RETURN TO MAIN MENU
IM568
SAM400 & 650 PERKINS DIESEL ENGINE DRIVEN
April, 1997
MULTI-PROCESS DC ARC WELDING POWER SOURCES
For use with SAM400 machines having Code Numbers: 10140 & 10141
For use with SAM650 machines having Code Number: 10333
Supersedes IM247-D
Safety Depends on You
Lincoln arc welding and cutting
equipment is designed and built with
safety in mind. However, your overall
safety can be increased by proper
installation ... and thoughtful opera-
tion on your part. DO NOT
INSTALL, OPERATE OR REPAIR
THIS EQUIPMENT WITHOUT
READING THIS MANUAL AND
THE SAFETY PRECAUTIONS
CONTAINED
THROUGHOUT.
And, most importantly, think before
you act and be careful.
OPERATOR’S MANUAL
World's Leader in Welding and Cutting Products
Premier Manufacturer of Industrial Motors
Sales and Service through Subsidiaries and Distributors Worldwide
22801 St. Clair Ave. Cleveland, Ohio 44117-1199 U.S.A. Tel. (216) 481-8100
Download from Www.Somanuals.com. All Manuals Search And Download.
ii
ii
SAFETY
ARC RAYS can burn.
ELECTRIC SHOCK can kill.
3.a. The electrode and work (or ground) circuits
are electrically “hot” when the welder is on.
Do not touch these “hot” parts with your bare
skin or wet clothing. Wear dry, hole-free
gloves to insulate hands.
4.a. Use a shield with the proper filter and cover
plates to protect your eyes from sparks and
the rays of the arc when welding or observing
open arc welding. Headshield and filter lens
should conform to ANSI Z87. I standards.
4.b. Use suitable clothing made from durable flame-resistant
material to protect your skin and that of your helpers from
the arc rays.
3.b. Insulate yourself from work and ground using dry insulation.
Make certain the insulation is large enough to cover your full
area of physical contact with work and ground.
4.c. Protect other nearby personnel with suitable, non-flammable
screening and/or warn them not to watch the arc nor expose
themselves to the arc rays or to hot spatter or metal.
In addition to the normal safety precautions, if welding
must be performed under electrically hazardous
conditions (in damp locations or while wearing wet
clothing; on metal structures such as floors, gratings or
scaffolds; when in cramped positions such as sitting,
kneeling or lying, if there is a high risk of unavoidable or
accidental contact with the workpiece or ground) use
the following equipment:
FUMES AND GASES
can be dangerous.
5.a. Welding may produce fumes and gases
hazardous to health. Avoid breathing these
• Semiautomatic DC Constant Voltage (Wire) Welder.
• DC Manual (Stick) Welder.
• AC Welder with Reduced Voltage Control.
fumes and gases.When welding, keep
your head out of the fume. Use enough
ventilation and/or exhaust at the arc to keep
3.c. In semiautomatic or automatic wire welding, the electrode,
electrode reel, welding head, nozzle or semiautomatic
welding gun are also electrically “hot”.
fumes and gases away from the breathing zone. When
welding with electrodes which require special
ventilation such as stainless or hard facing (see
instructions on container or MSDS) or on lead or
cadmium plated steel and other metals or coatings
which produce highly toxic fumes, keep exposure as
low as possible and below Threshold Limit Values (TLV)
using local exhaust or mechanical ventilation. In
confined spaces or in some circumstances, outdoors, a
respirator may be required. Additional precautions are
also required when welding on galvanized steel.
3.d. Always be sure the work cable makes a good electrical
connection with the metal being welded. The connection
should be as close as possible to the area being welded.
3.e. Ground the work or metal to be welded to a good electrical
(earth) ground.
3.f. Maintain the electrode holder, work clamp, welding cable and
welding machine in good, safe operating condition. Replace
damaged insulation.
5.b. Do not weld in locations near chlorinated hydrocarbon vapors
coming from degreasing, cleaning or spraying operations.
The heat and rays of the arc can react with solvent vapors to
form phosgene, a highly toxic gas, and other irritating
products.
3.g. Never dip the electrode in water for cooling.
3.h. Never simultaneously touch electrically “hot” parts of
electrode holders connected to two welders because voltage
between the two can be the total of the open circuit voltage
of both welders.
5.c. Shielding gases used for arc welding can displace air and
cause injury or death. Always use enough ventilation,
especially in confined areas, to insure breathing air is safe.
3.i. When working above floor level, use a safety belt to protect
yourself from a fall should you get a shock.
5.d. Read and understand the manufacturer’s instructions for this
equipment and the consumables to be used, including the
material safety data sheet (MSDS) and follow your
employer’s safety practices. MSDS forms are available from
your welding distributor or from the manufacturer.
3.j. Also see Items 6.c. and 8.
5.e. Also see item 1.b.
Mar ‘95
SAM400 & 650
Download from Www.Somanuals.com. All Manuals Search And Download.
iii
iii
SAFETY
WELDING SPARKS can
cause fire or explosion.
CYLINDER may explode
if damaged.
6.a. Remove fire hazards from the welding area.
If this is not possible, cover them to prevent
7.a. Use only compressed gas cylinders
containing the correct shielding gas for the
the welding sparks from starting a fire.
Remember that welding sparks and hot
materials from welding can easily go through small cracks
and openings to adjacent areas. Avoid welding near
hydraulic lines. Have a fire extinguisher readily available.
process used and properly operating
regulators designed for the gas and
pressure used. All hoses, fittings, etc. should be suitable for
the application and maintained in good condition.
7.b. Always keep cylinders in an upright position securely
chained to an undercarriage or fixed support.
6.b. Where compressed gases are to be used at the job site,
special precautions should be used to prevent hazardous
situations. Refer to “Safety in Welding and Cutting” (ANSI
Standard Z49.1) and the operating information for the
equipment being used.
7.c. Cylinders should be located:
•Away from areas where they may be struck or subjected to
physical damage.
6.c. When not welding, make certain no part of the electrode
circuit is touching the work or ground. Accidental contact can
cause overheating and create a fire hazard.
•A safe distance from arc welding or cutting operations and
any other source of heat, sparks, or flame.
7.d. Never allow the electrode, electrode holder or any other
electrically “hot” parts to touch a cylinder.
6.d. Do not heat, cut or weld tanks, drums or containers until the
proper steps have been taken to insure that such procedures
will not cause flammable or toxic vapors from substances
inside. They can cause an explosion even though they have
been “cleaned”. For information, purchase “Recommended
Safe Practices for the Preparation for Welding and Cutting of
Containers and Piping That Have Held Hazardous
Substances”, AWS F4.1 from the American Welding Society
(see address above).
7.e. Keep your head and face away from the cylinder valve outlet
when opening the cylinder valve.
7.f. Valve protection caps should always be in place and hand
tight except when the cylinder is in use or connected for
use.
7.g. Read and follow the instructions on compressed gas
cylinders, associated equipment, and CGA publication P-l,
“Precautions for Safe Handling of Compressed Gases in
Cylinders,” available from the Compressed Gas Association
1235 Jefferson Davis Highway, Arlington, VA 22202.
6.e. Vent hollow castings or containers before heating, cutting or
welding. They may explode.
6.f. Sparks and spatter are thrown from the welding arc. Wear oil
free protective garments such as leather gloves, heavy shirt,
cuffless trousers, high shoes and a cap over your hair. Wear
ear plugs when welding out of position or in confined places.
Always wear safety glasses with side shields when in a
welding area.
FOR ELECTRICALLY
powered equipment.
6.g. Connect the work cable to the work as close to the welding
area as practical. Work cables connected to the building
framework or other locations away from the welding area
increase the possibility of the welding current passing
through lifting chains, crane cables or other alternate circuits.
This can create fire hazards or overheat lifting chains or
cables until they fail.
8.a. Turn off input power using the disconnect
switch at the fuse box before working on
the equipment.
8.b. Install equipment in accordance with the U.S. National
Electrical Code, all local codes and the manufacturer’s
recommendations.
6.h. Also see item 1.c.
8.c. Ground the equipment in accordance with the U.S. National
Electrical Code and the manufacturer’s recommendations.
Mar ‘95
SAM400 & 650
Download from Www.Somanuals.com. All Manuals Search And Download.
iv
iv
SAFETY
PRÉCAUTIONS DE SÛRETÉ
6. Eloigner les matériaux inflammables ou les recouvrir afin de
prévenir tout risque d’incendie dû aux étincelles.
Pour votre propre protection lire et observer toutes les instructions
et les précautions de sûreté specifiques qui parraissent dans ce
manuel aussi bien que les précautions de sûreté générales suiv-
antes:
7. Quand on ne soude pas, poser la pince à une endroit isolé de
la masse. Un court-circuit accidental peut provoquer un
échauffement et un risque d’incendie.
Sûreté Pour Soudage A L’Arc
8. S’assurer que la masse est connectée le plus prés possible de
la zone de travail qu’il est pratique de le faire. Si on place la
masse sur la charpente de la construction ou d’autres endroits
éloignés de la zone de travail, on augmente le risque de voir
passer le courant de soudage par les chaines de levage,
câbles de grue, ou autres circuits. Cela peut provoquer des
risques d’incendie ou d’echauffement des chaines et des
câbles jusqu’à ce qu’ils se rompent.
1. Protegez-vous contre la secousse électrique:
a. Les circuits à l’électrode et à la piéce sont sous tension
quand la machine à souder est en marche. Eviter toujours
tout contact entre les parties sous tension et la peau nue
ou les vétements mouillés. Porter des gants secs et sans
trous pour isoler les mains.
b. Faire trés attention de bien s’isoler de la masse quand on
soude dans des endroits humides, ou sur un plancher met-
allique ou des grilles metalliques, principalement dans
les positions assis ou couché pour lesquelles une grande
partie du corps peut être en contact avec la masse.
c. Maintenir le porte-électrode, la pince de masse, le câble de
soudage et la machine à souder en bon et sûr état defonc-
tionnement.
9. Assurer une ventilation suffisante dans la zone de soudage.
Ceci est particuliérement important pour le soudage de tôles
galvanisées plombées, ou cadmiées ou tout autre métal qui
produit des fumeés toxiques.
