DE............................................................ discard eligible
DLCI ....................................................... data link connection identifier
DSR ......................................................... data set ready
61200214L1-1
IQ Probe User Manual
117
Download from Www.Somanuals.com. All Manuals Search And Download.
Acronyms and Abbreviations
DSU ......................................................... data service unit
DTE ......................................................... data terminal equipment
DTR ......................................................... data terminal ready
EA ............................................................ extended address
EBCDIC .................................................. extended binary coded decimal interexchange
code
ESP .......................................................... embedded SNMP
FECN ...................................................... forward explicit congestion notification
FEP .......................................................... front end processor
FIFO ........................................................ first in first out
FR ............................................................ frame relay
FRAD ...................................................... frame relay access device
FRF .......................................................... frame relay forum
FSU .......................................................... frame relay service unit
GUI.......................................................... graphical user interface
HDLC ..................................................... high-speed data link control
IA ............................................................. inactive
IP ............................................................. internet protocol
ISDN ....................................................... integrated services digital network
ITU .......................................................... International Telecommunications Union
IXC .......................................................... interexchange carrier
KA ........................................................... keep alive
kbps ......................................................... kilobits per second
LAN ........................................................ local area network
LEC ......................................................... local exchange carrier
LED ......................................................... light emitting diode
LI ............................................................. link integrity
LMI.......................................................... local management interface
MIB.......................................................... management information base
ms ............................................................ millisecond
NI ............................................................ network interface
OCU ........................................................ office channel unit
POP ......................................................... point-of-presence
PPP .......................................................... point-to-point protocol
PU ............................................................ physical unit
PVC ......................................................... permanent virtual circuit
RD ........................................................... receive data
RDL ......................................................... remote digital loopback
RFC ......................................................... request for comments
RFECN .................................................... remote forward explicit congestion notification
118
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Acronyms and Abbreviations
RIP ........................................................... routing information protocol
RMA ........................................................ return material authorization
RS ............................................................ request to send; also recommended standard
RTS .......................................................... request to send
Rx ............................................................ receive
SAP ......................................................... service access point
SDLC ....................................................... synchronous data link control
SLIP ......................................................... serial line internet protocol
SNA ......................................................... systems network architecture
SNMP ..................................................... simple network management protocol
SR ............................................................ data set ready
SVC ......................................................... switched virtual circuit
SW56 ....................................................... switched 56
sync ......................................................... synchronous
TD ............................................................ transmit data
telco ......................................................... telephone company
TR ............................................................ data terminal ready
Tx............................................................. transmit
UA ........................................................... unavailable
UNI ......................................................... user-to-network interface
VRC ......................................................... vertical redundancy check
WAN ....................................................... wide area network
61200214L1-1
IQ Probe User Manual
119
Download from Www.Somanuals.com. All Manuals Search And Download.
Acronyms and Abbreviations
120
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Glossary
ANSI
American National Standards Institute. Devices and proposes recommendations
for international communications standards.
ASCII
American National Standard Code for Information Interchange. The standard
and predominant 7-bit (8-bit with parity) character code used for data
communications and data processing.
asynchronous
A method of data transmission which allows characters to be sent at irregular
intervals by preceding each character with a start bit, followed by a stop bit.
attenuation
The loss of signal amplitude during transmission. The received signal is lower in
signal amplitude than the transmitted signal due to losses in the transmission
medium (resistance in the cable). Attenuation is measured in decibels.
bandwidth
The bandwidth determines the rate at which information can be sent through a
channel (the greater the bandwidth, the more information that can be sent in a
given amount of time).
BECN
backward explicit congestion notification. A bit set by a frame relay network to
notify an interface device (DTE) that congestion avoidance procedures should be
initiated by the sending device.
61200214L1-1
IQ Probe User Manual
121
Download from Www.Somanuals.com. All Manuals Search And Download.
Glossary
bit
A binary digit. A signal, wave, or state is represented as either a binary 0 or 1.
bits per second (bps)
The number of bits passing a specific point per second. Examples of common
rates are:
• A Kilobit is one thousand bits per second (kbps)
• A Megabit is one million bits per second (Mbps)
bridge
A device that supports LAN-to-LAN communications. Bridges may be equipped
to provide frame relay support to the LAN devices they serve. A frame relay
capable bridge encapsulates LAN frames in frame relay frames and feeds them to
a frame relay switch for transmission across the network. A frame relay capable
bridge also receives frame relay frames from the network, strips the frame relay
frame off each LAN frame, and passes the LAN frame on to the end device.
