Goodman Mfg Gas Heater ANSI Z2147CSA 23 User Manual

INSTALLATION INSTRUCTIONS FOR  
COMMERCIAL HEATING & COOLING  
15 & 20 TON PACKAGE GAS SERIES  
CPG SERIES  
®
US  
C
This Forced Air Central Unit Design Complies With  
Requirements Embodied in The American National  
Standard / National Standard of Canada Shown  
Below.  
ANSI Z21.47•CSA-2.3 Central Furnaces  
RECOGNIZE THIS SYMBOL AS A SAFETY PRECAUTION.  
ATTENTION INSTALLING PERSONNEL  
Prior to installation, thoroughly familiarize yourself with this Installation Manual. Observe all safety warnings.  
During installation or repair, caution is to be observed.  
It is your responsibility to install the product safely and to educate the customer on its safe use.  
All information contained herein is subject to change without notice.  
© 2010 Goodman Manufacturing Company, L.P.  
IO-366B  
7/10  
5151 San Felipe, Suite 500 Houston, TX 77056  
Download from Www.Somanuals.com. All Manuals Search And Download.  
WARNING  
WARNING  
THIS PRODUCT CONTAINS OR PRODUCES A CHEMICAL OR CHEMICALS  
WHICH MAY CAUSE SERIOUS ILLNESS OR DEATH AND WHICH ARE  
KNOWN TO THE STATE OF CALIFORNIA TO CAUSE CANCER, BIRTH  
DEFECTS OR OTHER REPRODUCTIVE HARM.  
CARBON MONOXIDE POISONING HAZARD  
Failure to keep this compartment closed except  
when servicing could result in carbon monoxide  
poisoning or death.  
WARNING  
TO AVOID PROPERTY DAMAGE, PERSONAL INJURY OR DEATH, DO NOT  
USE THIS UNIT IF ANY PART HAS BEEN UNDER WATER. IMMEDIATELY  
CALL A QUALIFIED SERVICE TECHNICIAN TO INSPECT THE FURNACE AND  
TO REPLACE ANY PART OF THE CONTROL SYSTEM AND ANY GAS  
CONTROL HAVING BEEN UNDER WATER.  
This compartment must be closed except  
when servicing.  
DANGER  
RISQUE D'EMPOISONNEMENT AU  
MONOXYDE DE CARBONE  
Si ce compartiment n'est pas ferme en tout temps, sauf  
en cas de reparation, il y a risque d'empoisonnement  
ou monoxyde de carbon ou de mort.  
WARNING  
Ce compartiment doit être ferme sauf au  
moment de l'entretien.  
THIS UNIT MUST NOT BE USED AS A CONSTRUCTION HEATERDURING  
THE FINISHING PHASES OF CONSTRUCTION ON A NEW STRUCTURE. THIS  
TYPE OF USE MAY RESULT IN PREMATURE FAILURE OF THE UNIT DUE TO  
EXTREMELY LOW RETURN AIR TEMPERATURES AND EXPOSURE TO  
CORROSIVE OR VERY DIRTY ATMOSPHERES.  
PELIGRO  
PELIGRO MONOXIDO DE CARBONO  
TOXICO  
El fracaso de no mantener compartimiento cerrado  
menos durante, atender, podria tener como resultado  
envenar de monoxido de carbona o muerte.  
WARNING  
Este compartimiento debe cerrado menos  
HIGH VOLTAGE !  
al atender.  
0140L00106 REV C  
DISCONNECT ALL POWER BEFORE SERVICING OR  
INSTALLING THIS UNIT. MULTIPLE POWER SOURCES MAY  
BE PRESENT. FAILURE TO DO SO MAY CAUSE PROPERTY  
DAMAGE, PERSONAL INJURY OR DEATH.  
GENERAL INFORMATION  
WARNING  
WARNING  
TO PREVENT PROPERTY DAMAGE, PERSONAL INJURY OR DEATH DUE TO  
FIRE, EXPLOSIONS, SMOKE, SOOT, CONDENSATION, ELECTRIC SHOCK OR  
CARBON MONOXIDE, THIS UNIT MUST BE PROPERLY INSTALLED,  
REPAIRED, OPERATED AND MAINTAINED.  
TO PREVENT THE RISK OF PROPERTY DAMAGE, PERSONAL INJURY OR  
DEATH, DO NOT STORE COMBUSTIBLE MATERIALS OR USE GASOLINE OR  
OTHER FLAMMABLE LIQUIDS OR VAPORS IN THE VICINITY OF THIS  
APPLIANCE.  
This unit is approved for outdoor installation ONLY. To  
assure that your unit operates safely and efficiently, it must  
be installed, operated, and maintained in accordance with  
these installation and operating instructions, all local building  
codes and ordinances, or in their absence, with the latest  
edition of the National Fuel Gas Code NFPA54/ANSI Z223.1  
and National Standard of Canada CAN/CSA B149 Installa-  
tion Codes.  
WARNING  
HIGH VOLTAGE!  
INSTALLATION AND REPAIR OF THIS UNIT SHOULD BE  
PERFORMED ONLY BY INDIVIDUALS MEETING (AT A  
MINIMUM) THE REQUIREMENTS OF AN “ENTRY LEVEL  
TECHNICIANAS SPECIFIED BY THE AIR CONDITIONING,  
HEATING, AND REFRIGERATION INSTITUTE (AHRI).  
ATTEMPTING TO INSTALL OR REPAIR THIS UNIT WITHOUT  
SUCH BACKGROUND MAY RESULT IN PRODUCT DAMAGE,  
PERSONAL INJURY OR DEATH.  
The heating and cooling capacities of the unit should be  
greater than or equal to the design heating and cooling loads  
of the area to be conditioned. The loads should be calculated  
by an approved method or in accordance withASHRAE Guide  
or Manual J - Load Calculations published by the Air Condi-  
tioning Contractors of America.  
Obtain from:  
American National Standards Institute  
1430 Broadway  
New York, NY 10018  
3
Download from Www.Somanuals.com. All Manuals Search And Download.  
System design and installation should also, where applicable, IMPORTANT NOTE: Remove wood shipping rails prior to  
follow information presented in accepted industry guides such installation of the unit. See important note under Roof Curb  
as the ASHRAE Handbooks. The manufacturer assumes no Installation Only.  
responsibility for equipment installed in violation of any code  
or regulation. The mechanical installation of the packaged  
roof top units consists of making final connections between  
the unit and building services; supply and return duct con-  
nections; and drain connections (if required). The internal  
systems of the unit are completely factory-installed and tested  
prior to shipment.  
ALL INSTALLATIONS:  
IMPORTANT NOTE: Unit should be energized 24 hours prior  
to compressor start up to ensure crankcase heater has  
sufficientlywarmedthecompressors.Compressordam-  
age may occur if this step is not followed.  
Units are generally installed on a steel roof mounting curb  
assembly which has been shipped to the job site for installa-  
tion on the roof structure prior to the arrival of the unit. The  
NOTE: Appliance is shipped from factory for vertical duct  
application.  
model number shown on the unit’s identification plate identi- Proper installation of the unit ensures trouble-free operation.  
fies the various components of the unit such as refrigeration Improper installation can result in problems ranging from  
tonnage, heating input and voltage.  
noisy operation to property or equipment damages, danger-  
ous conditions that could result in injury or personal property  
damage and could void the warranty. Give this booklet to the  
user and explain it’s provisions. The user should retain these  
instructions for future reference.  
Carefully inspect the unit for damage including damage to  
the cabinetry. Any bolts or screws which may have loosened  
in transit must be re-tightened. In the event of damage, the  
receiver should:  
1. Make notation on delivery receipt of any visible  
damage to shipment or container.  
For proper flame pattern within the heat exchanger  
and proper condensate drainage, the unit must be  
mounted level.  
2. Notify carrier promptly and request an inspection.  
3. In case of concealed damage, carrier should be  
notified as soon as possible-preferably within 5 days.  
4. File the claim with the following supporting documents:  
a. Original Bill of Lading, certified copy, or indemnity  
bond.  
b. Original paid freight bill or indemnity in lieu thereof.  
c. Original invoice or certified copy thereof, showing  
trade and other discounts or reductions.  
d. Copy of the inspection report issued by carrier  
representative at the time damage is reported to the  
carrier. The carrier is responsible for making prompt  
inspection of damage and for a thorough  
investigation of each claim. The distributor or  
manufacturer will not accept claims from dealers for  
transportation damage.  
The flue outlet must be at least 12 inches from any  
opening through which flue gases could enter a  
building, and at least three feet above any forced air  
inlet located within ten feet. The economizer/manual  
fresh air intake/motorized fresh air intake and  
combustion air inlet mounted on the unit are not  
affected by this restriction.  
To avoid possible corrosion of the heat exchanger,  
do not locate the unit in an area where the outdoor air  
(i.e. combustion air for the unit) will be frequently  
contaminated by compounds containing chlorine or  
fluorine. Common sources of such compounds include  
swimming pool chemicals and chlorine bleaches, paint  
stripper, adhesives, paints, varnishes, sealers, waxes  
(which are not yet dried) and solvents used during  
construction and remodeling. Various commercial and  
industrial processes may also be sources of chlorine/  
fluorine compounds.  
NOTE: When inspecting the unit for transportation damage,  
remove all packaging materials. Recycle or dispose of the  
packaging material according to local codes.  
PRE-INSTALLATION CHECKS  
Carefully read all instructions for the installation prior to in-  
stalling unit. Ensure each step or procedure is understood  
and any special considerations are taken into account be-  
fore starting installation. Assemble all tools, hardware and  
supplies needed to complete the installation. Some items may  
need to be purchased locally.  
To avoid possible illness or death of the building  
occupants, do NOT locate outside air intake device  
(economizer, manual fresh air intake, motorized fresh  
air intake) too close to an exhaust outlet, gas vent  
termination, or plumbing vent outlet. For specific  
distances required, consult local codes.  
Allow minimum clearances from the enclosure for fire  
protection, proper operation, and service access (see  
unit clearances). These clearances must be  
permanently maintained.  
UNIT LOCATION  
WARNING  
TO PREVENT POSSIBLE EQUIPMENT DAMAGE, PROPERTY DAMAGE,  
PERSONAL INJURY OR DEATH, THE FOLLOWING BULLET POINTS MUST BE  
OBSERVED WHEN INSTALLING THE UNIT.  
4
Download from Www.Somanuals.com. All Manuals Search And Download.  
The combustion air inlet and flue outlet on the unit  
must never be obstructed. If used, do not allow the  
economizer/manual fresh air damper/ motorized fresh  
air damper to become blocked by snow or debris. In  
some climates or locations, it may be necessary to  
elevate the unit to avoid these problems.  
When the unit is heating, the temperature of the return  
air entering the unit must be between 50° F and 100°  
F.  
GROUND LEVEL INSTALLATIONS ONLY:  
When the unit is installed on the ground adjacent to  
the building, a level concrete (or equal) base is  
recommended. Prepare a base that is 3” larger than  
the package unit footprint and a minimum of 3” thick.  
ELECTRICAL ENTRANCE LOCATIONS  
Do not remove any access panels until unit has been  
installed on roof curb or field supplied structure.  
Do not roll unit across finished roof without prior  
approval of owner or architect.  
Do not skid or slide on any surface as this may  
damage unit base. The unit must be stored on a  
flat, level surface. Protect the condenser coil  
because it is easily damaged.  
The base should also be located where no runoff of  
water from higher ground can collect in the unit.  
ROOF TOP INSTALLATIONS ONLY:  
To avoid possible property damage or personal injury,  
the roof must have sufficient structural strength to carry  
the weight of the unit(s) and snow or water loads as  
required by local codes. Consult a structural engineer  
to determine the weight capabilities of the roof.  
ROOF CURB INSTALLATIONS ONLY:  
The unit may be installed directly on wood floors or  
on ClassA, Class B, or Class C roof covering material.  
To avoid possible personal injury, a safe, flat surface  
for service personnel should be provided.  
As indicated on the unit data plate, a minimum  
clearance of 36” to any combustible material is  
required on the furnace access side of the unit. All  
combustible materials must be kept out of this area.  
Before installing this unit...  
IMPORTANT NOTE: This unit has been equipped with a ship-  
ping brace under the compressor section that MUST BE RE-  
MOVED before installing the unit on a roof curb.  
Please follow the instructions below to remove brace.  
This 36” clearance must also be maintained to insure  
proper combustion air and flue gas flow. The  
combustion air intake and furnace flue discharge must  
not be blocked for any reason, including blockage by  
snow.  
CAUTION  
WHEN UNIT IS SUSPENDED, BOARDS AND SHIPPING BRACE WILL DROP WHEN  
SCREWS ARE REMOVED. TO PREVENT PERSONAL INJURY, STAND CLEAR.  
REMOVE FORK HOLE BRACKETS, BOARDS AND SHIPPING BRACE FROM BOTTOM  
OF UNIT BEFORE PLACING UNIT ONTO CURB.  
Adequate clearances from the furnace flue discharge  
to any adjacent public walkways, adjacent buildings,  
building openings or openable windows must be  
maintained in accordance with the latest edition of  
the National Fuel Gas Code (ANSI Z223.1)  
1. Remove wooden struts and shipping brace per  
installation instructions. The struts are located in the  
fork holes and are used to protect the unit from  
damage while lifting with forks. The shipping brace  
is located under the unit (under compressor). Also  
remove the fork hole brackets as shown in the  
following figure.  
Minimum horizontal clearance of 48” from the furnace  
flue discharge to any electric meters, gas meters,  
regulators and relief equipment is required.  
2. Locate and remove the end brackets as shown in the  
following figure.  
UNIT PRECAUTIONS  
Do not stand or walk on the unit.  
Except for holes in the wiring entrances (see Figure  
below), do not drill holes anywhere in panels or in  
the base frame of the unit. Unit access panels  
provide structural support.  
5
Download from Www.Somanuals.com. All Manuals Search And Download.  
LIFT OVERAPPROXIMATE  
CENTER OF UNIT  
WARNING  
SPREADER BARS  
MUST BE USED WITH  
LIFTING STRAPS THAT  
ARE LESS THAN 16  
FEET LONG  
TO PREVENT POSSIBLE EQUIPMENT DAMAGE, PROPERTY DAMAGE,  
PERSONAL INJURY OR DEATH, THE FOLLOWING BULLET POINTS MUST BE  
OBSERVED WHEN INSTALLING THE UNIT.  
Sufficient structural support must be determined prior  
to locating and mounting the curb and package unit.  
Ductwork must be constructed using industry  
guidelines. The duct work must be placed into the  
roof curb before mounting the package unit. Our full  
perimeter curbs include duct connection frames to be  
assembled with the curb. Cantilevered type curbs  
are not available from the factory.  
Curb insulation, cant strips, flashing and general  
roofing material are furnished by the contractor.  
The curbs must be supported on parallel sides by roof mem-  
bers. The roof members must not penetrate supply and re-  
turn duct opening areas as damage to the unit might occur.  
