®
ENGINEERING, LLC
1650 PACIFIC AVENUE • CHANNEL ISLANDS, CA 93033-9901 • (805) 247-0226
P/N: 4FD020-010
©2001 Vortech Engineering, LLC
All Rights Reserved, Intl. Copr. Secured
31JUL01 V1.1(Explorer/Ranger(4FD V1.1))
Table Of Contents
FOREWORD ...................................................................................................................... ii
TABLE OF CONTENTS ..................................................................................................... iii
TOOL & SUPPLY REQUIREMENTS.................................................................................. iv
NOTICE .............................................................................................................................. v
PARTS LIST ....................................................................................................................... vi
1.
PREPARATION/COMPONENT REMOVAL............................................................ 1
OIL FEED LINE INSTALLATION ............................................................................ 1
OIL DRAIN FITTING............................................................................................... 2
MOUNTING BRACKET INSTALLATION ................................................................ 4
FMU INSTALLATION.............................................................................................. 5
FUEL PUMP ........................................................................................................... 6
SUPERCHARGER INSTALLATION ....................................................................... 7
SUPERCHARGER DRIVE BELT ........................................................................... 7
AIR INLET DUCT ................................................................................................... 8
SUPERCHARGER DISCHARGE DUCT ................................................................ 9
FINAL REASSEMBLY & CHECK ........................................................................... 11
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
P/N: 4FD020-010
©2001 Vortech Engineering, LLC
All Rights Reserved, Intl. Copr. Secured
31JUL01 V1.1(Explorer/Ranger(4FD V1.1))
iii
4.0L EFXOPRLDO1R99E1R-1/9R9A4 NGER
Installation Instructions
Also applicable for the 1990-94 Mazda Navajo and 1994 Mazda B4000
50 State Smog Legal, as per CARB EO #D-213-17
Congratulations on selecting the best performing and best backed automotive
supercharger available today... the VORTECH® V-2® Supercharger!
NOTE: This supercharger kit is designed to fit on Ford Explorer/Mazda Navajo vehicles. This kit, with the
addition of the Ranger Supplement assembly part number 4FD248-050, may be installed on 1990-1994 Ford
Ranger and 1994 Mazda B4000 vehicles.
Before beginning this installation, please read through this entire instruction booklet and the Street
Supercharger System Owner's Manual which includes the Limited Warranty Program and the Warranty
Registration form and return envelope.
Vortechsuperchargersystemsareperformanceimprovingdevices. Inmostcases, increasesintorqueof30-35%
and horsepower of 35-45% can be expected with the boost levels specified by Vortech Engineering. This product
is intended for use on healthy, well maintained engines. Installation on a worn-out or damaged engine is not
recommended and may result in failure of the engine as well as the supercharger.
Vortech Engineering is not responsible for engine damage.
Installation on new vehicles will not harm or adversely affect the break-in period so long as factory break-in
procedures are followed.
For best performance and continued durability, please take note of the following key points:
1. Use only premium grade fuel 92 octane or higher (R+M/2).
2. The engine must have stock compression ratio.
3. If the engine has been modified in any way, check with Vortech prior to using this product.
4. Always listen for any sign of detonation (pinging) and discontinue hard use (no boost) until problem is
resolved.
5. Perform an oil and filter change upon completion of this installation and prior to test driving your vehicle.
Thereafter, always use a high grade SF rated engine oil or a high quality synthetic, and change the oil and
filter every 3,000 miles or less. Never attempt to extend the oil change interval beyond 3,000 miles,
regardless of oil manufacturer's claims, as potential damage to the supercharger may result.
6. Before beginning installation, replace all spark plugs that are older than 1 year or 10,000 miles with original
heat range plugs as specified by the manufacturer and reset timing to factory specifications (follow the
procedures indicated within the factory repair manual and/or as indicated on the factory underhood
emissions tag). Do not use platinum spark plugs unless they are original equipment. Change spark
plugs every 15,000 miles and spark plug wires every 50,000 miles or earlier.