Bridges are generally used to connect LAN segments to other LAN segments or
to a WAN. They route traffic on the level 2 LAN protocol (e.g. the Media Access
Control address), which occupies the lower sub-layer of the LAN OSI data link
layer. See also router.
byte
Generally, an 8-bit quantity of information, used mainly in referring to parallel
data transfer, semiconductor capacity, and data storage. Also, it is generally
referred to in data communications as an octet or character.
carrier
The provider of the data service to the customer site. Carriers can be local
telephone companies, regional telephone companies or any inter-exchange
carrier such as AT&T, Sprint, or MCI.
CD
carrier detect. A signal generated by a modem or DSU/ CSU. CD indicates the
presence of a carrier signal on a communications link.
channel bank
Equipment in a telephone central office or customer premises that performs
multiplexing of lower speed digital channels into a higher speed composite
channel. The channel bank also detects and transmits signalling information for
each channel; thereby transmitting framing information so that time slots
allocated to each channel can be identified by the receiver.
122
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Glossary
CIR
committed information rate. Less than or equal to the access rate, the CIR is used
by the service provider for rate enforcement when the network is congested.
When rates exceed the CIR, frames may be discarded.
clocking
An oscillator-generated signal that provides a timing reference for a transmission
link. A clock provides signals used in a transmission system to control the timing
of certain functions. The clock has two functions: (1) to generate periodic signals
for synchronization and (2) to provide a time base.
control port
The electrical interface between the IQ Probe unit and a control terminal. The
control terminal is used to communicate commands to the unit.
CPE
customer premise equipment. All telecommunications terminal equipment
located on the customer premises including telephone sets, private branch
exchanges (PBXs), data terminals, and customer-owned coin-operated
telephones.
C/R bit
In the Q.921 protocols, a bit that identifies a data-link-layer frame as either a
command or a response.
CRC
cyclic redundancy check. A computational means to ensure the accuracy of
frames transmitted between devices in a frame relay network. The mathematical
function is computed, before the frame is transmitted, at the originating device.
Its numerical value is computed based on the content of the frame. This value is
compared with a recomputed value of the function at the destination device.
CS
See CTS.
CSU
channel service unit. A device used to connect a digital phone line coming in
from the phone company to either a multiplexer, channel bank, or directly to
another device producing a digital signal (for example: a digital PBX, a PC, or
data communications device). A CSU performs certain line-conditioning and
equalization functions and responds to loopback commands sent from the central
61200214L1-1
IQ Probe User Manual
123
Download from Www.Somanuals.com. All Manuals Search And Download.
Glossary
office. A CSU regenerates digital signals. It monitors them for problems, and
provides a way of testing the digital circuit.
CTS
clear to send. A signal on the DTE interface indicating that the DCE is clear to
send data.
dB
The standard abbreviation for decibel. A decibel is a unit of measure for signal. A
decibel is usually the relation between a transmitted signal and a standard signal
source. Therefore, 6 dB of loss would mean that there is a 6 dB difference
between what arrives down a communications circuit and what was transmitted
by a standard signal generator.
DCE
data communications equipment. A device that provides all the functions
required for connection to telephone company lines and for converting signals
between telephone lines and DTE. Also see DTE.
DDS
digital data service. AT&T private line service for transmitting data over a digital
system. The digital transmission system transmits electrical signals directly,
instead of translating the signals into tone of varied frequencies as with
traditional analog transmission systems. Digital techniques provide more
efficient use of transmission facilities, resulting in lower error rates and costs
than analog systems.
DE
discard eligibility. A user-set bit indicating that a frame may be discarded in
preference to other frames if congestion occurs, to maintain the committed
quality of service within the network. Frames with the DE bit set are considered
Be excess data.
DLCI
data link connection identifier. A unique number assigned to a PVC end point in
a frame relay network. Identifies a particular PVC endpoint within a user's
access channel in a frame relay network and has local significance only to that
channel.
124
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Glossary
DSU
data service unit. A device designed to transmit and receive digital data on
digital transmission facilities.