NOTE: The unit and curb accessories are designed to allow  
vertical duct installation before unit placement. Duct  
installation after unit placement is not recommended.  
CAUTION  
ALL CURBS LOOK SIMILAR. TO AVOID INCORRECT CURB POSITIONING,  
CHECK JOB PLANS CAREFULLY AND VERIFY MARKINGS ON CURB  
ASSEMBLY. INSTRUCTIONS MAY VARY IN CURB STYLES AND SUPERCEDE  
INFORMATION SHOWN.  
REMOVE 2 BRACKETS  
ON EACH END TO  
REMOVE  
REMOVE 2 BRACKETS  
ON EACH END TO  
REMOVE  
WOODEN STRUTS  
SHIPPING BRACE  
See the manual shipped with the roof curb for assembly and  
installation instructions.  
CLEARANCES  
3. Lift unit per the “Rigging Details” section of this manual,  
observing all warnings and cautions. When unit is  
lifted, boards and shipping brace will drop if screws  
have been removed. To avoid injury, STAND CLEAR.  
36”; minimum  
roof overhang  
4. Dispose of the boards and brace appropriately.  
Curb installations must comply with local codes and should  
be done in accordance with the established guidelines of the  
National Roofing Contractors Association.  
48”  
72”  
Proper unit installation requires that the roof curb be firmly  
and permanently attached to the roof structure. Check for  
adequate fastening method prior to setting the unit on the  
curb.  
48”  
6”  
Full perimeter roof curbs are available from the factory and  
are shipped unassembled. Field assembly, squaring, level-  
ing and mounting on the roof structure are the responsibility  
of the installing contractor. All required hardware necessary  
for the assembly of the sheet metal curb is included in the  
curb accessory.  
UNIT CLEARANCES  
Adequate clearance around the unit should be kept for safety,  
service, maintenance, and proper unit operation. Atotal clear-  
ance of 75” on the main control panel side of the unit is rec-  
ommended to facilitate possible fan shaft, coil, electric heat  
and gas furnace removal. Aclearance of 48” is recommended  
on all other sides of the unit to facilitate possible compressor  
6
Download from Www.Somanuals.com. All Manuals Search And Download.  
removal, to allow service access and to insure proper venti-  
lation and condenser airflow. The unit must not be installed  
beneath any obstruction. The unit should be installed re-  
mote from all building exhausts to inhibit ingestion of exhaust  
air into the unit fresh air intake.  
RIGGING DETAILS  
WARNING  
TO PREVENT PROPERTY DAMAGE, THE UNIT SHOULD REMAIN IN AN  
UPRIGHT POSITION DURING ALL RIGGING AND MOVING OPERATIONS.  
TO FACILITATE LIFTING AND MOVING WHEN A CRANE IS USED, PLACE  
THE UNIT IN AN ADEQUATE CABLE SLING.  
CAUTION  
DO NOT LIFT UNITS TWO AT A TIME. PROVISIONS FOR FORKS HAVE BEEN  
INCLUDED IN THE UNIT BASE FRAME. MINIMUM FORK LENGTH IS 72” TO  
PREVENT DAMAGE TO THE UNIT.  
Provisions for forks have been included in the unit base frame.  
No other fork locations are approved.  
WARNING  
TO PREVENT POSSIBLE EQUIPMENT DAMAGE, PROPERTY DAMAGE,  
PERSONAL INJURY OR DEATH, THE FOLLOWING BULLET POINTS MUST BE  
OBSERVED WHEN INSTALLING THE UNIT.  
Unit must be lifted by the four lifting holes located at  
the base frame corners.  
Lifting cables should be attached to the unit with  
shackles.  
The distance between the crane hook and the top of  
the unit must not be less than 60”.  
Two spreader bars must span over the unit to prevent  
damage to the cabinet by the lift cables. Spreader  
bars must be of sufficient length so that cables do not  
come in contact with the unit during transport.  
Remove wood struts mounted beneath unit base  
frame before setting unit on roof curb. These struts  
are intended to protect unit base frame from fork lift  
damage. Removal is accomplished by extracting the  
sheet metal retainers and pulling the struts through  
the base of the unit. Refer to rigging label on the unit.  
INSULATED  
PANELS  
ROOF CURB INSTALLATION  
ROOF CURB POST-INSTALLATION  
CHECKS  
After installation, check the top of the curb, duct connection  
frame and duct flanges to make sure gasket has been ap-  
plied properly. Gasket should be firmly applied to the top of  
the curb perimeter, duct flanges and any exposed duct con-  
nection frame. If gasket is loose, re-apply using strong  
weather resistant adhesive.  
Important: If using bottom discharge with roof curb, duct-  
work should be attached to the curb prior to installing the  
unit. Ductwork dimensions are shown in Roof Curb Installa-  
tion Instructions.  
Refer to the Roof Curb Installation Instructions for proper curb  
installation. Curbing must be installed in compliance with the  
National Roofing Contractors Association Manual.  
PROTRUSION  
Lower unit carefully onto roof mounting curb. While rigging  
unit, center of gravity will cause condenser end to be lower  
than supply air end.  
Inspect curb to ensure that none of the utility services (elec-  
tric) routed through the curb protrude above the curb.  
CAUTION  
IF PROTRUSIONS EXIST, DO NOT ATTEMPT TO SET UNIT ON CURB.  
INFORMATION SHOWN.  
ROOF TOP DUCT CONNECTIONS  
Install all duct connections on the unit before placing the unit  
on rooftop.  
7
Download from Www.Somanuals.com. All Manuals Search And Download.  
CAUTION  
TO PREVENT SEVERE DAMAGE TO THE BOTTOM OF THE UNIT, DO NOT  
FORK LIFT UNIT AFTER WOOD STRUTS HAVE BEEN REMOVED.  
Bring condenser end of unit into alignment with the curb. With  
condenser end of the unit resting on curb member and using  
curb as a fulcrum, lower opposite end of the unit until entire  
unit is seated on the curb. When a rectangular cantilever  
curb is used, care should be taken to center the unit. Check  
for proper alignment and orientation of supply and return  
openings with duct.  
RIGGING REMOVAL  
CAUTION  
TO PREVENT DAMAGE TO THE UNIT, DO NOT ALLOW CRANE HOOKS AND  
SPREADER BARS TO REST ON THE ROOF OF THE UNIT.  
Remove spreader bars, lifting cables and other rigging equip-  
ment.  
CAUTION  
ELECTRICAL WIRING  
WHEN UNIT IS SUSPENDED, BOARDS AND SHIPPING BRACE WILL DROP WHEN  
SCREWS ARE REMOVED. TO PREVENT PERSONAL INJURY, STAND CLEAR.  
REMOVE FORK HOLE BRACKETS, BOARDS AND SHIPPING BRACE FROM BOTTOM  
OF UNIT BEFORE PLACING UNIT ONTO CURB.  
WARNING  
HIGH VOLTAGE !  
To assist in determining rigging requirements, unit weights  
are shown as follows:  
DISCONNECT ALL POWER BEFORE SERVICING OR  
INSTALLING THIS UNIT. MULTIPLE POWER SOURCES MAY  
BE PRESENT. FAILURE TO DO SO MAY CAUSE PROPERTY  
DAMAGE, PERSONAL INJURY OR DEATH.  
A
C
COMPRESSOR 1  
Y
WARNING  
HIGH VOLTAGE !  
CG  
TO AVOID PERSONAL INJURY OR DEATH DUE TO ELECTRICAL  
SHOCK, DO NOT TAMPER WITH FACTORY WIRING. THE  
INTERNAL POWER AND CONTROL WIRING OF THESE UNITS  
ARE FACTORYINSTALLED AND HAVE BEEN THOROUGHLY  
TESTED PRIOR TO SHIPMENT. CONTACT YOUR LOCAL  
REPRESENTATIVE IF ASSISTANCE IS REQUIRED.  
COMPRESSOR 2  
B
D
CAUTION  
X
CORNER & CENTER OF GRAVITY LOCATIONS  
TO PREVENT DAMAGE TO THE WIRING, PROTECT WIRING FROM SHARP  
EDGES. FOLLOW NATIONAL ELECTRICAL CODE AND ALL LOCAL CODES  
AND ORDINANCES. DO NOT ROUTE WIRES THROUGH REMOVABLE  
ACCESS PANELS.  
CPG Weights  
(lbs)  
CPG Weights  
(lbs)  
20 Tons  
655  
DATA  
15 Tons  
Corner Weight - A  
Corner Weight - B  
Corner Weight - C  
Corner Weight - D  
Unit Shipping Weight  
Unit Operating Weight  
X (Inches)  
570  
535  
545  
510  
2270  
CAUTION  
535  
CONDUIT AND FITTINGS MUST BE WEATHERTIGHT TO PREVENT WATER  
ENTRY INTO THE BUILDING.  
600  
485  
For unit protection, use a fuse or HACR circuit breaker that is  
in excess of the circuit ampacity, but less than or equal to the  
maximum overcurrent protection device. DO NOT EXCEED  
THE MAXIMUM OVERCURRENT DEVICE SIZE SHOWN  
ON UNIT DATA PLATE.  
2390  
2275  
63"  
2155  
65"  
43"  
40"  
Y (Inches)  
NOTE: These weights are without accessories installed.  
8
Download from Www.Somanuals.com. All Manuals Search And Download.  
All line voltage connections must be made through weather-  
proof fittings. All exterior power supply and ground wiring  
must be in approved weatherproof conduit.  
Line voltage connects  
to middle contactor  
on 460v and 575v  
Gas Packs  
The main power supply wiring to the unit and low voltage  
wiring to accessory controls must be done in accordance with  
these instructions, the latest edition of the National Electrical  
Code (ANSI/NFPA 70), and all local codes and ordinances.  
All field wiring shall conform with the temperature limitations  
for Type T wire (63°F/35°C rise).  
Ground  
Lug  
Power Block  
(Coolers &  
230V Gas Packs  
Only)  
The main power supply shall be three-phase, three wire. The  
unit is factory wired for the voltage shown on the unit’s data  
plate.  
Line voltage connects  
to power block on  
Coolers and the 230v  
Gas Packs  
NOTE: If supply voltage is 208V, all leads on primary of trans-  
former TRANS1 must be moved from the 230V to the 208V  
tap.  
Low Voltage  
Terminal Strip  
Main power wiring should be sized for the minimum wire  
ampacity shown on the unit’s database. Size wires in accor-  
dance with the ampacity tables in Article 310 of the National  
Electrical Code. If long wires are required, it may be neces-  
sary to increase the wire size to prevent excessive voltage  
drop. Wires should be sized for a maximum of 3% voltage  
drop.  
Field wiring enters  
from this direction  
Thermostat wiring  
for all units  
connect to low  
voltage strip  
POWER AND LOW VOLTAGE BLOCK LOCATIONS  
WARNING  
CAUTION  
FAILURE OF UNIT DUE TO OPERATION ON IMPROPER LINE VOLTAGE OR  
WITH EXCESSIVE PHASE UNBALANCE CONSTITUTES PRODUCT ABUSE AND  
WILL VOID YOUR WARRANTY AND MAY CAUSE SEVERE DAMAGE TO THE  
UNIT ELECTRICAL COMPONENTS.  
TO AVOID PROPERTY DAMAGE OR PERSONAL INJURY DUE TO FIRE, USE  
ONLY COPPER CONDUCTORS.  
CAUTION  
AREAS WITHOUT CONVENIENCE OUTLET  
TO PREVENT IMPROPER AND DANGEROUS OPERATION DUE TO WIRING  
ERRORS, LABEL ALL WIRES PRIOR TO DISCONNECTION WHEN SERVICING  
CONTROLS. VERIFY PROPER OPERATION AFTER SERVICING.  
It is recommended that an independent 115V power source  
be brought to the vicinity of the roof top unit for portable lights  
and tools used by the service mechanic.  
NOTE: A weather-tight disconnect switch, properly sized for  
the unit total load, must be field installed. An external field  
supplied disconnect may be mounted on the exterior panel.  
UNITS INSTALLED ON ROOF TOPS  
Main power and low voltage wiring may enter the unit through  
the side or through the roof curb. Install conduit connectors  
at the desired entrance locations. External connectors must  
be weatherproof. All holes in the unit base must be sealed  
(including those around conduit nuts) to prevent water leak-  
age into building. All required conduit and fittings are to be  
field supplied.  
Ensure the data plate is not covered by the field-supplied  
disconnect switch.  
Some disconnect switches are not fused. Protect the  
power leads at the point of distribution in accordance  
with the unit data plate.  
The unit must be electrically grounded in accordance  
with local codes or, in the absence of local codes,  
with the latest edition of the National Electrical Code  
(ANSI-NFPA 70). A ground lug is provided for this  
purpose. Size grounding conductor in accordance  
with Table 250-95 of the National Electrical Code. Do  
not use the ground lug for connecting a neutral  
conductor.  
Supply voltage to roof top unit must not vary by more than  
10% of the value indicated on the unit data plate. Phase  
voltage unbalance must not exceed 2%. Contact your local  
power company for correction of improper voltage or phase  
unbalance.  
Connect power wiring to the middle contactor within  
the main control box.  
9
Download from Www.Somanuals.com. All Manuals Search And Download.  
GAS SUPPLY PIPING  
WARNING  
TO PREVENT PERSONAL INJURY OR DEATH DUE TO IMPROPER  
INSTALLATION, ADJUSTMENT, ALTERATION, SERVICE OR MAINTENANCE,  
REFER TO THIS MANUAL. FOR ADDITIONAL ASSISTANCE OR  
INFORMATION, CONSULT A QUALIFIED INSTALLER, SERVICE AGENCY OR  
THE GAS SUPPLIER.  
IMPORTANT NOTE: This unit is factory set to operate on  
natural gas at the altitudes shown on the rating plate.  
WARNING  
TO PREVENT PROPERTY DAMAGE, PERSONAL INJURY OR DEATH WHEN  
EITHER USING PROPANE GAS ALONE OR AT HIGHER ALTITUDES, OBTAIN  
AND INSTALL THE PROPER CONVERSION KIT(S). FAILURE TO DO SO CAN  
RESULT IN UNSATISFACTORY OPERATION AND/OR EQUIPMENT DAMAGE.  
HIGH ALTITUDE KITS ARE FOR U.S. INSTALLATIONS ONLY AND ARE NOT  
APPROVED FOR USE IN CANADA.  
ELECTRICAL ENTRANCE LOCATIONS  
Unit is equipped with a Low Voltage Terminal Block and has  
Single Point wiring to the contactor.  
LOW VOLTAGE CONTROL WIRING  
1. A24V thermostat must be installed for unit operation.  
It may be purchased with the unit or field -supplied.  
Thermostats may be programmable or  
electromechanical as required.  
The rating plate is stamped with the model number, type of  
gas and gas input rating. Make sure the unit is equipped to  
operate on the type of gas available. Conversion to propane  
(LP) gas is permitted with the use of the factory authorized  
conversion kit (see the unit Technical Manual for the appro-  
priate kit). For HighAltitude derates, refer to the latest edition  
of the National Fuel Gas Code NFPA 54/ANSI Z223.1.  