TOOL & SUPPLY REQUIREMENTS
• Ford style Snap Lock fuel disconnect tool
• Factory Repair Manual
• 3/8" socket and drive set: SAE & metric
• Flat #2 screwdriver
• Phillips #2 screwdriver
• Large screwdriver or pry bar
• Adjustable wrench
• 3/32" drill bit
• Drill motor
• Center punch
• 11/16" Greenlee™ Punch
• Silicone sealer
• Open end wrenches:
3/8", 7/16", 9/16", 5/8", 3/4", 7/8
Note: If your vehicle has in excess of 10,000 miles since its last spark plug change, then you may need:
• Spark plug socket
• 6 new OE heat range spark plugs
P/N: 4FD020-010
©2001 Vortech Engineering, LLC
All Rights Reserved, Intl. Copr. Secured
31JUL01 V1.1(Explorer/Ranger(4FD V1.1))
iv
NOTICE
This product is protected by state common law, copyright and/or patent. All legal
rights therein are reserved. The design, layout, dimensions, geometry, and
engineering features shown in this product are the exclusive property of Vortech
Engineering, LLC. This product may not be copied or duplicated in whole or part,
abstractly or fundamentally, intentionally or fortuitously, nor shall any design,
dimension, or other information be incorporated into any product or apparatus
without prior written consent of Vortech Engineering, LLC.
P/N: 4FD020-010
©2001 Vortech Engineering, LLC
All Rights Reserved, Intl. Copr. Secured
31JUL01 V1.1(Explorer/Ranger(4FD V1.1))
v
1991-1994 EXPLORER/RANGER
Part No. 4FD218-050SQ
®
ENGINEERING, LLC
PARTS LIST
IMPORTANT: Before beginning installation, verify that all parts are included in the kit. Report any short-
ages or damaged parts immediately.
Part Number
2E228-020
Description
Quantity
1
Part Number
Description
Quantity
V-2 SUPERCHARGER ASSEMBLY
4FD130-026
7U030-016
7P125-103
7P250-066
7P525-067
7P250-082
7P250-034
OIL FEED ASSEMBLY
1/4" oil feed x 23"
-4 x 45° 1/8" NPT male elbow
#4 swivel x 1/4" hoses, barb fit
.500 crimp ferrules
1
1
1
2
2
1
1
4FD111-021 MOUNTING BRACKET ASSEMBLY
1
1
1
1
1
2
4
5
9
3
4
1
4
1
3
13
1
4FD011-021
4FD110-043
4FD010-063
4FD015-136
7U250-020
7A375-124
7A375-100
7A375-075
7F375-016
7L312-000
7A375-325
7C080-050
7C010-035
7L375-075
7K375-040
4FD010-034
Mounting bracket
Welded bracket assembly
Bracket C
1/4" NPT x -4 90° fitting
1/4" NPT x 1/4" NPT straight tee
Support brace
11mm dowels
3/8-16 x 1-1/4" bolts
3/8-16 x 1" bolts
3/8-16 x 3/4" bolts
3/8-16 nuts
5/16 - split (lock) washers
3/8-16 x 3-1/4" bolts
8mm x 1.5 x 150 bolts
M10-1.5 x 35mm bolt
3/8" lock washers
3/8" AN flat washers
Mounting plate
4FD130-036
7P375-042
7P500-020
7P500-002
7P375-017
7P375-045
7P100-121
7R001-008
7U030-036
OIL DRAIN ASSEMBLY
Male connector, inverted flair
Tube nut, inverted flair
1/2" x 8" aluminum tube
3/8" NPT x 1/2" straight hose barb
3/8" NPT 45° street elbow
Sealing nut
1
1
1
1
1
1
1
2
1
#8 stainless hose clamps
1/2" x 5" oil drain hose
4FD238-068 FUEL MANAGEMENT UNIT (WITH LINES) 1
4FD112-010
4FD012-010
4FD012-020
4FD012-030
7R005-001
7S300-000
7R002-052
7S300-300
7S300-200
4FD050-010
4FD015-020
4FD015-010
7F250-040
7A250-175
7R002-048
7C060-010
7F006-093
7C080-023
7R002-044
7S275-200
4FD012-040
4FD012-050
4FD012-060
7S250-200
7R002-040
