User’s Guide
Models:
f
CBS-2031e / CBS-2031s
CBS-2032e / CBS-2032s
f
NOTICE TO INSTALLER: Please leave this book with the machine.
Table of Contents
Contact Information ..................................................2
Operating Instructions ..............................................8
Programming............................................................9
Batch Settings.......................................................9
Temperature Settings .........................................10
Advanced Settings and Diagnostics ...................10
Relay Test...........................................................11
Error Codes ............................................................12
Parts .......................................................................13
Description & Features.............................................2
Specifications............................................................2
Requirements........................................................2
Weights and Capacities ........................................2
Electrical Configuration and Brewing Efficiency ...3
Dimensions & Utility Connections.............................4
Installation.................................................................5
FETCO®, LUXUS®, EXTRACTOR® and Driven To Pioneer Innovation™ are trademarks or trade names of Food Equipment Technologies Company.
© 2005 Food Equipment Technologies Company Part # P019 August 16, 2005
Electrical Configuration and Brewing Efficiency
US & Canada
CBS-2031e / CBS-2031s
3.0 liters per batch
Batches per Hour* (max 11)
Electrical
Heater
Voltage
(AC)
Maximum
Amp draw
Config. Code
Configuration
Phase
Wires
KW
1.6
2.4
2.6
3.1
Cold Water
Hot Water
E31045
Can be connected
1 X 1.5 KW
2 X 1.5 KW
120
single 2 + ground
13.0
11.3
12.0
13.0
4.9
11.0
120/208 single 3 + ground
120/220
120/240
7.3
11.0
to 120 VAC or
8.2
11.0
120/208-240 VAC
9.7
11.0
E31035
Can be connected
1 X 1.7 KW
2 X 1.7 KW
120
single 2 + ground
1.8
2.7
3.0
3.5
14.7
12.8
13.5
14.7
5.5
8.3
9.2
11.0
11.0
11.0
11.0
120/208 single 3 + ground
120/220
120/240
to 120 VAC or
120/208-240 VAC
11.0
E31015
Can be connected
1 X 2.3 KW
2 X 2.3 KW
120
single 2 + ground
2.4
3.6
4.1
4.7
19.7
17.1
18.1
19.7
7.4
11.0
11.0
11.0
11.0
120/208 single 3 + ground
120/220
120/240
11.0
11.0
11.0
to 120 VAC or
120/208-240 VAC
CBS-2032e / CBS-2032s
3.0 liters per batch
Batches per Hour* (max 22)
Electrical
Heater
Voltage
(AC)
Maximum
Amp draw
Config. Code
Configuration
Phase
Wires
KW
Cold Water
Hot Water
E32015
2 X 3 KW
120/208 single 3 + ground 4.6
22.4
23.7
25.8
14.6
16.9
19.4
22.0
22.0
22.0
120/220
120/240
5.1
6.1
* Based on standard factory settings: 4.0 minute brew time; 0% prewet; 200 F water.
Export
CBS-2031e / CBS-2031s
3.0 liters per batch
Batches per Hour* (max 11)
Electrical
Heater
Voltage
(AC)
Maximum
Amp draw
Config. Code
Configuration
Phase
Wires
KW
Cold Water
Hot Water
E31025
1 X 3 KW
220
single 2 + ground 2.6
12.0
8.4
11..0
CBS-2032e / CBS-2032s
3.0 liters per batch
Batches per Hour* (max 22)
Electrical
Heater
Voltage
(AC)
Maximum
Amp draw
Config. Code
Configuration
Phase
Wires
KW
Cold Water
Hot Water
E32025
2 X 3 KW
220
single 2 + ground 5.1
23.7
16.9
22.0
* Based on standard factory settings: 4.0 minute brew time; 0% prewet; 200 F water.
3
Dimensions & Utility Connections
CBS-2031e / CBS-2031s
DWG 201108-000
CBS-2032e / CBS-2032s
DWG 201109-000
4
Installation
(For Qualified Service Technicians Only)
Keys To A Successful Installation
If not installed correctly by qualified personnel, the brewer will not operate properly and damage may result.
Damages resulting from improper installation are not covered by the warranty.
Here are the key points to consider before installation:
Electrical:
All FETCO brewers require NEUTRAL. Ground is not an acceptable substitute. Installation without neutral
may cause damage to the electronic components.
The electrical diagram is located on the inside of the lower cover.
The installation must comply with applicable federal, state, and local codes having jurisdiction at your
location. Check with your local inspectors to determine what codes will apply.
Plumbing:
This equipment is to be installed to comply with the applicable federal, state, or local plumbing codes.
The water line must be flushed thoroughly prior to connecting it to the brewer to prevent debris from
contaminating the machine.
Verify that the water line will provide at least ¼ gallon per minute for the CBS-2031, and ½ gallons per
minute for the CBS-2032 before connecting it to the brewer.
General:
Utilize only qualified beverage equipment service technicians for installation. A Service Company Directory
Installation Instructions
Brewer Setup
1. Review the Dimensions for the unit you are installing. Verify that the brewer will fit in the space intended for it,
and that the counter or table will support the total weight of the brewer and dispensers when filled.
2. The brewer’s legs are shipped inside the brew baskets.
Warning: Legs are to be adjusted for
leveling the brewer only. Do not use
for height adjustment or extend them
higher than necessary.
Remove the brew basket(s) and the coffee dispenser(s).
Place the brewer on its back and screw in the legs.