2. Locate thermostat or remote sensor in the conditioned  
space where it will sense average temperature. Do  
not locate the device where it may be directly exposed  
to supply air, sunlight or other sources of heat. Follow  
installation instructions packaged with the thermostat.  
3. Use #18 AWG wire for 24V control wiring runs not  
exceeding 75 feet. Use #16AWG wire for 24V control  
wiring runs not exceeding 125 feet. Use #14 AWG  
wire for 24V control wiring runs not exceeding 200  
feet. Low voltage wiring may be National Electrical  
Code (NEC) Class 2 where permitted by local codes.  
4. Route thermostat wires from sub-base terminals to  
the unit. Control wiring should enter through the duct  
panel (dimple marks entrance location). Connect  
thermostat and any accessory wiring to low voltage  
terminal block TB1 in the main control box.  
INLET GAS PRESSURE  
Min. 5.0" W.C., Max. 10.0" W.C.  
Min. 11.0" W.C., Max. 14.0" W.C.  
NATURAL  
PROPANE  
Inlet Gas Pressure Must Not Exceed the Maximum Value Shown in Table  
Above.  
The minimum supply pressure should not vary from that  
shown in the table above because this could prevent the unit  
from having dependable ignition. In addition, gas input to the  
burners must not exceed the rated input shown on the rating  
plate. Overfiring of the unit could result in premature heat  
exchanger failure.  
NOTE: Field-supplied conduit may need to be installed  
depending on unit/curb configuration. Use #18 AWG solid  
conductor wire whenever connecting thermostat wires to  
terminals on sub-base. DO NOT use larger than #18 AWG  
wire. A transition to #18 AWG wire may be required before  
entering thermostat sub-base.  
PIPING  
IMPORTANT NOTE: To avoid possible unsatisfactory opera-  
tion or equipment damage due to under firing of equipment,  
do not undersize the natural/propane gas piping from the  
meter/tank to the unit. When sizing a trunk line, include all  
appliances on that line that could be operated simultaneously.  
LEAD  
Red  
THERMOSTAT  
R (24V)  
The rating plate is stamped with the model number, type of  
gas and gas input rating. Make sure the unit is equipped to  
operate on the type of gas available. The gas line installation  
must comply with local codes, or in the absence of local codes,  
with the latest edition of the National Fuel Gas Code NFPA  
54/ANSI Z223.1.  
Green  
Yellow  
Purple  
Blue  
White  
Brown  
G (Fan)  
Y1 (High Cool)  
Y2 (Low Cool)  
Common (if req'd)  
W1 (Heat)  
W2 (High Heat)  
CPG240 (GAS HEAT)  
10  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Natural Gas Connection  
GAS INLET LOCATION (3/4” NPT)  
Natural Gas Capacity of Pipe  
in Cubic Feet of Gas Per Hour (CFH)  
Nominal Black Pipe Size (inches)  
Length of  
Pipe in Feet  
1
1/2  
132  
92  
73  
63  
56  
50  
46  
43  
40  
38  
3/4  
278  
190  
152  
130  
115  
105  
96  
1
1/4  
1050  
730  
590  
500  
440  
400  
370  
350  
320  
305  
1
1/2  
1600  
1100  
980  
760  
670  
610  
560  
530  
490  
460  
10  
20  
30  
40  
50  
60  
70  
80  
90  
100  
520  
350  
285  
245  
215  
195  
180  
170  
160  
150  
90  
84  
79  
46-1/10”  
74-11/12”  
Pressure = .50 PSIG or less and Pressure Drop of 0.3" W.C. (Based  
on 0.60 Specific Gravity Gas)  
HOOD LOCATED  
INSIDE HEAT SECTION  
DURING SHIPPING  
BTUH Furnace Input  
CFH =  
Heating Value of Gas (BTU/Cubic Foot)  
Refer to the Proper Piping Practice drawing for the general  
layout at the unit. The following rules apply:  
DOOR  
1. Use black iron pipe and fittings for the supply piping.  
The use of a flex connector and/or copper piping is  
permitted as long as it is in agreement with local  
codes.  
2. Use pipe joint compound on male threads only. Pipe  
joint compound must be resistant to the action of the  
fuel used.  
PROVIDE  
CLEARANCE  
FOR REMOVAL OF  
ACCESS PANELS  
3. Use ground joint unions.  
4. Install a drip leg to trap dirt and moisture before it can  
enter the gas valve. The drip leg must be a minimum  
of three inches long.  
DRIP LEG  
MANUAL  
SHUT OFF  
VALVE  
GROUND  
JOINT  
UNION  
5. Use two pipe wrenches when making connection to  
the gas valve to keep it from turning.  
6. Install a manual shut-off valve in a convenient location  
(within six feet of unit) between the meter and the  
unit.  
7. Tighten all joints securely.  
PROPER PIPING PRACTICE  
8. The unit must be connected to the building piping by  
one of the following methods:  
NOTE: The unit gas supply entrance is factory sealed with  
plugs. Keep plugs in place until gas supply is ready to be  
installed. Once ready, replace the plugs with the supplied  
grommets and install gas supply line.  
Rigid metallic pipe and fittings  
Semirigid metallic tubing and metallic fittings  
(Aluminum alloy tubing must not be used in exterior  
locations)  
Listed gas appliance connectors used in accordance  
with the terms of their listing that are completely in  
the same room as the equipment  
In the prior two methods above the connector or  
tubing must be protected from physical and thermal  
damage.Aluminum alloy tubing and connectors must  
be coated to protect against external corrosion when  
in contact with masonry, plaster or insulation or are  
subject to repeated wettings by liquids (water - not  
rain water, detergents or sewage).  
11  
Download from Www.Somanuals.com. All Manuals Search And Download.  
1. Vaporization rate, which depends on (a) temperature  
of the liquid, and (b) wetted surface area of the  
container or containers.  
GAS PIPING CHECKS  
CAUTION  
2. Proper pressure regulation.  
TO PREVENT PROPERTY DAMAGE OR PERSONAL INJURY DUE TO FIRE,  
THE FOLLOWING INSTRUCTIONS MUST BE PERFORMED REGARDING GAS  
CONNECTIONS AND PRESSURE TESTING:  
• THE UNIT AND ITS GAS CONNECTIONS MUST BE LEAK TESTED  
BEFORE PLACING IN OPERATION. BECAUSE OF THE DANGER OF  
EXPLOSION OR FIRE, NEVER USE A MATCH OR OPEN FLAME TO TEST  
FOR LEAKS. NEVER EXCEED SPECIFIED PRESSURES FOR TESTING.  
HIGHER PRESSURE MAY DAMAGE GAS VALVE AND CAUSE  
OVERFIRING WHICH MAY RESULT IN PREMATURE HEAT EXCHANGE  
FAILURE.  
3. Pressure drop in lines between regulators, and  
between second stage regulator and the appliance.  
Pipe size required will depend on length of pipe run  
and total load of all appliances.  
TANKS AND PIPING  
Complete information regarding tank sizing for  
vaporization, recommended regulator settings and pipe  
sizing is available from most regulator manufacturers and  
propane gas suppliers.  
Since propane gas will quickly dissolve white lead or most  
standard commercial compounds, special pipe dope  
must be used. Shellac base compounds resistant to the  
actions of liquefied petroleum gases such as Gasolac®,  
Stalactic®, Clyde’s® or John Crane® are satisfactory.  
See following figure for typical propane gas piping.  
• THIS UNIT AND ITS SHUTOFF VALVE MUST BE DISCONNECTED FROM  
THE GAS SUPPLY DURING ANY PRESSURE TESTING OF THAT SYSTEM  
AT TEST PRESSURES IN EXCESS OF 1/2 PSIG (3.48  
KPA).  
• THIS UNIT MUST BE ISOLATED FROM THE GAS SUPPLY SYSTEM BY  
CLOSING ITS MANUAL SHUTOFF VALVE DURING ANY PRESSURE  
TESTING OF THE GAS SUPPLY PIPING SYSTEM AT TEST PRESSURES  
EQUAL TO OR LESS THAN 1/2 PSIG (3.48  
KPA).  
5 to 15 PSIG  
(20 PSIG Max.)  
First Stage  
Regulator  
WARNING  
Continuous  
11" W.C.  
TO AVOID PROPERTY DAMAGE OR PERSONAL INJURY, BE SURE THERE IS  
NO OPEN FLAME IN THE VICINITY DURING AIR BLEEDING.  
200 PSIG  
Maximum  
Second Stage  
Regulator  
There will be air in the gas supply line after testing for leaks  
on a new installation. Therefore, the air must be bled from  
the line by loosening the ground joint union until pure gas is  
expelled. Tighten union and wait for five minutes until all gas  
has been dissipated in the air. Be certain there is no open  
flame in the vicinity during air bleeding procedure. The unit is  
placed in operation by closing the main electrical disconnect  
switch for the unit.  
TYPICAL PROPANE GAS PIPING  
ROOF TOP LOCATION AND INSTALLATION  
The gas supply piping location and installation for roof top  
units must be in accordance with local codes or, in the ab-  
sence of locals codes, with ordinances of the latest edition of  
the National Fuel Gas Code (ANSI Z223.1).  
PROPANE GAS INSTALLATIONS  
WARNING  
TO AVOID PROPERTY DAMAGE, PERSONAL INJURY OR DEATH DUE TO  
FIRE OR EXPLOSION CAUSED BY A PROPANE GAS LEAK, INSTALL A GAS  
DETECTING WARNING DEVICE. SINCE RUST CAN REDUCE THE LEVEL OF  
ODORANT IN PROPANE GAS, A GAS DETECTING WARNING DEVICE IS THE  
ONLY RELIABLE WAY TO DETECT A PROPANE GAS LEAK. CONTACT A  
LOCAL PROPANE GAS SUPPLIER ABOUT INSTALLING A GAS DETECTING  
WARNING DEVICE.  
A manual gas shutoff valve must be field installed external to  
the roof top unit. In addition, a drip leg must be installed near  
the inlet connection. A ground joint union connection is re-  
quired between the external shutoff valve and the unit con-  
nection to the gas valve to permit removal of the burner as-  
sembly for servicing.  
1. Route gas piping to unit so that it does not interfere  
with the removal of access panels. Support and align  
piping to prevent strains or misalignment of the  
manifold assembly.  
IMPORTANT NOTE: Propane gas conversion kits must be  
installed to convert units to propane gas.  
2. All units are furnished with standard female NPT pipe  
connections. Connection pipe size is 3/4" NPT. The  
size of the gas supply piping to the unit must be based  
on length of run, number of units on the system, gas  
characteristics, BTU requirement and available supply  
pressure. All piping must be done in accordance with  
local codes or, in the absence of local codes, with the  
latest edition of the National Fuel Gas Code (ANSI  
Z223.1).  
All propane gas equipment must conform to the safety  
standards of the National Board of Fire Underwriters (See  
NBFU Manual 58). Line pressure 11.3 - 14” w.c.  
For satisfactory operation, propane gas manifold pressure  
must be within 9.7 - 10.3 inches w.c. for high fire and within  
6.7 - 7.3 inches w.c. low fire at the manifold with all gas appli-  
ances in operation. Maintaining proper gas pressure depends  
on three main factors:  
12  
Download from Www.Somanuals.com. All Manuals Search And Download.  
NOTE: The gas connection size at the unit does NOT  
establish the size of the supply line.  
CIRCULATING AIR AND FILTERS  
DUCTWORK  
3. These units are designed for either natural or propane  
(LP) gas and are specifically constructed at the factory  
for only one of these fuels. The fuels are NOT  
interchangeable. However, the furnace can be  
converted in the field from natural gas to LP gas with  
the appropriate factory kit (see unit Technical Manual  
for the appropriate kit). Only a qualified contractor,  
experienced with natural and propane gas systems,  
should attempt conversion. Kit instructions must be  
followed closely to assure safe and reliable unit  
operation.  
The supply duct should be provided with an access panel  
large enough to inspect the air chamber downstream of the  
heat exchanger. A cover should be tightly attached to pre-  
vent air leaks.  
Ductwork dimensions are shown in the roof curb installation  
manual.  
If desired, supply and return duct connections to the unit may  
be made with flexible connections to reduce possible unit  
operating sound transmission.  
VENTING  
4. With all units on a common line operating under full  
fire, natural gas main supply pressure should be  
adjusted to approximately 7.0" w.c., measured at the  
unit gas valve. If the gas pressure at the unit is greater  
than 10.5" w.c., the contractor must furnish and install  
an external type positive shutoff service pressure  
regulator. The unit will not function satisfactorily if  
supply gas pressure is less than 5.5" w.c. or greater  
than 10.5" w.c..  
NOTE: Venting is self-contained.  
CONDENSATE DRAIN CONNECTION  
CONDENSATE DRAIN CONNECTION  
A 3/4” NPT drain connection is supplied for condensate pip-  
ing. An external trap must be installed for proper condensate  
drainage.  
NOTE: A minimum horizontal distance of 48"  
between the regulator and the furnace flue discharge  
is required.  
UNIT  
2" MINIMUM  
5. With all units on a common line operating under full  
LP gas main supply pressure should be at least 11.0"  
w.c. and must be no greater than 14.0" w.c., measured  
at the unit gas valve. Unit will not function satisfactorily  
if supply gas pressure is less than 11.0" w.c. or greater  
than 14.0" w.c..  
6. All pipe connections should be sealed with a pipe  
thread compound, which is resistant to the fuel used  
with the furnace. A soapy water solution should be  
used to check all joints for leaks. A 1/8" NPT plugged  
tap is located on the entering side of the gas valve for  
test gauge connection to measure supply (main) gas  
pressure. Another 1/8" tap is provided on the side of  
the manifold for checking manifold pressure.  
FLEXIBLE  
TUBING-HOSE  
OR PIPE  
3" MINIMUM  
A POSITIVE LIQUID  
SEAL IS REQUIRED  
DRAIN CONNECTION  
Install condensate drain trap as shown. Use 3/4" drain line  
and fittings or larger. Do not operate without trap.  
HORIZONTAL DRAIN  
Drainage of condensate directly onto the roof may be ac-  
ceptable; refer to local code. It is recommended that a small  
drip pad of either stone, mortar, wood or metal be provided to  
prevent any possible damage to the roof.  
WARNING  
THIS UNIT AND ITS INDIVIDUAL SHUTOFF VALVE MUST BE  
DISCONNECTED FROM THE GAS SUPPLY SYSTEM DURING ANY  
PRESSURE TESTING OF THAT SYSTEM AT TEST PRESSURES IN EXCESS OF  
CLEANING  
1/2 PSIG (13.8”  
W.C.).  
Due to the fact that drain pans in any air conditioning unit  
will have some moisture in them, algae and fungus will  
grow due to airborne bacteria and spores. Periodic clean-  
ing is necessary to prevent this build-up from plugging the  
drain.  