DTE
data terminal equipment. The end-user terminal or computer that plugs into the
termination point (DCE) of a communications circuit. The main difference
between the DCE and the DTE is that pins two and three are reversed.
encapsulation
A process by which an interface device places an end device's protocol-specific
frames inside a frame rely frame. The network accepts only frames formatted
specifically for frame relay; therefore interface devices acting as interfaces to a
frame relay network must perform encapsulation. See also interface device and
frame-relay-capable interface device.
end device
The ultimate source or destination of data flowing through a frame relay network
sometimes referred to as DTE. As a source device, it sends data to an interface
device for encapsulation in a frame relay frame. As a destination device, it
receives de-encapsulated data (i.e., the frame relay frame is stripped off, leaving
only the user's data) from the interface device.
far end
The unit or units not on-site (at the customer's premises or the other end of the
data link).
FECN
forward explicit congestion notification. A bit set by a frame relay network to
notify an interface device (DTE) that congestion avoidance procedures should be
initiated by the receiving device. See also BECN.
file server
In the context of frame relay network supporting LAN-to-LAN communications,
a device connecting a series of workstations within a given LAN. The device
performs error recovery and flow control functions as well as end-to-end
acknowledgment of data during data transfer, thereby significantly reducing
overhead within the frame relay network.
61200214L1-1
IQ Probe User Manual
125
Download from Www.Somanuals.com. All Manuals Search And Download.
Glossary
frame-relay-capable interface device
A communications device that performs encapsulation. Frame-relay-capable
routers and bridges are examples of interface devices used to interface the
customer's equipment to frame relay network. See also interface device and
encapsulation.
frame relay frame
A variable-length unit of data, in frame-relay format that is transmitted through a
frame relay network as pure data. Contrast with packet.
frame relay network
A telecommunications network based on frame relay technology. Data is
multiplexed. Contrast with packet switching network.
gateway
A device which enables information to be exchanged between two dissimilar
systems or networks.
HDLC
high level data link control. A generic link-level communications protocol
developed by the International Organization for Standardization (ISO). HDLC
manages synchronous code-transparent, serial information transfer over a link
connection. See also SDLC.
host computer
The primary or controlling computer in a multiple computer operation.
in-band
Signaling (dialing, diagnostics, management, configuration, etc.) over the same
channel used for data.
ingress
Frame relay frames leaving from an access device in a direction toward the frame
relay network.
interface device
Provides the interface between the end device(s) and a frame relay network by
encapsulating the user's native protocol in frame relay frames and sending the
frames across the frame relay backbone. See also encapsulation and frame-relay-
capable interface device.
126
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Glossary
IP
internet protocol. A protocol which provides for transmitting blocks of data
between hosts identified by fixed-length addresses.
ISDN
integrated services digital network. A network architecture that enables end-to-
end digital connections. The network supports diverse services through
integrated access arrangements and defines a limited set of standard,
multipurpose interfaces for equipment vendors, network providers, and
customers. Interworking with a public switched telephone network is retained.
LAN
local area network. A privately owned network that offers high-speed
communications channels to connect information processing equipment in a
limited geographic area.
MIB
management information base. A database of network management information
used by SNMP.
modem
The equipment that connects DTE to an analog (voice) communications.
near end
The unit on-site.
network interface (NI)
The point of interconnection between the IQ Probe unit and the carrier's frame
relay network.
out-of-band
Signaling that is separated from the channel carrying information (voice, data,
video, etc.). Typically the separation is accomplished by a filter. The signaling
includes dialing and other supervisory signals.
packet
A message containing both control information and data. The control
information is used for routing the packet through a network to its final
destination. Contrast with frame relay frame.
61200214L1-1
IQ Probe User Manual
127
Download from Www.Somanuals.com. All Manuals Search And Download.
Glossary
packet-switching network
A telecommunications network based on packet-switching technology, wherein a
transmission channel is occupied only for the duration of the transmission of the
packet. Contrast with frame relay network.
parameter
A numerical code that controls an aspect of terminal and/ or network operation.
Parameters control such aspects as page size, data transmission speed, and
timing options.
ping
An internet protocol standard that provides loopback on demand for any device
in an IP network. One device "pings" another by sending a loopback request to
the device's IP address.
point-to-point
Type of communications link that connects a single device to another single
device, such as a remote terminal to a host computer.