3. Place the brewer on the counter or stand.
4. When the brewer is in position, level it front to back as well
as side to side by adjusting the legs.
5. Remove the lower cover to access the water and electrical connections. Knock-outs are provided in the back
and base of the brewer body for the connections.
Water Connection
1. Water inlet is a 3/8 inch male flare fitting.
2. The brewer can be connected to a cold or hot water line. Cold water is preferred for best coffee flavor, but hot
water will allow for faster recovery times.
3. Install a water shut off valve near the brewer to facilitate service. If an in-line water filter is used, it should be
installed after the water shut off valve and in a position to facilitate filter replacement.
4. Flush the water supply line and filter before connecting it to the brewer.
5. Verify that the water line will provide at least ¼ gallon per minute for the CBS-2031, and ½ gallon per minute
for the CBS-2032, and that the water pressure is between 20 and 75 psig.
5
Electrical Connection – US & Canada
1. Verify that the actual voltage at the electrical service connection is compatible with the specifications on the
brewer’s serial number label. Make sure the electrical service includes neutral.
2. The temperature and water tank fill level are pre-set at the factory. There is no need to turn off the heaters
during the installation process. The heaters are disabled by the control board until the tank is full of water. The
heating process will start automatically when the tank has filled.
3. The CBS-2031 is factory equipped with a 120 V cord and plug. The CBS-2032 has only a terminal block for
connecting the incoming power wires. Consult local codes to determine if a cord and plug can be installed, or if
the unit must be hard wired.
4. A fused disconnect switch or circuit breaker on the incoming power line must be conveniently located near the
brewer, and its location and markings known to the operators.
Warning: To prevent
electrical shock, this
unit must be properly
grounded.
5. The body of the brewer must be grounded to a suitable building ground.
A ground lug is provided in the brewer next to the power terminal block.
Use only 10 gauge copper wire for grounding.
6. Electrical connections must be secured in-place within the unit to meet
national and local standards.
7. Finally, connect the incoming power wires to the terminal block as shown in accordance with applicable codes.
CBS-2031e / CBS-2031s
Can be connected to 120 VAC or 120/208-240 VAC
Factory Configuration
120 VAC, 3 wires
Optional Field Conversion*
120/208-240 VAC, 4 wires
Step 1: Remove the factory provided 120 V cord &
plug from the terminal block.
Step 2: Connect the incoming wires to the terminal
block in accordance with applicable codes.
L1
N
L2
GROUND
GROUND LUG
L1
N
L2
L2 - NOT USED
CORD WITH
NEMA 5-20P PLUG
120V
120V
N
GROUND
WIRE
208-240V
*This procedure must be performed only by a qualified
service technician or electrician.
Notice: In order for this product to comply with the
requirements of the Underwriters Laboratories listing,
the following conditions apply:
1.) This unit must be hard wired for 120/208-240 VAC.
2.) Once the unit is converted to 120/208-240 VAC
operation, it cannot be converted back to 120
VAC operation.
CBS-2032e / CBS-2032s
Can be connected only to 120/208-240 VAC
GROUND LUG
L1
N
L2
120V
120V
N
GROUND
WIRE
208-240V
6
Final Setup
1. Turn on the incoming water supply line and inspect both inside
and outside of the brewer for leaks in all fittings and tubes
2. Turn on the incoming power.
3. Press the brewer’s main power switch, which is hidden behind the
front leg of the brewer. The control panel on/off switch will begin
flashing. Press this switch.
4. Within 6 seconds, the hot water tank will begin filling until the
water is sensed by the probe at the top of the tank. The display will
read “FIL”. The heaters will be disabled by the control board until
the tank is full.
5. While the water is heating, the display will read “LO” and the
actual water temperature will be displayed. After the water has
reached the set temperature, the display will be blank. There is no
“ready” light.
6. Review the Operating Instructions. Brew one full batch (water
only) on each side to confirm proper fill levels. The brewer is
factory set with water only (no coffee) to dispense the correct
amount of water. If the actual volume is slightly different from the
programmed volume, fine tuning the brewer may be necessary.
See #60 – 61 in the Advanced Settings & Diagnostics section.
7. Re-attach the covers after one final inspection for leaks. Look
closely in the top of the brewer at the dispense fittings during this
inspection.
Operator Training
Review the operating procedures with whoever will be using the
brewer. Pay particular attention to the following areas:
1. Always pre-heat the dispensers before the first use of each day by
filling them half way with hot water, and letting them stand for at
least 15 minutes.
2. Don't remove the brew basket until it has stopped dripping.
3. Make sure the dispenser is empty before brewing into it.
4. Show how to attach covers, close, and or secure the thermal
dispensers for transporting.
5. Show the location and operation of the water shut off valve as well
as the circuit breaker for the brewer.
6. Steam from the tank will form condensation in the vent tubes. This
condensation will drip into and then out of the brew baskets. 1/4
cup discharging overnight is possible. Place an appropriate
container under each brew basket when not in use.
7. We recommend leaving the power to the brewer on overnight. The
water tank is well insulated and will use very little electricity to
keep the tank hot. Leaving the brewer in the on position will also
avoid delays at the beginning of shifts for the brewer to reach
operating temperature.
7
Operating Instructions
Control Panel Functions
Only switches that are active are illuminated.
Switches that are inactive or disabled are invisible.
X Main Power Switch
Controls all power to brewer
Indicator lamp at top of panel.
Y Control Panel On/Off Switch
Affects only control panel. Does
not disconnect main power.
