| 	
		 GE Appliances   
					AZ22E09D*P - GE Zoneline Dry Air 25 Series Cooling and Electric Heat Unit   
					Electrical Wiring   
					Wall Case Dimensions   
					Maximum Cord Extension   
					(in inches)   
					All wiring, including installation of receptacle, must be made in accordance with local electrical   
					codes and regulations.   
					Note: Aluminum wiring may pose special problems—consult a qualified electrician.   
					RAB71A = 20-7/8   
					RAB77A = 21   
					7-1/8   
					Grille   
					A 
					Resistance Heat   
					Resistance heat or back-up heat determined by Quick Connect power cord on the Premium Series   
					and selected heater size for the Value Series (15 amp. 8,600 BTU, 20 amp. 11,700 BTU and 30   
					amp. 17,000 BTU @ 230 volt).   
					RAB71A = 16   
					RAB77A = 16-1/4   
					SIDE   
					VIEW   
					C 
					Grille Options   
					Inside   
					Outside   
					Stamped Aluminum Grille—RAG60   
					Molded Exterior Architectural Louvers (Cycoloy)   
					RAG61 or RAG64 (Beige)   
					RAG62 or RAG65 (Maple)   
					Ducted Applications   
					2200 and 3200 series can be used with ductwork to heat or cool more than one room. RAK605 Duct   
					Adaptor is applied to top of case over air discharge/RAK601 Duct Extension is applied to right or left   
					of adaptor. Locally fabricated ductwork may be added to extend to maximum recommended distance   
					of 15 feet.   
					RAG63 or RAG66 (Bittersweet)   
					RAG67 (Extruded Aluminum)   
					B 
					Room   
					Cabinet   
					RAB71 Insulated Wall Case   
					Heavy-gauge galvanized steel, with insulation.   
					A-42", B-13-3/4", C-16"   
					RAB77 Wall Case   
					Molded SMC fiberglass-reinforced polyester compound.   
					A-42-1/8", B-13-7/8", C-16-1/4"   
					Electrical Connection   
					21   
					58   
					230/208 volt units may be plugged into a receptacle. 265 volt units and special application 230/208   
					volt units require direct connection. See Architects and Engineers Design Data Manual for electrical   
					connection information including use of sub-base for direct connected units. Installation must   
					comply with local electrical codes and regulations.   
					Wall Opening Dimensions   
					Inside   
					Add 1/4" to A and C dimensions for all cut-out size.   
					Zoneline Installation   
					Simple Three-Step Installation   
					1. Frame the Opening. The RAB77A SMC wall case requires an opening of 16-1/2" high x 42-3/8"   
					wide. Position the sleeve, secure it to the studs and then caulk. Complete instructions are furnished   
					with each unit.   
					2. Connect the Electrical Supply. Each Zoneline unit requires a 230/208V power supply. It is   
					strongly recommended that electrical connections be made by a qualified electrician. All wiring,   
					including installation of the receptacle, must be in accordance with local codes.   
					Zoneline heat pumps and heat/cool units are designed for easy installation, off or flush with the floor.   
					When the SMC fiberglass-reinforced polyester sleeve is installed, the chassis simply slides into place.   
					Compatibility with existing Zoneline wall cases and rear grilles simplifies retrofit installations. A new   
					chassis simply slides into the already installed wall case; the existing rear grille may be used as is, or   
					with a minor modification for greater operating efficiency.   
					3. Slide In Chassis. With the wall sleeve, electrical receptacle, and exterior grille in place, the   
					separate chassis simply slides into position. Install the roomside cabinet, and plug into the electrical   
					receptacle. You are now ready for many years of quiet comfort.   
					® 
					™ 
					™ 
					For answers to your Monogram, GE Profile Performance Series, GE Profile, and   
					GE appliance questions, call GE Answer Center® service, 800.626.2000.   
					Created 3/99   
				 |