PVC
permanent virtual circuit. A frame relay logical link, whose endpoints and class
of service are defined by network management. Analogous to an X.25
permanent virtual circuit, a PVC consists of the originating frame relay network
element address, originating data link control identifier, terminating frame relay
network element address, and termination data link control identifier.
Originating refers to the access interface from which the PVC is initiated.
Terminating refers to the access interface at which the PVC stops. Many data
network customers require a PVC between two points. Data terminating
equipment with a need for continuous communion use PVCs. See also DLCI.
remote configuration
A feature designed into ADTRAN products that allows remote units to be
configured from a local unit or VT 100 compatible terminal.
router
A device that supports LAN-to-LAN communications. Routers may be equipped
to provide frame relay support to the LAN devices they serve. A frame-relay-
capable router encapsulates LAN frames into frame relay frames and feeds those
frame relay frames to a frame relay switch for transmission across the network.
A frame-relay-capable router also receives frame relay frames from the network,
128
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Glossary
strips the frame relay frame off of each frame to produce the original LAN frame,
and passes the LAN frame on to the end device. Routers connect multiple LAN
segments to each other or to a WAN. Routers route traffic on the Level 3 LAN
protocol (e.g., the internet protocol address). See also bridge.
SDLC
synchronous data link control. A link-level communications protocol used in an
IBM systems network architecture (SNA) network that manages synchronous,
code-transparent, serial information transfer over a link connection. SDLC is a
subset of the HDLC protocol developed by ISO.
service
The provision of telecommunications to customers by a common carrier,
administration, or private operating agency using voice, data, and/ or video
technologies.
SNA
systems network architecture. The IBM protocol group which governs
mainframe communication.
SNMP
simple network management protocol. A control and reporting scheme widely
used to manage devices from different vendors. SNMP operates on top of the
internet protocol.
SR
data set ready. A signal on the DTE interface that indicates if the
communications is connected and ready to start handshaking control signals so
communications can begin.
statistical multiplexing
Interleaving the data input of two or more devices on a single channel or access
line for transmission through a frame relay network. Interleaving of data is
accomplished using the DLCI.
switched network
The network of dial-up telephone lines using circuit switching to provide
communications services to network users.
61200214L1-1
IQ Probe User Manual
129
Download from Www.Somanuals.com. All Manuals Search And Download.
Glossary
synchronizing bits (sync bits)
A fixed pattern in synchronous transmission used to identify the boundaries of
frames.
synchronous
Communications in which the timing is achieved by sharing a single clock. Each
end of the transmission synchronizes itself with the use of clocks and
information sent along with the transmitted data.
TELNET
The standard TCP/ IP remote login protocol specified in RFC-854.
transmission
The dispatching of a signal, message, or other form of intelligence by wire, radio,
telegraphy, telephony, facsimile, or other means. A series of characters,
messages, or blocks including control information and user data. The signalling
of data over communications channels.
VT 100
A non-intelligent terminal or terminal emulation mode used for asynchronous
communications. Used to configure the IQ Probe.
130
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Index
average frame delay 90
average loop response time 103
average Rx frame 89
Symbols
10baseT LAN port 8, 9, 25
pin assignments 107
4-wire SW56
average Rx throughput 77, 82, 87
average Rx utilization 77, 82, 87
average Tx frame 90
DBU card 5
average Tx throughput 78, 83, 87
average Tx utilization 78, 83, 88
AVG RESP TIME 103
A
abort frames 94, 95
DBU port 96
aborts 75, 80, 84
activating menu items 13, 18
add 55, 66
ADD key 14, 15, 55, 66
address to ping 104
addressing 2
ping test 104
avg response time
ping test 104
B
B-CH BIT RATE 62
B-channel bit rate 62
BECN 88
BEEP OPTION 59
beeper option 59
begin remote session 19
agent 4
alarm
17
ALM LED 17, 15
always on 47
Annex A 49, 51
Annex D 49, 51
ANSI 2
ANSI T1.617-D 49, 51
applications 23
dial backup 33
arrow keys 13, 15
async PPP 2, 8, 12, 25
async status 80
auto DBU 59
C
CANCEL key 13, 15
cards (options)
installation 11
carrier detect 17
carrier detect loss 60
CD 17, 93, 94
CD option 45
change password 63
61200214L1-1
IQ Probe User Manual
131
Download from Www.Somanuals.com. All Manuals Search And Download.