AIR PASSAGE ASSEMBLY
Inlet duct A
Intake tube A
Intake tube B
208-91 3.75" T-bone clamp
3" 90° rubber elbow
#52 hose clamps
1
1
1
1
1
1
2
1
2
1
1
1
2
2
6
1
1
1
4
2
1
1
1
3
6
6Z110-111
4FD145-156
4FD146-166
7U030-046
7U100-055
7E010-046
12:1 black fuel management unit
Fuel line assembly, male
Fuel line assembly, female
5/32" x 32" vacuum line
6" nylon tie wraps
1
1
1
1
7
2
#8 x 3/4" sheet metal screws
3" x 3" sleeve
3" x 2" sleeves
Air plenum
4FD113-010
7U400-001
7P250-126
7P250-125
7U030-030
CHECK VALVE ASSEMBLY
One-way valve
1
1
1
1
1
Dual pipe bracket, adjustable
Dual pipe bracket, fixed
1/4-20 nut plates, clip on
1/4-20 x 1-3/4" bolts
#48 hose clamps
6mm x 1.0 x 16 flat allen
6mm nylock nut
1/4" restrictor
1/4" tee
1/4" x 12" vacuum line
4FD101-002
8F001-002
7R003-024
7R001-004
7P500-014
7P312-003
7U100-055
5W001-011
5W001-010
5W001-002
5W018-021
7J010-001
7F010-032
5W018-036
7U031-018
7U030-010
7C011-075
FUEL PUMP ASSEMBLY
155 inline fuel pump
1-1/2" adel clamp
1
1
1
5
1
1
8
1
3
1
1
2
1
1
1
1
1
8mm x 1.25 x 20 flat allen
#44 hose clamps
#4 hose clamps
Ford fuel fitting adapter
5/16" female fuel connector
6" nylon tie wraps
16-14GA eyelet
16-14GA female slides, insulated
Fuse tap
2-3/4" x 2" sleeves
Discharge tube A
Discharge tube B
Discharge tube C
2-1/2" x 2" sleeves
#40 stainless hose clamps
18GA standard black wire
#10 flat washers
2A046-103
BELT
1
10-32 nylock nut
18GA standard red wire
5/16" x 20" fuel hose
12mm x 20" fuel hose
10/32" x 3/4" bolt
P/N: 4FD020-010
©2001 Vortech Engineering, LLC
All Rights Reserved, Intl. Copr. Secured
31JUL01 V1.1(Explorer/Ranger(4FD V1.1))
vi
1.
PREPARATION/COMPONENT REMOVAL
A. Disconnect the battery.
B. Remove the air intake duct and valve cover
breather hose.
C. Remove the accessory drive belt.
D. Rotate the vacuum reservoir located on top of
the air conditioning condenser 180° (see Fig.
1-a), rerouting the vacuum line attached to the
mounting tab.
E. Removetheairconditioningcompressor,butdo
not break open any lines. Disconnect the air
conditioning line bracket located in front of the
water pump. Remove the air conditioning clutch
electrical connector. Temporarily secure the
compressor on top of the radiator shroud to
provide work area.
Fig. 1-a
2. OIL FEED LINE INSTALLATION
A. Remove the oil pressure sender (located near
the power steering pump).
B. Thread the 1/4" NPT street TEE into the oil
pressuresenderextensionintheblock.Position
the tee so that the branch portion faces forward.
C. Thread the 1/4" NPT x #4 flare 90° fitting into the
upper branch so that the flare end points up
toward the brake master cylinder.
D. Thread the original pressure sender into the
center branch and reconnect sender wire.
THREAD INTO OIL
SENDING UNIT
FITTING LOCATED
IN BLOCK NEAR
POWER STEERING
PUMP
NOTE: Keep all oil fittings and hoses abso-
lutely clean. Use Teflon paste SPAR-
INGLY ON THE MALE PIPE
THREADS ONLY. NEVER use Teflon
tape. Apply ONLY MOTOR OIL TO
FLARE FITTINGS. NEVER OVER-
TIGHTEN FITTINGS.
Fig. 2-a
E. Install the Vortech supplied oil line onto the flare
fitting. Cover the loose end with a plastic bag for
later assembly.