Flashing = Off
Lit = On
Invisible = Main Power Off
Z Display
”FILL” = Water tank is filling.
”LO XXX” = Unit is heating, not
ready to brew. (XXX = actual
temperature.)
Blank = Ready to brew.
Also displays error messages.
[ Stop Switches
Stops brew cycle
Lit = Brew cycle in progress
Invisible = Not brewing, or dripping
in progress
\ Brew Switches
Starts brew cycle
Must be held in for 1 second
Flashing = Brew cycle in progress
Lit = Ready to brew
Invisible – Not ready to brew, or
batch disabled
(See Programming Section)
] Hot Water Switch
Dispenses hot water from faucet
Hold in to dispense
Brewing
1. Turn the main power switch and control
panel switch on.
7. When the brew cycle is finished, the STOP
button will extinguish and the BREW button will
continue flashing, indicating that coffee may still
be dripping from the bottom of the brew basket.
8. Before removing the brew basket or dispenser,
visually verify that dripping has stopped.
Notes:
2. Prepare a brew basket with the correct size
filter and appropriate amount of coffee.
3. Slide the brew basket completely into the
rails.
4. Place a clean, empty, preheated dispenser
under the brew basket.
5. Select a batch from the available choices,
and hold the corresponding BREW button in
for 1 second to start the brew cycle.
6. The STOP button will illuminate, and the
selected BREW button will flash, indicating
that brewing is in progress. All other BREW
buttons will extinguish.
Preheat dispenser by filling at least ½ full with
water at brewing temperature. Allow it to sit for
at least 15 minutes before draining.
8
Programming
Display
Batch Settings
Turn the brewer off by pressing the main power switch.
Press the main power switch again to turn the unit on.
32
The last 2 digits of the model number will display briefly, then S t b.
S t b
Quickly hold the STOP button for 3 seconds.
The display will show the software version. Example:
Press STOP to continue.
P r G
MAIN POWER
SWITCH IS
BEHIND
0.0 3.2
FRONT LEG.
Batches are numbered 1 – 2 (single brewers) or 1 – 4 (dual brewers)
PARAMETER
BATCH #
SETTING
1.1 2.49
Example: Left Side – Large Batch – Volume 2.49 Liters.
Next, the first batch parameter is displayed – batch 1, brew volume
Use the SCROLL UP and SCROLL DOWN buttons to adjust.
Press the STOP button to go to the next parameter – brew time.
1.1 2.49
1.2 4.00
Continue this way until all parameters are programmed for batch #1.
(See the chart below for an explanation of each parameter.)
Next, batch #2 programming begins.
2.0 OFF
Batches 2 and 4 may be disabled by leaving them set to “OFF”.
Change to “ON” to enable. Batches 1 and 3 cannot be disabled.
After all batches are programmed, go to temperature settings.
7
200
(See next page)
Important! After programming, you must press the HOT WATER button to save the settings and exit
programming mode, or changes will be lost. You may exit programming at any time.
Batch Parameters
X=Batch Number (1 - 4)
Parameter
Name
Range
Increment
Default Setting
Comment
X.0
Batch Enabled or
Disabled
Brew Volume (Liters) 0.94 – 4.72
On/Off
Batch 1 & 3 = ON
Batch 2 & 4 = OFF
2.49 liters
Batch 1 & 3 cannot be
disabled.
To display gallons,
see # 59 in Advanced
Settings section.
X.1
0.03 or
0.04
X.2
X.3
Brew Time (Min:Sec) 2:00 – 24:00
0:30
1%
4:00 minutes
0 %
Bypass Percent
0.00 – 40.0%
0.00 – 15.0%
0:10 – 5:00
Percentage of total
brew volume
Percentage of total
brew volume
The time between
prewetting and start of
brew cycle.
(CBS-2031s / 2032s only)
X.4
X.5
Prewet Percent
1%
0 %
Prewet Delay
(Min:Sec)
0:10
1:00 minute
X.6
Drip Delay (Min:Sec) 0:30 – 6:00
Minutes
0:10
1:00 minute
The time between end
of brew cycle and
when brew switch
stops blinking.
9
Temperature Settings
Parameter
Name
Range
Default Setting
Comment
7
Inside tank. Will be slightly lower at
spray head. To display in ° Celsius,
see # 58 in Advanced Settings.
A= Faucet will dispense only when not
brewing.
On=Faucet always enabled.
Off=Faucet always disabled.
0=Will brew at any temperature.
1=Will brew only at set temperature.
Note: Changes will not take effect until
the next brew cycle is completed.
Water Temp. (°F)
180°F - 208°F
200°F
8
9
Hot Water Service
A (auto) / On / Off
A (auto)
1
Brew at Set
Temperature
0 - 1
Parameter
Name
Range
Default Setting
Comment
10
Enter Advanced
Settings &
Diagnostics
0 - 1
0
0 = Skip Advanced Settings &
Diagnostics. Loop back to start of
batch programming cycle.
1 = Enter Advanced Settings &
Diagnostics.
Press STOP to continue
Important! To save your changes, press
to exit programming mode and return to operating mode.
Advanced Settings and Diagnostics
Address
Description
Water Level
in Tank
Range
Default
Comment
50
0 - 1
Tests if water is touching probe.
0 = Tank is less than full
1 = Tank is full
52
Brew Basket
Sensor State
(left / right)
0 - 1
CBS-2031s / CBS-2032s Only
To test, slide the brew basket in and out. Display
should toggle between 0 and 1.