CAUTION  
THIS UNIT MUST BE ISOLATED FROM THE GAS SUPPLY PIPING SYSTEM  
BY CLOSING ITS INDIVIDUAL MANUAL SHUTOFF VALVE DURING ANY  
PRESSURE TESTING EQUAL TO OR LESS THAN 1/2 PSIG.  
7. There must be no obstruction to prevent the flow of  
combustion and ventilating air. A vent stack is not  
required and must never be used. The power ventor  
will supply an adequate amount of combustion air as  
long as the air passageways are kept free of any  
obstructions and the recommended external unit  
clearances are maintained.  
13  
Download from Www.Somanuals.com. All Manuals Search And Download.  
STARTUP, ADJUSTMENTS, AND CHECKS  
TOOLS REQUIRED  
Refrigeration gauge and manifold  
Voltmeter  
WARNING  
Clamp-on ammeter  
Ohmmeter  
Test lead  
(Minimum #16 AWG with insulated alligator clips)  
Manometer for verifying gas pressure 0 to 20" w.c.  
Air temperature measuring device  
General refrigeration mechanics’ tools  
HIGH VOLTAGE!  
TO AVOID PERSONAL INJURY OR DEATH DUE TO  
ELECTRICAL SHOCK, BOND THE FRAME OF THIS UNIT TO  
THE BUILDING ELECTRICAL GROUND BY USE OF THE  
GROUNDING TERMINAL PROVIDED OR OTHER  
ACCEPTABLE MEANS. DISCONNECT ALL POWER BEFORE  
SERVICING OR INSTALLING THIS UNIT.  
TEMPORARY HEATING OR COOLING  
PRE-STARTUP INSTRUCTIONS  
If the unit is to be used for temporary heating or cooling, a  
“Startup, Adjustments, and Checks” must first be performed  
in accordance with this manual. Failure to comply with this  
requirement will void the warranty. After the machines are  
used for temporary heating or cooling, inspect the coils, fans,  
and motors for unacceptable levels of construction dust and  
dirt and install new filters.  
CAUTION  
TO PREVENT PROPERTY DAMAGE OR PERSONAL INJURY, DO NOT START  
THE UNIT UNTIL ALL NECESSARY PRECHECKS AND TEST HAVE BEEN  
PERFORMED.  
Prior to the beginning of Startup, Adjustments, and Checks  
procedures, the following steps should be completed in the  
building.  
CONTRACTOR RESPONSIBILITY  
THERMOSTAT. Set the thermostat in the conditioned  
space at a point at least 10°F below zone temperature.  
Set the thermostat system switch on COOL and the  
fan switch on AUTO.  
The installing contractor must be certain that:  
All supply and return air ductwork is in place and  
corresponds with installation instructions.  
All thermostats are mounted and wired in accordance  
with installation instructions.  
All electric power, all gas, hot water or steam line  
connections, and the condensate drain installation  
have been made to each unit on the job. These main  
supply lines must be functional and capable of  
operating all units simultaneously.  
WARNING  
MOVING MACHINERY HAZARD!  
TO PREVENT POSSIBLE PERSONAL INJURY OR DEATH, DISCONNECT  
POWER TO THE UNIT AND PADLOCK IN THE “OFF” POSITION BEFORE  
SERVICING FANS.  
HEATING STARTUP  
ROOF CURB INSTALLATION CHECK  
This unit is equipped with an electronic ignition device to au-  
tomatically light the main burners. It also has a power vent  
blower to exhaust combustion products.  
Inspect the roof curb for correct installation. The unit and curb  
assembly should be level. Inspect the flashing of the roof  
mounting curb to the roof, especially at the corners, for good  
workmanship. Also check for leaks around gaskets. Note any  
deficiencies in a separate report and forward to the contrac-  
tor.  
On new installations, or if a major component has been re-  
placed, the operation of the unit must be checked.  
Check unit operation as outlined in the following instructions.  
If any sparking, odors, or unusual sounds are encountered,  
shut off electrical power and recheck for wiring errors, or ob-  
structions in or near the blower motors. Duct covers must  
be removed before operating unit.  
OBSTRUCTIONS, FAN CLEARANCE AND WIRING  
Remove any extraneous construction and shipping materi-  
als that may be found during this procedure. Rotate all fans  
manually to check for proper clearances and that they rotate  
freely. Check for bolts and screws that may have jarred loose  
during shipment to the jobsite. Retighten if necessary. Re-  
tighten all electrical connections.  
The Startup, Adjustments, and Checks procedure provides a  
step-by-step sequence which, if followed, will assure the  
proper startup of the equipment in the minimum amount of  
time. Air balancing of duct system is not considered part of  
this procedure. However, it is an important phase of any air  
conditioning system startup and should be performed upon  
completion of the Startup, Adjustments, and Checks proce-  
dure. The Startup, Adjustments, and Checks procedure at  
outside ambients below 55°F should be limited to a readi-  
ness check of the refrigeration system with the required final  
check and calibration left to be completed when the outside  
ambient rises above 55°F.  
PRE-STARTUP PRECAUTIONS  
It is important to your safety that the unit has been properly  
grounded during installation. Check ground lug connection  
in main control box for tightness prior to closing circuit breaker  
or disconnect switch. Verify that supply voltage on line side  
of disconnect agrees with voltage on unit identification plate  
and is within the utilization voltage range as indicated in Ap-  
pendix C Electrical Data.  
14  
Download from Www.Somanuals.com. All Manuals Search And Download.  
System Voltage - That nominal voltage value assigned to a  
circuit or system for the purpose of designating its voltage  
class.  
SET EVAPORATOR FAN RPM  
Actual RPM’s must be set and verified with a tachometer or  
strobe light. Refer to Appendices A and B for basic unit fan  
RPM. Refer also to “Airflow” section of this manual. With  
disconnect switch open, disconnect thermostat wires from  
terminals Y and W. This will prevent heating and mechanical  
cooling from coming on. Place a jumper wire across termi-  
nals R and G at TB1 terminal block. Close disconnect switch;  
evaporator fan motor will operate so RPM can be checked.  
Nameplate Voltage - That voltage assigned to a piece of  
equipment for the purpose of designating its voltage class  
and for the purpose of defining the minimum and maximum  
voltage at which the equipment will operate.  
Utilization Voltage - The voltage of the line terminals of the  
equipment at which the equipment must give fully satisfac-  
tory performance. Once it is established that supply voltage  
will be maintained within the utilization range under all sys-  
tem conditions, check and calculate if an unbalanced condi-  
tion exists between phases. Calculate percent voltage un-  
balance as follows:  
For gas heat units, the airflow must be adjusted so that the  
air temperature rise falls within the ranges given stated on  
Data Plate (see Appendix A - Blower Performance).  
TENSION AND ALIGNMENT ADJUSTMENT  
Correct belt tension is very important to the life of your belt.  
Too loose a belt will shorten its life; too tight, premature mo-  
tor and bearing failure will occur. Check you belt drive for  
adequate “run-in” belt tension by measuring the force required  
to deflect the belt at the midpoint of the span length. Belt  
tension force can be measured using a belt tension gauge,  
available through most belt drive manufacturers.  
Three Phase Models  
2) MAXIMUM VOLTAGE DEVIATIONS  
FROM AVERAGE VOLTAGE  
3) PERCENT VOLTAGE  
UNBALANCE  
= 100 X  
1) AVERAGE VOLTAGE  
HOW TO USE THE FORMULA:  
EXAMPLE: With voltage of 220, 216, and 213  
1) Average Voltage = 220+216+213=649 / 3 = 216  
2) Maximum Voltage Deviations from Average Voltage = 220 - 216 = 4  
4
216  
400  
216  
3) Percent Voltage Unbalance = 100 x  
=
= 1.8%  
Percent voltage unbalance MUST NOT exceed 2%  
.
FIELD DUCT CONNECTIONS  
Verify that all duct connections are tight and that there is no  
air bypass between supply and return.  
CONTROL VOLTAGE CHECK  
With disconnect switch in the open “OFF” position, discon-  
nect blue wire from low voltage transformer TRANS1. Close  
the disconnect switch to energize TRANS1 control trans-  
former. Check primary and secondary (24V) of control trans-  
former TRANS1.  
t = Span length, inches  
C = Center distance, inches  
D = Larger sheave diameter, inches  
d = Smaller sheave diameter, inches  
h = Deflection height, inches  
THERMOSTAT PRELIMINARY CHECK  
DRIVE BELT TENSION ADJUSTMENT  
With disconnect switch open and blue wire disconnected from  
TRANS1 transformer, attach one lead of ohmmeter to termi-  
nal R on TB1 terminal block. Touch, in order, the other ohm-  
meter lead to terminals Y1, Y2 and G at TB1 terminal block.  
There must be continuity from terminal R to terminals Y and  
G. R to Y indicates cool. R to G indicates fan (auto). Replace  
blue wire on TRANS1 transformer.  
SHEAVE  
DIAMETER  
DEFLECTION  
FORCE (lbs)  
DEFLECTION  
(in)  
TYPE  
MODEL  
(in)  
BELT DRIVE  
Used  
New  
15 Ton B, BA Standard 4.3 to 5.5 5.5 + .5 8.2 + .5  
High  
1/4 ± 1/16  
1/4 ± 1/16  
15 Ton B, BA  
4.3 to 5.5 5.5 + .5 8.2 + .5  
FILTER SECTION CHECK  
Static  
Remove filter section access panels and check that filters  
are properly installed. Note airflow arrows on filter frames.  
20 Ton B, BA Standard 4.3 to 5.5 5.5 + .5 8.2 + .5  
1/4 ± 1/16  
1/4 ± 1/16  
High  
20 Ton B, BA  
4.3 to 5.5 5.5 + .5 8.2 + .5  
Static  
BEARING CHECK  
RECOMMENDED POUNDS OF FORCE PER BELT  
Prior to energizing any fans, check and make sure that all  
setscrews are tight so that bearings are properly secured to  
shafts.  
The correct deflection force is 5 Ibs. for a new belt and 3.5  
Ibs. for a belt that has been run in. New belt tension includes  
initial belt stretch. When new V-belts are installed on a drive  
the initial tension will drop rapidly during the first few hours.  
15  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Check tension frequently during the first 24 hours of opera-  
tion. Subsequent retensioning should fall between the mini-  
mum and maximum force. To determine the deflection dis-  
tance from the normal position, use a straightedge or stretch  
a cord from sheave to sheave to use as a reference line. On  
multiple belt drives, an adjacent undeflected belt can be used  
as a reference.  
WARNING  
TO AVOID PROPERTY DAMAGE, PERSONAL INJURY OR DEATH DUE TO  
FIRE OR EXPLOSION, A QUALIFIED SERVICER MUST INVESTIGATE THE  
REASON FOR THE ROLLOUT PROTECTION DEVICE TO OPEN BEFORE  
MANUALLY RESETTING THE ROLLOUT PROTECTION DEVICE.  
Secondary Limit Control  
EVAPORATOR FAN ROTATION CHECK (THREE PHASE MODELS  
ONLY)  
The secondary limit control is located on the side of the blower  
scroll assembly. This control opens when elevated tempera-  
tures are sensed. Elevated temperatures at the control are  
normally caused by blower failure. The reason for the open-  
ing should be determined and repaired prior to resetting.  
Check that fan rotates clockwise when viewed from the drive  
side of unit and in accordance with rotation arrow shown on  
blower housing. If it does not, reverse any two incoming power  
cables at Single Point Power Block. In this case, repeat bear-  
ing check.  
If the power to the unit is interrupted during the heating cycle,  
it may cause the secondary limit to trip. Once the blower com-  
partment temperature drops below the limit reset tempera-  
ture, the limit will automatically reset.  
Do not attempt to change load side wiring. Internal wiring  
assures all motors and compressors will rotate in correct di-  
rection once evaporator fan motor rotation check has been  
made.  
Pre-Operation Checks  
1. Close the manual gas valve external to the unit.  
2. Turn off the electrical power supply to the unit.  
3. Set the room thermostat to its lowest possible setting.  
4. Remove the heat exchanger door on the side of the  
unit by removing screws.  
5. This unit is equipped with an ignition device which  
automatically lights the main burner. DO NOT try to  
light burner by any other method.  
ELECTRICAL INPUT CHECK  
Make preliminary check of evaporator fan ampere draw and  
verify that motor nameplate amps are not exceeded. A final  
check of amp draw should be made upon completion of air  
balancing of the duct system (see Appendix C).  
RESTORING CONNECTIONS  
6. Move the gas control valve switch to the OFF position.  
Do not force.  
With disconnect switch open, remove jumper wire from ter-  
minals R and G at TB1 terminal block, and reconnect ther-  
mostat wires to terminals Y and W.  
7. Wait five minutes to clear out any gas.  
8. Smell for gas, including near the ground. This is  
important because some types of gas are heavier than  
air. If you have waited five minutes and you do smell  
gas, immediately follow the warnings on page 3 of  
this manual. If having waited for five minutes and no  
gas smell is noted, move the gas control valve switch  
to the ON position.  
9. Replace the heat exchanger door on the side of the  
unit.  
10. Open the manual gas valve external to the unit.  
11. Turn on the electrical power supply to the unit.  
12. Set the thermostat to desired setting.  
REFRIGERATION SYSTEM CHECKS  
Ensure the hold-down bolts on the compressor are secure  
and have not vibrated loose during shipment. Check that vi-  
bration grommets have been installed. Visually check all pip-  
ing and clamps. The entire refrigeration system has been  
factory charged and tested, making it unnecessary to field  
charge. Factory charges are shown in Appendix C and on  
the unit nameplate.  
Install service manifold hoses. Gauges should read satura-  
tion pressure corresponding to ambient temperature. Charge  
should be checked to obtain 12° to 15° of sub-cooling per  
system (i.e. compressor circuits).  
Gas Supply And Manifold Check  
Gas supply pressure and manifold pressure with the burners  
operating must be as specified on the rating plate.  
Rollout Protection Control  
The rollout protection device opens, cutting power to the  
gas valve, if the flames from the burners are not properly  
drawn into the heat exchanger. The rollout protection  
device is located above the burner bracket (See page  
19). The reason for elevated temperatures at the control  
should be determined and repaired prior to resetting this  
manual reset control.  
Gas Inlet Pressure Check  
Gas inlet pressure must be checked and adjusted in accor-  
dance to the type of fuel being consumed.  
With Power And Gas Off:  
1. Connect a water manometer or adequate gauge to  
the inlet pressure tap of the gas valve.  
Inlet gas pressure can also be measured by removing  
the cap from the dripleg and installing a predrilled cap  
with a hose fitting.  
16  
Download from Www.Somanuals.com. All Manuals Search And Download.  
With Power And Gas On:  
Input = 1000 x 3600 / 34 = 106,000 BTU per Hour.  
NOTE: BTU content of the gas should be obtained  
from the gas supplier. This measured input must not  
be greater than shown on the unit rating plate.  
4. Relight all other appliances turned off in step 1. Be  
sure all pilot burners are operating.  
2. Put unit into heating cycle and turn on all other gas  
consuming appliances.  
INLET GAS PRESSURE  
Min. 5.0" W.C., Max. 10.0" W.C.  