P/N: 4FD020-010
©2001 Vortech Engineering, LLC
All Rights Reserved, Intl. Copr. Secured
31JUL01 V1.1(Explorer/Ranger(4FD V1.1))
1
3. OIL DRAIN FITTING
A. Remove the two vacuum lines on the EGR
reference module and mark their position for
reinstallation. Remove module and bracket.
B. Remove EGR reference module from mount.
Bend the mount down lengthwise so that the
module will run perpendicular to the ground to
accommodate the discharge tube. (See Fig.
3-a.)
C. Remove the EGR tube coming from the ex-
haust. Disconnect the EGR guard, vacuum line
andelectricalconnector.RemovetheEGRvalve
and assembly and set aside for reinstallation
later. Remove the guard/bracket. Cut off and
discard the upper portion of the bracket in the
area shown in Fig 3-b.
Fig. 3-a
DISCARD THIS
PORTION
CUT HERE
D. Remove the breather line connecting the intake
to the vapor canister (located on the left fender
apron) for clearance. Remove three left side
spark plug wires from the spark plugs and the
PCV valve and line for access to the left valve
cover.
E. Remove the EGR tube from the exhaust mani-
fold.
F. Remove the left valve cover using care to save
the gasket.
G. An 11/16" hole must be punched or drilled.
Measure and mark the hole location following
the graphic on the next page.
H. Make an 11/16" diameter hole at the mark using
a drill or chassis punch. Deburr the hole com-
pletely. Thoroughly clean the valve cover. (See
Fig. 3-c.)
Fig. 3-b
I. Installthe1/2"hosefittingintothe3/8"NPTx45°
elbow and tighten.
J. Insert the elbow fitting through the hole in the
valve cover so the barb points forward and
slightly up from horizontal. Secure with the
sealing nut provided in the kit. Make sure to
place the sealing side of the nut against the
valve cover surface.
11/16" HOLE
K. Reinstall the valve cover. (See Fig. 3-d.)
Fig. 3-c
L. Install the 1/2" oil drain hose piece and #8
clamps to drain fitting on valve cover.
M. Reinstall the PCV valve and spark plug wires.
Check and reposition any existing lines around
the area.
OIL DRAIN FITTING
Fig. 3-d
P/N: 4FD020-010
©2001 Vortech Engineering, LLC
All Rights Reserved, Intl. Copr. Secured
31JUL01 V1.1(Explorer/Ranger(4FD V1.1))
2
3. OIL DRAIN GRAPHIC
Fig. 3-e
P/N: 4FD020-010
©2001 Vortech Engineering, LLC
All Rights Reserved, Intl. Copr. Secured
31JUL01 V1.1(Explorer/Ranger(4FD V1.1))
3
4. MOUNTING BRACKET INSTALLATION
A. With the air conditioning compressor tempo-
rarily moved off to one side, install the two
Vortech supplied 11mm dowel sleeves into the
air conditioning compressor mount. (See Fig.
4-a.)
B. Position the spacer and bracket on the air con-
ditioning compressor mount as shown. (See
Fig. 4-b.)
11mm
DOWELS
C. Remove the factory dowel sleeves from the
bottom of the air conditioning compressor and
setaside.Installthecompressorontopoftheair
conditioning mount and brackets.
Fig. 4-a
D. InstallthefactorydowelsleevesintotheVortech
aluminumadapterbracketandinstallthebracket
on top of the air conditioning compressor. Insert
the four supplied 8mm x 150mm bolts and AN
washers. Start all bolts before tightening in a
crisscross sequence. Make sure all dowels and
brackets are aligned properly. (See Fig. 4-c.)
SPACER
BRACKET
E. Using the supplied tie wraps, resecure the left
side air conditioning line to prevent contact with
the power steering pump or brake lines.
FORWARD
F. Install the supercharger mounting plate using
four3/8-16x1"bolts,fourANwashers,two3/8"-
16 nuts and two 3/8" lock washers.
G. Reroute and install air conditioning clutch wiring
connector. (See Fig. 4-d.)
11mm
DOWELS
NOTE: If your vehicle has gone over 10,000
miles since its last spark plug change,
you will need to change the spark plugs
now before test driving the vehicle.
