Spalding Fitness Equipment 21112201 User Manual

REQUIRED TOOLS  
AND MATERIALS:  
A DIVISION OF RUSSELL CORPORATION  
• 2 People  
Ground Sleeve Owners Manual  
for a 4” (10.2 cm) square pole  
• Carpenter’s Level  
• 15’ Tape Measure  
Customer Service Center  
• N53 W24700 South Corporate Circle • Sussex, WI 53089 • U.S.A.  
• Shovel & Post  
Hole Digger  
• Spade  
• Wood Board  
(scrap)  
• Tape  
• Sawhorse or  
Support Table  
• Wedge  
• Safety Glasses  
• Heavy-Duty Tape  
• Container to Mix  
• (2 each) Wrenches and/or  
Socket Wrenches and  
Sockets (Deep-Well Sockets  
are Recommended).  
9/16"  
AND/OR  
Write Model Number  
WARNING!  
From Box Here:  
READ AND UNDERSTAND  
OPERATOR'S MANUAL  
9/16"  
BEFORE USING THIS UNIT.  
FAILURE TO FOLLOW  
OPERATING INSTRUCTIONS  
COULD RESULT IN INJURY  
OR DAMAGE TO  
• Extension is Recommended  
OPTIONAL TOOLS  
AND MATERIALS:  
PROPERTY.  
Toll-Free Customer Service Number for U.S: 1-800-558-5234,  
For Canada: 1-800-284-8339,  
• Large and Small Adjustable  
Wrenches  
For Europe: 00 800 555 85234 (Sweden: 009 555 85234),  
For Australia: 1-800-632 7921  
1
11/05  
ID# 21112201  
Download from Www.Somanuals.com. All Manuals Search And Download.  
SAFETY INSTRUCTIONS  
FAILURE TO FOLLOW THESE SAFETY INSTRUCTIONS MAY RESULT IN  
SERIOUS INJURY, PROPERTY DAMAGE AND WILL VOID WARRANTY.  
Owner must ensure that all players know and follow these rules for safe  
operation of the system.  
To ensure safety, do not attempt to assemble this system without following  
the instructions carefully. Proper and complete assembly, use and  
supervision is essential for proper operation and to reduce the risk of  
accident or injury. A high probability of serious injury exists if this system is  
not installed, maintained, and operated properly. Check entire box and inside  
all packing material for parts and/or additional instructional material. Before  
beginning assembly, read the instructions and identify parts using the  
hardware identifier and parts list in this document.  
• If using a ladder during assembly, use extreme caution.  
• Two (2) people are recommended for this operation.  
• Seat the pole sections properly. Failure to do so could allow the pole  
sections to separate during play.  
• Before digging, contact utility company to locate underground power  
cables, gas, and water lines. Ensure there are no overhead power lines  
within 20 ft. (7 m) radius of pole location.  
• Climate, corrosion, excessive use, or misuse could result in system  
failure.  
• If technical assistance is required, contact Huffy Sports.  
• Minimum operational height is 6' 6" (1.98 m) to the bottom of backboard.  
• This equipment is intended for home recreational use only and NOT  
excessive competitive play.  
• Read and understand the warning labels.  
• The life of your basketball pole depends on many conditions. The climate,  
placement of the pole, the location of the pole, exposure to corrosives  
such as pesticides, herbicides, or salts are all important.  
• Adult supervision is recommended when adjusting height.  
• Serious injury could occur if teeth/face come in contact with backboard,  
net, or rim.  
Most injuries are caused by misuse and/or not following instructions.  
Use caution when using this system.  
3
11/05  
ID# 21112201  
Download from Www.Somanuals.com. All Manuals Search And Download.  
1.  
NOTE:  
TOP  
POLE(S) NOT INCLUDED.  
FOLLOW  
MANUFACTURERS  
INSTRUCTIONS  
ACCORDINGLY.  
BOTTOM  
POLE STYLE WILL VARY  
Ensure ground is level with playing surface, then dig pole hole.  
2.  
WARNING!  
IMPORTANT!  
Maximum distance from edge  
of hole to edge of playing  
surface: 6” (15.2 cm).  
GROUND  
SURFACE  
24" (61 cm)  
6" (15.2 cm)  
CONTACT UTILITIES  
BEFORE DIGGING.  
PLAYING  
SURFACE  
24" (61 cm)  
4
ID# 21112201 11/05  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Insert bottom pole section into  
ground sleeve (1).  
Assemble clamps (4) around bottom pole and ground  
sleeve (1) as shown.  
3.  
4.  
4
4
5
2
IMPORTANT!  