Min. 11.0" W.C., Max. 14.0" W.C.  
NATURAL  
PROPANE  
Main Burner Flame Check  
Flames should be stable, soft and blue (dust may cause or-  
ange tips but they must not be yellow) and extending directly  
outward from the burner without curling, floating or lifting off.  
NOTE: Inlet Gas Pressure Must Not Exceed the Maximum  
Value Shown.  
Temperature Rise Check  
If operating pressures differ from above, make necessary  
pressure regulator adjustments, check piping size, etc., and/  
or consult with local utility.  
Check the temperature rise through the unit by placing ther-  
mometers in supply and return air registers as close to the  
unit as possible. Thermometers must not be able to sample  
temperature directly from the unit heat exchangers, or false  
readings could be obtained.  
Manifold Pressure Check  
The gas valve has a tapped opening to facilitate measure-  
ment of the manifold pressure. A “U” Tube manometer hav-  
ing a scale range from 0 to 12 inches of water should be  
used for this measurement. The manifold pressure must be  
measured with the burners operating.  
1. All registers must be open; all duct dampers must be  
in their final (fully or partially open) position and the  
unit operated for 15 minutes on HIGH FIRE before  
taking readings.  
To adjust the pressure regulator, remove the adjustment screw  
or cover on the gas valve. Turn out (counterclockwise) to  
decrease pressure, turn in (clockwise) to increase pressure.  
Only small variations in gas flow should be made by means  
of the pressure regulator adjustment. In no case should the  
final manifold pressure vary more than plus or minus 0.3  
inches water column from the specified nominal pressure.  
Any major changes in flow should be made by changing the  
size of the burner orifices. The measured input rate to the  
furnace must not exceed the rating specified on the unit rat-  
ing plate.  
2. The temperature rise must be within the range  
specified on the rating plate.  
NOTE: Air temperature rise is the temperature difference  
between supply and return air.  
With a properly designed system, the proper amount of tem-  
perature rise will normally be obtained when the unit is oper-  
ated at rated input with the recommended blower speed.  
If the correct amount of temperature rise is not obtained, it  
may be necessary to change the blower speed. A higher  
blower speed will lower the temperature rise.Aslower blower  
speed will increase the temperature rise.  
For natural gas, the manifold pressure must be between 3.2  
and 3.8 inches w.c. (3.5 nominal) for high fire and between  
1.7 and 2.3 inches w.c. (2.0 nominal) for low fire.  
NOTE: Blower speed MUST be set to give the correct air  
For propane gas, the manifold pressure must be between temperature rise through the unit as marked on the rating  
9.7 and 10.3 inches w.c. (10.0 nominal) for high fire and be- plate.  
tween 6.7 and 7.3 inches w.c. (7.0 nominal) for low fire.  
REFRIGERATION SEQUENCE CHECK  
Gas Input (Natural Gas Only) Check  
With the disconnect switch open, remove the field connected  
To measure the gas input use a gas meter and proceed  
as follows:  
1. Turn off gas supply to all other appliances except the  
unit.  
thermostat wire from terminal R on TB1 terminal block. Place  
a jumper across terminals R and G, and across R and Y on  
TB1 terminal block. Close the disconnect switch. The follow-  
ing operational sequence should be observed.  
2. With the unit operating, time the smallest dial on the  
meter for one complete revolution. If this is a 2 cubic  
foot dial, divide the seconds by 2; if it is a 1 cubic foot  
dial, use the seconds as is. This gives the seconds  
per cubic foot of gas being delivered to the unit.  
3. INPUT=GAS HTG VALUE x 3600 / SEC. PER CUBIC  
FOOT  
Example: Natural gas with a heating value of 1000 BTU per  
cubic foot and 34 seconds per cubic foot as determined by  
Step 2, then:  
1. Current through primary winding of transformer  
TRANS1 energizes the 24-volt control circuit.  
2. To simulate a mechanical call for cooling from the wall  
thermostat, place a jumper across terminals R and  
Y1 of terminal block TB1.  
3. UNIT WITH ECONOMIZER OPTION: The  
compressor circuit is interlocked through terminals 3  
and 4 of the economizer module. If the outdoor air  
enthalpy (temperature and humidity) is not suitable  
for cooling, the economizer terminals will be closed  
permitting compressor to be energized.  
17  
Download from Www.Somanuals.com. All Manuals Search And Download.  
4. The belt drive blower contactor closes its contacts L1,  
L2 and L3 to T1, T2 and T3 to provide power to the  
supply fan motor.  
11. Open disconnect switch. Reconnect the field  
thermostat wire at terminal R on terminal block TB1.  
REFRIGERATION PERFORMANCE CHECK  
5. Check supply fan rotation. If the supply fan is rotating  
in the wrong direction, disconnect and lock off Single  
Point Power Block. Do not attempt to change load  
side wiring. Internal wiring is set at the factory to assure  
that the supply fan and compressors all rotate in the  
proper direction. Verification of correct supply fan  
rotation at initial startup will also indicate correct  
compressor rotation. Reconnect power and check for  
proper operation.  
6. Compressor contactor closes its contacts L1, L2 and  
L3 to T1, T2 and T3 to provide power to the  
compressor motor COMP 1; COMP 2, if conditions  
are correct. In addition, contactor C1 closes its contact  
L3 to T3 , energizing the condenser fan motor.  
Under normal summertime (full load) operating conditions,  
superheat should be between 8°F and 12°F and sub-cooling  
measured at the condenser outlet should be 15°F (nominal).  
A 25°F to 35°F temperature difference should exist between  
the entering condenser air and the temperature correspond-  
ing to the compressor saturated discharge pressure. Check  
that compressor RLA corresponds to values shown in Ap-  
pendix C. RLA draw can be much lower than values listed at  
low load conditions and low ambient condensing tempera-  
tures. Values in Appendix C can slightly exceed at high load  
conditions and high ambient condensing temperatures.  
GAS SUPPLY PRESSURES & REGULATOR ADJUSTMENTS  
WARNING  
WARNING  
BURN HAZARD!  
SHOULD OVERHEATING OCCUR OR THE GAS SUPPLY FAIL TO SHUT OFF,  
TURN OFF THE MANUAL GAS SHUTOFF VALVE EXTERNAL TO THE UNIT  
BEFORE TURNING OFF THE ELECTRICAL SUPPLY.  
DO NOT TOUCH! DISCHARGE LINE MAY BE HOT!  
7. Check that each compressor is operating correctly.  
The scroll compressors in these units MUST operate  
in the proper rotation. To ensure the compressors are  
operating in the correct direction, check the  
compressor discharge line pressure or temperature  
after each compressor is started.  
WARNING  
TO AVOID PROPERTY DAMAGE, PERSONAL INJURY OR DEATH, DO NOT  
FIRE GAS UNIT WITH FLUE BOX COVER REMOVED.  
The discharge pressure and discharge line  
temperature should increase. If this does not occur  
and the compressor is producing an exceptional  
amount of noise, perform the following checks.  
NOTE: Except during brief periods when gas pressures are  
being measured by qualified service personnel, the furnace  
access panel must always be secured in place when the  
furnace is in operation.An inspection port in the access panel  
is provided to monitor the flame.  
Ensure all compressors and the supply fan motor  
are operating in the proper direction. If a single  
motor is operating backwards, check the power  
wiring for that motor and correct any leads that  
have been interchanged at the contactor or at the  
motor.  
The first step in checking out the gas-fired furnace is to test  
the gas supply piping to the unit for tightness and purge the  
system of air using methods outlined in the latest edition of  
the National Fuel Gas Code ANSI Z223.1. Verify that the  
disconnect switch is in the “OFF” position. A soapy water  
solution should be used to check for gas leaks. Since the unit  
is subject to considerable jarring during shipment, it is ex-  
tremely important that all gas connections and joints be tested  
for tightness. Gas piping downstream from the unit inlet should  
be checked for leaks during the subsequent sequence check.  
If all of the motors are operating backward,  
disconnect the unit power supply and lock it in the  
“OFF” position. Switch two leads of the power  
supply at the unit Single Point Power Block.  
Reconnect power and check for compressor and  
supply fan motor operation.  
8. With all safety devices closed, the system will continue  
cooling operation until the thermostat is satisfied.  
9. Disconnecting the jumper wire between R and Y1 and  
Y2 and between R and G on TB1 terminal block will  
simulate a satisfied thermostat. The compressors will  
cycle off and IIC (pin 12) will initiate its time delay  
cycle. The compressor and the supply fan will cycle  
off.  
10. After a time delay of approximately 3 minutes, the  
compressor control circuits will be ready to respond  
to a subsequent call for cooling from the wall  
thermostat.  
The supply gas pressure should be adjusted to 7.0" w.c. on  
natural gas and 11.0" on LP gas with the gas burners operat-  
ing. If there is more than one unit on a common gas line, the  
pressures should be checked with all units under full fire. A  
supply pressure tap is provided on the upstream side of the  
gas valve. A manifold pressure tap is provided on the mani-  
fold. The normal manifold pressure for full input is 3.5" w.c.  
on natural gas and 10.0" w.c. for propane gas. Minimum gas  
supply pressure is 5.5" w.c. for natural gas and 11.0" for pro-  
pane gas. In order to obtain rating, gas supply pressure must  
be 11.0" w.c. for propane gas.  
18  
Download from Www.Somanuals.com. All Manuals Search And Download.  
The pressure regulator on LP gas models is adjusted for 10.0"  
w.c. manifold pressure and is intended to prevent over-firing  
only. Do not attempt adjustment of the built-in pressure regu-  
lator unless the supply pressure is at least 7.0" w.c. on natu-  
ral gas or 14.0" w.c. on propane gas. Check the location of  
the ignition electrode and the flame sensor for correct gap  
setting.  
NORMAL SEQUENCE OF OPERATION  
HEATING  
This unit has one (RS) Manual Reset Limit Control Switch.  
Check the limit to make sure it has not tripped. The limit may  
arrive at the job site tripped as a result of shipping shock.  
If the ventor motor comes on, but the unit does not attempt  
ignition, check if the ALS (Automatic Reset High Limit Con-  
trol Switch) requires resetting.  
1. With electricity and gas turned on, the system switch  
in the “HEAT” or “AUTO” position and the fan switch  
in the “AUTO” position, the thermostat will close the  
circuit between unit terminals R and W (R-W) when  
the temperature falls below the thermostat setting.  
2. D1 on IIC energizes relay IDMR.  
3. Relay IDMR energizes the ventor motor IDM.  
4. Operation of the vent motor closes the pressure switch  
PS located in the burner compartment. the control  
then initiates a 15-second pre-purge time delay.  
During this period, the ventor motor will clear the  
combustion chamber of any residual gas.  
5. After the pre-purge period, the ignition control  
energizes the Wl-C gas valve and simultaneously  
initiates a “three (3)-try” spark ignition sequence.  
6. When the burners are ignited, a minimum four (4)  
micro-amp DC current will flow through the flame  
between the sensor electrode and the grounded  
burner.  
Flame  
Sensor  
Ignitor  
GAS ORIFICES  
NATURAL PROPANE (LP)  
#30 #48  
MAXIMUM NUMBER  
INPUT  
(BTUH) BURNERS  
MAXIMUM  
BTUH/BURNER  
of  
7. When the controller proves that the flame has been  
established, it will keep the gas valve energized and  
discontinue the ignition spark. First stage manifold  
pressure will be approximately 2.0" w.c. for natural  
gas and 7.0" w.c. for propane (LP).  
400,000  
8
50,000  
HEAT EXCHANGER AND BURNER ORIFICE SPECIFICATIONS  
8. If the control is unable to ignite the burners after its  
initial attempt, it will initiate another purge and spark  
sequence. A third purge and spark sequence will be  
initiated if the second attempt is unsuccessful. If the  
third attempt is unsuccessful, the controller will close  
the gas valve and lock itself out. It may be reset by  
momentarily interrupting power. This may be  
accomplished by briefly lowering the room thermostat  
set-point below room temperature, or by shutting off  
the main power to the unit. (See TP-105 for more  
details.)  
NOTE: Gas appliances located more than 2000 feet above  
sea level must be derated 4% per 1000 feet of total elevation  
and that variance in gas heating value and specific gravity  
require change in manifold pressure to obtain rating, it is  
mandatory that the input be adjusted at the installation site.  
All installations should be made as outlined in the latest edition  
of the National Fuel Gas Code ANSI Z223.1, section  
“Procedures To Be Followed To Place An Appliance in  
Operation”. Refer also to the “User’s Information Manual”  
supplied with the unit for additional information on the gas  
furnace.  
9. Integrated ignition control will close its normally open  
contacts after a delay of approximately 30 seconds.  
This action energizes contactor BC and starts the  
supply fan motor. Operation of the supply fan  
circulates air across the heat exchanger and delivers  
heated air to the conditioned space.  
Unit Shutdown  
1. Set the thermostat to lowest setting.  
2. Turn off the electrical power supply to the unit.  
3. Remove the heat exchanger door on the side of the  
unit by removing screws.  
10. When the space temperature rises, the thermostat  
will open R-W. Opening R-W will cause the gas valve  
to close, and the furnace to shut down.  
11. The furnace has three high temperature limit controls,  
which can shut down the burner. They do not shut  
down the ventor motor.  
4. Move the gas control valve switch to the OFF position.  
Do not force.  
5. Close manual gas shutoff valve external to the unit.  
6. Replace the heat exchanger door on the unit.  
7. If cooling and/or air circulation will be desired, turn  
ON the electrical power.  
19  
Download from Www.Somanuals.com. All Manuals Search And Download.  
The diagnostic fault code is 1 flash for a lockout due to failed  
ignition attempts or flame dropouts. The integrated control  
will automatically reset after one hour, or it can be reset by  
removing the thermostat signal or disconnecting the electri-  
cal power supply for over five seconds. If the diagnostic LED  
indicates an external lockout, perform the following checks:  
AUTOMATIC RESET HIGH LIMIT CONTROL (LS)  
Located in the burner compartment on the heat exchanger,  
its sensing element projects through the blower section bulk-  
head and senses the temperature at the rear of the furnace.  
It will cycle the furnace off if the temperature exceeds 100°F  
plus maximum rise.  
Check the supply and manifold pressures  
Check the gas orifices for debris  
AUTOMATIC RESET HIGH LIMIT CONTROL (ALS)  
Check gas valve for proper operation  
Check secondary limit  
Located in the blower compartment on the blower housing, it  
senses air temperature within the blower compartment and  
protects the filters from excessive temperature. It will shut  
down the furnace if it senses excessive temperatures.  
A dirty filter, excessive duct static, insufficient air  
flow, a faulty limit, or a failed circulator blower can  
cause this limit to open. Check filters, total external  
duct static, circulator blower motor, blower motor  
speed tap (see wiring diagram), and limit. An  
interruption in electrical power during a heating  
cycle may also cause the auxiliary limit to open.  
The automatic reset secondary limit is located on  
top of the circulator blower assembly.  