Fig. 4-b
Fig. 4-c
Fig. 4-d
P/N: 4FD020-010
©2001 Vortech Engineering, LLC
All Rights Reserved, Intl. Copr. Secured
31JUL01 V1.1(Explorer/Ranger(4FD V1.1))
4
5.
FMU INSTALLATION
CONNECT TO MANIFOLD
VACUUM/PRESSURE
A. Locate the return fuel line spring lock connector
(left side frame below master cylinder). Sepa-
rate the return line with a spring lock disconnect
tool. Snap the Vortech fuel line with the male
spring lock connector into the fuel rail outlet.
Attach the other end to the Vortech fuel man-
agement unit inlet.
B. Snapthesecondlinewiththefemalespringlock
connectorontothefuelreturnlinethatreturnsto
the tank (see Fig. 5-a.) Connect the other end to
the FMU outlet at the center fitting. (See Fig.
5-b.)
INLET
(FUEL LINE
FROM
STOCK
OUTLET
(FUEL FROM
HERE
RETURNS
TO TANK)
REGULATOR)
Fig. 5-a
EXPLORER/MAZDA NAVAJO FMU:
1. Remove windshield washer fluid/cool-
ant overflow reservoir by removing the
twomountingboltsontheleftsidefender
apron, disconnecting the fluid lines and
wiring connection.
FUEL
MANAGEMENT
UNIT (FMU)
2. Mount the FMU behind the gas vapor
canister bracket on the driver's side
(FMU lines should be attached to the
unit before it is mounted) using the
sheet metal screws supplied in the kit.
ENGINE
3. Connectthe5/32"vacuumlinefromthe
FMU to the intake manifold vacuum
tree (located at the top rear of the upper
intake manifold) and secure. (See Fig.
5-c.)
VORTECH
FUEL PUMP
FILTER
FUEL
PUMP
RANGER/MAZDA B4000 FMU:
FUEL TANK
1. Mount the FMU on the left side fender
apron,forwardofthestarterrelay(FMU
lines should be attached to the unit
before it is mounted), using the sheet
metal screws supplied in the kit.
Fig. 5-b
2. Connectthe5/32"vacuumlinefromthe
FMU to the intake manifold vacuum
tree (located at the top rear of the upper
intake manifold) and secure. (See Fig.
5-c.)
VACUUM
TREE
MANIFOLD
NOTE: Make sure you have routed all fuel
lines away from all moving parts,
sharp edges, exhaust pipes and
manifolds. Secure the fuel lines
with the tie wraps provided.
TOP VIEW
Fig. 5-c
P/N: 4FD020-010
©2001 Vortech Engineering, LLC
All Rights Reserved, Intl. Copr. Secured
31JUL01 V1.1(Explorer/Ranger(4FD V1.1))
5
6. FUEL PUMP
A. Release any pressure from the fuel tank by
momentarily loosening the filler cap.
B. Disconnect the line to the fuel filter by carefully
removing the white retaining tab. Attach the line
to the adapter fitting as shown.
C. Mount the fuel pump on the frame near the filter
using the supplied #10 nut and bolt.
D. Connect the fuel pump inlet to the adapter with
the 3/8" hose provided.
E. Connect the fuel pump outlet to the filter inlet
with the 5/16" hose. Use the supplied Ford fuel
connector and hose clamp.
NOTE: Make sure that the hoses are routed
smoothly with no kinks or sharp bends
and away from sharp objects.
F. Attach the negative pump terminal to a clean
ground fastener with the wire provided.
G. Connect positive terminal on fuel pump to fuse
box (30 amp A/C works well).
H. Secure the fuel pump and hose with the clamps
provided.
I. After installation is complete, start engine and
check system for leakage.
VORTECH FUEL PUMP
GROUND (-)
3/8" FUEL LINE
FUSE BOX (+)
5/16" HOSE
STOCK
FUEL FILTER
TO
RAIL
EXISTING FEED LINE
FROM TANK
ADAPTER FITTING
Fig. 6-a
P/N: 4FD020-010
©2001 Vortech Engineering, LLC
All Rights Reserved, Intl. Copr. Secured
31JUL01 V1.1(Explorer/Ranger(4FD V1.1))
6
7. SUPERCHARGER INSTALLATION
A. Reinstall the EGR valve by connecting the ex-
haustmanifoldtubefirst, thenthevalve. Tighten
all the fittings, EGR bolts and connect all the
vacuum lines.