0 = Brew basket out. 1 = Brew Basket in.
Displays current tank temperature. If temperature
is below 175°F, displays “LO”.
Must be set for the correct model number of the
brewer: 31 for CBS-2031e or 2031s, 32 for CBS-
2032e or 2032s.
55
56
Tank Temperature
180°F - 208°F
Brewer Model
Number
31 - 52
57
Reload Defaults
0 - 1
0
Changes all settings to default factory settings.
0 = Do not reload defaults
1 = Reload all default settings
If 1 is selected, you must advance to the next
address for this change to take effect.
Does not change address 56 – model number.
F = Displays temp in degrees Fahrenheit
C = Displays temp in degrees Celsius
LTR = Displays volume in liters
58
59
Temperature Scale F or C
F
Water Volume
Scale
LTR or GAL
LTR
GAL = Displays volume in gallons
10
Address
60
and
61
Description
Range
Default
Comment
Left Brew Valve
Flow Rate
Right Brew Valve
Flow Rate
0.35 – 2.24
If #59 is LTR
1.48
Use this to compensate for minor discrepancies in
actual volume versus programmed volume. Set
lower to increase volume, higher to decrease
volume. The following formula can be used to
determine the correct setting:
or
0.09 – 0.59
If #59 is GAL
0.39
0
ACTUAL VOLUME
CURRENT
SETTING
NEW
SETTING
X
=
PROGRAMMED VOLUME
64
65
Keypad Test
0 - 1
Tests function of control panel switches.
0 - Skip keypad test
1 - Keypad test active
Starting at the top, press each button. Display will
read the name of the switch being pressed.
Brew switches are named S1, S2, S3, etc.
The hot water switch must be pressed last, as this
will exit the test.
Relay Test
0 - 1
0
0 - Skip relay test. Loop back to #50
1 – Relay test active.
Press STOP to continue
Press
Press
to save the settings and exit Diagnostic mode.
again to exit Programming mode and return to Operating mode.
Warning: During these
tests, hot water may
be dispensed from
Relay Test
Tests the individual relays which control various components.
Use either batch button to actuate the relays.
the valve being tested.
To begin, you must first press the blinking Control Panel Power Switch.
Address
Description
Comment
90
91
92
93
94
95
Left or Single Brew Valve
Right Brew Valve
Left or Single Bypass Valve
Right Bypass Valve
Hot Water Faucet
Fill Valve
CBS-2031s / CBS-2032s Only
CBS-2031s / CBS-2032s Only
96
Heater
To protect the heaters, this test will work only if the tank is full.
Press
to exit Relay Test.
Press
Press
again to exit Diagnostic mode.
again to exit Programming mode and return to Operating mode.
11
Error Codes
How to Clear Error
Codes
Code
Description
Possible Cause
Corrective Action
001
Internal Error
System had to reload default
settings.
Control board failure.
Clear error.
Turn main power
switch off and on.
Re-program the brewer to the
desired specifications. If error
occurs again, replace control
board.
050
051
Shorted temperature probe.
Open temperature probe.
Probe failure.
Replace probe.
Turn main power
switch off and on.
Turn main power
switch off and on.
Bad probe connection, or Check all connections. Replace
probe failure.
probe if necessary.
075
or
NO
BAS
CBS-2031e / 2032e
Brew Basket Sensor
These models do not
have brew basket
sensors or locks. This
error indicates a bad
connection on the brown
jumper wire on the Molex
connector connected to
the top of the control
board.
Press both ends of the jumper
wire into the connector to make
better contact.
075
CBS-2031s / 2032s
Brew basket lock or sensor
failure.
Brew basket sensor or
lock has failed.
Repair or replace brew basket
sensor or lock.
Press the flashing
control panel power
switch to resume
operation.
If the brew basket can be
pulled out during the
brew cycle, the brew
basket lock has failed.
Magnet in brew basket
handle is missing or
loose.
Remove brew basket handle.
Place magnet in correct
position.
100
101
102
Initial Fill Error
Initial fill time was more than
15 minutes.
Water supply flow rate is
too low.
Watch for short potting during
Press the control
brew cycle. Investigate cause of panel power switch.
low flow rate. (Clogged water
filter, etc.)
Watch for short potting during
brew cycle. Investigate cause of cleared automatically
low flow rate. (Clogged water
filter, etc.)
Check inside of machine for
leaks.
Error on refill
Tank did not refill within 3
minutes.
Water supply flow rate is
too low.
Error message is
at end of brew cycle.
Unwanted Fill
Possible leak in tank,
fitting, or valve.
Turn main power
switch off and on.
When brewer is idle, the fill
valve was activated for more
than 30 seconds during a 1
hour period.
Output on control board
has failed, causing a
dispense valve to open.
Replace control board.
200
201
Flat Line Temperature
(Water is boiling)
System is calling for heat, but
the temperature does not rise
at least 2°F within 10 minutes.
Heater Open
System is calling for heat, but
the temperature does not rise
at least 2°F within 10 minutes.
This error is disabled during
brewing and while using the
hot water faucet.
Triac is stuck closed, bad Check triacs, check control
Turn main power
switch off and on.
output on control board,
or temperature is set too
high for altitude.
board output, or adjust
temperature for altitude.
Heating element failure.
Check and replace heating
elements if necessary.
Turn main power
switch off and on.
202
255
Heater Short
Possible triac stuck
closed, or bad output on
control board.
Check triac and control board.
Enter programming
mode, then exit
programming mode.