MANUAL RESET FLAME ROLLOUT CONTROL (RS)  
Located in the burner compartment at the top of the burner  
assembly, it senses high temperature that could occur if the  
heat exchanger tubes were plugged and the flame was roll-  
ing out instead of entering the tubes. It has a manual push-  
button reset that cannot be actuated until the limit control has  
cooled.  
Check rollout limit  
If the burner flames are not properly drawn into  
the heat exchanger, the flame rollout protection  
device will open. Possible causes are restricted  
or blocked flue passages, blocked or cracked heat  
exchanger, a failed induced draft blower, or  
insufficient combustion air. The rollout protection  
device is a manual reset limit located on the burner  
bracket. The cause of the flame rollout must be  
determined and corrected before resetting the limit.  
Check flame sensor  
TROUBLESHOOTING  
IGNITION CONTROL ERROR CODES  
The following presents probable causes of questionable unit  
operation. Refer to Diagnostic Indicator Chart for an inter-  
pretation of the signal and to this section for an explanation.  
Remove the control box access panel and note the number  
of diagnostic LED flashes. Refer to Diagnostic Indicator Chart  
for an interpretation of the signal and to this section for an  
explanation.  
A drop in flame signal can be caused by nearly  
invisible coating on the sensor. Remove the sensor  
and carefully clean with steel wool.  
ABNORMAL OPERATION - HEATING  
Check wiring  
Check wiring for opens/shorts and miswiring.  
Internal Control Failure  
If the integrated ignition control in this unit encounters an in-  
ternal fault, it will go into a “hard” lockout and turn off the  
diagnostic LED. If diagnostic LED indicates an internal fault,  
check power supply to unit for proper voltage, check all fuses,  
circuit breakers and wiring. Disconnect electric power for  
five seconds. If LED remains off after restoring power, re-  
place control.  
IMPORTANT: If you have to frequently reset your gas/electric  
package unit, it means that a problem exists that should be  
corrected. Contact a qualified servicer for further information.  
Pressure Switch Stuck Open  
A pressure switch stuck open can be caused by a faulty pres-  
sure switch, faulty wiring, a disconnected or damaged hose,  
a blocked or restricted flue, or a faulty induced draft blower.  
External Lockout  
If the control senses an open pressure switch during the pre-  
purge cycle, the induced draft blower only will be energized.  
If the pressure switch opens after ignition has begun the gas  
valve is deenergized, the circulator blower heat off cycle be-  
gins, and the induced draft blower remains on. The diagnos-  
tic fault code is two flashes.  
An external lockout occurs if the integrated ignition control  
determines that a measurable combustion cannot be estab-  
lished within three (3) consecutive ignition attempts. If flame  
is not established within the seven (7) second trial for igni-  
tion, the gas valve is deenergized, 15 second inter-purge cycle  
is completed, and ignition is reattempted. The control will  
repeat this routine three times if a measurable combustion is  
not established. The control will then shut off the induced  
draft blower and go into a lockout state.  
Pressure Switch Stuck Closed  
A stuck closed pressure switch can be caused by a faulty  
pressure switch or faulty wiring. If the control encounters a  
pressure switch stuck closed, the induced draft blower re-  
mains off. The diagnostic LED code for this fault is three (3)  
flashes.  
If flame is established but lost, the control will energize the  
circulator blower at the heat speed and then begin a new  
ignition sequence. If flame is established then lost on subse-  
quent attempts, the control will recycle for four (4) consecu-  
tive ignition attempts (five attempts total) before locking out.  
20  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Open Thermal Protection Device  
the range specified on the unit data plate. NOTE: Thermal  
efficiency of the furnace is a product efficiency rating deter-  
mined under continuous operating conditions independent  
of any installed system.  
If the primary limit switch opens, the gas valve is immediately  
deenergized, the induced draft and air circulating blowers  
are energized. The induced draft and air circulator blowers  
remain energized until the limit switch recloses. The diag-  
nostic fault code for an open limit is four (4) flashes.  
Regulator Cover Screws  
(Reg. Adj. Beneath these screws)  
High Fire  
Adjust  
A primary limit will open due to excessive supply air tempera-  
tures. This can be caused by a dirty filter, excessive duct  
static, insufficient air flow, or a faulty limit. Check filters, total  
external duct static, blower motor, blower motor speed tap  
(see wiring diagram), and limit. This limit will automatically  
reset once the temperature falls below a preset level.  
Low Fire  
Adjust  
INLET  
OUTLET  
Gas Valve  
On/Off Switch  
Flame Detected with Gas Valve Closed  
WHITE-RODGERS 36H54 PRESSURE ADJUSTMENTS  
If flame is detected with the gas valve deenergized, the com-  
bustion and air circulator blowers are energized. The diag-  
nostic fault code is five (5) flashes for this condition. The  
control can be reset by removing the power supply to the unit  
or it will automatically reset after one hour. Miswiring is the  
probable cause for this fault.  
ABNORMAL OPERATION - COOLING  
Short Cycle Compressor Delay  
The automatic ignition control has a built-in feature that pre-  
vents damage to the compressor in short cycling situations.  
In the event of intermittent power losses or intermittent ther-  
mostat operation, the ignition control will delay output to the  
compressor contactor for three minutes from the time power  
is restored. (Compressor is off a total of three minutes). The  
diagnostic LED will flash six (6) times to indicate the com-  
pressor contactor output is being delayed.  
HONEYWELL 0151M00015 PRESSURE ADJUSTMENTS  
CAUTION  
TO PREVENT UNRELIABLE OPERATION OR EQUIPMENT DAMAGE, THE  
GAS MANIFOLD PRESSURE MUST BE AS SPECIFIED ON THE UNIT RATING  
PLATE. ONLY MINOR ADJUSTMENTS SHOULD BE MADE BY ADJUSTING  
THE GAS VALVE PRESSURE REGULATOR.  
NOTE: Some electronic thermostats also have a built-in  
compressor short cycle timer that may be longer than the  
three minute delay given above. If you are using an electronic  
thermostat and the compressor has not started after three  
minutes, wait an additional five minutes to allow the thermostat  
to complete its short cycle delay time.  
AIR FLOW ADJUSTMENTS  
The drive on the supply fan is typically set in the middle of the  
RPM range. The drive motor sheave pitch diameter is field  
adjustable for the required airflow. Refer to “Drive  
Adjustments” section below.  
INPUT RATING  
It is the responsibility of the contractor to adjust the gas input  
to the unit. The input rate can be calculated by using the  
formula:  
When the final adjustments are complete, the current draw  
of the motor should be checked and compared to the full  
load current rating of the motor. The amperage must not ex-  
ceed the service factor stamped on the motor nameplate.  
The total airflow must not be less than that required for op-  
eration of the electric heaters or the furnace.  
3600 x HV  
INPUT Btu/Hr =  
T
WHERE:  
HV = Heating value of fuel = Btu/ft3 of gas  
T = Time in seconds per ft3 of gas flow as read from gas meter  
If an economizer is installed, check the unit operating bal-  
ance with the economizer at full outside air and at minimum  
outside air. Upon completion of the air flow balancing, we  
recommend replacing the variable pitched motor sheave with  
a properly-sized fixed sheave. A matching fixed sheave will  
provide longer belt and bearing life and vibration free opera-  
tion. Initially, it is best to have a variable pitched motor sheave  
Adjust input rate by varying the adjustment of the gas pres-  
sure regulator on the gas valve.All adjustments must be made  
with furnace operating at high fire and at normal operating  
temperature. Clockwise (P) rotation of the pressure regula-  
tor screw increases pressure and gas flow rate. Turn screw  
counterclockwise (Q) to decrease pressure and gas flow rate.  
After adjustment the furnace temperature rise must be within  
21  
Download from Www.Somanuals.com. All Manuals Search And Download.  
for the purpose of airflow balancing, but once the balance  
has been achieved, fixed sheaves maintain alignment and  
minimize vibration more effectively. For direct drive units, move  
green wire for fan.  
WARNING  
TO PREVENT PERSONAL INJURY OR DEATH DUE TO IMPROPER  
INSTALLATION, ADJUSTMENT, ALTERATION, SERVICE OR MAINTENANCE,  
REFER TO THIS MANUAL. FOR ADDITIONAL ASSISTANCE OR  
INFORMATION, CONSULT A QUALIFIED INSTALLER, SERVICE AGENCY OR  
THE GAS SUPPLIER.  
MOTOR SHEAVE ADJUSTMENTS  
VL, VM & 2VP VARIABLE PITCH KEY TYPE MOTOR SHEAVES  
CAUTION  
The driving and driven motor sheaves should be in align-  
ment with each other and the shafts parallel.  
SHEET METAL PARTS, SCREWS, CLIPS AND SIMILAR ITEMS INHERENTLY  
HAVE SHARP EDGES, AND IT IS NECESSARY THAT THE INSTALLER AND  
SERVICE PERSONNEL EXERCISE CAUTION.  
VL & VM SHEAVES ADJUSTMENT  
1. Loosen set screw “B” using a 5/32" Allen key.  
2. Making half or full turns from closed position, adjust  
sheave pitch diameter for desired speed. DO NOT  
OPEN MORE THAN SIX FULL TURNS.  
3. Tighten set screw “B” securely over flat.  
4. Carefully put on belts and adjust belt tension. DO NOT  
FORCE BELTS OVER GROOVES.  
5. Ensure all keys are in place and the set screws tight  
before starting drive. Recheck set screws and belt  
tension after 24 hours service.  
Preventive maintenance is the best way to avoid unneces-  
sary expense and inconvenience. Have this system inspected  
at regular intervals by qualified service personnel, at least  
twice a year. Routine maintenance should cover the follow-  
ing items:  
1. Tighten all belts, set screws, and wire connections.  
2. Clean evaporator and condenser coils mechanically  
or with cold water, if necessary. Usually any fouling is  
only matted on the entering air face of the coil and  
can be removed by brushing.  
3. Lubricate motor bearings.  
4. Align or replace belts as needed.  
5. Replace filters as needed (see below).  
6. Check for blockage of condensate drain.  
7. Check power and control voltages.  
NOTE: Future adjustments should be made by loosening the  
belt tension and increasing or decreasing the pitch diameter  
of the sheave by half or full turns as required. Readjust belt  
tension before starting drive.  
8. Check running amperage.  
9. Check operating temperatures and pressures.  
10. Check and adjust temperature and pressure controls.  
11. Check and adjust damper linkages.  
C
12. Check operation of all safety controls.  
13. Examine gas furnaces (see below and the User’s  
Information Manual).  
B
14. Check condenser fans and tighten set screws.  
VL & VM  
FILTERS  
NOTE: For horizontal discharge, remove the supply and return  
duct covers and place them over the vertical discharge return  
and supply openings (bottom of unit).  
CAUTION  
TO PREVENT PROPERTY DAMAGE DUE TO FIRE AND LOSS OF EQUIPMENT  
EFFICIENCY OR EQUIPMENT DAMAGE DUE TO DUST AND LINT BUILD UP  
ON INTERNAL PARTS, NEVER OPERATE UNIT WITHOUT AN AIR FILTER  
INSTALLED IN THE RETURN AIR SYSTEM.  
NOTE: Do not operate sheave with flange projecting beyond  
the hub end.  
MAINTENANCE  
Every application may require a different frequency of replace-  
ment of dirty filters. Filters must be replaced at least every  
three (3) months during operating seasons.  
WARNING  
HIGH VOLTAGE !  
Dirty filters are the most common cause of inadequate heat-  
ing or cooling performance. Filter inspection should be made  
at least every two months; more often if necessary because  
of local conditions and usage.  
DISCONNECT ALL POWER BEFORE SERVICING OR  
INSTALLING THIS UNIT. MULTIPLE POWER SOURCES MAY  
BE PRESENT. FAILURE TO DO SO MAY CAUSE PROPERTY  
DAMAGE, PERSONAL INJURY OR DEATH.  
Dirty throwaway filters should be discarded and replaced with  
a new, clean filter.  
22  
Download from Www.Somanuals.com. All Manuals Search And Download.  
Disposable return air filters are supplied with this unit. See  
the unit Specification Sheet or Technical Manual for the cor-  
rect size and part number. To remove the filters, remove the  
filter access panel on return side of the unit.  
d. The entire burner assembly can now be removed  
from the unit.  
NOTE: Use all screws that were removed; they are  
necessary for safe and proper operation of the unit.  
3. Inspect and periodically clean the vent outlet (bird  
screen) on the access panel.  
CABINET FINISH MAINTENANCE  
Use a fine grade automotive wax on the cabinet finish to  
maintain the finish’s original high luster. This is especially  
important in installations with extended periods of direct sun-  
light.  
NOTE: Periodic observation of the flame and a log of C02  
measurements are recommended. This will aid in determining  
whether the furnace is operating efficiently or if the furnace  
requires cleaning.  
CLEAN OUTSIDE COIL (QUALIFIED SERVICER ONLY)  
Flames should be stable, soft and blue (dust may cause or-  
ange tips but must not be yellow). The flames must extend  
directly outward from the burner without curling, floating or  
lifting off.  
The coil with the outside air flowing over it should be inspected  
annually and cleaned as frequently as necessary to keep the  
finned areas free of lint, hair and debris.  
CONDENSER, EVAPORATOR, AND INDUCED DRAFT MOTORS  
Bearings on the air circulating blower motor, condenser mo-  
tor and the combustion fan motor are permanently lubricated.  
No additional oiling is required.  
FLAME SENSOR (QUALIFIED SERVICER ONLY)  
A drop in the flame current can be caused by a nearly invis-  
ible coating on the flame sensor. This coating, created by the  
fuel or combustion air supply, can be removed by carefully  
cleaning the flame sensor with steel wool.  
BURNER FLAME  
NOTE: After cleaning, the microamp signal should be stable  
and in the range of 4 - 6 microamps DC.  
WARNING  
TO AVOID PERSONAL INJURY OR DEATH DUE TO ELECTRIC SHOCK, DO  
NOT REMOVE ANY INTERNAL COMPARTMENT COVERS OR ATTEMPT ANY  
ADJUSTMENT. CONTACT A QUALIFIED SERVICER AT ONCE IF AN  
ABNORMAL FLAME SHOULD DEVELOP.  
FLUE PASSAGES (QUALIFIED SERVICER ONLY)  
At the start of each heating season, inspect and, if neces-  
sary, clean the unit flue passage.  
At least once a year, prior to or during the heating season,  
make a visual check of the burner flames.  
LUBRICATION  
The fan shaft bearings, the 1 to 2 HP supply fan motors the  
condenser fan motors and compressors are permanently lu-  
bricated.  
NOTE: This will involve removing and reinstalling the heat  
exchanger door on the unit, which is held by two screws. If  
you are uncertain about your ability to do this, contact a  
qualified servicer.  
INSPECTION & CLEANING  
All flue product carrying areas of the furnace, its vent sys-  
tem, and main burners should be examined by a qualified  
service agency before the start of each heating season. This  
examination is necessary for continued safe operation. Par-  
ticular attention should be given to deterioration from corro-  
sion or other sources. This examination is accomplished in  
the following manner.  
