GEH3417 INSTALLATION INSTRUCTIONS FOR RIGHT POLE MOUNTING ONLY  
Molded Case Circuit Breakers  
Under voltage Release for Type: TED  
DESCRIPTION  
This device is used for automatic breaker  
tripping when line voltage drops below a pre  
determined level.  
CAUTION: Before inspecting or beginning any  
maintenance work on the breaker, it must be  
dis-connected from all voltage sources, both  
power and control, and breaker must be off  
(open).  
STEP 1  
BREAKER PREPARATION-FOR FIELD  
INSTALLATION.  
NOTES: 1. Any work requiring cover removal of a  
sealed breaker voids UL listing. The UL label  
must be destroyed.  
2. UVR cannot be installed in breakers code  
dated with this number or lower: 101  
Open breaker contacts by moving handle to the  
breaker "OFF" position.  
ELECTRICAL DATA  
MA Current  
Cat. No.  
(Right Pole  
Only)  
Rated  
Voltage  
Dc  
Ac  
. . .  
18  
120V Ac  
240V Ac  
380V Ac  
480V Ac  
600V Ac  
12V Dc  
TEDUV1 s  
. . .  
. . .  
. . .  
. . .  
18  
18  
TEDUV2*  
TEDUV3*  
TEDUV4*  
TEDUV6*  
S
S
S
S
18  
18  
. . .  
TEDUV7 s  
200  
100  
50  
18  
18  
. . .  
. . .  
. . .  
24V Dc  
TEDUV8 s  
48V Dc  
125V Dc  
250V Dc  
TEDUV9 s  
TEDUV10 S  
TEDUV11* S  
. . .  
TEDUV-S  
Side Wired  
* Kit includes special externally mounted resistor.  
Figure 1.  
ALL RATINGS CONSUME 2.2 WATTS EXCLUSIVE OF  
RESISTOR  
3
STEP4  
REPLACING BARRIER  
Remove barrier between right pole and  
mechanism pole, and replace with barrier  
supplied with kit. Locate projection of new  
barrier toward load end of breaker. (See Figure  
6.)  
MOVE HANDLE TOWARDS LINE END  
BARRIER PROTECTION  
LOAD END  
LOCATING TAB  
TAB POSITIONING  
HOLE  
Figure 7.  
INSTALL  
BARRIER  
Figure 6.  
STEP5  
INSTALLATION  
Figure 8.  
Move the handle toward the line end of the  
breaker to facilitate assembly. Be sure locating  
tab is plugged into positioning hole in base. (See  
Figure 7.)  
The pre-positioned coil leads should be close to  
the current location to fit the notch in the cover.  
Be absolutely sure to reinstall in their proper  
location barriers or other parts accidentally  
removed from the breaker. Reinstall plastic  
breaker handle (white line towards breaker load  
end).  
Install breaker cover making sure no wires are  
pinched in the process. Install cover mounting  
screws and apply label to breaker side.  
Note that on TB1 breakers the second barrier  
shown in Figures 8 and 9 must be installed.  
4
CAUTION: BUTTON WILL  
POP OUT WHEN TRIP  
BAR IS DISTURBED  
LOCATING TAB  
(INSERTED  
IN HOLE)  
TRIP BAR  
Figure 9.  
STEP 6  
PERFORMANCE  
CHECK  
Move breaker handle to "OFF" position to reset  
breaker.  
With coil deenergized, move breaker handle  
towards "ON" position. Breaker should trip and  
handle should come to rest in the tripped position  
when released.  
1.  
2.  
Apply 80% of rated voltage to coil (use dropping  
resistor if required). Repeat Step 1, then move  
handle to "ON" position. Breaker should turn "ON"  
and stay "ON".  
Reduce coil voltage. Device should trip breaker  
between 35% and 70% of rated voltage.  
3.  
4.  
These instructions do not purport to cover all details or variations in equipment nor to provide for every  
possible contingency to be met in connection with installation operation or maintenance. Should further  
information be desired or should particular problems arise which are not covered sufficiently for the  
purchaser's purposes, the matter should be referred to the ABB Company.  
ABB Inc.  
305 Gregson Drive  
Cary, NC 27511.  
electrification.us.abb.com  
We reserve all rights in this document and  
in the subject matter and illustrations  
contained therein. Any reproduction or  
utilization of its contents – in whole or in  
parts – is forbidden without prior written  
consent of ABB Inc.  
GE is a trademark of GE. Manufactured  
by ABB Inc. under license from GE.  
We reserve the right to make technical  
changes or modify the contents of this  
document without prior notice. With  
regard to purchase orders, the agreed  
particulars shall prevail. ABB Inc. does not  
accept any responsibility whatsoever for  
potential errors or possible lack of  
information in this document.  
Copyright© 2019 ABB  
All rights reserved  

Miele CVA 4070 EN CA User Manual
LG Electronics CU500 User Manual
LaCie 14C User Manual
Jura Capresso 95 User Manual
Fujitsu HARD DISK DRIVES MAW3300FC User Manual
Emotiva ERC 1 User Manual
Dell Computer Drive IDRAC6 35 User Manual
Cuisinart DGB 500 User Manual
Compaq 517212 001 User Manual
Casio PQ 32 User Manual