Clamp assembly MUST  
be positioned  
as shown below.  
1
3
1
4
Fill hole approximately 1/3 full with mixed  
concrete.  
5.  
5
11/05  
ID# 21112201  
Download from Www.Somanuals.com. All Manuals Search And Download.  
6.  
Insert ground sleeve assembly and center in hole (FIG. A).  
Note: Leave 1" below flange exposed for drainage hill.  
FIG. A  
IMPORTANT!  
FRONT OF POLE MUST  
BE PARALLEL WITH  
PLAYING SURFACE.  
PLA  
SURF  
YIN  
G
ACE  
PLAYING SURFACE  
SIDE VIEW  
IMPORTANT!  
NOTE POSITION OF  
GROUND SLEEVE  
PLAYING SURFACE  
1" (2.54 cm)  
IMPORTANT!: CONTINUE ON TO NEXT STEP.  
DO NOT WAIT FOR CONCRETE TO CURE.  
6
ID# 21112201 11/05  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Fill hole completely with concrete.  
7.  
1" (2.54 cm)  
IMPORTANT!: CONTINUE ON TO NEXT STEP.  
DO NOT WAIT FOR CONCRETE TO CURE.  
Tamp down concrete to release air pockets and build drainage hill. Level pole section in all directions  
several times while concrete is curing.  
8.  
DRAINAGE HILL  
1" (2.54 cm)  
FILL TO  
HERE  
1" (2.54 cm)  
PLAYING SURFACE  
SIDE VIEW  
IMPORTANT!: WAIT A MINIMUM OF 24 HOURS BEFORE GOING ON TO  
NEXT STEP. CONCRETE MUST CURE.  
7
11/05  
ID# 21112201  
Download from Www.Somanuals.com. All Manuals Search And Download.  
After concrete has cured, remove clamp assembly and lift bottom pole section from  
ground sleeve as shown.  
9.  
8
ID# 21112201 11/05  
Download from Www.Somanuals.com. All Manuals Search And Download.  
10.  
Bounce pole sections together until they no longer move  
toward taped reference mark.  
NOTE:  
POLE(S) NOT INCLUDED.  
FOLLOW MANUFACTURERS  
INSTRUCTIONS  
ACCORDINGLY.  
IMPORTANT!  
POLES SHOULD  
HAVE A  
4-1/2” (11.4 CM)  
MINIMUM OVERLAP.  
11.  
Insert pole cap onto bottom pole end. Mix concrete  
and fill pole.  
NOTE: Concrete must cure before going on to the  
next step.  
NOTE:  
FOLLOW MANUFACTURERS  
INSTRUCTIONS ON FILLING  
POLE ACCORDINGLY.  
IMPORTANT!  
FAILURE TO FILL YOUR POLE  
COMPLETELY WITH CONCRETE  
AS DESCRIBED IN THESE  
INSTRUCTIONS WILL VOID  
ALL WARRANTIES  
WRITTEN OR IMPLIED.  
9
11/05  
ID# 21112201  
Download from Www.Somanuals.com. All Manuals Search And Download.  
WARNING!  
TWO PEOPLE REQUIRED FOR THIS  
PROCEDURE. FAILURE TO FOLLOW  
THIS WARNING COULD RESULT IN  
SERIOUS INJURY AND/OR  
PROPERTY DAMAGE.  
Remove pole cap from bottom pole section and insert  
clamp cover (6) onto bottom section. Bend back  
exposed top flange sections of secured ground sleeve  
(1) as shown. Then insert pole into ground sleeve (1).  
12.  
13.  
Secure clamps (4) around pole section as shown.  
Refer to Step 4. Tighten completely.  
6
6
1
Lower clamp cover (6) over clamps and snap into  
proper position.  
14.  
6
WARNING!  
REMOVE BACKBOARD AND RIM  
BEFORE REMOVING POLE FROM  
GROUND SLEEVE. REQUIRES TWO  
PEOPLE TO REMOVE POLE.  
10  
ID# 21112201 11/05  
Download from Www.Somanuals.com. All Manuals Search And Download.  

Sharp Printer AR M450 User Manual
Sony DVD Recorder RDR VX515 User Manual
Sony Ericsson Cell Phone Z320 User Manual
Sony Laptop VPCS12 Series User Manual
Sony Speaker System SAVA D900 User Manual
Speco Technologies Security Camera VL 565PIR User Manual
Spin Master Cassette Player 09002 User Manual
Stiga Lawn Mower VE32 User Manual
Stovax Stove Huntingdon 30 User Manual
Sylvania Flat Panel Television LD320SS2 User Manual