Index
descriptions 5
slot 9
CIR 54
clear to send 17
clock
criteria 60
DLCI 53
setting 66
setting to 0 34
interface card slot 10, 11
options 57, 59
password 59
port
CONFIG 18, 22
configuration 18, 22
DCE port 49
DTE port 43
local 37
menus 38
front panel 41
terminal 39
remote 37
system 63–67
congestion 45
congestion control 3
control port 2, 8, 9, 10, 12, 19, 25
configuring 37
mode 26, 64
options 64
pin assignments 108
CR 88, 89
CRC errors 75, 80, 84, 94, 95
DBU port 96
CRC16 2
CS 17, 93, 94
CS LED 15
CTRL PORT MODE 64
CTRL PORT OPTS 64
CTS 73
CTS option 45
customer service 6, 7
statistics 81, 95
state 77, 82
statistics 69
status 94, 95
timers 60
DCD 73
state change 80
DCE 9, 62
port
configuring 37
statistics 69
DCE card 5, 62
DCE interface 10, 11
DCE port
configuration 49
terminal menu 50
frame relay options menu
terminal 51
statistics 76, 78, 79, 94
DE 88
dedicated PVC management 27, 32, 33
delay measurement 2, 54
delete 55, 66
DELETE key 14, 15, 55, 66
diagnostics 116
dial 22
D
daily lockout 59
data rates 115
data terminal ready 17
date
setting 66
DB-25 cable 11
DBU
bit rate 62
card 4
configuration options 61
dial backup 2, 105
application 33
configuring 37
configuring for 57
connectors
pin assignments 113
menu tree 58
operation 4
132
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Index
options
ESP DCE card 5
activating 105–106
ESP ethernet card 9
ESP ISDN DBU card 61
ESP V.34 DBU card 61
ethernet 1, 2, 8, 25, 28
ethernet address
dial options
during DBU 106
menu tree 105–106
with DBU idle 105
discard eligibility 88
discard frame 75, 80, 83
DLCI
viewing 96
ethernet port 63
F
3, 19, 23, 28, 47, 52, 53, 54, 75, 101, 115
1 and 2 52
fail timer 60
1 and 2 MODE 52
statistics 72, 85, 86
specific DLCI 86
summary of all 91
DLCI list
features 1
FECN 88
FECN/BECN
flow control 45
flags 2
statistics
flow control 44
FOLLOW NET 48
follow network 48
follow RTS
CTS option 45
forced on
front panel 96
DMS100 61
DSR 73
DSR option 45
DSR state change 80
DTE 9
CD option 46
CTS option 45
DSR option 45
FR OPTS 46
port 2, 18
configuration 43–48
configuring 37
menu tree 44
DCE port 51
statistics 73, 92
terminal configuration menu 43
statistics 69
DTE interface 10, 11
DTR 73
FRAD 2, 47
frame relay
general description 2
monitoring 1
options 46
DCE port 51
E
protocol options 43
frames in 95
DBU port 96
frames out 95
DBU port 96
frames Rx 102
frames Tx 102
front panel 3, 13
configuration menu tree 41, 41
entering letters 67
illustration/descriptions 15
EA violation 76, 81
EIA-232 11, 44
EIA-530 11, 44
encapsulation error 76, 81, 85
ENTER key 13, 15
error threshold
defining 46
errored frames 94, 95
DBU port 96
ESC 72
ESP card options 5
61200214L1-1
IQ Probe User Manual
133
Download from Www.Somanuals.com. All Manuals Search And Download.