If a strong wind is blowing, it may alter the airflow pattern  
within the unit enough that an inspection of the burner flames  
is not possible.  
FUNCTIONAL PARTS  
Refer to the unit Parts Catalog for a list of functional parts.  
Parts are available from your distributor.  
1. Disconnect power to the unit and remove furnace  
section access panel.  
2. Remove burner assembly:  
a. Disconnect the three wires from the gas valve after  
noting which wires are connected to each terminal.  
b. Disconnect wires from the flame rod and ignition  
electrode.  
c. Disconnect the gas piping at the union.  
23  
Download from Www.Somanuals.com. All Manuals Search And Download.  
APPENDIX A BLOWER PERFORMANCE DATA  
BELT DRIVE - STANDARD HORIZONTAL  
CPG180 STANDARD BELT DRIVE  
TURNS OPEN  
3
ESP, In H2O  
0
1
2
4
5
6
CFM  
---  
BHP  
---  
CFM  
---  
BHP  
---  
CFM  
---  
BHP  
---  
CFM  
---  
BHP  
0.00  
2.76  
CFM  
6827  
6161  
BHP  
2.67  
2.34  
CFM  
6394  
5706  
BHP  
2.28  
1.98  
CFM  
5982  
5271  
BHP  
1.94  
1.66  
0.2  
0.4  
---  
---  
---  
---  
7079  
3.20  
6623  
0.6  
0.8  
1.0  
1.2  
---  
---  
6903  
6198  
3.32  
2.92  
6405  
5668  
2.83  
2.45  
5923  
5152  
2.41  
2.05  
5434  
---  
2.02  
---  
4949  
---  
1.68  
---  
---  
---  
---  
---  
6717  
3.42  
5975  
5147  
2.99  
2.55  
5418  
---  
2.51  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
CPG240 STANDARD BELT DRIVE  
TURNS OPEN  
3
ESP, In H2O  
0
1
2
4
5
6
CFM  
---  
BHP  
---  
CFM  
---  
BHP  
---  
CFM  
9359  
8632  
BHP  
4.92  
4.39  
CFM  
8991  
8251  
BHP  
3.79  
3.39  
CFM  
8621  
7867  
BHP  
3.54  
3.15  
CFM  
8188  
7363  
BHP  
3.27  
2.85  
CFM  
7826  
6992  
BHP  
3.04  
2.63  
0.2  
0.4  
---  
---  
9018  
3.18  
0.6  
0.8  
1.0  
1.2  
---  
---  
8279  
7513  
2.96  
2.73  
7879  
7097  
3.86  
3.35  
7484  
---  
2.99  
---  
7085  
---  
2.75  
---  
---  
---  
---  
---  
---  
---  
---  
---  
7957  
4.82  
7179  
6368  
4.23  
3.66  
6716  
---  
2.49  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
NOTES:  
High static airflow requires installation of high static kit (HSKT240), or factory-built High Static model.  
Unit factory shipped with sheave set at 2.5 turns open.  
Air flow tables represent dry coil with filters installed; SCFM correction factor for wet coil is 4%.  
24  
Download from Www.Somanuals.com. All Manuals Search And Download.  
APPENDIX A BLOWER PERFORMANCE DATA  
BELT DRIVE - HIGH STATIC  
CPG180 HIGH STATIC BELT DRIVE  
TURNS OPEN  
3
ESP, In H2O  
0
1
2
4
5
6
CFM  
---  
BHP  
---  
CFM  
---  
BHP  
---  
CFM  
---  
BHP  
---  
CFM  
---  
BHP  
---  
CFM  
6690  
5922  
5056  
BHP  
3.69  
3.22  
2.74  
CFM  
6008  
5182  
---  
BHP  
3.02  
2.58  
---  
CFM  
5321  
---  
BHP  
2.43  
---  
1.0  
1.2  
1.4  
1.6  
1.8  
2.0  
---  
---  
---  
---  
---  
---  
6653  
5857  
3.95  
3.44  
---  
---  
---  
---  
6634  
2.80  
---  
---  
---  
---  
6638  
5784  
4788  
4.55  
3.95  
3.32  
5808  
4855  
---  
2.43  
2.05  
---  
4948  
---  
2.91  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
6683  
5803  
4.93  
4.27  
---  
---  
CPG240 HIGH STATIC BELT DRIVE  
TURNS OPEN  
3
ESP, In H2O  
0
1
2
4
5
6
CFM  
---  
BHP  
---  
CFM  
---  
BHP  
---  
CFM  
BHP  
CFM  
9001  
BHP  
6.83  
CFM  
8394  
BHP  
6.01  
CFM  
BHP  
4.78  
CFM  
7227  
BHP  
4.28  
1.0  
1.2  
1.4  
1.6  
1.8  
2.0  
7797  
---  
---  
8891  
8148  
6.83  
6.15  
8262  
7495  
6.15  
5.48  
7632  
6841  
5.35  
4.71  
7012  
---  
4.20  
---  
---  
---  
---  
---  
---  
---  
---  
---  
8811  
6.86  
---  
---  
8065  
7290  
---  
6.19  
5.52  
---  
7377  
5.48  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
---  
7998  
6.89  
---  
---  
---  
---  
7221  
6.10  
NOTES:  
High static airflow requires installation of high static kit (HSKT240), or factory-built High Static model.  
Unit factory shipped with sheave set at 2.5 turns open.  
Air flow tables represent dry coil with filters installed; SCFM correction factor for wet coil is 4%.  
25  
Download from Www.Somanuals.com. All Manuals Search And Download.  
APPENDIX B ELECTRICAL DATA  
ELECTRICAL DATA  
VOLTAGE  
LIMITATIONS  
LARGER  
COMPRESSOR  
SMALLER  
COMPRESSOR  
OD FAN MOTORS (ea)  
ID FAN MOTOR  
VOLTAGE  
(NAMEPLATE)  
ID MOTOR  
APPL  
MODELS  
15 TON  
MIN  
187  
414  
518  
MAX  
253  
506  
633  
Qty  
RLA LRA  
Qty  
RLA LRA  
25.0 164.0  
12.2 100.0  
Qty  
3
HP  
1/3  
1/3  
1/3  
RLA  
2.40  
1.20  
0.90  
HP  
5.0  
5.0  
5.0  
FLA  
12.7  
6.4  
208/230-60-3  
460-60-3  
1
1
1
29.5 195.0  
1
1
1
BD STD STATIC  
BD STD STATIC  
BD STD STATIC  
14.7  
12.2  
95.0  
80.0  
3
575-60-3  
9.0  
78.0  
3
5.1  
ELECTRICAL DATA  
VOLTAGE  
LIMITATIONS  
COMPRESSOR  
(ea)  
OD FAN MOTORS  
(ea)  
ID FAN  
MOTOR  
VOLTAGE  
(NAMEPLATE)  
ID MOTOR  
APPL  
MODELS  
MIN  
187  
414  
518  
MAX  
253  
506  
633  
Qty RLA LRA Qty  
HP  
1/3  
1/3  
1/3  
RLA  
HP  
5.0  
5.0  
5.0  
FLA  
208/230-60-3  
460-60-3  
2
2
2
33.3 239.0  
17.9 125.0  
12.8 80.0  
3
3
3
2.40 BD STD STATIC  
1.20 BD STD STATIC  
0.90 BD STD STATIC  
12.7  
6.4  
20 TON  
575-60-3  
5.1  
NOTES: See unit nameplate for proper overcurrent protection.  
26  
Download from Www.Somanuals.com. All Manuals Search And Download.  
APPENDIX C UNIT DIMENSIONS  
Model  
A
B
C
D
15 Ton  
20 Ton  
133-1/2"  
88-7/32" 50-9/32" 5-5/32"  
B
A
C
D
21”  
60”  
7”  
48”  
22”  
VERTICAL DISCHARGE (TOP VIEW)  
27  
Download from Www.Somanuals.com. All Manuals Search And Download.  
CPG1803503B* & CPG2404003B* THREE PHASE 208-230/60 HZ BELT DRIVE WIRING DIAGRAM  
BK  
OR  
OR  
BK  
PB  
RD  
RD  
BK  
RD  
BK  
RD  
RD  
BK  
OR  
RD  
OR  
OR  
WH  
OR  
OR  
BK  
L1  
T1  
L2  
T2  
L3  
T3  
L1  
T1  
L2  
T2  
L3  
T3  
POWER SUPPLY  
208V / 240V - 3 ph - 60 Hz  
SEE NOTE 4  
L1  
T1  
L2  
T2  
L3  
T3  
OR  
BK  
CC  
2
CC  
1
BC  
BL  
BL  
GR  
GRND  
RD  
RD  
BL  
OR  
BK  
RD  
BL  
C
PU  
BK  
FC1  
BL  
BK  
OR  
YL  
RD  
YL  
BK  
RD  
RD  
F
YL  
BK  
BR  
BL  
YL  
EM  
BL  
BL  
C
FC2  
F
PU  
BR  
BK  
RD  
CCH2  
T1  
BK  
RD  
YL  
COMP  
2
T2  
T3  
RD  
BL  
PU  
C
FC3  
F
BK  
OR  
WH  
BK  
CCH1  
T1  
BK  
RD  
YL  
BR  
COMP  
1
T2  
T3  
RD  
BK  
PU BR  
PU  
RD  
BR  
YL  
BK  
4
GR  
BL  
BL  
2
4
6
BL  
BK  
3
2
1
BK  
2
1
4
6
230  
208  
C
YL  
BK  
TB2  
3
1
BK  
PU  
OR  
1
BL  
BL  
OR  
YL  
VMR  
CCHR2  
BK  
BK  
24V  
CCHR1  
VM  
6
BK  
PU BR  
BL  
GR  
PU  
WH  
YL  
CM3  
PK  
GR  
OR  
WH  
GR  
WH  
RD  
YL  
BL  
YL  
PU  
BK  
S1  
S2  
LPS2  
HPS2  
3
2
1
9
8
6
5
4
BL  
BR  
PU  
WH  
CM2  
CM1  
PS  
WH  
TB1  
BR  
YL  
PU  
BL  
7
BL  
YL  
GR  
BK  
LPS1  
WH  
HPS1  
YL  
YL  
YL  
BL  
YL  
BR  
PU  
BL  
BR  
ALS  
PU  
PU  
PU  
PU  
GR  
YL  
WH  
YL  
YL  
RD  
RD  
YL  
BL  
PU  
PU  
BL  
WH  
LS  
PU  
YL  
RS  
BL  
BL  
GR  
GR  
BR  
BL  
BL  
BR  
BL  
BL  
YL  
GR  
RD  
BR  
YL  
1
BL  
IIC  
L2  
3
2
5
8
YL  
RD  
ECON  
PU  
4
6
9
GR  
L1  
UNUSED  
BL  
BR  
YL  
DI  
7
RD  
SEE NOTE 5  
PU  
GV  
12  
YL  
11 10  
BL  
BR  
BL  
HEAT  
YL  
BL  
COOL  
WH  
YL  
PU  
YL  
RD  
GR  
WH  
FS  
WH  
Y1  
R
G
W1  
C
Y2  
W2  
TB1  
GR  
WH  
GR  
RD  
RD  
FS  
OR  
IGN  
TO THERMOSTAT  
++  
0140L00954 REV A  
Wiring is subject to change. Always refer to the wiring diagram on the unit for the most up-to-date wiring.  
28  
Download from Www.Somanuals.com. All Manuals Search And Download.  
CPG1803503B* & CPG2404003B* THREE PHASE 208-230/60 HZ BELT DRIVE WIRING DIAGRAM  
SUPPLY VOLTAGE  
208-240/3/60  
COMPONENT LEGEND  
L
1
L3  
L2  
ALS  
BC  
COMP  
CM  
AUXILIARY LIMIT SWITCH  
BLOWER CONTACTOR  
COMPRESSOR  
CONDENSER MOTOR  
COMPRESSOR CONTACTOR  
CRANK CASE HEATER  
CRANK CASE HEATER RELAY  
EVAPORATOR MOTOR  
FUSE  
T
2
C
C1  
T2  
CC  
1
T1  
T1  
COMP1  
T
3
CC  
1
T
3
CC  
C
F
CCH  
CCHR  
EM  
RCCF  
1
C
M1  
F
FC  
FS  
FAN CAPACITOR  
FLAME SENSOR  
C
F
R
CCF3  
C
F
GND  
GV  
HPS  
IBR  
IIC  
IGN  
LPS  
LS  
EQUIPMENT GROUND  
GAS VALVE  
HIGH PRESSURE SWITCH  
INDOOR BLOWER RELAY  
INTEGRATED IGNITION CONTROL  
IGNITOR  
LOW PRESSURE SWITCH  
LIMIT SWITCH  
POWER DISTRUBTION BLOCK  
C
M3  
R
C
CF2  
CM2  
CC2  
T
2
2
CC2  
T1  
T
2
COMP  
T1  
CC2  
T3  
T3  
B
C
T
2
PB  
PLF  
PS  
RS  
TB1  
TB2  
TR  
VM  
VMR  
FEMALE PLUG/CONNECTOR  
PRESSURE SWITCH  
ROLLOUT SWITCH  
TERMINAL BLOCK (24V SIGNAL)  
TERMINAL BLOCK (L1)  
TRANSFORMER  
T
1
BC  
EM  
T3  
BC  
1
3
VM  
CCH1  
CCH2  
2
2
1
VENT MOTOR  
VENT MOTOR RELAY  
1
208-240v  
3
1
2
NOTES  
TB1  
S1  
S2  
TR  
1. REPLACEMENT WIRE MUST BE THE SAME  
SIZE AND TYPE OF INSULATIONAS ORIGINAL.  
(USE COPPER CONDUCTOR ONLY).  
2. ACCESSORY ECONOMIZER PLUG ADJACENT  
TO BLOWER HOUSING IN RETURN AIR  
COMPARTMENT. REMOVE MALE PLUG AND  
ATTACH FEMALE PLUG TO THE ECONOMIZER  
ACCESSORY.  
NOTE 3  
IIC  
NOTE 3  
1
24V  
L1  
L2  
IGN  
FS  
FS  
D1  
F
BC  
H
C
6
4
4
5
3. L1 AND L2 ON IIC CONTROL IS 24V INPUT.  
4. USE COPPER CONDUCTORS ONLY.  
USE NEC CLASS 2 WIRE.  
VMR  
LS  
5. FOR TWO STAGE OPERATION REMOVE  
W1 TO W2 WIRE JUMPER.  
ALS  
RS  
3
6
8
GV  
6. FOR 208V OPERATION MOVE BLACK WIRE  
FROM TERMINAL 3 TO TERMINAL 2 ON THE  
TRANSFORMER.  