B. Reinstall the modified EGR guard. Reconnect
all wires and vacuum lines.
C. Mount the modified EGR reference module.
Reconnect all wires and hoses.
D. Mount the supercharger mounting brace from
the back of the mounting plate to the cylinder
headusingthesupplied10mmx1.5bolt, 3/8-16
x 3-1/4" bolt, 3/8 x 16 nut and 3/8" lock washers.
(See Fig. 7-a.)
E. Align the drain tube according to Fig. 7-b.)
F. Mount the supercharger by guiding the drain
tube into the 1/2" drain hose on the valve cover.
Secure the drain hose with the hose clamp.
Fasten the supercharger to the mounting plate
with the five 3/8-16 x 3/4" bolts and AN type
washers provided.
G. Install the 45° flare to the 1/8" pipe fitting into the
oil feed on the supercharger and "clock" it to the
4 or 5 o'clock position.
H. Attach the oil feed line and secure away from all
moving parts and the exhaust manifold with tie
wraps.
Fig. 7-a
I. On Explorer/Navajo applications, reinstall the
washer/coolant tank and the necessary plumb-
ing and wiring connections.
Fig. 7-b
8. SUPERCHARGER DRIVE BELT
A. The new longer accessory drive belt is routed
the same as the original belt except for accom-
modation of the supercharger and idler pulleys.
B. Route the belt around the outside of the super-
charger drive pulley then around the inside of
the idler pulleys as shown in Fig. 8-a).
Fig. 8-a
P/N: 4FD020-010
©2001 Vortech Engineering, LLC
All Rights Reserved, Intl. Copr. Secured
31JUL01 V1.1(Explorer/Ranger(4FD V1.1))
7
9. AIR INLET DUCT
A. Rotate the vacuum tree located on the rear left
side of the intake manifold approximately 180°
to gain clearance for the intake/discharge ple-
num. (See Fig. 9-c.)
B. On automatic transmission equipped applica-
tions, the transmission vacuum line must be
removedfromthemanifold,reroutedandformed
to run along the firewall for plenum clearance.
The rubber portion of the transmission vacuum
line must be cut and the Vortech supplied
restrictorandcheckvalveassemblysplicedinto
the two cut ends. (See Fig. 9-a.)
C. Remove the plastic throttle cable retaining clip
from the top of the intake manifold.
D. Attach the two 1/4-20 nut plates to each of the
suppliedsteelplenummountingtabs.Mountthe
plenum mounting tab assemblies to the upper
intake manifold. The thin, non-slotted tab is
mounted to the upper manifold boss that is
located near the idle-air motor using the sup-
plied 6mm flat head screw. At the top rear of the
upper intake manifold, install the thick, slotted
tabwiththe8mmflatheadscrew.(SeeFig.9-b.)
Fig. 9-c
8mm FLAT HEAD
REAR MOUNT
1/4-20 BOLT
E. Position the plenum bosses over the adjustable
tabs and secure with 1/4-20 bolts.
F. Mount the plastic intake duct to the super-
charger inlet with the 3-1/2" T-bolt clamp, leav-
ing the clamp loose.
SNAP-ON
NUT PLATE
G. Secure intake tube 'B' to the plenum and plastic
intake duct using 3" x 2" and 3" x 3" blue silicone
sleeves and #48 clamps as shown in Fig. 10-a
on the page 10.
6mm FLAT HEAD
H. Position intake tube 'A', 3" x 2" silicone sleeve
and #48 clamps onto the plenum. Mount the 3"
90° rubber elbow and #52 clamps into the mass
air flow housing and connect to the intake tube.
Connect the crankcase breather hose to the
barb on intake tube 'A'.