10. Ne pas souder en présence de vapeurs de chlore provenant
d’opérations de dégraissage, nettoyage ou pistolage. La
chaleur ou les rayons de l’arc peuvent réagir avec les vapeurs
du solvant pour produire du phosgéne (gas fortement toxique)
ou autres produits irritants.
d.Ne jamais plonger le porte-électrode dans l’eau pour le
refroidir.
e. Ne jamais toucher simultanément les parties sous tension
des porte-électrodes connectés à deux machines à soud-
er parce que la tension entre les deux pinces peut être le
total de la tension à vide des deux machines.
11. Pour obtenir de plus amples renseignements sur la sûreté, voir
le code “Code for safety in welding and cutting” CSA Standard
W 117.2-1974.
f. Si on utilise la machine à souder comme une source de
courant pour soudage semi-automatique, ces precautions
pour le porte-électrode s’applicuent aussi au pistolet de
soudage.
2. Dans le cas de travail au dessus du niveau du sol, se protéger
contre les chutes dans le cas ou on recoit un choc. Ne jamais
enrouler le câble-électrode autour de n’importe quelle partie
du corps.
PRÉCAUTIONS DE SÛRETÉ POUR
LES MACHINES À SOUDER À
TRANSFORMATEUR ET À
REDRESSEUR
3. Un coup d’arc peut être plus sévère qu’un coup de soliel,
donc:
a. Utiliser un bon masque avec un verre filtrant approprié
ainsi qu’un verre blanc afin de se protéger les yeux du ray-
onnement de l’arc et des projections quand on soude ou
quand on regarde l’arc.
1. Relier à la terre le chassis du poste conformement au code de
l’électricité et aux recommendations du fabricant. Le dispositif
de montage ou la piece à souder doit être branché à une
bonne mise à la terre.
b. Porter des vêtements convenables afin de protéger la peau
de soudeur et des aides contre le rayonnement de l‘arc.
c. Protéger l’autre personnel travaillant à proximité au
soudage à l’aide d’écrans appropriés et non-inflammables.
2. Autant que possible, I’installation et l’entretien du poste seront
effectués par un électricien qualifié.
3. Avant de faires des travaux à l’interieur de poste, la debranch-
er à l’interrupteur à la boite de fusibles.
4. Des gouttes de laitier en fusion sont émises de l’arc de
soudage. Se protéger avec des vêtements de protection libres
de l’huile, tels que les gants en cuir, chemise épaisse, pan-
talons sans revers, et chaussures montantes.
4. Garder tous les couvercles et dispositifs de sûreté à leur
place.
5. Toujours porter des lunettes de sécurité dans la zone de
soudage. Utiliser des lunettes avec écrans lateraux dans les
zones où l’on pique le laitier.
Mar. ‘93
SAM400 & 650
Download from Www.Somanuals.com. All Manuals Search And Download.
v
v
for selecting a QUALITY product by Lincoln Electric. We want you
to take pride in operating this Lincoln Electric Company product •••
as much pride as we have in bringing this product to you!
Thank You
Please Examine Carton and Equipment For Damage Immediately
When this equipment is shipped, title passes to the purchaser upon receipt by the carrier. Consequently, Claims
for material damaged in shipment must be made by the purchaser against the transportation company at the
time the shipment is received.
Please record your equipment identification information below for future reference. This information can be found
on your machine nameplate.
Model Name & Number _____________________________________
Code & Serial Number _____________________________________
Date of Purchase _____________________________________
Whenever you request replacement parts for or information on this equipment always supply the information you
have recorded above.
Read this Operators Manual completely before attempting to use this equipment. Save this manual and keep it
handy for quick reference. Pay particular attention to the safety instructions we have provided for your protection.
The level of seriousness to be applied to each is explained below:
WARNING
This statement appears where the information must be followed exactly to avoid serious personal injury or
loss of life.
CAUTION
This statement appears where the information must be followed to avoid minor personal injury or damage to
this equipment.
SAM400 & 650
Download from Www.Somanuals.com. All Manuals Search And Download.
vi
vi
TABLE OF CONTENTS
Page
Installation Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Section A
Technical Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .A-1
Product Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-3
Installation Precautions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-3
Spark Arrester . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-3
Machine Grounding . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-3
Additional Safety Precautions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-3
Pre-Operation Service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-4
Output Cables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-4
Welder Location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-4
Operating Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Section B
Operating Precautions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-1
Pipe Thawing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-1
Additional Safety Precautions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-1
Engine Controls: Function/Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-1
Welder Controls: Function/Operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-2
Starting Welders with Dead Batteries . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .B-9
Auxiliary Power . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-9
Duty Cycle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-9
Starting Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-9
Break-In Period . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-9
Accessories . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Section C
Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Section D
Routine Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . D-1
Periodic Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . D-1
Troubleshooting Guide . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Section E
Diode Test Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .E-6
SCR Bridge PC Board Test Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .E-6
Control PC Board Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .E-7
Ground Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .E-8
Wiring Diagrams and Dimension Print . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Section F
Parts List . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Appendix
SAM400 & 650
Download from Www.Somanuals.com. All Manuals Search And Download.
A-1
A-1
INSTALLATION
TECHNICAL SPECIFICATIONS - SAM400
INPUT - DIESEL ENGINE
Make/Model
Description
Speed (RPM)
Displacement
Starting
System
Capacities
Perkins
4.236 Diesel
Engine
4 cylinder
63 HP @
1725 RPM
High Idle 1790
Low Idle 1100
Full Load 1725
236 cu. in
(3.87 L)
12VDC batteries
(2) & Starter
Fuel: 22.5 gal.
85.1 L
Bore x Stroke
Oil: 8.5 Qts.
8.04 L
3.875” x 5.00”
(98.4 mm x 127.0mm)
Coolant: 3.2 gal.
12.11 L
RATED OUTPUT - WELDER
Welding Output
Duty Cycle
Volts at Rated Amps
60% (NEMA)
400 amps
400 amps
36 volts
40 volts
60% (Lincoln Plus)
OUTPUT - WELDER AND GENERATOR
Welding Range
Open Circuit Voltage
Auxiliary Power
60 - 500 Amps
CV Current Range
80 - 500
17 - 45 OCV
120/240 VAC
2kVA, 60 Hz.
100% Duty Cycle
(excluding hot start voltage)
60 - 95 OCV
VV Current Range
PHYSICAL DIMENSIONS
HEIGHT1
50.13 in.
WIDTH
DEPTH
WEIGHT
2163 lbs.
981.1 kg
27.12 in.
83.00 in.
2108.2 mm
1273.3 mm
688.9 mm
1. Add 15.4” (391.2 mm) for optional muffler.
SAM400 & 650
Download from Www.Somanuals.com. All Manuals Search And Download.
A-2
A-2
INSTALLATION
TECHNICAL SPECIFICATIONS - SAM650
INPUT - DIESEL ENGINE
Make/Model
Description
Speed (RPM)
Displacement
Starting
System
Capacities
Perkins
1006-6 Diesel
Engine
6 cylinder
93 HP @
1730 RPM
High Idle 1790
Low Idle 1200
Full Load 1750
365 cu. in
(5.98 L)
12VDC batteries
(2) & Starter
Fuel: 22.5 gal.
85.1 L
Bore x Stroke
Oil: 14.0 Qts.
13.24 L
3.937” x 5.00”
(100mm x 127mm)
Coolant: 5.5 gal.
20.8 L
RATED OUTPUT - WELDER
Welding Output
Duty Cycle
Volts at Rated Amps
80% (NEMA)
60%(NEMA)
80%(Lincoln Plus)
60%(Lincoln Plus)
650 Amps
725 Amps
650 Amps
725 Amps
44 volts
44 volts
50 volts
50 volts
OUTPUT - WELDER AND GENERATOR
Welding Range
Open Circuit Voltage
Auxiliary Power
80 - 815 Amps
CV Current Range
80 - 815
18 - 50 OCV
120/240 VAC
2kVA, 60 Hz.
100% Duty Cycle
(excluding hot start voltage)
45 - 90 OCV
VV Current Range
PHYSICAL DIMENSIONS
HEIGHT
56.7 in.
WIDTH
DEPTH
WEIGHT
2800 lbs.
1270.1 kg
27.12 in.
88.75 in.
2254.2 mm
1440.2 mm
688.9 mm
SAM400 & 650
Download from Www.Somanuals.com. All Manuals Search And Download.
A-3
A-3
INSTALLATION
earth ground such as a metal water pipe going into the
ground for at least ten feet and having no insulated
joints, or to the metal framework of a building which
has been effectively grounded. The National Electrical
Code lists a number of alternate means of grounding
electrical equipment.
PRODUCT DESCRIPTION
The SAM engine welders are multi-purpose welding
machines. They are designed to be used on all open
arc or submerged arc processes within the rating of the
unit.
The machine is designed to be used with the following
automatic equipment: LN-7, LN-8, LN-9, LN-22, LN-
23P (with Adapter Kit), LN-25, NA-3, LT-7, or LT-56. It
can be used with most other equipment whose power
requirements do not exceed the rating of the machine.
WARNING
ADDITIONAL SAFETY PRECAUTIONS
FALLING EQUIPMENT can cause
injury.
The SAM machines have two types of output charac-
teristics; a variable voltage output characteristic for
stick and submerged arc welding and also constant
voltage characteristics for Innershield® plus both dip-
transfer and spray-transfer processes.
● Do not lift this machine using lift
bale if it is equipped with a heavy
accessory such as trailer or gas
cylinder.
● Lift only with equipment of adequate lifting
capacity.
INSTALLATION PRECAUTIONS
● Be sure machine is stable when lifting.
SPARK ARRESTER
The recommended undercarriage for use with this
equipment for in-plant and yard towing by a vehicle is
Lincoln’s K767-1. If the user adapts a non-Lincoln
undercarriage, he must assume responsibility that the
method of attachment and usage does not result in a
safety hazard nor damage the welding equipment.
Some of the factors to be considered are as follows:
Some federal, state or local laws may require that
diesel engines be equipped with exhaust spark
arresters when they are operated in certain locations
where unarrested sparks may present a fire hazard.
The standard mufflers included with these welders do
not qualify as spark arresters. When required by local
regulations suitable spark arresters must be installed
and properly maintained.
1. Design capacity of undercarriage vs. weight of
Lincoln equipment and likely additional attach-
ments.
CAUTION
An incorrect arrester may lead to damage of the
engine or its performance. Contact the engine
manufacturer for specific recommendations.