System is not calling for heat,
but temperature rises more
than 5°F.
Keypad Error
Switch was held in too
Clear error and try again. If
error occurs without switch
being pressed, replace input
board.
Turn main power
switch off and on.
A switch was pressed for more long, or switch is stuck
than 45 seconds. closed.
12
Parts
Figure 1 – CBS-2031e / CBS-2031s Main Assembly
DWG 101194-C
ITEM #
QTY
PART # DESCRIPTION
1
2
2
3
4
5
1
1
1
2
4
1
001051 WELDMENT CBS-2031e
108001 SWITCHING/CONTROL BOARD, 5 KEYS, S2P (CBS-2031e ONLY)
108037 SWITCHING/CONTROL BOARD, 5 KEYS, S2P (CBS-2031s ONLY)
29007 NUT, #4-40 KNURLED THUMB
15007 STANDOFF, MALE-FEMALE, THREADED HEX 4-40-1/2"
51042 BOARD, POWER SUPPLY-120VAC
EXPORT
220V ONLY
5
1
51055 BOARD, POWER SUPPLY-220VAC
6
7
4
1
29019 SPACER, .25" HEX x 1" LG., FEM, #4-40 THREAD
57006 FILL VALVE, S-53 120VAC
EXPORT
220V ONLY
7
1
57017 FILL VALVE, S-53 220VAC
8
9
10
11
12
13
1
1
1
4
1
1
24012 GASKET, S-53 FILL VALVE
31078 FITTING, S-53 FILL VALVE INLET
03074 BRACKET, S-53
82020 SCREW, S-53 FILL VALVE
31031 FITTING, 90º MALE ELBOW, 3/8 TUBE OD X 3/8 MPT
86040 CONNECTOR, CABLE CLAMP, 3/4"
13
14
15
16
17
17
17
18
19
20
1
1
2
1
1
1
7
13
1
52050 TERMINAL BLOCK
65002 CONNECTOR, COPPER LUG
86032 BUSHING, SNAP, 1" MOUNTING HOLE DIA
102189 ASSEMBLY, POWER BRACKET, CBS-2000e
52026 CIRCUIT BREAKER, 5A
58054 SWITCH, PUSH BUTTON
83026 WASHER, INTERNAL TOOTH LOCK, #8 SCREW SIZE,
84002 NUT, HEX, #8-32 MACHINE SCREW
102080 ASSEMBLY, SMALL SPRAY HEAD, 120V (SEE FIG. 5)
EXPORT
220V ONLY
20
1
102158 ASSEMBLY, SMALL SPRAY HEAD, 220V (SEE FIG. 5)
21
22
23
24
25
25
1
1
4
2
1
002065 WELDMENT, HOT WATER FAUCET
33007 LOCKNUT, 7/16 STRAIGHT PIPE THREAD
73029 LEG, THERMOPLASTIC, 2.50"(63mm)
29021 SPACER, #8 SCREW SIZE, ½ OD X ¼ LG, ROUND UNTH.
102192 ASSEMBLY, HOT WATER VALVE, 120VAC
57047 VALVE, DSV-11, 120 VAC (COIL, DIAPHRAGM, SPRING, & PLUNGER)
EXPORT
220V ONLY
EXPORT
25
25
1
102193 ASSEMBLY, HOT WATER VALVE, 220VAC
57071 VALVE, DSV-11, 220 VAC (COIL, DIAPHRAGM, SPRING, & PLUNGER)
220V ONLY
25
26
27
28
29
30
31
32
33
34
35
36
37
38
38
39
40
41
42
44
45
46
47
48
49
50
51
52
53
54
55
57073 VALVE REBUILD KIT, DSV11. (PLUNGER, SPRING, AND DIAPHRAGM)
83051 WASHER, #8 SCREW SIZE, FLAT
104028 ASSEMBLY TANK CBS-2031e (SEE FIG 2)
22062 INSULATION TANK FRONT CBS-2031e
22063 INSULATION TANK BACK CBS-2031e
45077 OVERLAY CBS-2031e
41016 LABEL, EXTRACTOR
46029 LABEL, POWER SWITCH
102139 ASSEMBLY, WATER LEVEL PROBE, CBS-2030
102190 ASSEMBLY, DIGITAL TEMP. PROBE, 5.0" LG.
44004 LABEL GROUND
402025 HARNESS, LOW AMP, ELECTRICAL, CBS-2031e, TWO HEATERS
402035 HARNESS, HIGH AMP, ELEC. 2 HEATER WIRE SET CBS-2031e
63019 CORD, 120 VAC, 12/3 AWG ,20 AMP , W/5-20P NEMA PLUG
63018 CORD, 120 VAC, 12/3 AWG ,15 AMP , W/5-15P NEMA PLUG
25056 TUBE, 3/4"OD X 1/2"ID X 4"LG, BREW
25058 TUBE 5/8"OD X 3/8"ID X 2.5"LG, HOT WATER FAUCET
86038 CLAMP, HOSE, .670"-.780" DIA RANGE
86020 CLAMP, HOSE, .875"-.750" DIA RANGE
25059 TUBE, 5/16"OD X 3/16"ID X 9 1/4"LG VENT
25102 TUBE, 1/4"OD X 1/8"ID X 20" LG VENT HOT WATER VALVE
25055 TUBE, 5/8"OD X 3/8"ID X 12"LG DRAIN