Index
operation 18
L
full status 80
LAN 25
full status polls 75
LAN 10baseT port 10, 12, 63, 64
LCD window 13, 15
LDN 62
leads on 73, 76
LED
G
gateway IP address 27, 64
GW IP ADDRESS 64
ALM 15
CS 15
H
description 17, 66
RD 15
hang up 106
hardware
RS 15
flow control 45
header 2
HIS INT SIZE 66
HIST INT COUNT 53
history interval count 53
history interval size 66, 71
hot keys 72
TD 15
length error 76, 81, 85
link integrity 52, 75, 80
link violations 75
LMI 49, 51
local configuration 37
local login 19
local PVC management 27, 28, 29
local PVC Rx bytes 74
local PVC Rx frames 74
local PVC Tx bytes 75
local PVC Tx frames 74
lockout end 60
I
in-band 2
in-band management 27
inactive DLCI 76, 81
included in shipment
ESP cards 8
lockout start 59
login menu 19, 20
logout 22
IQ Probe 7
interface support 115
interface type 44, 50, 62
interval remaining 74, 77, 82
invalid DLCI 76, 81
IP address 26, 28, 29, 31, 47, 63
IQ View 2
loopback 100
lost frames 89, 102
lost packets 54
Lucent 5ESS 61, 62
ISDN 5
M
switch type 61
main menu 21, 22
configuration 21
dial 21
ISDN DBU card 5
configuration options 61
ITU Q.933-A 49
logout 21
test 21
ITU-T Q.933-A 51
view statistics 21
management DLCI 29, 47
configuration 47
management DLCI 1 and 2 52
K
keypad 14, 15
134
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Index
mode 52
National 61
management DLCI 1 and/or DLCI 2 31
management DLCI 1 and/or DLCI 2 mode 31
management options 23
management PVC option 47
MAX PVC COUNT 53
MAX RESP TIME 102
NEC 61
network manager 3, 25
network port 52
next 54, 66
NEXT key 14, 15, 54, 66
no test active 102
normal
ping test 104
max response time
CD option 46
DSR option 45
ping test 104
maximum frame delay 90
maximum loop response time 102
maximum PVC count 53
maximum Rx frame 89
maximum Rx throughput 77, 82, 87
maximum Rx utilization 77, 82, 87
maximum Tx frame 89
maximum Tx throughput 78, 82, 87
maximum Tx utilization 78, 83, 87
menu items
number of B-channels 62
numeric keypad 14, 15
O
octet align 76, 80, 84, 94, 95
DBU port 96
opening menu 21
operating modes 115
operation 13–22
out-of-band management 25, 26
selecting 14
menu navigation 18
P
MGMT DLCI 47
MGMT PVC OPT 47
password 19, 63
default 19
MIB 1, 2, 4, 8, 25
MIN RESP TIME 102
option 59
ping test 104
phone numbers
min response time
storing 62
ping test 104
PHYS LYR OPTS
minimum frame delay 90
minimum loop response time 102
minimum Rx frame 89
minimum Tx frame 89
modem options 61
DCE port 50
DTE port 44
physical layer options
DCE port 50
DTE port 43, 44
pin assignments
10baseT connector 107
adapter cable
N
N391
network port 52
N392
DTE port 46
network port 52
N393
DTE port 46
network port 52
DB-25 to V.35 (DCE card) 112
DB-25 to V.35 (rear panel) 111
DB-25 to X.21 110
control connector 108
dial backup connectors 113
ping 104
ping address 104
61200214L1-1
IQ Probe User Manual
135
Download from Www.Somanuals.com. All Manuals Search And Download.
Index
ping responses 104
ping tests 99
remote lost frames 89, 102
request to send 17
reset test stats 103
restore timer 60
return material authorization (RMA) 6
RFC 1213 3
PINGS RX 104
pings transmitted 104
PINGS TX 104
pinouts 107
polling 49
RFC 1315 3
port UA time 79, 95
power cord 10
RFC 1490 23, 28, 30
router 47
RS 17, 93, 94
RS LED 15
RTS 73
Rx BECN 88
Rx burst seconds 89
Rx bytes 77, 82, 86
Rx CR 88
Rx DE 88
Rx FECN 88
Rx frames 77, 82, 86
Rx full status 75, 80
Rx LI only 75, 80
power switch 10
power up 8
PPP 1, 8, 12, 25
PREV key 14, 15, 54, 66
previous 54, 66
product overview 1–2
provided by customer 8
PVC 1, 3, 4, 28, 30, 49, 53, 101
active/inactive/undefined 102
PVC CONFIG 53
PVC count 53
PVC delay 54
PVC inactive 88
PVC loopback 100
PVC loopback test 99
PVC options 14, 53
PVC state change 90
S
SEQ # 54
sequence number checking 54
serial bit rate 50
shared PVC management 27, 30, 31
SHIFT key 14, 18, 15
SIG RESPONSES 47
SIGNAL
Q
QUICK key 14, 15
