1. Introduction
This document describes modification steps to be performed on TA514-SAFETY training case to use it
with AC500 V3 non-safety CPU (e.g., PM5630-2ETH) instead of AC500 V2 non-safety CPU (e.g., PM573-
ETH).
AC500-S safety PLC module functions remain unchanged after modifications of TA514-SAFETY training
case. It means that the AC500-S safety PLC and related safety functions can be used with TA514-SAFETY
training case independently on the used non-safety CPU (AC500 V2 CPU or AC500 V3 CPU).
TA514-SAFETY. In addition, references [1] and [2] provide detailed TA514-SAFETY training case descrip-
tion and related AC500-S safety PLC functionality.
2. Modification instructions
2.1. Prerequisites
You will need the following AC500 products to be able to modify TA514-SAFETY training case for its us-
age with AC500 V3 non-safety CPU:
•
•
TB5620-2ETH terminal base, https://new.abb.com/products/1SAP112300R0278/tb5620-2eth
PM5630-2ETH CPU module, https://new.abb.com/products/1SAP131000R0278/pm5630-2eth
In addition, a slotted screwdriver may be needed to be able to move I/O modules along the DIN rail.
2.2. Modification steps
Make sure that TA514-SAFETY training case is not energized (refer to A in Figure 1, re-
move the external power supply connector from TA514-SAFETY) to prevent any electri-
cal shock. In addition, it is recommended to bring the power switch in the OFF state
DANGER
(refer to B in Figure 1).
The following modification steps shall be performed on TA514-SAFETY training case to work with
AC500 V3 non-safety CPU when it is de-energized (see DANGER note above):
1. Remove the power connector (refer to C in Figure 1) from TB521-ETH terminal base of PM573-ETH
CPU module and PROFINET cable (refer to D in Figure 1) from CM579-PNIO module.
DOCUMENT ID.
REV.
LANG.
DATE
PAGE
3ADR010771
A
en
2.7.2021
3/7
A
B
D
F
C
E
G
Figure 1: Front view of TA514-SAFETY training case
2. Remove CM579-PNIO and SM560-S modules from TB521-ETH.
3. Remove PM573-ETH from TB521-ETH.
4. Using the slotted screwdriver, unscrew the terminal block end stop (refer to E in Figure 1) and remove
it from the DIN rail.
5. Move carefully TB521-ETH along the DIN rail to the left to have no direct mechanical and electrical
contact from TB521-ETH with TU582-S of AI581-S. If needed, the slotted screwdriver can be used as a
supportive tool (refer to F in Figure 1 for an approximate location on where to apply the force using
the slotted screwdriver).
PAGE
REV.
LANG.
DATE
DOCUMENT ID.
4/7
A
en
2.7.2021
3ADR010771
6. Remove TB521-ETH from the DIN rail.
7. Put TB5620-2ETH on the DIN rail position of TB521-ETH and shift it to the right to have the mechani-
cal and electrical contact with TU582-S of AI581-S (refer to F in Figure 1).
8. Put previously removed terminal block end stop (refer to E in Figure 1) back to the DIN rail and screw
it tight to the DIN rail using the slotted screwdriver.
9. Put PM5630-2ETH CPU module on TB5620-2ETH.
10. Put SM560-S safety CPU module in the slot next to PM5630-2ETH on TB5620-2ETH and then CM579-
PNIO module in the slot next to SM560-S on TB5620-2ETH.
DOCUMENT ID.
REV.
LANG.
DATE
PAGE
3ADR010771
A
en
2.7.2021
5/7
11. Connect the power connector to TB5620-2ETH below PM5630-2ETH (refer to C in Figure 1) and con-
nect the PROFINET cable back to CM579-PNIO (refer to D in Figure 1).
12. Connect the energized external power supply cable (refer to A in Figure 1) and put the power switch
to ON state (refer to B in Figure 1) to switch on the TA514-SAFETY training case with the new
PM5630-2ETH V3 CPU on it. TA514-SAFETY modification is complete now.
You can now connect your own ETH cable to the ETH connector (refer to G in Figure 1) on TB5620-2ETH
of PM5630-2ETH CPU module and access PM5630-2ETH from your engineering PC with Automation
Builder suite according to AC500 V3 non-safety CPU instructions [3], e.g., to update PM5630-2ETH firm-
ware, if needed, and download the Automation Builder project of TA514-SAFETY (refer to
www.abb.com/plc for the latest TA514-SAFETY Automation Builder project with AC500 V3 non-safety
CPU) to it and the safety CPU.
For more details on assembly and disassembly of AC500 modules, refer to [4].
3. References
[4.] Installation instructions for AC500 modules, https://search.abb.com/library/Download.aspx?Docu-
PAGE
REV.
LANG.
DATE
DOCUMENT ID.
6/7
A
en
2.7.2021
3ADR010771
__
__
ABB Automation Products GmbH We reserve the right to make technical
We reserve all rights in this document and
in the subject matter and illustrations con-
tained therein. Any reproduction, disclo-
sure to third parties or utilization of its
contents – in whole or in parts – is forbid-
den without prior written consent of ABB
AG.
Eppelheimer Straße 82
69123 Heidelberg, Germany
Phone: +49 62 21 701 1444 Fax :
+49 62 21 701 1382
changes or modify the contents of this docu-
ment without prior notice. With regard to
purchase orders, the agreed particulars shall
prevail. ABB AG does not accept any respon-
sibility whatsoever for potential errors or
possible lack of information in this docu-
ment.
Mail: [email protected]
Copyright© 2021 ABB. All rights reserved
|