25057 TUBE, 5/8"OD X 3/8"ID X 14 1/2"LG, COLD WATER
25064 TUBE, 5/8"OD X 3/8"ID X 6.5"LG. HOT WATER
86007 CLAMP, HOSE, .593"-.656" DIA RANGE
01506 COVER TOP CBS-2031 & 41
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
3
1
1
1
1
1
1
5
1
1
1
1
10
1
01507 COVER BASE UPPER CBS-2031
401217 WIRING DIAGRAM, CBS-2031e, L1, L2, N, + GR
102191 ASSEMBLY, RIGHT COVER CBS-2030's
82053 SCREW, # 6-32 X 1/2" TRUSS HD PH
101171 BREW BASKET ASSY., 13 X 5, DIA HOLE 0.218" (SEE FIG. 6)
ADDITIONAL PARTS FOR CBS-2031s, NOT SHOWN ON DRAWING
1
1
102207 ASSEMBLY, REED SWITCH
101160 ASSEMBLY, BREW BASKET LOCK. 120 VAC
EXPORT
220V ONLY
1
1
101174 ASSEMBLY, BREW BASKET LOCK. 220 VAC
57044 VALVE, BYPASS LEFT 120 VAC
57047 VALVE, DSV-11, 120 VAC (COIL, DIAPHRAGM, SPRING, & PLUNGER)
EXPORT
220V ONLY
EXPORT
1
57077 VALVE, BYPASS LEFT 220 VAC
57071 VALVE, DSV-11, 220 VAC (COIL, DIAPHRAGM, SPRING, & PLUNGER)
220V ONLY
57073 VALVE REBUILD KIT, DSV11. (PLUNGER, SPRING, AND DIAPHRAGM)
101175 BREW BASKET ASSEMBLY, 13 x 5, DIA. HOLE 0.280 (SEE FIG. 7)
1
14
Figure 2 – CBS-2031e / CBS-2031s Tank Assembly
DWG 104028-A
ITEM #
QTY
PART # DESCRIPTION
1
1
004042 WELDMENT TANK CBS-2031e
2
3
1
1
3
3
1
1
1
2
2
2
2
1
1
1
2
2
8
24002 O-RING, TANK COVER
102013 ASSEMBLY, TANK COVER
4
31117 LOCKNUT 1/4 STRAIGHT PIPE THREAD
83042 WASHER, .875"OD X .562"ID, FLAT
31081 PLUG, HEX HEAD 1/4" MPT
5
6
7
25098 FITTING, COMPRESSION MALE CONNECTOR
31036 FITTING COMPR. MALE CONNECTOR 1/4 TUBE OD X 1/4 MPT
107025 HEATER ASSY., 1500W/120VAC
107019 HEATER ASSY., 1700W/120VAC
107020 HEATER ASSY., 2300W/120VAC
107021 HEATER ASSY., 3000W/240VAC
31116 LOCKNUT 1/8 STRAIGHT PIPE THREAD
83041 WASHER, .812"OD X .412"ID, FLAT
31005 FITTING, 90 ELBOW, 1/4 HOSE ID X 1/8 MPT
03332 BRACKET 2, ONE SHOT THERMOSTAT
53064 THERMOSTAT, SINGLE SHOT,TRIAC
83011 WASHER, #6 SCREW SIZE, INTERNAL
8
9
9
9
EXPORT
220V ONLY
9
10
11
12
13
14
15
15
16
17
18
19
20
21
22
23
24
25
26
27
28
8
1
1
1
3
1
1
2
1
1
2
2
1
84001 NUT, HEX, #6-32 MACHINE SCREW
31118 LOCKNUT 3/8 STRAIGHT PIPE THREAD
83044 WASHER, 1.125"OD X 0.750"ID, FLA
31071 FITTING, 1/2 HOSE ID X 3/8" MPT
31021 BUSHING, 3/4-16 X 1/4 NPSM, HEX HEAD
31152 VALVE, COMPR 3/8 TUBE OD X 1/4 MPT
13055 TUBE, VALVE DRAIN , 3/8" OD X .035"TH X 1.5" LG
31128 FITTING, 90 ELBOW, 3/8 HOSE ID X 1/4 MPT
31027 FITTING, COMPR 90 MALE ELBOW, 3/8 TUBE OD X 1/4 MPT
13072 OUTLET, INSIDE TANK HOT WATER
03297 SINK, HEAT FOR 40A TRIAC
59008 TRIAC 40A, 600V
84007 NUT, 3/4-16 HEX JAM
16
Figure 3 – CBS-2032e / CBS-2032s Main Assembly
DWG 101196-D
ITEM #
QTY
PART # DESCRIPTION
1
1
001050 WELDMENT, CBS-2032e
2
3
1
1
1
2
2
1
1
1
2
1
1
1
1
2
1
104027 ASSEMBLY, TANK CBS-2032e (SEE FIG. 4)
22041 INSULATION TANK FRONT CBS-2032e
22042 INSULATION TANK BACK CBS-2032e
102080 ASSEMBLY, SMALL SPRAY HEAD, 120V (SEE FIG 5)
102158 ASSEMBLY, SMALL SPRAY HEAD, 220V (SEE FIG 5)
102189 ASSEMBLY, POWER BRACKET, CBS-2000e
52026 CIRCUIT BREAKER, 5A
4
5
EXPORT
220V ONLY
5
6
6
6
58054 SWITCH, PUSH BUTTON
7
86032 BUSHING, SNAP, 1" MOUNTING HOLE DIA
52050 TERMINAL BLOCK
8
9
65002 CONNECTOR, COPPER LUG
10
11
12