IIC  
CC2  
PS  
LPS2  
HPS2  
ECON  
9
2
7
10  
12  
11  
LPS1  
4
HPS1  
CC1  
4
6
6
THERMOSTAT  
FIELD WIRING  
CCHR1  
CCHR2  
2 STAGE COOLING  
NOTE 5  
Y1  
9
8
7
6
5
4
3
2
1
PLF  
2
FACTORY WIRING  
WH  
GR  
RD  
YL  
W
G
W
G
Y
Y2  
R
G
C
W1 W2  
LINE VOLTAGE  
LOW VOLTAGE  
OPTIONAL  
R
R
Y1  
Y1  
Y2  
TB1  
TO THERMOSTAT  
PK  
Y/Y2  
C
HIGH VOLTAGE  
BL  
C
OR  
O
O
INSTALLER/SERVICEMAN  
FIELD WIRING  
STAT  
TB1  
HIGH VOLTAGE  
LOW VOLTAGE  
THE STATUS LIGHT ON THE FURNACE CONTROL MAY BE USED AS A GUIDE TO  
TROUBLESHOOTING THIS APPLIANCE. STATUS LIGHT CODES ARE AS FOLLOWS:  
NO ECONOMIZER  
W
G
R
WH  
GR  
RD  
W
G
R
STATUS LIGHT  
ON  
EQUIPMENT STATUS  
NORMAL OPERATION  
CHECK  
------  
WIRE CODE  
BLACK  
BLUE  
Y1  
CHECK INPUT POWER  
CHECK FUSE ON CONTROL  
REPLACE CONTROL  
NO POWER OR  
INTERNAL CONTROL  
BK  
BL  
YL  
BL  
OFF  
Y/Y2  
C
Y2  
C
BR  
GR  
OR  
PK  
PU  
RD  
BROWN  
GREEN  
ORANGE  
PINK  
PURPLE  
RED  
GAS FLOW  
GAS PRESSURE  
GAS VALVE  
FLAME SENSOR  
FLAME ROLLOUT  
BAD SWITCH  
AUX. LIMIT OPEN  
CHECK  
PRESSURE SWITCH  
IGNITION FAILURE  
OR  
O
O
STAT  
TB1  
OPEN ROLLOUT  
SWITCH  
1 BLINK  
OPEN AUX. LIMIT  
SWITCH  
WITH ECONOMIZER OPTION  
W
G
WH  
GR  
RD  
YL  
W
G
R
Y
WH  
YL  
WHITE  
YELLOW  
PRESSURE SWITCH  
OPEN  
PRESSURE SWITCH CLOSED  
WITHOUT INDUCER ON  
2 BLINKS  
3 BLINKS  
R
CHECK  
YL/PK YELLOW WITH  
PINK STRIPE  
BL/PK BLUE WITH  
PINK STRIPE  
Y1  
PRESSURE SWITCH  
MAIN LIMIT OPEN  
BAD SWITCH  
Y/Y2  
C
4 BLINKS  
5 BLINKS  
OPEN LIMIT SWITCH  
BL  
C
FALSE FLAME SENSED  
STICKING GAS VALVE  
O
OR  
O
STAT  
COMPRESSOR  
OUTPUT DELAY  
3 MIN. COMP.  
ANTI-CYCLE TIMER  
TB1  
6 BLINKS  
SEE UNI  
OF OVER CU  
T
RATI  
R
N
G PL  
T
A
TE  
R TYPE AND SIZE  
O
F
0140L00955 REV A  
REN PROTECTION  
Wiring is subject to change. Always refer to the wiring diagram on the unit for the most up-to-date wiring.  
29  
Download from Www.Somanuals.com. All Manuals Search And Download.  
CPG1803504B*/7B & CPG2404004B*/7B* THREE PHASE 460-575/60 HZ BELT DRIVE WIRING DIAGRAM  
P
OWER SUPPL  
Y
460V  
/ 575 - 3 ph - 6  
0
Hz  
BL  
SEE NO  
TE 4  
O
R
BL  
RD  
OR  
O
R
R
D
K
RD  
BK  
RD  
WH  
B
BK  
BK  
B
L
BL  
BL  
BK  
L1  
L2  
L
3
L
1
L2  
T2  
LL3  
L
1
L
2
L3  
GRN  
D
C
2
C
C
1
C
B
L
BC  
T1  
T2  
T3  
T3  
T1  
T2  
T3  
B
L
GR  
RD  
RD  
OR  
BK  
RD  
C
PU  
B
L
BK  
FC1  
BK  
YL  
RD  
YL  
RD  
BK  
RD  
YL  
BK  
BR  
F
YL  
EM  
PU  
BR  
C
FC2  
F
RD BK  
BL  
CCH2  
T
1
BK  
C
OMP  
2
T2  
T3  
R
D
R
D
YL  
PU  
C
BK  
W
H
BK  
F
C3  
CCH1  
T
1
B
K
BR  
F
C
OMP  
1
T2  
RD  
BK  
T3  
Y
L
BK  
R
D
B
K
R
D
P
U BR  
PU  
BR  
YL  
O
R
4
6
2
1
GR  
BL  
BL  
1
2
3
BK  
YL  
46  
0
C
T
B2  
3
BK  
BK  
BK  
4
VMR  
46  
R APP  
IN T VOLTAG  
0
OR APPROPR  
I
I
ATE  
B
R
L
NPUT VOLTAGE  
O
ROPRIAT  
E
C
CHR2  
BK  
B
L
BK  
PU  
E
BK  
BK  
BK  
2
4V  
2
40  
6
PU BR  
1
PU  
BL  
G
VM  
WH  
Y
L
CM3  
CM2  
PK  
G
R
R
D
RD  
WH  
WH  
RD  
YL  
SEE  
TE 2  
G
R
N
O
YL  
BL  
P
U
S1  
LPS  
2
HPS2  
3
2
1
9
6
5
4
BL  
B
R
S
2
WH  
YL  
PU  
PS  
WH  
TB  
1
8
7
BL  
YL  
PU  
BL  
BR  
B
L
YL  
GR  
B
K
LPS1  
WH  
H
PS1  
Y
L
YL  
BL  
Y
L
B
L
BR  
PU  
CM  
1
BL  
B
R
BK  
2
ALS  
P
U
PU  
PU  
PU  
G
R
4
WH YL  
YL  
R
D
YL  
W
BL  
PU  
PU  
6
O
R
1
RD  
BL  
H
L
S
PU  
YL  
RS  
CCHR1  
BL  
BL  
GR  
GR  
BL  
BL  
BL  
YL  
BR  
BR  
BL  
YL  
G
R
RD  
BR  
YL  
BL  
1
IIC  
L
2
3
6
9
2
5
8
RD  
YL  
PU  
ECO  
N
4
7
G
R
L
1
UNUSED  
BL  
BR  
DI  
YL  
R
D
SEE NOT  
E
5
Y
L
GV  
12 11  
10  
BL  
C
BR  
BL  
HEAT  
YL  
B
L
COO  
L
Y
L
W
H
PU  
Y
L
R
D
GR  
WH  
PU  
FS  
WH  
Y1  
R
G
W1  
Y
2
W2  
TB1  
G
R
W
H
R
O
D
R
GR  
RD  
FS  
I
GN  
TO  
THERMOSTAT  
++  
01  
4
0
L00956 REV  
A
Wiring is subject to change. Always refer to the wiring diagram on the unit for the most up-to-date wiring.  
30  
Download from Www.Somanuals.com. All Manuals Search And Download.  
CPG1803504B*/7B & CPG2404004B*/7B* THREE PHASE 460-575/60 HZ BELT DRIVE WIRING DIAGRAM  
SUPPLY VOLTAGE  
460-575/3/60  
L
1
L2  
L3  
COMPONENT LEGEND  
T
2
C
C1  
ALS  
BC  
AUXILIARY LIMIT SWITCH  
T2  
CC1  
T1  
BLOWER CONTACTOR  
CRANK CASE HEATER  
CRANK CASE HEATER RELAY  
COMPRESSOR  
CONDENSER MOTOR  
COMPRESSOR CONTACTOR  
EVAPORATOR MOTOR  
FUSE  
FAN CAPACITOR  
FLAME SENSOR  
EQUIPMENT GROUND  
GAS VALVE  
T1  
COMP1  
T
3
CC  
1
CCH  
CCHR  
COMP  
CM  
CC  
EM  
F
FC  
FS  
T3  
C
F
RCCF  
1
C
M
1
C
F
R
CCF3  
C
F
CM3  
GND  
GV  
RCCF  
2
C
M2  
HPS  
IBR  
IIC  
IGN  
LPS  
LS  
PLF  
PS  
RS  
HIGH PRESSURE SWITCH  
INDOOR BLOWER RELAY  
INTEGRATED IGNITION CONTROL  
IGNITOR  
LOW PRESSURE SWITCH  
LIMIT SWITCH  
FEMALE PLUG/CONNECTOR  
PRESSURE SWITCH  
ROLLOUT SWITCH  
TERMINAL BLOCK (24V SIGNAL)  
TERMINAL BLOCK (L1)  
CC2  
T2  
CC2  
T
1
T
2
T1 COMP2  
C
C2  
T
3
T3  
BC  
T
2
T1  
BC  
EM  
T
3
B
C
1
3
VM  
TB1  
TB2  
460V OR 575V  
TR  
VM  
VMR  
TRANSFORMER  
VENT MOTOR  
VENT MOTOR RELAY  
1
3
CCH1  
CCH2  
460V OR 575V  
TR  
2
2
1
1
1
3
NOTES  
TBB1  
S1  
S2  
TR  
1. REPLACEMENT WIRE MUST BE THE SAME  
SIZE AND TYPE OF INSULATION AS ORIGINAL.  
(USE COPPER CONDUCTOR ONLY).  
2. ACCESSORY ECONOMIZER PLUG ADJACENT  
TO BLOWER HOUSING IN RETURN AIR  
COMPARTMENT. REMOVE MALE PLUG AND  
ATTACH FEMALE PLUG TO THE ECONOMIZER  
ACCESSORY.  
NOTE 3  
IIC  
NOTE 3  
1
L1  
L2  
24V  
IGN  
FS  
FS  
D1  
F
BC  
H
C
6
4
4
5
3. L1 AND L2 ON IIC CONTROL IS 24V INPUT.  
4. USE COPPER CONDUCTORS ONLY.  
USE NEC CLASS 2 WIRE.  
VMR  
LS  
5. FOR TWO STAGE OPERATION REMOVE  
W1 TO W2 WIRE JUMPER.  
ALS  
RS  
3
6
8
GV  
IIC  
CC2  
PS  
LPS2  
HPS2  
ECON  
9
2
7
10  
12  
11  
LPS1  
HPS1  
6
CC1  
4
4
6
THERMOSTAT  
FIELD WIRING  
CCHR1  
CCHR2  
NOTE 5  
Y1  
2 STAGE COOLING  
9
8
7
6
5
4
3
2
1
PLF  
NOTE  
2
FACTORY WIRING  
W
G
R
WH  
GR  
RD  
YL  
W
G
Y
Y2  
R
G
C
W1 W2  
LINE VOLTAGE  
LOW VOLTAGE  
OPTIONAL  
R
TB1  
TO THERMOSTAT  
Y1  
Y/Y2  
C
Y1  
Y2  
PK  
BL  
HIGH VOLTAGE  
C
OR  
O
O
FIELD WIRING  
STAT  
INSTALLER/SERVICEMAN  
TB1  
HIGH VOLTAGE  
LOW VOLTAGE  
THE STATUS LIGHT ON THE FURNACE CONTROL MAY BE USED AS A GUIDE TO  
TROUBLESHOOTING THIS APPLIANCE. STATUS LIGHT CODES ARE AS FOLLOWS:  
NO ECONOMIZER  
W
G
R
WH  
GR  
RD  
W
G
R
CHECK  
----  
NPUT PO  
N CO  
E C  
FLOW  
K
STATUS LIGHT  
ON  
EQUIPMENT STATUS  
NORMAL OPERATION  
-
---  
O
N
WIRE CODE  
BLACK  
BLUE  
BROWN  
GREEN  
ORANGE  
PINK  
Y1  
C
H
C
K
U
P
I
U
OWWEERR  
ONTRROOL  
NO POWER OR  
INTERNAL CONTROL  
BK  
BL  
YL  
BL  
Y/Y2  
C
Y2  
CHE  
S
E
O
N
OFFF  
ACE  
OONTROL  
C
O
BR  
GR  
OR  
PK  
PU  
RD  
F
R
O
OR  
IGNI  
OP  
TTIO  
S
S
REE  
STAT  
TB1  
O
E
N
R
L
A
M
M
E
S
SSO  
OOU  
S
TTC  
1
RO  
L
PURPLE  
RED  
WITH ECONOMIZER OPTION  
OOP  
BAD SWITCH  
S
W
H
AUX. LIMIT OPEN  
W
G
WH  
GR  
RD  
YL  
W
G
R
Y
WH  
YL  
WHITE  
YELLOW  
CHECK  
CH CK  
P
R
E
SS  
U
OOP  
S
TT  
ITCH  
R
SS RE SW TCH  
PEN  
E S ITC  
IN UC  
2
3
4
B
L
LI  
NNKKSS  
P
R
S
U
R
RE WITC  
CHECK  
SS RE WI  
N LIMIT OPEN  
D SWITCH  
VALVE  
3 MIN. COMP..  
YC E TIMER  
S
S
W
CHH  
R
YL/PK YELLOW WITH  
PINK STRIPE  
BL/PK BLUE WITH  
PINK STRIPE  
PR  
E
S
T
R
UU  
W
W
C
H
H
C
C
L
L
OSED  
B
LLI  
NNKKSS  
Y1  
WIT  
O
N
D
D
C
E
E
R O  
ONN  
PR  
U
I
S
G
R
SS  
W
TTCHH  
Y/Y2  
C
MA  
I
B
LLI  
N
NKSS  
K
OPEN LIMIT SWITCH  
FALSE FLAME SENSED  
BL  
A
II  
D
N
IT  
C
O
OR  
5 B  
6 B  
L
LI  
N
NK  
S
S
ST  
I
G
A
S
V
O
STAT  
C
P
TB1  
LL  
IN  
NK  
KS  
OUTPUT DELAY  
AN  
I
-
-
C
Y
LLE  
SEE UNIT RATING PLATE FOR TYPE AND SIZE  
OF OVER CURRENT PROTECTION  
0140L00957 REV A  
Wiring is subject to change. Always refer to the wiring diagram on the unit for the most up-to-date wiring.  
31  
Download from Www.Somanuals.com. All Manuals Search And Download.  
© 2010 Goodman Manufacturing Company, L.P.  
5151 San Felipe, Suite 500 Houston, TX 77056  
32  
Download from Www.Somanuals.com. All Manuals Search And Download.  

Edirol Stereo System UA 20 User Manual
Fisher Price Motorized Toy Car J9520 User Manual
Flymo Trimmer 5119748 03 User Manual
Ford Automobile Parts M 6007 XEFMS User Manual
Furman Sound Power Supply ElitE 20 PF User Manual
Gateway Server GR585 F1 User Manual
GE Car Video System VTPR1000 User Manual
Gefen Switch EXT HDMI13 242 User Manual
GE Intercom System 25425 User Manual
GE Juicer 840095800 User Manual