2. Proper support of, and attachment to, the base of
the welding equipment so there will be no undue
stress to the framework.
3. Proper placement of the equipment on the under-
carriage to insure stability side to side and front to
back when being moved and when standing by itself
while being operated or serviced.
MACHINE GROUNDING
The 1984 National Electrical Code does not require
this machine to be grounded under normal operating
circumstances.
4. Typical conditions of use, i.e., travel speed; rough-
ness of surface on which the undercarriage will be
operated; environmental conditions; likely mainte-
nance.
Some state, local or other codes or unusual operating
circumstances may require the machine frame to be
grounded. It is recommended that you determine the
extent to which such requirements may apply to your
particular situation and follow them explicitly. A
5. Conformance with federal, state and local laws.(1)
machine grounding stud marked with the symbol
provided on the welding generator frame foot.
is
(1) Consult applicable federal, state and local laws regarding
specific requirements for use on public highways.
In general, if the machine is to be grounded it should
be connected with a #8 or larger copper wire to a solid
SAM400 & 650
Download from Www.Somanuals.com. All Manuals Search And Download.
A-4
A-4
INSTALLATION
IMPORTANT: To prevent ELECTRICAL DAMAGE
WHEN:
PRE-OPERATION SERVICE
Oil: This unit is supplied from the factory with the
engine crankcase filled with a high quality 10W30 oil.
This oil should be acceptable for most typical ambient
temperatures. Consult the Engine Operation Manual
for specific recommendations. Upon receipt of the
welder, check the dipstick to be sure the oil is at the
"full" mark. DO NOT OVERFILL.
a) Installing new batteries.
b) Using a booster.
Use correct polarity — Negative Ground.
To prevent BATTERY BUCKLING, tighten nuts on bat-
teries only until snug. DO NOT OVERTIGHTEN.
Fuel: Fill the fuel tank with the grade of diesel fuel rec-
ommended in the engine Instruction Manual. Open the
fuel feed valve on the sediment bowl by turning the
handle counterclockwise.
Muffler: On SAM650 units: Screw the muffler into the
exhaust flange and tighten.
On SAM400 units with the optional noise
control muffler: Attach the muffler with the
supplied hardware.
Cooling System:The cooling system has been filled at
the factory with a 50-50 mixture of ethylene glycol
antifreeze and water. Check the radiator level and add
a 50-50 solution as needed. (See Engine Manual or
antifreeze container for alternate antifreeze recom-
mendation.)
The engine and welder controls were properly set at
the factory and should require no adjusting when
received.
OUTPUT CABLES
Battery: Remove the insulating cap from the negative
battery terminal. Replace and tighten negative battery
cable terminal. NOTE: This machine is furnished with
wet charged batteries; if unused for several months,
the batteries may require a booster charge. Be sure to
use the correct polarity when charging the batteries.
With the engine off, connect the electrode and work
cables to the studs provided. These connections
should be checked periodically and tightened if neces-
sary.When welding at a considerable distance from the
welder, be sure you use ample size welding cables.
Listed below are copper cable sizes recommended for
the rated current and duty cycle. Lengths stipulated are
the distance from the welder to work and back to the
welder again. Cable sizes are increased for greater
lengths primarily for the purpose of minimizing cable
voltage drop.
WARNING
GASES FROM BATTERY can explode.
● Keep sparks, flame and cigarettes
away from battery.
Cable Sizes For Combined Lengths
%
Duty
To prevent EXPLOSION when:
Of Electrode And Work Cables
Amps
Cycle
0-100 ft.
100-200 ft.
200-250 ft.
● INSTALLING A NEW BATTERY — disconnect
negative cable from old battery first and
connect to new battery last.
650
650
400
60
80
60
3/0
2-1/0
2/0
2-2/0
2-2/0
3/0
2-3/0
2-3/0
4/0
● CONNECTING A BATTERY CHARGER —
remove battery from welder by disconnecting
negative cable first, then positive cable and
battery clamp. When reinstalling, connect
negative cable last. Keep well ventilated.
WELDER LOCATION
The welder should be located to provide an unrestrict-
ed flow of clean, cool air to the cooling air inlets (lou-
vered panel and below side doors) and to avoid heat-
ed air coming out the radiator of the welder recirculat-
ing back to the cooling air inlets. Also, locate the welder
so that engine fumes are properly exhausted.
● USING A BOOSTER — connect positive lead to
battery first then connect negative lead to neg-
ative battery lead at engine foot.
BATTERY ACID can burn eyes and
skin.
● Wear gloves and eye protection
and be careful when working near
battery.
● Follow instructions printed on battery.
SAM400 & 650
Download from Www.Somanuals.com. All Manuals Search And Download.
B-1
B-1
OPERATION
SPEED CONTROL LEVER
OPERATING PRECAUTIONS
Manually allows the engine to run at its high idle speed
controlled by the governor or at the factory set low idle
speed. When welding or using auxiliary power the
speed control lever must be in the “RUN” position. To
reduce the engine to low idle speed when not welding
or not using auxiliary power place the speed control
lever in the “IDLE” position notch.
WARNING
Do not attempt to use this equipment until you
have thoroughly read the engine manufacturer’s
manual supplied with your welder. It includes
important safety precautions, detailed engine
starting, operating and maintenance instructions,
and parts lists.
ENGINE TEMPERATURE GAUGE
Displays the coolant temperature in the engine block.
OIL PRESSURE GAUGE
PIPE THAWING
WARNING
PIPE THAWING can result in fire or
explosion.
Displays the oil pressure to the engine. When the
engine starts running, watch for the oil pressure to
build up. If no pressure shows within 30 seconds, stop
the engine and consult the engine instruction manual.
● Only connect welder across
FROZEN section of CONTINUOUS
METAL PIPE.
● While thawing, remove any ground leads con-
nected to Frozen pipe.
BATTERY CHARGING AMMETER
● Turn welder on AFTER cables are connected to
Displays the current going from the charging alternator
into the batteries. It is normal for charging current to be
high (above 15 amps) after starting or when the batter-
ies are ‘low’ on charge.
pipe. Turn off when done.
IMPORTANT: DO NOT USE A WELDER TO THAW A
PIPE BEFORE REVIEWING LINCOLN BULLETIN
E695.1 (dated May 1987 or later). This bulletin may be
obtained from your local Lincoln distributor or by writ-
ing directly to Lincoln Electric at the address on the
back of this manual.
ENGINE HOUR METER (Factory Installed Optional
Feature)
The optional engine hour meter records the total run-
ning time on the engine in hours. It can be used to keep
a record of maintenance on the engine and or welder.
ADDITIONAL SAFETY PRECAUTIONS
Always operate the welder with the hinged doors
closed as these provide maximum protection from
moving parts and insure proper cooling air flow.
ENGINE PROTECTION SYSTEM
The engine protection system shuts down the engine
under high coolant temperature or low oil pressure
conditions by allowing the fuel solenoid valve to close.
Read carefully the Safety Precautions page in the
Instruction Manual before operating this machine.
Always follow these and any other safety procedures
included in this manual and in the engine instruction
manual.
ENGINE CONTROLS:
FUNCTION/OPERATION
IGNITION SWITCH
When placed in the “ON” position, this switch energizes
the fuel solenoid. When placed in the “OFF” position,
the flow of fuel to the injection pump is stopped to shut
down the engine.
SAM400 & 650
Download from Www.Somanuals.com. All Manuals Search And Download.
B-2
B-2
OPERATION
place.
WELDER CONTROLS:
FUNCTION/OPERATION
3. Remove the two screws on the top end of the wire
feeder nameplate.
PORTABLE FIELD CONTROL CONNECTION
4. Position the “Portable Field Control” mounting slots
over these holes and replace the screws.
A “Portable Field Control” complete with 25’ leads is
shipped with each SAM welder.
5. Route the leads with the LN-5 or LN-6 control cable
back to the power source.
A “Portable Field Control” is not required for proper
operation of the SAM welder when connected to an
LN-8, LN-9, NA-3, NA-5, LT-7, or LT-56 wire feeder.
With other wire feeders and when stick electrode weld-
ing, the “Portable Field Control” must be installed or
the SAM cannot produce its full open circuit voltage.
MOUNTING ON LN-7
1. Remove the top screws on the side of the LN-7 con-
trol box cover. (This is the left side when facing the
nameplate).
When installed the “Portable Field Control” is a fine
voltage adjustment when using the SAM as a constant
voltage power source. It is a fine current adjustment
when using the SAM as a variable voltage power
source.
2. Position the “Portable Field Control” on the side of
the control box with the mounting slots over these
holes and replace the screws.
3. Route the leads with the LN-7 control cable back to
the power source.
The “Portable Field Control” can be mounted on the
SAM or wherever convenient for the welding operation.
When using an LN-4, LN-5, LN-6 or LN-7 wire feeder,
the control should normally be mounted on the wire
feeder. Specific mounting instructions are given below.
OUTPUT STUDS
After mounting, connect the “Portable Field Control”
leads to #75 and #76 on the SAM terminal strip locat-
ed behind the lower cover panel directly below the con-
trol panel on the SAM400 or behind the right front
hinged door on the SAM650. Connect the green lead
of the “Portable Field Control” to the grounding stud
With the Engine OFF connect the work cable to the “To
Work” stud.
A. For Stick Electrode Welding
1. Connect the electrode cable to the “Stick” stud
and the work cable to the “To Work” stud.
Connect the “TAP” lead in the SAM650 to the
appropriate stud to adjust current and the arc
characteristics as described under “Current
and Voltage Controls.”
marked with the symbol
strips.
located near the terminal
MOUNTING ON LN-4 (Discontinued)
2. Install the “Portable Field Control”.
1. Place the “Portable Field Control” on the vertical
front panel of the LN-4 on the wire reel side (next to
the rheostat panel) and mark the location of the
mounting slots.
B. Automatic or Semiautomatic Welding
For all automatic welding processes, connect the
welding power cable from the wire feeder to the
“Connect to Auto. Equipment” stud. Connect the
“TAP” lead in the SAM650 to the appropriate stud to
adjust current and the arc characteristics as
described under “Current and Voltage Controls.”
1. LN-7, LN-8, LN-9, NA-3, NA-5, LT-7 and LT-
56 Wire Feeders.
2. Drill two holes in the panel and mount the control
using #10 sheet metal screws.