R
DCE port 51
signal down time 75, 79, 94
signal errors 75, 79, 94, 95
signal state 93, 94
signal state change 75, 79, 93, 94
signal timeouts 75, 79, 93, 95
signaling format 49
signaling responses 47
signaling state 74, 76
signaling type
RATE 50
RD 17
RD COMMUNITY 65
RD LED 15
read community 27, 29, 32, 65
rear panel 9
receipt inspection 7
receive data 17
redial counter 60
remaining 86
remote configuration 37
remote login 19
DCE port 51
SLIP 1, 2, 8, 12, 25
SNMP
1, 2, 3, 8, 25, 26, 27, 47, 65, 115, 116
136
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Index
in-band 23
TD 17
out-of-band 23
specifications 115
SPID 62
TD LED 15
TELNET 2, 4, 23, 25, 27, 47, 115, 116
terminal
SR 93, 94
start ping 104
start test
configuration 49
configuration menu tree 39
connection/operation 19
interface 38
PVC loopback test 101
statistics 1
test 22
DBU port 81
test active 102
DCE port 76
test length
DLCI 85
PVC loopback test 101
test status screen 103
testing 99
DTE port 73
system 91
view by day 74
view by interval 73
viewing 69
throughput
DLCI stats 86
time
front panel 92
terminal 69
statistics menus
changing view option 72
scrolling left and right 72
turning pages 72
STATS 22
stay on leased 105
stay on line 106
stop test
PVC loopback test 101
subnet mask 26, 47, 64
SVC 3
SW56 DBU 5
switch type 61
system
configuration 37, 63
statistics 69, 91, 97
front panel 96
system LEDs reflect 66
system time/date 66
setting 66
time in DBU 83, 88
DBU port 95
tone/pulse 61
TR 17, 93, 94
transmission errors 75
transmit data 17
TRAP DLCI 65
TRAP IP 65
trap manager DLCI 27, 30, 32, 65
trap manager IP address 27, 30, 32, 65
trap manager options 65
trap manager port 27, 30, 32, 65
TRAP PORT 65
Tx BECN 88
Tx burst seconds 89
Tx bytes 77, 82, 87
Tx CR 89
Tx DE 88
Tx FECN 88
Tx frames 77, 82, 87
Tx full status 80
Tx LI only 80
T
T391 51, 79
T392 46
U
TC CLOCK OPT 46
TC clock option 46
UNI 46, 49, 52
unrouteable 76, 81, 85
61200214L1-1
IQ Probe User Manual
137
Download from Www.Somanuals.com. All Manuals Search And Download.
Index
utilization
DLCI stats 86
V
V.34 DBU card 5, 61
V.35 9, 11, 44
adapter cable
part number 9
pin assignments
DCE card 112
rear panel 111
view by day 70, 71, 72, 74
view by interval 70, 72, 73
view DLCI list 103
view statistics 22
view test stats
PVC loopback test 102
virtual circuit 47, 49
address 3
permanent 3
switched 3
virtual connections 2
VT 100 2, 3, 12, 23
configuration menu tree 39
connection/operation 19
management 24
W
wait to redial 61
WAN 2, 28
weekend lockout 60
wide area network 2
WITH DCD LOSS 60
with no LMI 60
WR COMMUNITY 65
write community 27, 30, 32, 65
X
X.21 9, 11, 44
adapter cable
part number 9
pin assignments 110
138
IQ Probe User Manual
61200214L1-1
Download from Www.Somanuals.com. All Manuals Search And Download.
Product Support Information
Pre-Sales Inquiries and Applications Support
Please contact your local distributor, ADTRAN Applications
Engineering, or ADTRAN Sales:
Applications Engineering (800) 615-1176
Sales
(800) 827-0807
Post-Sale Support
Please contact your local distributor first. If your local distribu-
tor cannot help, please contact ADTRAN Technical Support and
have the unit serial number available.
Technical Support
(888) 4ADTRAN
Repair and Return
If ADTRAN Technical Support determines that a repair is
needed, Technical Support will coordinate with the Customer
and Product Service (CAPS) department to issue a Return
Material Authorization (RMA) number. For information
regarding equipment currently in house or possible fees associ-
ated with repair, contact CAPS directly at the following number:
CAPS Department
(256) 963-8722
Identify the RMA number clearly on the package, and return to
the following address:
ADTRAN, Inc.
CAPS Department
6767 Old Madison Pike
Building #6 Suite 690
Huntsville, Alabama 35807
Download from Www.Somanuals.com. All Manuals Search And Download.
|