13
402023 HARNESS, LOW AMP, ELECTRICAL, CBS-2032e, TWO HEATERS
402032 HARNESS, HIGH AMP, TWO HEATER WIRE SET CBS-2032e
29021 SPACER, #8 SCREW SIZE
102192 ASSEMBLY, HOT WATER VALVE, 120VAC
17
13
13
57047 VALVE, DSV-11, 120 VAC (COIL, DIAPHRAGM, SPRING, & PLUNGER)
102193 ASSEMBLY, HOT WATER VALVE, 220VAC
EXPORT
220V ONLY
EXPORT
1
13
13
14
15
16
17
17
18
19
20
20
21
22
23
24
25
26
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
57
57071 VALVE, DSV-11, 220 VAC (COIL, DIAPHRAGM, SPRING, & PLUNGER)
57073 VALVE REBUILD KIT, DSV11. (PLUNGER, SPRING, AND DIAPHRAGM)
83051 WASHER, #8 SCREW SIZE, FLAT
220V ONLY
2
7
17
1
1
4
3
1
1
4
1
1
1
3
1
1
1
1
1
4
1
1
1
1
2
2
1
1
1
1
1
4
2
5
1
1
2
1
1
1
1
10
1
1
1
2
83026 WASHER, INTERNAL TOOTH LOCK, #8 SCREW SIZE,
84002 NUT, HEX, #8-32 MACHINE SCREW
108002 SWITCHING/CONTROL BOARD, 8 KEYS, D2P (CBS-2032e ONLY)
108038 SWITCHING/CONTROL BOARD, 8 KEYS, D2P (CBS-2032s ONLY)
15007 STANDOFF, MALE-FEMALE, THREADED HEX 4-40-1/2"
29007 NUT, #4-40 KNURLED THUMB
51042 BOARD, POWER SUPPLY-120VAC
EXPORT
220V ONLY
51055 BOARD, POWER SUPPLY-220VAC
29019 SPACER, .25" HEX x 1" LG., FEM, #4-40 THREAD
002065 WELDMENT, HOT WATER FAUCET
33007 LOCKNUT, 7/16 STRAIGHT PIPE THREAD
45078 OVERLAY CBS-2032e
73029 LEG, THERMOPLASTIC, 2.50"(63mm)
57006 FILL VALVE, S-53 120VAC
EXPORT
220V ONLY
57017 FILL VALVE, S-53 220VAC
24012 GASKET, S-53 FILL VALVE
31078 FITTING, S-53 FILL VALVE INLET
03074 BRACKET, S-53
82020 SCREW, S-53 FILL VALVE
31031 FITTING, 90 MALE ELBOW, 3/8 TUBE OD X 3/8 MPT
86040 CONNECTOR, CABLE CLAMP, 3/4"
102190 ASSEMBLY, DIGITAL TEMP. PROBE, 5.0" LG.
102139 ASSEMBLY, WATER LEVEL PROBE, CBS-2030'S
102195 ASSEMBLY, BUMPER, 2030e
25056 TUBE, 3/4"OD X 1/2"ID X 4"LG, BREW
25064 TUBE, 5/8"OD X 3/8"ID X 6.5"LG. HOT WATER
25055 TUBE, 5/8"OD X 3/8"ID X 12"LG DRAIN
25057 TUBE, 5/8"OD X 3/8"ID X 14 1/2"LG, COLD WATER
25058 TUBE 5/8"OD X 3/8"ID X 2.5"LG, HOT WATER FAUCET
25059 TUBE, 5/16"OD X 3/16"ID X 9 1/4"LG VENT
86038 CLAMP, HOSE, .670"-.780" DIA RANGE
86020 CLAMP, HOSE, .875"-.750" DIA RANGE
86007 CLAMP, HOSE, .593"-.656" DIA RANGE
25102 TUBE, 1/4"OD X 1/8"ID X 20" LG VENT HOT WATER VALVE
44004 LABEL GROUND
44024 LABEL, WARNING-HIGH VOLTAGE
01479 COVER, TOP CBS-2032 & 42
01463 COVER, UPPER BASE CBS-2032e
401219 WIRING DIAGRAM, CBS-2032e, 1PH, 3 WIRE + GR, 2 HEATERS
102191 ASSEMBLY, RIGHT COVER CBS-2030's
82053 SCREW, # 6-32 X 1/2" TRUSS HD PH
46027 LABEL, SPRAY HOUSING
46029 LABEL, POWER SWITCH
41016 LABEL, EXTRACTOR
101171 BREW BASKET ASSY., 13 X 5, DIA HOLE 0.218" (SEE FIG 6)
ADDITIONAL PARTS FOR CBS-2032s, NOT SHOWN ON DRAWING
2
101160 ASSEMBLY, BREW BASKET LOCK. 120 VAC
EXPORT
220V ONLY
2
101174 ASSEMBLY, BREW BASKET LOCK. 220 VAC
2
1
102207 ASSEMBLY, REED SWITCH
57043 VALVE, BYPASS RIGHT 120 VAC
57047 VALVE, DSV-11, 120 VAC (COIL, DIAPHRAGM, SPRING, & PLUNGER)
EXPORT
220V ONLY
1
57076 VALVE, BYPASS RIGHT 220 VAC
18
EXPORT
220V ONLY
57071 VALVE, DSV-11, 220 VAC (COIL, DIAPHRAGM, SPRING, & PLUNGER)
57073 VALVE REBUILD KIT, DSV11. (PLUNGER, SPRING, AND DIAPHRAGM)
83051 WASHER, #8 SCREW SIZE, FLAT