3. Route the leads with the LN-4 control cable back to
the power source.
MOUNTING ON LN-5 OR LN-6 (Discontinued)
a. Make the connections exactly as speci-
fied on the connection wiring diagram
included in the wire feeder Instruction
Manual.
1. Remove the knob from the upper rheostat on the
wire feeder control panel.
b. Install the “Portable Field Control” when
using an LN-7.
2. Be sure the appropriate wire feeder nameplate -
“Constant Voltage” or “ Variable Voltage “ - is in
SAM400 & 650
Download from Www.Somanuals.com. All Manuals Search And Download.
B-3
B-3
OPERATION
c. Be sure the wire feeder is properly set for
CURRENT AND VOLTAGE CONTROLS
constant or variable voltage as appropri-
ate.
Constant Voltage Welding
2. ML-2, ML-3, MN-1, LN-4, LN-5 and LN-6
Wire Feeders
The SAM-400 “Current Control” is NOT in the circuit
when the ‘Electrode Polarity’ switch is set for constant
voltage welding.
This power source can be used with these
obsolete wire feeders. Write to the factory
for specific connections.
Set the open circuit voltage (OCV) needed for the par-
ticular application with the “Constant Voltage Control”
located to the left of the nameplate. Adjust the final
welding voltage with either the wire feeder voltage con-
trol or the “Portable Field Control”. Set the welding cur-
rent with “Amps” or “Wire Feed Speed” control on the
wire feeder.
3. Other Wire Feeders
This power source can be used with wire
feeders manufactured by other companies.
The connection must be determined by the
customer for the specific equipment being
used.
Low Range Feature (SAM400 K1279-1 only) --
Extends the output voltage range of the SAM400
welder down to 12 volts for constant voltage welding.
The maximum output current is not to exceed the rat-
ing of the machine. The Low Range Feature provides
a two-position manual switch which allows the operator
to set his machine for normal welding or for low voltage
welding. Factory installed only.
Auxiliary power available for wire feeder
operation is described under “Auxiliary
Power” in this section of the manual. To
operate the SAM contactor, connect the
appropriate wire feeder control circuit to
close the circuit from #2 to #4 on the SAM
terminal strip.
On the SAM650 connect the “Tap” lead inside the
machine to the appropriate “Innershield” stud for”Min.
(Flat) Slope.” “Med. Slope” or “Max. Slope”. Low voltage
(below 20 volts) low current welding often requires
“Max. Slope” to adjust the weld metal droplet size for
minimum spatter and to control puddle fluidity and
bead shape. Innershield and other spray transfer type
processes generally operate with “Med. Slope”.
TOGGLE SWITCH
This switch is located on the front of the control panel
at the top of the nameplate. Set the switch to “Variable
Voltage” or “Constant Voltage” as appropriate for the
welding process to be used. See Control Panel operat-
ing illustrations in this section of the manual.
A Hot Start circuit on all models operates automatical-
ly whenever the toggle switch is set on “Constant
Voltage.” It increases the open circuit voltage by sev-
eral volts until the arc is established -- then the voltage
automatically drops to normal welding voltage. When
the wire feeder is started before the arc is started, the
voltmeter indicates a voltage several volts higher than
welding voltage. To read actual welding voltage, the
arc must be established.
CONTACTOR
The output contactor is automatically in the welding cir-
cuit when the machine is properly connected to a
Lincoln® wire feeder through the “Connect to Auto.
Equipment” stud. It closes only when the wire feeder is
welding. The contactor is not in the welding circuit
when using the ‘Stick’ stud.
ELECTRODE POLARITY SWITCH
Constant Voltage Welding With Variable Inductance
Control: SAM-400 Only.
Select electrode negative (straight) or electrode posi-
tive (reverse) polarity as needed. On the SAM-400,
this switch must also be set for either constant or vari-
able voltage welding as appropriate.
Variable inductance or slope control is usually desir-
able for low voltage (below 20 volts) applications and is
sometimes useful in other constant voltage jobs.
To introduce this control into the circuit, set the
“Electrode Polarity” switch to “Variable Voltage” and the
toggle switch to “Constant Voltage”. Then the “Current
Control” acts as the variable inductance control.
Normally this control must be kept within the 8 to 1
o’clock range.
CAUTION
DO NOT SWITCH WHILE WELDING.
SAM400 & 650
Download from Www.Somanuals.com. All Manuals Search And Download.
B-4
B-4
OPERATION
To Set The Controls -- Stick Welding
Set the welding current and voltage as described under
“Constant Voltage Welding” above.
a. Make the coarse setting of welding heat with the
SAM400 “Current Control” or the SAM650
“Tap’”lead.
Variable Voltage Welding
The SAM400 “Current Control” provides the major
adjustment of current. It has two calibrated scales; the
one gives maximum and the other minimum current
available at any given setting.
b. Adjust for the desired arc characteristics with the
“Variable Voltage Control”. For a soft arc desired
for most welding keep this control between 7 and
High. For a more digging arc, set it lower.
c. If remote control is NOT desired leave the
“Portable Field Control” on “High”. For remote con-
trol, leave the “Variable Voltage Control” near
“High” and make the adjustments described in
paragraph “b” above with the “Portable Field
CAUTION
DO NOT ADJUST THE “CURRENT CONTROL”
WHEN WELDING.
The SAM650 “Tap” lead inside the machine and the
series of five “Sub Arc & Stick” studs provide the major
adjustment of welding current. Generally connect the
“Tap” lead to the stud with the lowest current range that
still provides the desired current.
Control”.
Remember, increasing either the
“Variable Voltage Control” or “Portable Field
Control” setting also increases the current.
To Set The Controls -- Submerged Arc
The “Variable Voltage Control” to the left of the name-
plate on all models is both the open circuit voltage con-
trol and a fine adjustment. The wire feeder current con-
trol and the “Portable Field Control” provide the same
function as the “Variable Voltage Control.”
a. The open circuit voltage (OCV) is generally not
critical in submerged arc welding. Therefore, the
“Variable Voltage Control” can usually be left
between 7 and “High” -- no future adjustments are
needed.
b. Set SAM400 “Current Control” so the calibration
on the higher scale is a little above the current
desired. Set the SAM650 “Tap” lead to the stud
with the lowest current range that still provides the
desired current.
c. Make the final current adjustment with either the
wire feeder current control or the “Portable Field
Control”. Set the arc voltage with the wire feeder
control.
Consult the following illustrations for examples of how
to set the machine.
SAM400 & 650
Download from Www.Somanuals.com. All Manuals Search And Download.
B-5
B-5
OPERATION
SAM400 Controls
SAM400 & 650
Download from Www.Somanuals.com. All Manuals Search And Download.
B-6
B-6
OPERATION
SAM400 Controls
SAM400 & 650
Download from Www.Somanuals.com. All Manuals Search And Download.
B-7
B-7
OPERATION
SAM650 Controls
SAM400 & 650
Download from Www.Somanuals.com. All Manuals Search And Download.
B-8
B-8
OPERATION
SAM650 Controls
SAM400 & 650
Download from Www.Somanuals.com. All Manuals Search And Download.
B-9
B-9
OPERATION
about five minutes and then stop the engine and
recheck the oil. If the level is down, fill to the full mark
again.The engine controls were properly set at the fac-
tory and should require no adjusting when received.
STARTING WELDERS WITH DEAD BATTERIES
DO NOT attempt to start a SAM engine driven welder
by driving the welding generator as a starter motor
using the output of another welder. In addition to the
possibility of damaging the machines, starting a SAM
engine welder without using its starting circuit elimi-
nates the operation of the flashing circuit. This can
cause the generator to fail to produce any output.
For added safety always operate the welder with the
doors closed. Further, leaving the doors open changes
the designed air flow and may cause overheating.
Cold Weather Starting
AUXILIARY POWER
WARNING
An alternator generates 2 KVA of 120/240 volt 60 Hertz
AC power. It is available either from #31 and #32 on
the terminal strip or from the receptacles on the
Control Panel. Be careful not to overload this circuit.
Never use any other starting aids, such as ether, when
using the “Thermostart” system.
When overnight temperatures are between 10°F (-
12°C) and freezing, use the standard “Thermostart”
starting system installed on all engines. Follow the
instructions on the start panel nameplate and in the
engine manual shipped with the welder. With fully
charged batteries and the proper weight oil, the
“Thermostart” system operates satisfactorily even
down to about 0°F (-18°C).
The auxiliary power receptacle should only be used
with three wire grounded type plugs or approved dou-
ble insulated tools with two wire plugs.
The alternator is protected by thermostats and fuses.
DUTY CYCLE
If the engine must be frequently started below 10°F
(-12°C), it may be desirable to remove the
“Thermostart” and install the optional ether starter kit.
Installation and operating instructions are included in
the kit. Use ether starting only when required because
excessive use shortens engine life.
Duty cycle is based on a ten minute period and opera-
tion in an ambient temperature of 104°F(40°C).
The SAM400 is NEMA rated at 60% duty cycle. The
SAM650 is NEMA rated at 80% duty cycle. Duty cycle
is based on a ten minute period. Therefore, a 60% duty
cycle welder can be operated at nameplate rated out-
put for 6 minutes (8 minutes for 80% duty cycle) out of
every 10 minute period without overheating.
BREAK-IN PERIOD
The engine used to supply power for your welder is a
heavy duty, industrial engine. It is designed and built
for rugged use. It is very normal for any engine to use
small quantities of oil until the break-in is accom-
plished. Check the oil level twice a day during the
break-in period (about 200 running hours).
The auxiliary power can be used continuously (100%
duty cycle) within its rated current capacities.
STARTING INSTRUCTIONS
Be sure all Pre-Operation Maintenance has been per-
formed. (See Installation Section of this manual.)
IMPORTANT: IN ORDER TO ACCOMPLISH THIS
BREAK-IN, THE UNIT SHOULD BE SUBJECTED TO
HEAVY LOADS, WITHIN THE RATING OF THE
MACHINE. AVOID LONG IDLE RUNNING PERIODS.
To start the engine, set the speed control lever in the
“RUN” position. Place ignition toggle switch in the “ON”
position. Push in the engine protection system reset
button (if so equipped). Engage the starter button.