SNAP-ON
NUT PLATE
FRONT MOUNT
TO TRANSMISSION
MODULATOR
Fig. 9-b
1/4" TEE
TRANSMISSION
VACUUM LINE
RESTRICTOR
TO VACUUM
TREE
ONE WAY
VALVE
Fig. 9-a
P/N: 4FD020-010
©2001 Vortech Engineering, LLC
All Rights Reserved, Intl. Copr. Secured
31JUL01 V1.1(Explorer/Ranger(4FD V1.1))
8
10. SUPERCHARGER DISCHARGE DUCT
A. Slide a 2-3/4" x 2" sleeve and two #44 clamps
onto the supercharger discharge. Use a 2-1/2"
x 2" sleeve with #40 clamps on the discharge
plenum. Install discharge tube A. Refer to Fig.
10-a on page 10.
B. Mount discharge tubes B and C together using
a 2-1/2" x 2" sleeve and #40 clamps. Slide a 2-
3/4" sleeve onto the throttle body and a 2-1/2"
sleeve onto the discharge plenum. Attach the
discharge tube assembly to the plenum and
throttle body using #40 and #44 clamps.
C. Underhood lamp must be removed or relocated
to provide adequate clearance for the super-
charger.
NOTE: Position the intake and discharge tubes
as low as possible for hood clearance.
Due to factory variations, on some mod-
els modification to hood insulation may
be necessary.
P/N: 4FD020-010
©2001 Vortech Engineering, LLC
All Rights Reserved, Intl. Copr. Secured
31JUL01 V1.1(Explorer/Ranger(4FD V1.1))
9
10. SUPERCHARGER DISCHARGE DUCT
PLASTIC
INTAKE
DUCT
3" x 3"
SLEEVE
DISCHARGE
TUBE 'A'
INTAKE
TUBE 'B'
2-3/4" x 2"
SLEEVE
2-1/2" x 2"
SLEEVE
2-3/4" x 2"
SLEEVE
FRONT OF
VEHICLE
2-1/2" x 2"
SLEEVE
DISCHARGE
TUBE 'C'
2-1/2" x 2"
SLEEVE
INTAKE
TUBE 'A'
DISCHARGE
TUBE 'B'
VALVE COVER
BREATHER
HOSE BARB
RUBBER
ELBOW
MAF
SENSOR
Fig. 10-a
P/N: 4FD020-010
©2001 Vortech Engineering, LLC
All Rights Reserved, Intl. Copr. Secured
31JUL01 V1.1(Explorer/Ranger(4FD V1.1))
10
11. FINAL REASSEMBLY & CHECK
A. Reconnect the battery.
B. Check all fittings, nuts, bolts and clamps for
tightness. Pay particular attention to oil and fuel
lines around moving parts, sharp edges and
exhaust system parts. Make sure all wires and
lines are properly secured with clamps or tie
wraps.
C. Check all fluid levels, making sure that your
tank(s) is filled with 92 octane or higher fuel
before commencing test drive.
D. Start engine and allow to idle a few minutes,
then shut off.
E. Rechecktobesurethatnohoses,wires,etc.are
near exhaust headers or moving parts and for
signs of any fluid leakage. Check ignition timing
to make sure it is set to stock specifications
before commencing test drive.
F. PLEASE TAKE SPECIAL NOTE: Operating
the vehicle without all of the subassemblies
completely and properly installed may cause
FAILURE OF MAJOR ENGINE COMPO-
NENTS.
Fig. 11-a
WARNING: Do not attempt to operate the
vehicle until ALL components
are installed andALL operations
are completed including the fi-
nal check.
G. Test drive the vehicle.
H. Read the STREET SUPERCHARGER SYS-
TEM OWNER'S MANUAL AND WARRANTY
REGISTRATION FORM within thirty (30) days
of purchasing your supercharger system to
qualify.
P/N: 4FD020-010
©2001 Vortech Engineering, LLC
All Rights Reserved, Intl. Copr. Secured
31JUL01 V1.1(Explorer/Ranger(4FD V1.1))
11
®
ENGINEERING, LLC
1650 PACIFIC AVENUE • CHANNEL ISLANDS, CA 93033-9901 • (805) 247-0226
P/N: 4FD020-010
©2001 Vortech Engineering, LLC
All Rights Reserved, Intl. Copr. Secured
31JUL01 V1.1(Explorer/Ranger(4FD V1.1))
|