84030 LOCKNUT, #8-32 SCREW SIZE, HEX THIN NYLON INSERT
57044 VALVE, BYPASS LEFT 120 VAC
6
4
1
57047 VALVE, DSV-11, 120 VAC (COIL, DIAPHRAGM, SPRING, & PLUNGER)
EXPORT
220V ONLY
EXPORT
1
57077 VALVE, BYPASS LEFT 220 VAC
57071 VALVE, DSV-11, 220 VAC (COIL, DIAPHRAGM, SPRING, & PLUNGER)
220V ONLY
57073 VALVE REBUILD KIT, DSV11. (PLUNGER, SPRING, AND DIAPHRAGM)
101175 BREW BASKET ASSEMBLY, 13 x 5, DIA. HOLE 0.280 (SEE FIG. 7)
1
19
Figure 4 – CBS-2032e / CBS-2032s Tank Assembly
DWG 104027-A
20
ITEM #
QTY
PART # DESCRIPTION
1
1
4043 WELDMENT TANK CBS-2032e
2
2
1
1
1
3
2
2
2
2
2
8
8
2
3
1
1
1
1
3
1
1
2
1
1
1
1
2
107021 HEATER ASSY., 3000W/240VAC
3
31116 LOCKNUT 1/8 STRAIGHT PIPE THREAD
83041 WASHER, .812"OD X .412"ID, FLAT
31005 FITTING, 90 ELBOW, 1/4 HOSE ID X 1/8 MPT
31117 LOCKNUT 1/4 STRAIGHT PIPE THREAD
31118 LOCKNUT 3/8 STRAIGHT PIPE THREAD
83044 WASHER, 1.125"OD X 0.750"ID, FLA
3332 BRACKET 2, ONE SHOT THERMOSTAT
3297 SINK, HEAT FOR 40A TRIAC
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
59008 TRIAC 40A, 600V
83011 WASHER, #6 SCREW SIZE, INTERNAL
84001 NUT, HEX, #6-32 MACHINE SCREW
31071 FITTING, 1/2 HOSE ID X 3/8" MPT
83042 WASHER, .875"OD X .562"ID, FLAT
31081 PLUG, HEX HEAD 1/4" MPT
31036 FITTING COMPR. MALE CONNECTOR 1/4 TUBE OD X 1/4 MPT
25098 FITTING, COMPRESSION MALE CONNECTOR
84007 NUT, 3/4-16 HEX JAM
31021 BUSHING, 3/4-16 X 1/4 NPSM, HEX HEAD
31027 FITTING, COMPR 90 MALE ELBOW, 3/8 TUBE OD X 1/4 MPT
13072 OUTLET, INSIDE TANK HOT WATER
31128 FITTING, 90 ELBOW, 3/8 HOSE ID X 1/4 MPT
31152 VALVE, COMPR 3/8 TUBE OD X 1/4 MPT
13055 TUBE, VALVE DRAIN , 3/8" OD X .035"TH X 1.5" LG
24002 O-RING, TANK COVER
102013 ASSEMBLY, TANK COVER
53064 THERMOSTAT, SINGLE SHOT,TRIAC
21
Figure 5 – Spray Housing Assembly, 120 VAC, Part # 102080
Spray Housing Assembly, 220 VAC, Part # 102158 (EXPORT ONLY)
ITEM #
QTY
4
PART # DESCRIPTION
1
2
82112 #8 X 3/4'' PAN HD. PHIL. T.S. 18-8 S.S. SCREW
57047 VALVE ASSY., DSV-11, 120 VAC
1
EXPORT
220V ONLY
2
3
4
5
6
1
1
1
1
1
57071 VALVE ASSY., DSV-11, 240 VAC
57073 VALVE REBUILD KIT, DSV11
102082 SPRAY HOUSING ASSY.
24054 O-RING 4.237” I.D., #156
102081 SPRAY PLATE ASSY., 4 7/8" DIA.
22
NOTE: The round and square brew baskets pictured below are not interchangeable. Use only the
type of brew basket that originally came with the brewer.
Figure 6 – Brew Basket Assembly, 13” X 5”, Part # 101171 (ROUND)
ITEM QTY PART # DESCRIPTION
1
2
3
4
1
2
1
1
9021 WIRE INSERT, 13 X 5
82118 HANDLE SCREW
23074 BREW BASKET HANDLE, BLACK
46011 WARNING LABEL
F002 PAPER FILTERS, 13” X 5”
500 PER CASE
NOT
SHOWN
COLOR BREW BASKET HANDLES
PART # DESCRIPTION
23169 BREW BASKET HANDLE, RED
23171 BREW BASKET HANDLE, GREEN
Figure 7 – Brew Basket Assembly, 13” X 5”, Part # 101175 (SQUARE)
ITEM QTY PART # DESCRIPTION
1
2
3
5
8
09022 WIRE INSERT, 13” X 5
23117 BREW BASKET HANDLE, BLACK
46011 WARNING LABEL
82096 HANDLE SCREW
1
1
1
1
57082 MAGNET
PAPER FILTERS, 13” X 5”
F002
NOT
SHOWN
500 PER CASE
COLOR BREW BASKET HANDLES
PART # DESCRIPTION
23106 BREW BASKET HANDLE, GREEN
23107 BREW BASKET HANDLE, ORANGE
23148 BREW BASKET HANDLE, RED
23
|