When the engine starts running, observe the oil pres-
sure. If no pressure shows within 30 seconds, stop the
engine and consult the engine operating manual. To
stop the engine, place the ignition toggle switch in the
“OFF” position.
When an engine is started for the first time, some of the
oil will be needed to fill the passages of the lubricating
system. Therefore, on initial starting, run the engine for
SAM400 & 650
Download from Www.Somanuals.com. All Manuals Search And Download.
C-1
C-1
ACCESSORIES
K799 Hi-Freq™ - Provides high frequency plus a gas
valve for TIG welding. A water valve is available as an
option. Requires 115 volt AC input. Cannot be used
with optional meters connected, or in constant voltage
mode. (Limited to 250A - 60% Duty Cycle).
K802-D Power Plug Kit - For SAM welders with stan-
dard 2KVA of AC auxiliary power. Kit includes male
plugs for each auxiliary receptacle.
K805-1 Ether Start Kit - Injects ether for starting aid.
Recommended only when engines are frequently
started at temperatures under 10°F (-12°C). Ether
cylinder is not included.
K767-1 Undercarriage - A 4-wheel steerable under-
carriage for in-plant and yard towing1 with E78-14 load
range (B) tubeless tires. Mounts directly to welder
base.
1For highway use, consult applicable federal, state and local laws regarding
possible requirements for brakes, lights, fenders, etc.
Linc-Thaw™ - Includes meter and fuse to protect the
welder when thawing frozen water pipes. (L2964-[ ]
Specify SAM400 or SAM650)
K704(SAM400 only) Standard Accessory Kit -
Includes electrode and work cables, headshield, work
clamp and electrode holder.
K865(SAM400 only) Engine Hour Meter Kit -
(Standard on K1279-1). Keeps track of how long
engine has been operated. Useful for following recom-
mended maintenance schedules on machine.
SAM400 & 650
Download from Www.Somanuals.com. All Manuals Search And Download.
D-1
D-1
MAINTENANCE
SAM400 only:
WARNING
Inspect the oil bath air filter daily - more often in dusty
conditions. When necessary clean and fill the oil bath.
The filter should never be removed while the engine is
running.
ELECTRIC SHOCK can kill.
● Do not touch electrically live parts
such as output terminals or inter-
nal wiring
PERIODIC MAINTENANCE
ENGINE EXHAUST can kill.
1. Blow out the welder and controls with an air hose at
least once every two months. In particularly dirty
locations, this cleaning may be necessary once a
week. Use low pressure air to avoid driving dirt into
the insulation.
● Use in open, well ventilated areas
or vent exhaust outside
MOVING PARTS can injure.
● Do not operate with doors open or
2. The SAM400 current control reactor brushes are
self-lubricating and should not be greased. Keep the
contacts clean. This control should be moved from
maximum to minimum daily to prevent the controls
from sticking.
guards off
● Stop engine before servicing
● Keep away from moving parts
● Remove guards only when necessary and
replace when work requiring removal is com-
plete.
3. See the engine Instruction Manual for periodic
engine maintenance information. Change the
crankcase oil at regular intervals using the proper
grade of oil as recommended in the engine operat-
ing manual. Change the oil filter in accordance with
the instructions in the engine operating manual.
When the filter is changed add one quart of oil to
the crankcase to replace the oil held in the filter dur-
ing operation.
● Only qualified personnel should install, use, or
service this equipment.
ROUTINE MAINTENANCE
At the end of each day’s welding, refill the fuel tank to
minimize moisture condensation in the tank. Also, run-
ning out of fuel tends to draw dirt into the fuel system.
Check the crankcase oil level.
4. Belts tend to loosen after the first 30 or 40 hours of
operation. Check the cooling fan belt and tighten if
necessary. DO NOT OVER TIGHTEN.
If the fuel supply runs out while the fuel pump is oper-
ating, air may be entrapped in the fuel distribution sys-
tem. If this happens, bleeding of the fuel system may
be necessary. See the engine instruction manual.
BEARING MAINTENANCE
This welder is equipped with a double-shielded ball
bearing having sufficient grease to last indefinitely
under normal service. Where the welder is used con-
stantly or in excessively dirty locations, it may be nec-
essary to add one-half ounce of grease per year. A pad
of grease one inch wide, one inch long and one inch
high weighs approximately one-half ounce. Over
greasing is far worse than insufficient greasing.
AIR FILTER
SAM650 only:
The air filter element is a dry cartridge type. It can be
cleaned and re-used; however, damaged elements
should not be washed or re-used. Remove loose dirt
from element with compressed air or water hose direct-
ed from inside out. Compressed Air: 100 psi maximum.
The filter should never be removed while the engine is
running.
When greasing the bearings, keep all dirt out of the
area. Wipe the fittings completely clean and use clean
equipment. More bearing failures are caused by dirt
introduced during greasing than from insufficient
grease.
SAM400 & 650
Download from Www.Somanuals.com. All Manuals Search And Download.
D-2
D-2
MAINTENANCE
COMMUTATOR AND BRUSH MAINTENANCE
Arcing or excessive exciter brush wear indicates a pos-
sible misaligned shaft. Have an authorized Field
Service Shop check and realign the shaft.
WARNING
Uncovered rotating equipment can be dangerous.
Use care so your hands, hair, clothing or tools do
not catch in the rotating parts. Protect yourself
from particles that may be thrown out by the rotat-
ing armature when stoning the commutator.
COOLING SYSTEM
The SAM welders are equipped with a pressure radia-
tor. Keep the radiator cap tight to prevent loss of
coolant. Clean and flush the cooling system periodi-
cally to prevent clogging the passage and overheating
the engine. When antifreeze is needed, always use the
permanent type.
The generator brushes are properly adjusted when the
welder is shipped. They require no particular attention.
DO NOT SHIFT THE BRUSHES or adjust the rocker
setting.
Shifting of the brushes may result in:
- Change in machine output
- Commutator Damage
CONTACTOR MAINTENANCE
Where the output contactor is operated frequently
when tacking or making short welds, turn the engine off
and inspect the contactor every three months:
- Excessive brush wear
Periodically inspect the commutator, slip rings and
brushes by removing the covers. DO NOT remove or
replace these covers while the machine is running.
1. be sure the mating surfaces of silver contacts are
not worn and all make contact at approximately
the same time.
Commutators and slip rings require little attention.
However, if they are black or appear uneven, have
them cleaned by an experienced maintenance man
using fine sandpaper or a commutator stone. Never
use emery cloth or paper for this purpose.
2. Make sure the springs and holders are not broken
or out of adjustment. Approximate spring com-
pression after making contact is 1/8”. Less than
1/16” compression indicates worn contacts that
should be replaced.
NOTE: If the welder is used in dirty or dusty locations,
or if the welder is not used for prolonged periods of
time, it may be necessary to clean the commutator and
slip rings more often.
3. Make sure the moving contact or other moving
parts are not binding.
4. Check interlock contacts and springs. Be sure
mounting screws are tight.
Replace brushes when they wear within 1/4" of the pig-
tail. A complete set of replacement brushes should be
kept on hand. Lincoln brushes have a curved face to fit
the commutator. Have an experienced maintenance
man seat these brushes by lightly stoning the commu-
tator as the armature rotates at full speed until contact
is made across the full face of the brushes. After ston-
ing, blow out the dust with low pressure air.
To seat the slip ring brushes, position the brushes in
place. Then slide one end of a piece of fine sandpaper
between slip rings and brushes with the coarse side
against the brushes. With slight additional finger pres-
sure on top of the brushes, pull the sandpaper around
the circumference of the rings, in direction of rotation
only - until brushes seat properly. In addition, stone
slip ring with a fine stone. Brushes must be seated
100%.
SAM400 & 650
APR97
Download from Www.Somanuals.com. All Manuals Search And Download.
E-1
E-1
TROUBLESHOOTING
HOW TO USE TROUBLESHOOTING GUIDE
WARNING
Service and Repair should only be performed by Lincoln Electric Factory Trained Personnel.
Unauthorized repairs performed on this equipment may result in danger to the technician
and machine operator and will invalidate your factory warranty. For your safety and to avoid
Electrical Shock, please observe all safety notes and precautions detailed throughout this
manual.
__________________________________________________________________________
This Troubleshooting Guide is provided to
help you locate and repair possible machine
malfunctions. Simply follow the three-step
procedure listed below.
Step 3. RECOMMENDED COURSE OF
ACTION
This column provides a course of action for
the Possible Cause.
Step 1. LOCATE PROBLEM (SYMPTOM).
Look under the column labeled “PROBLEM
(SYMPTOMS)”. This column describes pos-
sible symptoms that the machine may exhib-
it. Find the listing that best describes the
symptom that the machine is exhibiting.
If you do not understand or are unable to
perform the Recommended Course of
Action safely, contact you local Lincoln
Authorized Field Service Facility.
Step 2. POSSIBLE CAUSE.
The second column labeled “POSSIBLE
CAUSE” lists the obvious external possibili-
ties that may contribute to the machine
symptom.
WARNING
ELECTRIC SHOCK can kill.
• Do not touch electrically live parts such as output
terminals or internal wiring.
ENGINE EXHAUST can kill.
• Use in open, well ventilated areas or vent exhaust
outside.
MOVING PARTS can injure.
• Do not operate with doors open or guards off.
• Stop engine before servicing.
• Keep away from moving parts.
• Remove guards only when necessary and replace when work
requiring removal is complete.
• Only qualified personnel should install, use or service this
equipment.
CAUTION
If for any reason you do not understand the test procedures or are unable to perform the tests/repairs safely, contact your Local
Lincoln Authorized Field Service Facility for technical troubleshooting assistance before you proceed.
SAM400 & 650
Download from Www.Somanuals.com. All Manuals Search And Download.
E-2
E-2
TROUBLESHOOTING
Observe all Safety Guidelines detailed throughout this manual
PROBLEMS
(SYMPTOMS)
RECOMMENDED
COURSE OF ACTION
POSSIBLE CAUSE
FUNCTION PROBLEMS
LOSS OF OUTPUT IN ONE MODE 1. Test for shorted diode on Three
1. Check diodes D7, D8, D9, D10,
D11. (See Diode Test Procedure)
ONLY
Phase Bridge.
(Constant or Variable Voltage
Positions) (For loss in both modes
see the following pages)
2. Test for failure of Control Board
#2.
2. a) Turn machine off.
b) Put toggle switch in mode in
question.
These items functioning properly:
1. Alternator
2. Silicon Controlled Rectifier (SCR)
Assembly
c) Remove Control Board #2.
d) Turn voltage control and
portable field control to mini-
mum.
3. Control Board #1
4. Generator
e) Start the machine.
f) If generator builds up, install
new Control Board #2 (Note
A); if it does not build up,
proceed to Step 3.
3. Test for Defective Toggle Switch, 3. a) Turn machine off.
Rheostat or Open Circuit b) Remove Control Board #1
c) Put toggle switch in the
mode in question.
d) Turn voltage control to maxi-
mum.
e) Check continuity of the tog-
gle switch and voltage con-
trol. (Note B).
1)Variable Voltage Position
Check continuity from Pin
#76 to Pin #204 on Control
Board #1 connector. Meter
should read a short circuit.
2)Constant Voltage Position
Check continuity from Pin
#76 to Pin #207 on
Control Board #1 connec-
tor. Meter should read a
short circuit.
NOTE A: If at any time either of the Control (PC) boards is replaced, follow the calibration procedure outlined later in this sec-
tion under “Control P.C. Board Calibration Procedure”. The open circuit voltage will be out of range if trimmers are
not properly set. If both trimmers are set at minimum, the machine might lose excitation.
NOTE B: When making continuity checks, use the 1K (X1000) or next higher range.
NOTE C: Do not replace PC boards without following outlined procedure for indicated trouble -- damage may result due to
other defective parts.
CAUTION
If for any reason you do not understand the test procedures or are unable to perform the tests/repairs safely, contact your Local
Lincoln Authorized Field Service Facility for technical troubleshooting assistance before you proceed.
SAM400 & 650
Download from Www.Somanuals.com. All Manuals Search And Download.
E-3
E-3
TROUBLESHOOTING
Observe all Safety Guidelines detailed throughout this manual
PROBLEMS
(SYMPTOMS)
RECOMMENDED
COURSE OF ACTION
POSSIBLE CAUSE
FUNCTION PROBLEMS
LOSS OF OUTPUT IN BOTH
MODES OF OPERATION
Test Alternator Rotor Voltage (80-
90 Volts DC) Lead #222 to #1
1. If rotor voltage present go to Step 9. If
no rotor voltage go to Step 2.
2. Lightly sand slip rings and reseat brush-
es.
3. Flash rotor fields.
(Constant and Variable Voltage
Positions)
a) Turn machine off.
b) Use a 12 to 24 volt battery.
c) Apply voltage for 15 seconds, negative
lead to #1, positive lead to #222 at alter-
nator terminal strip.
CAUTION: Wrong polarity may dam-
age diodes.
4. Jumper leads #75 to #222 -- replace
alternator thermostats if this produces
output.
5. Continuity check - (Note B Pg. E-2).
a) Remove rotor brushes.
b) Disconnect #212 and #214 from alterna-
tor terminal strip.
c) Remove all leads from #1 and #2 on con-
trol box terminal strip.
d) Remove both Control Boards.
e) Check continuity from #214 to #1 and #212
to #1 with the positive lead on #214 and
#212. This should read about 27,000 ohms.
If shorted, check C-7 for a short. If all right,
check D5 and D6. See Procedure
6. SCR Bridge Check.-See Procedure
7. Three phase bridge rectifier check.
a) Remove leads from three phase bridge
rectifier assembly and check diodes (D7 -
D8 - D9 - D10 - D11 - D12) See
Procedure
8. Alternator continuity check - (Note B Pg. E-2).
a) Disconnect lead #212 and #214 and
check winding for continuity.
b) Remove one rotor brush, check continuity
of rotor field.
NOTE: Checking resistance of rotor field
may cancel residual magnetism
in the rotor iron. Repeat Step 3,
"Flash Rotor Fields".
9. If Rotor Voltage is present check voltage
between lead #75 and Pin #227 at the
rear of Control Board #2 connector.
(Approximately 15 to 22 volts DC.)
CAUTION
If for any reason you do not understand the test procedures or are unable to perform the tests/repairs safely, contact your Local
Lincoln Authorized Field Service Facility for technical troubleshooting assistance before you proceed.
SAM400 & 650
Download from Www.Somanuals.com. All Manuals Search And Download.
E-4
E-4
TROUBLESHOOTING
Observe all Safety Guidelines detailed throughout this manual
PROBLEMS
(SYMPTOMS)
RECOMMENDED
COURSE OF ACTION
POSSIBLE CAUSE
FUNCTION PROBLEMS
10. Voltage higher than 22 volts DC.
a) If between 22 and 100 volts, replace both
Control Boards. (Note A Pg. E-2).
b) If voltage is greater than 100 volts:
1)Check diode D-4 for a short. See Procedure
2)Replace both Control Boards but only if
voltage between Pin #75 and #227 is
less than 100 volts DC.
11. Voltage less than 15 volts DC, replace
Control Board #1. (Note A Pg. E-2).
12. Voltage within limits.
a) Check SCR Bridge. See Procedure
b) Check generator field coil resistance.
1)Disconnect blue and brown field coil
leads. Resistance should be about 10
ohms.
c) Replace Control Board #1. (Note A Pg. E-2).
d) Check Control Board #2 by following Step
2, Pg E-2.
Output without control - one mode only
(Constant or Variable Voltage)
Output without control - both modes
(Constant and Variable Voltage)
SCR Bridge Test (See Procedure)
Continuity test. (Note B Pg. E-2).
If bridge tests good proceed to next step.
1. Turn machine off.
2. Remove both Control Boards.
3. Place electrode polarity switch in con-
stant voltage positive position.
4. Toggle switch to mode in question.
5. Check continuity of the following (Note
B Pg. E-2):
a) Constant Voltage
1)Work to Pin #217 of the connector for
Control Board #2.
2)Pin #203 of the connector for Control
Board #2 to Pin #216 of the connector
for Control Board #1.
3)Between corresponding numbers of the
connectors for both Control
Pin #75, 216 and 227.
Boards,
b) Variable Voltage
1)Blue field lead to Pin #201 of the con-
nector for Control Board #2.
2)Pin #202 of the connector for Control
Board #2 to Pin #216 of the connector
for Control Board #1.
3)Between corresponding pins of the
connectors of both Control Boards, Pin
#75, 216 and 227.
CAUTION
If for any reason you do not understand the test procedures or are unable to perform the tests/repairs safely, contact your Local
Lincoln Authorized Field Service Facility for technical troubleshooting assistance before you proceed.
SAM400 & 650
Download from Www.Somanuals.com. All Manuals Search And Download.
E-5
E-5
TROUBLESHOOTING
Observe all Safety Guidelines detailed throughout this manual
PROBLEMS
(SYMPTOMS)
RECOMMENDED
COURSE OF ACTION
POSSIBLE CAUSE
FUNCTION PROBLEMS
Output without control -
one mode
Continuity test. (Note B Pg. E-2).
1.Make continuity test outlined in Step 3,
on page E-2 except turn voltage con-
trol from maximum (0 ohms) to mini-
mum (10,000 ohms).
2.Replace Control Board #2. (Note A Pg. E-2).
Output without control -
both modes
l. Replace Control Board #2
2.Replace Control Board #1. (Note A Pg. E-2).
Output low in both modes -
open circuit voltage low (CV and VV
positions)
Test rotor voltage (80-90 volts DC)
1.Rotor Voltage less than 80-90 volts DC
a)Check Diodes D1 - D2 - D5 -D6. See
Procedure.
b)Check SCR Bridge. See Procedure.
c)Check resistance of rotor fields.
Normal value about 14 ohms.
2.Rotor Voltage Within Limits
a)Check SCR Bridge. See Procedure.
b)Check generator field coil resis-
tance.
1)Disconnect blue and brown
field coil leads. Normal value
about 10 ohms. One field coil
open - 20 ohms. Both field
coils open - infinite resistance.
Arc difficult to start in CV position
using low current and voltage
(Characterized by large droplets, low
frequency transfer)
Test alternator outputs
volts DC)
(22-24
1.Set polarity switch in electrode positive
position.
2.Check voltage between work stud and
positive alternator lead connected to
input side of line contactor.
a)Within Limits
Check contactor contacts.
b)Less than 22-24 volts DC
Check three phase bridge recti-
fier diodes D7 - D8 -D9 -D10 -
D11 -D12. See Procedure.
CAUTION
If for any reason you do not understand the test procedures or are unable to perform the tests/repairs safely, contact your Local
Lincoln Authorized Field Service Facility for technical troubleshooting assistance before you proceed.
SAM400 & 650
Download from Www.Somanuals.com. All Manuals Search And Download.
E-6
E-6
TROUBLESHOOTING
DIODE TEST PROCEDURE
SCR BRIDGE PC BOARD TEST PROCEDURE
CAUTION
Standard Polarity
Reverse Polarity
Anode
Cathode
THE SCR BRIDGE SHOULD BE CHECKED BEFORE
INSTALLING NEW CONTROL BOARD. COMPONENTS
ON THE NEW CONTROL BOARD COULD BE DAMAGED
BY A DEFECTIVE SCR BRIDGE.
Cathode
Anode
Conventional
Current Flow
Symbol
Symbol
Conventional
Current Flow
1. Visually inspect the board for obvious failures.
Figure E.1
2. Remove all leads from the terminal strip of the SCR
Bridge PC Board.
1. Isolate the diode in question from the remainder of
the circuit and determine its polarity from the wiring
diagram and Figure E.1.
3. Check C5 and C6 for a short. Read the resistance
between terminals 210 and 214 for C5, and between ter-
minals 212 and 213 for C6.
2. Establish the polarity of the ohmmeter leads.
4. Check SCR1 and SCR2. For SCR1, attach the (-) ohm-
meter lead to the "Brn" Terminal. Place the (+) lead first
on Terminal 210 and then on Terminal 214 and record the
resistance of each. To check SCR2, keep the (-) lead on
the Brn terminal and with the (+) lead on Terminal 212 and
then on Terminal 214 record the resistances read.
Reverse the leads and repeat the above tests. The sec-
ond resistance values should all be higher than those
recorded first. The ohmmeter should be set in its highest
range or in "Auto Range".
3. Connect the ohmmeter across the diode in question
as illustrated in Figures E.2 and E.3 below. Note
polarity of ohmmeter in reference to diode.
A SHORTED DIODE will indicate equally low
resistance in both directions.
AN OPEN DIODE will have infinite or high
resistance in both directions.
A GOOD DIODE will have a reverse resistance
much higher than forward resistance.
5. Check D1 and D2. Place the (-) lead on Terminal 75, and
place the (+) lead on Terminal 214 for D1. Keeping the (-
) lead on Terminal 75, attach the (+) lead to Terminal 212
to test D2. This tests the diodes in the "forward" direction.
Reverse the leads and repeat the previous test. This tests
the diodes in the "reverse" direction. The resistance val-
ues in the reverse direction should all be higher than
those in the forward direction.
OHMMETER
i
-
+
Cathode
Anode
6. Test D3 and R28. Connect the (+) lead to the Brn
Terminal and the (-) lead to the 75 Terminal and record the
resistance. Reverse the meter leads to test the diode in
the reverse direction. The resistance in the reverse direc-
tion should be higher than it is in the forward direction.
Forward Resistance Low
Figure E.2
a) If your ohmmeter has a "Diode Test Range"
(
), use that range for this test. Otherwise
OHMMETER
use "Auto Range" or the lowest range that pro-
duces a meter reading.
i
-
+
b) If D3 is open (or you are using too high a range
on the ohmmeter) you will read only the value of
R28 (about 1200 ohms) in both directions. If D3
is shorted, you will read zero ohms or a very low
resistance in both directions.
Cathode
Anode
Reverse Resistance Low
Figure E.3
7. If the board fails any of the tests, replace it.
SAM400 & 650
Download from Www.Somanuals.com. All Manuals Search And Download.
E-7
E-7
TROUBLESHOOTING
DC on SAM400 machines or 45±1 volts for
SAM650 machines. Recheck to make sure
readings fall within limits. Trimmer #4 set-
ting is dependent on Trimmer #3.
CONTROL PC BOARD CALIBRATION
CAUTION
THE SCR BRIDGE SHOULD BE CHECKED
BEFORE INSTALLING A NEW CONTROL BOARD.
COMPONENTS ON THE NEW CONTROL BOARD
COULD BE DAMAGED BY A DEFECTIVE SCR
BRIDGE.
B. Constant Voltage
1. Place toggle switch in constant voltage
position.
2. Turn constant voltage rheostat and portable
field control to high.
3. Set Trimmer #1 so that OCV is 60±1 volts
DC on SAM400 machines or 68±1 volts for
SAM650 machines.
4. Turn constant voltage rheostat and portable
field control to low.
5. Set Trimmer #2 so that OCV is 21± 0.5 volts
DC on SAM400 machines or 22±0.5 volts
for SAM650 machines. Recheck to make
sure readings fall within limits. Trimmer #2
setting is dependent on Trimmer #1.
NOTE: Before the PC Boards can be calibrated the
machine must be "hot". That is, it should be run
approximately one hour at maximum O.C.V. with all
covers on the generator.
Factory replacement Control PC Boards are preset
and should require only minor adjustment if any.
1. Before any calibrations are made, the engine speed
must be correct. Check the engine speed as fol-
lows:
a) Set toggle switch to variable voltage.
b) Set variable voltage control and portable
field control to high.
c) Allow engine to warm up for approximately
15 minutes.
d) Using an accurate tachometer, check high
idle engine speed. It must be within limits
given on the nameplate. Adjust governor
only if absolutely necessary. To obtain an
accurate speed setting, the unit must be
generating its maximum open circuit voltage
(Step A.3 below). If no voltage is being gen-
erated, this trouble must be first corrected
before final speed setting is obtained.
MAX
-1-
MIN
-2-
Constant
Voltage Trimmers
MAX
-3-
MIN
-4-
Variable
Voltage Trimmers
A. Variable Voltage
1. Place toggle switch in variable voltage posi-
tion.
2. Turn variable voltage control and portable
field control to high.
3. Set Trimmer #3 so that OCV is 95±1 volts
DC on SAM400 machines or 89±1 volts for
SAM650 machines.
4. Turn variable voltage rheostat and portable
field control to low.
5. Set Trimmer #4 so that OCV is 65±1 volts
SAM400 & 650
Download from Www.Somanuals.com. All Manuals Search And Download.
E-8
E-8
TROUBLESHOOTING
GROUND TESTS
CAUTION
This machine is equipped with solid-state electronic
components which can be damaged if subjected to a
ground test or a megger test without observing special
precautions as outlined here:
A. Prior to the ground test always turn the engine off
and remove the two Printed Circuit boards mounted
on the rear of the welder control panel. For access
remove the welder roof and the metal enclosures
over the PC boards. Remove one screw from the
smaller board and two screws from the larger board
and pull each board straight out from the connector
block. There are no wires to disconnect.
B. Connect the following jumpers:
1. Welding generator frame to base.
2. Across D13 (#232 to #1)
3. Across D14 (#234 to #75).
C. Place jumpers across the following points, see
wiring diagram.
1. Across the voltmeter terminals if the unit is
so equipped.
2. Positive side of SCR bridge (#75) to #214
on the SCR bridge located on the rear
panel of the control box.
3. Positive side of SCR bridge (#75) to #212
on the SCR bridge.
4. Across C5 on the SCR bridge.
5. Negative side of the SCR bridge (brown
generator field lead) to #214 on the SCR
bridge.
6. Negative side of the SCR bridge to #212 on
the SCR bridge.
7. Across C6 on the SCR bridge.
8. #1 on the two diode aluminum finned heat
sink to #212 on the SCR bridge.
9. #1 on the two diode aluminum finned heat
sink to #213 on the SCR bridge.
10. #2 on the base of D4, single diode mount-
ed on copper heat sink to #75 on SCR
bridge.
11. Across each of the three-phase bridge
diodes, jumper from the heat sink across
the diode on all six diodes.
NOTE: All jumpers must be as short as possible
SAM400 & 650
Download from Www.Somanuals.com. All Manuals Search And Download.
F-1
F-1
WIRING DIAGRAMS
R 2 2
2 B
2 A
2 1 8
2 1 9
SAM400 & 650
Download from Www.Somanuals.com. All Manuals Search And Download.
F-2
F-2
WIRING DIAGRAMS
R 2 2
F 2
R 2 9
M I N T O 1 4 0 , S T I C K
1 3 0 T O 2 2 5 , S U B M E R G E D A R C , O R S T I C K
2 1 0 T O 3 3 0 , S U B M E R G E D A R C , O R S T I C K
3 0 0 T O 5 7 5 , S U B M E R G E D A R C , M A X . S L O P E , I N N E R S H I E L D
4 5 0 T O M A X . , S U B M E R G E D A R C , M E D . S L O P E , I N N E R S H I E L D
M I N . S L O P E , I N N E R S H I E L D
SAM400 & 650
Download from Www.Somanuals.com. All Manuals Search And Download.
F-3
F-3
WIRING DIAGRAMS
GENERAL MAINTENANCE INSTRUCTIONS FOR ENGINE DRIVEN ARC WELDING POWER SOURCES
WARNING:
Have only qualified personnel perform
maintenance work.
Turn the engine or input power OFF before
maintenance work unless the maintenance work
requires it to be running.
Keep hands, hair, clothing and tools away
from moving parts, and insure all guards or
covers are replaced after servicing.
MOVING
PARTS
CAN INJURE
MAINTENANCE INSTRUCTIONS
DAILY CHECKS:
- Electrode and work connections are tight.
- Rotate the current control twice to clean contacts.
- All equipment in serviceable condition.
- Engine oil, coolant, air cleaner and fuel strainer are at
proper operating level and clean.
AS REQUIRED:
- Blow dust from the machine using clean low pressure air.
- Clean commutators or slip rings with fine sandpaper-
NOT EMERY CLOTH. See the Operating Manual for instructions.
- Replace brushes before the pigtail is within 1/ 4" of the commutator.
See the Operating Manual for instructions.
- Grease may be added to bearings no more than once a year. See
the Operating Manual for instructions.
TO FLASHING DIODE
THERMOSTART
(SAE UNITS ONLY)
EXC
AMMETER
START
THERMOSTART
IGNITER
-
COLD
TERMINAL
B
TO CR7
(SAM UNITS
ONLY)
ALTERNATOR
Y
}
-
IGNITION
SWITCH
-
-
ENGINE HOUR
METER
(OPTIONAL)
FUEL SHUT
OFF VALVE
S
FUEL INJECTION
PUMP
STARTING
MOTOR
M16879
4-3-92A
SAM400 & 650
Download from Www.Somanuals.com. All Manuals Search And Download.
F-4
F-4
WIRING DIAGRAMS
+
+
+
+
+
SAM400 & 650
Download from Www.Somanuals.com. All Manuals Search And Download.
F-5
F-5
DIMENSION PRINT
SAM400 & 650
Download from Www.Somanuals.com. All Manuals Search And Download.
Now Available...12th Edition
New Lessons in Arc Welding
The Procedure Handbook of Arc Welding
Lessons, simply written, cover manipulatory techniques;
machine and electrode characteristics; related subjects, such
as distortion; and supplemental information on arc welding
applications, speeds and costs. Practice materials, exercises,
questions and answers are suggested for each
lesson.
With over 500,000 copies of previous editions published
since 1933, the Procedure Handbook is considered by many to
be the “Bible” of the arc welding industry.
This printing will go fast so don’t delay. Place your
order now using the coupon below.
528 pages, well illustrated, 6” x 9” size, bound in simulated,
gold embossed leather.
The hardbound book contains over 750 pages of welding infor-
mation, techniques and procedures. Much of this material
has never been included in any other book.
$5.00 postage paid U.S.A. Mainland
A
must for all welders, supervisors, engineers and
designers. Many welding instructors will want to use the book as
a reference for all students by taking advantage of the low quan-
tity
discount
prices
which
include
shipping
by
4th class parcel post.
$15.00 postage paid U.S.A. Mainland
Need Welding Training?
The Lincoln Electric Company operates the oldest and
most respected Arc Welding School in the United States at its
corporate headquarters in Cleveland, Ohio. Over 100,000 students
have graduated. Tuition is low and the training is
“hands on”
How To Read Shop Drawings
The book contains the latest information and application
data on the American Welding Society Standard Welding
Symbols. Detailed discussion tells how engineers and drafts-
men use the “short-cut” language of symbols to pass on
assembly and welding information to shop personnel.
For details write:
Lincoln Welding School
22801 St. Clair Ave.
Cleveland, Ohio 44117-1199.
Practical exercises and examples develop the reader’s ability
to visualize mechanically drawn objects as they will appear in
their assembled form.
and ask for bulletin ED-80 or call 216-383-2259 and ask for the
Welding School Registrar.
187 pages with more than 100 illustrations. Size 8-1/2” x 11”
Durable, cloth-covered board binding.
Lincoln Welding School
BASIC COURSE
5 weeks of fundamentals
$700.00
$4.50 postage paid U.S.A. Mainland
There is a 10% discount on all orders of $50.00 or more for shipment at one time to one location.
Orders of $50 or less before discount or orders outside of North America must be prepaid with charge, check or money order in U.S. Funds Only.
Prices include shipment by 4thClass Book Rate for U.S.A. Mainland Only. Please allow up to 4 weeks for delivery.
UPS Shipping for North America Only. All prepaid orders that request UPS shipment please add:
$5.00
For order value up to $49.99
$10.00
$15.00
For order value between $50.00 & $99.99
For order value between $100.00 & $149.00
For North America invoiced orders over $50.00 & credit card orders, if UPS is requested, it will be invoiced or charged to you at cost.
Outside U.S.A. Mainland order must be prepaid in U.S. Funds. Please add $2.00 per book for surface mail or $15.00 per book for air parcel post shipment.
METHOD OF PAYMENT: (Sorry, No C.O.D. Orders)
CHECK ONE:
Name:
_______________________________________________
Address: _______________________________________________
_______________________________________________
Please Invoice (only if order is over $50.00)
Check or Money Order Enclosed, U.S. Funds only
Credit Card -
Telephone: _______________________________________________
MasterCard
VISA
®
®
Signature as it appears on Charge Card:
|_|_| |_|_|
Account No.
|_|_|_|_|_|_|_|_|_|_|_|_|_|_|_|_|_|_|_|_|_|
Exp Date
______________________
Month
Year
USE THIS FORM TO ORDER:
BOOKS OR FREE INFORMATIVE CATALOGS
Order from: BOOK DIVISION, The Lincoln Electric Company, 22801 St. Clair Avenue, Cleveland, Ohio 44117-1199
Telephone: 216-383-2211 or, for fastest service, FAX this completed form to: 216-361-5901.
Lincoln Welding School
Titles:
Price
$5.00
$15.00
$4.50
$5.00
Code
L
PH
H
IM
Quantity
Cost
(ED-80)
New Lessons in Arc Welding
Procedure Handbook “Twelfth Edition”
How to Read Shop Drawings
Incentive Management
A New Approach to Industrial Economics $5.00
The American Century of John C. Lincoln $5.00
Seminar Information
(ED-45)
Educational Video Information
(ED-93)
NA
AC
James F. Lincoln Arc Welding
Foundation Book Information
Welding Preheat Calculator
Pipe Welding Charts
$3.00
$4.50
WC-8
ED-89
(JFLF-515)
SUB TOTAL
Additional Shipping Costs if any
TOTAL COST
Download from Www.Somanuals.com. All Manuals Search And Download.
● Do not touch electrically live parts or ● Keep flammable materials away.
● Wear eye, ear and body protection.
electrode with skin or wet clothing.
● Insulate yourself from work and
ground.
WARNING
Spanish
● No toque las partes o los electrodos ● Mantenga el material combustible
● Protéjase los ojos, los oídos y el
bajo carga con la piel o ropa moja-
da.
● Aislese del trabajo y de la tierra.
fuera del área de trabajo.
cuerpo.
AVISO DE
PRECAUCION
French
● Ne laissez ni la peau ni des vête-
ments mouillés entrer en contact
avec des pièces sous tension.
● Gardez à l’écart de tout matériel
inflammable.
● Protégez vos yeux, vos oreilles et
votre corps.
ATTENTION
● Isolez-vous du travail et de la terre.
German
● Berühren Sie keine stromführenden
Teile oder Elektroden mit Ihrem
Körper oder feuchter Kleidung!
● Isolieren Sie sich von den
● Entfernen Sie brennbarres Material! ● Tragen Sie Augen-, Ohren- und Kör-
perschutz!
WARNUNG
Elektroden und dem Erdboden!
Portuguese
● Não toque partes elétricas e elec-
trodos com a pele ou roupa molha-
da.
● Mantenha inflamáveis bem guarda- ● Use proteção para a vista, ouvido e
dos.
corpo.
ATENÇÃO
● Isole-se da peça e terra.
Japanese
Chinese
Korean
Arabic
READ AND UNDERSTAND THE MANUFACTURER’S INSTRUCTION FOR THIS EQUIPMENT AND THE CONSUMABLES TO
BE USED AND FOLLOW YOUR EMPLOYER’S SAFETY PRACTICES.
SE RECOMIENDA LEER Y ENTENDER LAS INSTRUCCIONES DEL FABRICANTE PARA EL USO DE ESTE EQUIPO Y LOS
CONSUMIBLES QUE VA A UTILIZAR, SIGA LAS MEDIDAS DE SEGURIDAD DE SU SUPERVISOR.
LISEZ ET COMPRENEZ LES INSTRUCTIONS DU FABRICANT EN CE QUI REGARDE CET EQUIPMENT ET LES PRODUITS A
ETRE EMPLOYES ET SUIVEZ LES PROCEDURES DE SECURITE DE VOTRE EMPLOYEUR.
LESEN SIE UND BEFOLGEN SIE DIE BETRIEBSANLEITUNG DER ANLAGE UND DEN ELEKTRODENEINSATZ DES HER-
STELLERS. DIE UNFALLVERHÜTUNGSVORSCHRIFTEN DES ARBEITGEBERS SIND EBENFALLS ZU BEACHTEN.
SAM400 & 650
Download from Www.Somanuals.com. All Manuals Search And Download.
● Keep your head out of fumes.
● Use ventilation or exhaust to
remove fumes from breathing zone.
● Turn power off before servicing.
● Do not operate with panel open or
guards off.
WARNING
Spanish
● Los humos fuera de la zona de res-
piración.
● Mantenga la cabeza fuera de los
humos. Utilice ventilación o
aspiración para gases.
● Desconectar el cable de ali-
mentación de poder de la máquina
antes de iniciar cualquier servicio.
● No operar con panel abierto o
guardas quitadas.
AVISO DE
PRECAUCION
French
● N’opérez pas avec les panneaux
ouverts ou avec les dispositifs de
protection enlevés.
● Gardez la tête à l’écart des fumées. ● Débranchez le courant avant l’entre-
● Utilisez un ventilateur ou un aspira-
teur pour ôter les fumées des zones
de travail.
tien.
ATTENTION
German
● Anlage nie ohne Schutzgehäuse
oder Innenschutzverkleidung in
Betrieb setzen!
● Vermeiden Sie das Einatmen von
Schweibrauch!
● Sorgen Sie für gute Be- und
Entlüftung des Arbeitsplatzes!
● Strom vor Wartungsarbeiten
abschalten! (Netzstrom völlig öff-
nen; Maschine anhalten!)
WARNUNG
Portuguese
● Não opere com as tampas removidas.
● Desligue a corrente antes de fazer
serviço.
● Mantenha-se afastado das partes
moventes.
● Não opere com os paineis abertos
ou guardas removidas.
● Mantenha seu rosto da fumaça.
● Use ventilação e exhaustão para
remover fumo da zona respiratória.
ATENÇÃO
● Não toque as partes elétricas nuas.
Japanese
Chinese
Korean
Arabic
LEIA E COMPREENDA AS INSTRUÇÕES DO FABRICANTE PARA ESTE EQUIPAMENTO E AS PARTES DE USO, E SIGA AS
PRÁTICAS DE SEGURANÇA DO EMPREGADOR.
SAM400 & 650
Download from Www.Somanuals.com. All Manuals Search And Download.
3
Y E A R
W ARRANTY
IN CLUDIN G: P AR TS
&
LABOR
S22127-3
LIMITED WARRANTY
STATEMENT OF WARRANTY:
TO OBTAIN WARRANT
The Lincoln Electric Company (Lincoln) warrants to the
original purchaser (end-user) of new equipment that it will
be free of defects in workmanship and material.
You are required to oln
Distributor, Lincolf
any defect wits
recommen
This warranty is void if Lincoln finds that the equipment has
been subjected to improper care or abnormal operation.
WAR
WARRANTY PERIOD:
nfirms the exis-
ty, the defect will be
Lincoln's option.
All warranty periods date from the date of shipment to t
original purchaser and are as follows:
Three Years:
Transformer Welders
Motor-generator Welders
Inverter Welders
Automatic Wire Feeders
Semiautomatic Wire Feeders
Plasma-cutting Power Source
Engine Driven Welders (ex
accessories) with opera
t of shipping the equipment to a
er or Field Service Shop as well as
you from that location.
NT WARRANTY LIMITATIONS:
incoln will not accept responsibility for repairs made
without its authorization.
Two Years:
Engine Driven
accessories
with oper
• Lincoln shall not be liable for consequential damages
(such as loss of business, etc.) caused by the defect or
reasonable delay in correcting the defect.
SEE IMWS 1
All end by the
enare not cov-
• Lincoln's liability under this warranty shall not exceed
the cost of correcting the defect.
O
WARRANTY SUPERSEDED
• This written warranty is the only express warranty pro-
Equigun and cable assem-
blies, wor MIG-TRAK equipment,
air compr00 WELD’N AIR, Power-Arc
4000 generWire Feed Module (Factory
Installed) and fieled optional equipment.
vided by Lincoln with respect to its products. Warranties
implied by law such as the Warranty of Merchantability
are limited to the duration of this limited warranty for the
equipment involved.
April, ‘97
World's Leader in Welding and Cutting Products
Premier Manufacturer of Industrial Motors
• Sales and Service through Subsidiaries and Distributors Worldwide •
22801 St. Clair Ave. Cleveland, Ohio 44117-1199 U.S.A. Tel. 216-481-8100
Download from Www.Somanuals.com. All Manuals Search And Download.
|